{{#Wiki_filter:Oconee Nuclear Station Question:       76 1LT48 ONSSRONRCExamination (1 point)
{{#Wiki_filter:Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
76 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
Initial conditions:
Initial conditions:
* Reactor trip due to loss of Main Feedwater Current conditions:
Reactor trip due to loss of Main Feedwater Current conditions:
* ALL sources of feedwater are lost
ALL sources of feedwater are lost SM declares an ALERT due to initiation of HPI Forced Cooling In accordance with RPIO/N10001002 (Control Room Emergency Coordinator Procedure), the SM is permitted to appoint a qualified individual to Which ONE of the following completes the statement above?
* SM declares an ALERT due to initiation of HPI Forced Cooling In accordance with RPIO/N10001002 (Control Room Emergency Coordinator Procedure), the SM is permitted to appoint a qualified individual to Which ONE of the following completes the statement above?
A.
A.       perform Enclosure 4.3 (Emergency Coordinator Parallel Actions)
perform Enclosure 4.3 (Emergency Coordinator Parallel Actions)
B.       perform Enclosure 4.5 (Emergency Classification Termination Criteria)
B.
C.       approve a follow-up notification form if conditions have not changed on Unit 3 D.       approve an off-site notification form for a NOUE on another unit.
perform Enclosure 4.5 (Emergency Classification Termination Criteria)
C.
approve a follow-up notification form if conditions have not changed on Unit 3 D.
approve an off-site notification form for a NOUE on another unit.
Page 76 of 100
Page 76 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:
* 77 1LT48 ON$SRONRCExamination (1 point)
77 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
Initial conditions:
Initial conditions:
* Reactor in MODE 5
Reactor in MODE 5 ALL LTOP requirements established in accordance with Tech Spec 3.4.12 (Low Temperature Overpressure Protection (LTOP) System)
* ALL LTOP requirements established in accordance with Tech Spec 3.4.12 (Low Temperature Overpressure Protection (LTOP) System)
Current conditions:
Current conditions:
* 3RC-66 (PORV) fails open
3RC-66 (PORV) fails open 1)
: 1) In accordance with OMP 1-18 (Implementation Standard During Abnormal and Emergency Events), closing 3RC-4 _(1) require CRS concurrence, if the CRS is available.
In accordance with OMP 1-18 (Implementation Standard During Abnormal and Emergency Events), closing 3RC-4 _(1) require CRS concurrence, if the CRS is available.
: 2) In accordance with Tech Spec 3.4.12, a dedicated LTOP operator _(2)_ allowed as a substitute for an inoperable PORV to prevent exceeding RCS brittle fracture pressure limits.
2)
In accordance with Tech Spec 3.4.12, a dedicated LTOP operator _(2)_ allowed as a substitute for an inoperable PORV to prevent exceeding RCS brittle fracture pressure limits.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. is B.       1. does
: 1. does
: 2. is NOT C.       1. does NOT
: 2. is B.
: 2. is D.       1. does NOT
: 1. does
: 2. is NOT C.
: 1. does NOT
: 2. is D.
: 1. does NOT
: 2. is NOT Page 77 of 100
: 2. is NOT Page 77 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 78 1LT48 ONS SRO NRC Examination (1 point)
78 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time   = 1000:
Time = 1000:
* 1A S/G developed a SGTR
1A S/G developed a SGTR EOP SGTR Tab in progress IA SIG level = 240 inches XSUR slowly decreasing SCM = 10°F stable Time = 1040:
* EOP SGTR Tab in progress
MSLB on lB SG outside containment and can NOT be steamed EOP EHT Tab complete 1A SIG has reached the level where water can enter the main steam lines Rule 4 has been initiated and the PORV has been opened Core SCM = 0°F
* IA SIG level = 240 inches XSUR slowly decreasing
* SCM = 10°F stable Time   = 1040:
* MSLB on lB SG outside containment and can NOT be steamed
* EOP EHT Tab complete
* 1A SIG has reached the level where water can enter the main steam lines
* Rule 4 has been initiated and the PORV has been opened
* Core SCM = 0°F
: 1) At Time = 1000, the SGTR tab _(1)_ requite that the lASteam Generator be isolated.
