{{#Wiki_filter:UNITE D S TATE S
{{#Wiki_filter:September 11, 2013  
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                    R E G IO N I V
                                              1600 EAST LAMAR BLVD
                                        AR L I NGTON , TEXAS 7 601 1- 4511
Mr. Oscar A. Limpias, Vice President-Nuclear  
                                          September 11, 2013
and Chief Nuclear Officer  
Mr. Oscar A. Limpias, Vice President-Nuclear
Nebraska Public Power District  
and Chief Nuclear Officer
Cooper Nuclear Station  
Nebraska Public Power District
72676 648A Avenue  
Cooper Nuclear Station
Brownville, NE 68321  
72676 648A Avenue
Brownville, NE 68321
SUBJECT:         COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION
SUBJECT:  
                (NRC INSPECTION REPORT 05000298/2013005) AND REQUEST FOR
COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION  
                INFORMATION
(NRC INSPECTION REPORT 05000298/2013005) AND REQUEST FOR  
Dear Mr. Limpias:
INFORMATION  
From October 21 through 25, 2013, inspectors from the Nuclear Regulatory Commissions
(NRC) Region IV office will perform the baseline biennial requalification inspection at Cooper
Dear Mr. Limpias:  
Nuclear Station, using NRC Inspection Procedure 71111.11B, Licensed Operator
Requalification Program. Experience has shown that this inspection is a resource intensive
From October 21 through 25, 2013, inspectors from the Nuclear Regulatory Commissions  
inspection both for the NRC inspectors and your staff. In order to minimize the impact to your
(NRC) Region IV office will perform the baseline biennial requalification inspection at Cooper  
onsite resources and to ensure a productive inspection, we have enclosed a request for
Nuclear Station, using NRC Inspection Procedure 71111.11B, Licensed Operator  
documents needed for this inspection. These documents have been divided into three groups.
Requalification Program. Experience has shown that this inspection is a resource intensive  
The first group (Section A of the enclosure) identifies information to be provided prior to the
inspection both for the NRC inspectors and your staff. In order to minimize the impact to your  
inspection to ensure that the inspectors are adequately prepared. The second group (Section B
onsite resources and to ensure a productive inspection, we have enclosed a request for  
of the enclosure) identifies the information the inspectors will need upon arrival at the site. The
documents needed for this inspection. These documents have been divided into three groups.
third group (Section C of this enclosure) identifies the items which are necessary to close out
The first group (Section A of the enclosure) identifies information to be provided prior to the  
the inspection and are usually sent a few weeks after the team has left the site. It is important
inspection to ensure that the inspectors are adequately prepared. The second group (Section B  
that all of these documents are up to date and complete in order to minimize the number of
of the enclosure) identifies the information the inspectors will need upon arrival at the site. The  
additional documents requested during the preparation and/or the onsite portions of the
third group (Section C of this enclosure) identifies the items which are necessary to close out  
inspection.
the inspection and are usually sent a few weeks after the team has left the site. It is important  
We have discussed the schedule for these inspection activities with your staff and understand
that all of these documents are up to date and complete in order to minimize the number of  
that our regulatory contact for this inspection will be Ms. Jodie Olberding of your licensing
additional documents requested during the preparation and/or the onsite portions of the  
organization. Our inspection dates are subject to change based on your updated schedule of
inspection.  
examination activities. If there are any questions about this inspection or the material
requested, please contact the lead inspector Mr. Steve Garchow at (817) 200-1426
We have discussed the schedule for these inspection activities with your staff and understand  
(Steve.Garchow@nrc.gov) or Mr. Duane Strickland at (817) 200-1570
that our regulatory contact for this inspection will be Ms. Jodie Olberding of your licensing  
(Duane.Strickland@NRC.gov).
organization. Our inspection dates are subject to change based on your updated schedule of  
examination activities. If there are any questions about this inspection or the material  
requested, please contact the lead inspector Mr. Steve Garchow at (817) 200-1426  
(Steve.Garchow@nrc.gov) or Mr. Duane Strickland at (817) 200-1570  
(Duane.Strickland@NRC.gov).  
UNITED STATES
NUCLEAR REGULATORY COMMI SSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511


