IR 05000341/2015403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:January 6, 2016 | ||
==SUBJECT:== | |||
FERMI POWER PLANT, UNIT 2 - NRC SECURITY BASELINE INSPECTION REPORT 05000341/2015403 | |||
==Dear Mr. Fessler:== | ==Dear Mr. Fessler:== | ||
On December 11, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the | On December 11, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on December 11, 2015, with Mr. M. OConnor and other members of your staff. | ||
The NRC inspector documented one finding of very low security significance (Green) in this report. The finding involved a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a. of the Enforcement Policy. | The NRC inspector documented one finding of very low security significance (Green) in this report. The finding involved a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a. of the Enforcement Policy. | ||
If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. | If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Fermi Power Plant. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
and | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely, | Sincerely, | ||
/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: | /RA/ | ||
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety | |||
Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: | |||
IR 05000341/2015403 w/Attachment: | IR 05000341/2015403 w/Attachment: | ||
Supplemental Information cc: M. | Supplemental Information cc: M. OConnor, Security Manager K. Yale, State Liaison Officer, State of Michigan DISTRIBUTION: | ||
Distribution via LISTSERV | N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR R. McKinley, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV | ||
cc w/o encl: Distribution via LISTSERV | |||
}} | }} | ||
Latest revision as of 05:45, 10 January 2025
| ML16006A528 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/06/2016 |
| From: | Steven Orth Plant Support Branch II |
| To: | Fessler P DTE Electric Company |
| References | |
| IR 2015403 | |
| Download: ML16006A528 (4) | |
Text
January 6, 2016
SUBJECT:
FERMI POWER PLANT, UNIT 2 - NRC SECURITY BASELINE INSPECTION REPORT 05000341/2015403
Dear Mr. Fessler:
On December 11, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on December 11, 2015, with Mr. M. OConnor and other members of your staff.
The NRC inspector documented one finding of very low security significance (Green) in this report. The finding involved a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a. of the Enforcement Policy.
If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Fermi Power Plant.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure:
IR 05000341/2015403 w/Attachment:
Supplemental Information cc: M. OConnor, Security Manager K. Yale, State Liaison Officer, State of Michigan DISTRIBUTION:
N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR R. McKinley, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV
cc w/o encl: Distribution via LISTSERV