On November 21, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your James A. Fitzpatrick Nuclear Power Plant. On December 11, 2014, the NRC inspectors discussed the results of this inspection, via telephone, with Mr. Dave Poulin and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. | On November 21, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your James A. Fitzpatrick Nuclear Power Plant. On December 11, 2014, the NRC inspectors discussed the results of this inspection, via telephone, with Mr. Dave Poulin and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. | ||
NRC inspectors documented two findings of very low security significance (Green) in this report | NRC inspectors documented two findings of very low security significance (Green) in this report. | ||
These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with 2.3.2.a of the NRC Enforcement Policy. | |||
If you contest the violations or the significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. | |||
James A. Fitzpatrick Nuclear Power Plant. | Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I, the Director, Office of Nuclear Security and Incident Response, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the James A. Fitzpatrick Nuclear Power Plant. | ||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region 1, the Director, Office of Nuclear Security and Incident Response, and the NRC Resident Inspector at the James A. Fitzpatrick Nuclear Power Plant. | If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region 1, the Director, Office of Nuclear Security and Incident Response, and the NRC Resident Inspector at the James A. Fitzpatrick Nuclear Power Plant. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, | However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - | ||
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) | |||
is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response | and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely, | Sincerely, | ||
/RA by Joshua Berry for/ | /RA by Joshua Berry for/ | ||
Robert C. Johnson, Chief | Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response | ||
Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response | |||
Docket No. 50-333 License No. DPR-59 | Docket No. 50-333 License No. DPR-59 | ||
| Line 56: | Line 51: | ||
cc w/encl: T. Redfearn, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority J. Hauer, Commissioner, NY State Div. of Homeland Security and Emergency Services | cc w/encl: T. Redfearn, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority J. Hauer, Commissioner, NY State Div. of Homeland Security and Emergency Services | ||
ML14357A367 OFFICE NSIR/DSO/SPEB NSIR/ | ML14357A367 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RI NSIR/DSO/SPEB NAME R. Dexter J. Curry D. Cardenas A. Dimitriadis C. Johnson DATE 12/17 /14 12/18/14 1 /23/14 1/9/15 1/20/15 | ||
/18/ | |||
}} | }} | ||
Latest revision as of 15:16, 10 January 2025
| ML14357A367 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/20/2015 |
| From: | Rachel Johnson NRC/NSIR/DSO/DDSO/SPEB |
| To: | Brian Sullivan Entergy Nuclear Northeast |
| References | |
| IR-2014201 | |
| Download: ML14357A367 (3) | |
Text
January 20, 2015
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000333/2014201
Dear Mr. Sullivan:
On November 21, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your James A. Fitzpatrick Nuclear Power Plant. On December 11, 2014, the NRC inspectors discussed the results of this inspection, via telephone, with Mr. Dave Poulin and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented two findings of very low security significance (Green) in this report.
These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with 2.3.2.a of the NRC Enforcement Policy.
If you contest the violations or the significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I, the Director, Office of Nuclear Security and Incident Response, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the James A. Fitzpatrick Nuclear Power Plant.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region 1, the Director, Office of Nuclear Security and Incident Response, and the NRC Resident Inspector at the James A. Fitzpatrick Nuclear Power Plant. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA by Joshua Berry for/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response
Docket No. 50-333 License No. DPR-59
Nonpublic Enclosure: Inspection Report 05000333/2014201 w/Attachments: Supplemental Information
cc w/encl: T. Redfearn, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority J. Hauer, Commissioner, NY State Div. of Homeland Security and Emergency Services
ML14357A367 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RI NSIR/DSO/SPEB NAME R. Dexter J. Curry D. Cardenas A. Dimitriadis C. Johnson DATE 12/17 /14 12/18/14 1 /23/14 1/9/15 1/20/15