| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Hon A L
| addressee name = Hon A
| addressee affiliation = NRC/NRR/DORL/LPWB
| addressee affiliation = NRC/NRR/DORL/LPWB
| docket = 05000390, 05000391
| docket = 05000390, 05000391
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:HdlHydrologySeptember 10, 2014 Agendag*Introduction and PurposeJoe Shea*BackgroundJoe Shea g*TVAs ApproachGary Mauldin*ScheduleGary Mauldin*ConclusionJoe Shea
{{#Wiki_filter:H d l
*QuestionsGary Mauldin/Joe Shea 2Shea Hydrology Background
Hydrology September 10, 2014
*Describe TVA's Approach to resolving NRC questions regarding dam stability analyses as part of the Watts Bar Nuclear Plant (WBN) hydrology evaluation
*DibTVA'ltbitdttthdiWBNUit1Li
*Describe TVA's plans to submit an update to the pending WBN Unit 1 License Amendment Request and WBN Unit 2 Final Safety Analysis Report that:
-ReflectrevisedapproachtoevaluatingdamstabilityaspartofTVA
'snuclearplant Reflect revised approach to evaluating dam stability as part of TVAs nuclear plant hydrology analyses
-Revise the hydrology modeling tools used by TVA to evaluate probable maximum flood scenarios*Discuss schedule for submitting updated information 3Shea Hydrology Background
*TVA submitted a request to amend the WBN Unit 1 license on July 19, 2012-TVA proposed to revise the hydrologic analyses for Watts Bar siteTVAdNRCJl222014diifhbilTh
*TVA and NRC met on July 22, 2014 to discuss port ions of the submittal. The discussion surrounded TVA's dam stability analyses.In2012TVAcompletedre
-evaluationofthedesignbasisProbableMaximum In 2012, TVA completed re-evaluation of the design basis Probable MaximumFlood (PMF) affecting the TVA Nuclear SitesAs a result of the re-evaluation, PMF levels increased from 734.9' to 739.2' at Watts BarThe increase in PMF levels resulted in a corresponding increase in the headwater and tailwater levels seen at the dams of the WBN and Sequoyah (SQN) plants.The increase in headwater and tailwater required the structural stability of the dams 4to be validated Shea Hydrology Background*July 22, 2014 meeting with NRC (continued): DuringanauditofTVA
'sUpdatedFinalSafetyAnalysisReport(UFSAR)submittalinDuring an audit of TVAs Updated Final Safety Analysis Report (UFSAR) submittal in April of 2014, the NRC staff noted that the "no dam failure" assumption in the PMF analysis for a licensing basis change was not supported.BasedonTVA
'sunderstandingoftheissuethecriteriausedtoevaluatetheBased on TVAs understanding of the issue, the criteria used to evaluate the acceptability of dams impacting WBN and SQN for PMF will be clearly defined and should be consistent with current industry techniques
*TVAhasperformedanalysisofapplicabledamsusingcurrentindustrytechniques
*TVA has performed analysis of applicable dams using current industry techniquesDetails will be discussed in subsequent slidesTVA is designing and implementing improvements to certain dams consistent with current industry techniques 5Shea Timeline of Design Basis Hydrology Events 6Shea Tennessee River System Overview *The existing WBN and SQN licensing basis regarding dams and hydrology are based on dam safety criteria in place at the time. Those techniques, while meeting the requirements of the licensing basis, do not meet the documentation expectations of today
*TVAhasdeterminedthatthemostrobustwayto
*TVA has determined that the most robust way to demonstrate the stability of its dams and associated hydraulic analysis is to convert to modern industry


