ML14218A054: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14218A054
| number = ML14218A054
| issue date = 08/07/2014
| issue date = 08/07/2014
| title = 08/07/2014 Handout Davis-Besse EOC Mtg
| title = Handout Davis-Besse EOC Mtg
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Davis-BesseNuclear Power StationAnnual Assessment Meeting/Open HouseAugust7, 20142013 Reactor Oversight ProcessNuclear Regulatory Commission -Region III 12OurMissionTolicenseandregulatethenation'scivilianuseofbyproduct,source,andspecialnuclearmaterialstoensureadequateprotectionofpublichealthandsafety,promotethecommondefenseandsecurity,andprotecttheenvironment.NRCStrategicPlanGoalsSafety-EnsureadequateprotectionofpublichealthandsafetyandtheenvironmentSecurity-Ensureadequateprotectioninthesecureuseandmanagementofradioactivematerials34HowWeRegulate*Establishrulesandregulations*Issuelicenses*Provideoversightthroughinspection,enforcement,andevaluationofoperationalexperience*Conductresearchtoprovidesupportforregulatorydecisions*Respondtoeventsandemergencies5ReactorOversightProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 26ActionMatrixConceptIncreasingSafetySignificanceIncreasingNRCInspectionEffortsIncreasingNRC/LicenseeManagementInvolvementIncreasingRegulatoryActionsLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformanceNRCAnnualAssessmentSummaryFirstEnergyNuclearOperatingCompany(FENOC)operatedtheStationsafelyandinamannerthatpreservedthepublichealthandsafetyandprotectedtheenvironment.DavisBessewasintheRegulatoryResponseColumnoftheNRC'sActionMatrixinthelastquarterof2013.DavisBessetransitionedtotheLicenseeResponseColumnonDecember19,2013.NoSubstantivecrosscuttingissueswereidentifiedDavisBesseNuclearPowerStation78National Summary of Plant PerformanceStatus as of 12/31/2013Licensee Response 80Regulatory Response   9Degraded Cornerstone   9Multiple/Repetitive Deg. Cornerstone1Unacceptable  0IMC 0350 Oversight1Total100NRCInspectionActivities6030totalhoursexpendedbyNRC2216hoursofdirectinspectionactivity654additionalhoursreviewingplantoperatingstatus2residentinspectorsonsite-residentsproducefourquarterlyinspectionreportsperyearandwalkthroughtheplantdaily25regionalinspectorsparticipatedinvariousinspections1majorteaminspectionBiennialProblemIdentificationandResolutionInspectionDavisBessefor20139 3DavisBessePIsandFindingsAllGreenPerformanceIndicators12Green/SeverityLevelIVinspectionfindingsJanuary1throughDecember31,201310SignificanceThresholdGreenBaselineInspectionWhiteRequiresadditionalNRCoversightYellowRequiresmoreNRCoversightRedRequiresmostNRCoversightPerformanceIndicatorsInspectionFindingsGreenVerylowsafetyissueWhiteLowtomoderatesafetyissueYellowSubstantialsafetyissueRedHighsafetyissue11NRCInspectionFindingsOperatorErrorCausedMomentaryInoperabilityofaContainmentIsolationValveCommunicationsandWorkCoordinationErrorCausedServiceWaterSystemTransientReactorTripDuetoFailureofanUnsuitableRepairTerminalBoardInstalledinReactorCoolantPumpMonitoringCircuitOperationsShiftCrewTurnoverInadequate-FuseIssueNotMentionedinTurnoverDavisBesseNuclearPowerStationSomeExamplesofActualFindings12NRCInspectionPlansfor2014NRCplansbaselineinspectionsatDavisBesseNuclearPowerStationfortheremainderof2014.Thisincludesthefollowingteaminspections:TriennialModifications/50.59Inspection(November)SteamGeneratorReplacementInspection(ConductedJanuarythroughJune2014)TriennialHeatSinkInspection(ConductedinJune2014)13 4Actions in Response to the Japan Nuclear Accident*Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html*Mailbox for comments on staff actions: JLD_Public.Resource@nrc.gov*Office of Public Affairs Point of Contact: OPA.resource@nrc.govor 301-415-820014NRC Social Media Channels*Blog:http://public-blog.nrc-gateway.gov/*Flickr:http://www.flickr.com/photos/nrcgov/*Twitter:https://twitter.com/#!/nrcgov*YouTube: http://www.youtube.com/user/NRCgov*RSS:http://www.nrc.gov/public-involve/listserver.html#rss15Contacting the NRCReport an emergency*(301) 816-5100 (call collect)Report a safety concern*(800) 695-7403
{{#Wiki_filter:Davis-Besse Nuclear Power Station Annual Assessment Meeting/Open House August 7, 2014 2013 Reactor Oversight Process Nuclear Regulatory Commission - Region III
*Allegation@nrc.govGeneral information or questions*www.nrc.govContact Davis-BesseResident Inspectors*(419) 244-449416NRC Inspection ActivitiesforDavis-BesseOnce Through Steam GeneratorReplacement Outage17 5*Started first quarter of 2014; Completed second quarter of 2014*Openings made in Shield Building and Containment Vessel*NRC inspected various pre-outage, outage activities, and plant restoration activities*Inspectors from NRC regional office with specialized backgrounds supplemented the assigned two resident inspectors FENOC/DavisBesseSteamGeneratorReplacement18SteamGeneratorReplacementInspectionObjectivesVerifythat:-Engineeringevaluationsanddesignchangesareinconformancewithfacilitylicense,codes,regulations-RemovalandreplacementactivitiesmaintainnuclearandradiologicalsafetyinaccordancewithFederalregulationsandindustrycodesandstandards-Postinstallationtestprogramwasimplementationisincompliancewithapplicablecodesandregulations19SteamGeneratorReplacementNRCInspectionResults*SteamGeneratorssuccessfullyinstalledbythelicensee*Containmentvesselopeningrestoredfollowedbysatisfactorycontainmentleakageintegritytest*Shieldbuildingaccessopeningrestored*Preoutageestimatesforradiologicaldoseswasconsistentwithdosesactuallyreceived*Uponplantstartupandpoweroperation,SteamGeneratorsperformedasexpectedanddesigned*ResultsofinspectiondocumentedinIR2013010(ADAMSACCESSION#ML14204A317)20End of PresentationNuclear Regulatory CommissionRegion IIILisle, IllinoisAugust 7, 201421}}
 
