| issue date = 10/29/2015
| issue date = 10/29/2015
| title = NRC Evaluated Emergency Preparedness Exercise - Inspection Report 05000317/2015502 and 05000318/2015502
| title = NRC Evaluated Emergency Preparedness Exercise - Inspection Report 05000317/2015502 and 05000318/2015502
| author name = McKinley R R
| author name = Mckinley R
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Gellrich G H
| addressee name = Gellrich G
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000317, 05000318
| docket = 05000317, 05000318
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713
{{#Wiki_filter:October 29, 2015


October 29, 2015 Mr. George Vice President Calvert Cliffs Nuclear Power Plant, LLC Exelon Generation Company, LLC 1650 Calvert Cliffs Pkwy Lusby, MD 20657-4702
==SUBJECT:==
 
CALVERT CLIFFS NUCLEAR POWER PLANT - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000317/2015502 AND 05000318/2015502
SUBJECT: CALVERT CLIFFS NUCLEAR POWER PLANT - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000317/2015502 AND 05000318/2015502


==Dear Mr. Gellrich:==
==Dear Mr. Gellrich:==
On September 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 15, 2015, evaluated emergency preparedness exercise at your Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on September 18, 2015, with you and other members of your staff.
On September 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 15, 2015, evaluated emergency preparedness exercise at your Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on September 18, 2015, with you and other members of your staff.


The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings were identified.
Based on the results of this inspection, no findings were identified.


In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
 
A. Dimitriadis for


Sincerely,/RA/ A. Dimitriadis for Raymond McKinley, Chief Plant Support Branch 1  
Raymond McKinley, Chief Plant Support Branch 1 Division of Reactor Safety


Division of Reactor Safety
Docket Nos.


Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69  
50-317, 50-318 License Nos. DPR-53, DPR-69  


===Enclosure:===
===Enclosure:===
NRC Inspection Report No. 05000317/2015502 and 05000318/2015502 cc w/encl: Distribution via ListServ T. Scardino, RAC Chair, FEMA Region III
NRC Inspection Report No. 05000317/2015502 and 05000318/2015502  
 
REGION I==
Docket Nos.:
50-317 and 50-318
 
License Nos.
 
DPR-53 and DPR-69


ML15306A515 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Barr\EP Ex15 Calvert\Calvert Cliffs EP EX 2015 Report.docx SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr ADimitriadis RMcKinley DATE 11/ /2015 11/ /2015 11/ /2015 i Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket Nos.: 50-317 and 50-318
Report Nos.


License Nos. DPR-53 and DPR-69
05000317/2015502 and 05000318/2015502


Report Nos. 05000317/2015502 and 05000318/2015502
Licensee:


Licensee: Exelon Generation Company, LLC  
Exelon Generation Company, LLC  


Facility: Calvert Cliffs Nuclear Power Plant, Units 1 and 2
Facility:  


Location: Lusby, MD
Calvert Cliffs Nuclear Power Plant, Units 1 and 2


Dates: September 14-18, 2015
Location:  


Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead) J. DeBoer, Emergency Preparedness Inspector, DRS, Region I D. Caron, Senior Physical Security Inspector, DRS, Region I D. Everhart, Physical Security Inspector, DRS, Region I P. Presby, Senior Operations Inspector, DRS, Region I N. Perry, Senior Resident Inspector, Ginna, DRP, Region I C. Highley, Resident Inspector (Acting), Calvert Cliffs, DRP, Region I
Lusby, MD


Approved By: Raymond McKinley, Chief Plant Support Branch 1 Division of Reactor Safety  
Dates:
 
September 14-18, 2015
 
Inspectors:
S. Barr, Senior Emergency Preparedness Inspector,
 
Division of Reactor Safety (DRS), Region I (Lead)
 
J. DeBoer, Emergency Preparedness Inspector, DRS, Region I D. Caron, Senior Physical Security Inspector, DRS, Region I D. Everhart, Physical Security Inspector, DRS, Region I P. Presby, Senior Operations Inspector, DRS, Region I
 
