Line 3: Line 3:
| issue date = 12/29/2014
| issue date = 12/29/2014
| title = Safety Evaluation Close-out Letter for Calvert Cliffs Nuclear Power Plant and Independent Spent Fuel Storage Installation with Enclosure
| title = Safety Evaluation Close-out Letter for Calvert Cliffs Nuclear Power Plant and Independent Spent Fuel Storage Installation with Enclosure
| author name = Huyck D G
| author name = Huyck D
| author affiliation = NRC/NSIR/DSP
| author affiliation = NRC/NSIR/DSP
| addressee name = Beasley B G
| addressee name = Beasley B
| addressee affiliation = NRC/NRR/DORL/LPLI-1
| addressee affiliation = NRC/NRR/DORL/LPLI-1
| docket = 05000317, 05000318, 07200008
| docket = 05000317, 05000318, 07200008
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:December 29, 2014 MEMORANDUM TO: Benjamin G. Beasley, Chief Plant Licensing Branch I-1 (LPL1-1)
{{#Wiki_filter:December 29, 2014 MEMORANDUM TO:
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Doug Huyck, Chief  
Benjamin G. Beasley, Chief Plant Licensing Branch I-1 (LPL1-1)
/RA/ Reactor Security Licensing Branch Division of Security Policy Office of Nuclear Security and Incident Response  
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Doug Huyck, Chief /RA/
Reactor Security Licensing Branch Division of Security Policy Office of Nuclear Security and Incident Response  


==SUBJECT:==
==SUBJECT:==
REQUEST FOR LICENSE AMENDMENT FOR SECTION 161A PREEMPTION AUTHORITY - DRAFT SAFETY EVALUATIONS FOR CALVERT CLIFFS NUCLEAR POWER PLANT AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION By application dated August 14, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13228A265), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13280A271), Constellation Energy Nuclear Group, LLC, (CENG or licensee), and letter dated May 14, 2014 (ADAMS Accession No. ML14139A342),  
REQUEST FOR LICENSE AMENDMENT FOR SECTION 161A PREEMPTION AUTHORITY - DRAFT SAFETY EVALUATIONS FOR CALVERT CLIFFS NUCLEAR POWER PLANT AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION By application dated August 14, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13228A265), as supplemented by {{letter dated|date=October 3, 2013|text=letter dated October 3, 2013}} (ADAMS Accession No. ML13280A271), Constellation Energy Nuclear Group, LLC, (CENG or licensee), and {{letter dated|date=May 14, 2014|text=letter dated May 14, 2014}} (ADAMS Accession No. ML14139A342),
(Exelon Generation or licensee), submitted a request for amendment to the Calvert Cliffs Nuclear Power Plant, Unit 1, Unit 2 (CCNPP), and the Calvert Cliffs specific-license Independent Spent Fuel Storage Installation (CCNPP-ISFSI) operating licenses.  
(Exelon Generation or licensee), submitted a request for amendment to the Calvert Cliffs Nuclear Power Plant, Unit 1, Unit 2 (CCNPP), and the Calvert Cliffs specific-license Independent Spent Fuel Storage Installation (CCNPP-ISFSI) operating licenses.
Specifically, Exelon Generating has applied, on behalf of CCNPP and CCNPP-ISFSI for Commission authorization to use the provisions of Section 161A of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2201a), at the CCNPP and CCNPP-ISFSI facilities as specified in Commission Order EA-13-092, dated June 5, 2013 (ADAMS Accession No. ML13121A459).
The Office of Nuclear Security and Incident Response, Division of Security Policy, Reactor Security and Licensing Branch (RSLB), conducted a comprehensive technical review of the CCNPP and CCNPP-ISFSI application in accordance with the Six-Step process approved by the Commission in SRM-SECY-12-0125, dated November 21, 2012 (ADAMS Accession No. ML12164A839). Specifically, this action satisfies Step 4 of the Commission approved Six-Step process.
In performing and documenting the required technical reviews, the RSLB technical reviewer followed the guidance provided in the Office of Nuclear Reactor Regulation (NRR) Office Procedure LIC-101 to inform the format and content of the enclosed Draft Safety Evaluation.
CONTACT: D. Gordon, NSIR/DSP (301) 287-3633