: 1) At Time = 1000, the SGTR tab _(1)_ requite that the lASteam Generator be isolated.
: 2) At Time   = 1040, the SGTR tab will direct initiation of the (2)_tab.
: 2) At Time = 1040, the SGTR tab will direct initiation of the (2)_tab.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. HPICD B.       1. does
: 1. does
: 2. LOCACD C.       1. does NOT
: 2. HPICD B.
: 2. HPICD D.       1. does NOT
: 1. does
: 2. LOCACD C.
: 1. does NOT
: 2. HPICD D.
: 1. does NOT
: 2. LOCACD Page 78 of 100
: 2. LOCACD Page 78 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 79 1LT48 ONS SRO NRC Examination (1 point)
79 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
* Reactor power = 50% stable
Reactor power = 50% stable iki and IKU panelboards are de-energized Which ONE of the following contains the procedure steps that will be used to maintain Steam Generator pressure and RCS temperature?
* iki and IKU panelboards are de-energized Which ONE of the following contains the procedure steps that will be used to maintain Steam Generator pressure and RCS temperature?
A.
A.     AP/23 (Loss of lOS Power)
AP/23 (Loss of lOS Power)
B.     AP/25 (Standby Shutdown Facility)
B.
C.     EOP Enclosure 5.24 (Operation of the ADVs)
AP/25 (Standby Shutdown Facility)
D.     EOP Enclosure 5.42 (Alignment of EFM Pump to Feed SG5)
C.
EOP Enclosure 5.24 (Operation of the ADVs)
D.
EOP Enclosure 5.42 (Alignment of EFM Pump to Feed SG5)
Page 79 of 100
Page 79 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 80 1LT48 ONS SRO NRC Examination (1 point)
80 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1200:
Time = 1200:
* Reactor trip from 100%
Reactor trip from 100%
* AP/22 (Loss of Instrument Air) in progress
AP/22 (Loss of Instrument Air) in progress Instrument Air (IA) and Auxiliary Instrument Air (AlA) pressure lost to the 1A Turbine Bypass Valves IA SG pressure 935 psig stable Maintaining 1A SG pressure with Atmospheric Dump Valves (ADVs) in accordance with EOP Subsequent Actions Time = 1210:
* Instrument Air (IA) and Auxiliary Instrument Air (AlA) pressure lost to the 1A Turbine Bypass Valves
IA SG Tube Leak = 15 gpm stable Time = 1230:
* IA SG pressure 935 psig stable
1A SG Tube Rupture = 180 gpm stable EOP SGTR in progress
* Maintaining 1A SG pressure with Atmospheric Dump Valves (ADVs) in accordance with EOP Subsequent Actions Time = 1210:
: 1) At time = 1210, the HIGHEST emergency classification (if any) is _(1)_.
* IA SG Tube Leak     = 15 gpm stable Time = 1230:
: 2) At time = 1230, the HIGHEST emergency classification is _(2)_.
* 1A SG Tube Rupture = 180 gpm stable
* EOP SGTR in progress
: 1) At time = 1210, the HIGHEST emergency classification (if any) is _(1)_.
: 2) At time = 1230, the HIGHEST emergency classification is _(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.     1. NONE
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.
: 2. ALERT B.     1. NONE
: 1. NONE
: 2. SITE AREA EMERGENCY C.     1. UNUSUAL EVENT
: 2. ALERT B.
: 2. ALERT D.     1. UNUSUAL EVENT
: 1. NONE
: 2. SITE AREA EMERGENCY C.
: 1. UNUSUAL EVENT
: 2. ALERT D.
: 1. UNUSUAL EVENT
: 2. SITE AREA EMERGENCY Page 80 of 100
: 2. SITE AREA EMERGENCY Page 80 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
        *        $1 1LT48 ONS SRO NRC Examination (1 point)
$1 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1200
Time = 1200 Reactor power 100% stable AFIS bypassed for maintenance SA-16/C-1 (230 KV Swyd Isolate ES Permit) actuated 230 KV Yellow Bus voltage = 224.2 KV increasing Time = 1201 AP/34 (Degraded Grid) in progress Main Turbine trips due to low grid frequency 230 KV Yellow Bus voltage = 226.8 Ky increasing RCS pressure = 1245 psig rapidly decreasing RB pressure = 11.4 psig rapidly increasing Tave = 545°F slowly decreasing Engineered Safeguards systems...