N. Perry, Senior Resident Inspector, Ginna, DRP, Region I
 
C. Highley, Resident Inspector (Acting), Calvert Cliffs, DRP, Region I
 
Approved By:
Raymond McKinley, Chief  
 
Plant Support Branch 1  
 
Division of Reactor Safety  


ii  
ii  


=SUMMARY=
=SUMMARY=
Inspection Report 05000317/2015502; 05000318/2014502; 9/14-18, 2015; Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2; Exercise Evaluation - Hostile Action (HA) Event;
Inspection Report 05000317/2015502; 05000318/2014502; 9/14-18, 2015; Calvert Cliffs  


Nuclear Power Plant (CCNPP), Units 1 and 2; Exercise Evaluation - Hostile Action (HA) Event;
Exercise Evaluation - Scenario Review; Performance Indicator Verification.
Exercise Evaluation - Scenario Review; Performance Indicator Verification.


This was an announced inspection conducted by five Region I-based inspectors and two resident inspectors. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5.
This was an announced inspection conducted by five Region I-based inspectors and two resident inspectors. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.


===Cornerstone: Emergency Preparedness===
===Cornerstone: Emergency Preparedness===
No findings were identified.
No findings were identified.


Line 76: Line 108:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
===Cornerstone: Emergency Preparedness (EP)===
===Cornerstone:===
Emergency Preparedness (EP)  
 
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)


====a. Inspection Scope====
====a. Inspection Scope====
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight  
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Exelon designed the September 15, 2015, Calvert Cliffs EP exercise to satisfy that requirement, and the NRC inspected the Calvert Cliffs HA event exercise to assess Exelons ability to effectively implement the Calvert Cliffs Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
 
calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Exelon designed the September 15, 2015, Calvert Cliffs EP exercise to satisfy that requirement, and the NRC inspected the Calvert Cliffs HA event exercise to assess Exelon's ability to effectively implement the Calvert Cliffs Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.


The exercise evaluation consisted of the following review and assessment:
The exercise evaluation consisted of the following review and assessment:
* The adequacy of Exelon's ERO performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
* The adequacy of Exelons ERO performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
* The overall adequacy of Exelon's emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Alternative Facility, the Central Alarm Station (CAS), the local county Incident Command Post (ICP), the Joint Information Center (JIC)and the Emergency Operations Facility (EOF).
* The overall adequacy of Exelons emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Alternative Facility, the Central Alarm Station (CAS), the local county Incident Command Post (ICP), the Joint Information Center (JIC)and the Emergency Operations Facility (EOF).
* A review of other performance areas, such as the Exelon's ERO recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
* A review of other performance areas, such as the Exelons ERO recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra-and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
* A review of past performance issues from the last NRC Calvert Cliffs EP exercise inspection report and recent Exelon Calvert Cliffs EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 15, 2015, exercise and to ensure compliance with  
* A review of past performance issues from the last NRC Calvert Cliffs EP exercise inspection report and recent Exelon Calvert Cliffs EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 15, 2015, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
 
* The licensees post-exercise critiques, to evaluate Exelons self-assessment of its Calvert Cliffs ERO performance during the September 15, 2015, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
10 CFR 50.47(b)(14).
* The licensee's post-exercise critiques, to evaluate Exelon's self-assessment of its Calvert Cliffs ERO performance during the September 15, 2015, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.


The inspectors reviewed the documents listed in the attachment to this report.
The inspectors reviewed the documents listed in the attachment to this report.
Line 104: Line 129:


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the September 15, 2015, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Calvert Cliffs Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
Prior to the September 15, 2015, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Calvert Cliffs Emergency Plan as required by 10 CFR 50.47(b)(14).
 
This overall exercise inspection activity represented the completion of one sample on a biennial cycle.


The inspectors reviewed the documents listed in the attachment to this report.
The inspectors reviewed the documents listed in the attachment to this report.
Line 113: Line 140:
==OTHER ACTIVITIES (OA)==
==OTHER ACTIVITIES (OA)==
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification (71151 - 3 Samples)==
==4OA1 Performance Indicator Verification (71151 - 3 Samples)==
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed data for the Calvert Cliffs EP Performance Indicators (PI),
The inspectors reviewed data for the Calvert Cliffs EP Performance Indicators (PI),which are:
which are:
: (1) Drill and Exercise Performance (DEP) (EP01);
: (1) Drill and Exercise Performance (DEP) (EP01);
: (2) ERO Drill Participation (EP02); and
: (2) ERO Drill Participation (EP02); and
: (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Calvert Cliffs was conducted in the fourth calendar quarter of 2014, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2014 through the second calendar quarter of 2015, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 7.
: (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Calvert Cliffs was conducted in the fourth calendar quarter of 2014, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2014 through the second calendar quarter of 2015, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7.


This inspection activity represented the completion of three samples.
This inspection activity represented the completion of three samples.
Line 127: Line 153:
No findings were identified.
No findings were identified.


{{a|4OA6}}
{{a|4OA6}}
 
==4OA6 Meetings, including Exit==
==4OA6 Meetings, including Exit==
 
On September 18, 2015, the inspectors presented the results of this inspection to Mr. George Gellrich, Site Vice President and other members of Exelons staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
On September 18, 2015, the inspectors presented the results of this inspection to Mr. George Gellrich, Site Vice President and other members of Exelon's staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.


ATTACHMENT  
ATTACHMENT  
Line 137: Line 163:


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
===Licensee Personnel===
===Licensee Personnel===
: [[contact::G. Gellrich]], Calvert Cliffs Site Vice President  
: [[contact::G. Gellrich]], Calvert Cliffs Site Vice President  
Line 144: Line 169:


==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
None


None 
==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 1EP7: Exercise Evaluation - Hostile Action (HA) Event==
: EP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision 26)
: EP-AA-1011, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station (Revision 0)
: EP-AA-112-700, Alternative Facility Operation (Revision 0)
: EP-AA-122, Drill and Exercise Program (Revision 18)
: EP-AA-122-200, Drill and Exercise Execution (Revision 0)
: EP-AA-122-300, Drill and Exercise Evaluation (Revision 1)
: SE-23, Response to Security Threats - Procedure (Revision 18) Calvert Cliffs Emergency Plan Implementing Procedures Calvert Cliffs September 15, 2015, Emergency Exercise Scenario Package Calvert Cliffs Emergency Preparedness Drill Reports, January 2014 - August 2015
: Exelon Generation Calvert Cliffs 2015 Graded Exercise Evaluation Report (dated 10/14/15)
==Section 1EP8: Exercise Evaluation - Scenario Review==
: EP-AA-1000, Exelon Nuclear Standardized Emergency Plan (Revision 26)
: EP-AA-1011, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station (Revision 0)
: EP-AA-122, Drill and Exercise Program (Revision 18)
: EP-AA-122-100, Drill and Exercise Planning and Scheduling (Revision 1) Calvert Cliffs September 15, 2015, Emergency Exercise Scenario Package


==Section 4OA1: Performance Indicator (PI) Verification==
: LS-AA-2110, Monthly Data Elements for NRC Emergency Response Organization (ERO) Drill Participation (Revision 6)
: LS-AA-2120, Monthly Data Elements for NRC Drill/Exercise Performance (Revision 4)
: LS-AA-2130, Monthly Data Elements for NRC Aler
t and Notification System (ANS) Reliability (Revision 5)
: EP-AA-125-1001, EP Performance Indicator Guidance (Revision 7)
: DEP PI data, October 2014 - June 2015 ERO Drill Participation PI data, October 2014 - June 2015
==LIST OF ACRONYMS==
: [[ADAMS]] [[Agencywide Documents Access and Management System]]
: [[ANS]] [[Alert Notification System]]
: [[CAS]] [[Central Alarm Station]]
: [[CFR]] [[Code of Federal Regulations]]
: [[DEP]] [[Drill and Exercise Performance]]
: [[EOF]] [[Emergency Operations Facility]]
: [[EP]] [[Emergency Preparedness]]
: [[ERO]] [[Emergency Response Organization]]
: [[HA]] [[Hostile Action]]
: [[ICP]] [[Incident Command Post]]
: [[JIC]] [[Joint Information Center]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NRC]] [[Nuclear Regulatory Commission]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PI]] [[Performance Indicator]]
: [[RSPS]] [[Risk Significant Planning Standard]]
}}
}}

Latest revision as of 06:46, 10 January 2025

NRC Evaluated Emergency Preparedness Exercise - Inspection Report 05000317/2015502 and 05000318/2015502
ML15306A515
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/29/2015
From: Raymond Mckinley
Plant Support Branch 1
To: George Gellrich
Exelon Generation Co
McKinley R
References
IR 2015502
Download: ML15306A515 (10)


Text

October 29, 2015

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000317/2015502 AND 05000318/2015502

Dear Mr. Gellrich:

On September 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 15, 2015, evaluated emergency preparedness exercise at your Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on September 18, 2015, with you and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

A. Dimitriadis for

Raymond McKinley, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos.