O. Limpias                                   -2-
O. Limpias  
This letter does not contain new or amended information collection requirements subject
- 2 -  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
This letter does not contain new or amended information collection requirements subject  
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
respond to, a request for information or an information collection requirement unless the
collection requirements were approved by the Office of Management and Budget, control  
requesting document displays a currently valid Office of Management and Budget control
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to  
number.
respond to, a request for information or an information collection requirement unless the  
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
requesting document displays a currently valid Office of Management and Budget control  
enclosure will be available electronically for public inspection in the NRC Public Document
number.
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its  
web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
enclosure will be available electronically for public inspection in the NRC Public Document  
                                                        Sincerely,
Room or from the Publicly Available Records (PARS) component of NRCs Agencywide  
                                                        /RA/
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC  
                                                        Vince Gaddy, Chief
web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
                                                        Operations Branch
                                                        Division of Reactor Safety
Docket: 50-298
Sincerely,  
License: DPR-46
Enclosure:
Inservice Inspection Document Request
/RA/  
cc: Electronic Distribution for Cooper Nuclear Station
Vince Gaddy, Chief  
Operations Branch
Division of Reactor Safety  
Docket:   50-298  
License: DPR-46  
Enclosure:  
Inservice Inspection Document Request  
cc: Electronic Distribution for Cooper Nuclear Station  




ML13254A049
  ML13254A049  
ADAMS: No Yes  SUNSI Review Complete               Reviewer Initials: SMG
ADAMS:   No   Yes  SUNSI Review Complete  
                    Publicly Available                 Non-Sensitive
Reviewer Initials: SMG  
                    Non-publicly Available             Sensitive
SOE:OB       C:OB
  Publicly Available  
SGarchow     VGaddy
Non-Sensitive  
/RA/         /RA/
9/11/13       9/11/13
  Non-publicly Available  
  Sensitive  
SOE:OB  
C:OB  
SGarchow  
VGaddy  
/RA/  
/RA/  
9/11/13  
9/11/13  


            BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
FROM:           Steve Garchow
                Senior Operations Engineer, NRC RIV
                817-200-1426
- 1 -
TO:             Scott DeRosier
Enclosure
                Operator Training Superintendent, Cooper Nuclear Station
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  
                402-825-5573
SUBJECT:       INFORMATION REQUEST TO SUPPORT OCTOBER 21-25, 2013, LICENSED
                OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)
FROM:  
A. The following information is requested in order to support inspection preparation
Steve Garchow  
  activities. These items are listed by section as they appear in the inspection module
Senior Operations Engineer, NRC RIV  
  (i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or
817-200-1426  
  hardcopy in order to arrive at the Region IV office no later than June 15, 2012.
  *   Electronically: TO: E-mail address Steve.Garchow@NRC.Gov
TO:  
                        CC: Duane.Strickland@NRC.Gov )
Scott DeRosier  
  *   Hardcopy to: US Nuclear Regulatory Commission, Region IV
Operator Training Superintendent, Cooper Nuclear Station  
                        1600 E. Lamar Blvd
402-825-5573  
                        Arlington, TX 76011
                        ATTN: Steve Garchow
SUBJECT:  
  General Requests:
INFORMATION REQUEST TO SUPPORT OCTOBER 21-25, 2013, LICENSED  
        * List of licensed operators (SRO & RO) by crew (operating & staff)
OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)  
        * Training and Operations Department organization charts (with qualified LOR
            evaluators identified)
A. The following information is requested in order to support inspection preparation  
        * Procedures that identify process for revising and maintaining LO continuing training
activities. These items are listed by section as they appear in the inspection module  
            program up to date
(i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or  
        * List of outstanding LOR program changes
hardcopy in order to arrive at the Region IV office no later than June 15, 2012.  
        * List of plant events and industry operating experience incorporated into LOR
            program since last BRQ
*  
        * Audits and/or self-assessment reports addressing the licensed operator
Electronically:   TO: E-mail address Steve.Garchow@NRC.Gov
            requalification training program
CC:   Duane.Strickland@NRC.Gov )  
        * Last two years of simulator review committee (or equivalent) meeting minutes
        * Last two years of CRC (or equivalent) meeting minutes
*  
        * Licensed operator training schedule for the week of October 21, 2013
Hardcopy to: US Nuclear Regulatory Commission, Region IV  
B. The following information is requested in order to support the onsite inspection
1600 E. Lamar Blvd  
  activities. Requested materials should be available to the inspection team, either
Arlington, TX 76011  
  electronically or hardcopy, upon site arrival on October 21, 2013. Note that it is not
ATTN: Steve Garchow  
  required to make copies of all the materials, but to have them available.
                                            -1-                                    Enclosure
General Requests:  
*  
List of licensed operators (SRO & RO) by crew (operating & staff)  
*  
Training and Operations Department organization charts (with qualified LOR  
evaluators identified)  
*  
Procedures that identify process for revising and maintaining LO continuing training  
program up to date  
*  
List of outstanding LOR program changes  
*  
List of plant events and industry operating experience incorporated into LOR  
program since last BRQ  
*  
Audits and/or self-assessment reports addressing the licensed operator  
requalification training program  
*  
Last two years of simulator review committee (or equivalent) meeting minutes  
*  
Last two years of CRC (or equivalent) meeting minutes  
*  
Licensed operator training schedule for the week of October 21, 2013  
B. The following information is requested in order to support the onsite inspection  
activities. Requested materials should be available to the inspection team, either  
electronically or hardcopy, upon site arrival on October 21, 2013. Note that it is not  
required to make copies of all the materials, but to have them available.  