* Reactor power 100% stable
* AFIS bypassed for maintenance
* SA-16/C-1 (230 KV Swyd Isolate ES Permit) actuated
* 230 KV Yellow Bus voltage = 224.2 KV increasing Time     = 1201
* AP/34 (Degraded Grid) in progress
* Main Turbine trips due to low grid frequency
* 230 KV Yellow Bus voltage = 226.8 Ky increasing
* RCS pressure = 1245 psig rapidly decreasing
* RB pressure = 11 .4 psig rapidly increasing
* Tave = 545°F slowly decreasing Engineered Safeguards systems...
: 1) will be energized from _(1)_.
: 1) will be energized from _(1)_.
: 2)     j2)_ sufficient to maintain Reactor Building pressure within design limits.
2) j2)_ sufficient to maintain Reactor Building pressure within design limits.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1. CT-i
A.
: 2. are B.         1. CT-I
: 1. CT-i
: 2. are NOT C.         1. CT-4
: 2. are B.
: 2. are D.         I. CT-4
: 1. CT-I
: 2. are NOT C.
: 1. CT-4
: 2. are D.
I. CT-4
: 2. are NOT Page 81 of 100
: 2. are NOT Page 81 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 82 1LT48 ONSSRONRCExamination (1 point)
82 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
Initial conditions:
Initial conditions:
* Reactor power = 100%
Reactor power = 100%
* Control Rod 3 in Group 7 indicates 0% withdrawn
Control Rod 3 in Group 7 indicates 0% withdrawn AP/Ol (Unit Runback) initiated Current conditions:
* AP/Ol (Unit Runback) initiated Current conditions:
Reactor power = 70% decreasing
* Reactor power   = 70% decreasing
: 1) The AMBER lights on the P1 panel will illuminate when a control rod reaches a MINIMUM of(1) inches from its group average.
: 1) The AMBER lights on the P1 panel will illuminate when a control rod reaches a MINIMUM of(1)         inches from its group average.
2)
: 2) In accordance with TS 3.1 .4 (Control Rod Group Alignment Limits), the basis for the limit on Reactor power for the given conditions is to maintain 2)_ within design limits.
In accordance with TS 3.1.4 (Control Rod Group Alignment Limits), the basis for the limit on Reactor power for the given conditions is to maintain 2)_ within design limits.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1>7
A.
: 2. Linear Heat Rate B.       1.>7
1>7
: 2. Shutdown Margin C.       1>9
: 2. Linear Heat Rate B.
: 2. Linear Heat Rate D.       1>9
1.>7
: 2. Shutdown Margin C.
1>9
: 2. Linear Heat Rate D.
1>9
: 2. Shutdown Margin Page 82 of 100
: 2. Shutdown Margin Page 82 of 100


Oconee Nuclear Station Question:    83 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
83 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1200
Time = 1200 Reactor power = 75% stable Group 7 rod position = 72% withdrawn stable Makeup to LDST initiated Time = 1230 Reactor power = 75% stable Group 7 rod position = 55% slowly inserting CRS determines Tech Spec 3.2.1 (Regulating Rod Position Limits) requirements are NOT met
* Reactor power = 75% stable
* Group 7 rod position = 72% withdrawn stable
* Makeup to LDST initiated Time = 1230
* Reactor power = 75% stable
* Group 7 rod position = 55% slowly inserting
* CRS determines Tech Spec 3.2.1 (Regulating Rod Position Limits) requirements are NOT met
: 1) Makeup to the LDST has resulted in an RCS _(1)_ event.
: 1) Makeup to the LDST has resulted in an RCS _(1)_ event.
: 2) At Time 1230, Tech Spec 3.1.1 (Shutdown Margin) requires that the RCS makeup source be either the _(2)_ or the Concentrated Boric Acid Storage Tank.
