{{#Wiki_filter | {{#Wiki_filter:November 20, 2012 | ||
Mr. Adam C. Heflin, Senior Vice | |||
President and Chief Nuclear Officer | |||
Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 | Union Electric Company | ||
P.O. Box 620 Fulton, MO 65251 | |||
SUBJECT: CALLAWAY PLANT - NRC LICENSE RENEWAL INSPECTION REPORT 05000483/2012009 | SUBJECT: CALLAWAY PLANT - NRC LICENSE RENEWAL INSPECTION REPORT 05000483/2012009 Dear Mr. Heflin: | ||
On September 28, 2012, a U.S. Nuclear Regulatory Commission (NRC) team completed the | |||
onsite portion of an inspection of your application for license renewal of your Callaway Plant. The team discussed the inspection results with Ms. S. Kovaleski, Supervising Engineer, and | |||
On September 28, 2012, a U.S. Nuclear Regulatory Commission (NRC) team completed the onsite portion of an inspection of your application for license renewal of your Callaway Plant. The team discussed the inspection results with Ms. S. Kovaleski, Supervising Engineer, and other members of your staff during the exit meeting on | other members of your staff during the exit meeting on November 7, 2012. This inspection examined activities that supported the application for a renewed license for the | ||
Callaway Plant. The inspection addressed your processes for scoping structures, systems, and components to select equipment subject to an aging management review. Further, the | |||
The team concluded that your staff appropriately implemented the scoping of nonsafety-related structures, systems, and components that could affect safety-related structures, systems and components. The team concluded that your staff conducted an appropriate review of the materials and environments and established appropriate aging management programs, as described in the license renewal application and as supplemented through your responses to requests for additional information from the NRC. The team concluded that your staff maintained the documentation supporting the application in an auditable and retrievable form. | inspection addressed the development and implementation of aging management programs to support continued plant operation into the period of extended operation. As part of the inspection, the NRC examined procedures and representative records, interviewed personnel, and visually examined accessible portions of various structures, systems, or components to verify license renewal scoping and to observe any effects of equipment aging. These NRC | ||
inspection activities constitute one of several inputs into the NRC review process for license renewal applications. | |||
The team identified a number of issues that resulted in your staff revising your license renewal application and revising aging management processes, which are described in the report. Based on the samples reviewed by the team, the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation. | The team concluded that your staff appropriately implemented the scoping of nonsafety-related structures, systems, and components that could affect safety-related structures, systems and | ||
components. The team concluded that your staff conducted an appropriate review of the materials and environments and established appropriate aging management programs, as described in the license renewal application and as supplemented through your responses to requests for additional information from the NRC. The team concluded that your staff | |||
Sincerely,/RA/ Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety Docket: 50-483 License: NPF-30 | maintained the documentation supporting the application in an auditable and retrievable form. | ||
The team identified a number of issues that resulted in your staff revising your license renewal application and revising aging management processes, which are described in the report. Based on the samples reviewed by the team, the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to | |||
manage the effects of aging in the structures, systems, and components identified in your application and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 | |||
Inspection Report 05000483/2012009 w/attachments Electronic Distribution to Callaway | A. Heflin - 2 - | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document | |||
= | Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, /RA/ Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety | |||
Docket: 50-483 | |||
License: NPF-30 | |||
Enclosure: Inspection Report 05000483/2012009 w/attachments | |||
Electronic Distribution to Callaway | |||
A. Heflin - 3 - | |||
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Art.Howell@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Deputy Director (Barry.Westreich@nrc.gov) | |||
Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov) | |||
Resident Inspector (Nestor.Makris@nrc.gov) | |||
Resident Inspector (Zachary.Hollcraft@nrc.gov) | |||
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (David.You@nrc.gov) | |||
CW Administrative Assistant (Dawn.Yancey@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Fred.Lyon@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource ROPreports | |||
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov) | |||
DRS/TSB STA (Dale.Powers@nrc.gov) RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource | |||
RidsNrrDlrRerb Resource | |||
RidsNrrDlrRpob Resource | |||
File located: R:\_REACTORS\CWY\CWY LRI2012009 RP-gap.docx ML12328A053 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GAP Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GAP DRS/EB2 DRS/EB2 DRS/PSB2 RI:DRS/EB1 DRP/PBE GPick NOkonkwo SAlferink GMeyer JMelfi /RA/ /RA/ /RA/ /RA/ /RA/ 11/7 /2012 11/15/2012 11/15/2012 11/5/2012 11/8/2012 C:DRS/EB2 C:DRP/PBB C:DRS/EB2 GMiller NO'Keefe GMiller /RA/ /RA/ /RA/ 11/14/2012 11/ 19/2012 11/20 /2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
- 1 - Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Dockets: 50-483 Licenses: NPF-30 Report: 05000483/2012009 Applicant: Union Electric Company Facility: Callaway Plant Location: Junction Hwy CC and Hwy O Fulton, MO | |||
Dates: September 10 through November 7, 2012 Inspectors: G. Pick, Senior Reactor Inspector and Team Leader S. Alferink, Reactor Inspector J. Melfi, Reactor Engineer | |||
G. Meyer, Senior Reactor Inspector, Region I | |||
N. Okonkwo, Reactor Inspector | |||
Accompanying Personnel: W. Holston, Senior Mechanical Engineer, Division of License Renewal, Office of Nuclear Reactor Regulation Approved By: Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety | |||
- 2 - Enclosure TABLE OF CONTENTS | |||
SUMMARY OF FINDINGS ............................................................................................................ 4 | |||
REPORT DETAILS ....................................................................................................................... 5 | |||
OTHER ACTIVITIES 4OA5 Other - License Renewal ......................................................................................... 5 a. Inspection Scope ............................................................................................. 5 b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components ........................................................................................ 5 b.2 Evaluation of New Aging Management Programs ........................................... 6 .1 B2.1.15 Aboveground Metallic Tanks (XI.M29) .......................................... 7 | |||
.2 B2.1.18 One-Time Inspection (XI.M32) ..................................................... 8 | |||
.3 B2.1.19 Selective Leaching (XI.M33) ........................................................ 9 .4 B2.1.21 External Surfaces Monitoring of Mechanical Components (XI.M36) ........................................................................ 10 | |||
.5 B2.1.25 Buried and Underground Piping and Tanks (XI.M41) ................. 11 | |||
.6 B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49 | |||
Environmental Qualification Requirements (XI.E6) ........................... 13 | |||
.7 B2.1.39 Metal-Enclosed Bus (XI.E4) ....................................................... 14 b.3 Evaluation of Existing Aging Management Programs .................................... 15 .1 B2.1.2 Water Chemistry (XI.M2) .............................................................. 15 | |||
.2 B2.1.3 Reactor Head Closure Stud Bolting (XI.M3) ................................. 16 .3 B2.1.7 Flow-Accelerated Corrosion (XI.M17) .......................................... 17 .4 B2.1.10 Open-Cycle Cooling Water System (XI.M20) ............................. 18 .5 B2.1.11 Closed Treated Water Systems (XI.M21A) ................................. 19 | |||
.6 B2.1.13 Fire Protection (XI.M26) ............................................................. 20 | |||
.7 B2.1.14 Fire Water System (XI.M27) ....................................................... 22 | |||
.8 B2.1.16 Fuel Oil Chemistry (XI.M30) ....................................................... 23 | |||
.9 B2.1.24 Lubricating Oil Analysis (XI.M39) ............................................... 25 .10 B2.1.30 Masonry Walls (XI.S5) ................................................................ 26 .11 B2.1.31 Structures Monitoring (XI.S6) ..................................................... 26 | |||
.12 B2.1.32 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (XI.S7) ..................................................... 28 .13 B2.1.33 Protective Coating Monitoring and Maintenance Program (XI.S8) ................................................................................. 28 .14 B2.1.34 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E1) ........................................................................ 29 | |||
.15 B2.1.35 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (XI.E2) ............................................ 30 .16 B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E3) ........................... 31 | |||
- 3 - Enclosure b.4 System Reviews ............................................................................................ 32 c. Overall Conclusion ........................................................................................ 34 | |||
4OA6 Meetings, Including Exit ......................................................................................... 34 | |||
ATTACHMENT: SUPPLEMENTAL INFORMATION ........................................................... A-1 | |||
- 4 - Enclosure SUMMARY OF FINDINGS | |||
IR 05000483/2012009; 09/10 - 11/7/2012; Callaway Plant, Scoping of Nonsafety-Related Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs | IR 05000483/2012009; 09/10 - 11/7/2012; Callaway Plant, Scoping of Nonsafety-Related Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs | ||
NRC inspectors from Region IV, Region I, and a reviewer from Headquarters performed onsite | |||
inspections of the applicant's license renewal activities. The team performed the evaluations in accordance with Manual Chapter 2516, "Policy and Guidance for the License Renewal Inspection Programs," and Inspection Procedure 71002, "License Renewal Inspection." The | |||
team did not identify any findings as defined in NRC Manual Chapter 0612. | |||
The team concluded that the applicant adequately performed scoping of nonsafety-related structures, systems, and components as required by 10 CFR 54.4(a)(2). The team concluded that the applicant conducted an appropriate review of the materials and environments and | |||
established appropriate aging management programs, as described in the license renewal | |||
application and as supplemented through responses to requests for additional information from | |||
the NRC. The team found that the applicant provided the documentation that supported the application and inspection process in an auditable and retrievable form. The team identified a number of issues that resulted in changes to the application, aging management programs, and | |||
processes. | |||
Based on the samples reviewed by the team, the inspection results supported a conclusion of reasonable assurance that actions have been identified and have been taken or planned to manage the effects of aging in the structures, systems, and components identified in the application and that the intended functions of these structures, systems, and components would be maintained in the period of extended operation. | |||
A. NRC-Identified and Self-Revealing Findings No findings of significance were identified B. Licensee-Identified Violations None. | |||
- 5 - Enclosure REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Other - License Renewal a. Inspection Scope (IP 71002) | |||
NRC inspectors performed this inspection to evaluate the thoroughness and accuracy of the applicant's scoping of nonsafety-related structures, systems, and components (SSCs), as required by 10 CFR 54.4(a)(2). The team evaluated whether aging management programs would be capable of managing identified aging effects in | |||
an appropriate manner. | |||
In order to evaluate scoping activities, the team selected a number of SSCs for review to | |||
evaluate whether the methodology used by the applicant appropriately addressed the nonsafety-related systems with the potential to affect the safety functions of a structure, system, or component within the scope of license renewal. Scoping activities are those | |||
activities performed by the applicant to identify the population of SSCs that should be | |||
considered for aging management activities. | |||
The team selected a sample of 23 of the 39 aging management programs developed by the applicant to verify the adequacy of the applicant's guidance, implementation | |||
activities, and documentation. The team evaluated the aging management programs to determine whether the applicant would appropriately manage the effects of aging and to | |||
verify that the applicant would maintain the component safety functions during the period | |||
of extended operation. The team reviewed supporting documentation and interviewed personnel to confirm the | |||
accuracy of the license renewal application conclusions. The team walked down | |||
accessible portions of the in-scope systems to observe aging effects and to review the | |||
material condition of the SSCs. In-scope refers to SSCs that the applicant concluded would require aging management because they were passive or long-lived. b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components | |||
The team | |||
Division of License Renewal | Division of License Renewal | ||
J. Gavula, Senior Mechanical Engineer R. Kalikian, Materials Engineer E. Wong, Chemical Engineer | |||
A-2 Attachment DOCUMENTS REVIEWED General Callaway Action Requests: | |||
201205800* 201206520* 201206557* 201206824* | |||
Attachment | *identified as a result of the inspection | ||
Letters: NUMBER TITLE DATE Scoping and Screening Methodology Report Regarding the Callaway Plant, Unit 1, License Renewal Application 08/06/2012 | |||
General | Aging Management Programs Audit Report Regarding the Callaway Plant, Unit 1, License Renewal Application 08/09/2012 ULNRC-05877 Responses to RAI Set #1 and Amendment 4 to the Callaway License Renewal Application 07/12/2012 | ||
ULNRC-05891 Responses to RAI Set #4 and Amendment 6 to the Callaway License Renewal Application 08/09/2012 ULNRC-05892 Responses to RAI Set #5 and Amendment 7 to the Callaway License Renewal Application (with Updates to Previous RAI | |||
Responses) 08/21/2012 | |||
ULNRC-05903 Responses to RAI Set #6 and Amendment 8 to the Callaway License Renewal Application 08/21/2012 | |||
ULNRC-5903 Responses To RAI Set #13 & #14 and Amendment 14 to the Callaway License Renewal Application 10/31/2012 Scoping Callaway Action Requests: 200306363 200404991 200607446 201102830 | |||
201202922 201204288 | |||
*identified as a result of the inspection Letters: | |||
Drawings: NUMBER TITLE REVISION | |||
A-3 Attachment Drawings: NUMBER TITLE REVISION M-25AE01 Hanger Location Drawing - Main Feedwater - Turbine Building 4 | |||
M-25AE03 Hanger Location Drawing - Main Feedwater - Turbine Building 1 M-25AE06 Hanger Location Drawing - Feedwater Minimum Flow to Condenser - Turbine Building 4 | |||
M-25KA01 Hanger Location Drawing - Compressed Air - Auxiliary Building 0 M-29KA21 Hanger Location Drawing - Small Pipe Instrument Air System - Auxiliary Building El. 2000' 14 | |||
M-29KA46 Hanger Location Drawing - Small Pipe N2 Backup Gas Supply - Auxiliary & Turbine Buildings 12 Complete set of license renewal drawings | |||
License Renewal: NUMBER TITLE REVISION Topical Report TR-6CW Criterion 54.4 (a)(2) 3 Topical Report TR-9CW Plant Systems and Aging Management Programs 3 New Aging Management Programs B2.1.15 Aboveground Metallic Tanks (XI.M29) Drawings: NUMBER TITLE REVISION C-2C0901 Condensate Storage & Demineralized Water Tanks. Concrete Line & Reinforcing Sections and Details 0 | |||
C-2C0241 Condensate Storage & Demineralized Water Tanks. Concrete Line & Reinforcing Sections and Details, Sheet 1 0 | |||
A-4 Attachment License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M29, "Aboveground Metallic Tanks" | |||
Operating Experience Summary Report, AMP XI.M29, "Aboveground Metallic Tanks" CW-AMP-B2.1.15 Aboveground Metallic Tanks Aging Management Program Evaluation Report 3 | |||
Miscellaneous: NUMBER TITLE REVISION/DATE Maintenance Rule Walk Down Report Structure - Condensate Storage Tank Foundation and Building | |||
Enclosure 08/10/2009 | |||
MS-25C Small Pipe Standard Support 0 Procedure | |||
EDP-ZZ-XXXXX Inspections of Aboveground Metallic Tanks 0 | |||
B2.1.18 One-Time Inspection (XI.M32) License Renewal: NUMBER TITLE REVISION Draft list of Callaway Material/Environment Combinations in the Scope of One Time Inspection | |||
License Renewal Component List for AMP XI.M32, "One-Time Inspection" Operating Experience Summary Report, AMP XI.M32, "One-Time Inspection" | |||
CW-AMP-B2.1.18 One-Time Inspection Aging Management Program Evaluation Report 2 | |||
A-5 Attachment B2.1.19 Selective Leaching (XI.M33) | |||
Callaway Action Requests: | |||
200909091 201009835 | |||
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M33, "Selective Leaching" | |||
Operating Experience Summary Report, AMP XI.M33, "Selective Leaching" | |||
CW-AMP-B2.1.19 Selective Leaching Aging Management Program Evaluation Report 5 | |||
Procedures: NUMBER TITLE REVISION APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Requirements 20 | |||
TBD Draft One-Time Inspection for Selective Leaching Degradation of Components Program Draft B2.1.21 External Surfaces Monitoring of Mechanical Components (XI.M36) Callaway Action Requests: 200803465 200803472 200810025 | |||
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M36, "External Surfaces Monitoring of Mechanical Components" | |||
Operating Experience Summary Report, AMP XI.M36, "External Surfaces Monitoring of Mechanical Components" | |||
A-6 Attachment License Renewal: NUMBER TITLE REVISION CW-AMP-B2.1.21 External Surfaces Monitoring of Mechanical Components Aging Management Program Evaluation Report 2 | |||
Procedures: NUMBER TITLE REVISION EDP-ZZ-01131 Plant Health and Performance Monitoring Program 21 EDP-ZZ-01131, | |||
Appendix K Engineering System Walkdowns 1 | |||
B2.1.25 Buried and Underground Piping and Tanks (XI.M41) Callaway Action Requests: 200207386 200605969 200606030 200607749 200608647 200702384 200702484 200703899 200704465 200707760 200711546 200800871 200803345 200808781 200904086 | |||
200909892 201000931 201006741 201010950 201204441 | |||
201206525 201206616 201206868 Drawings: NUMBER TITLE REVISION CU2C1 Essential Service Water System - Unit 1 yard Pipelines & Electrical Duct Banks Plan & Schedule 10 C-U206 Essential Service Water System Replacement Yard Piping Plan 0 | |||
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M41, "Buried and Underground Piping and Tanks" | |||
Callaway Action Request Operating Experience Report for AMP XI.M41, "Buried and Underground Piping and Tanks" | |||
A-7 Attachment License Renewal: NUMBER TITLE REVISION CW-AMP-B2.1.25 Buried and Underground Piping and Tanks Aging Management Program Evaluation Report 5 | |||
Miscellaneous: NUMBER TITLE DATE Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 13 10/01/2012 Soil Sample Request 07/27/2009 Soil Lab Results - Near Discharge Monitoring Tanks in the Radioactive Waste Yard 07/23/2012 Soil Lab Results - Intake Lube Water, Next to Pipe 04/02/2010 Draft Cathodic Protection Monitoring Procedure E-1026-00012 Cathodic Protection Design Report - Harco 08/02/1992 410049 2005 Cathodic Protection Survey and Assessment Report 05/05/2006 83470351 CC Technologies Final Report - Indirect Inspections ESW Supply, Return, Discharge and Strainer Backwash Pipelines 05/02/2007 83475171 Close-Interval Survey and Direct Current Voltage Gradient (Survey Buried Fire Water Protection Piping 05/07/2008 | |||
10513410-500 Annual Cathodic Protection System Survey 08/29/2011 | |||
Procedures: NUMBER TITLE REVISION APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Results (markup) 20 | |||
EDP-ZZ-01011 Buried and Underground Piping and Tanks Inspection Program 3 | |||
A-8 Attachment Procedures: NUMBER TITLE REVISION EDP-ZZ-02002 Backfill/Material Selection, Preparation, Placement , & Compaction 4 | |||
MTT-ZZ-1003 Coatings and Wrapping of Piping 6 | |||
Specifications: NUMBER TITLE REVISION/DATE 4645-23A Technical Specification for Fire Protection System 20 4645-P23-6 Procurement Specification for Pipe and Fittings Fire Protection System 3 4645-P23-7 Procurement Specification for Post Indicator Valves Fire Protection System 3 | |||
4645-P23-16 Procurement Specification for Shutoff Valves, Valve Bodies and Wrenches Fire Protection System 1 S-1080 Technical Specification for the Installation of Replacement ASME Section III Buried Essential Service Water System | |||
Piping 10/02/2008 | |||
Excavations and Pipe Evaluation: NUMBER TITLE DATE Job Order 09003490 As Found Buried Piping Visual Inspection Form,- Water Treatment Bypass Line 08/04/2009 Job Order | |||
09000264-535 Ultrasonic Thickness Report, 05/05/2010 | |||
Job Order 10000810 As Found Buried Piping Visual Inspection Form, Near CW/SW Near Intake Deep Well 05/06/2010 | |||
Job Order | |||
11000318.460 As Found Buried Piping Inspection Form, Fire Protection Piping 02/10/2011 | |||
Job Order 11002092.460 As Found Buried Piping Inspection Form, Fire Protection Piping 09/19/2011 | |||
A-9 Attachment Excavations and Pipe Evaluation: NUMBER TITLE DATE | |||
Job Order | |||
12000962-500 As Found Buried Piping Inspection Form, - Near Discharge Monitoring Tanks in the Radioactive Waste Yard 06/11/2012 | |||
Job Order 12000962-510 Ultrasonic Thickness Report 06/21/2012 | |||
B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E6) Callaway Action Requests: 200000569 200102076 200506953 200507313 200708150 200709539 200810789 200900024 201104380 | |||
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.E6, "Electrical Cable Connections Not Subject to 10 CFR 50.49 | |||
Environmental Qualification Requirements" | |||
Callaway Action Request Operating Experience Report for AMP XI.E6, "Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements" | |||
CW-AMP-B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Aging | |||
Management Program Evaluation Report 4 | |||
Miscellaneous: NUMBER TITLE DATE Information Notice | |||
2010-25 Inadequate Electrical Connection 11/17/2010 | |||
NG02BAF2 Preventive Maintenance Inspection Report for NG02BAF2 02/01/2012 PG13QER5 Thermography Preventive Maintenance Inspection Report 02/01/2012 | |||
A-10 Attachment Miscellaneous: NUMBER TITLE DATE | |||
PG14RFF2 Thermography Preventive Maintenance Inspection Report for FDR Bkr to QA01 TB Lighting PNL VIA XFMR XQA01 06/25/2012 | |||
Procedures: NUMBER TITLE REVISION EDP-ZZ-07001 Cable Management Program 0 EDP-ZZ-01113 Electrical Equipment Predictive Performance Manual 7 MTT-ZZ-01004 General Guidelines for Cable Terminations 14 MTT-ZZ-01004B Taping Instructions for Cables 7 MTT-ZZ-01013 Motor Program Guide 1 Work Orders: | |||
09512582-500 09512582-510 11500083-501 11500083-510 | |||
B2.1.39 Metal-Enclosed Bus Program (XI.E4) Callaway Action Requests: | |||
200508906 200909297 201008436 201010873 | |||
201109870 201206491* 201206807* | |||
Drawings: NUMBER TITLE REVISION 8600-X-88554 Schematic Diagram Main Circuit Breaker 152PB12101, Transformer XPB121, Circ. & Serv. Water Pumphouse 8 8600-X-88555 Schematic Diagram Main Circuit Breaker 152PB122101, Transformer XPB122, Circ. & Serv. Water Pumphouse 9 | |||
8600-X-88556 Schematic Diagram Main Circuit Breaker 152PB12301, Transformer XPB123, Circ. & Serv. Water Pumphouse 8 | |||
A-11 Attachment Drawings: NUMBER TITLE REVISION Elec-E-21001 | |||
: NUMBER TITLE DATE | |||
(E-21001(Q)) Main Single line Diagram 17 | (E-21001(Q)) Main Single line Diagram 17 | ||
C1515-6 Unit 3 Bus Duct 5KV Metal Switchgear Circ & Service Water Pumphouse 2 C1515-7 Unit 11 Bus Duct 5KV Metal Switchgear Circ & Service Water Pumphouse 2 | |||
C1515-8 Unit 7 Bus Duct 5KV Metal Switchgear Circ & Service Water Pumphouse 2 | |||
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.E4, "Metal-Enclosed Bus Program" | |||
Operating Experience Report for AMP XI.E4, "Metal-Enclosed Bus Program" | |||
CW-AMP-B2.1.39 Metal-Enclosed Bus Program Aging Management Program Evaluation Report 3 | |||
Miscellaneous: NUMBER TITLE REVISION 097739 General Electric Company Instruction Manual Metal-Clad Switchgear | |||
RFR-19619 Termination Instruction for XMA01A, B, C D Operating Experience: NUMBER TITLE DATE Information Notice 1989-64 Electrical Bus Bar Failure 09/07/1989 | |||
A-12 Attachment Operating Experience: NUMBER TITLE DATE Information | |||
Notice 2010-25 Inadequate Electrical Connection 09/17/2010 | |||
Procedures: NUMBER TITLE REVISION EDP-XX-NNNNN Metal | |||
(NY-10043) Imaging and Sensing Technology Corporation Document for Qualified Class 1E Compensated Ionization Chamber 09/1990 | (NY-10043) Imaging and Sensing Technology Corporation Document for Qualified Class 1E Compensated Ionization Chamber 09/1990 | ||
M-762-00412-03 (NY-10338) Imaging and Sensing Technology Corporation Document for Qualified Class 1E Uncompensated Ionization Chamber 05/1993 Minutes of EPRI Kapton Information Meeting 11/18/1988 Operating Experience: NUMBER TITLE DATE Information Notice | |||
1989-30 High Temperature Environment at Nuclear Power Plant 05/26/1989 Information Notice 1997-45 Environmental Qualification Deficiency for Cables and Containment Penetration Pigtails 07/02/1997 | |||
Licensee Event Report | |||
05000206-87-008 SONGS Kapton Insulation Damage on Containment Penetration Cables 06/02/1987 | |||
Procedures: NUMBER TITLE REVISION EDP-ZZ-07001 Cable Management Program 0 ISL-SE-00N31 Source Range N31 Channel Calibration 30 ISL-SE-00N32 Source Range N32 Channel Calibration 35 ISL-SE-OON35 INTMD RNG N35 "A" Train Loop Cal 27 ISL-SE-OON36 INTMD RNG N36 "B" Train Loop Cal 29 ISL-SE-ON41A Loop-NU; PR N41 Detector Plateau 11 | |||
A-39 Attachment Procedures: NUMBER TITLE REVISION ISL-SE-ON42A Loop-NU; PR N42 Detector Plateau 11 ISL-SE-ON43A Loop-NU; PR N43 Detector Plateau 11 ISL-SE-ON44A Loop-NU; PR N44 Detector Plateau 13 RFR 06770A Field Installation NIS Triaxial Cables 7 ITM-ZZ-00009 Triax Cable Maintenance and Testing 9 B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E3) | |||
Callaway Action Requests: | |||
200701041 200708150 200905490 201008000 201008001 | |||
201011217 201101616 201107892 | |||
Drawings: NUMBER TITLE REVISION 8600-X-88859 Duct banks and Manholes Site Plan-Key, On site Elec. Power Distribution, Comm. Signal and Control System 24 8600-X-89139 Duct banks and Manholes MH59-8 On site Elec. Power Distribution 3 | |||
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.E3, "Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements" Operating Experience Summary Report XI.E3, "Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental | |||
Qualification Requirements" | |||
CW-AMP-B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Aging 5 | |||
A-40 Attachment License Renewal: NUMBER TITLE REVISION Management Program Evaluation Report | |||
Miscellaneous: NUMBER TITLE REVISION Design Change | |||
MP-11-0011 Change package for design of sump pumps in Man Holes MH 59-04. MH 59-05, MH 59-08A&B, MH 59-10 2 Procedure | |||
EDP-ZZ-07001 Cable Management Program 0 | |||
White paper Man Hole Pump MP 11-0011 Vendor Manual | |||
0813 BJM submersible Pumps Technical Data Model JXA00SS Vendor Manual | |||
FM0493-1109 Zoeller Pump Product Information | |||
Operating Experience: NUMBER TITLE DATE Generic Letter 2007-01 Inaccessible or Underground Power Cable Failure That Disable Accident Mitigation Systems Or Cause Plant | |||
Transients 02/07/2007 | |||
Information Notice | |||
2010-26 Submerged Electrical Cables 02/02/2010 SYSTEM REVIEWS License Renewal: NUMBER TITLE REVISION CW-AER-AL Callaway Plant License Renewal Aging Evaluation Report - Auxiliary Feedwater System 3 | |||
A-41 Attachment License Renewal: NUMBER TITLE REVISION CW-SCO-AL Callaway Plant License Renewal System and Structure Scoping Report - Auxiliary Feedwater System 1 | |||
CW-SCR-AL Callaway Plant License Renewal Component Summary Screening Report - Auxiliary Feedwater System 4 | |||
Drawings: NUMBER TITLE REVISION LR-CW-AL-M-22AL01 Auxiliary Feedwater System 0B LR-CW-AL-M-22FC02 Auxiliary Feedwater Pump Turbine 0A LR-CW-KJ-M-22KJ01 Standby Diesel Generator A - Cooling Water System 21 LR-CW-KJ-M-22KJ02 Standby Diesel Generator A - Intake Exhaust. F.O & Starting Air System 20 | |||
LR-CW-KJ-M-22KJ04 Standby Diesel Generator B - Cooling Water System 19 LR-CW-KJ-M-22KJ05 Standby Diesel Generator B - Intake Exhaust, F.O & Starting Air System 24 | |||
}} | }} | ||
Revision as of 08:40, 28 March 2018
| ML12328A053 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/20/2012 |
| From: | Miller G B NRC/RGN-IV/DRS/EB-2 |
| To: | Heflin A C Union Electric Co |
| References | |
| IR-12-009 | |
| Download: ML12328A053 (78) | |
See also: IR 05000483/2012009
Text
November 20, 2012
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - NRC LICENSE RENEWAL INSPECTION REPORT 05000483/2012009 Dear Mr. Heflin:
On September 28, 2012, a U.S. Nuclear Regulatory Commission (NRC) team completed the
onsite portion of an inspection of your application for license renewal of your Callaway Plant. The team discussed the inspection results with Ms. S. Kovaleski, Supervising Engineer, and
other members of your staff during the exit meeting on November 7, 2012. This inspection examined activities that supported the application for a renewed license for the
Callaway Plant. The inspection addressed your processes for scoping structures, systems, and components to select equipment subject to an aging management review. Further, the
inspection addressed the development and implementation of aging management programs to support continued plant operation into the period of extended operation. As part of the inspection, the NRC examined procedures and representative records, interviewed personnel, and visually examined accessible portions of various structures, systems, or components to verify license renewal scoping and to observe any effects of equipment aging. These NRC
inspection activities constitute one of several inputs into the NRC review process for license renewal applications.
The team concluded that your staff appropriately implemented the scoping of nonsafety-related structures, systems, and components that could affect safety-related structures, systems and
components. The team concluded that your staff conducted an appropriate review of the materials and environments and established appropriate aging management programs, as described in the license renewal application and as supplemented through your responses to requests for additional information from the NRC. The team concluded that your staff
maintained the documentation supporting the application in an auditable and retrievable form.
The team identified a number of issues that resulted in your staff revising your license renewal application and revising aging management processes, which are described in the report. Based on the samples reviewed by the team, the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to
manage the effects of aging in the structures, systems, and components identified in your application and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
A. Heflin - 2 -
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety
Docket: 50-483
License: NPF-30
Enclosure: Inspection Report 05000483/2012009 w/attachments
Electronic Distribution to Callaway
A. Heflin - 3 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Nestor.Makris@nrc.gov)
Resident Inspector (Zachary.Hollcraft@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (David.You@nrc.gov)
CW Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Fred.Lyon@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource ROPreports
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov) RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource
RidsNrrDlrRerb Resource
RidsNrrDlrRpob Resource
File located: R:\_REACTORS\CWY\CWY LRI2012009 RP-gap.docx ML12328A053 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GAP Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GAP DRS/EB2 DRS/EB2 DRS/PSB2 RI:DRS/EB1 DRP/PBE GPick NOkonkwo SAlferink GMeyer JMelfi /RA/ /RA/ /RA/ /RA/ /RA/ 11/7 /2012 11/15/2012 11/15/2012 11/5/2012 11/8/2012 C:DRS/EB2 C:DRP/PBB C:DRS/EB2 GMiller NO'Keefe GMiller /RA/ /RA/ /RA/ 11/14/2012 11/ 19/2012 11/20 /2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
- 1 - Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Dockets: 50-483 Licenses: NPF-30 Report: 05000483/2012009 Applicant: Union Electric Company Facility: Callaway Plant Location: Junction Hwy CC and Hwy O Fulton, MO
Dates: September 10 through November 7, 2012 Inspectors: G. Pick, Senior Reactor Inspector and Team Leader S. Alferink, Reactor Inspector J. Melfi, Reactor Engineer
G. Meyer, Senior Reactor Inspector, Region I
N. Okonkwo, Reactor Inspector
Accompanying Personnel: W. Holston, Senior Mechanical Engineer, Division of License Renewal, Office of Nuclear Reactor Regulation Approved By: Geoffrey Miller, Chief Engineering Branch 2 Division of Reactor Safety
- 2 - Enclosure TABLE OF CONTENTS
SUMMARY OF FINDINGS ............................................................................................................ 4
REPORT DETAILS ....................................................................................................................... 5
OTHER ACTIVITIES 4OA5 Other - License Renewal ......................................................................................... 5 a. Inspection Scope ............................................................................................. 5 b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components ........................................................................................ 5 b.2 Evaluation of New Aging Management Programs ........................................... 6 .1 B2.1.15 Aboveground Metallic Tanks (XI.M29) .......................................... 7
.2 B2.1.18 One-Time Inspection (XI.M32) ..................................................... 8
.3 B2.1.19 Selective Leaching (XI.M33) ........................................................ 9 .4 B2.1.21 External Surfaces Monitoring of Mechanical Components (XI.M36) ........................................................................ 10
.5 B2.1.25 Buried and Underground Piping and Tanks (XI.M41) ................. 11
.6 B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49
Environmental Qualification Requirements (XI.E6) ........................... 13
.7 B2.1.39 Metal-Enclosed Bus (XI.E4) ....................................................... 14 b.3 Evaluation of Existing Aging Management Programs .................................... 15 .1 B2.1.2 Water Chemistry (XI.M2) .............................................................. 15
.2 B2.1.3 Reactor Head Closure Stud Bolting (XI.M3) ................................. 16 .3 B2.1.7 Flow-Accelerated Corrosion (XI.M17) .......................................... 17 .4 B2.1.10 Open-Cycle Cooling Water System (XI.M20) ............................. 18 .5 B2.1.11 Closed Treated Water Systems (XI.M21A) ................................. 19
.6 B2.1.13 Fire Protection (XI.M26) ............................................................. 20
.7 B2.1.14 Fire Water System (XI.M27) ....................................................... 22
.8 B2.1.16 Fuel Oil Chemistry (XI.M30) ....................................................... 23
.9 B2.1.24 Lubricating Oil Analysis (XI.M39) ............................................... 25 .10 B2.1.30 Masonry Walls (XI.S5) ................................................................ 26 .11 B2.1.31 Structures Monitoring (XI.S6) ..................................................... 26
.12 B2.1.32 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (XI.S7) ..................................................... 28 .13 B2.1.33 Protective Coating Monitoring and Maintenance Program (XI.S8) ................................................................................. 28 .14 B2.1.34 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E1) ........................................................................ 29
.15 B2.1.35 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (XI.E2) ............................................ 30 .16 B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E3) ........................... 31
- 3 - Enclosure b.4 System Reviews ............................................................................................ 32 c. Overall Conclusion ........................................................................................ 34
4OA6 Meetings, Including Exit ......................................................................................... 34
ATTACHMENT: SUPPLEMENTAL INFORMATION ........................................................... A-1
- 4 - Enclosure SUMMARY OF FINDINGS
IR 05000483/2012009; 09/10 - 11/7/2012; Callaway Plant, Scoping of Nonsafety-Related Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs
NRC inspectors from Region IV, Region I, and a reviewer from Headquarters performed onsite
inspections of the applicant's license renewal activities. The team performed the evaluations in accordance with Manual Chapter 2516, "Policy and Guidance for the License Renewal Inspection Programs," and Inspection Procedure 71002, "License Renewal Inspection." The
team did not identify any findings as defined in NRC Manual Chapter 0612.
The team concluded that the applicant adequately performed scoping of nonsafety-related structures, systems, and components as required by 10 CFR 54.4(a)(2). The team concluded that the applicant conducted an appropriate review of the materials and environments and
established appropriate aging management programs, as described in the license renewal
application and as supplemented through responses to requests for additional information from
the NRC. The team found that the applicant provided the documentation that supported the application and inspection process in an auditable and retrievable form. The team identified a number of issues that resulted in changes to the application, aging management programs, and
processes.
Based on the samples reviewed by the team, the inspection results supported a conclusion of reasonable assurance that actions have been identified and have been taken or planned to manage the effects of aging in the structures, systems, and components identified in the application and that the intended functions of these structures, systems, and components would be maintained in the period of extended operation.
A. NRC-Identified and Self-Revealing Findings No findings of significance were identified B. Licensee-Identified Violations None.
- 5 - Enclosure REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Other - License Renewal a. Inspection Scope (IP 71002)
NRC inspectors performed this inspection to evaluate the thoroughness and accuracy of the applicant's scoping of nonsafety-related structures, systems, and components (SSCs), as required by 10 CFR 54.4(a)(2). The team evaluated whether aging management programs would be capable of managing identified aging effects in
an appropriate manner.
In order to evaluate scoping activities, the team selected a number of SSCs for review to
evaluate whether the methodology used by the applicant appropriately addressed the nonsafety-related systems with the potential to affect the safety functions of a structure, system, or component within the scope of license renewal. Scoping activities are those
activities performed by the applicant to identify the population of SSCs that should be
considered for aging management activities.
The team selected a sample of 23 of the 39 aging management programs developed by the applicant to verify the adequacy of the applicant's guidance, implementation
activities, and documentation. The team evaluated the aging management programs to determine whether the applicant would appropriately manage the effects of aging and to
verify that the applicant would maintain the component safety functions during the period
of extended operation. The team reviewed supporting documentation and interviewed personnel to confirm the
accuracy of the license renewal application conclusions. The team walked down
accessible portions of the in-scope systems to observe aging effects and to review the
material condition of the SSCs. In-scope refers to SSCs that the applicant concluded would require aging management because they were passive or long-lived. b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components
The team assessed the thoroughness and accuracy of the methods used to identify the
SSCs required to be within the scope of the license renewal application as required by 10 CFR 54.4(a)(2). The team verified that the applicant had established procedures consistent with the NRC-endorsed guidance contained in Nuclear Energy Institute 95-10, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License
Renewal Rule," Revision 6, Appendix F, Sections 3, 4, and 5. The team assessed
whether the applicant evaluated: (1) nonsafety-related SSCs within the scope of the current licensing basis, (2) nonsafety-related SSCs directly connected to safety-related SSCs, and (3) nonsafety-related SSCs not directly connected but spatially near
safety-related SSCs.
The team reviewed the complete set of license renewal drawings. The applicant had color-coded the drawings to indicate in-scope systems and components required
- 6 - Enclosure by 10 CFR 54.4(a)(1), (a)(2), and (a)(3). The team interviewed personnel, reviewed program documents and independently walked down numerous plant areas. The team determined that the personnel involved in the process were knowledgeable and appropriately trained. For SSCs selected because of potential spatial interactions, where failure of
nonsafety-related components could adversely affect adjacent safety-related components, the team determined that the applicant accurately categorized the plant configuration within the license renewal documents. The team reviewed plant conditions in the essential service water pump house and the emergency diesel generator building.
The team walked down the areas to confirm that safety-related equipment did not have any unaccounted for nonsafety-related components. The team reviewed plant areas, designated as not containing safety-related equipment. The specific areas reviewed included the condensate storage tank, valve house and tunnel, and the communications corridor to confirm that areas had no such equipment. Also, the team selected specific
components to confirm that the components had been scoped properly and included
accurately in the drawings and database. The team determined that the applicant
accurately categorized the plant configuration for potential spatial interactions within the license renewal documents.
For SSCs selected because of potential structural interaction (seismic design of
safety-related components potentially affected by nonsafety-related components), the team determined that the applicant accurately identified and categorized the structural
boundaries within the program documents. The team walked down areas in the turbine and auxiliary buildings and independently sampled the seismic boundary determinations identified on the isometric drawings. The team determined that the applicant
appropriately identified the seismic design boundaries and correctly included the
applicable components within the license renewal scope. Further, the team confirmed
the accuracy of statements in applicant responses to requests for additional information related to potential safety-related equipment in the turbine building. The team determined that the applicant accurately categorized the plant configuration for potential
structural interactions within the license renewal documents.
The team concluded that the applicant had implemented an acceptable method of
scoping nonsafety-related SSCs and that this method resulted in appropriate scoping determinations for the samples reviewed. b.2 Evaluation of New Aging Management Programs
The team reviewed 7 of 9 new aging management programs to determine whether the applicant had established appropriate actions or had actions planned to manage the effects of aging. The team reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope
of these programs that had not been identified when considering applicable industry
operating experience.
Because the applicant had developed draft implementing procedures, the team assessed the effectiveness of the planned implementation of these programs. Some of
the new programs were one-time inspection programs that will involve testing of
- 7 - Enclosure applicable components prior to the period of extended operation to confirm the absence of significant aging effects. If the results determine aging effects have occurred, the applicant will need to establish actions to manage the identified effects.
The team selected in-scope SSCs to assess how the applicant maintained plant
equipment, to visually observe examples of nonsafety-related equipment determined to be within the scope of license renewal because of the proximity to safety-related
equipment, and to evaluate the potential for failure as a result of aging effects. .1 B2.1.15 Aboveground Metallic Tanks (XI.M29)
The applicant established this new aging management program, consistent with
NUREG-1801, "Generic Aging Lessons Learned (GALL) Report," Revision 2 (GALL Report), to manage loss of material for the external surfaces, including the bottom surfaces, of aboveground, outdoor metallic tanks. Additionally, this program was
credited with managing cracking, blistering, and change in color of the acrylic/urethane
insulation on the condensate storage tank. The four tanks within the scope of the
program included the condensate storage, the refueling water storage, and the two fire water storage tanks. For the carbon steel fire water tanks, the program relied on the application of coatings and a tank bottom edge grout as corrosion preventive measures.
The applicant had cathodically protected the fire water tanks to prevent corrosion on
exposed bare metal surfaces of the tanks. For the stainless steel condensate storage
and refueling water tanks, the applicant used jacketed insulation with overlapping seams
that prevent moisture intrusion or spray-on polyurethane foam insulation that adheres to tank surfaces as a corrosion preventive measure.
For the four tanks, the team reviewed license renewal documents, the aging
management program evaluation report, corrective action documents, technical specifications and drawings, procedures, and current external inspection results. The team verified that the applicant planned to perform ultrasonic testing (volumetric) to determine thickness measurements of tank bottoms whenever the tanks are drained and at least once within five years of entering the period of extended operation for the
condensate storage and refueling water storage tanks. The volumetric inspection should
provide direct evidence of any loss of material that has occurred or that could result in a
loss of function. The applicant took an exception to the requirement in the GALL Report to perform
ultrasonic testing (volumetric) to determine thickness measurements of tank bottoms whenever the tanks are drained and at least once within five years of entering the period of extended operation. At the time of the inspection, the applicant performed visual inspections on an alternating refueling outage frequency for each fire water storage tank. The applicant planned to perform ultrasonic thickness measurements of the bottom of
each fire water storage tank within five years of entering the period of extended
operation and a 10-year frequency from the initial inspection. The team determined that performing ultrasonic thickness measurements every ten years supplemented by visual inspections would provide an effective means to manage loss of material on the fire water storage tank bottoms.
- 8 - Enclosure The applicant established procedures to visually inspect for aging of the tank external surface paint or damage of the insulation covering. The applicant identified requirements to remove a representative sample of the stainless steel tank insulation to inspect the metal surface. Whenever the applicant finds damaged insulation that could permit water ingress, the applicant established requirements to remove the damaged
insulation and perform inspections. The applicant will inspect the surfaces of the carbon
steel fire water tanks for signs of coating degradation, such as flaking, cracking, and
peeling, to manage loss of material of the metallic surfaces. The team confirmed from review of the tank inspection results that the applicant had previously identified light corrosion and implemented corrective actions to clean and
recoat the fire water storage tanks. The team concluded that the surface coating of
corrosion had no impact on the structural integrity of the tank. The team walked down each of the tanks and discussed the condition of the tanks with
program and system engineers. During the walk downs, the team identified that eight of
the ten accessible condensate storage tank anchor bolts had insufficient thread
engagement on their nuts. The applicant confirmed that the bolting manual specified that these nonsafety-related anchor bolts were to have the studs flush with their nuts. The applicant documented this performance deficiency in Callaway Action
Request 2012-06831. The applicant performed a prompt operability assessment and
determined that all 56 anchor bolts could have the minimal amount of thread engagement identified during the walk down and still remain functional.
The team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the
effects of aging in the affected systems. The team concluded that, if implemented as described with the exception, the applicant developed guidance to appropriately identify and address aging effects during the period of extended operation. .2 B2.1.18 One-Time Inspection (XI.M32)
This was a new aging management program, consistent with the GALL Report, to
manage loss of material, cracking, and reduction of heat transfer internal to plant
systems. The applicant planned to conduct these one-time inspections to identify and characterize the material conditions in representative low-flow and stagnant areas of plant piping and components. The systems and components reviewed were evaluated
by the Water Chemistry, the Fuel Oil Monitoring, and the Oil Analysis programs. The planned visual and volumetric inspections should provide direct evidence of the presence and extent of loss of material resulting from all types of corrosion in treated liquid environments if it had occurred. The inspection should also provide direct evidence of any cracking as a result of stress corrosion cracking.
The team reviewed the license renewal application, aging management program evaluation report, plant operating experience, and a draft program procedure. The team discussed the program evaluations and planned activities with the responsible license renewal and plant staff. The team reviewed a sampling plan based on the material/environment combinations at Callaway, which estimated that approximately 200 inspections would be performed. The team confirmed that appropriately qualified
- 9 - Enclosure personnel would perform the nondestructive evaluations by using procedures and processes that met regulatory requirements. The elements of the program included: (1) determining the sample size based on
20 percent of the components in each material-environment-aging effect group up to a maximum of 25 components, (2) identifying inspection locations in each material-
environment group based on the potential for the aging effect to occur, (3) identifying the
most effective examination technique, including acceptance criteria, to be used, and (4) evaluating the aging effects and the need for follow-up examinations using the corrective action program.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described, the applicant provided guidance to appropriately identify and confirm whether
aging effects had occurred prior to the period of extended operation.
.3 B2.1.19 Selective Leaching (XI.M33) This was a new aging management program, consistent with the GALL Report with
exception, credited with managing loss of material resulting from selective leaching. The
selective leaching could occur in components made from gray cast iron and copper alloy
with greater than 15 percent zinc or greater than 8 percent aluminum exposed to treated
water, raw water, waste water, or groundwater environments. There were no copper alloy components with greater than eight percent aluminum within the scope of license renewal. The program will include a one-time visual inspection supplemented by
mechanical testing methods of susceptible components to determine whether loss of
material resulted from selective leaching. Inspections will commence within the five-year
period prior to entering the period of extended operation. The following systems contained components susceptible to selective leaching: fire protection; chemical and volume control; service water; compressed air; essential service water; plant heating;
fuel building heating, ventilation and air conditioning; auxiliary building heating,
ventilation and air conditioning; containment purge; and oily waste.
The team reviewed the license renewal application, the draft NRC aging management program audit results, aging management program evaluation report, plant operating experience, and draft implementing procedures. The team discussed the program evaluations and planned activities with the responsible staff. If selective leaching is
detected, deficiencies will be corrected in order to ensure that the systems will perform their intended function. Follow-up evaluations would include confirmation through metallurgical evaluation and expansion of the sample size.
The team noted that the applicant identified an exception to allow opportunistic
inspections of excavated buried gray cast iron fire protection valves and will send at least one for laboratory metallurgical examination from each batch with a minimum of two tests within the five years prior to entering the period of extended operation. The team determined that opportunistic inspections with a minimum of two valves being submitted for metallurgical examination would provide adequate insight into whether selective leaching was occurring in the soil environment. The metallurgical testing
- 10 - Enclosure provided more accurate indication whether selective leaching occurred than simply scraping and chipping the metal. The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging in components and systems that have metal alloys subject to this mechanism. The team concluded that, if implemented as described, the applicant
provided guidance to appropriately identify and address aging effects during the period of extended operation.
.4 B2.1.21 External Surfaces Monitoring of Mechanical Components (XI.M36) This was a new aging management program, consistent with the GALL Report, credited with managing: (1) loss of material and cracking for metallic components; (2) cracking and changes in material properties for cement board (splash panel) components;
and (3) loss of material, cracking, hardening and loss of strength for polymeric
components. The applicant planned to conduct periodic engineering walk downs of
external surfaces to: (1) identify loss of material and leakage; (2) include manual or physical manipulation of polymeric material to verify the absence of cracking, hardening, or loss of strength; and (3) inspect stainless steel components for cracking when
exposed to an air environment containing halides.
The team reviewed license renewal documents, the aging management program evaluation report, and implementing procedures. The team interviewed system engineers and license renewal personnel and performed system walk downs to evaluate the external condition of plant systems.
The applicant planned to conduct visual inspection of metallic components for
(1) corrosion, corrosion stains, material wastage, evidence of insulation damage or wetting; wear, flaking or oxide-coated surfaces; and leakage onto external surfaces and (2) coating degradation (e.g. cracking, flaking, and blistering) as an indicator of
possible underlying degradation of the component. The applicant planned to inspect
polymeric materials for dimensional change, exposure of internal reinforcement, and hardening/loss of strength as evidenced by loss of suppleness during manual or physical manipulation. The applicant planned to evaluate stainless steel components for cracking when exposed to an aggressive air environment containing halides. The applicant planned inspection of cement board components for loss of material or cracking that
results in a loss of the component's intended function.
The applicant planned to determine the inspection intervals for inaccessible components through an evaluation of aging effects and their impact on intended functions observed during external surface inspections on accessible components with the same material
and environment combination. The team verified that the applicant evaluated
degradation in accordance with their corrective action program.
The team concluded that the applicant had performed appropriate evaluations and considered pertinent plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described, the applicant
- 11 - Enclosure provided guidance to appropriately identify and address aging effects during the period of extended operation. .5 B2.1.25 Buried and Underground Piping and Tanks (XI.M41)
This was a new aging management program, consistent with the GALL Report, credited
with managing the aging of buried and underground steel, stainless steel, and high
density polyethylene components for loss of material, cracking, and blistering. The program includes prevention, mitigation, and inspection activities, including coatings, quality of backfill, cathodic protection, periodic inspections, and monitoring of the fire
protection jockey pump activity. This program included the high pressure coolant
injection, fire protection, emergency diesel fuel oil storage and transfer, essential service
water, service water, and auxiliary feedwater systems. The team reviewed the aging management program evaluation report, implementing procedures and procedure markups, and corrective action documents. The team also
reviewed plant specific operating experience, cathodic protection system evaluation reports, and excavation results. The team interviewed engineers responsible for the buried pipe and coatings programs and the cathodic protection system.
The team determined that the three exceptions identified by the applicant agreed with
changes identified in LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned
(GALL) Report Revision 2 Aging Management Program (AMP) XI.M41, 'Buried and
Underground Piping and Tanks'." These exceptions addressed that there were no coatings on the high density polyethylene piping, external volumetric examinations would not be utilized to detect internal corrosion of underground piping because other aging
management programs evaluate aging effects for each of the in-scope systems, and evaluations would be used to expand inspections once a deficient condition was
identified rather than a pure doubling of the sample size. The team reviewed the buried pipe program against the recommendations in
LR-ISG-2011-03 and determined that the proposed program was consistent except for a deficiency related to cathodic protection. The team determined that the existing cathodic
protection system did not provide sufficient protection of all buried in-scope piping. The
applicant stated that they would either upgrade the cathodic protection system to meet the recommended availability and effectiveness requirements or perform the increased inspections required for a plant with an ineffective cathodic protection system. The team
reviewed the applicant's response to Request for Additional Information Item B2.1.25-6a
in Letter ULNRC-05923, "Responses to Request for Additional Information Set #13 &
- 14 and Amendment 14 to the Callaway License Renewal Application," dated October 31, 2012. The team found this response satisfactory since the applicant committed to meet the conditions in LR-ISG-2011-03 by establishing a cathodic
protection system that met the availability and effectiveness criteria or by completing the specified number of inspections in each ten-year interval.
The team noted that the Close-Interval Survey and Direct Current Voltage Gradient Survey Buried Fire Water Protection Piping report, dated May 7, 2008, recommended that for locations not meeting -850 mV criterion, the station should determine whether the alternative 100 mV potential shift criterion would demonstrate acceptable cathodic
- 12 - Enclosure protection. The team also noted that LR-ISG-2011-03, Table 6a, "Cathodic Protection Acceptance Criteria," footnote 2, states, "[w]hen the 100 mV criterion is utilized in lieu of the -850 mV CSE criterion for steel piping, or where copper or aluminum components are protected, applicants must explain in the application why the effects of mixed
potentials are minimal and why the most anodic metal in the system is adequately protected." During discussions, the applicant stated that they would only use the 100mV
criterion for cast iron fire protection components because in the galvanic series, cast iron
has sufficient margin in its native value (i.e., -500 mV) to allow utilization of an increase of -100 mV. The team reviewed the applicant's response to a request for additional I information for Item B2.1.25-5a. From review of the response, the team determined that the applicant concluded that they had no electrically isolated piping sections and no data
to quantify that the effects of mixed potentials would be minimal. The team concluded
that the applicant would only use the -850 mV criteria and found the applicant's response satisfactory.
From review of several opportunistic buried piping inspection results, the team
determined that the applicant had appropriately evaluated and documented inspection findings with one exception. The team determined that the buried pipe engineer and coatings engineer were appropriately involved in each inspection. The applicant documented the results, including location, length of piping inspected, excavation site
details, photographs, description of nonconforming conditions, ultrasonic inspections
results, and coating repair dispositions. In one instance, the applicant had not
documented a condition adverse to quality (i.e., pieces of wood found in the backfill
adjacent to stainless steel piping). When questioned, the applicant agreed that the wood was, in fact, foreign material in the backfill. The applicant documented this nonconforming condition in Callaway Action Request 2012-06525.
In addition, for a buried pipe evaluation of piping considered not in-scope, the team
reviewed photographs that appeared to indicate pipe wrapping that was not completely adhered. During discussions, the applicant stated that had the buried piping been safety-related or in-scope, it is likely that they would have replaced the wrapping. The applicant added a corrective action to Callaway Action Request 2012-06868 that
specified the coatings engineer will perform the coatings evaluation when required.
The team reviewed several soil sample results. With the exception of one instance, the correct parameters were analyzed. During the excavation of stainless steel piping the buried piping engineer failed to preserve the samples in a manner appropriate to allow
testing for bacteria content. When questioned by the team in relation to how the
knowledge should be captured, the applicant initiated actions and revised Form CA2904,
"As Found Buried Piping Inspection Form," to describe packing samples in ice to keep them cool during shipping.
The team reviewed Procedure MTT-ZZ-01003, "Coatings and Wrapping of Piping,"
Revision 6, for new and repaired coating locations. The team noted that Sections 4.10
and 4.12 stated that Holiday testing (continuity testing) "may" be conducted. The team
informed the applicant that performing Holiday testing at lower voltages would confirm the correct application of coatings without damaging the coating. The applicant documented this procedure gap in Callaway Action Request 2012-06616 (i.e., enhance
the procedure to conduct Holiday testing on new shop and field applied thin coatings
- 13 - Enclosure where Holiday testing is accessible). The team determined that Section 4.7 lists a 10°F lower limit for use of the procedure, which agreed with the information provided by the vendor. The team identified a potential conflict between Section 6.5.3 that directs the craft to apply one coat of primer and Section 5.6, which states that primer is used, if
required. The team determined that the vendor recommended that a primer be used
anytime the temperature is below 32°F. Because of the potential for error, the applicant
added the need to correct this apparent conflict in application of primer to piping in
Callaway Action Request 2012-06616. The team concluded that the applicant had performed appropriate evaluations of the
piping conditions and considered pertinent industry experience and plant operating
history to determine the effects of aging on buried piping and tanks. The team
concluded that, if implemented as described including the exceptions and changes described in the above paragraphs, the applicant developed guidance to appropriately identify and address aging effects during the period of extended operation.
.6 B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E6) This was a new aging management program, consistent with the GALL Report, credited
with managing the increased resistance of connections to ensure that either aging of
metallic cable connections was not occurring and/or that the existing preventive
maintenance program was effective. This one-time test would confirm the absence of
age-related degradation of cable connections resulting from thermal cycling, ohmic heating, electrical transients, vibration, chemical contamination, corrosion, or oxidation of non-environmentally qualified electrical cable connections. The applicant planned to
evaluate a representative sample of electrical connections for in-scope components based upon the service application, circuit loading, and environment.
The representative sample will consist of 20 percent of the population of each type of connection, with a maximum of 25 connections, which will be tested at least once prior to
the period of extended operation. The applicant planned to select the samples based
upon voltage level (medium and low voltage), circuit loading (high loading), connection type, and location (high temperature, high humidity, vibration, etc.). The technical basis for the sample selection will be documented. The applicant planned to establish acceptance criteria that will be based on the temperature rise above the ambient temperatures or the baseline temperature data from the same type of connections being tested.
The team reviewed license renewal documents, the aging management program evaluation report, corrective action documents, industry and plant specific operating experience, and thermography results. The team walked down selected equipment while the applicant took thermography readings. The team determined that the applicant routinely performed infrared thermography as part of the preventive maintenance program for non-environmentally qualified electrical connections. In reviewing the operating experience, the team confirmed that the preventive maintenance program identified cable connections with thermal anomalies. These anomalies were evaluated and successfully repaired using the corrective action program and work process, respectively.
- 14 - Enclosure The team concluded that the applicant performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging. The team concluded that, if implemented as described, including
establishing an appropriate sample plan, the applicant provided guidance to
appropriately identify and address aging effects during the period of extended operation. .7 B2.1.39 Metal-Enclosed Bus (XI.E4) This was a new aging management program, consistent with the GALL Report, credited
with managing the aging affects associated with degradation of non-segregated metal-
enclosed bus ducts, including bolted bus bar connections, insulators, supports, and
elastomers. The program included 4.16 kV non-segregated buses that provided power to the circulating and service water pumps. The visual inspections will be performed at least once every five years, with the first inspections to be completed prior to the period
of extended operation.
The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, preventive maintenance tasks, and industry operating experience. The team walked down the in-scope non-segregated bus ducts
and interviewed the license renewal project personnel and the responsible engineers.
The applicant planned to inspect: (1) internal surfaces of bus enclosure assemblies for
cracks, corrosion, foreign debris, excessive dust buildup, and evidence of moisture intrusion; (2) bus insulation for signs of reduced resistance resulting from thermal degradation, radiation induced oxidation, moisture/debris intrusion, or ohmic heating, as
indicated by embrittlement, cracking, chipping, melting, discoloration, or swelling;
(3) internal bus insulating supports for structural integrity and signs of cracks;
(4) external portions of the bus duct, including gaskets and sealants, for surface cracking, crazing, scuffing, dimensional change (e.g., "ballooning" and "necking"), shrinkage, discoloration, hardening and loss of strength caused by elastomer
degradation; and (5) external surfaces for loss of material resulting from general
corrosion, pitting, and crevice corrosion.
The applicant planned to inspect visually a sample (20 percent of the population with a maximum of 25) of the accessible bolted connections. During the walk down and review, the team identified that the planned preventive maintenance activity and the plant drawings for the non-segregated bus duct did not identify the presence of a gasket
between each bus duct joint. Further, the applicant did not discuss evaluating the
gasket material in the aging management program evaluation report. From review of the vendor manual for the non-segregated bus duct, the team determined that the bus duct joints required installation of a gasket. The applicant initiated Callaway Action
Request 201206807 to resolve the discrepancy between the vendor and licensee
documents. The applicant planned to inspect the non-segregated bus duct in
December 2012 to establish the presence of the gaskets. If the applicant identifies no
gaskets are present, the applicant will install the gaskets. The team determined that the aging management program evaluation report did not list nor discuss managing aging effects of flexible links from the bus duct to the transformers
- 15 - Enclosure and to the switchgear. During walk downs and review of design information, the applicant confirmed the presence of flexible links and identified the need to monitor these connections for aging effects. The applicant initiated Procedure Change Tracking Form CW192 to include the flexible links in the bus duct preventive maintenance
program and revise the aging management program evaluation report to include the
inspection of flexible links for the bus duct connections.
The team determined that the applicant cleaned and visually inspected the metal-enclosed bus ducts during outages in accordance with existing preventive maintenance tasks. The applicant found no evidence of aging effects during past inspections of the
metal-enclosed bus ducts and has initiated a preventive maintenance procedure to
monitor and correct any aging effects in the future.
The team concluded that the applicant had performed appropriate evaluations and considered pertinent plant and industry experience to determine the effects of aging on
the metal enclosed non-segregated bus ducts. The team concluded that, if implemented
as described, the applicant provided guidance to appropriately identify and address
aging effects during the period of extended operation. b.3 Evaluation of Existing Aging Management Programs
The team sampled 16 of the 30 existing aging management programs to determine whether the applicant had taken or planned to take appropriate actions to manage the
effects of aging, as specified in the GALL Report. The team reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified from the applicant's review of industry operating experience. The team evaluated whether the applicant implemented or planned to implement appropriate actions to manage the effects of aging. These programs have established
procedures, records of past corrective actions, and previous operating experience
related to applicable components. Further, some programs required the applicant to
implement enhancements (i.e., new program aspects that will be implemented prior to the period of extended operation) to ensure consistency with the GALL Report. The team walked down selected in-scope SSCs to assess how the applicant maintained
plant equipment under the current operating license, to visually observe examples of nonsafety-related equipment determined to be in-scope because of the proximity to safety-related equipment, and to assess the potential for failure as a result of aging effects. .1 B2.1.2 Water Chemistry (XI.M2)
This was an existing program, consistent with the GALL Report, credited with managing
loss of material, cracking, reduction of heat transfer, and wall thinning in components exposed to a treated water environment. This mitigation program relied on monitoring and control of primary and secondary water chemistry to keep peak levels of various
- 16 - Enclosure contaminants below system-specific limits based on Electric Power Research Institute primary and secondary water chemistry guidelines. The applicant established their primary water chemistry program consistent with Electric
Power Research Institute 1014986, "PWR Primary Water Chemistry Guidelines,"
Revision 6, Volumes 1 and 2. The applicant established their secondary water
chemistry program consistent with Electric Power Research Institute 1016555, "PWR
Secondary Water Chemistry Guidelines," Revision 7. The applicant planned to supplement this program with the One-Time Inspection Program, which will utilize inspections or nondestructive evaluations of representative samples to verify the
effectiveness of the Water Chemistry program in stagnant or low-flow areas.
The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, audits and self-assessments, program health reports, corrective action documents, the site strategic chemistry plan, and
primary water chemistry trend data for the last five years. The team interviewed the
program owners and license renewal project personnel. The team verified that the
applicant maintained the primary and secondary water chemistry programs within the guidelines of Electric Power Research Institute 1014986 and Electric Power Research Institute 1016555, respectively.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging in the affected systems. The team concluded that the applicant provided guidance to appropriately identify and address aging effects during the period of extended operation if the program is implemented as described.
.2 B2.1.3 Reactor Head Closure Stud Bolting (XI.M3) This was an existing program, consistent with the GALL Report, credited with managing cracking and loss of material of the reactor head closure studs. The program included
periodic visual and volumetric examinations of reactor vessel flange stud hole threads,
reactor head closure studs, nuts, and washers and performed visual inspection of the
reactor vessel flange during primary system leakage tests. The program conducted inspections in accordance with American Society of Mechanical Engineer Section XI, Subsection IWB, Table IWB 2500-1, "Examination Categories, Examination Category B-G-1, Pressure Retaining Bolting Greater Than 2 in. (50 mm) in Diameter." The program
included preventive measures as recommended in Regulatory Guide 1.65, "Materials
and Inspections for Reactor Vessel Closure Studs," to use stable lubricants and to use
bolting material for closure studs that had an actual yield strength less than 150 kilo-pounds per square inch.
The team reviewed the aging management program evaluation report, implementing procedures, corrective action documents, and operating experience. The team reviewed certified material test reports, engineering evaluations related to a stud protection
sleeve, stress calculations, and nondestructive evaluations of the reactor vessel studs. The team verified that the applicant did not use lubricants containing molybdates and verified that the material had yield strength less than 150 kilo-pounds per square inch.
- 17 - Enclosure From review of operating experience and discussions with NRC headquarters personnel, the team determined that the applicant had several reactor vessel stud holes that had damaged threads removed. The team determined that Stud Holes 7, 4, 5, 53, 2, and 9 had 4, 6, 7.9, 9, 13.1 and 15.1 threads removed, respectively. Four other stud holes had
one or fewer threads removed. The applicant attributed the damage to foreign material
that had dropped into the stud holes because of poor foreign material exclusion controls
during the several outages beginning with the first refueling outage. Also, Stud 18
became stuck in the vessel flange 2.625 inches from being fully inserted during Refueling Outage 8. The team reviewed the calculations that demonstrated that sufficient threads were engaged to allow the reactor vessel to be tensioned without
overstressing the threads on the stud or in the stud holes. The team concluded that the
threads were not overstressed provided that the threads that were engaged did not have
any damage. During discussions, the applicant described that they had no evidence to indicate the presence of additional thread damage.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging for the reactor head closure studs and other components. The team concluded that, if implemented as described, the applicant provided guidance to appropriately identify and confirm whether aging effects had occurred prior to and during
the period of extended operation.
.3 B2.1.7 Flow-Accelerated Corrosion (XI.M17) This was an existing program, consistent with the GALL Report, credited with managing aging effects of wall thinning on the internal surfaces of carbon or low alloy steel piping,
elbows, reducers, expanders, and valve bodies that contain high energy fluids (both single phase and two phases). This program managed aging effects by performing
analyses to determine critical locations, conducting baseline and follow-up inspections at these critical locations, and taking corrective actions as necessary. The applicant used ultrasonic, visual, or other approved testing techniques capable of detecting wall
thinning. The program implemented the guidelines in Electric Power Research
Institute NSAC-202L, "Recommendations for an Effective Flow-Accelerated Corrosion
Program," Revision 3. Where applicable, the analyses to determine critical locations
were performed using CHECWORKSŽ, an industry standard predictive code that used the implementation guidance of NSAC-202L.
The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, calculations, system susceptibility evaluation drawings, outage reports, program health reports, and corrective action documents. The team interviewed the program owner and license renewal project personnel. The team reviewed the flow-accelerated corrosion database for a selected
sample of monitoring points.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described, the applicant provided guidance to appropriately identify and confirm whether
aging effects had occurred prior to and during the period of extended operation.
- 18 - Enclosure .4 B2.1.10 Open-Cycle Cooling Water System (XI.M20) This was an existing program, consistent with the GALL Report after enhancement,
credited with managing the aging effects related to loss of material, reduction of heat
transfer, cracking, blistering, change in color, and hardening and loss of strength for
components exposed to raw water. The applicant managed the aging effects through
periodic inspection and surveillance tests combined with chemistry controls and cleaning to minimize fouling, loss of material, and corrosion. The program specified performance testing of the component cooling water heat exchangers, visual inspections of the other
safety-related heat exchangers, and periodic inspections to monitor aging effects on other structures, systems and components. The existing program implemented the recommendations of Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment," dated July 18, 1989.
This program monitored aging effects in components serviced by the essential service water system and heat exchangers and other components in other systems serviced by the essential service water system. The safety-related heat exchangers cooled by essential service water included the: component cooling water heat exchangers, containment coolers, diesel generator heat exchangers, safety injection pump room
coolers, spent fuel pool pump room coolers, residual heat removal pump room coolers,
containment spray pump room coolers, centrifugal charging pump room coolers,
component cooling water pump room coolers, auxiliary feedwater pump room coolers, control room air conditioning condensers, Class 1E switchgear air-conditioning condensers, and electrical penetration room coolers.
The team reviewed the aging management program evaluation report, implementing procedures, and relevant corrective action documents. The team reviewed service water and ultimate heat sink chemistry data, component cooling water heat exchanger test results, essential service water flow balance test results, nondestructive testing results, room cooler and air conditioning condenser heat exchanger inspection results,
tube plugging limits and tube plug maps, and corrosion coupon trend data. In addition,
the team interviewed the program manager and walked down accessible portions of the essential service water system, the ultimate heat sink spray ponds, and the essential
service water pump and mechanical cooling tower structures. The team determined from the data and trend graphs that the applicant monitored and maintained proper controls to minimize fouling. The team determined that the applicant maintained
effective controls of the design and heat transfer capability in the heat exchangers.
In response to site-specific operating experience, the applicant had implemented corrective actions, which resulted in improving the material condition of the essential service water system. Specifically, the applicant had:
- Replaced the containment coolers that had been blocked by debris with a different design that allowed for tube cleaning, * Replaced all 4-inch diameter and smaller carbon steel piping and components with stainless steel to correct low flow and leakage issues,
- 19 - Enclosure * Replaced the admiralty brass emergency diesel generator jacket water, lube oil cooler, and intercoolers with stainless steel to correct for loss of material in the tubes, * Replaced 5 of 16 safety-related admiralty brass room coolers with stainless steel room coolers because aging issues caused poor performance. The applicant has a long term plan to replace the remaining 11 room coolers during upcoming outages with the final two room coolers replaced by 2022, and * Replaced the buried essential service water piping with high-density polyethylene (HDPE) piping, as a result of significant leakage resulting from microbiological induced corrosion. The team reviewed additional site specific operating experience that identified erosion from cavitation had occurred at the raised face flanges going into the safety-related room
coolers. Because this was an identified aging effect caused by erosion, the team
evaluated the controls that existed to evaluate additional erosion of the carbon steel flanges. The team determined that the coolers were scheduled to be replaced over the
next ten years. Further, the team determined that the heat exchanger inspection form required taking measurements of the flange face. The team concluded that the applicant had implemented sufficient controls that will continue to detect erosion prior to leakage
through the flange.
The applicant specified that procedures will be enhanced to include polymeric material inspection requirements, parameters monitored, and acceptance criteria. The applicant specified this examination would be consistent with the examinations performed when inspecting polymeric materials in the Internal Surfaces in Miscellaneous Piping and
Ducting Components program. The team verified that the proposed changes to
Procedure EDP-ZZ-01121, "Raw Water Systems Predictive Performance Program," Revision 14, provided appropriate guidance to evaluate polymeric material. The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging in components cooled by open-cycle cooling water. The team
concluded that, if implemented as described with the enhancement, the applicant provided guidance to appropriately identify and address aging effects during the period of extended operation.
.5 B2.1.11 Closed Treated Water Systems (XI.M21A) This was an existing program, consistent with the GALL Report after enhancement, credited with managing loss of material, cracking, and reduction of heat transfer for
components in the closed-cycle cooling water systems. The program included
monitoring and control of corrosion inhibitor and chemistry parameters consistent with the guidance of Electric Power Research Institute TR-107396, "Closed Cooling Water
Chemistry Guideline," Revision 1. Also, the applicant planned to conduct periodic inspections to determine the presence or extent of corrosion, fouling, and/or cracking. The program uses four chemistry control programs: molybdate with tolyltriazole (component cooling and chilled water systems), ethylene glycol (plant heating steam),
- 20 - Enclosure nitrite control with tolyltriazole (diesel generator jacket water), or diesel coolant additive and ethylene glycol (fire protection diesel jacket water). The systems included in this program were diesel generator jacket water, component cooling water, chilled water, and plant heating.
The team reviewed implementing procedures, corrosion rate data, and chemistry data
for the monitored systems. The team walked down the piping and components in the closed treated water systems and interviewed the system engineer. The team determined from the data and trend graphs reviewed that the applicant appropriately monitored for heat transfer and loss of material in the in-scope systems. The team verified that the heat exchangers had very few plugged tubes and determined that the
applicant had replaced the admiralty brass heat exchangers for the safety-related diesel
generator with stainless steel heat exchangers. The applicant planned to enhance this program to include visual inspections of
component surfaces. The visual inspections will: (1) include representative samples of
each combination of material and water treatment program at least every 10 years or
opportunistically when consistent with sample requirements; (2) be conducted and evaluated consistent with American Society of Mechanical Engineers Code inspections, industry standards, or a plant-specific inspection procedure by personnel qualified to
detect aging; (3) include additional examinations if adverse conditions were found;
and (4) determine the extent of cracking, loss of material and fouling, which would serve
as a leading indicator of the condition of the interior of piping components otherwise
inaccessible for visual inspection. The team compared the draft inspection procedure to the aging management program
evaluation report that specified visual inspection requirements. The team identified
several statements between the documents that did not agree. Following discussions
with the applicant regarding these discrepancies, the applicant reviewed the comments and made changes to both the draft inspection procedure and the aging management program evaluation report. The team verified that the changes made in each document
corrected the identified discrepancies. Further, the applicant tracked these changes
under Action Item RI202. The applicant documented the changes in Enclosure 3,
"Regional Inspection Item Updates," in Letter ULNRC-05923.
The team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the
effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancement, the applicant provided guidance to appropriately
identify and address whether aging effects had occurred during the period of extended operation. .6 B2.1.13 Fire Protection (XI.M26)
This was an existing program, consistent with the GALL Report after enhancement,
credited with managing loss of material of fire rated doors, fire dampers, and the halon system; concrete cracking, spalling, and loss of material of fire barrier walls, ceilings, and floors; and increased hardness, shrinkage, and loss of strength of fire barrier
- 21 - Enclosure penetration seals. This program was comprised of tests and inspections that followed the applicable National Fire Protection Association recommendations. The team reviewed license renewal documents, the aging management program evaluation report, program enhancements, implementing procedures (including the proposed changes), program health reports, and corrective actions documents. The
team interviewed fire protection personnel and license renewal project personnel. The
team inspected various fire rated doors, fire barriers, fire dampers, fire penetration seals, and the halon system to observe the physical condition of the fire protection features and to assess the effectiveness of the existing program.
The fire protection program managed the effects of aging through visual inspections of
fire rated doors, fire barriers (including walls, coatings, and wraps), fire dampers, fire penetration seals, and the halon system. The applicant performed visual inspections and functional tests for the fire doors at least once every 18 months. The applicant
performed visual inspections of the fire barriers within the scope of license renewal every
18 months. The applicant visually inspected at least 10 percent of the fire dampers and
each type of penetration seal every 18 months. The applicant planned to enhance the program to require visual inspections every six
months of the halon system to inspect for corrosion. Currently, the applicant conducted
a functional test of the halon system every 18 months, in accordance with the approved fire protection program. The team identified no concerns with this enhancement.
The team identified two concerns with the fire protection program. The first concern involved a difference between the guidance in the GALL Report and the aging
management program evaluation report associated with the inspection of fire penetration
seals. The GALL Report stated that any sign of degradation detected in the inspection
sample should lead to an increase in inspection scope. The applicant's aging management program provided a conditional statement that allowed an engineering evaluation prior to an increase in inspection scope. If the engineering evaluation concluded that the penetration seal was still capable of performing its intended function,
then the inspection scope did not need to be increased. The applicant changed the
aging management program evaluation report to make it fully consistent with the GALL
Report. Further, the applicant tracked these changes under Action Item RI088. The applicant documented the changes in Letter ULNRC-05923, Enclosure 3.
The second concern involved the procedure for inspecting fire barriers. During the
system walk down, the team noticed that several portions of the Darmat fire barrier were not easily accessible to inspectors standing on the ground, and ladders or scaffolding may be necessary for inspectors to observe the effects of aging on the fire barrier. The team discussed this issue with fire protection personnel and determined that the
program inspected accessible portions of the fire barrier as prescribed by the approved fire protection program. The applicant documented the need to revise the fire procedure
in Callaway Action Request 2012-07533, which documented the need to inspect the
entire Darmat fire barrier for the presence of aging effects. The team concluded that, overall, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine
- 22 - Enclosure the effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancement and changes, the applicant provided guidance to appropriately identify and confirm whether aging effects had occurred prior to the period of extended operation.
