ML14314A302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/10/2014
| issue date = 11/10/2014
| title = NRC Form 699 - Conversation Record - Conversation Re Arkansas Nuclear One (ANO) Exemption, Request for Additional Information (RAI) Discussion
| title = NRC Form 699 - Conversation Record - Conversation Re Arkansas Nuclear One (ANO) Exemption, Request for Additional Information (RAI) Discussion
| author name = Allen W C, Singal B K, Solis J
| author name = Allen W, Singal B, Solis J
| author affiliation = NRC/NMSS/DSFM
| author affiliation = NRC/NMSS/DSFM
| addressee name = Clark B, Lomax D, Manzione K, Palmer A, Pyle S L
| addressee name = Clark B, Lomax D, Manzione K, Palmer A, Pyle S
| addressee affiliation = Entergy Corp, Holtec International
| addressee affiliation = Entergy Corp, Holtec International
| docket = 05000313, 05000368, 07200013, 07201014
| docket = 05000313, 05000368, 07200013, 07201014
| license number =  
| license number =  
| contact person = Allen W C
| contact person = Allen W
| document type = Note to File incl Telcon Record, Verbal Comm
| document type = Note to File incl Telcon Record, Verbal Comm
| page count = 2
| page count = 2
| project =
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:NRC FORM 699 ...,. ** -. ** ., (03*2013) i .... / U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD ..... NAME OF PERSON(S)
{{#Wiki_filter:NRC FORM 699...,. ** -. **.,
CONTACTED OR IN CONTACT VVITH YOU !See below E-MAIL ADDRESS ORGANIZATION DOCKET NUMBER(S) DATE OF CONTACT 11/5/2014 TELEPHONE NUMBER (888) 447-9153 Nuclear Regulatory Commission  
(03*2013) f~
( 1RC) 72-1040, 72-13, 50-313, 50-368 LICENSE NUMBER(S)
i  
CONTROL NUMBER(S) N/A SUBJECT Arkansas uclear One Request for Additional Information (RAI) Discussion SUMMARY Entergy (licensee):
~ ~~*
tephenie Pyle, Bob Clark, Alan Palmer and Don Lomax Holtec: Kim Manzione, Abrar Mohammed and Debu Mita-Majumdar NRC participants: Chris Allen. Jorge olis and Balwant ingal DATE OF SIGNATURE II/I 0/2014 TYPE OF CONVERSATION DE-MAIL 0 TELEPHONE D INCOMING 0 OUTGOING A copy of the RAts were provided both to Entergy and to lloltec prior to the teleconference which commenced at approximately 2 P. M. Eastern tandard Time. Entergy began the conversation by explaining that the purpose for providing the bulk water temperature in the 111-TRAC annulus was to show that the canister was in a stable condition.
/
The RC acknowledged this, but emphasized that, because the fuel had been declared damaged, the canister was in a condition not analyzed in the Ill-TORM Final Safety Analysis Repon (F AR). Therefore, it was still necessary to provide information which showed that the analyses discussed in the F AR bounded the current cani tcr configura tion. Consequently, Entergy committed to providing information which showed the current canister configuration was bounded by the F AR analyses. Continue on Page 2 ACTION REQUIRED (IF ANY) Continue on Page 3 NAME OF PERSON DOCUMENTI NG CONVERSATION Chris Allen SIGNATURE  
U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD NAME OF PERSON(S) CONTACTED OR IN CONTACT VVITH YOU  
,
!See below E-MAIL ADDRESS ORGANIZATION DOCKET NUMBER(S)
DATE OF CONTACT 11 /5/2014 TELEPHONE NUMBER (888) 447-9 153 Nuclear Regulatory Commission ( 1RC) 72-1040, 72-13, 50-313, 50-368 LICENSE NUMBER(S)
CONTROL NUMBER(S)
N/A SUBJECT Arkansas uclear One Request for Additional Information (RAI) Discussion  
 
==SUMMARY==
Entergy (licensee):
tephenie Pyle, Bob Clark, A lan Palmer and Don Lomax Holtec: K im Manzione, Abrar Mohammed and Debu Mita-Majumdar NRC participants: Chris Allen. Jorge olis and Balwant ingal DATE OF SIGNATURE II /I 0/2014 TYPE OF CONVERSATION DE-MAIL 0 TELEPHONE D INCOMING 0 OUTGOING A copy of the RA ts were provided both to Entergy and to lloltec prior to the teleconference which commenced at approximately 2 P.
M. Eastern tandard Time. Entergy began the conversation by explaining that the purpose for providing the bulk water temperature in the 111-TRAC annulus was to show that the canister was in a stable condition. The RC acknowledged this, but emphasized that, because the fuel had been declared damaged, the canister was in a condition not analyzed in the Ill-TORM Final Safety Analysis Repon (F A R). Therefore, it was still necessary to provide information which showed that the analyses discussed in the F A R bounded the current cani tcr configuration. Consequently, Entergy committed to providing information which showed the current canister configuration was bounded by the F A R analyses.
Continue on Page 2 ACTION REQUIRED (IF ANY)
Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Chris A llen SIGNATURE,
C'ff~
NRC FORM 699 (03*2013)
NRC FORM 699 (03*2013)
Page 1 of NRC FORM 699 (03-2013) SUMMARY (Contmued from page 1) U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD (continued)
Page 1 of  
In discussing mou ehole blockage, lloltec stated that natural convection now within the basket was re tricted to the semi-circular ponion of the mou ehole a discussed in F AR Chapter II. R taffexpre s ed confu ion ince F AR Chapter II discu sed accidents and off-normal conditions. llowever, lloltec elaborated that the restricted now discussed in F A R Chapter II was actually incorporated into the normal condition analyses ofF 1\R Chapter 4. After discussion of the RA Is was complete, Entergy committed to providing a formal respon e to the information reque t early in the week of ovember 10. The call was concluded at approximately 2:30P.M. Eastern tandard Time. NRC FORM 699 (03-2013) Page 2 of}}
 