: 2) At Time 1230, Tech Spec 3.1.1 (Shutdown Margin) requires that the RCS makeup source be either the _(2)_ or the Concentrated Boric Acid Storage Tank.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. boration
A.
: 2. BWST B.     1. boration
: 1. boration
: 2. A BHUT C.     1. dilution
: 2. BWST B.
: 2. BWST D.     1. dilution
: 1. boration
: 2. A BHUT Page 83 of 100
: 2. A BHUT C.
: 1. dilution
: 2. BWST D.
: 1. dilution 2.
A BHUT Page 83 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ON$$RONRCExamination Question:
* 84 1LT48 ON$$RONRCExamination (1 point)
84 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
Initial conditions:
Initial conditions:
* Reactor power     = 100%
Reactor power = 100%
* ACB-3 closed Current conditions:
ACB-3 closed Current conditions:
* 2SA-1 7/A-i (GEN #1 EMERG. LOCKOUT) actuated
2SA-1 7/A-i (GEN #1 EMERG. LOCKOUT) actuated 1TC, ITD, and ITE 4l6oVswitchgear are Locked Out Blackout tab in progress EOP Enclosure 5.38 (Restoration of Power) has been initiated
* 1TC, ITD, and ITE 4l6oVswitchgear are Locked Out
: 1) Enclosure 5.38 will ensure that Main Feeder Buses are energized from (1).
* Blackout tab in progress
2)
* EOP Enclosure 5.38 (Restoration of Power) has been initiated
In accordance with the Blackout tab, once the Main Feeder Buses are energized, the CRS will be directed to _(2)_.
: 1) Enclosure 5.38 will ensure that Main Feeder Buses are energized from   (1).
: 2) In accordance with the Blackout tab, once the Main Feeder Buses are energized, the CRS will be directed to _(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. CT-S
A.
: 2. continue in the Blackout Tab B.       1. CT-5
: 1. CT-S
: 2. transfer back to Subsequent Actions Tab C.       1. KHU-2
: 2. continue in the Blackout Tab B.
: 2. continue in the Blackout Tab D.       1. KHU-2
: 1. CT-5
: 2. transfer back to Subsequent Actions Tab C.
: 1. KHU-2
: 2. continue in the Blackout Tab D.
: 1. KHU-2
: 2. transfer back to Subsequent Actions Tab Page 84 of 100
: 2. transfer back to Subsequent Actions Tab Page 84 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 85 1LT48 ONS SRO NRC Examination (1 point)
85 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
Time = 1200:
Time = 1200:
* Notified by Unit 2 that 2SA-18/A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL) in alarm
Notified by Unit 2 that 2SA-18/A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL) in alarm Reactor tripped from 100%
* Reactor tripped from 100%
EOP Turbine Building Flood (TBF) tab initiated Time = 1300:
* EOP Turbine Building Flood (TBF) tab initiated Time = 1300:
Core SCM = 0°F due to heatup In accordance with the EOP TBF tab...
* Core SCM   = 0°F due to heatup In accordance with the EOP TBF tab...
: 1) At Time = 1200, initiate feeding SGs with Main and Emergency Feedwater while maintaining a MINIMUM Tave of _(1)_°F.
: 1) At Time = 1200, initiate feeding SGs with Main and Emergency Feedwater while maintaining a MINIMUM Tave of _(1)_°F.
: 2) At Time     1300, the CRS is required to implement (2).
: 2) At Time 1300, the CRS is required to implement (2).
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. 550
A.
: 2. the LOSCM Tab B.     1. 532
: 1. 550
: 2. the LOS CM Tab C.     1. 550
: 2. the LOSCM Tab B.
: 1. 532
: 2. the LOS CM Tab C.
: 1. 550
: 2. Rule 4 (Initiation of HPI Forced Cooling)
: 2. Rule 4 (Initiation of HPI Forced Cooling)
D.     1. 532
D.