1 2
OurMission Tolicenseandregulate thenationscivilianuseof byproduct,source,and specialnuclearmaterials toensureadequate protectionofpublic healthandsafety, promotethecommon defenseandsecurity,and protecttheenvironment.
NRCStrategicPlanGoals Safety - Ensureadequateprotectionofpublic healthandsafetyandtheenvironment Security - Ensureadequateprotectioninthe secureuseandmanagementofradioactive materials 3
4 HowWeRegulate
* Establishrulesandregulations
* Issuelicenses
* Provideoversightthroughinspection, enforcement,andevaluationofoperational experience
* Conductresearchtoprovidesupportfor regulatorydecisions
* Respondtoeventsandemergencies 5
ReactorOversightProcess Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
 
2 6
ActionMatrixConcept IncreasingSafetySignificance IncreasingNRCInspectionEfforts IncreasingNRC/LicenseeManagementInvolvement IncreasingRegulatoryActions Licensee
 
===Response===
Regulatory
 
===Response===
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance NRCAnnualAssessmentSummary FirstEnergyNuclearOperatingCompany(FENOC) operatedtheStationsafelyandinamannerthat preservedthepublichealthandsafetyand protectedtheenvironment.
DavisBesse wasintheRegulatoryResponse ColumnoftheNRCsActionMatrixinthelast quarterof2013.
DavisBesse transitionedtotheLicensee ResponseColumnonDecember19,2013.
NoSubstantivecrosscuttingissueswere identified DavisBesse NuclearPowerStation 7
8 National Summary of Plant Performance Status as of 12/31/2013 Licensee Response 80 Regulatory Response 9
Degraded Cornerstone 9
Multiple/Repetitive Deg. Cornerstone 1
Unacceptable 0
IMC 0350 Oversight 1
Total 100 NRCInspectionActivities 6030totalhoursexpendedbyNRC 2216hoursofdirectinspectionactivity 654additionalhoursreviewingplantoperatingstatus 2 residentinspectorsonsite-residentsproducefour quarterlyinspectionreportsperyearandwalkthrough theplantdaily 25regionalinspectorsparticipatedinvariousinspections 1majorteaminspection BiennialProblemIdentificationandResolution Inspection DavisBesse for2013 9
 
3 DavisBesse PIsandFindings AllGreenPerformanceIndicators 12Green/SeverityLevelIV inspectionfindings January1throughDecember31,2013 10 SignificanceThreshold Green BaselineInspection White RequiresadditionalNRCoversight Yellow RequiresmoreNRCoversight Red RequiresmostNRCoversight PerformanceIndicators InspectionFindings Green Verylowsafetyissue White Lowtomoderatesafetyissue Yellow Substantialsafetyissue Red Highsafetyissue 11 NRCInspectionFindings OperatorErrorCausedMomentaryInoperabilityofa ContainmentIsolationValve CommunicationsandWorkCoordinationError CausedServiceWaterSystemTransient ReactorTripDuetoFailureofanUnsuitableRepair TerminalBoardInstalledinReactorCoolantPump MonitoringCircuit OperationsShiftCrewTurnoverInadequate-Fuse IssueNotMentionedinTurnover DavisBesse NuclearPowerStation SomeExamplesofActualFindings 12 NRCInspectionPlansfor2014 NRCplansbaselineinspectionsatDavis Besse NuclearPowerStationforthe remainderof2014.Thisincludesthe followingteaminspections:
TriennialModifications/50.59Inspection(November)
SteamGeneratorReplacementInspection(Conducted JanuarythroughJune2014)
TriennialHeatSinkInspection(ConductedinJune2014) 13
 
4 Actions in Response to the Japan Nuclear Accident
* Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html
* Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
* Office of Public Affairs Point of
 
==Contact:==
OPA.resource@nrc.gov or 301-415-8200 14 NRC Social Media Channels
* Blog:
http://public-blog.nrc-gateway.gov/
* Flickr:
http://www.flickr.com/photos/nrcgov/
* Twitter:
https://twitter.com/#!/nrcgov
* YouTube: http://www.youtube.com/user/NRCgov
* RSS:
http://www.nrc.gov/public-involve/listserver.html#rss 15 Contacting the NRC Report an emergency
* (301) 816-5100 (call collect)
Report a safety concern
* (800) 695-7403
* Allegation@nrc.gov General information or questions
* www.nrc.gov Contact Davis-Besse Resident Inspectors
* (419) 244-4494 16 NRC Inspection Activities for Davis-Besse Once Through Steam Generator Replacement Outage 17
 
5
* Started first quarter of 2014; Completed second quarter of 2014
* Openings made in Shield Building and Containment Vessel
* NRC inspected various pre-outage, outage activities, and plant restoration activities
* Inspectors from NRC regional office with specialized backgrounds supplemented the assigned two resident inspectors FENOC/DavisBesse SteamGeneratorReplacement 18 SteamGeneratorReplacement InspectionObjectives Verifythat:
- Engineeringevaluationsanddesignchangesarein conformancewithfacilitylicense,codes,regulations
- Removalandreplacementactivitiesmaintainnuclearand radiologicalsafetyinaccordancewithFederalregulations andindustrycodesandstandards
- Postinstallationtestprogramwasimplementationisin compliancewithapplicablecodesandregulations 19 SteamGeneratorReplacement NRCInspectionResults
* SteamGeneratorssuccessfullyinstalledbythelicensee
* Containmentvesselopeningrestoredfollowedby satisfactorycontainmentleakageintegritytest
* Shieldbuildingaccessopeningrestored
* Preoutageestimatesforradiologicaldoseswas consistentwithdosesactuallyreceived
* Uponplantstartupandpoweroperation,Steam Generatorsperformedasexpectedanddesigned
* ResultsofinspectiondocumentedinIR2013010 (ADAMSACCESSION#ML14204A317) 20 End of Presentation Nuclear Regulatory Commission Region III Lisle, Illinois August 7, 2014 21}}

Latest revision as of 17:31, 10 January 2025

Handout Davis-Besse EOC Mtg
ML14218A054
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/07/2014
From:
NRC/RGN-III
To:
References
Download: ML14218A054 (6)


Text

Davis-Besse Nuclear Power Station Annual Assessment Meeting/Open House August 7, 2014 2013 Reactor Oversight Process Nuclear Regulatory Commission - Region III

1 2

OurMission Tolicenseandregulate thenationscivilianuseof byproduct,source,and specialnuclearmaterials toensureadequate protectionofpublic healthandsafety, promotethecommon defenseandsecurity,and protecttheenvironment.

NRCStrategicPlanGoals Safety - Ensureadequateprotectionofpublic healthandsafetyandtheenvironment Security - Ensureadequateprotectioninthe secureuseandmanagementofradioactive materials 3

4 HowWeRegulate

  • Establishrulesandregulations
  • Issuelicenses
  • Provideoversightthroughinspection, enforcement,andevaluationofoperational experience
  • Conductresearchtoprovidesupportfor regulatorydecisions
  • Respondtoeventsandemergencies 5

ReactorOversightProcess Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

2 6

ActionMatrixConcept IncreasingSafetySignificance IncreasingNRCInspectionEfforts IncreasingNRC/LicenseeManagementInvolvement IncreasingRegulatoryActions Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance NRCAnnualAssessmentSummary FirstEnergyNuclearOperatingCompany(FENOC) operatedtheStationsafelyandinamannerthat preservedthepublichealthandsafetyand protectedtheenvironment.