NRC FORM 699 (03-2013)  
 
==SUMMARY==
(Contmued from page 1)
U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD (continued)
In discussing mou ehole blockage, lloltec stated that natural convection now within the basket was re tricted to the semi-circular ponion of the mou ehole a discussed in F A R Chapter I I.
R taffexpres ed confu ion ince F AR Chapter II discu sed accidents and off-normal conditions. l lowever, lloltec elaborated that the restricted now discussed in F A R Chapter I I was actually incorporated into the normal condition analyses of F 1\\R Chapter 4.
After discussion of the RA Is was complete, Entergy committed to providing a formal respon e to the information reque t early in the week of ovember 10. The call was concluded at approximately 2:30 P.M. Eastern tandard Time.
NRC FORM 699 (03-2013)
Page 2 of}}

Latest revision as of 16:09, 10 January 2025

NRC Form 699 - Conversation Record - Conversation Re Arkansas Nuclear One (ANO) Exemption, Request for Additional Information (RAI) Discussion
ML14314A302
Person / Time
Site: Holtec, Arkansas Nuclear  Entergy icon.png
Issue date: 11/10/2014
From: William Allen, Balwant Singal, Jorge Solis
Division of Spent Fuel Management
To: Brooke Clark, Lomax D, Manzione K, Anthony Palmer, Pyle S
Entergy Corp, Holtec
Allen W
References
Download: ML14314A302 (2)


Text

NRC FORM 699...,. ** -. **.,

(03*2013) f~

i

~ ~~*

/

U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD NAME OF PERSON(S) CONTACTED OR IN CONTACT VVITH YOU

!See below E-MAIL ADDRESS ORGANIZATION DOCKET NUMBER(S)

DATE OF CONTACT 11 /5/2014 TELEPHONE NUMBER (888) 447-9 153 Nuclear Regulatory Commission ( 1RC) 72-1040, 72-13, 50-313, 50-368 LICENSE NUMBER(S)

CONTROL NUMBER(S)

N/A SUBJECT Arkansas uclear One Request for Additional Information (RAI) Discussion

SUMMARY

Entergy (licensee):

tephenie Pyle, Bob Clark, A lan Palmer and Don Lomax Holtec: K im Manzione, Abrar Mohammed and Debu Mita-Majumdar NRC participants: Chris Allen. Jorge olis and Balwant ingal DATE OF SIGNATURE II /I 0/2014 TYPE OF CONVERSATION DE-MAIL 0 TELEPHONE D INCOMING 0 OUTGOING A copy of the RA ts were provided both to Entergy and to lloltec prior to the teleconference which commenced at approximately 2 P.

M. Eastern tandard Time. Entergy began the conversation by explaining that the purpose for providing the bulk water temperature in the 111-TRAC annulus was to show that the canister was in a stable condition. The RC acknowledged this, but emphasized that, because the fuel had been declared damaged, the canister was in a condition not analyzed in the Ill-TORM Final Safety Analysis Repon (F A R). Therefore, it was still necessary to provide information which showed that the analyses discussed in the F A R bounded the current cani tcr configuration. Consequently, Entergy committed to providing information which showed the current canister configuration was bounded by the F A R analyses.

Continue on Page 2 ACTION REQUIRED (IF ANY)

Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Chris A llen SIGNATURE,

C'ff~

NRC FORM 699 (03*2013)

Page 1 of

NRC FORM 699 (03-2013)

SUMMARY

(Contmued from page 1)

U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD (continued)

In discussing mou ehole blockage, lloltec stated that natural convection now within the basket was re tricted to the semi-circular ponion of the mou ehole a discussed in F A R Chapter I I.

R taffexpres ed confu ion ince F AR Chapter II discu sed accidents and off-normal conditions. l lowever, lloltec elaborated that the restricted now discussed in F A R Chapter I I was actually incorporated into the normal condition analyses of F 1\\R Chapter 4.

After discussion of the RA Is was complete, Entergy committed to providing a formal respon e to the information reque t early in the week of ovember 10. The call was concluded at approximately 2:30 P.M. Eastern tandard Time.

NRC FORM 699 (03-2013)

Page 2 of