{{#Wiki_filter:UNITED STATES ber 13, 2013
{{#Wiki_filter:September 13, 2013


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 NRC SECURITY BASELINE INSPECTION REPORT 05000237/2013405; 05000249/2013405
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3  
 
NRC SECURITY BASELINE INSPECTION REPORT 05000237/2013405; 05000249/2013405


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
Line 42: Line 44:


Sincerely,
Sincerely,
/RA/
/RA/  
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure: Inspection Report 05000237/2013405; 05000249/2013405 w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV D. OFlanagan, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency
 
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety  
 
Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25  
 
Nonpublic Enclosure: Inspection Report 05000237/2013405; 05000249/2013405  
 
w/Attachment: Supplemental Information  
 
cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV D. OFlanagan, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency
}}
}}

Latest revision as of 05:30, 11 January 2025

IR 05000237-13-405; 05000249-13-405; on 08/12/2013 - 08/16/2013, Dresden Nuclear Power Station, Units 2 and 3; Routine Security Baseline Inspection. (Cover Letter Only)
ML13259A239
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/13/2013
From: Richard Skokowski
Plant Support Branch II
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Joseph Maynen
References
IR-13-405
Download: ML13259A239 (4)


Text

September 13, 2013

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3

NRC SECURITY BASELINE INSPECTION REPORT 05000237/2013405; 05000249/2013405

Dear Mr. Pacilio:

On August 16, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Dresden Nuclear Power Station, Units 2 and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on August 16, 2013, with Mr. S. Marik and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Nonpublic Enclosure: Inspection Report 05000237/2013405; 05000249/2013405

w/Attachment: Supplemental Information

cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV D. OFlanagan, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency