{{#Wiki_filter:December 16, 2013 Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:December 16, 2013 Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1-2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Sincerely,  
                                                /RA/
/RA/
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-010 and 50-171
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-010 and 50-171  


==Enclosure:==
==Enclosure:==
RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists


RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists
Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  
 
Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1-2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Sincerely,  
                                                /RA/
/RA/
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-010 and 50-171
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-010 and 50-171  


==Enclosure:==
==Enclosure:==
RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY


RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII          MFerdas, RI      AKock, NRR KLois, NRR ML13347B326 OFC          DWMEP            DWMEP            DWMEP          DWMEP            DWMEP NAME        JHickman          CHolston          SGiebel        BWatson        JHickman DATE    12 / 16 / 2013    12 / 16 / 2013    12/16 /2013    12 / 16 / 2013  12 / 16 / 2013 OFFICIAL RECORD COPY
Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
 
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).
RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).
Per 10 CFR 50.75(f)(1), the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).
Per 10 CFR 50.75(f)(1), the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).
For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).
For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).
RAI # 2: Decommissioning Costs On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.
RAI # 2: Decommissioning Costs On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.
Per 10 CFR 50.82(a)(8)(v)(A) and (B) , the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
Per 10 CFR 50.82(a)(8)(v)(A) and (B), the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.
For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.
RAI # 3: Decommissioning Costs On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
RAI # 3: Decommissioning Costs On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.  
Enclosure


2 Per 10 CFR 50.82(a)(8)(v),
2 Per 10 CFR 50.82(a)(8)(v),
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
For both Dresden 1 and Peach Bottom provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
For both Dresden 1 and Peach Bottom provide the difference between actual and estimated costs for decommissioning work performed during the previous year.  


Dresden Nuclear Power Station, Unit 1 Service List cc:
Dresden Nuclear Power Station, Unit 1 Service List cc:
Site Vice President - Dresden Nuclear           Director - Licensing and Regulatory Affairs Power Station                                 Exelon Generation Company, LLC Exelon Generation Company, LLC                 4300 Winfield Road 6500 North Dresden Road                         Warrenville, IL 60555 Morris, IL 60450-9765 Manager Licensing - Clinton, Dresden, Plant Manager - Dresden Nuclear                   and Quad Cities Power Station                                 Exelon Generation Company, LLC Exelon Generation Company, LLC                 4300 Winfield Road 6500 North Dresden Road                         Warrenville, IL 60555 Morris, IL 60450-9765 Vice President and Deputy General Counsel Manager Regulatory Assurance - Dresden         Exelon Generation Company, LLC Nuclear Power Station                         200 Exelon Way, KSA-3E Exelon Generation Company, LLC                 Kennett Square, PA 19348 6500 North Dresden Road Morris, IL 60450-9765                           Document Control Desk - Licensing Exelon Generation Company, LLC Senior Vice President, Midwest Operations       4300 Winfield Road Exelon Generation Company, LLC                 Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                           Associate General Counsel Exelon Business Services Company, LLC Vice President, Midwest Operations              4300 Winfield Road Exelon Generation Company, LLC                 Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                           Associate General Counsel Exelon Business Services Company, LLC Senior Vice President - Operations Support      200 Exelon Way, KSA-3E Exelon Generation Company, LLC                 Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555                           U.S. Nuclear Regulatory Commission Resident Inspectors Office Vice President - Operations Support            Dresden Station Exelon Generation Company, LLC                  6500 North Dresden Road 4300 Winfield Road                              Morris, IL 60450-9765 Warrenville, IL 60555 Chairman Vice President - Licensing and Regulatory      Grundy County Board Affairs                                        Administration Building Exelon Generation Company, LLC                  1320 Union Street 4300 Winfield Road                              Morris, IL 60450 Warrenville, IL 60555
Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765 Manager Regulatory Assurance - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765 Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Clinton, Dresden, and Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President and Deputy General Counsel Exelon Generation Company, LLC 200 Exelon Way, KSA-3E Kennett Square, PA 19348 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC 200 Exelon Way, KSA-3E Kennett Square, PA 19348 U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station 6500 North Dresden Road Morris, IL 60450-9765 Chairman Grundy County Board Administration Building 1320 Union Street Morris, IL 60450  


Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704
Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704  


