IR 05000416/2015406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15237A314
| number = ML15237A314
| issue date = 08/25/2015
| issue date = 08/25/2015
| title = Grand Gulf Nuclear Station - NRC Inspection Report 05000416/2015406; NRC Investigation Report No. 4-2014-021
| title = NRC Inspection Report 05000416/2015406; NRC Investigation Report No. 4-2014-021
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Mulligan K
| addressee name = Mulligan K
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:" " August 25, 2015 EA-15-035 Mr. Kevin Mulligan Site Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:August 25, 2015


Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
==SUBJECT:==
GRAND GULF NUCLEAR STATION - NRC INSPECTION


SUBJECT: GRAND GULF NUCLEAR STATION - NRC INSPECTION REPORT 05000416/2015406; NRC INVESTIGATION REPORT NO. 4-2014-021
REPORT 05000416/2015406; NRC INVESTIGATION  
 
REPORT NO. 4-2014-021


==Dear Mr. Mulligan:==
==Dear Mr. Mulligan:==
This letter refers to the investigation conducted by the U.S. Nuclear Regulatory Commission's Office of Investigations, Region IV, at Grand Gulf Nuclear Station; Inspection Report 05000416/2015406 enclosed. The purpose of the investigation was to determine if there was a willful security-related violation at the Grand Gulf Nuclear Station. Following notification by Grand Gulf Nuclear Station staff of a potential willful security-related violation the NRC initiated an investigation on February 26, 2014. The investigation was completed on February 25, 2015. Based on the evidence developed during the investigation, the NRC determined that a willful security-related violation occurred. The enclosed inspection report documents the inspection results, which were discussed on July 16, 2015, with Paul Salgado, Acting Director of Regulatory Assurance and Performance Improvement, and other members of your staff.
This letter refers to the investigation conducted by the U.S. Nuclear Regulatory Commission's Office of Investigations, Region IV, at Grand Gulf Nuclear Station; Inspection Report 05000416/2015406 enclosed. The purpose of the investigation was to determine if there was a willful security-related violation at the Grand Gulf Nuclear Station. Following notification by Grand Gulf Nuclear Station staff of a potential willful security-related violation the NRC initiated an investigation on February 26, 2014. The investigation was completed on February 25, 2015. Based on the evidence developed during the investigation, the NRC determined that a willful security-related violation occurred. The enclosed inspection report documents the inspection results, which were discussed on July 16, 2015, with Paul Salgado, Acting Director of Regulatory Assurance and Performance Improvement, and other members of your staff.


Based on the results of this inspection, the NRC has determined that a Severity Level IV violation of NRC requirements occurred. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy. The NRC determined that a non-cited violation is appropriate in this case because: (a) the violation was licensee-identified; (b) the violation involved the acts of an individual who was not considered to be a licensee official within the context of the NRC enforcement policy; (c) the violation appeared to be an isolated action of the employee without management involvement and was not caused by a lack of management oversight; and (d) you took appropriate disciplinary and corrective actions. Since this violation is not being cited, a response to this letter is not required. However, if you contest the non-cited violation or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Generating Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the component of the NRC's Agencywide Documents Access and Management System (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or Safeguards Information so that it can be made available to the public without redaction.
Based on the results of this inspection, the NRC has determined that a Severity Level IV violation of NRC requirements occurred. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy. The NRC determined that a non-cited violation is appropriate in this case because: (a) the violation was licensee-identified; (b) the violation involved the acts of an individual who was not considered to be a licensee official within the context of the NRC enforcement policy; (c) the violation appeared to be an isolated action of the employee without management involvement and was not caused by a lack of management oversight; and (d) you took appropriate disciplinary and corrective actions. Since this violation is not being cited, a response to this letter is not required. However, if you contest the non-cited violation or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Generating Station. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the component of the NRC's Agencywide Documents Access and Management System (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or Safeguards Information so that it can be made available to the public without redaction.
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/
 