02.02: Exam Results
  * All results up to the day the team leaves the site.
02.03: Biennial Requalification Written Examination Quality
  * The current and approved biennial written examination schedule
- 2 -
  * The current requalification cycle written examination results for both SRO & RO that
      have already been administered up to the week prior to the inspection team arrival
02.02: Exam Results  
      onsite
*  
  * All written examinations that have been approved for administration up to and
All results up to the day the team leaves the site.
      including the week before the inspection team is onsite
  * The current requalification cycle examination methodology (sample plan)
02.03: Biennial Requalification Written Examination Quality  
02.04: Annual Requalification Operating Test Quality
*  
  * Any changes to the schedule for the operating tests (JPMs & scenarios) to be given
The current and approved biennial written examination schedule
      the week of October 21, 2013 (week team is onsite).
*  
  * The operating tests (JPMs & scenarios) (password protected and provide separately
The current requalification cycle written examination results for both SRO & RO that  
      via telephone at later date) to be given the week of October 21, 2013 (week team is
have already been administered up to the week prior to the inspection team arrival  
      onsite).
onsite  
  * Current requalification cycle operating tests (SRO & RO) and results up to the week
*  
      prior to the inspection team arrival onsite.
All written examinations that have been approved for administration up to and  
  * Current requalification cycle operating test methodology (sample plan)
including the week before the inspection team is onsite  
  * A listing of licensed operator response times for time critical operator actions
*  
02.05: Licensee Admin of Requal Exams
The current requalification cycle examination methodology (sample plan)  
  *   All procedures used to administer the annual operating test
  *   All procedures used to assess operator performance
02.04: Annual Requalification Operating Test Quality  
  *   All procedures that describe conduct of simulator training
*  
  *   All Procedures used to test, operate, and maintain the simulator
Any changes to the schedule for the operating tests (JPMs & scenarios) to be given  
02.06: Requalification Examination Security
the week of October 21, 2013 (week team is onsite).  
  * Any tracking tools that you use as a means to prevent excessive overlap on the
*  
      written examinations and also meet the intent of sampling all required topics on a
The operating tests (JPMs & scenarios) (password protected and provide separately  
      periodic basis
via telephone at later date) to be given the week of October 21, 2013 (week team is  
  * Any tracking tools that you use as a means to prevent excessive overlap on the
onsite).  
      operating tests and also meet the intent of sampling all required malfunctions
*  
      (including major events, instrument/component malfunctions, TS calls, etc.) on a
Current requalification cycle operating tests (SRO & RO) and results up to the week  
      periodic basis
prior to the inspection team arrival onsite.  
  * All procedures that describe examination security, including procedures used to
*  
      develop the examinations that include guidelines on overlap between examinations
Current requalification cycle operating test methodology (sample plan)  
      in current exam cycle tests and prior year examinations
*  
  * List of all condition reports since the last biennial requal inspection related to
A listing of licensed operator response times for time critical operator actions  
      examination security and overlap
                                        -2-
02.05: Licensee Admin of Requal Exams  
*  
All procedures used to administer the annual operating test  
*  
All procedures used to assess operator performance  
*  
All procedures that describe conduct of simulator training  
*  
All Procedures used to test, operate, and maintain the simulator  
02.06: Requalification Examination Security  
*  
Any tracking tools that you use as a means to prevent excessive overlap on the  
written examinations and also meet the intent of sampling all required topics on a  
periodic basis  
*  
Any tracking tools that you use as a means to prevent excessive overlap on the  
operating tests and also meet the intent of sampling all required malfunctions  
(including major events, instrument/component malfunctions, TS calls, etc.) on a  
periodic basis  
*  
All procedures that describe examination security, including procedures used to  
develop the examinations that include guidelines on overlap between examinations  
in current exam cycle tests and prior year examinations  
*  
List of all condition reports since the last biennial requal inspection related to  
examination security and overlap  