Specifically, Exelon Generating has applied, on behalf of CCNPP and CCNPP-ISFSI for Commission authorization to use the provisions of Section 161A of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2201a), at the CCNPP and CCNPP-ISFSI facilities as specified in Commission Order EA-13-092, dated June 5, 2013 (ADAMS Accession No. ML13121A459).
The RSLB technical review staff followed the review criteria specified in Step 4 of the Commission approved process and documented the results, as appropriate, in the enclosed Draft Safety Evaluation.
 
Based on the findings and conclusions described in the enclosed NSIR input to the required Safety Evaluations for CCNPP and CCNPP-ISFSI, the RSLB technical staff recommends that the Commission grant Section 161A preemption authorization to these two Commission-designated facilities through the issuance of a Confirmatory Order as outlined in Step 5 of the Commission approved Six-Step process, as specified in SRM-SECY-12-0125.
The Office of Nuclear Security and Incident Response, Division of Security Policy, Reactor Security and Licensing Branch (RSLB), conducted a comprehensive technical review of the CCNPP and CCNPP-ISFSI application in accordance with the Six-Step process approved by the Commission in SRM-SECY-12-0125, dated November 21, 2012 (ADAMS Accession No. ML12164A839). Specifically, this action satisf ies Step 4 of the Commission approved Six-Step process. 
Consequently, the RSLB staff requests that NRR staff take the actions required to finalize the enclosed Safety Evaluation; issue a Draft Confirmatory Order to the CCNPP and CCNPP-ISFSI facilities; gain the licensee Waiver of Hearing Rights; and provide all final licensing documentation needed to support the successful completion of W201200098, SRM-SECY 0027 Tasking No. 2, by the assigned due date of March 31, 2015. To meet the March 31, 2015 due date, it is recommended that NRR complete the actions required to obtain each licensees waiver of hearing rights no later than the week of January 19, 2015, to ensure adequate time for completion of the SECY-Paper concurrence process prior to the March 31, 2015, due date.  
 
In performing and documenting the required technical reviews, the RSLB technical reviewer followed the guidance provided in the Office of Nuclear Reactor Regulation (NRR) Office Procedure LIC-101 to inform the format and content of the enclosed Draft Safety Evaluation. 
 
CONTACT:  D. Gordon, NSIR/DSP          (301) 287-3633
 
The RSLB technical review staff followed the review criteria specified in Step 4 of the Commission approved process and documented the results, as appropriate, in the enclosed Draft Safety Evaluation.  
 
Based on the findings and conclusions described in the enclosed NSIR input to the required Safety Evaluations for CCNPP and CCNPP-ISFSI, the RSLB technical staff recommends that the Commission grant Section 161A preemption authorization to these two Commission-designated facilities through the issuance of a Confirmatory Order as outlined in Step 5 of the Commission approved Six-Step process, as specified in SRM-SECY-12-0125.  
 
Consequently, the RSLB staff requests that NRR sta ff take the actions required to finalize the enclosed Safety Evaluation; issue a Draft Confirmatory Order to the CCNPP and CCNPP-ISFSI facilities; gain the licensee Waiver of Hearing Rights; and provide all final licensing documentation needed to support the successful completion of W201200098, SRM-SECY 0027 Tasking No. 2, by the assigned due date of March 31, 2015. To meet the March 31, 2015 due date, it is recommended that NRR complete the actions required to obtain each licensee's waiver of hearing rights no later than the week of January 19, 2015, to ensure adequate time for completion of the SECY-Paper concurrence process prior to the March 31, 2015, due date.  


==Enclosure:==
==Enclosure:==
Safety Evaluation - Calvert Cliffs Nuclear Power Plant and the Calvert Cliffs Nuclear Power Plant specific-license Independent Spent Fuel Storage Installation


Safety Evaluation - Calvert Cliffs 
ML14363A045, Pkg. ML14363A048 OFFICE NSIR/DSP/RSLB BC:NSIR/DSP/RSLB NAME DGordon DHuyck DATE 12/29/14 12/29/14
 
Nuclear Power Plant and the Calvert 
 
Cliffs Nuclear Power Plant    specific-license Independent Spent    Fuel Storage Installation


ML14363A045, Pkg. ML14363A048 OFFICE NSIR/DSP/RSLB BC:NSIR/DSP/RSLB NAME DGordon DHuyck DATE 12/29/14 12/29/14 December 29, 2014 MEMORANDUM TO: Benjamin G. Beasley, Chief Plant Licensing Branch I-1 (LPL1-1)
December 29, 2014 MEMORANDUM TO:
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Doug Huyck, Chief  
Benjamin G. Beasley, Chief Plant Licensing Branch I-1 (LPL1-1)
/RA/ Reactor Security Licensing Branch Division of Security Policy Office of Nuclear Security and Incident Response  
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Doug Huyck, Chief /RA/
Reactor Security Licensing Branch Division of Security Policy Office of Nuclear Security and Incident Response  


==SUBJECT:==
==SUBJECT:==
REQUEST FOR LICENSE AMENDMENT FOR SECTION 161A PREEMPTION AUTHORITY - DRAFT SAFETY EVALUATIONS FOR CALVERT CLIFFS NUCLEAR POWER PLANT AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION By application dated August 14, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13228A265), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13280A271), Constellation Energy Nuclear Group, LLC, (CENG or licensee), and letter dated May 14, 2014 (ADAMS Accession No. ML14139A342),  
REQUEST FOR LICENSE AMENDMENT FOR SECTION 161A PREEMPTION AUTHORITY - DRAFT SAFETY EVALUATIONS FOR CALVERT CLIFFS NUCLEAR POWER PLANT AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION By application dated August 14, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13228A265), as supplemented by {{letter dated|date=October 3, 2013|text=letter dated October 3, 2013}} (ADAMS Accession No. ML13280A271), Constellation Energy Nuclear Group, LLC, (CENG or licensee), and {{letter dated|date=May 14, 2014|text=letter dated May 14, 2014}} (ADAMS Accession No. ML14139A342),
(Exelon Generation or licensee), submitted a request for amendment to the Calvert Cliffs Nuclear Power Plant, Unit 1, Unit 2 (CCNPP), and the Calvert Cliffs specific-license Independent Spent Fuel Storage Installation (CCNPP-ISFSI) operating licenses.  
(Exelon Generation or licensee), submitted a request for amendment to the Calvert Cliffs Nuclear Power Plant, Unit 1, Unit 2 (CCNPP), and the Calvert Cliffs specific-license Independent Spent Fuel Storage Installation (CCNPP-ISFSI) operating licenses.
Specifically, Exelon Generating has applied, on behalf of CCNPP and CCNPP-ISFSI for Commission authorization to use the provisions of Section 161A of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2201a), at the CCNPP and CCNPP-ISFSI facilities as specified in Commission Order EA-13-092, dated June 5, 2013 (ADAMS Accession No. ML13121A459).
The Office of Nuclear Security and Incident Response, Division of Security Policy, Reactor Security and Licensing Branch (RSLB), conducted a comprehensive technical review of the CCNPP and CCNPP-ISFSI application in accordance with the Six-Step process approved by the Commission in SRM-SECY-12-0125, dated November 21, 2012 (ADAMS Accession No. ML12164A839). Specifically, this action satisfies Step 4 of the Commission approved Six-Step process.
In performing and documenting the required technical reviews, the RSLB technical reviewer followed the guidance provided in the Office of Nuclear Reactor Regulation (NRR) Office Procedure LIC-101 to inform the format and content of the enclosed Draft Safety Evaluation.
CONTACT: D. Gordon, NSIR/DSP (301) 287-3633


Specifically, Exelon Generating has applied, on behalf of CCNPP and CCNPP-ISFSI for Commission authorization to use the provisions of Section 161A of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2201a), at the CCNPP and CCNPP-ISFSI facilities as specified in Commission Order EA-13-092, dated June 5, 2013 (ADAMS Accession No. ML13121A459).
The RSLB technical review staff followed the review criteria specified in Step 4 of the Commission approved process and documented the results, as appropriate, in the enclosed Draft Safety Evaluation.
 
