| issue date = 03/04/2015
| issue date = 03/04/2015
| title = Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001
| title = Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001
| author name = Rose S D
| author name = Rose S
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:March 4, 2015
[[Issue date::March 4, 2015]]


Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001


SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001
==Dear Mr. Heacock:==
On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 404-997-4609 with any questions you may have regarding this letter.
 
Sincerely,
/RA/
 
Steven D. Rose, Chief
 
Reactor Projects Branch 5
 
Division of Reactor Projects
 
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
 
Enclosure:
Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016)
 
cc Distribution via ListServ
 
_________________________
 
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP
 
SIGNATURE BDB3 SON SDR2
 
NAME B. Bishop S. Ninh S. Rose
 
DATE 02/27/2015 02/24/2015 03/02/2015
 
E-MAIL COPY?
YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.
 
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001  
 
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
Page 1 of 1 03/04/2015 09:42:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry Inspection / Activity Plan 03/01/2015 - 06/30/2016 TFPI
- TRIENNIEL FIRE PROTECTION INSPECTION
 
1, 2 IP Fire Protection [Triennial]
7111105T 03/09/2015 03/13/2015 1, 2 IP Fire Protection [Triennial]
7111105T 03/23/2015 03/27/2015 ISI
- UNIT 1 IN-SERVICE INSPECTION


==Dear Mr. Heacock:==
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 SGISI
On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4609 with any questions you may have regarding this letter.
- UNIT 1 SG IN-SERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 RP
- RP PUBLIC RAD SAFETY BASELINE
 
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/18/2015 05/22/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/18/2015 05/22/2015 1, 2 IP Performance Indicator Verification 71151 05/18/2015 05/22/2015 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
 
1, 2 IP Problem Identification and Resolution 71152B 07/13/2015 07/17/2015 1, 2 IP Problem Identification and Resolution 71152B 07/27/2015 07/31/2015 OL EXAM
- INITIAL LICENSE EXAM PREP
 
1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 08/24/2015 08/28/2015 MODS
- PLANT MODIFICATIONS INSPECTION
 
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/14/2015 09/18/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/28/2015 10/02/2015 OL EXAM
- INITIAL LICENSE EXAM
 
1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 09/21/2015 10/02/2015 ISI
- UNIT 2 IN-SERVICE INSPECTION
 
2 IP Inservice Inspection Activities - PWR 7111108P 10/19/2015 10/23/2015 RP
- RP OCCUPATIONAL BASELINE


Sincerely,/RA/ Steven D. Rose, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/19/2015 10/23/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/19/2015 10/23/2015 1, 2 IP Performance Indicator Verification 71151 10/19/2015 10/23/2015 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION


===Enclosure:===
2 IP Inservice Inspection Activities - PWR 7111108P 10/26/2015 10/30/2015 This report does not include INPO and OUTAGE activities.
Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ


_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 SON SDR2 NAME B. Bishop S. Ninh S. Rose DATE 02/27/2015 02/24/2015 03/02/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.
This report shows only on-site and announced inspection procedures.


SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Enclosure
Page 1 of 103/04/201509:42:47Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan03/01/2015-06/30/2016TFPI-TRIENNIEL FIRE PROTECTION INSPECTION61,2 IPFire Protection [Triennial]7111105T03/09/201503/13/20151,2 IPFire Protection [Triennial]7111105T03/23/201503/27/2015ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/27/201505/01/2015SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/27/201505/01/2015RP-RP PUBLIC RAD SAFETY BASELINE21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/18/201505/22/20151,2 IPRadiological Environmental Monitoring Program71124.0705/18/201505/22/20151,2 IPPerformance Indicator Verification7115105/18/201505/22/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B07/13/201507/17/20151,2 IPProblem Identification and Resolution71152B07/27/201507/31/2015OL EXAM-INITIAL LICENSE EXAM PREP31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2343708/24/201508/28/2015MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/14/201509/18/20151,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/28/201510/02/2015OL EXAM-INITIAL LICENSE EXAM31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2343709/21/201510/02/2015ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/19/201510/23/2015RP-RP OCCUPATIONAL BASELINE21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/19/201510/23/20151,2 IPPerformance Indicator Verification7115110/19/201510/23/2015SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/26/201510/30/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 14:02, 10 January 2025

Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001
ML15063A340
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2015
From: Steven Rose
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR 2014001
Download: ML15063A340 (5)


Text

March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001

Dear Mr. Heacock:

On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4609 with any questions you may have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016)

cc Distribution via ListServ

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP

SIGNATURE BDB3 SON SDR2

NAME B. Bishop S. Ninh S. Rose

DATE 02/27/2015 02/24/2015 03/02/2015

E-MAIL COPY?

YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 1 03/04/2015 09:42:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry Inspection / Activity Plan 03/01/2015 - 06/30/2016 TFPI

- TRIENNIEL FIRE PROTECTION INSPECTION

1, 2 IP Fire Protection [Triennial]

7111105T 03/09/2015 03/13/2015 1, 2 IP Fire Protection [Triennial]

7111105T 03/23/2015 03/27/2015 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 RP

- RP PUBLIC RAD SAFETY BASELINE

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/18/2015 05/22/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/18/2015 05/22/2015 1, 2 IP Performance Indicator Verification 71151 05/18/2015 05/22/2015 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 07/13/2015 07/17/2015 1, 2 IP Problem Identification and Resolution 71152B 07/27/2015 07/31/2015 OL EXAM

- INITIAL LICENSE EXAM PREP

1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 08/24/2015 08/28/2015 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/14/2015 09/18/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/28/2015 10/02/2015 OL EXAM

- INITIAL LICENSE EXAM

1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 09/21/2015 10/02/2015 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 10/19/2015 10/23/2015 RP

- RP OCCUPATIONAL BASELINE

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/19/2015 10/23/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/19/2015 10/23/2015 1, 2 IP Performance Indicator Verification 71151 10/19/2015 10/23/2015 SGISI

- UNIT 2 SG IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 10/26/2015 10/30/2015 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure