{{#Wiki_filter:NRC FORM 699       ...,.** -.**.,                                       U.S. NUCLEAR REGULATORY COMMISSION          DATE OF SIGNATURE (03*2013)         f~           i
{{#Wiki_filter:NRC FORM 699...,. ** -. **.,
                  ~ ~~*
(03*2013) f~
                  .... .....  /                        CONVERSATION RECORD                                             II /I 0/2014 NAME OF PERSON(S) CONTACTED OR IN CONTACT VVITH YOU                                           DATE OF CONTACT  TYPE OF CONVERSATION D E -MAIL
i  
!See below                                                                                          11 /5/20 14 0    TELEPHONE E-MAIL ADDRESS                                                                                TELEPHONE NUMBER D      INCOMING (888) 447-9 153       0      OUTGOING ORGANIZATIO N                                                            DOCKET NUMBER(S)
~ ~~*  
Nuclear Regul atory Commission ( 1RC)                                     72-1040, 72- 13, 50-313, 50-368 LICENSE NUMBER(S)                                                         CONTROL NUMBER(S)
/
N/ A SUBJECT A rkansas    uclear One Request for Additi onal Information (RAI) Discussion
U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD NAME OF PERSON(S) CONTACTED OR IN CONTACT VVITH YOU  
!See below E-MAIL ADDRESS ORGANIZATION DOCKET NUMBER(S)
DATE OF CONTACT 11 /5/2014 TELEPHONE NUMBER (888) 447-9 153 Nuclear Regulatory Commission ( 1RC) 72-1040, 72-13, 50-313, 50-368 LICENSE NUMBER(S)
CONTROL NUMBER(S)
N/A SUBJECT Arkansas uclear One Request for Additional Information (RAI) Discussion  


==SUMMARY==
==SUMMARY==
 
Entergy (licensee):
Entergy (l icensee):       tephenie Pyle, Bob Clark, A lan Palmer and Don Lomax Hol tec: K im Manzione, A brar Mohammed and Debu Mita-Maj umdar N RC parti cipants: Chris Al len. Jorge olis and Balwant ingal A copy of the RA ts were provided both to Entergy and to lloltec prior to the teleconference which commenced at approximately 2 P.
tephenie Pyle, Bob Clark, A lan Palmer and Don Lomax Holtec: K im Manzione, Abrar Mohammed and Debu Mita-Majumdar NRC participants: Chris Allen. Jorge olis and Balwant ingal DATE OF SIGNATURE II /I 0/2014 TYPE OF CONVERSATION DE-MAIL 0 TELEPHONE D INCOMING 0 OUTGOING A copy of the RA ts were provided both to Entergy and to lloltec prior to the teleconference which commenced at approximately 2 P.
M. Eastern tandard Time. Entergy began the conversati on by explaining that the purpose for providing the bulk water temperature in the 111-TRAC annulus was to show that the canister was in a stable condition. The RC acknow ledged thi s, but emphasized that, because the fuel had been declared damaged, the canister was in a condition not analyzed in the Ill- TORM Final Safety Analysis Repon (F A R). Therefore, it was still necessary to provide information which showed that the analyses discussed in the F A R bounded the current cani tcr configuration. Consequently, Entergy committed to providing information w hich showed the current canister configuration was bounded by the F A R analyses.
M. Eastern tandard Time. Entergy began the conversation by explaining that the purpose for providing the bulk water temperature in the 111-TRAC annulus was to show that the canister was in a stable condition. The RC acknowledged this, but emphasized that, because the fuel had been declared damaged, the canister was in a condition not analyzed in the Ill-TORM Final Safety Analysis Repon (F A R). Therefore, it was still necessary to provide information which showed that the analyses discussed in the F A R bounded the current cani tcr configuration. Consequently, Entergy committed to providing information which showed the current canister configuration was bounded by the F A R analyses.
Continue on Page 2 ACTION REQUIRED (IF ANY)
Continue on Page 2 ACTION REQUIRED (IF ANY)
Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Chris A llen SIGNATURE ,
Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Chris A llen SIGNATURE,
C'ff~
C'ff~
NRC FORM 699 (03*2013)
NRC FORM 699 (03*2013)
Page 1 of
Page 1 of  


NRC FORM 699                                                                                     U.S. NUCLEAR REGULATORY COMMISSION (03-2013)
NRC FORM 699 (03-2013)  
CONVERSATION RECORD (continued)