Based on the findings and conclusions described in the enclosed NSIR input to the required Safety Evaluations for CCNPP and CCNPP-ISFSI, the RSLB technical staff recommends that the Commission grant Section 161A preemption authorization to these two Commission-designated facilities through the issuance of a Confirmatory Order as outlined in Step 5 of the Commission approved Six-Step process, as specified in SRM-SECY-12-0125.
The Office of Nuclear Security and Incident Response, Division of Security Policy, Reactor Security and Licensing Branch (RSLB), conducted a comprehensive technical review of the CCNPP and CCNPP-ISFSI application in accordance with the Six-Step process approved by the Commission in SRM-SECY-12-0125, dated November 21, 2012 (ADAMS Accession No. ML12164A839). Specifically, this action satisf ies Step 4 of the Commission approved Six-Step process. 
Consequently, the RSLB staff requests that NRR staff take the actions required to finalize the enclosed Safety Evaluation; issue a Draft Confirmatory Order to the CCNPP and CCNPP-ISFSI facilities; gain the licensee Waiver of Hearing Rights; and provide all final licensing documentation needed to support the successful completion of W201200098, SRM-SECY 0027 Tasking No. 2, by the assigned due date of March 31, 2015. To meet the March 31, 2015 due date, it is recommended that NRR complete the actions required to obtain each licensees waiver of hearing rights no later than the week of January 19, 2015, to ensure adequate time for completion of the SECY-Paper concurrence process prior to the March 31, 2015, due date.  
 
In performing and documenting the required technical reviews, the RSLB technical reviewer followed the guidance provided in the Office of Nuclear Reactor Regulation (NRR) Office Procedure LIC-101 to inform the format and content of the enclosed Draft Safety Evaluation. 
 
CONTACT:  D. Gordon, NSIR/DSP          (301) 287-3633
 
The RSLB technical review staff followed the review criteria specified in Step 4 of the Commission approved process and documented the results, as appropriate, in the enclosed Draft Safety Evaluation.  
 
Based on the findings and conclusions described in the enclosed NSIR input to the required Safety Evaluations for CCNPP and CCNPP-ISFSI, the RSLB technical staff recommends that the Commission grant Section 161A preemption authorization to these two Commission-designated facilities through the issuance of a Confirmatory Order as outlined in Step 5 of the Commission approved Six-Step process, as specified in SRM-SECY-12-0125.  
 
Consequently, the RSLB staff requests that NRR sta ff take the actions required to finalize the enclosed Safety Evaluation; issue a Draft Confirmatory Order to the CCNPP and CCNPP-ISFSI facilities; gain the licensee Waiver of Hearing Rights; and provide all final licensing documentation needed to support the successful completion of W201200098, SRM-SECY 0027 Tasking No. 2, by the assigned due date of March 31, 2015. To meet the March 31, 2015 due date, it is recommended that NRR complete the actions required to obtain each licensee's waiver of hearing rights no later than the week of January 19, 2015, to ensure adequate time for completion of the SECY-Paper concurrence process prior to the March 31, 2015, due date.  


