IR 05000280/2014001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 03/04/2015 | | issue date = 03/04/2015 | ||
| title = Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001 | | title = Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001 | ||
| author name = Rose S | | author name = Rose S | ||
| author affiliation = NRC/RGN-II/DRP/RPB5 | | author affiliation = NRC/RGN-II/DRP/RPB5 | ||
| addressee name = Heacock D | | addressee name = Heacock D | ||
| addressee affiliation = Virginia Electric & Power Co (VEPCO) | | addressee affiliation = Virginia Electric & Power Co (VEPCO) | ||
| docket = 05000280, 05000281 | | docket = 05000280, 05000281 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:March 4, 2015 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 | ==Dear Mr. Heacock:== | ||
On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 404-997-4609 with any questions you may have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Steven D. Rose, Chief | |||
Reactor Projects Branch 5 | |||
Division of Reactor Projects | |||
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 | |||
Enclosure: | |||
Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016) | |||
cc Distribution via ListServ | |||
_________________________ | |||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP | |||
SIGNATURE BDB3 SON SDR2 | |||
NAME B. Bishop S. Ninh S. Rose | |||
DATE 02/27/2015 02/24/2015 03/02/2015 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015. | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 | |||
DISTRIBUTION: | |||
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO) | |||
Page 1 of 1 03/04/2015 09:42:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry Inspection / Activity Plan 03/01/2015 - 06/30/2016 TFPI | |||
- TRIENNIEL FIRE PROTECTION INSPECTION | |||
1, 2 IP Fire Protection [Triennial] | |||
7111105T 03/09/2015 03/13/2015 1, 2 IP Fire Protection [Triennial] | |||
7111105T 03/23/2015 03/27/2015 ISI | |||
- UNIT 1 IN-SERVICE INSPECTION | |||
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 SGISI | |||
- UNIT 1 SG IN-SERVICE INSPECTION | |||
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 RP | |||
- RP PUBLIC RAD SAFETY BASELINE | |||
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/18/2015 05/22/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/18/2015 05/22/2015 1, 2 IP Performance Indicator Verification 71151 05/18/2015 05/22/2015 PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION | |||
1, 2 IP Problem Identification and Resolution 71152B 07/13/2015 07/17/2015 1, 2 IP Problem Identification and Resolution 71152B 07/27/2015 07/31/2015 OL EXAM | |||
- INITIAL LICENSE EXAM PREP | |||
1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 08/24/2015 08/28/2015 MODS | |||
- PLANT MODIFICATIONS INSPECTION | |||
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/14/2015 09/18/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/28/2015 10/02/2015 OL EXAM | |||
- INITIAL LICENSE EXAM | |||
1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 09/21/2015 10/02/2015 ISI | |||
- UNIT 2 IN-SERVICE INSPECTION | |||
2 IP Inservice Inspection Activities - PWR 7111108P 10/19/2015 10/23/2015 RP | |||
- RP OCCUPATIONAL BASELINE | |||
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/19/2015 10/23/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/19/2015 10/23/2015 1, 2 IP Performance Indicator Verification 71151 10/19/2015 10/23/2015 SGISI | |||
- UNIT 2 SG IN-SERVICE INSPECTION | |||
2 IP Inservice Inspection Activities - PWR 7111108P 10/26/2015 10/30/2015 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
}} | }} | ||
Latest revision as of 14:02, 10 January 2025
| ML15063A340 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/04/2015 |
| From: | Steven Rose NRC/RGN-II/DRP/RPB5 |
| To: | Heacock D Virginia Electric & Power Co (VEPCO) |
| References | |
| IR 2014001 | |
| Download: ML15063A340 (5) | |
Text
March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001
Dear Mr. Heacock:
On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4609 with any questions you may have regarding this letter.
Sincerely,
/RA/
Steven D. Rose, Chief
Reactor Projects Branch 5
Division of Reactor Projects
Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
Enclosure:
Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016)
cc Distribution via ListServ
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP
SIGNATURE BDB3 SON SDR2
NAME B. Bishop S. Ninh S. Rose
DATE 02/27/2015 02/24/2015 03/02/2015
E-MAIL COPY?
YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 1 03/04/2015 09:42:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry Inspection / Activity Plan 03/01/2015 - 06/30/2016 TFPI
- TRIENNIEL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennial]
7111105T 03/09/2015 03/13/2015 1, 2 IP Fire Protection [Triennial]
7111105T 03/23/2015 03/27/2015 ISI
- UNIT 1 IN-SERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 04/27/2015 05/01/2015 RP
- RP PUBLIC RAD SAFETY BASELINE
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/18/2015 05/22/2015 1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/18/2015 05/22/2015 1, 2 IP Performance Indicator Verification 71151 05/18/2015 05/22/2015 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
1, 2 IP Problem Identification and Resolution 71152B 07/13/2015 07/17/2015 1, 2 IP Problem Identification and Resolution 71152B 07/27/2015 07/31/2015 OL EXAM
- INITIAL LICENSE EXAM PREP
1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 08/24/2015 08/28/2015 MODS
- PLANT MODIFICATIONS INSPECTION
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/14/2015 09/18/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 09/28/2015 10/02/2015 OL EXAM
- INITIAL LICENSE EXAM
1 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V23437 09/21/2015 10/02/2015 ISI
- UNIT 2 IN-SERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 10/19/2015 10/23/2015 RP
- RP OCCUPATIONAL BASELINE
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/19/2015 10/23/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/19/2015 10/23/2015 1, 2 IP Performance Indicator Verification 71151 10/19/2015 10/23/2015 SGISI
- UNIT 2 SG IN-SERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 10/26/2015 10/30/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure