IR 05000335/2015404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML15069A238 | ||
| issue date = | | issue date = 03/10/2015 | ||
| title = | | title = U.S. Nuclear Regularly Commission Physical Security Inspection Report 05000335/2015404 and 05000389/2015404 | ||
| author name = Desai | | author name = Desai B | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS/PSB2 | ||
| addressee name = Workman C | | addressee name = Workman C | ||
| addressee affiliation = Florida Power & Light Co | | addressee affiliation = Florida Power & Light Co | ||
| Line 11: | Line 11: | ||
| contact person = Linda K. Gruhler 404-997-4633 | | contact person = Linda K. Gruhler 404-997-4633 | ||
| document report number = IR 2015404 | | document report number = IR 2015404 | ||
| document type = | | document type = Letter | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 10, 2015 | ||
==SUBJECT:== | |||
SAINT LUCIE NUCLEAR PLANT - U.S. NUCLEAR REGULARY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000335/2015404 AND 05000389/2015404 | |||
==Dear Mr. Workman:== | |||
On January 15, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of a security baseline inspection at your St Lucie Nuclear Plant, Units 1 and 2. The NRC inspector discussed the results of this inspection with Mr. J. Jensen and other members of your staff. A final exit meeting was conducted by telephone on February 5, 2015, with you and other staff members. The inspector documented the results of this inspection in the enclosed inspection report. | |||
The NRC inspector documented one self-revealing finding of very low safety-significance (Green) | |||
in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV), consistent with Section 2.3.2a of the NRC Enforcement Policy. | |||
If you contest this NCV, you should provide a response within 30 days of the date of this inspection report (IR), with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the St. Lucie Nuclear Plant. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholdings, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely, | |||
/RA/ | |||
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety | |||
Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 | |||
Enclosure: | |||
IR 05000335/2015404 and 05000389/2015404 w/Attachment: Supplementary Info (OUO) | |||
cc: (See page 3) | |||
ML15069A238 | |||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRP/BR3 RII:DRS/PSB2 | |||
SIGNATURE JPT EJS2 BBD | |||
NAME J. Tornow E. Stamm B. Desai | |||
DATE 3/ 9 /2015 3/ 9 /2015 3/ 10 /2015 | |||
E-MAIL COPY YES NO YES NO YES NO cc: | |||
Christopher Costanzo Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957 | |||
Robert Bitner Nuclear Fleet Security Florida Power & Light Co. | |||
St. Lucie Nuclear Plant 700 Universe Blvd Juno Beach, FL 33408 | |||
Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy 700 Universe Blvd Juno Beach, FL 33408 | |||
}} | }} | ||
Latest revision as of 13:55, 10 January 2025
| ML15069A238 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/10/2015 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Workman C Florida Power & Light Co |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 2015404 | |
| Download: ML15069A238 (4) | |
Text
March 10, 2015
SUBJECT:
SAINT LUCIE NUCLEAR PLANT - U.S. NUCLEAR REGULARY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000335/2015404 AND 05000389/2015404
Dear Mr. Workman:
On January 15, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of a security baseline inspection at your St Lucie Nuclear Plant, Units 1 and 2. The NRC inspector discussed the results of this inspection with Mr. J. Jensen and other members of your staff. A final exit meeting was conducted by telephone on February 5, 2015, with you and other staff members. The inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspector documented one self-revealing finding of very low safety-significance (Green)
in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV), consistent with Section 2.3.2a of the NRC Enforcement Policy.
If you contest this NCV, you should provide a response within 30 days of the date of this inspection report (IR), with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the St. Lucie Nuclear Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholdings, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16
Enclosure:
IR 05000335/2015404 and 05000389/2015404 w/Attachment: Supplementary Info (OUO)
cc: (See page 3)
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRP/BR3 RII:DRS/PSB2
SIGNATURE JPT EJS2 BBD
NAME J. Tornow E. Stamm B. Desai
DATE 3/ 9 /2015 3/ 9 /2015 3/ 10 /2015
E-MAIL COPY YES NO YES NO YES NO cc:
Christopher Costanzo Site Vice President St. Lucie Nuclear Plant 6501 S. Ocean Drive Jensen Beach, FL 34957
Robert Bitner Nuclear Fleet Security Florida Power & Light Co.
St. Lucie Nuclear Plant 700 Universe Blvd Juno Beach, FL 33408
Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy 700 Universe Blvd Juno Beach, FL 33408