DavisBesse wasintheRegulatoryResponse ColumnoftheNRCsActionMatrixinthelast quarterof2013.

DavisBesse transitionedtotheLicensee ResponseColumnonDecember19,2013.

NoSubstantivecrosscuttingissueswere identified DavisBesse NuclearPowerStation 7

8 National Summary of Plant Performance Status as of 12/31/2013 Licensee Response 80 Regulatory Response 9

Degraded Cornerstone 9

Multiple/Repetitive Deg. Cornerstone 1

Unacceptable 0

IMC 0350 Oversight 1

Total 100 NRCInspectionActivities 6030totalhoursexpendedbyNRC 2216hoursofdirectinspectionactivity 654additionalhoursreviewingplantoperatingstatus 2 residentinspectorsonsite-residentsproducefour quarterlyinspectionreportsperyearandwalkthrough theplantdaily 25regionalinspectorsparticipatedinvariousinspections 1majorteaminspection BiennialProblemIdentificationandResolution Inspection DavisBesse for2013 9

3 DavisBesse PIsandFindings AllGreenPerformanceIndicators 12Green/SeverityLevelIV inspectionfindings January1throughDecember31,2013 10 SignificanceThreshold Green BaselineInspection White RequiresadditionalNRCoversight Yellow RequiresmoreNRCoversight Red RequiresmostNRCoversight PerformanceIndicators InspectionFindings Green Verylowsafetyissue White Lowtomoderatesafetyissue Yellow Substantialsafetyissue Red Highsafetyissue 11 NRCInspectionFindings OperatorErrorCausedMomentaryInoperabilityofa ContainmentIsolationValve CommunicationsandWorkCoordinationError CausedServiceWaterSystemTransient ReactorTripDuetoFailureofanUnsuitableRepair TerminalBoardInstalledinReactorCoolantPump MonitoringCircuit OperationsShiftCrewTurnoverInadequate-Fuse IssueNotMentionedinTurnover DavisBesse NuclearPowerStation SomeExamplesofActualFindings 12 NRCInspectionPlansfor2014 NRCplansbaselineinspectionsatDavis Besse NuclearPowerStationforthe remainderof2014.Thisincludesthe followingteaminspections:

TriennialModifications/50.59Inspection(November)

SteamGeneratorReplacementInspection(Conducted JanuarythroughJune2014)

TriennialHeatSinkInspection(ConductedinJune2014) 13

4 Actions in Response to the Japan Nuclear Accident

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200 14 NRC Social Media Channels

  • Blog:

http://public-blog.nrc-gateway.gov/

  • Flickr:

http://www.flickr.com/photos/nrcgov/

  • Twitter:

https://twitter.com/#!/nrcgov

  • RSS:

http://www.nrc.gov/public-involve/listserver.html#rss 15 Contacting the NRC Report an emergency

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Contact Davis-Besse Resident Inspectors
  • (419) 244-4494 16 NRC Inspection Activities for Davis-Besse Once Through Steam Generator Replacement Outage 17

5

  • Started first quarter of 2014; Completed second quarter of 2014
  • NRC inspected various pre-outage, outage activities, and plant restoration activities
  • Inspectors from NRC regional office with specialized backgrounds supplemented the assigned two resident inspectors FENOC/DavisBesse SteamGeneratorReplacement 18 SteamGeneratorReplacement InspectionObjectives Verifythat:

- Engineeringevaluationsanddesignchangesarein conformancewithfacilitylicense,codes,regulations

- Removalandreplacementactivitiesmaintainnuclearand radiologicalsafetyinaccordancewithFederalregulations andindustrycodesandstandards

- Postinstallationtestprogramwasimplementationisin compliancewithapplicablecodesandregulations 19 SteamGeneratorReplacement NRCInspectionResults

  • SteamGeneratorssuccessfullyinstalledbythelicensee
  • Containmentvesselopeningrestoredfollowedby satisfactorycontainmentleakageintegritytest
  • Shieldbuildingaccessopeningrestored
  • Preoutageestimatesforradiologicaldoseswas consistentwithdosesactuallyreceived
  • ResultsofinspectiondocumentedinIR2013010 (ADAMSACCESSION#ML14204A317) 20 End of Presentation Nuclear Regulatory Commission Region III Lisle, Illinois August 7, 2014 21