==SUMMARY==
==SUMMARY==
(Contmued from page 1)
(Contmued from page 1)
In discussing mou ehole blockage, lloltec stated that natural convection now w ithin the basket was re tricted to the semi-circular ponion of the mou ehole a discussed in F A R Chapter I I. R taffexpres ed confu ion ince F AR Chapter II discu sed accidents and off-norm al conditions. l lowever, ll oltec elaborated that the restricted now discussed in F A R Chapter I I was actually incorporated into the normal condition analyses of F 1\R Chapter 4.
U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD (continued)
After discussion of the RA Is was complete, Entergy commi tted to providi ng a formal respon e to the i nformation reque t early in the week of ovember 10. The call was concluded at approximately 2:30 P.M. Eastern tandard T i me.
In discussing mou ehole blockage, lloltec stated that natural convection now within the basket was re tricted to the semi-circular ponion of the mou ehole a discussed in F A R Chapter I I.
NRC FORM 699 (03-2013)                                                                                               Page 2 of}}
R taffexpres ed confu ion ince F AR Chapter II discu sed accidents and off-normal conditions. l lowever, lloltec elaborated that the restricted now discussed in F A R Chapter I I was actually incorporated into the normal condition analyses of F 1\\R Chapter 4.
After discussion of the RA Is was complete, Entergy committed to providing a formal respon e to the information reque t early in the week of ovember 10. The call was concluded at approximately 2:30 P.M. Eastern tandard Time.
NRC FORM 699 (03-2013)
Page 2 of}}

Latest revision as of 16:09, 10 January 2025

NRC Form 699 - Conversation Record - Conversation Re Arkansas Nuclear One (ANO) Exemption, Request for Additional Information (RAI) Discussion
ML14314A302
Person / Time
Site: Holtec, Arkansas Nuclear  Entergy icon.png
Issue date: 11/10/2014
From: William Allen, Balwant Singal, Jorge Solis
Division of Spent Fuel Management
To: Brooke Clark, Lomax D, Manzione K, Anthony Palmer, Pyle S
Entergy Corp, Holtec
Allen W
References
Download: ML14314A302 (2)


Text

NRC FORM 699...,. ** -. **.,

(03*2013) f~

i

~ ~~*

/

U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD NAME OF PERSON(S) CONTACTED OR IN CONTACT VVITH YOU

!See below E-MAIL ADDRESS ORGANIZATION DOCKET NUMBER(S)

DATE OF CONTACT 11 /5/2014 TELEPHONE NUMBER (888) 447-9 153 Nuclear Regulatory Commission ( 1RC) 72-1040, 72-13, 50-313, 50-368 LICENSE NUMBER(S)

CONTROL NUMBER(S)

N/A SUBJECT Arkansas uclear One Request for Additional Information (RAI) Discussion

SUMMARY

Entergy (licensee):

tephenie Pyle, Bob Clark, A lan Palmer and Don Lomax Holtec: K im Manzione, Abrar Mohammed and Debu Mita-Majumdar NRC participants: Chris Allen. Jorge olis and Balwant ingal DATE OF SIGNATURE II /I 0/2014 TYPE OF CONVERSATION DE-MAIL 0 TELEPHONE D INCOMING 0 OUTGOING A copy of the RA ts were provided both to Entergy and to lloltec prior to the teleconference which commenced at approximately 2 P.

M. Eastern tandard Time. Entergy began the conversation by explaining that the purpose for providing the bulk water temperature in the 111-TRAC annulus was to show that the canister was in a stable condition. The RC acknowledged this, but emphasized that, because the fuel had been declared damaged, the canister was in a condition not analyzed in the Ill-TORM Final Safety Analysis Repon (F A R). Therefore, it was still necessary to provide information which showed that the analyses discussed in the F A R bounded the current cani tcr configuration. Consequently, Entergy committed to providing information which showed the current canister configuration was bounded by the F A R analyses.

Continue on Page 2 ACTION REQUIRED (IF ANY)

Continue on Page 3 NAME OF PERSON DOCUMENTING CONVERSATION Chris A llen SIGNATURE,

C'ff~

NRC FORM 699 (03*2013)

Page 1 of

NRC FORM 699 (03-2013)

SUMMARY

(Contmued from page 1)

U.S. NUCLEAR REGULATORY COMMISSION CONVERSATION RECORD (continued)

In discussing mou ehole blockage, lloltec stated that natural convection now within the basket was re tricted to the semi-circular ponion of the mou ehole a discussed in F A R Chapter I I.

R taffexpres ed confu ion ince F AR Chapter II discu sed accidents and off-normal conditions. l lowever, lloltec elaborated that the restricted now discussed in F A R Chapter I I was actually incorporated into the normal condition analyses of F 1\\R Chapter 4.

After discussion of the RA Is was complete, Entergy committed to providing a formal respon e to the information reque t early in the week of ovember 10. The call was concluded at approximately 2:30 P.M. Eastern tandard Time.

NRC FORM 699 (03-2013)

Page 2 of