50-317, 50-318 License Nos. DPR-53, DPR-69

Enclosure:

NRC Inspection Report No. 05000317/2015502 and 05000318/2015502

REGION I==

Docket Nos.:

50-317 and 50-318

License Nos.

DPR-53 and DPR-69

Report Nos.

05000317/2015502 and 05000318/2015502

Licensee:

Exelon Generation Company, LLC

Facility:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2

Location:

Lusby, MD

Dates:

September 14-18, 2015

Inspectors:

S. Barr, Senior Emergency Preparedness Inspector,

Division of Reactor Safety (DRS), Region I (Lead)

J. DeBoer, Emergency Preparedness Inspector, DRS, Region I D. Caron, Senior Physical Security Inspector, DRS, Region I D. Everhart, Physical Security Inspector, DRS, Region I P. Presby, Senior Operations Inspector, DRS, Region I

N. Perry, Senior Resident Inspector, Ginna, DRP, Region I

C. Highley, Resident Inspector (Acting), Calvert Cliffs, DRP, Region I

Approved By:

Raymond McKinley, Chief

Plant Support Branch 1

Division of Reactor Safety

ii

SUMMARY

Inspection Report 05000317/2015502; 05000318/2014502; 9/14-18, 2015; Calvert Cliffs

Nuclear Power Plant (CCNPP), Units 1 and 2; Exercise Evaluation - Hostile Action (HA) Event;

Exercise Evaluation - Scenario Review; Performance Indicator Verification.

This was an announced inspection conducted by five Region I-based inspectors and two resident inspectors. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.

Cornerstone: Emergency Preparedness

No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness (EP)

1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)

a. Inspection Scope

Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Exelon designed the September 15, 2015, Calvert Cliffs EP exercise to satisfy that requirement, and the NRC inspected the Calvert Cliffs HA event exercise to assess Exelons ability to effectively implement the Calvert Cliffs Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

The exercise evaluation consisted of the following review and assessment:

  • The adequacy of Exelons ERO performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
  • A review of other performance areas, such as the Exelons ERO recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra-and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
  • A review of past performance issues from the last NRC Calvert Cliffs EP exercise inspection report and recent Exelon Calvert Cliffs EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 15, 2015, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
  • The licensees post-exercise critiques, to evaluate Exelons self-assessment of its Calvert Cliffs ERO performance during the September 15, 2015, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.

The inspectors reviewed the documents listed in the attachment to this report.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)

a. Inspection Scope

Prior to the September 15, 2015, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Calvert Cliffs Emergency Plan as required by 10 CFR 50.47(b)(14).

This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

The inspectors reviewed the documents listed in the attachment to this report.

b. Findings

No findings were identified.

OTHER ACTIVITIES (OA)

4OA1 Performance Indicator Verification (71151 - 3 Samples)

a. Inspection Scope

The inspectors reviewed data for the Calvert Cliffs EP Performance Indicators (PI),which are:

(1) Drill and Exercise Performance (DEP) (EP01);
(2) ERO Drill Participation (EP02); and
(3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Calvert Cliffs was conducted in the fourth calendar quarter of 2014, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2014 through the second calendar quarter of 2015, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7.

This inspection activity represented the completion of three samples.

b. Findings

No findings were identified.

4OA6 Meetings, including Exit

On September 18, 2015, the inspectors presented the results of this inspection to Mr. George Gellrich, Site Vice President and other members of Exelons staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

G. Gellrich, Calvert Cliffs Site Vice President
V. Cwietniewicz, Exelon Mid-Atlantic Emergency Planning Manager
P. Amos, Calvert Cliffs Emergency Planning Manager

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

None

LIST OF DOCUMENTS REVIEWED