Mark S. Haire, Branch Chief
 
Plant Support Branch 1
 
Division of Reactor Safety
 
Docket No. 50-416 License No. NPF-29
 
Nonpublic Enclosures:
1. Factual Summary for NRC Investigation Report No. 4-2014-021 2. NRC Inspection Report 05000416/2015406 w/Attachment: Supplemental Information Since this violation is not being cited, a response to this letter is not required. However, if you contest the non-cited violation or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Generating Station. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the component of the NRC's Agencywide Documents Access and Management System (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or Safeguards Information so that it can be made available to the public without redaction.
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/
 
Mark S. Haire, Branch Chief
 
Plant Support Branch 1
 
Division of Reactor Safety
 
Docket No. 50-416 License No. NPF-29
 
Nonpublic Enclosures:
1. Factual Summary for NRC Investigation Report No. 4-2014-021 2. NRC Inspection Report 05000416/2015406 w/Attachment: Supplemental Information
 
Distribution: See next page


However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
ADAMS ACCESSION NUMBER: ML15237A314 Entire Document:
SUNSI Review By: ADM Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review By: ADM Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
RGN-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:RPBC C:ACES RC NAME AMeyen JLarsen MHaire GWarnick CMaier KFuller SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE 8/19/15 8/19/15 8/19/15 8/20/15 8/21/15 8/24/15 OFFICE C:PSB1


Sincerely,/RA/
NAME MHaire
Mark S. Haire, Branch Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 Nonpublic


===Enclosures:===
SIGNATURE
1. Factual Summary for NRC Investigation Report No. 4-2014-021 2. NRC Inspection Report 05000416/2015406
/RA/


===w/Attachment:===
DATE 8/25/15 Letter to Kevin Mulligan from Mark S. Haire, dated August 25, 2015
Supplemental Information Since this violation is not being cited, a response to this letter is not required. However, if you contest the non-cited violation or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Generating Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the component of the NRC's Agencywide Documents Access and Management System (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or Safeguards Information so that it can be made available to the public without redaction. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,/RA/ Mark S. Haire, Branch Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 Nonpublic
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC INSPECTION


===Enclosures:===
REPORT 05000416/2015406; NRC INVESTIGATION
1. Factual Summary for NRC Investigation Report No. 4-2014-021 2. NRC Inspection Report 05000416/2015406  


===w/Attachment:===
REPORT NO. 4-2014-021
Supplemental Information Distribution: See next page ADAMS ACCESSION NUMBER: ML15237A314 Entire Document: SUNSI Review By: ADM Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review By: ADM Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:RPBC C:ACES RC NAME AMeyen JLarsen MHaire GWarnick CMaier KFuller SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 8/19/15 8/19/15 8/19/15 8/20/15 8/21/15 8/24/15 OFFICE C:PSB1 NAME MHaire SIGNATURE /RA/ DATE 8/25/15 Letter to Kevin Mulligan from Mark S. Haire, dated August 25, 2015


SUBJECT: GRAND GULF NUCLEAR STATION - NRC INSPECTION REPORT 05000416/2015406; NRC INVESTIGATION REPORT NO. 4-2014-021 cc: Electronic Distribution for Grand Gulf Nuclear Station  
cc: Electronic Distribution for Grand Gulf Nuclear Station  


Distribution w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Matt.Young@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Administrative Assistant (Alley.Farrell@nrc.gov)  
Administrative Assistant (Alley.Farrell@nrc.gov)  


Electronic distribution w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Electronic distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Matt.Young@nrc.gov) Resident Inspector (Neil.Day@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov)
Administrative Assistant (Alley.Farrell@nrc.gov)
Administrative Assistant (Alley.Farrell@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Ray.Azua@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Senior Project Engineer, DRP/C (Ray.Azua@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Latest revision as of 09:19, 10 January 2025