methodologyTVAhdlliPMPiTVA can then document a ll its PMP assumptions, methods, and conclusions in a way that will best facilitate the NRC's review to support the licensing timeline for Watts Bar Unit 2This methodology will also more clearly demonstrate the margins in PMF for WBN and SQN.*Simulated Open Channel Hydraulics (SOCH) is not an industryrecognizedstandardtool.
Agenda g
7industry recognized standard tool.Mauldin TVA's Approach
* Introduction and Purpose Joe Shea
*Two major elements of converting TVA to modern industry techniques:
* Background Joe Shea g
1)TVA has develo ped, in its RO Dam Safet y program, a procedure for evaluatin g dams that  
* TVAs Approach Gary Mauldin
)pypgpgis consistent with other federal dam safety agencies2)TVA will convert to the United States Army Corps of Engineers Hydrologic Engineering Center River Analysis System (HEC-RAS) tool for performing hydraulic analysis.
* Schedule Gary Mauldin
*The new TVA analytical approach is to perform hydraulic analysis using HEC-RAS. UsingthedevelopednuclearPMFelevationsTVAwillevaluatestabilityofupstreamdamsUsing the developed nuclear PMF elevations
* Conclusion Joe Shea
, TVA will evaluate stability of upstream dams credited in the current licensing basis using TVA RO procedures. Any dam not meeting the requirements of TVA's current procedures based on nuclear PMF inputswillnotbecreditedinitshydraulicPMFanalyses inputs will not be credited in its hydraulic PMF analyses HEC-RAS will be re-run crediting only those dams meeting current TVA RO dam stability requirements 8Mauldin TVA's Approach
* Questions Gary Mauldin/Joe Shea 2
*The basis for TVA to demonstrate dam safety under PMF conditions will be the combination of upgraded dam stability criteria and HEC-RAS crediting only fully compliant dams:dams:Current approach will require completing in-process modifications and additional modifications. Design and implementation of the new modifications is underwayEvaluate warnin g times to ensure the u pdated PMF anal ysis continues to meet desi gn basisgpygEvaluate the seismic events associated with flooding to ensure updated PMF analysis continuestomeetdesignbasisCurrentseismicdesignbasisisnotrevisedaspartofthis continues to meet design basis. Current seismic design basis is not revised as part of this updated submittal 9Mauldin TVA's Approach
Shea
*Submittal (Approach and Actions):TVA proposes a submittal that moves to a full HEC-RAS model, and requests NRC staff's review of that model. Stability assumptions of model:
 
oStability for PMF to modern industry standards analysis complete for initial flood numbers (will require validation after HEC-RAS model runs are completed) o11 dams are credited in the evaluation -Cherokee, Douglas (main/concrete dam), Fontana, Hiwassee, Norris, South Holston, Watauga, Nottely, Chatuge, Blue Ridge, Chickamauga 10Chickamauga Mauldin TVA's Approach
Hydrology Background Describe TVAs Approach to resolving NRC questions regarding dam stability analyses as part of the Watts Bar Nuclear Plant (WBN) hydrology evaluation D
*Submittal (Approach and Actions) continued:
ib TVA l
o4 dams are not credited in the analysis -Boone, Fort Patrick Henry, Apalachia, Melton Hill oTVA will upgrade 4 reduced margin dams to dam stability standards
t b
*Additional dam modifications will be performed  
it d t t
-Watts Bar and Tellico pnon-overflow necks, Fort Loudoun non-overflow, Watts Bar west saddle dam, Watts Bar east flood wall, Douglas saddle damDam stability calculations will be available for audit consistent with TVA's other upgraded calculations (Cherokee and Douglas).
th di WBN U it 1 Li Describe TVAs plans to submit an update to the pending WBN Unit 1 License Amendment Request and WBN Unit 2 Final Safety Analysis Report that:
11Mauldin TVA's Approach
Reflect revised approach to evaluating dam stability as part of TVAs nuclear plant Reflect revised approach to evaluating dam stability as part of TVAs nuclear plant hydrology analyses Revise the hydrology modeling tools used by TVA to evaluate probable maximum flood scenarios Discuss schedule for submitting updated information 3
*Submittal (Approach and Actions) -continued:Assumptions of HEC-RAS modelV&V model  
Shea
-main stream and tributariesInput assumptions for main river consistent with SOCH modelTributary reservoir routingAssumptions consistent with July 2012 submittalMain Stem GeometryStorm DataRunoffdata 12Runoff dataMethodology for discharge rating Mauldin TVA's Approach*Basis (Why Approach Works):Removes any question about the stability of dams credited in the PMF analysisMove to a full HEC-RAS model provides more consistent and reliable results, which will not resultinmodificationstotheplant result in modifications to the plant.HEC-RAS tool provides a robust analysis using current industry acknowledged methodologiesFacilitatestimelyNRCreviewusinganalysismethodologyfamiliartothestaffFacilitates timely NRC review using analysis methodology familiar to the staffTool is consistent with TVA analysis for its Fukushima submittals*Result:PMF level is bounded by July 2012 License Amendment Request submittal level 13Mauldin Schedule*Complete initial evaluation of affected dams  
 