.7 B2.1.14 Fire Water System (XI.M27)
This program was an existing program, consistent with the GALL Report after enhancement, credited with managing loss of material for water-based fire protection systems consisting of aboveground, buried, and underground: piping, fittings, valves, fire pump casings, sprinklers, nozzles, hydrants, hose stations, standpipes, and water storage tanks. This program used periodic fire main and hydrant inspections and
flushing, sprinkler inspections, function tests, and flow tests in accordance with the National Fire Protection Association standards to ensure the systems remained capable of performing their intended function. The applicant maintained and monitored the fire
protection system at the required normal operating pressure such that a loss of system
pressure would be immediately detected and corrective actions initiated.
The team reviewed license renewal documents, the aging management program evaluation report, program enhancements, program exceptions, implementing procedures and procedure markups, program health reports, and corrective action
documents. The team interviewed fire protection personnel and license renewal project
personnel. The team walked down portions of the fire water system, including the fire
pumps and associated piping. The applicant identified six enhancements needed to ensure this program was
consistent with the GALL Report. The applicant planned to enhance the implementing
procedures to: (1) include non-intrusive pipe wall thickness examinations on fire water
piping or, as an alternative, perform internal inspections on accessible exposed portions of fire water piping during plant maintenance activities; (2) replace sprinkler heads prior to 50 years in service or have a recognized testing laboratory field-service test a representative sample in accordance with National Fire Protection Association 25,
"Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection
Systems"; (3) review and evaluate trends in flow parameters recorded during flow tests; (4) perform annual hydrant flow testing in accordance with National Fire Protection Association 25; (5) perform annual hydrostatic testing of the fire brigade hoses; and (6) recoat the internal surfaces of the fire water storage tanks. The team reviewed
the procedure markups and confirmed that the applicant had included each of the
enhancements in the procedures.
The applicant took two exceptions to the GALL Report. First, the applicant performed power block hose station gasket inspections at least every 18 months as specified in the
approved fire protection program, rather than annually as specified in the GALL Report
and National Fire Protection Association 25. Second, the GALL Report required annual
testing of fire hydrant hoses. However, the applicant hydrostatically tested fire hoses at
interior fire hose stations five years from installation and every three years thereafter, as specified in the approved fire protection program. The team identified no concerns with these exceptions because this meets the industry standard surveillance frequency and
meets the requirements in the approved fire protection program.
- 23 - Enclosure The team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancements and exceptions, the applicant provided guidance to
appropriately identify and address aging effects during the period of extended operation.
.8 B2.1.16 Fuel Oil Chemistry (XI.M30) This was an existing program, consistent with the GALL Report after enhancement,
credited for managing the loss of material on the internal surface of diesel fuel oil
storage tanks through monitoring and control of fuel oil quality. The fuel oil tanks
included the emergency fuel oil storage and fuel oil day tanks for the emergency diesel generators, the diesel-driven fire pumps fuel oil day tanks and the security system diesel generator fuel oil day tank.
The team reviewed the aging management program evaluation report, implementing procedures and procedure mark-ups, and relevant corrective action documents. The team interviewed plant personnel and walked down accessible portions of the diesel generators, diesel generator day tanks, diesel-driven fire pump day tanks, and the security system diesel day tank. From a review of plant operating experience, the team determined that no additional aging effects had occurred that would require modifying
this aging management program. The team noted that the applicant utilizes other onsite
fuel oil storage tanks as a holding tank for fuel used to refill the diesel-driven fire pump and security system diesel tanks.
The applicant identified numerous enhancements to procedures to ensure consistency
with the GALL Report. Specifically, the applicant developed draft procedures that
included requirements to: * Periodically drain water from the emergency fuel oil storage tank, the two diesel fire pump fuel oil day tanks, and the security diesel generator fuel oil day tank; * Add biocide to the two diesel fire pump fuel oil day tanks and the security diesel generator fuel oil day tank, if required from sample results; * Include draining, cleaning, and inspection of the emergency fuel oil day tanks; * Sample periodically for water and sediment in the emergency fuel oil day tanks and security diesel generator fuel oil day tank; * Evaluate particulate concentrations during the periodic sampling of the emergency fuel oil storage tanks, the two diesel fire pump fuel oil day tanks, and the security diesel generator fuel oil day tank; * Determine microbial activity concentrations during the periodic sampling of the emergency fuel oil storage tanks, emergency fuel oil day tanks, two diesel fire pump fuel oil day tanks, and security diesel generator fuel oil day tank;
- 24 - Enclosure * Sample new fuel oil for water and sediment prior to introduction into the security diesel generator fuel oil day tank and diesel fire pump fuel oil day tanks; * Perform periodic volumetric examination of the emergency fuel oil storage tanks and day tanks if evidence of tank degradation is observed during the visual inspection; * Perform periodic volumetric examinations on the external surface of the diesel fire pump fuel oil day tanks and security diesel generator fuel oil day; * Trend at least quarterly the water, biological activity, and particulate concentrations for the emergency fuel oil day tanks, diesel fire pump fuel oil day tanks, and security diesel generator fuel oil day tank; and
- Remove immediately accumulated water when discovered in the emergency fuel oil day tanks, diesel fire pump fuel oil day tanks, and security diesel generator fuel oil day tank.
The team reviewed the four procedure markups that included the requirements
described in the previous paragraph. The team determined that the applicant had not
included all the enhancements, as described. During discussions with the applicant, the
applicant agreed with the identified discrepancies in the procedure markups and initiated corrections. The team verified that the applicant had made appropriate changes to include the missing requirements in the draft procedures prior to the end of the
inspection.
From review of site-specific operating experience, the team identified that blisters inside the Train A emergency fuel oil storage tank could have resulted from an aging mechanism, which would require volumetric examination of the tank. Specifically, the team questioned the applicant about the cause, location and number of dime-to-nickel
sized blisters inside the Train A emergency fuel oil storage tank. The applicant could not
identify the number or location of the dime-to-nickel sized blisters inside the Train A emergency fuel oil storage tank. From anecdotal stories, the applicant indicated that the number and size of the blisters had not changed. However, the inspections indicated
that the coating had good adhesion around the blisters. The team reviewed the
documented inspections of the tank and determined that insufficient information was
recorded other than the existence of the dime-to-nickel sized blisters.
The blisters had been present in the tank since at least 1990 as documented in an inspection. Because of the lack of information related to the cause of the blisters, the
number of blisters and whether the blisters had increased over time, the team requested
that the applicant remove all the blisters, evaluate the condition of the underlying metal,
remediate the blisters, and implement the appropriate aging management actions. If the blisters resulted from an adhesion problem without any evidence of aging effects, then a visual inspection every 10 years would continue to be appropriate. However, if an aging
effect were to be identified, then the applicant would need to volumetrically examine the
tank. The applicant changed the aging management program evaluation report to make
- 25 - Enclosure it fully consistent with the GALL Report. Further, the applicant tracked these changes under Action Item RI178. The applicant documented the changes in Letter ULNRC-05923, Enclosure 3. Also, the applicant revised the license renewal application to indicate they would inspect and repair the blisters prior to entering the
period of extended operation. The team confirmed the applicant would perform the
next 10-year inspection prior to entering the period of extended operation.
The team concluded that the applicant had, generally, performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging on internal surfaces in those systems containing diesel fuel oil. The team concluded that, if implemented as described including the
enhancements and corrective actions, the applicant provided guidance to appropriately
identify and address aging effects during the period of extended operation. .9 B2.1.24 Lubricating Oil Analysis (XI.M39)
This was an existing program, consistent with the GALL Report after enhancement,
credited with managing oil environments in order to prevent loss of material and reduction of heat transfer. The program maintained lubricating oil contaminants (primarily water and particulates) within acceptable limits, thereby preserving an environment that was not conducive to loss of material or reduction of heat transfer. The
applicant sampled, analyzed, and trended results for numerous systems, as listed in this program, to provide an early indication of adverse equipment condition. The team reviewed the license renewal application, aging management program evaluation report, plant operating experience, program and implementing procedures, and relevant condition reports. The team interviewed license renewal and plant
personnel, and walked down the accessible lubricating oil components of the Train A
emergency diesel generator and diesel-driven fire pumps. The team sampled oil measurement results and trending within the lubricating oil database and reviewed oil analysis program reports.
The applicant identified numerous enhancements to procedures to ensure consistency
with the GALL Report. Specifically, the applicant described that procedures would be
enhanced to: (1) indicate that lubricating oil contaminants were maintained within acceptable limits, thereby preserving an environment that was not conducive to loss of material or reduction of heat transfer; (2) state the testing standards for water content
and particle count; and (3) state that phase separated water in any amount was not
acceptable. The team confirmed that the markup for Procedure EDP-ZZ-01126,
"Lubrication Predictive Maintenance Program," Revision 11, incorporated each of these enhancements.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging on piping and component surfaces in lubricating and hydraulic oil
systems. The team concluded that, if implemented as described including enhancements, the applicant provided guidance to appropriately identify and address aging effects during the period of extended operation.
- 26 - Enclosure .10 B2.1.30 Masonry Walls (XI.S5) This was an existing program, consistent with the GALL Report, credited with managing cracking of masonry walls through visual inspections. This program was integrated into
and administered as part of the structures monitoring program, which implements the maintenance rule structures inspections. The applicant had based this program on
guidance provided in Inspection and Enforcement Bulletin 80-11, "Masonry Wall
Design," and Information Notice 87-67, "Lessons Learned from Regional Inspections of Licensee Actions in Response to NRC IE Bulletin 80-11." The team confirmed that the applicant had masonry walls in the turbine building, auxiliary building, control building,
and essential service water pump house. The applicant performed the masonry wall
inspections at intervals of no more than five years.
The team reviewed license renewal documents, the aging management program evaluation report, program procedures, corrective action documents, and masonry wall
drawings. The team discussed the program with civil engineers and visually examined accessible masonry block walls to assess their condition. The team determined that the applicant used the guidance for masonry walls from the maintenance rule structures monitoring program to perform the visual inspections. The team verified that the applicant had safety-related masonry block walls. The team concluded that the masonry
walls were in good condition and had been constructed in accordance with the design
drawings.
The team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described, the applicant provided guidance to appropriately identify and address aging
effects during the period of extended operation.
.11 B2.1.31 Structures Monitoring (XI.S6)
This was an existing program, consistent with the GALL Report after enhancement,
credited with managing loss of material, cracking, and change in material properties of
structures and structural components, including structural bolting, through visual
inspections. The applicant implemented the structures monitoring requirements of 10 CFR 50.65, "Maintenance Rule," and used guidance provided in the American Concrete Institute Standards 201.1R, "Guide for Conducting a Visual Inspection of
Concrete in Service," and 349.3R, "Evaluation of Existing Nuclear Safety-Related
Concrete Structures." This program provided inspection guidelines for concrete
elements, structural steel, roof systems, masonry walls and metal siding, including all masonry walls and water control structures within the scope of license renewal. The program monitored settlement for each major structure and inspects non-code
mechanical and electrical supports. The inspection of all structural components,
including masonry walls and water-control structures, were performed at intervals of no
more than five years.
The team reviewed license renewal documents, the aging management program evaluation report, procedures, corrective action documents, work orders, and
engineering requests. The team interviewed the program engineers and discussed
- 27 - Enclosure program enhancements, existing program procedures, and qualifications of inspection personnel. The team performed walk downs with civil engineers involved with performing the inspections and visually examined a sample of structures and structural components in the control and auxiliary buildings. The team independently walked down
areas in the auxiliary and control buildings. The team verified that the applicant
maintained records and recorded structural indications and deficiencies in a manner
such that future inspectors could compare the inspection results.
This program required numerous enhancements to be consistent with the GALL Report. Specifically, the applicant identified enhancements to:
- Inspect penetrations, transmission towers, electrical conduits, raceways, cable trays, electrical cabinets/enclosures, and associated anchorages, and to complete a baseline inspection of these components prior to December 31, 2017; * Include the main access facility into the program scope; * Monitor groundwater for pH, chlorides and sulfates, and every five years test at least two samples and evaluate the results to assess the impact on below grade structures; * Specify, for replacement bolts, that the bolt material, installation torque/tension, and use of lubricants and sealants met required industry guidelines; * Specify preventive actions for storage, lubrication, and stress corrosion cracking potential discussed in specified industry standards; * Specify inspections of penetrations; * Require that inspectors meet the qualifications listed in American Concrete Institute 349.3R-96; * Quantify acceptance criteria and critical parameters for monitoring degradation, including guidance for unacceptable conditions; * Incorporate applicable industry codes, standards and guidelines for acceptance criteria; and * Require an engineer familiar with the seismic design of the plant, including the evaluation of the seismic isolation function, to evaluate degradation, obstruction or questionable material and determine the corrective actions.
The team confirmed that the mark-up for Procedure ESP-ZZ-01013, "Maintenance Rule Structures Inspection," Revision 6 included the enhancements.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging in the affected systems. The team concluded that, if implemented as
- 28 - Enclosure described with enhancements, the applicant provided guidance to appropriately identify and address aging effects during the period of extended operation. .12 B2.1.32 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (XI.S7)
This was an existing program, consistent with the GALL Report, credited with managing
loss of bond, loss of material (spalling), cracking, increase in porosity and permeability, loss of strength, change in material properties, and loss of form in water-control structures through visual inspections. The existing program was developed based on
guidance provided in Regulatory Guide 1.127, "Inspection of Water-Control Structures
Associated with Nuclear Power Plants," Revision 1. This program also included
structural steel and structural bolting associated with water-control structures. The applicant included these program requirements in their structures monitoring program, which implements the maintenance rule structures inspections. Water-control structures within the scope of the program included the essential service water pump house, the essential service water supply lines yard vault, the ultimate heat sink cooling tower and
retention pond, and the submerged discharge structure. The team reviewed license renewal documents, the aging management program evaluation report, program procedures, corrective action documents, and engineering
requests. The team interviewed the program engineers and discussed the results of the
most recent inspection, existing program procedures, and qualifications of inspection
personnel. The team performed walk downs with engineers involved with performing the inspections and visually examined a sample of structures and structural components including the essential service water system pump house, the ultimate heat sink cooling tower, and the ultimate heat sink retention pond.
The applicant performed in-service and structural inspections of the ultimate heat sink retention pond and its associated structures to evaluate their structural safety and operational adequacy at five year intervals. The applicant performed algae treatment
and riprap inspections along the ultimate heat sink retention pond and monitored
underwater benchmarks for settlement of the Category 1 structures. During walk downs,
the team did not see any algae, misplaced riprap, or problems with the structures.
The team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the
effects of aging in the affected systems. The team concluded that, if implemented as described, the applicant provided guidance to appropriately identify and address aging
effects during the period of extended operation. .13 B2.1.33 Protective Coating Monitoring and Maintenance Program (XI.S8)
This was an existing program, consistent with the GALL Report after enhancement,
credited with managing loss of coating integrity of Service Level I coatings inside
containment. The program included visual inspections of accessible coatings that covered steel and concrete surfaces inside containment (e.g., steel liner, steel shell, supports, concrete surfaces, and penetrations).
- 29 - Enclosure The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures and procedure mark-ups, corrective action documents, plant operating experience, and inspection results. The team searched the corrective action program database for relevant corrective action requests. The team interviewed the program owner and license renewal project personnel.
The program will be enhanced to revise program documents prior to entering the period
of extended operation to specify: (1) monitoring or inspecting for visible defects, such as blistering, cracking, flaking, peeling, rusting, and physical damage; (2) meeting the requirements of American Society of Testing Materials Standard D5163-08,
"Establishing a Program for Condition Assessment of Coating Service Level I Coating Systems in Nuclear Power Plants," for inspection frequencies, plans and methods,
personnel qualifications, and inspection equipment; (3) reviewing the previous two monitoring reports to prioritize areas for repair or to allow postponing to a future outage with surveillance in the interim period; (4) characterizing, documenting, and testing
consistent with American Society of Testing Materials Standard D5163-08, Sections 10.2
through 10.4; (5) evaluating inspection results by a coating specialist who summarizes
the findings and recommendations for future surveillance or repair; and (6) requiring that inspection reports prioritize repair areas as either needing repair during the same outage or postponing to future outages with surveillance in the interim period.
The applicant took an exception to the GALL Report so that they only implemented
those activities associated with Service Level I coatings specified in Regulatory
Guide 1.54, "Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants," Revision 2. The team confirmed that the applicant implemented their program consistent with the requirements of American Society of Testing Materials
Standard D5163-08. Further, the team confirmed that the applicant had included these
inspection requirements, as well as the enhancements in the mark-up of
Procedure EDP-ZZ-03000, "Containment Building Coatings," Revision 17. The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancements and exceptions, the applicant provided guidance to
appropriately identify and address aging effects during the period of extended operation. .14 B2.1.34 Insulation Materials for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E1)
This was an existing program, consistent with the GALL Report after enhancement, credited with managing reduced insulation resistance in non-environmentally qualified electrical cables, connections and terminal blocks in adverse localized environments.
Visual inspections would look for embrittlement, melting, cracking, swelling, surface
contamination, or discoloration that could indicate incipient conductor insulation aging
from temperature, radiation, or moisture. The applicant will complete the first inspection
prior to entering the period of extended operation and at least once every ten years thereafter.
The team reviewed license renewal documents, the aging management program
- 30 - Enclosure evaluation report, corrective action documents, plant operating experience and draft Procedure EDP-ZZ-07001, "Cable Management Program," Revision 0. The applicant defined adverse localized environments as a limited plant area that had conditions where temperature, radiation, or moisture may exceed the design conditions. The team
walked down selected plant areas and looked for adverse localized environments. The
team interviewed design engineers and project personnel to determine their plans for
conducting these aging effects evaluations. The applicant identified the plant areas for
evaluation of adverse localized environments in the aging management program evaluation report for this program and draft Procedure EDP-ZZ-07001.
The program required two enhancements to be consistent with the GALL Report. The
applicant included information in their draft procedure that specified (1) including all
accessible in-scope cables in any adverse localized environment and (2) conducting an engineering evaluation for any visual indications of cable insulation surface anomalies. The applicant used technical information contained within SAND 96-0344, "Aging
Management Guideline for Commercial Nuclear Projects - Electrical Cable and
Terminations," and Electric Power Research Institute TR-1013475, "Plant Support
Engineering: License Renewal Electrical Handbook," to determine the service limitations of the cable, connection and terminal block insulating materials. The applicant used SAND 96-0344 and Electric Power Research Institute TR-109619, "Guideline for the
Management of Adverse Localized Equipment Environments," to develop guidance for
visual inspection techniques of cables, connections and terminal blocks for aging.