==Enclosure:==
==Enclosure:==
 
Safety Evaluation - Calvert Cliffs Nuclear Power Plant and the Calvert Cliffs Nuclear Power Plant specific-license Independent Spent Fuel Storage Installation  
Safety Evaluation - Calvert Cliffs
 
Nuclear Power Plant and the Calvert
 
Cliffs Nuclear Power Plant   specific-license Independent Spent   Fuel Storage Installation  


ML14363A045, Pkg. ML14363A048 OFFICE NSIR/DSP/RSLB BC:NSIR/DSP/RSLB NAME DGordon DHuyck DATE 12/29/14 12/29/14}}
ML14363A045, Pkg. ML14363A048 OFFICE NSIR/DSP/RSLB BC:NSIR/DSP/RSLB NAME DGordon DHuyck DATE 12/29/14 12/29/14}}

Latest revision as of 15:13, 10 January 2025

Safety Evaluation Close-out Letter for Calvert Cliffs Nuclear Power Plant and Independent Spent Fuel Storage Installation with Enclosure
ML14363A045
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/29/2014
From: Doug Huyck
Division of Security Policy
To: Benjamin Beasley
Plant Licensing Branch 1
Gordon D
Shared Package
ML14363A048 List:
References
Download: ML14363A045 (3)


Text

December 29, 2014 MEMORANDUM TO:

Benjamin G. Beasley, Chief Plant Licensing Branch I-1 (LPL1-1)

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Doug Huyck, Chief /RA/

Reactor Security Licensing Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

REQUEST FOR LICENSE AMENDMENT FOR SECTION 161A PREEMPTION AUTHORITY - DRAFT SAFETY EVALUATIONS FOR CALVERT CLIFFS NUCLEAR POWER PLANT AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION By application dated August 14, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13228A265), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13280A271), Constellation Energy Nuclear Group, LLC, (CENG or licensee), and letter dated May 14, 2014 (ADAMS Accession No. ML14139A342),

(Exelon Generation or licensee), submitted a request for amendment to the Calvert Cliffs Nuclear Power Plant, Unit 1, Unit 2 (CCNPP), and the Calvert Cliffs specific-license Independent Spent Fuel Storage Installation (CCNPP-ISFSI) operating licenses.

Specifically, Exelon Generating has applied, on behalf of CCNPP and CCNPP-ISFSI for Commission authorization to use the provisions of Section 161A of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2201a), at the CCNPP and CCNPP-ISFSI facilities as specified in Commission Order EA-13-092, dated June 5, 2013 (ADAMS Accession No. ML13121A459).

The Office of Nuclear Security and Incident Response, Division of Security Policy, Reactor Security and Licensing Branch (RSLB), conducted a comprehensive technical review of the CCNPP and CCNPP-ISFSI application in accordance with the Six-Step process approved by the Commission in SRM-SECY-12-0125, dated November 21, 2012 (ADAMS Accession No. ML12164A839). Specifically, this action satisfies Step 4 of the Commission approved Six-Step process.

In performing and documenting the required technical reviews, the RSLB technical reviewer followed the guidance provided in the Office of Nuclear Reactor Regulation (NRR) Office Procedure LIC-101 to inform the format and content of the enclosed Draft Safety Evaluation.

CONTACT: D. Gordon, NSIR/DSP (301) 287-3633

The RSLB technical review staff followed the review criteria specified in Step 4 of the Commission approved process and documented the results, as appropriate, in the enclosed Draft Safety Evaluation.

Based on the findings and conclusions described in the enclosed NSIR input to the required Safety Evaluations for CCNPP and CCNPP-ISFSI, the RSLB technical staff recommends that the Commission grant Section 161A preemption authorization to these two Commission-designated facilities through the issuance of a Confirmatory Order as outlined in Step 5 of the Commission approved Six-Step process, as specified in SRM-SECY-12-0125.

Consequently, the RSLB staff requests that NRR staff take the actions required to finalize the enclosed Safety Evaluation; issue a Draft Confirmatory Order to the CCNPP and CCNPP-ISFSI facilities; gain the licensee Waiver of Hearing Rights; and provide all final licensing documentation needed to support the successful completion of W201200098, SRM-SECY 0027 Tasking No. 2, by the assigned due date of March 31, 2015. To meet the March 31, 2015 due date, it is recommended that NRR complete the actions required to obtain each licensees waiver of hearing rights no later than the week of January 19, 2015, to ensure adequate time for completion of the SECY-Paper concurrence process prior to the March 31, 2015, due date.