-Completepp*Commence Inde pendent Evaluation of reduced mar gin dams -Completepgp*Complete development and implementation of modifications to reduced margin dams -Prior to Fuel Load
Hydrology Background TVA submitted a request to amend the WBN Unit 1 license on July 19, 2012 TVA proposed to revise the hydrologic analyses for Watts Bar site TVA d NRC J l 22 2014 di i
*CompletedevelopmentofWBNUFSARAmendmentSeptember302014
f h b
*Complete development of WBN UFSAR Amendment
i l
-September 30, 2014 14Mauldin Conclusion*NRC approval of TVA's proposal to transition to a HEC-RAS based model for evaluating dam stability will maintain the 2012 proposed design basis flood levels and facilitatethelicensingofWattsBarUnit 2facilitate the licensing of Watts Bar Unit 2.15Shea Questions}}
Th TVA and NRC met on July 22, 2014 to discuss portions of the submittal. The discussion surrounded TVAs dam stability analyses.
 
In 2012 TVA completed re-evaluation of the design basis Probable Maximum In 2012, TVA completed re-evaluation of the design basis Probable Maximum
 
Flood (PMF) affecting the TVA Nuclear Sites
 
As a result of the re-evaluation, PMF levels increased from 734.9 to 739.2 at Watts Bar
 
The increase in PMF levels resulted in a corresponding increase in the headwater and tailwater levels seen at the dams of the WBN and Sequoyah (SQN) plants.
 
The increase in headwater and tailwater required the structural stability of the dams 4
to be validated Shea
 
Hydrology Background
* July 22, 2014 meeting with NRC (continued):
 
During an audit of TVAs Updated Final Safety Analysis Report (UFSAR) submittal in
 
During an audit of TVAs Updated Final Safety Analysis Report (UFSAR) submittal in April of 2014, the NRC staff noted that the no dam failure assumption in the PMF analysis for a licensing basis change was not supported.
 
Based on TVAs understanding of the issue the criteria used to evaluate the
 
Based on TVAs understanding of the issue, the criteria used to evaluate the acceptability of dams impacting WBN and SQN for PMF will be clearly defined and should be consistent with current industry techniques
* TVA has performed analysis of applicable dams using current industry techniques
* TVA has performed analysis of applicable dams using current industry techniques
 
Details will be discussed in subsequent slides
 
TVA is designing and implementing improvements to certain dams consistent with current industry techniques 5
Shea
 
Timeline of Design Basis Hydrology Events 6
Shea
 
Tennessee River System Overview The existing WBN and SQN licensing basis regarding dams and hydrology are based on dam safety criteria in place at the time.
 
Those techniques, while meeting the requirements of the licensing basis, do not meet the documentation expectations of today TVA has determined that the most robust way to TVA has determined that the most robust way to demonstrate the stability of its dams and associated hydraulic analysis is to convert to modern industry methodology TVA h
d ll i PMP i
 
TVA can then document all its PMP assumptions, methods, and conclusions in a way that will best facilitate the NRCs review to support the licensing timeline for Watts Bar Unit 2
 
This methodology will also more clearly demonstrate the margins in PMF for WBN and SQN.
Simulated Open Channel Hydraulics (SOCH) is not an industry recognized standard tool.
7 industry recognized standard tool.
Mauldin
 