: 1. 532
: 2. Rule 4 (Initiation of HPI Forced Cooling)
: 2. Rule 4 (Initiation of HPI Forced Cooling)
Page 85 of 100
Page 85 of 100


Oconee Nuclear Station Question:       86 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station Question:
86 1LT48 ONS SRO NRC Examination (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1215
Time = 1215 Unit shutdown in progress 1A1 RCP in operation Tcold = 220°F slowly decreasing RCS pressure 325 psig slowly decreasing LPI Cooler outlet temperature = 110°F stable Time = 1230 Tcold = 200°F slowly decreasing RCS pressure = 275 psig stable LPI Cooler outlet temperature = 110°F stable 1A LPI Pump is started Time = 1240 Tcold = 197°F stable 1A1 RCP secured Time = 1245 LPI Cooler outlet temperature = 180°F stable
* Unit shutdown in progress
: 1) The RCS cooldown rate _(1) violate the maximum cooldown rate allowed per Tech Specs.
* 1A1 RCP in operation
: 2) When the 1A LPI pump is started at Time = 1230, the temperature transient that results from the difference in LPI Cooler Outlet temperature and Tcold (2) outside the bounds of the Reactor Vessel stress analysis.
* Tcold = 220°F slowly decreasing
* RCS pressure 325 psig slowly decreasing
* LPI Cooler outlet temperature = 110°F stable Time   = 1230
* Tcold = 200°F slowly decreasing
* RCS pressure = 275 psig stable
* LPI Cooler outlet temperature = 110°F stable
* 1A LPI Pump is started Time = 1240
* Tcold = 197°F stable
* 1A1 RCP secured Time = 1245
* LPI Cooler outlet temperature     = 180°F stable
: 1) The RCS cooldown rate _(1)           violate the maximum cooldown rate allowed per Tech Specs.
: 2) When the 1A LPI pump is started at Time = 1230, the temperature transient that results from the difference in LPI Cooler Outlet temperature and Tcold   (2) outside the bounds of the Reactor Vessel stress analysis.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. is B.       1. does
: 1. does
: 2. is NOT C.       1. does NOT
: 2. is B.
: 2. is D.       1. does NOT
: 1. does
: 2. is NOT C.
: 1. does NOT
: 2. is D.
: 1. does NOT
: 2. is NOT Page 86 of 100
: 2. is NOT Page 86 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 87 1LT48 ONSSRONRCExamination (1 point)
87 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Initial conditions:
Initial conditions:
* Reactor power = 100%
Reactor power = 100%
* l&E performing Reactor Protective System (RPS) calibration procedure Current conditions:
l&E performing Reactor Protective System (RPS) calibration procedure Current conditions:
* The RCS High Pressure trip setpoint is determined to be 2351 psig in 1A and 1 B RPS Channels
The RCS High Pressure trip setpoint is determined to be 2351 psig in 1A and 1 B RPS Channels
: 1) The required actual RPS trip setpoint for RCS High Pressure is(1)       psig.
: 1) The required actual RPS trip setpoint for RCS High Pressure is(1) psig.
: 2) In accordance with the bases of Tech Spec 3.3.1 (Reactor Protective System (RPS) Instrumentation), the 1A and I B RCS High Pressure Trip Functions are Which ONE of the following completes the statements above?
2)
A.         1. 2345
In accordance with the bases of Tech Spec 3.3.1 (Reactor Protective System (RPS) Instrumentation), the 1A and I B RCS High Pressure Trip Functions are Which ONE of the following completes the statements above?
: 2. operable B.         1. 2345
A.
: 2. inoperable C.         1. 2355
: 1. 2345
: 2. operable D.         1. 2355
: 2. operable B.
: 1. 2345
: 2. inoperable C.
: 1. 2355
: 2. operable D.
: 1. 2355
: 2. inoperable Page 87 of 100
: 2. inoperable Page 87 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:
* 88 1LT48 ON$SRONRCExamination (1 point)
88 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
* Reactor power = 100%
Reactor power = 100%
* RCS pressure = 2155 psig stable
RCS pressure = 2155 psig stable RB pressure 0.1 psig stable ES Channel 2 actuation
* RB pressure 0.1 psig stable
: 1) AP/42 Enclosure 5.3 (SSF Restoration)
* ES Channel 2 actuation
(1)_ required to be performed.