Enclosure:

Safety Evaluation - Calvert Cliffs Nuclear Power Plant and the Calvert Cliffs Nuclear Power Plant specific-license Independent Spent Fuel Storage Installation

ML14363A045, Pkg. ML14363A048 OFFICE NSIR/DSP/RSLB BC:NSIR/DSP/RSLB NAME DGordon DHuyck DATE 12/29/14 12/29/14

December 29, 2014 MEMORANDUM TO:

Benjamin G. Beasley, Chief Plant Licensing Branch I-1 (LPL1-1)

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Doug Huyck, Chief /RA/

Reactor Security Licensing Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

REQUEST FOR LICENSE AMENDMENT FOR SECTION 161A PREEMPTION AUTHORITY - DRAFT SAFETY EVALUATIONS FOR CALVERT CLIFFS NUCLEAR POWER PLANT AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION By application dated August 14, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13228A265), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13280A271), Constellation Energy Nuclear Group, LLC, (CENG or licensee), and letter dated May 14, 2014 (ADAMS Accession No. ML14139A342),

(Exelon Generation or licensee), submitted a request for amendment to the Calvert Cliffs Nuclear Power Plant, Unit 1, Unit 2 (CCNPP), and the Calvert Cliffs specific-license Independent Spent Fuel Storage Installation (CCNPP-ISFSI) operating licenses.

Specifically, Exelon Generating has applied, on behalf of CCNPP and CCNPP-ISFSI for Commission authorization to use the provisions of Section 161A of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2201a), at the CCNPP and CCNPP-ISFSI facilities as specified in Commission Order EA-13-092, dated June 5, 2013 (ADAMS Accession No. ML13121A459).

The Office of Nuclear Security and Incident Response, Division of Security Policy, Reactor Security and Licensing Branch (RSLB), conducted a comprehensive technical review of the CCNPP and CCNPP-ISFSI application in accordance with the Six-Step process approved by the Commission in SRM-SECY-12-0125, dated November 21, 2012 (ADAMS Accession No. ML12164A839). Specifically, this action satisfies Step 4 of the Commission approved Six-Step process.

In performing and documenting the required technical reviews, the RSLB technical reviewer followed the guidance provided in the Office of Nuclear Reactor Regulation (NRR) Office Procedure LIC-101 to inform the format and content of the enclosed Draft Safety Evaluation.

CONTACT: D. Gordon, NSIR/DSP (301) 287-3633

The RSLB technical review staff followed the review criteria specified in Step 4 of the Commission approved process and documented the results, as appropriate, in the enclosed Draft Safety Evaluation.

Based on the findings and conclusions described in the enclosed NSIR input to the required Safety Evaluations for CCNPP and CCNPP-ISFSI, the RSLB technical staff recommends that the Commission grant Section 161A preemption authorization to these two Commission-designated facilities through the issuance of a Confirmatory Order as outlined in Step 5 of the Commission approved Six-Step process, as specified in SRM-SECY-12-0125.

Consequently, the RSLB staff requests that NRR staff take the actions required to finalize the enclosed Safety Evaluation; issue a Draft Confirmatory Order to the CCNPP and CCNPP-ISFSI facilities; gain the licensee Waiver of Hearing Rights; and provide all final licensing documentation needed to support the successful completion of W201200098, SRM-SECY 0027 Tasking No. 2, by the assigned due date of March 31, 2015. To meet the March 31, 2015 due date, it is recommended that NRR complete the actions required to obtain each licensees waiver of hearing rights no later than the week of January 19, 2015, to ensure adequate time for completion of the SECY-Paper concurrence process prior to the March 31, 2015, due date.

Enclosure:

Safety Evaluation - Calvert Cliffs Nuclear Power Plant and the Calvert Cliffs Nuclear Power Plant specific-license Independent Spent Fuel Storage Installation

ML14363A045, Pkg. ML14363A048 OFFICE NSIR/DSP/RSLB BC:NSIR/DSP/RSLB NAME DGordon DHuyck DATE 12/29/14 12/29/14