TVAs Approach
* Two major elements of converting TVA to modern industry techniques:
1)
TVA has developed, in its RO Dam Safety program, a procedure for evaluating dams that  
)
p y p g
p g
is consistent with other federal dam safety agencies 2)
TVA will convert to the United States Army Corps of Engineers Hydrologic Engineering Center River Analysis System (HEC-RAS) tool for performing hydraulic analysis.
* The new TVA analytical approach is to perform hydraulic analysis using HEC-RAS.
Using the developed nuclear PMF elevations TVA will evaluate stability of upstream dams Using the developed nuclear PMF elevations, TVA will evaluate stability of upstream dams credited in the current licensing basis using TVA RO procedures.
Any dam not meeting the requirements of TVAs current procedures based on nuclear PMF inputs will not be credited in its hydraulic PMF analyses inputs will not be credited in its hydraulic PMF analyses HEC-RAS will be re-run crediting only those dams meeting current TVA RO dam stability requirements 8
Mauldin
 
TVAs Approach
* The basis for TVA to demonstrate dam safety under PMF conditions will be the combination of upgraded dam stability criteria and HEC-RAS crediting only fully compliant dams:
dams:
Current approach will require completing in-process modifications and additional modifications. Design and implementation of the new modifications is underway Evaluate warning times to ensure the updated PMF analysis continues to meet design basis g
p y
g Evaluate the seismic events associated with flooding to ensure updated PMF analysis continues to meet design basis Current seismic design basis is not revised as part of this continues to meet design basis. Current seismic design basis is not revised as part of this updated submittal 9
Mauldin
 
TVAs Approach
* Submittal (Approach and Actions):
TVA proposes a submittal that moves to a full HEC-RAS model, and requests NRC staffs review of that model.  
 
Stability assumptions of model:
o Stability for PMF to modern industry standards analysis complete for initial flood numbers (will require validation after HEC-RAS model runs are completed) o 11 dams are credited in the evaluation - Cherokee, Douglas (main/concrete dam),
Fontana, Hiwassee, Norris, South Holston, Watauga, Nottely, Chatuge, Blue Ridge, Chickamauga 10 Chickamauga Mauldin
 
TVAs Approach
* Submittal (Approach and Actions) continued:
o 4 dams are not credited in the analysis - Boone, Fort Patrick Henry, Apalachia, Melton Hill o TVA will upgrade 4 reduced margin dams to dam stability standards Additional dam modifications will be performed - Watts Bar and Tellico p
non-overflow necks, Fort Loudoun non-overflow, Watts Bar west saddle dam, Watts Bar east flood wall, Douglas saddle dam Dam stability calculations will be available for audit consistent with TVAs other upgraded calculations (Cherokee and Douglas).
11 Mauldin
 
TVAs Approach Submittal (Approach and Actions) - continued:
 
Assumptions of HEC-RAS model
 
V&V model - main stream and tributaries
 
Input assumptions for main river consistent with SOCH model
 
Tributary reservoir routing
 
Assumptions consistent with July 2012 submittal
 
Main Stem Geometry
 
Storm Data
 
Runoff data 12 Runoff data
 
Methodology for discharge rating Mauldin
 
TVAs Approach Basis (Why Approach Works):
Removes any question about the stability of dams credited in the PMF analysis Move to a full HEC-RAS model provides more consistent and reliable results, which will not result in modifications to the plant result in modifications to the plant.
HEC-RAS tool provides a robust analysis using current industry acknowledged methodologies Facilitates timely NRC review using analysis methodology familiar to the staff Facilitates timely NRC review using analysis methodology familiar to the staff Tool is consistent with TVA analysis for its Fukushima submittals Result:
 
PMF level is bounded by July 2012 License Amendment Request submittal level 13 Mauldin
 
Schedule
* Complete initial evaluation of affected dams - Complete p
p
* Commence Independent Evaluation of reduced margin dams - Complete p
g p
* Complete development and implementation of modifications to reduced margin dams - Prior to Fuel Load
* Complete development of WBN UFSAR Amendment September 30 2014
* Complete development of WBN UFSAR Amendment - September 30, 2014 14 Mauldin
 
Conclusion
* NRC approval of TVAs proposal to transition to a HEC-RAS based model for evaluating dam stability will maintain the 2012 proposed design basis flood levels and facilitate the licensing of Watts Bar Unit 2 facilitate the licensing of Watts Bar Unit 2.
15 Shea
 
