ML14357A295: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (9 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML14357A295 | | number = ML14357A295 | ||
| issue date = 01/12/2015 | | issue date = 01/12/2015 | ||
| title = | | title = Independent Spent Fuel Storage Facility - Acceptance Review of Decommission Quality Assurance Program | ||
| author name = Wengert T | | author name = Wengert T | ||
| author affiliation = NRC/NRR/DORL/LPLIV-2 | | author affiliation = NRC/NRR/DORL/LPLIV-2 | ||
| addressee name = Palmisano T | | addressee name = Palmisano T | ||
| addressee affiliation = Southern California Edison Co | | addressee affiliation = Southern California Edison Co | ||
| docket = 05000206, 05000361, 05000362, 07200041 | | docket = 05000206, 05000361, 05000362, 07200041 | ||
| license number = NPF-010, NPF-015 | | license number = NPF-010, NPF-015 | ||
| contact person = Wengert T | | contact person = Wengert T | ||
| case reference number = TAC MF5215, TAC MF5216, TAC MF5217 | | case reference number = TAC MF5215, TAC MF5216, TAC MF5217 | ||
| document type = Letter | | document type = Letter | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 12, 2015 Mr. Thomas J. Palmisano Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3AND INDEPENDENT SPENT FUEL STORAGE FACILITY-ACCEPTANCE REVIEW OF THE DECOMMISSIONING QUALITY ASSURANCE PROGRAM (TAC NOS. MF5215, MF5216, AND MF5217) Dear Mr. Palmisano: By letter dated November 13, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 12, 2015 Mr. Thomas J. Palmisano Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 | ||
}} | ==SUBJECT:== | ||
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3AND INDEPENDENT SPENT FUEL STORAGE FACILITY-ACCEPTANCE REVIEW OF THE DECOMMISSIONING QUALITY ASSURANCE PROGRAM (TAC NOS. MF5215, MF5216, AND MF5217) | |||
==Dear Mr. Palmisano:== | |||
By {{letter dated|date=November 13, 2014|text=letter dated November 13, 2014}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14322A157), Southern California Edison (SCE) submitted a proposed revision to the San Onofre Nuclear Generating Station (SONGS) Quality Assurance Program (QAP) for review and approval by the U.S. Nuclear Regulatory Commission (NRC), | |||
since it involves aspects that are considered reductions in commitments. The purpose of this letter is to provide the results of the NRC staff's acceptance review of the submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of this request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | |||
Note that, because the NRC staff has accepted this application for review and will be performing a detailed review of this request, the 60-day period referenced in Title 10 of the Code of Federal Regulations, paragraph 50.54(a)(4)(iv) is not applicable. Accordingly, SCE can implement reductions in commitments only after the NRC staff has completed its review and issued a safety evaluation. | |||
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas.Wengert@nrc.gov. | |||
Docket Nos. 50-206, 50-361, 50-362, and 72-041 cc: Distribution via Listserv Sincerely, | |||
~~~ | |||
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
ML14357A295 OFFICE NRR/DORL/LPL4-2/PM NRRIDORLILPL4-2/LA NAME TWengert PBiechman DATE 1/5/15 12/23/14 Sincerely, IRA! | |||
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation NRRIDORL/LPL4-2/LA NRRIDORLILPL4-2/BC NRR/DORL/LPL4-2/PM JBurkhardt DBroaddus TWengert 12/24/14 1/12/15 1/12/15}} | |||
Latest revision as of 15:16, 10 January 2025
| ML14357A295 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/12/2015 |
| From: | Thomas Wengert Plant Licensing Branch IV |
| To: | Thomas J. Palmisano Southern California Edison Co |
| Wengert T | |
| References | |
| TAC MF5215, TAC MF5216, TAC MF5217 | |
| Download: ML14357A295 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 12, 2015 Mr. Thomas J. Palmisano Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3AND INDEPENDENT SPENT FUEL STORAGE FACILITY-ACCEPTANCE REVIEW OF THE DECOMMISSIONING QUALITY ASSURANCE PROGRAM (TAC NOS. MF5215, MF5216, AND MF5217)
Dear Mr. Palmisano:
By letter dated November 13, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14322A157), Southern California Edison (SCE) submitted a proposed revision to the San Onofre Nuclear Generating Station (SONGS) Quality Assurance Program (QAP) for review and approval by the U.S. Nuclear Regulatory Commission (NRC),
since it involves aspects that are considered reductions in commitments. The purpose of this letter is to provide the results of the NRC staff's acceptance review of the submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of this request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Note that, because the NRC staff has accepted this application for review and will be performing a detailed review of this request, the 60-day period referenced in Title 10 of the Code of Federal Regulations, paragraph 50.54(a)(4)(iv) is not applicable. Accordingly, SCE can implement reductions in commitments only after the NRC staff has completed its review and issued a safety evaluation.
If you have any questions, please contact me at (301) 415-4037 or via e-mail at Thomas.Wengert@nrc.gov.
Docket Nos. 50-206, 50-361, 50-362, and 72-041 cc: Distribution via Listserv Sincerely,
~~~
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML14357A295 OFFICE NRR/DORL/LPL4-2/PM NRRIDORLILPL4-2/LA NAME TWengert PBiechman DATE 1/5/15 12/23/14 Sincerely, IRA!
Thomas J. Wengert, Senior Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation NRRIDORL/LPL4-2/LA NRRIDORLILPL4-2/BC NRR/DORL/LPL4-2/PM JBurkhardt DBroaddus TWengert 12/24/14 1/12/15 1/12/15