The team concluded that the applicant performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in cables exposed to adverse localized environments. The team concluded that, if implemented as described including the enhancements, the applicant
provided guidance to appropriately identify and address aging effects during the period
of extended operation. .15 B2.1.35 Insulation Materials for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (XI.E2)
This was an existing program, consistent with the GALL Report after enhancement, credited with managing reduced insulation resistance for cables and connections used in sensitive instrumentation circuits within the ex-core neutron monitoring system. This program would provide reasonable assurance that the intended function of
instrumentation circuit cables and connections exposed to adverse localized
environments caused by temperature, radiation, or moisture were maintained consistent with the current licensing basis. When instruments were found out of calibration, the applicant performed troubleshooting on the loop, including the instrumentation cable and
connections. The applicant committed to complete a review of surveillance results prior
to the period of extended operation and every ten years thereafter.
The team reviewed license renewal documents, the aging management program evaluation report, corrective action documents, industry operating experience, and surveillance test results. The team walked down accessible in-scope cables and
interviewed the responsible system engineer and license renewal personnel. The
- 31 - Enclosure program required three enhancements to be consistent with the GALL Report. The applicant planned to: (1) identify the scope of cables requiring aging management, (2) require engineering review of surveillance results every ten years, and (3) ensure corrective actions were initiated when surveillance results did not meet acceptance
criteria, which included performing an engineering evaluation and assessing whether the cable testing frequency needed to be increased. The team verified that draft
Procedure EDP-ZZ-07001 included each of these enhancements. However, the team
determined the procedure was difficult to follow and discern the requirements specifically related to each of the electrical aging management programs. The applicant indicated that the planned revisions to the cable management procedure included clarifying the
requirements associated with each of the aging management programs.
The team concluded that the applicant performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging. The team concluded that, if implemented as described with the
enhancements, the applicant provided guidance to appropriately identify and address aging effects during the period of extended operation.
.16 B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E3)
This was an existing program, consistent with the GALL Report after enhancement,
credited with managing aging caused by reduced insulation resistance. This reduced
insulation resistance could lead to electrical failure of in-scope inaccessible power cables (greater than or equal to 400 volts) exposed to wetting or submergence caused by significant moisture. Significant moisture was defined as periodic exposures to
moisture that lasted more than a few days. The applicant planned to manage the aging
effects by periodically inspecting for water in cable manholes and conduits and by
testing the inaccessible medium-voltage electrical cables. The applicant would test the cables prior to the period of extended operations and once every 6 years.
The team reviewed license renewal documents, the aging management program evaluation report, the draft implementing procedure, corrective action documents, plant operating experience, and work orders. The team interviewed plant personnel and walked down several underground cable manholes. The team also reviewed the dewatering program for performing annual inspection of the in-scope cables and duct banks for water intrusion. During the review of draft Procedure EDP-ZZ-07001, the team
identified an apparent conflict in the cables identified as underground and the assigned
aging management program. The applicant included this apparent conflict in their list of
improvements required for this draft aging management program procedure. The team concluded this was an appropriate planned corrective action.
The applicant identified numerous enhancements required to ensure consistency with
the GALL Report. Specifically, the applicant developed draft procedures that included
requirements to: (1) identify the inaccessible medium voltage power cables (greater than or equal to 400 volts); (2) inspect periodically manholes, pits, and duct banks to confirm cables were not submerged, cables/splices and cable support structures were intact, and dewatering/drainage systems and alarms operated properly; (3) inspect at
least annually based on water accumulation and after event driven occurrences (e.g.,
- 32 - Enclosure heavy rain or flooding); (4) test in-scope power cables at least once every six years and adjust based on test results and operating experience; (5) require comparing test results to previous test results to identify the rate of cable degradation; (6) define acceptance criteria for cable testing prior to each test; and (7) require an engineering evaluation
when the acceptance criteria were not met.
The team verified that the applicant incorporated these enhancements into draft
Procedure EDP-ZZ-07001. The team determined that the applicant conducted the inspections using preventive maintenance activities. Whenever plant personnel found water in manholes, they measured and sampled the water prior to pumping the water
from the manhole. The applicant described that testing could be a mix of proven testing
methods such as dielectric loss (dissipation factor/power factor), AC voltage withstand, partial discharge, step voltage, time domain reflectometry, insulation resistance and polarization index, line resonance analysis, or other state-of-the-art testing. If the applicant identified anomalies during the testing, they would take actions in accordance
with the corrective action program to correct the condition and adjust the frequency of
testing.
The applicant had determined that safety-related cables in Manhole MH-01 were submerged while completing inspections in response to Generic Letter 2007-01,
"Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation
Systems or Cause Plant Transients," dated February 7, 2007. The applicant had had no failures of medium-voltage cables because of water treeing; however, the applicant
increased the frequency of inspection of Manhole MH-01 for water intrusion from 36 to 6 months after the repairs and modification of the manhole, as specified in Callaway Action Request 201101616. The applicant was establishing a dewatering
program that would install sump pumps in the manholes. The applicant had developed
preventive maintenance requirements to monitor, inspect and repair the dewatering systems. The team did not identify any water in the manholes that had been identified as susceptible to water intrusion.
The team concluded that the applicant had performed appropriate evaluations and
considered pertinent industry experience and plant operating history to determine the
effects of aging for inaccessible cables. The team concluded that, if implemented as
described with enhancements, the applicant provided guidance to appropriately identify and address aging effects during the period of extended operation. b.4 System Reviews
The team performed a vertical slice review of selected in-scope systems to assess the applicant's scoping, screening, and aging management reviews of selected components to confirm whether the applicant accurately determined the appropriate material and
environment and correctly assigned the appropriate aging management programs.
The team selected the following systems for review:
- Auxiliary feedwater * Compressed air * Emergency diesel generator subsystems
- 33 - Enclosure The team interviewed the license renewal staff members and the responsible system engineers. The team: (1) selected components and verified material specifications; (2) walked down the systems to confirm that the applicant had properly identified
scoping boundaries (including structural and spatial interactions); (3) identified the
environments affecting the systems and had properly identified aging management programs to manage the effects of aging for these systems; and (4) evaluated the physical condition of the sampled systems. The team met with license renewal staff to determine how the applicant identified the applicable aging effects and assigned the applicable aging management program for each structure, system, or component.
The aging effects requiring management for the auxiliary feedwater system included cracking, hardening and loss of strength, loss of material, loss of preload, reduction of heat transfer, and wall thinning. The applicant credited the following aging management programs for managing the identified aging effects: Bolting Integrity, Buried and
Underground Piping and Tanks, External Surfaces Monitoring of Mechanical
Components, Flow-Accelerated Corrosion, Inspection of Internal Surfaces in
Miscellaneous Piping and Ducting Components, Lubricating Oil Analysis, One-Time Inspection, and Water Chemistry programs. The team identified no concerns related to the boundaries, materials, environments, or aging management programs assigned for
this system.
The compressed air system provides air to the main feedwater valves, atmospheric dump valves, and auxiliary feedwater injection valves. The aging effects requiring management for the compressed air system include loss of material and loss of preload. The applicant credited the following aging management programs for managing the
identified aging effects: External Surfaces Monitoring, Bolting Integrity, and Inspection of
Internal Surfaces in Miscellaneous Piping and Ducting Components programs. The
team identified no concerns related to the boundaries, materials, environments, or aging management programs assigned for this system.
The emergency diesel generator engine system contains the following subsystems:
cooling water, starting, lubrication, and combustion air intake and exhaust. The aging
effects requiring management for the emergency diesel generator subsystems included
cracking, hardening and loss of strength, loss of material, loss of preload, and reduction of heat transfer. The applicant credited the following aging management programs for managing the identified aging effects: Bolting Integrity, Closed Treated Water Systems,
External Surfaces Monitoring of Mechanical Components, Fuel Oil Chemistry, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, Lubricating Oil
Analysis, One-Time Inspection, and Open-Cycle Cooling Water System programs. The team identified no concerns related to the boundaries, materials, environments, or aging management programs assigned for this system.
For these systems, the team concluded that the physical condition of the system and the results of tests and inspections of the various existing aging management programs demonstrated that materials, environments, and aging effects on the selected systems had been appropriately identified and addressed. The team concluded that the applicant appropriately addressed the aging effects for these systems with the identified aging
management programs.
- 34 - Enclosure c. Overall Conclusion Overall based on the samples reviewed by the team, the inspection results supported a conclusion that there is reasonable assurance that actions have been identified and
have been taken or will be taken to manage the effects of aging in the SSCs identified in
the application and that the intended functions of these SSCs will be maintained in the
period of extended operation. 40A6 Meetings, Including Exit The team presented inspection results to Mr. C. Reasoner, Vice President Engineering,
and other members of the applicant's staff during a preliminary exit meeting conducted on September 28, 2012. The applicant acknowledged the NRC inspection observations. The team returned all proprietary information reviewed during this inspection.
The team presented inspection results to Ms. S. Kovaleski, Supervising Engineer, and
other members of the applicant's staff during a telephonic exit meeting conducted on November 7, 2012. The applicant acknowledged the NRC inspection observations.
ATTACHMENT: SUPPLEMENTAL INFORMATION
A-1 Attachment SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Applicant
S. Abraham, NSSS Systems Engineer
A. Alley, Civil Design Engineer R. Andreasen, Civil Design Engineer A. Burgess, Lead Mechanical Engineer
S. Cantrell, Balance of Plant Systems Engineer
E. Dorge, Chemistry Engineer
N. Fisher, Electrical Systems Engineer G. Forster, Engineering Programs Engineer J. Howard, Chemistry Supervisor
J. Imhoff, NSSS Systems Engineer
L. Kanuckel, Manager Engineering Design
B. Kelley, Chemistry Supervisor S. Kovaleski, Supervising Engineer G. Kremer, Manager Engineering Programs
D. Martin, Electrical Engineer
D. Maschler, Chemistry Engineer
J. McLaughlin, NSSS Systems Engineer
S. Merciel, Site License Renewal Project Manager S. Morris, Engineering Programs Engineer W. Muskopf, Mechanical Engineering Projects
T. Parashar, NSSS Systems Engineer
L. Ptasznik, Engineering Programs Engineer
C. Reasoner, Vice President Engineering B. Richardson, Safety Analysis Engineer J. Small, Chemistry Superintendent
C. Stundebeck, Civil Design Engineer
E. Vaughn, Civil Design Engineer
STARS Center of Business E. Blocher, License Renewal Project Manager
K. Bryant, Mechanical Lead
R. Davis, Utility Representative
J. Johnson, Structural Lead J. Knust, Mechanical Lead A. Saunders, Utility Representative
Division of License Renewal
J. Gavula, Senior Mechanical Engineer R. Kalikian, Materials Engineer E. Wong, Chemical Engineer
A-2 Attachment DOCUMENTS REVIEWED General Callaway Action Requests:
201205800* 201206520* 201206557* 201206824*
- identified as a result of the inspection
Letters: NUMBER TITLE DATE Scoping and Screening Methodology Report Regarding the Callaway Plant, Unit 1, License Renewal Application 08/06/2012
Aging Management Programs Audit Report Regarding the Callaway Plant, Unit 1, License Renewal Application 08/09/2012 ULNRC-05877 Responses to RAI Set #1 and Amendment 4 to the Callaway License Renewal Application 07/12/2012
ULNRC-05891 Responses to RAI Set #4 and Amendment 6 to the Callaway License Renewal Application 08/09/2012 ULNRC-05892 Responses to RAI Set #5 and Amendment 7 to the Callaway License Renewal Application (with Updates to Previous RAI
Responses) 08/21/2012
ULNRC-05903 Responses to RAI Set #6 and Amendment 8 to the Callaway License Renewal Application 08/21/2012
ULNRC-5903 Responses To RAI Set #13 & #14 and Amendment 14 to the Callaway License Renewal Application 10/31/2012 Scoping Callaway Action Requests: 200306363 200404991 200607446 201102830
201202922 201204288
Drawings: NUMBER TITLE REVISION
A-3 Attachment Drawings: NUMBER TITLE REVISION M-25AE01 Hanger Location Drawing - Main Feedwater - Turbine Building 4
M-25AE03 Hanger Location Drawing - Main Feedwater - Turbine Building 1 M-25AE06 Hanger Location Drawing - Feedwater Minimum Flow to Condenser - Turbine Building 4
M-25KA01 Hanger Location Drawing - Compressed Air - Auxiliary Building 0 M-29KA21 Hanger Location Drawing - Small Pipe Instrument Air System - Auxiliary Building El. 2000' 14
M-29KA46 Hanger Location Drawing - Small Pipe N2 Backup Gas Supply - Auxiliary & Turbine Buildings 12 Complete set of license renewal drawings
License Renewal: NUMBER TITLE REVISION Topical Report TR-6CW Criterion 54.4 (a)(2) 3 Topical Report TR-9CW Plant Systems and Aging Management Programs 3 New Aging Management Programs B2.1.15 Aboveground Metallic Tanks (XI.M29) Drawings: NUMBER TITLE REVISION C-2C0901 Condensate Storage & Demineralized Water Tanks. Concrete Line & Reinforcing Sections and Details 0
C-2C0241 Condensate Storage & Demineralized Water Tanks. Concrete Line & Reinforcing Sections and Details, Sheet 1 0
A-4 Attachment License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M29, "Aboveground Metallic Tanks"
Operating Experience Summary Report, AMP XI.M29, "Aboveground Metallic Tanks" CW-AMP-B2.1.15 Aboveground Metallic Tanks Aging Management Program Evaluation Report 3
Miscellaneous: NUMBER TITLE REVISION/DATE Maintenance Rule Walk Down Report Structure - Condensate Storage Tank Foundation and Building
Enclosure 08/10/2009
MS-25C Small Pipe Standard Support 0 Procedure
EDP-ZZ-XXXXX Inspections of Aboveground Metallic Tanks 0
B2.1.18 One-Time Inspection (XI.M32) License Renewal: NUMBER TITLE REVISION Draft list of Callaway Material/Environment Combinations in the Scope of One Time Inspection
License Renewal Component List for AMP XI.M32, "One-Time Inspection" Operating Experience Summary Report, AMP XI.M32, "One-Time Inspection"
CW-AMP-B2.1.18 One-Time Inspection Aging Management Program Evaluation Report 2
A-5 Attachment B2.1.19 Selective Leaching (XI.M33)
Callaway Action Requests:
200909091 201009835
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M33, "Selective Leaching"
Operating Experience Summary Report, AMP XI.M33, "Selective Leaching"
CW-AMP-B2.1.19 Selective Leaching Aging Management Program Evaluation Report 5
Procedures: NUMBER TITLE REVISION APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Requirements 20
TBD Draft One-Time Inspection for Selective Leaching Degradation of Components Program Draft B2.1.21 External Surfaces Monitoring of Mechanical Components (XI.M36) Callaway Action Requests: 200803465 200803472 200810025
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M36, "External Surfaces Monitoring of Mechanical Components"
Operating Experience Summary Report, AMP XI.M36, "External Surfaces Monitoring of Mechanical Components"
A-6 Attachment License Renewal: NUMBER TITLE REVISION CW-AMP-B2.1.21 External Surfaces Monitoring of Mechanical Components Aging Management Program Evaluation Report 2
Procedures: NUMBER TITLE REVISION EDP-ZZ-01131 Plant Health and Performance Monitoring Program 21 EDP-ZZ-01131,
Appendix K Engineering System Walkdowns 1
B2.1.25 Buried and Underground Piping and Tanks (XI.M41) Callaway Action Requests: 200207386 200605969 200606030 200607749 200608647 200702384 200702484 200703899 200704465 200707760 200711546 200800871 200803345 200808781 200904086
200909892 201000931 201006741 201010950 201204441
201206525 201206616 201206868 Drawings: NUMBER TITLE REVISION CU2C1 Essential Service Water System - Unit 1 yard Pipelines & Electrical Duct Banks Plan & Schedule 10 C-U206 Essential Service Water System Replacement Yard Piping Plan 0
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M41, "Buried and Underground Piping and Tanks"
Callaway Action Request Operating Experience Report for AMP XI.M41, "Buried and Underground Piping and Tanks"
A-7 Attachment License Renewal: NUMBER TITLE REVISION CW-AMP-B2.1.25 Buried and Underground Piping and Tanks Aging Management Program Evaluation Report 5
Miscellaneous: NUMBER TITLE DATE Request for Additional Information for the Review of the Callaway Plant, Unit 1, License Renewal Application, Set 13 10/01/2012 Soil Sample Request 07/27/2009 Soil Lab Results - Near Discharge Monitoring Tanks in the Radioactive Waste Yard 07/23/2012 Soil Lab Results - Intake Lube Water, Next to Pipe 04/02/2010 Draft Cathodic Protection Monitoring Procedure E-1026-00012 Cathodic Protection Design Report - Harco 08/02/1992 410049 2005 Cathodic Protection Survey and Assessment Report 05/05/2006 83470351 CC Technologies Final Report - Indirect Inspections ESW Supply, Return, Discharge and Strainer Backwash Pipelines 05/02/2007 83475171 Close-Interval Survey and Direct Current Voltage Gradient (Survey Buried Fire Water Protection Piping 05/07/2008
10513410-500 Annual Cathodic Protection System Survey 08/29/2011
Procedures: NUMBER TITLE REVISION APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Results (markup) 20
EDP-ZZ-01011 Buried and Underground Piping and Tanks Inspection Program 3
A-8 Attachment Procedures: NUMBER TITLE REVISION EDP-ZZ-02002 Backfill/Material Selection, Preparation, Placement , & Compaction 4
MTT-ZZ-1003 Coatings and Wrapping of Piping 6
Specifications: NUMBER TITLE REVISION/DATE 4645-23A Technical Specification for Fire Protection System 20 4645-P23-6 Procurement Specification for Pipe and Fittings Fire Protection System 3 4645-P23-7 Procurement Specification for Post Indicator Valves Fire Protection System 3
4645-P23-16 Procurement Specification for Shutoff Valves, Valve Bodies and Wrenches Fire Protection System 1 S-1080 Technical Specification for the Installation of Replacement ASME Section III Buried Essential Service Water System
Piping 10/02/2008
Excavations and Pipe Evaluation: NUMBER TITLE DATE Job Order 09003490 As Found Buried Piping Visual Inspection Form,- Water Treatment Bypass Line 08/04/2009 Job Order
09000264-535 Ultrasonic Thickness Report, 05/05/2010
Job Order 10000810 As Found Buried Piping Visual Inspection Form, Near CW/SW Near Intake Deep Well 05/06/2010
Job Order
11000318.460 As Found Buried Piping Inspection Form, Fire Protection Piping 02/10/2011
Job Order 11002092.460 As Found Buried Piping Inspection Form, Fire Protection Piping 09/19/2011
A-9 Attachment Excavations and Pipe Evaluation: NUMBER TITLE DATE
Job Order
12000962-500 As Found Buried Piping Inspection Form, - Near Discharge Monitoring Tanks in the Radioactive Waste Yard 06/11/2012
Job Order 12000962-510 Ultrasonic Thickness Report 06/21/2012
B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E6) Callaway Action Requests: 200000569 200102076 200506953 200507313 200708150 200709539 200810789 200900024 201104380
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.E6, "Electrical Cable Connections Not Subject to 10 CFR 50.49
Environmental Qualification Requirements"
Callaway Action Request Operating Experience Report for AMP XI.E6, "Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements"
CW-AMP-B2.1.37 Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Aging
Management Program Evaluation Report 4
Miscellaneous: NUMBER TITLE DATE Information Notice 2010-25 Inadequate Electrical Connection 11/17/2010
NG02BAF2 Preventive Maintenance Inspection Report for NG02BAF2 02/01/2012 PG13QER5 Thermography Preventive Maintenance Inspection Report 02/01/2012
A-10 Attachment Miscellaneous: NUMBER TITLE DATE
PG14RFF2 Thermography Preventive Maintenance Inspection Report for FDR Bkr to QA01 TB Lighting PNL VIA XFMR XQA01 06/25/2012
Procedures: NUMBER TITLE REVISION EDP-ZZ-07001 Cable Management Program 0 EDP-ZZ-01113 Electrical Equipment Predictive Performance Manual 7 MTT-ZZ-01004 General Guidelines for Cable Terminations 14 MTT-ZZ-01004B Taping Instructions for Cables 7 MTT-ZZ-01013 Motor Program Guide 1 Work Orders:
09512582-500 09512582-510 11500083-501 11500083-510
B2.1.39 Metal-Enclosed Bus Program (XI.E4) Callaway Action Requests:
200508906 200909297 201008436 201010873
201109870 201206491* 201206807*
Drawings: NUMBER TITLE REVISION 8600-X-88554 Schematic Diagram Main Circuit Breaker 152PB12101, Transformer XPB121, Circ. & Serv. Water Pumphouse 8 8600-X-88555 Schematic Diagram Main Circuit Breaker 152PB122101, Transformer XPB122, Circ. & Serv. Water Pumphouse 9
8600-X-88556 Schematic Diagram Main Circuit Breaker 152PB12301, Transformer XPB123, Circ. & Serv. Water Pumphouse 8
A-11 Attachment Drawings: NUMBER TITLE REVISION Elec-E-21001
(E-21001(Q)) Main Single line Diagram 17
C1515-6 Unit 3 Bus Duct 5KV Metal Switchgear Circ & Service Water Pumphouse 2 C1515-7 Unit 11 Bus Duct 5KV Metal Switchgear Circ & Service Water Pumphouse 2
C1515-8 Unit 7 Bus Duct 5KV Metal Switchgear Circ & Service Water Pumphouse 2
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.E4, "Metal-Enclosed Bus Program"
Operating Experience Report for AMP XI.E4, "Metal-Enclosed Bus Program"
CW-AMP-B2.1.39 Metal-Enclosed Bus Program Aging Management Program Evaluation Report 3
Miscellaneous: NUMBER TITLE REVISION 097739 General Electric Company Instruction Manual Metal-Clad Switchgear
RFR-19619 Termination Instruction for XMA01A, B, C D Operating Experience: NUMBER TITLE DATE Information Notice 1989-64 Electrical Bus Bar Failure 09/07/1989
A-12 Attachment Operating Experience: NUMBER TITLE DATE Information
Notice 2010-25 Inadequate Electrical Connection 09/17/2010
Procedures: NUMBER TITLE REVISION EDP-XX-NNNNN Metal Enclosed Bus Clean and Inspect D MPE-ZZ-QS004 General Electric 13.8KV Switchgear PM 17 MPE-ZZ-QS014 General Electric 4.16KV Switchgear PM 10 Existing Aging Management Programs B2.1.2 Water Chemistry (XI.M2) Audits/Self Assessments: NUMBER TITLE DATE AP09-002 Quality Assurance Audit of Plant Operations and Chemistry 04/23/2009 SA08-CH-S01 Raw Water Self-Assessment 09/22/2008 SA10-CH-S01 Chemistry Fundamentals and Conduct of Operation 02/12/2010 SA10-CH-S04 SGFW Iron Transport 10/18/2010 SA10-CH-S05 Demineralizer Water System 12/15/2010
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.M2, "Water Chemistry"
Operating Experience Summary Report XI.M2, "Water Chemistry"
A-13 Attachment License Renewal: NUMBER TITLE REVISION CW-AMP-B2.1.32 Water Chemistry Aging Management Program Evaluation Report 3
Miscellaneous: TITLE Callaway Action Request 201109890 Chemistry Department Health Report - December 2011
Chemistry Department Health Report - June 2012
Chemistry Department Health Report - August 2012
Primary Chemistry Trend Data
Miscellaneous: NUMBER TITLE REVISION EPRI 1016555 Pressurized Water Reactor Secondary Water Chemistry Guidelines 7 EPRI 1014986 Pressurized Water Reactor Primary Water Chemistry Guidelines 6
Procedures: NUMBER TITLE REVISION APA-ZZ-01020 Primary Chemistry Program 21 APA-ZZ-01021 Secondary Chemistry Program 30 CDP-ZZ-00110 Chemistry Data Trending Program 4 CDP-ZZ-00200 Chemistry Schedule and Water Specs 92 CTO-ZZ-01020 Off Normal Primary Chemistry Corrective Actions 7
A-14 Attachment Procedures: NUMBER TITLE REVISION CTO-ZZ-01021 Off Normal Secondary Chemistry Corrective Actions 13 B2.1.3 Reactor Head Closure Stud Bolting (XI.M3) Callaway Action Requests:
199601632
Calculations: NUMBER TITLE REVISION BB-131 Review of Decreased Thread Engagement For Reactor Vessel Head Stud #18 0 DEI-260 Flange Thread Degradation - Callaway Unit 1 Reactor Vessel 0
Drawings: NUMBER TITLE REVISION E-11173-121-005 Upper Vessel Machining - Westinghouse Electric Corporation 173" ID PWR 3 E-11173-179-001 Stud, Nut, and Washer - Westinghouse Electric Corporation 173" ID PWR 2
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.M3, "Reactor Head Closure Stud Bolting" Operating Experience Summary Report XI.M3, "Reactor Head Closure Stud Bolting"
CW-AMP-B2.1.3 Reactor Head Closure Stud Bolting Aging Management Program Evaluation Report 2
A-15 Attachment Miscellaneous: NUMBER TITLE REVISION/DATE Certified material test report for reactor vessel head studs for Callaway Plant
Photographs of Stud 18 protective can and reactor vessel head with secured with stuck stud M-706-00068 Westinghouse Instruction Manual for Reactor Vessel Assembly for SNUPPS Callaway Nuclear Power Plant
Unit 1 10
NMR 92-I00263 Thread Damage in Stud Holes 9, 13, 25, 39, and 54 04/28/1992 NUREG-1339 Resolution of Generic Safety Issue 29: Bolting Degradation or Failure in Nuclear Power Plants 06/1990 Procedure
AE-UT-98-5 Ultrasonic Examination of Bolts/Studs Greater than 2" in Diameter 0
Procedure
ETP-BB-03165 Reactor Vessel Head Stud Removal 12 Regulatory
Guide 1.65 Materials and Inspections for Reactor Vessel Closure Studs 1
RFR 18432A Evaluating Leaving Stuck Stud in Place During Refueling 9 01/27/1998 RFR 18432B Update for Stud Can Change - Refueling Outage 12 09/09/2002 Table
IWB-2500-1 Examination Categories, Examination Category B-G-1, Pressure Retaining Bolting Greater Than 2 in. (50 mm) in Diameter 1998
Stud Repair Plans: NUMBER TITLE DATE NMR89-I00145 Stud Hole No. 4 Repair Plan 04/18/1989 NMR89-I00164 Stud Hole No. 5 Repair Plan 04/19/1989 NMR89-I00165 Stud Hole No. 9 Repair Plan 04/18/1989
A-16 Attachment Stud Repair Plans: NUMBER TITLE DATE NMR89-I00171 Stud Hole No. 7 Repair Plan 04/18/1989 NMR89-I00173 Stud Hole No. 53 Repair Plan 04/21/1989 NMR89-I00176 Stud Hole No. 1 Repair Plan 04/20/1989
Work Orders: 08511749-550 10506686-550 10508687-550 B2.1.7 Flow-Accelerated Corrosion (XI.M17) Callaway Action Requests: 200604618 200711756 200811208 200811225
201109374 201206822*
Calculations: NUMBER TITLE REVISION 4501-01 Callaway Nuclear Plant FAC System Susceptibility Evaluation (SSE) 0
4501-02 Callaway Nuclear Plant FAC Susceptible Non-Modeled (SNM) Program 0
4501.101-01 Callaway Energy Center CHECWORKS SFA Verification & Validation 0
Drawings: NUMBER TITLE REVISION M-22AB01(Q) Main Steam System 16 M-22AB02(Q) Main Steam System 15 M-22AB03 Main Steam System 20 M-22AC01 Main Turbine 14
A-17 Attachment Drawings: NUMBER TITLE REVISION M-22AC02 Main Turbine 17 M-22AC03 Main Turbine 22 M-22AC04 Main Turbine 14 M-22AD01 Condensate System 17 M-22AD02 Condensate System 31 M-22AD06 Condensate System 16 M-22AE01(Q) Feedwater System 44 M-22AE02(Q) Feedwater System 28 M-22AF01 Feedwater Heater Extraction Drains and Vents 33 M-22AF02 Feedwater Heater Extraction Drains and Vents 41 M-22AF03 Feedwater Heater Extraction Drains and Vents 20 M-22AF04 Feedwater Heater Extraction Drains and Vents 10 M-22AN01 Demineralized Water Storage and Transfer System 36 M-22AP01 Condensate Storage and Transfer System 25 M-22BL01(Q) Reactor Make-up Water System 22 M-22BM01(Q) Steam Generator Blowdown System 34 M-22BM02 Steam Generator Blowdown System 16 M-22BN01(Q) Borated Refueling Water Storage System 25 M-22CA01 Steam Seal System 5 M-22FA01 Auxiliary Boiler System 16 M-22FB01 Auxiliary Steam System 19 M-22FB02 Auxiliary Steam System 11
A-18 Attachment Drawings: NUMBER TITLE REVISION M-22FC02(Q) Auxiliary Feedwater Pump Turbine 20 M-22FC03 SGFP Turbine "A" 17 M-22FC04 SGFP Turbine "B" 19 M-22GA01 Plant Heating System 9 M-22HC01 Solid Radwaste System 32 M-22HD01 Decontamination System 9
Miscellaneous: TITLE DATE Flow-Accelerated Corrosion Health Report - December 2011 12/02/2011 Flow-Accelerated Corrosion Health Report - January 2012 01/25/2012 Flow-Accelerated Corrosion Health Report - April 2012 04/27/2012 Flow-Accelerated Corrosion Health Report - July 2012 07/25/2012 Miscellaneous: NUMBER TITLE REVISION/DATE Specification for Evaluation and Acceptance of Local Areas of Material, Parts, and Components that are Less than the Specified Thickness 07/28/1993
Component List for Aging Management Program XI.M17, "Flow-Accelerated Corrosion" Operating Experience Summary Report XI.M17, "Flow-Accelerated Corrosion"
CW-AMP-B2.1.7 Flow-Accelerated Corrosion Aging Management Program Evaluation Report 4
A-19 Attachment Miscellaneous: NUMBER TITLE REVISION/DATE NSAC-202L-R3 Recommendations for an Effective Flow-Accelerated Corrosion Program 05/2006
Outage Reports: NUMBER TITLE DATE NET 08-0070 Refuel 16 Flow Accelerated Corrosion Report 11/07/2008 NET 10-0026 Refuel 17 Flow Accelerated Corrosion Report 05/15/2010 NET 11-0104 Refuel 18 Flow Accelerated Corrosion Report 11/21/2011 Procedures: NUMBER TITLE REVISION DTI-E-00004 Flow-Accelerated Corrosion Program Desktop Instruction 1 EDP-ZZ-01115 Flow-Accelerated Corrosion of Piping and Components Predictive Performance Manual 23
ME-004 Engineering Design Guide - Material Selection 1 ME-013 Engineering Design Guide - Pipewall Thickness 1 QCP-ZZ-05019 Ultrasonic Thickness Measurement 13
B2.1.10 Open-Cycle Cooling Water Systems (XI.M20) Callaway Action Requests: 200608992 200703776 200811088 200902969 200903703 200909455 201011236 201011505 201103465 201205800 201206831
A-20 Attachment Drawings: NUMBER TITLE REVISION Elevation Drawings for Piping from the Cooling Tower to the Power Block
C-U206 Essential Service Water System Replacement Yard Piping Plan 1 CAD-0576 Essential Service Water System - FSAR Figure 9.2-2, Sheet 1 CAD-0577 Essential Service Water System - FSAR Figure 9.2-2, Sheet 2 CAD-0578 Essential Service Water System - FSAR Figure 9.2-2, Sheet 3 M-22GK02 (Q) Control Building Heating, Ventilation, and Air Conditioning 17 M-072-00001 Setting Plan for Component Cooling Water Heat Exchangers 76" ID X 37'0" Tube Length 18 M-1089-00097A Type "R" Coil 31 Tube Face - Carrier Replacement 6 Row - 4 Pass (11/2 Circuit) Right & Left Hand 1
8600-X-88195 Piping Plan - Circulating Water System 5 8600-X-88202 Piping Plans - Circulating Water Trifurcation & Service Water Manifold, Circulating and Service Water Pumphouse 4
8600-X-88726 Piping Installation Details - Water Plan, Profile & Sections Service Water System 2
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.M20, "Open-Cycle Cooling Water System"
Operating Experience Summary Report XI.M20, "Open-Cycle Cooling Water System" CW-AMP-B2.1.10 Open-Cycle Cooling Water System Aging Management Program Evaluation Report 2
A-21 Attachment Miscellaneous: NUMBER TITLE REVISION/DATE Chemistry data for service water system and the ultimate heat sink
Generic Letter 89-13 Room Coolers Long Term Asset Management Plan 05/2012 Tube plugging limits for heat exchangers serviced by essential service water system
CA-1259 Aerofin Corporation Instruction Manual for R. P. Adams 26"/30" HDWS-80 Essential Service Water Strainer 0
Letter
ULNRC-05425 Cycle 15 Commitment Change Summary Report 07/16/2007 M-1180-00001 Manual for Adams HWS and VWS Single Backwash Automatic Poro-Edge Strainers 0
NPS-Proc 007 Examination for the Detection and Sizing of Pitting, Corrosion, and Wall Loss Using Low Frequency Electromagnetic Techniques 4
PD041150.02 Record of Eddy Current Inspection of Component Cooling Water (CCW) Heat Exchanger - B at Callaway Nuclear Plant 04/2010 PM 0818570 Clean and Inspect EKJ03A Intercooler Heat Exchanger and Expansion Joints 6
RP0502-2002 National Society of Corrosion Engineers (NACE) Pipeline External Corrosion Direct Assessment Methodology 2002 RFR 022364B Document Generic Letter 89-13 Compliance 0 T-11231-LF Low Frequency Electromagnetic Technique Inspection Report of the Essential Service Water Containment Piping at Callaway 12/20/2011
A-22 Attachment Procedures: NUMBER TITLE REVISION APA-ZZ-01025 Raw Water Systems Control Program 0 CDP-ZZ-00200 Chemistry Schedule and Water Specs 92 CDP-ZZ-00940 Auxiliary Water Systems Chemistry Optimization Plan 6 EDP-ZZ-01112 Heat Exchanger Predictive Performance Manual 17 EDP-ZZ-01112 Heat Exchanger Predictive Performance Manual 17 EDP-ZZ-01121,
Appendix 2 Non-Trended Monitored Locations for Raw Water Program 2
EDP-ZZ-01128 Maintenance Rule Program 17 EDP-ZZ-01131 Plant Health and Performance Monitoring Program 21 EDP-ZZ-01131,
Appendix K Engineering System Walkdowns 1 ESP-EF-0002A Essential Service Water Train A Flow Verification 12 ESP-EF-0002B Essential Service Water Train B Flow Verification 16 ETP-EG-00003 Thermal Performance Test of the 'A' CCW Heat Exchanger 0 ETP-EG-00004 Thermal Performance Test of the 'B' CCW Heat Exchanger 0 ETP-ZZ-03001 GL 89-13 Heat Exchanger Inspection 9 QCP-ZZ-05047 Nondestructive Examination Procedure Using Low Frequency Electromagnetic Techniques 0
OTS-AL-00001 ESW Train "A" to TDAFP Flush (High Flow) 21 OTS-AL-00002 ESW Train "B" to TDAFP Flush (High Flow) 21 OTS-AL-00003 "A" MDAFP Flush (High Flow) 19 OTS-AL-00004 "B" MDAFP Flush (High Flow) 19
A-23 Attachment Work Orders: 08512698-500 08512900-500 08512901-500 08513322-500 08513323-520 09500848-500 09510848-580 09512842-500 10510385-500 10511510-580
10511630-500 10512857-500 10513220-580 10513276-580 B2.1.11 Closed Treated Water Systems (XI.M21A)
Callaway Action Requests:
200000281 200700441 200805013
Drawings: NUMBER TITLE REVISION M-22GB01 Central Chilled Water System 18 M-22GK02 (Q) Control Building Heating, Ventilation, and Air Conditioning 17
M-072-00001 Setting Plan for Component Cooling Water Heat Exchangers 76" ID X 37'0" Tube Length 18
M-612-00006 Room Coolers 9
Lesson Plans: NUMBER TITLE REVISION T61.016D.6 Component Cooling Water T61.016C.6 Central Chilled Water License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.M21A, "Closed Treated Water Systems"
Operating Experience Summary Report XI.M21A, "Closed Treated Water Systems"
A-24 Attachment License Renewal: NUMBER TITLE REVISION CW-AMP-B2.1.21A Closed Treated Water Systems Aging Management Program Evaluation Report 2 and 3