02.07: Licensee Remedial Training Program
  * List of remedial training conducted or planned since last requal exams (includes
      training provided to operators to enable passing requal exams and training provided
      to correct generic or individual weaknesses observed during previous requal exam
- 3 -
      cycle)
  * Remediation plans (lesson plans, reference materials, and attendance
02.07: Licensee Remedial Training Program  
      documentation)
*  
02.08: Conformance with Operator License Conditions
List of remedial training conducted or planned since last requal exams (includes  
  *   Access to licensed operators records (operating and staff crews)
training provided to operators to enable passing requal exams and training provided  
  *   Access to licensed operators training attendance records
to correct generic or individual weaknesses observed during previous requal exam  
  *   Access to licensed operators medical records
cycle)  
  *   All Procedures and Program documentation for maintaining active operator licenses,
*  
      tracking training attendance, and ensuring medical fitness of licensed operators
Remediation plans (lesson plans, reference materials, and attendance  
  *   All Procedures and associated documentation that support reactivation of any
documentation)  
      SRO/RO license (operating or staff crew) since the last biennial inspection
02.09: Simulator Performance
02.08: Conformance with Operator License Conditions  
  * Simulator discrepancies (DRs) from October 1, 2011, through October 1, 2013. This
*  
      should include all open DRs and DRs that have been closed, including the
Access to licensed operators records (operating and staff crews)  
      documentation/justification for closure.
*  
  * Acceptance test documentation, including hardware and software model revisions at
Access to licensed operators training attendance records  
      the time of acceptance (as available).
*  
  * Documentation that validates current models, including the thermal-hydraulics and
Access to licensed operators medical records  
      neutronics models, to the actual plant.
*  
  * All current model deficiencies, including FSAR vs Design differences in the simulator
All Procedures and Program documentation for maintaining active operator licenses,  
      (any documentation on this)
tracking training attendance, and ensuring medical fitness of licensed operators  
  * Summary list of modifications from June 1, 2010, through June 1, 2012.
*  
  * Plant Modifications (both hardware and software) completed on the Simulator by due
All Procedures and associated documentation that support reactivation of any  
      date from June 1, 2010, through June 1, 2012.
SRO/RO license (operating or staff crew) since the last biennial inspection  
  * Simulator Differences Lesson plan used in training (current to June 1, 2010).
  * The complete book of all Simulator annual performance test packages (usually in a
02.09: Simulator Performance  
      single book, but may be electronic or in single test packages), complete with all
*  
      transient tests, steady state tests, and malfunction tests. This should also include
Simulator discrepancies (DRs) from October 1, 2011, through October 1, 2013. This  
      the test procedures for each test, the acceptance criteria, and results. For each
should include all open DRs and DRs that have been closed, including the  
      transient test, the reference chart should be included or an equivalent subject matter
documentation/justification for closure.  
      expert review versus the simulator results with a write-up for any differences beyond
*  
      the ANSI standard requirements.
Acceptance test documentation, including hardware and software model revisions at  
  * All test packages used to verify core physics parameters (such as MTC, IRW). The
the time of acceptance (as available).  
      applicable reference graphs from the Plant physics data book (electronic or other
*  
      means as available) should also be included as well as the test procedures used and
Documentation that validates current models, including the thermal-hydraulics and  
      the acceptance criteria with results.
neutronics models, to the actual plant.
  * All Simulator test, configuration management, and related documents available in the
*  
      room for inspectors to review. This includes training needs analysis packages,
All current model deficiencies, including FSAR vs Design differences in the simulator  
      simulator review committee meeting minutes, etc.
(any documentation on this)  
  * Current copy of ANSI 3.5 standard you are committed to for Simulator testing.
*  
                                        -3-
Summary list of modifications from June 1, 2010, through June 1, 2012.  
*  
Plant Modifications (both hardware and software) completed on the Simulator by due  
date from June 1, 2010, through June 1, 2012.
*  
Simulator Differences Lesson plan used in training (current to June 1, 2010).  
*  
The complete book of all Simulator annual performance test packages (usually in a  
single book, but may be electronic or in single test packages), complete with all  
transient tests, steady state tests, and malfunction tests. This should also include  
the test procedures for each test, the acceptance criteria, and results. For each  
transient test, the reference chart should be included or an equivalent subject matter  
expert review versus the simulator results with a write-up for any differences beyond  
the ANSI standard requirements.  
*  
All test packages used to verify core physics parameters (such as MTC, IRW). The  
applicable reference graphs from the Plant physics data book (electronic or other  
means as available) should also be included as well as the test procedures used and  
the acceptance criteria with results.  
*  
All Simulator test, configuration management, and related documents available in the  
room for inspectors to review. This includes training needs analysis packages,  
simulator review committee meeting minutes, etc.  
*  
Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  