Questions}}

Latest revision as of 17:02, 10 January 2025

9/10/2014, Meeting Slide for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Hydrology
ML14253A303
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/10/2014
From:
Tennessee Valley Authority
To: Andrew Hon
Watts Bar Special Projects Branch
Hon A
References
Download: ML14253A303 (16)


Text

H d l

Hydrology September 10, 2014

Agenda g

  • Introduction and Purpose Joe Shea
  • Background Joe Shea g
  • TVAs Approach Gary Mauldin
  • Schedule Gary Mauldin
  • Conclusion Joe Shea
  • Questions Gary Mauldin/Joe Shea 2

Shea

Hydrology Background Describe TVAs Approach to resolving NRC questions regarding dam stability analyses as part of the Watts Bar Nuclear Plant (WBN) hydrology evaluation D

ib TVA l

t b

it d t t

th di WBN U it 1 Li Describe TVAs plans to submit an update to the pending WBN Unit 1 License Amendment Request and WBN Unit 2 Final Safety Analysis Report that:

Reflect revised approach to evaluating dam stability as part of TVAs nuclear plant Reflect revised approach to evaluating dam stability as part of TVAs nuclear plant hydrology analyses Revise the hydrology modeling tools used by TVA to evaluate probable maximum flood scenarios Discuss schedule for submitting updated information 3

Shea

Hydrology Background TVA submitted a request to amend the WBN Unit 1 license on July 19, 2012 TVA proposed to revise the hydrologic analyses for Watts Bar site TVA d NRC J l 22 2014 di i

f h b

i l

Th TVA and NRC met on July 22, 2014 to discuss portions of the submittal. The discussion surrounded TVAs dam stability analyses.

In 2012 TVA completed re-evaluation of the design basis Probable Maximum In 2012, TVA completed re-evaluation of the design basis Probable Maximum

Flood (PMF) affecting the TVA Nuclear Sites

As a result of the re-evaluation, PMF levels increased from 734.9 to 739.2 at Watts Bar

The increase in PMF levels resulted in a corresponding increase in the headwater and tailwater levels seen at the dams of the WBN and Sequoyah (SQN) plants.

The increase in headwater and tailwater required the structural stability of the dams 4

to be validated Shea

Hydrology Background

  • July 22, 2014 meeting with NRC (continued):

During an audit of TVAs Updated Final Safety Analysis Report (UFSAR) submittal in

During an audit of TVAs Updated Final Safety Analysis Report (UFSAR) submittal in April of 2014, the NRC staff noted that the no dam failure assumption in the PMF analysis for a licensing basis change was not supported.

Based on TVAs understanding of the issue the criteria used to evaluate the

Based on TVAs understanding of the issue, the criteria used to evaluate the acceptability of dams impacting WBN and SQN for PMF will be clearly defined and should be consistent with current industry techniques

  • TVA has performed analysis of applicable dams using current industry techniques
  • TVA has performed analysis of applicable dams using current industry techniques

Details will be discussed in subsequent slides

TVA is designing and implementing improvements to certain dams consistent with current industry techniques 5

Shea

Timeline of Design Basis Hydrology Events 6

Shea

Tennessee River System Overview The existing WBN and SQN licensing basis regarding dams and hydrology are based on dam safety criteria in place at the time.

Those techniques, while meeting the requirements of the licensing basis, do not meet the documentation expectations of today TVA has determined that the most robust way to TVA has determined that the most robust way to demonstrate the stability of its dams and associated hydraulic analysis is to convert to modern industry methodology TVA h

d ll i PMP i

TVA can then document all its PMP assumptions, methods, and conclusions in a way that will best facilitate the NRCs review to support the licensing timeline for Watts Bar Unit 2

This methodology will also more clearly demonstrate the margins in PMF for WBN and SQN.

Simulated Open Channel Hydraulics (SOCH) is not an industry recognized standard tool.

7 industry recognized standard tool.

Mauldin

TVAs Approach

  • Two major elements of converting TVA to modern industry techniques:

1)

TVA has developed, in its RO Dam Safety program, a procedure for evaluating dams that

)

p y p g

p g

is consistent with other federal dam safety agencies 2)

TVA will convert to the United States Army Corps of Engineers Hydrologic Engineering Center River Analysis System (HEC-RAS) tool for performing hydraulic analysis.

