| issue date = 01/13/2014
| issue date = 01/13/2014
| title = IR 05000346-13-201, 12/17-18/2013, Davis-Besse Nuclear Power Station, Cover Letter
| title = IR 05000346-13-201, 12/17-18/2013, Davis-Besse Nuclear Power Station, Cover Letter
| author name = West G B
| author name = West G
| author affiliation = NRC/NSIR/DSO
| author affiliation = NRC/NSIR/DSO
| addressee name = Lieb R
| addressee name = Lieb R
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:January 13, 2014  
{{#Wiki_filter:January 13, 2014


Mr. Raymond Lieb Site Vice President
==SUBJECT:==
 
DAVIS-BESSE NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000346/2013201
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080
 
Oak Harbor, OH 43449-9760
 
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000346/2013201


==Dear Mr. Lieb:==
==Dear Mr. Lieb:==
On December 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.
On December 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.


The enclosed inspection report documents the inspection results, which were discussed on December 18, 2013, with L. Rushing, Director - Steam Generator Replacement Project, and other members of your staff.
The enclosed inspection report documents the inspection results, which were discussed on December 18, 2013, with L. Rushing, Director - Steam Generator Replacement Project, and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Line 40: Line 35:
Based on the results of this inspection, no findings were identified.
Based on the results of this inspection, no findings were identified.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management Sy stem (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's  
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's Agencywide Documents Access and Management System (ADAMS).


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's PARS, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs PARS, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,
Sincerely,
/RA by Michael J. Buckley for/  
/RA by Michael J. Buckley for/  


Garmon West, Jr., Chief Security Training and Support Branch  
Garmon West, Jr., Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response  
 
Division of Security Operations Office of Nuclear Security and Incident Response  


Docket Nos. 50-346 License Nos. NPF-3  
Docket Nos. 50-346 License Nos. NPF-3  


Enclosure Inspection Report 05000346/2013201 w/Attachments: Supplemental Information response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Enclosure Inspection Report 05000346/2013201 w/Attachments: Supplemental Information response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,
Sincerely,
/RA by Michael J. Buckley for/  
/RA by Michael J. Buckley for/  


Garmon West, Jr., Chief Security Training and Support Branch  
Garmon West, Jr., Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response  
 
Division of Security Operations Office of Nuclear Security and Incident Response  


Docket Nos. 50-346 License Nos. NPF-3  
Docket Nos. 50-346 License Nos. NPF-3  
Line 67: Line 62:


DISTRIBUTION:
DISTRIBUTION:
R. Albert, NSIR M. Buckley, NSIR N. Simonian, NSIR C. Johnson, NSIR D. Johnson, NSIR C. Keon, NSIR M. Maley, NSIR L. Jones, NSIR C. Adkison, NSIR  
R. Albert, NSIR M. Buckley, NSIR N. Simonian, NSIR C. Johnson, NSIR D. Johnson, NSIR C. Keon, NSIR M. Maley, NSIR L. Jones, NSIR C. Adkison, NSIR A. Dimitriadis, RI B. Desai, RII R. Skokowski, RIII M. Haire, RIV  
 
A. Dimitriadis, RI B. Desai, RII R. Skokowski, RIII M. Haire, RIV  


ADAMS PACKAGE NO.:
ADAMS PACKAGE NO.: ML13358A192 Letter: ML13358A204 Enclosure: ML13358A207 OFFICE NSIR/DSO/STSB NSIR/DSO/STSB NSIR/DSO/STSB NAME D. Johnson M. Buckley G. West DATE 1/2/14 12/30/14 1/13/14 OFFICIAL RECORD COPY
ML13358A192 Letter: ML13358A204 Enclosure:
ML13358A207 OFFICE NSIR/DSO/STSB NSIR/DSO/STSB NSIR/DSO/STSB NAME D. Johnson M. Buckley G. West DATE 1/2/14 12/30/14 1/13/14 OFFICIAL RECORD COPY
}}
}}

Latest revision as of 00:09, 11 January 2025

IR 05000346-13-201, 12/17-18/2013, Davis-Besse Nuclear Power Station, Cover Letter
ML13358A204
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/13/2014
From: West G
Division of Security Operations
To: Lieb R
FirstEnergy Nuclear Operating Co
Shared Package
ML13358A192 List:
References
IR-13-201
Download: ML13358A204 (3)


Text

January 13, 2014

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000346/2013201

Dear Mr. Lieb:

On December 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on December 18, 2013, with L. Rushing, Director - Steam Generator Replacement Project, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs PARS, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA by Michael J. Buckley for/

Garmon West, Jr., Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response

Docket Nos. 50-346 License Nos. NPF-3

Enclosure Inspection Report 05000346/2013201 w/Attachments: Supplemental Information response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA by Michael J. Buckley for/

Garmon West, Jr., Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response

Docket Nos. 50-346 License Nos. NPF-3

Enclosure Inspection Report 05000346/2013201 w/Attachments: Supplemental Information

DISTRIBUTION:

R. Albert, NSIR M. Buckley, NSIR N. Simonian, NSIR C. Johnson, NSIR D. Johnson, NSIR C. Keon, NSIR M. Maley, NSIR L. Jones, NSIR C. Adkison, NSIR A. Dimitriadis, RI B. Desai, RII R. Skokowski, RIII M. Haire, RIV

ADAMS PACKAGE NO.: ML13358A192 Letter: ML13358A204 Enclosure: ML13358A207 OFFICE NSIR/DSO/STSB NSIR/DSO/STSB NSIR/DSO/STSB NAME D. Johnson M. Buckley G. West DATE 1/2/14 12/30/14 1/13/14 OFFICIAL RECORD COPY