Miscellaneous: NUMBER TITLE REVISION/DATE Chemistry Parameter Trend Graphs for Component Cooling Water, Diesel Generator Jacket Water, Closed Cooling Water, and Central Chilled Water
EPRI 1007820 Closed Cooling Water Chemistry Guideline 1 Health Report Component Cooling Water Letter
ULNRC-2146 Response to Generic Letter 89-13, "Service Water Problems Affecting Safety- Related Equipment 01/29/1990
Procedure EDP-ZZ-XXXXX Non-Chemistry Inspections of Closed Treated Water Systems Markup 0
Procedures: NUMBER TITLE REVISION APA-ZZ-01025 Raw Water Systems Control Program 0 CDP-ZZ-00110 Chemistry Data Trending Program 4 CDP-ZZ-00200 Chemistry Schedule and Water Specs 92 CDP-ZZ-00200,
Appendix D Closed Cooling Systems Tables 11
CDP-ZZ-00940 Auxiliary Water Systems Chemistry Optimization Plan 6 EDP-ZZ-01112 Heat Exchanger Predictive Performance Manual 17 EDP-ZZ-01128 Maintenance Rule Program 17 EDP-ZZ-01131 Plant Health and Performance Monitoring Program 21
A-25 Attachment Procedures: NUMBER TITLE REVISION EDP-ZZ-01131,
Appendix K Engineering System Walkdowns 1
ETP-EG-00002 Component Cooling Water System Flow Verification 14 ETP-EG-00003 Thermal Performance Test of the 'A' CCW Heat Exchanger 0 ETP-EG-00004 Thermal Performance Test of the 'B' CCW Heat Exchanger 0 OTN-EG-00001 Component Cooling Water System 50 B2.1.13 Fire Protection (XI.M26)
Callaway Action Requests:
200401401 200402661 201202582 201203013
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.M26, "Fire Protection"
Operating Experience Summary Report XI.M26, "Fire Protection"
CW-AMP-B2.1.13 Fire Protection Aging Management Program Evaluation Report 4 Miscellaneous: TITLE Fire Protection (Appendix R) Health Report - December 2011 Fire Protection (Appendix R) Health Report - January 2012
Fire Protection (Appendix R) Health Report - April 2012
Fire Protection (Appendix R) Health Report - July 2012
A-26 Attachment Procedures: NUMBER TITLE REVISION APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Requirements 20
MSM-KC-FQ001 Function Test - Halon Systems Protecting Safety Related Areas 27 MSM-KC-FT001 Halon Fire Protection Cylinder Inspection 27 MSM-ZZ-FG002 Fire Damper Inspection and Drop Test 12 OSP-KC-00015 Fire Door Inspections 13 QSP-ZZ-65045 Fire Barrier Seal Visual Inspection 8 QSP-ZZ-65046 Fire Barrier Inspection 13 B2.1.14 Fire Water Systems (XI.M27) Callaway Action Requests: 200711546 201102974 201206538*
Miscellaneous: TITLE Fire Main Flow Test, dated November 17, 2009
Fire Main Flow Test, dated December 3, 2009
Fire Main Flow Test, dated April 11, 2011 Fire Main Flow Test, dated April 12, 2011
Fire Water System Health Report - December 2011
Fire Water System Health Report - January 2012
Fire Water System Health Report - April 2012
Fire Water System Health Report - July 2012
A-27 Attachment Procedures: NUMBER TITLE REVISION CTP-ZZ-02038 Microbiologically Influenced Corrosion Monitoring Program 16 EDP-ZZ-01121 Raw Water Systems Predictive Performance Program 15 MSM-KC-FW002 Water Spray Flow Test for Turbine Driven Aux Feedpump 15 APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Requirements 20 CTP-KC-06001 Fire Protection System Chemical Addition 6 MPM-KC-FW004 Fire Hose Station Inspection Outside Areas 9 MSM-KC-FW003 Fire Hose Station Inspection Inside RCA 19 MSM-KC-FW004 Fire Hose Hydrostatic Testing 19 MSM-KC-FW007 Yard Loop Flush 18 MSM-KC-FW008 Fire Hose Hydrostatic Testing in Potentially Contaminated Areas 11
MSM-KC-FW009 Fire Hose Station Inspection Outside RCA 7 OSP-KC-00008 Sprinkler System Discharge Head Inspection 10 OSP-KC-03003 Fire Main Flow Test 5 B2.1.16 Fuel Oil Chemistry (XI.M30) Callaway Action Requests:
201004307
Drawings: NUMBER TITLE REVISION 8600-X-89634 Diesel Driven Fire Pump PKC1002A Fire Protection System (KC1) 6
A-28 Attachment Drawings: NUMBER TITLE REVISION 8600-X-89888 Security Diesel Generator System - Security Diesel Generator Building 17
95645 Tank - Diesel Fuel 250 Gallon TKC100B, Fire Protection System 2 104283 275A SFT (Security Fuel Tank) Assembly 4 FEG-8600-X-
89642 Auxiliary Fuel Oil Unloading Station Storage & Transfer (JA1) - Auxiliary Fuel Oil Storage & Transfer System B FEG-8600-X-
89643 Auxiliary Fuel Oil Unloading Station Storage & Transfer (JA1) - Auxiliary Fuel Oil Storage & Transfer System A
M-105A-00015 Emergency Fuel Oil Day Tank TJE01A/TJE01B 10 M-109-00013 Emergency Fuel Oil Storage Tank - SNUPPS 8
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.M30, "Fuel Oil Chemistry"
Callaway Action Request Operating Experience Report for AMP XI.M30, "Fuel Oil Chemistry"
CW-AMP-B2.1.16 Fuel Oil Chemistry Aging Management Program Evaluation Report 2
Miscellaneous: NUMBER TITLE DATE D 1796 - 83 Standard Test Method for Water and Sediment in Fuel Oils by the Centrifuge Method (Laboratory Procedure)
D 2276 - 73 Standard Test Method for Particulate Contamination in Aviation Turbine Fuels
04503148-500 2008 Train B Emergency Fuel Oil Storage Tank Inspection
A-29 Attachment Miscellaneous: NUMBER TITLE DATE RFR 09606A Diesel Generator Oil Equivalent Tank Cleaning 09/30/1991 Specification 10466
-M-109-049-02 Coating Repair Procedure 04/30/1979 Table 9.5.4.3 Comparison of The Design to Regulatory Positions of Regulatory Guide 1.137, Revision 0, "Fuel-Oil Systems for
Standby Diesel Generators"
Technical Specification 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air
Technical
Specification Bases 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air
Procedures: NUMBER TITLE REVISION APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Requirements 20 CTP-ZZ-02135 Specific Gravity Determination 14 CTP-ZZ-02145 Flash Point Determination 10 CTP-ZZ-02233 Biodiesel Determination 0 CTP-ZZ-02350 Viscosity Determination 9 CTP-ZZ-02360 Water and Sediment Determination 8 OTS-JE-00002 Filtration of Emergency Diesel Generator Fuel Oil 9 Procedure Markups: NUMBER TITLE REVISION MSM-KJ-QT001 10 Year Emergency Diesel Generator Fuel Oil Storage Tank Cleaning 11
A-30 Attachment Procedure Markups: NUMBER TITLE REVISION CSP-ZZ-07350 Diesel Fuel Oil Testing Program 23 CTP-JE-01230 Diesel Fuel Oil Water Removal and Sampling 43 CTP-JE-01235 Diesel Fuel Oil Skid Sampling and Chemical Addition 5
Work Orders: S503345 W129881 04503148-500 B2.1.24 Lubricating Oil Analysis (XI.M39) Callaway Action Requests: 200906391 200907931 201004714 201101042
Miscellaneous: NUMBER TITLE REVISION/DATE CW-AMP-B2.1.24 Lubricating Oil Analysis Aging Management Program Evaluation Report 2
NET 12-0019 Vibration/Oil Analysis Report - February 2012 03/06/2012 NET 12-0024 Vibration/Oil Analysis Report - March 2012 04/10/2012 R&G Laboratories Oil Analysis Data Sheet Reports Procedures: NUMBER TITLE REVISION EDP-ZZ-01126 Lubrication Predictive Maintenance Program 11 EDP-ZZ-01131 Plant Health and Performance Monitoring Program 21
MDP-ZZ-L0001 Lubrication Program 17
A-31 Attachment B2.1.30 Masonry Walls (XI.S5)
Drawings: NUMBER TITLE REVISION A-2301 Auxiliary and Reactor Building Floor Plan, El. 1974'-0" 5 A-2325 Control & Diesel Gen. Buildings & Communication Corridor Floor Plans @ El. 2000'-0" & El 2016'-0"
3
A-2326 Control & Diesel Gen. Buildings & Communication Corridor Floor Plans @ El. 2032'-0" & El 2047'-6" 9 A-2337 Computer Room & Control Room Detailed Floor Plans @ El 2047'-6" 12 A-2341 CMU Wall Penetrations Control Bldg.& Communication Corridor 1 A-2342 CMU Wall Penetrations Control Bldg.& Communication Corridor 0 A-2905 Architectural General Masonry Details 0
A-2904 General Masonry Details 0 C-2031 Civil Structural Standard Details Sheet No. 20 0
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.S5, "Masonry Walls"
Callaway Action Request Operating Experience Report for AMP XI.S5, "Masonry Walls" CW-AMP-B2.1.30 Masonry Walls Aging Management Program Evaluation Report 2 B2.1.31 Structures Monitoring (XI.S6)
Callaway Action Requests:
200105924 200200983 200403475
A-32 Attachment Drawings: NUMBER TITLE REVISION C-2C1910 Auxiliary Building Conc. Neat Lines & Reinforcing Wall Elevation Sheet-10 5
C-2L2902 Reactor Building Liner Plate Developed Elevations 0 C-2L2908 Reactor Building Liner Plate Floor and Wall Details 0 M-2G026 Equipment Location Reactor and Auxiliary Building Section A 10 M-2G027 Equipment Location Reactor and Auxiliary Building Section B 4 M-2G028 Equipment Location Reactor and Auxiliary Building Section C 7 M-2G029 Equipment Location Reactor and Auxiliary Building Section D 7 M-2G030 Equipment Location Reactor and Auxiliary Building Sections E, F, & G 7
M-2G040 Equipment Location Fuel Building Plan Elevation 2000'-0", 2026'-0", 2047'-6" 30 M-2G041 Equipment Location Fuel Building Sections A, B, & C 2 M-2G042 Equipment Location Fuel Building Sections D, E, & F 2 M-2G050 Equipment Location Control Building & Communication Corridor Plan Elevation 1974'-0" & 1984'-0" 29
M-2G051 Equipment Location Control Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" 35
M-2G052 Equipment Location Control Diesel Generator Buildings & Communication Corridor Plan Elevation 2032'-0" & 2047'-6" 30
M-2G053 Equipment Location Control Diesel Generator Buildings & Corridor Plan Elevation 2061'-6", 2066'-0" & 2073'-6" & Section D 15 M-2G054 Equipment Location Control Diesel Generator Building & Communication Corridor Section A 7
M-2G055 Equipment Location Control Diesel Generator Building Sections B & C 5
A-33 Attachment Drawings: NUMBER TITLE REVISION M-2GO21 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & 2013'-6" 10
M-2GO22 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" 56 M-2X1902 Auxiliary Building Penetration Closure Wall Elevations Sheet -2 3 M-2Y1902C Penetration Closure Schedule Aux Bldg 5
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.S6, "Structures Monitoring"
Operating Experience Summary Report, AMP XI.S6, "Structures Monitoring" CW-AMP-B2.1.31 Structures Monitoring Aging Management Program Evaluation Report 5
Miscellaneous: NUMBER TITLE DATE Maintenance Rule Walkdown Report Structure Reactor Building 05/02/2001 Maintenance Rule Walkdown Report Structure Control Building 10/05/2004 Maintenance Rule Walkdown Report Structure Reactor Building Interior 09/2005
Maintenance Rule Walkdown Report Structure Control Building 03/25/2009 Maintenance Rule Walkdown Report Structure Reactor Building Interior 04/26/2010
Maintenance Rule Structures Walkdown Schedule
A-34 Attachment Miscellaneous: NUMBER TITLE DATE ACI 349.3R-96 Evaluation of Existing Nuclear Safety-Related Concrete Structures 1996
ACI 201.1R-08 Guide for Conducting a Visual Inspection of Concrete in Service 1996 Calculation
C-03-134-F(2) Auxiliary Building Shielding Block Walls 2003
Procedures: NUMBER TITLE REVISION EDP-ZZ-01128 Maintenance Rule Program 18 ESP-ZZ-01013 Maintenance Rule Structures Inspection (markup) 6 B2.1.32 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (XI.S7) Callaway Action Requests:
200609956 200900096 201206557 Drawings: NUMBER TITLE REVISION M-UGO80 Essential Service Water Pumphouse Equipment Locations - Plans 14 M-UGO81 Essential Service Water Pumphouse Equipment Locations - Sections 5 M-UGO82 Ultimate Heat Sink Cooling Tower Arrangement 7
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.S7, "Inspection of Water-Control Structures Associated with Nuclear Power Plants"
A-35 Attachment License Renewal: NUMBER TITLE REVISION Operating Experience Summary Report, AMP XI.S7, "Inspection of Water-Control Structures Associated with Nuclear Power
Plants"
CW-AMP-B2.1.32 Inspection of Water-Control Structures Associated with Nuclear Power Plants Aging Management Program Evaluation Report 2
Miscellaneous: NUMBER TITLE REVISION Design Input
Report Train A Essential Service Water Support Modification and Penetrations Seal Change C
Procedures: NUMBER TITLE REVISION ESP-EF-03002 Ultimate Heat Sink Retention Pond Inservice Inspection 6 ESP-ZZ-03907 Settlement Monitoring Program 5 B2.1.33 Protective Coating Monitoring and Maintenance (XI.S8)
License Renewal: NUMBER TITLE REVISION License Renewal Component List for AMP XI.S8, "Protective Coating Monitoring and Maintenance"
Operating Experience Summary Report, AMP XI.S8, "Protective Coating Monitoring and Maintenance" CW-AMP-B2.1.33 Protective Coating Monitoring and Maintenance Aging Management Program Evaluation Report 1
A-36 Attachment Miscellaneous: NUMBER TITLE REVISION ASTM D5163-08 Establishing a Program for Condition Assessment of Coating Service Level I Coating Systems in Nuclear Power Plants
Procedure EDP-ZZ-3000 Containment Building Coatings (markup) 17 B2.1.34 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E1) Callaway Action Requests:
200708150 201206824*
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.E1, "Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements"
Operating Experience Summary Report XI.E1, "Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements" CW-AMP-B2.1.34 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification
Requirements Aging Management Program Evaluation Report 3
Miscellaneous: NUMBER TITLE REVISION/DATE EPRI TR-109619 Guideline for Management of Adverse Localized Environments 09/1999
Procedure
EDP-ZZ-07001 Cable Management program 0
SAND 96-0344 Aging Management Guidelines for Commercial Nuclear Projects- Electrical Cables and terminations 09/1996
A-37 Attachment Operating Experience: NUMBER TITLE DATE Generic Letter 1984-24 Certificate of Compliance to 10CFR50.49: EQ of Electrical Equipment Importance to Safety for NPPs 12/27/1984
Information Notice 1988-89 Degradation of Kapton Electrical Insulation 11/21/1988
Information Notice 1989-30 High Temperature Environment at Nuclear Power Plants 03/15/1989 B2.1.35 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits
(XI.E2) Callaway Action Request:
200404746
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.E2, "Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements"
Operating Experience Summary Report XI.E2, "Insulation Material for Electrical Cables and Connections Not Subject to
10 CFR 50.49 Environmental Qualification Requirements"
CW-AMP-B2.1.34 Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification
Requirements Aging Management Program Evaluation Report 3
Miscellaneous: NUMBER TITLE DATE ISES01BA Cable Routing data Sheet for Power block Electrical Cable
A-38 Attachment Miscellaneous: NUMBER TITLE DATE ISES01BE Cable Routing data Sheet for Power block Electrical Cable M-762-00412-03
(NY-10044) Imaging and Sensing Technology Corporation Document for Qualified Class 1E BF3 Proportional Counter Assembly 09/1990 M-762-00412-03
(NY-10043) Imaging and Sensing Technology Corporation Document for Qualified Class 1E Compensated Ionization Chamber 09/1990
M-762-00412-03 (NY-10338) Imaging and Sensing Technology Corporation Document for Qualified Class 1E Uncompensated Ionization Chamber 05/1993 Minutes of EPRI Kapton Information Meeting 11/18/1988 Operating Experience: NUMBER TITLE DATE Information Notice 1989-30 High Temperature Environment at Nuclear Power Plant 05/26/1989 Information Notice 1997-45 Environmental Qualification Deficiency for Cables and Containment Penetration Pigtails 07/02/1997
Licensee Event Report
05000206-87-008 SONGS Kapton Insulation Damage on Containment Penetration Cables 06/02/1987
Procedures: NUMBER TITLE REVISION EDP-ZZ-07001 Cable Management Program 0 ISL-SE-00N31 Source Range N31 Channel Calibration 30 ISL-SE-00N32 Source Range N32 Channel Calibration 35 ISL-SE-OON35 INTMD RNG N35 "A" Train Loop Cal 27 ISL-SE-OON36 INTMD RNG N36 "B" Train Loop Cal 29 ISL-SE-ON41A Loop-NU; PR N41 Detector Plateau 11
A-39 Attachment Procedures: NUMBER TITLE REVISION ISL-SE-ON42A Loop-NU; PR N42 Detector Plateau 11 ISL-SE-ON43A Loop-NU; PR N43 Detector Plateau 11 ISL-SE-ON44A Loop-NU; PR N44 Detector Plateau 13 RFR 06770A Field Installation NIS Triaxial Cables 7 ITM-ZZ-00009 Triax Cable Maintenance and Testing 9 B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (XI.E3)
Callaway Action Requests:
200701041 200708150 200905490 201008000 201008001
201011217 201101616 201107892
Drawings: NUMBER TITLE REVISION 8600-X-88859 Duct banks and Manholes Site Plan-Key, On site Elec. Power Distribution, Comm. Signal and Control System 24 8600-X-89139 Duct banks and Manholes MH59-8 On site Elec. Power Distribution 3
License Renewal: NUMBER TITLE REVISION Component List for Aging Management Program XI.E3, "Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements" Operating Experience Summary Report XI.E3, "Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental
Qualification Requirements"
CW-AMP-B2.1.36 Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Aging 5
A-40 Attachment License Renewal: NUMBER TITLE REVISION Management Program Evaluation Report
Miscellaneous: NUMBER TITLE REVISION Design Change
MP-11-0011 Change package for design of sump pumps in Man Holes MH 59-04. MH 59-05, MH 59-08A&B, MH 59-10 2 Procedure
EDP-ZZ-07001 Cable Management Program 0
White paper Man Hole Pump MP 11-0011 Vendor Manual
0813 BJM submersible Pumps Technical Data Model JXA00SS Vendor Manual
FM0493-1109 Zoeller Pump Product Information
Operating Experience: NUMBER TITLE DATE Generic Letter 2007-01 Inaccessible or Underground Power Cable Failure That Disable Accident Mitigation Systems Or Cause Plant
Transients 02/07/2007
Information Notice
2010-26 Submerged Electrical Cables 02/02/2010 SYSTEM REVIEWS License Renewal: NUMBER TITLE REVISION CW-AER-AL Callaway Plant License Renewal Aging Evaluation Report - Auxiliary Feedwater System 3
A-41 Attachment License Renewal: NUMBER TITLE REVISION CW-SCO-AL Callaway Plant License Renewal System and Structure Scoping Report - Auxiliary Feedwater System 1
CW-SCR-AL Callaway Plant License Renewal Component Summary Screening Report - Auxiliary Feedwater System 4
Drawings: NUMBER TITLE REVISION LR-CW-AL-M-22AL01 Auxiliary Feedwater System 0B LR-CW-AL-M-22FC02 Auxiliary Feedwater Pump Turbine 0A LR-CW-KJ-M-22KJ01 Standby Diesel Generator A - Cooling Water System 21 LR-CW-KJ-M-22KJ02 Standby Diesel Generator A - Intake Exhaust. F.O & Starting Air System 20
LR-CW-KJ-M-22KJ04 Standby Diesel Generator B - Cooling Water System 19 LR-CW-KJ-M-22KJ05 Standby Diesel Generator B - Intake Exhaust, F.O & Starting Air System 24