  • The new TVA analytical approach is to perform hydraulic analysis using HEC-RAS.

Using the developed nuclear PMF elevations TVA will evaluate stability of upstream dams Using the developed nuclear PMF elevations, TVA will evaluate stability of upstream dams credited in the current licensing basis using TVA RO procedures.

Any dam not meeting the requirements of TVAs current procedures based on nuclear PMF inputs will not be credited in its hydraulic PMF analyses inputs will not be credited in its hydraulic PMF analyses HEC-RAS will be re-run crediting only those dams meeting current TVA RO dam stability requirements 8

Mauldin

TVAs Approach

  • The basis for TVA to demonstrate dam safety under PMF conditions will be the combination of upgraded dam stability criteria and HEC-RAS crediting only fully compliant dams:

dams:

Current approach will require completing in-process modifications and additional modifications. Design and implementation of the new modifications is underway Evaluate warning times to ensure the updated PMF analysis continues to meet design basis g

p y

g Evaluate the seismic events associated with flooding to ensure updated PMF analysis continues to meet design basis Current seismic design basis is not revised as part of this continues to meet design basis. Current seismic design basis is not revised as part of this updated submittal 9

Mauldin

TVAs Approach

  • Submittal (Approach and Actions):

TVA proposes a submittal that moves to a full HEC-RAS model, and requests NRC staffs review of that model.

Stability assumptions of model:

o Stability for PMF to modern industry standards analysis complete for initial flood numbers (will require validation after HEC-RAS model runs are completed) o 11 dams are credited in the evaluation - Cherokee, Douglas (main/concrete dam),

Fontana, Hiwassee, Norris, South Holston, Watauga, Nottely, Chatuge, Blue Ridge, Chickamauga 10 Chickamauga Mauldin

TVAs Approach

  • Submittal (Approach and Actions) continued:

o 4 dams are not credited in the analysis - Boone, Fort Patrick Henry, Apalachia, Melton Hill o TVA will upgrade 4 reduced margin dams to dam stability standards Additional dam modifications will be performed - Watts Bar and Tellico p

non-overflow necks, Fort Loudoun non-overflow, Watts Bar west saddle dam, Watts Bar east flood wall, Douglas saddle dam Dam stability calculations will be available for audit consistent with TVAs other upgraded calculations (Cherokee and Douglas).

11 Mauldin

TVAs Approach Submittal (Approach and Actions) - continued:

Assumptions of HEC-RAS model

V&V model - main stream and tributaries

Input assumptions for main river consistent with SOCH model

Tributary reservoir routing

Assumptions consistent with July 2012 submittal

Main Stem Geometry

Storm Data

Runoff data 12 Runoff data

Methodology for discharge rating Mauldin

TVAs Approach Basis (Why Approach Works):

Removes any question about the stability of dams credited in the PMF analysis Move to a full HEC-RAS model provides more consistent and reliable results, which will not result in modifications to the plant result in modifications to the plant.

HEC-RAS tool provides a robust analysis using current industry acknowledged methodologies Facilitates timely NRC review using analysis methodology familiar to the staff Facilitates timely NRC review using analysis methodology familiar to the staff Tool is consistent with TVA analysis for its Fukushima submittals Result:

PMF level is bounded by July 2012 License Amendment Request submittal level 13 Mauldin

Schedule

  • Complete initial evaluation of affected dams - Complete p

p

  • Commence Independent Evaluation of reduced margin dams - Complete p

g p

  • Complete development and implementation of modifications to reduced margin dams - Prior to Fuel Load
  • Complete development of WBN UFSAR Amendment September 30 2014
  • Complete development of WBN UFSAR Amendment - September 30, 2014 14 Mauldin

Conclusion

  • NRC approval of TVAs proposal to transition to a HEC-RAS based model for evaluating dam stability will maintain the 2012 proposed design basis flood levels and facilitate the licensing of Watts Bar Unit 2 facilitate the licensing of Watts Bar Unit 2.

15 Shea

Questions