NRC Inspection Report 05000416/2015406; NRC Investigation Report No. 4-2014-021
ML15237A314
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/25/2015
From: Mark Haire
Plant Support Branch-1
To: Kevin Mulligan
Entergy Operations
References
EA-15-035 4-2014-021, IR 2015406
Download: ML15237A314 (4)


Text

August 25, 2015

SUBJECT:

GRAND GULF NUCLEAR STATION - NRC INSPECTION

REPORT 05000416/2015406; NRC INVESTIGATION

REPORT NO. 4-2014-021

Dear Mr. Mulligan:

This letter refers to the investigation conducted by the U.S. Nuclear Regulatory Commission's Office of Investigations, Region IV, at Grand Gulf Nuclear Station; Inspection Report 05000416/2015406 enclosed. The purpose of the investigation was to determine if there was a willful security-related violation at the Grand Gulf Nuclear Station. Following notification by Grand Gulf Nuclear Station staff of a potential willful security-related violation the NRC initiated an investigation on February 26, 2014. The investigation was completed on February 25, 2015. Based on the evidence developed during the investigation, the NRC determined that a willful security-related violation occurred. The enclosed inspection report documents the inspection results, which were discussed on July 16, 2015, with Paul Salgado, Acting Director of Regulatory Assurance and Performance Improvement, and other members of your staff.

Based on the results of this inspection, the NRC has determined that a Severity Level IV violation of NRC requirements occurred. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy. The NRC determined that a non-cited violation is appropriate in this case because: (a) the violation was licensee-identified; (b) the violation involved the acts of an individual who was not considered to be a licensee official within the context of the NRC enforcement policy; (c) the violation appeared to be an isolated action of the employee without management involvement and was not caused by a lack of management oversight; and (d) you took appropriate disciplinary and corrective actions. Since this violation is not being cited, a response to this letter is not required. However, if you contest the non-cited violation or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Generating Station. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the component of the NRC's Agencywide Documents Access and Management System (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or Safeguards Information so that it can be made available to the public without redaction.

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Branch Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-416 License No. NPF-29

Nonpublic Enclosures:

1. Factual Summary for NRC Investigation Report No. 4-2014-021 2. NRC Inspection Report 05000416/2015406 w/Attachment: Supplemental Information Since this violation is not being cited, a response to this letter is not required. However, if you contest the non-cited violation or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Regional Administrator, Region IV; and the NRC Resident Inspectors at the Grand Gulf Generating Station. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the component of the NRC's Agencywide Documents Access and Management System (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or Safeguards Information so that it can be made available to the public without redaction.

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Branch Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-416 License No. NPF-29

Nonpublic Enclosures:

1. Factual Summary for NRC Investigation Report No. 4-2014-021 2. NRC Inspection Report 05000416/2015406 w/Attachment: Supplemental Information

Distribution: See next page

ADAMS ACCESSION NUMBER: ML15237A314 Entire Document:

SUNSI Review By: ADM Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

MD 3.4 Non-Public A.3 Cover Letter Only:

SUNSI Review By: ADM Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:

RGN-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:RPBC C:ACES RC NAME AMeyen JLarsen MHaire GWarnick CMaier KFuller SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE 8/19/15 8/19/15 8/19/15 8/20/15 8/21/15 8/24/15 OFFICE C:PSB1

NAME MHaire

SIGNATURE

/RA/

DATE 8/25/15 Letter to Kevin Mulligan from Mark S. Haire, dated August 25, 2015

SUBJECT:

GRAND GULF NUCLEAR STATION - NRC INSPECTION

REPORT 05000416/2015406; NRC INVESTIGATION

REPORT NO. 4-2014-021

cc: Electronic Distribution for Grand Gulf Nuclear Station

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Matt.Young@nrc.gov)

Administrative Assistant (Alley.Farrell@nrc.gov)

Electronic distribution w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Neil.Day@nrc.gov)

Administrative Assistant (Alley.Farrell@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer, DRP/C (Ray.Azua@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)