Peach Bottom Atomic Power Station, Unit 1 Service List cc:
Peach Bottom Atomic Power Station, Unit 1 Service List cc:
Mr. Michael J. Pacilio                           4300 Winfield Road Senior Vice President                           Warrenville, IL 60555 Exelon Generation Company, LLC 4300 Winfield Road                               Mr. Keith R. Jury Warrenville, IL 60555                           Vice President, Licensing and Regulatory Affairs Mr. Christopher M. Crane                         Exelon Generation Company, LLC President and Chief Operating Officer           4300 Winfield Road Exelon Corporation                               Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                           Mr. Timothy J. Tulon Vice President, Midwest Operations, Mr. Charles G. Pardee                           Exelon Generation Company, LLC Chief Operating Officer (COO)                   4300 Winfield Road Exelon Generation Company, LLC                   Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                           Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Ms. Susan R. Landahl                            Exelon Generation Company, LLC Senior Vice President                            200 Exelon Way, KSA 3-N Exelon Generation Company, LLC                   Kennett Square, PA 19348 4300 Winfield Road Warrenville, IL 60555                           Mr. Robert J. Hovey Vice President, Nuclear Oversight Mr. Ronald J. De Gregorio                        Exelon Generation Company, LLC Senior Vice President, Operations Support        4300 Winfield Road Exelon Generation Company, LLC                   Warrenville, IL 60555 200 Exelon Way, KSA 3-N Kennett Square, PA 19348                         Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Mr. Joseph P. Grimes, Jr.                          Power Station Senior Vice President, Mid-Atlantic              Exelon Generation Company, LLC Operations                                      1848 Lay Road Exelon Generation Company, LLC                  Delta, PA 17314 200 Exelon Way, KSA 3-N Kennett Square, PA 19348                        Plant Manager - Peach Bottom Atomic Power Station Mr. Stephen E. Kuczynski                        Exelon Generation Company, LLC Senior Vice President, Engineering and          1848 Lay Road Technical Services                              Delta, PA 17314 Exelon Generation Company, LLC 4300 Winfield Road                              Manager Regulatory Assurance - Peach Warrenville, IL 60555                              Bottom Atomic Power Station Exelon Generation Company, LLC Mr. Bryan C. Hanson                              1848 Lay Road Senior Vice President, Midwest Operations        Delta, PA 17314 Exelon Generation Company, LLC
Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher M. Crane President and Chief Operating Officer Exelon Corporation 4300 Winfield Road Warrenville, IL 60555 Mr. Charles G. Pardee Chief Operating Officer (COO)
Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Ms. Susan R. Landahl Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Ronald J. De Gregorio Senior Vice President, Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Joseph P. Grimes, Jr.
Senior Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Plant Manager - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314  


Mr. Roland Fletcher                       Vice President, Licensing and Regulatory Department of Environment                   Affairs Radiological Health Program               Exelon Generation Company, LLC 2400 Broening Highway                     4300 Winfield Road Baltimore, MD 21224                       Warrenville, IL 60555 Director, Licensing and Regulatory Affairs Associate General Counsel Exelon Generation Company, LLC            Exelon Generation Company, LLC Correspondence Control                     4300 Winfield Road P.O. Box 160                               Warrenville, IL 60555 Kennett Square, PA 19348 Correspondence Control Desk Manager Licensing                         Exelon Generation Company, LLC Exelon Generation Company, LLC            200 Exelon Way, KSA 1-N-1 Correspondence Control                     Kennett Square, PA 19348 P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236}}
Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348}}

Latest revision as of 00:18, 11 January 2025

M. Pacilio Ltr. Request for Additional for Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1
ML13347B326
Person / Time
Site: Dresden, Peach Bottom  Constellation icon.png
Issue date: 12/16/2013
From: John Hickman
NRC/FSME/DWMEP/DURLD/RDB
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Hickman J
References
Download: ML13347B326 (8)


Text

December 16, 2013 Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1-2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Pacilio:

On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos.50-010 and 50-171

Enclosure:

RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists

Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1-2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Pacilio:

On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos.50-010 and 50-171

Enclosure:

RAI for Dresden Unit 1 and Peach Bottom, Unit 1 cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY

Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).

Per 10 CFR 50.75(f)(1), the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c).

For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).

RAI # 2: Decommissioning Costs On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.

Per 10 CFR 50.82(a)(8)(v)(A) and (B), the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.

RAI # 3: Decommissioning Costs On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

2 Per 10 CFR 50.82(a)(8)(v),

The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

For both Dresden 1 and Peach Bottom provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Dresden Nuclear Power Station, Unit 1 Service List cc:

Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765 Manager Regulatory Assurance - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765 Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Clinton, Dresden, and Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President and Deputy General Counsel Exelon Generation Company, LLC 200 Exelon Way, KSA-3E Kennett Square, PA 19348 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Business Services Company, LLC 200 Exelon Way, KSA-3E Kennett Square, PA 19348 U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station 6500 North Dresden Road Morris, IL 60450-9765 Chairman Grundy County Board Administration Building 1320 Union Street Morris, IL 60450

Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704

Peach Bottom Atomic Power Station, Unit 1 Service List cc:

Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher M. Crane President and Chief Operating Officer Exelon Corporation 4300 Winfield Road Warrenville, IL 60555 Mr. Charles G. Pardee Chief Operating Officer (COO)

Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Ms. Susan R. Landahl Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Ronald J. De Gregorio Senior Vice President, Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Joseph P. Grimes, Jr.

Senior Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Plant Manager - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314

Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348