      *   For the following cases, send the most recent transient test packages, which may be
          electronic or in paper single test packages and shall be complete with test
          procedures for each test, the acceptance criteria, and results. For each transient
          test, the reference chart should be included or an equivalent subject matter expert
- 4 -
          review versus the simulator results with a write-up for any differences beyond the
          ANSI 3.5 standard requirements.
*  
          o   Transient test 1, Manual Rx trip
For the following cases, send the most recent transient test packages, which may be  
          o   Transient test 6, Main turbine trip (no reactor trip)
electronic or in paper single test packages and shall be complete with test  
          o   Transient test 10, Stuck open PORV
procedures for each test, the acceptance criteria, and results. For each transient  
          o   Steady State tests for low power
test, the reference chart should be included or an equivalent subject matter expert  
      *   All Simulator Management and Configuration Procedures if not already provided for
review versus the simulator results with a write-up for any differences beyond the  
          section 02.05 above.
ANSI 3.5 standard requirements.  
      *   Simulator Discrepancy Report summary list for all open DRs. For closed DRs,
          summary list for those items closed between June 1, 2010, and June 1, 2012.
o Transient test 1, Manual Rx trip
  02.10: Problem Identification and Resolution
o Transient test 6, Main turbine trip (no reactor trip)  
      * A summary report of all condition reports related to operator actions/errors in the
o Transient test 10, Stuck open PORV  
          control room
o Steady State tests for low power  
      * Any revised requalification training that was based on licensed operator performance
          issues
*  
      * All condition reports related to operator actions/errors in the control room
All Simulator Management and Configuration Procedures if not already provided for  
C. Cooper Nuclear Station is required to send the final results summary and any
section 02.05 above.  
  remaining exams and operating tests that have not been reviewed to the regional
*  
  office lead inspector for this inspection for final review and comparison against the
Simulator Discrepancy Report summary list for all open DRs. For closed DRs,  
  Significance Determination Tools in order to communicate the exit results for the
summary list for those items closed between June 1, 2010, and June 1, 2012.
  inspection.
                                            -4-
02.10: Problem Identification and Resolution  
*  
A summary report of all condition reports related to operator actions/errors in the  
control room  
*  
Any revised requalification training that was based on licensed operator performance  
issues  
*  
All condition reports related to operator actions/errors in the control room  
C. Cooper Nuclear Station is required to send the final results summary and any  
remaining exams and operating tests that have not been reviewed to the regional  
office lead inspector for this inspection for final review and comparison against the  
Significance Determination Tools in order to communicate the exit results for the  
inspection.
}}
}}

Latest revision as of 05:41, 11 January 2025

Notification of Inspection (NRC Inspection Report 05000298/2013005) and Request for Information
ML13254A049
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/11/2013
From: Vincent Gaddy
Division of Reactor Safety IV
To: Limpias O
Nebraska Public Power District (NPPD)
References
IR-13-005
Download: ML13254A049 (7)


See also: IR 05000298/2013005

Text

September 11, 2013

Mr. Oscar A. Limpias, Vice President-Nuclear

and Chief Nuclear Officer

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000298/2013005) AND REQUEST FOR

INFORMATION

Dear Mr. Limpias:

From October 21 through 25, 2013, inspectors from the Nuclear Regulatory Commissions

(NRC) Region IV office will perform the baseline biennial requalification inspection at Cooper

Nuclear Station, using NRC Inspection Procedure 71111.11B, Licensed Operator

Requalification Program. Experience has shown that this inspection is a resource intensive

inspection both for the NRC inspectors and your staff. In order to minimize the impact to your

onsite resources and to ensure a productive inspection, we have enclosed a request for

documents needed for this inspection. These documents have been divided into three groups.

