ML14364A385: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 11/24/2014 | | issue date = 11/24/2014 | ||
| title = 2014 Braidwood Station Initial License Examination Form ES-401-3 | | title = 2014 Braidwood Station Initial License Examination Form ES-401-3 | ||
| author name = | | author name = Mcneil D | ||
| author affiliation = NRC/RGN-III/DRS/OLB | | author affiliation = NRC/RGN-III/DRS/OLB | ||
| addressee name = | | addressee name = | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES- | {{#Wiki_filter:ES-401 Generic Knowledge and Abilities Outline (Tier 3) | ||
Equipment | Form ES-401-3 Facility Name:Braidwood Date of Exam:11/10/2014 IR IR 2.1. 27 Knowledge of system purpose and/or function. | ||
Conduct of | 3.9 1 | ||
2.1. 13 Knowledge of facility requirements for controlling vital/controlled access. | |||
2.5 1 | |||
2.1. 36 Knowledge of procedures and limitations involved in core alterations. | |||
4.1 1 | |||
2.1. 43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc. | |||
4.3 1 | |||
2.1. | |||
2.1. | |||
Subtotal 2 | |||
2 2.2. 18 Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc. | |||
2.6 1 | |||
2.2. 40 Ability to apply Technical Specifications for a system. | |||
3.4 1 | |||
2.2. 12 Knowledge of surveillance procedures. | |||
3.7 1 | |||
2.2. 05 Knowledge of the process for making design or operating changes to the facility. | |||
3.2 1 | |||
2.2. | |||
2.2. | |||
Subtotal 3 | |||
1 2.3. 07 Ability to comply with radiation work permit requirements during normal or abnormal conditions. | |||
3.5 1 | |||
2.3. 14 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities. | |||
3.4 1 | |||
2.3. 05 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc. | |||
2.9 1 | |||
2.3. 11 Ability to control radiation releases. | |||
4.3 1 | |||
2.3. | |||
2.3. | |||
Subtotal 2 | |||
2 2.4. 17 Knowledge of EOP terms and definitions. | |||
3.9 1 | |||
2.4. 29 Knowledge of the emergency plan. | |||
3.1 1 | |||
2.4. 13 Knowledge of crew roles and responsibilities during EOP usage. | |||
4.0 1 | |||
2.4. 18 Knowledge of the specific bases for EOPs. | |||
4.0 1 | |||
2.4. 16 Knowledge of EOP implementation hierarchy and coordination with other support procedures or guidelines such as, operating procedures, abnormal operating procedures, and severe accident management guidelines 4.4 1 | |||
2.4. | |||
Subtotal 3 | |||
2 10 7 | |||
ES-401, Page 26 of 33 RO SRO-Only Tier 3 Point Total | |||
: 3. | |||
Radiation Control | |||
: 4. | |||
Emergency Procedures / | |||
Plan | |||
: 2. | |||
Equipment Control Category Topic | |||
: 1. | |||
Conduct of Operations K/A #}} | |||
Latest revision as of 15:11, 10 January 2025
| ML14364A385 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/24/2014 |
| From: | Mcneil D NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Shared Package | |
| ML14344A990 | List: |
| References | |
| ES-401-3 50-456/OL-14, 50-457/OL-14 | |
| Download: ML14364A385 (1) | |
Text
ES-401 Generic Knowledge and Abilities Outline (Tier 3)
Form ES-401-3 Facility Name:Braidwood Date of Exam:11/10/2014 IR IR 2.1. 27 Knowledge of system purpose and/or function.
3.9 1
2.1. 13 Knowledge of facility requirements for controlling vital/controlled access.
2.5 1
2.1. 36 Knowledge of procedures and limitations involved in core alterations.
4.1 1
2.1. 43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.
4.3 1
2.1.
2.1.
Subtotal 2
2 2.2. 18 Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc.
2.6 1
2.2. 40 Ability to apply Technical Specifications for a system.
3.4 1
2.2. 12 Knowledge of surveillance procedures.
3.7 1
2.2. 05 Knowledge of the process for making design or operating changes to the facility.
3.2 1
2.2.
2.2.
Subtotal 3
1 2.3. 07 Ability to comply with radiation work permit requirements during normal or abnormal conditions.
3.5 1
2.3. 14 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
3.4 1
2.3. 05 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
2.9 1
2.3. 11 Ability to control radiation releases.
4.3 1
2.3.
2.3.
Subtotal 2
2 2.4. 17 Knowledge of EOP terms and definitions.
3.9 1
2.4. 29 Knowledge of the emergency plan.
3.1 1
2.4. 13 Knowledge of crew roles and responsibilities during EOP usage.
4.0 1
2.4. 18 Knowledge of the specific bases for EOPs.
4.0 1
2.4. 16 Knowledge of EOP implementation hierarchy and coordination with other support procedures or guidelines such as, operating procedures, abnormal operating procedures, and severe accident management guidelines 4.4 1
2.4.
Subtotal 3
2 10 7
ES-401, Page 26 of 33 RO SRO-Only Tier 3 Point Total
- 3.
Radiation Control
- 4.
Emergency Procedures /
Plan
- 2.
Equipment Control Category Topic
- 1.
Conduct of Operations K/A #