| issue date = 09/02/2014
| issue date = 09/02/2014
| title = Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402)
| title = Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402)
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Koehl D L
| addressee name = Koehl D
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " September 2, 2014  
{{#Wiki_filter:September 2, 2014


Mr. Dennis President and CEO/CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
==SUBJECT:==
NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)


SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND
==Dear Mr. Koehl:==
On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.


05000499/2014402)
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.


==Dear Mr. Koehl:==
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.


The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
Thus due to the security-related information contained in this correspondence, and  


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
UNITED STATES NUCLEAR REGULATORY COMMISSION


Thus due to the security-related information contained in this correspondence, and UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
==REGION IV==
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).


Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Line 47: Line 49:
Inspection Plan  
Inspection Plan  


cc w/enclosure: Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483  
cc w/enclosure:
Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483  


ML14245A444 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 8/29/2014 -SECURI TY-RELATED INFORMATION Letter to Dennis from Mark S. Haire, dated September 2, 2014 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND
ML14245A444 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002  


05000499/2014402)
OFFICE C:PSB1
Electronic Distribution by RIV w/enclosure
 
: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
NAME MHaire/dch
 
SIGNATURE
/RA/
 
DATE 8/29/2014 Letter to Dennis from Mark S. Haire, dated September 2, 2014
 
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)  
 
Electronic Distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)  
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)  


Electronic Distribution by RIV w/o enclosure
Electronic Distribution by RIV w/o enclosure:
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)  
Acting DRP Director (Troy.Pruett@nrc.gov)
 
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
Resident Inspector (Nick.Hernandez@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)
 
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Nick.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
Project Manager (Balwant.Singal@nrc.gov)
 
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPreports
ROPreports
}}
}}

Latest revision as of 17:10, 10 January 2025

Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402)
ML14245A444
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/02/2014
From: Mark Haire
Region 4 Engineering Branch 1
To: Koehl D
South Texas
References
IR-2014-402
Download: ML14245A444 (4)


Text

September 2, 2014

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)

Dear Mr. Koehl:

On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80

Enclosure:

Inspection Plan

cc w/enclosure:

Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

ML14245A444 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002

OFFICE C:PSB1

NAME MHaire/dch

SIGNATURE

/RA/

DATE 8/29/2014 Letter to Dennis from Mark S. Haire, dated September 2, 2014

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)

Electronic Distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Electronic Distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (Nick.Hernandez@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)

ROPreports