IR 05000382/2015404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:SECURITY-RELATED UNITED STATES uly 1, 2015
{{#Wiki_filter:July 1, 2015


==SUBJECT:==
==SUBJECT:==
Line 37: Line 37:


Sincerely,
Sincerely,
/RA/ James R. Larsen for Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38 Nonpublic Enclosure:
/RA/ James R. Larsen for  
NRC Inspection Report 05000382/2015404 w/Attachment: Supplemental Information cc w/o encl: Electronic Distribution SECURITY-RELATED


ML15182A289 Entire Report:  Non-Sensitive Publicly Available Keyword:
Mark S. Haire
SUNSI Review by: MLC Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
 
SUNSI Review by: MLC Sensitive Non-Publicly Available SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 C:PBE C:PSB1 NAME MChambers MHaire GMiller MHaire SIGNATURE /RA/ /RA/ JRL for /RA/ /RA/ JRL for DATE 6/30/15 6/30/15 7/1/15 7/1/15 SECURITY-RELATED Letter to Michael from Mark S. Haire, dated July 1, 2015 SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2015404 Distribution w/enclosure:
Chief, Plant Support Branch 1
 
Division of Reactor Safety
 
Docket No. 50-382 License No. NPF-38
 
Nonpublic Enclosure:
NRC Inspection Report 05000382/2015404 w/Attachment: Supplemental Information
 
cc w/o encl: Electronic Distribution
 
ML15182A289 Entire Report:
SUNSI Review by: MLC Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review by: MLC Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 C:PBE C:PSB1  
 
NAME MChambers MHaire GMiller MHaire  
 
SIGNATURE  
/RA/  
/RA/ JRL for  
/RA/  
/RA/ JRL for  
 
DATE 6/30/15 6/30/15 7/1/15 7/1/15 SECURITY-RELATED SECURITY-RELATED Letter to Michael from Mark S. Haire, dated July 1, 2015  
 
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2015404  
 
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Line 51: Line 80:
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Administrative Assistant: (Linda.Dufrene@nrc.gov)
Administrative Assistant: (Linda.Dufrene@nrc.gov)  
 
Electronic w/o enclosure:
Electronic w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Line 77: Line 107:
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
ROPreports SECURITY-RELATED
ROPreports
}}
}}

Latest revision as of 10:39, 10 January 2025

IR 05000382/2015404, on 05/21/2015, Waterford Steam Electric Station, Unit 3 - NRC Security Inspection Report
ML15182A289
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/01/2015
From: Mark Haire
Plant Support Branch-1
To: Chisum M
Entergy Operations
References
IR 2015404
Download: ML15182A289 (8)


Text

July 1, 2015

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2015404

Dear Mr. Chisum:

On May 21, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Waterford Steam Electric Station. NRC inspectors discussed the results of this inspection with Mr. M. Chisum, Site Vice President, and other members of your staff.

The inspectors documented the results of this inspection in the enclosed inspection report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, inspectors documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Waterford Steam Electric Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). SECURITY-RELATED SECURITY-RELATED However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/ James R. Larsen for

Mark S. Haire

Chief, Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-382 License No. NPF-38

Nonpublic Enclosure:

NRC Inspection Report 05000382/2015404 w/Attachment: Supplemental Information

cc w/o encl: Electronic Distribution

ML15182A289 Entire Report:

SUNSI Review by: MLC Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

MD 3.4 Non-Public A.3 Cover Letter Only:

SUNSI Review by: MLC Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 C:PBE C:PSB1

NAME MChambers MHaire GMiller MHaire

SIGNATURE

/RA/

/RA/ JRL for

/RA/

/RA/ JRL for

DATE 6/30/15 6/30/15 7/1/15 7/1/15 SECURITY-RELATED SECURITY-RELATED Letter to Michael from Mark S. Haire, dated July 1, 2015

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC SECURITY INSPECTION REPORT 05000382/2015404

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Administrative Assistant: (Linda.Dufrene@nrc.gov)

Electronic w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Michael.Orenak@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

ROPreports