IR 05000416/2014406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 05/02/2014 | | issue date = 05/02/2014 | ||
| title = NRC Security Special Inspection Report 05000416-14-406 | | title = NRC Security Special Inspection Report 05000416-14-406 | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Mulligan K | | addressee name = Mulligan K | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:May 2, 2014 | {{#Wiki_filter:May 2, 2014 | ||
==SUBJECT:== | |||
GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY SPECIAL | |||
INSPECTION REPORT 05000416/2014406 | |||
==Dear Mr. Mulligan:== | ==Dear Mr. Mulligan:== | ||
| Line 27: | Line 30: | ||
On March 25, 2014, the NRC completed its reactive inspection and on March 28, the NRC inspection team discussed the results of this inspection telephonically with Mr. T. Coutu, Director, Regulatory and Performance Improvement. The inspection team documented the results of this inspection in the enclosed inspection report. | On March 25, 2014, the NRC completed its reactive inspection and on March 28, the NRC inspection team discussed the results of this inspection telephonically with Mr. T. Coutu, Director, Regulatory and Performance Improvement. The inspection team documented the results of this inspection in the enclosed inspection report. | ||
NRC inspectors documented one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC | NRC inspectors documented one finding of very low safety significance (Green) in this report. | ||
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a, of the Enforcement Policy. | |||
If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Grand Gulf Nuclear Station. | If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Grand Gulf Nuclear Station. | ||
One cross-cutting aspect was assigned to the finding in the area of human performance because management personnel were not commonly seen in the work areas of the plant observing, coaching, and reinforcing standards and expectations. This resulted in deviations from standards and expectations thus preventing the prompt correction of these behaviors [H.2]. | One cross-cutting aspect was assigned to the finding in the area of human performance because management personnel were not commonly seen in the work areas of the plant observing, coaching, and reinforcing standards and expectations. This resulted in deviations from standards and expectations thus preventing the prompt correction of these behaviors [H.2]. | ||
If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear Station. | |||
If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION | |||
==REGION IV== | |||
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear Station. | |||
In accordance with Title 10 of the Code of Federal Regulations, (10 CFR) 2.390, | In accordance with Title 10 of the Code of Federal Regulations, (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Plant Support Branch 1 | Mark S Haire, Chief Plant Support Branch 1 Division of Reactor Safety | ||
Docket: 50-416 License: NPF-29 | |||
Nonpublic Enclosure: | Nonpublic Enclosure: | ||
NRC Inspection Report 05000416/2014406 w/Attachments: 1. Supplemental Information 2. Special Inspection Charter 3. Event Chronology | NRC Inspection Report 05000416/2014406 w/Attachments: | ||
1. Supplemental Information 2. Special Inspection Charter 3. Event Chronology | |||
Manager, Security Entergy Operations, Inc. | cc w/enclosure: | ||
Mr. James Dorsey Manager, Security Entergy Operations, Inc. | |||
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 | Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 | ||
Latest revision as of 21:15, 10 January 2025
| ML14122A311 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/02/2014 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Kevin Mulligan Entergy Operations |
| References | |
| IR-14-406 | |
| Download: ML14122A311 (3) | |
Text
May 2, 2014
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY SPECIAL
INSPECTION REPORT 05000416/2014406
Dear Mr. Mulligan:
On January 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its initial assessment of the circumstances surrounding the security event which occurred on January 15, 2014, at the Grand Gulf Nuclear Station, Unit 1. Based on this initial assessment, the NRC sent an inspection team on February 3, 2014.
On March 25, 2014, the NRC completed its reactive inspection and on March 28, the NRC inspection team discussed the results of this inspection telephonically with Mr. T. Coutu, Director, Regulatory and Performance Improvement. The inspection team documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a, of the Enforcement Policy.
If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Grand Gulf Nuclear Station.
One cross-cutting aspect was assigned to the finding in the area of human performance because management personnel were not commonly seen in the work areas of the plant observing, coaching, and reinforcing standards and expectations. This resulted in deviations from standards and expectations thus preventing the prompt correction of these behaviors [H.2].
If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Grand Gulf Nuclear Station.
In accordance with Title 10 of the Code of Federal Regulations, (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Docket: 50-416 License: NPF-29
Nonpublic Enclosure:
NRC Inspection Report 05000416/2014406 w/Attachments:
1. Supplemental Information 2. Special Inspection Charter 3. Event Chronology
cc w/enclosure:
Mr. James Dorsey Manager, Security Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
cc w/o enclosure: Electronic Distribution for Grand Gulf