The first group (Section A of the enclosure) identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure) identifies the information the inspectors will need upon arrival at the site. The

third group (Section C of this enclosure) identifies the items which are necessary to close out

the inspection and are usually sent a few weeks after the team has left the site. It is important

that all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Jodie Olberding of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact the lead inspector Mr. Steve Garchow at (817) 200-1426

(Steve.Garchow@nrc.gov) or Mr. Duane Strickland at (817) 200-1570

(Duane.Strickland@NRC.gov).

UNITED STATES

NUCLEAR REGULATORY COMMI SSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

O. Limpias

- 2 -

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vince Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-298

License: DPR-46

Enclosure:

Inservice Inspection Document Request

cc: Electronic Distribution for Cooper Nuclear Station

ML13254A049

ADAMS: No Yes SUNSI Review Complete

Reviewer Initials: SMG

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

SOE:OB

C:OB

SGarchow

VGaddy

/RA/

/RA/

9/11/13

9/11/13

- 1 -

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

FROM:

Steve Garchow

Senior Operations Engineer, NRC RIV

817-200-1426

TO:

Scott DeRosier

Operator Training Superintendent, Cooper Nuclear Station

402-825-5573

SUBJECT:

INFORMATION REQUEST TO SUPPORT OCTOBER 21-25, 2013, LICENSED

OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than June 15, 2012.

Electronically: TO: E-mail address Steve.Garchow@NRC.Gov

CC: Duane.Strickland@NRC.Gov )

Hardcopy to: US Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Steve Garchow

General Requests:

List of licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

Procedures that identify process for revising and maintaining LO continuing training

program up to date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last two years of simulator review committee (or equivalent) meeting minutes

Last two years of CRC (or equivalent) meeting minutes

Licensed operator training schedule for the week of October 21, 2013

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on October 21, 2013. Note that it is not

required to make copies of all the materials, but to have them available.

- 2 -

02.02: Exam Results

All results up to the day the team leaves the site.

02.03: Biennial Requalification Written Examination Quality

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite

All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite

The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

Any changes to the schedule for the operating tests (JPMs & scenarios) to be given

the week of October 21, 2013 (week team is onsite).

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of October 21, 2013 (week team is

onsite).

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite.

Current requalification cycle operating test methodology (sample plan)

A listing of licensed operator response times for time critical operator actions

02.05: Licensee Admin of Requal Exams

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All Procedures used to test, operate, and maintain the simulator

02.06: Requalification Examination Security

Any tracking tools that you use as a means to prevent excessive overlap on the

written examinations and also meet the intent of sampling all required topics on a

periodic basis

Any tracking tools that you use as a means to prevent excessive overlap on the

operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc.) on a

periodic basis

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

List of all condition reports since the last biennial requal inspection related to

examination security and overlap

- 3 -

02.07: Licensee Remedial Training Program

List of remedial training conducted or planned since last requal exams (includes

training provided to operators to enable passing requal exams and training provided

to correct generic or individual weaknesses observed during previous requal exam

cycle)

Remediation plans (lesson plans, reference materials, and attendance

documentation)

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

All Procedures and Program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

All Procedures and associated documentation that support reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

02.09: Simulator Performance

Simulator discrepancies (DRs) from October 1, 2011, through October 1, 2013. This

should include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

All current model deficiencies, including FSAR vs Design differences in the simulator

(any documentation on this)

Summary list of modifications from June 1, 2010, through June 1, 2012.

Plant Modifications (both hardware and software) completed on the Simulator by due

date from June 1, 2010, through June 1, 2012.

Simulator Differences Lesson plan used in training (current to June 1, 2010).

The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

- 4 -

For the following cases, send the most recent transient test packages, which may be

electronic or in paper single test packages and shall be complete with test

procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI 3.5 standard requirements.

o Transient test 1, Manual Rx trip

o Transient test 6, Main turbine trip (no reactor trip)

o Transient test 10, Stuck open PORV

o Steady State tests for low power

All Simulator Management and Configuration Procedures if not already provided for

section 02.05 above.

Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between June 1, 2010, and June 1, 2012.

02.10: Problem Identification and Resolution

A summary report of all condition reports related to operator actions/errors in the

control room

Any revised requalification training that was based on licensed operator performance

issues

All condition reports related to operator actions/errors in the control room

C. Cooper Nuclear Station is required to send the final results summary and any

remaining exams and operating tests that have not been reviewed to the regional

office lead inspector for this inspection for final review and comparison against the

Significance Determination Tools in order to communicate the exit results for the

inspection.