: 1) AP/42 Enclosure 5.3 (SSF Restoration)       (1)_ required to be performed.
2)
: 2) In accordance with AD-LS-ALL-0006 (Notification/Reportability Evaluation), a 4 hour ENS notification   (2)   requited.
In accordance with AD-LS-ALL-0006 (Notification/Reportability Evaluation), a 4 hour ENS notification (2) requited.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED A.       1. is
REFERENCE PROVIDED A.
: 2. is B.       1. is NOT
: 1. is
: 2. is C.       1. is
: 2. is B.
: 2. is NOT D.       1. is NOT
: 1. is NOT
: 2. is C.
: 1. is
: 2. is NOT D.
: 1. is NOT
: 2. is NOT Page 88 of 100
: 2. is NOT Page 88 of 100


Oconee Nuclear Station Question:        89 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
89 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 0800:
Time = 0800:
* Reactor power = 20%
Reactor power = 20%
* Reactor is being shutdown to repair 1A2 RCP (tripped due to high vibration)
Reactor is being shutdown to repair 1A2 RCP (tripped due to high vibration)
Time   = 0801:
Time = 0801:
* 1TA loses power
1TA loses power Reactor trip occurs 1RL-16 in HIGH alarm SGTR tab entered Time = 0830:
* Reactor trip occurs
Power is restored to 1TA Time = 0845:
* 1RL-16 in HIGH alarm
IA1 RCP restarted per End. 5.6 (RCP Restart)
* SGTR tab entered Time = 0830:
SCM=0°F Time = 0847:
* Power is restored to 1TA Time = 0845:
SCM=0°F
* IA1 RCP restarted per End. 5.6 (RCP Restart)
* SCM=0°F Time = 0847:
* SCM=0°F
: 1) Per the SGTR tab, initial RCS cooldown is performed by reducing SG pressure in
: 1) Per the SGTR tab, initial RCS cooldown is performed by reducing SG pressure in
_(1) SG(s) to 835 to 845 psig.
_(1) SG(s) to 835 to 845 psig.
: 2) The EARLIEST time that a transfer to the LOSCM tab is required is   j2)_.
: 2) The EARLIEST time that a transfer to the LOSCM tab is required is j2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. one
A.
: 2. 0845 B.         1. one
: 1. one
: 2. 0847 C.         1. both
: 2. 0845 B.
: 2. 0845 D.       1. both
: 1. one
: 2. 0847 C.
: 1. both
: 2. 0845 D.
: 1. both
: 2. 0847 Page 89 of 100
: 2. 0847 Page 89 of 100


Oconee Nuclear Station Question:      90 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
: 1) Actuating Unit I & 2 Keowee Emergency Start Channel B switch in the Unit 2 Control Room will start (I)   KHU(s).
90 (1 point)
: 1) Actuating Unit I & 2 Keowee Emergency Start Channel B switch in the Unit 2 Control Room will start (I)
KHU(s).
: 2) The switch in part I above _(2)_ be used to satisfy the Unit 2 Manual Keowee Emergency Start requirements of Tech Spec 3.3.22 (EPSL Manual Keowee Emergency Start Function).
: 2) The switch in part I above _(2)_ be used to satisfy the Unit 2 Manual Keowee Emergency Start requirements of Tech Spec 3.3.22 (EPSL Manual Keowee Emergency Start Function).
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. ONLY one
A.
: 2. can B.       1. BOTH
: 1. ONLY one
: 2. can C.       1. ONLY one
: 2. can B.
: 2. can NOT D.       I. BOTH
: 1. BOTH
: 2. can C.
: 1. ONLY one
: 2. can NOT D.
I. BOTH
: 2. can NOT Page 90 of 100
: 2. can NOT Page 90 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:
* 91 1LT48 ONS$RONRCExamination (1 point)
91 (1 point)
Given the following Unit 3 plant conditions:
Given the following Unit 3 plant conditions:
* Reactor in MODE 1 In accordance with Tech Specs, to prevent exceeding the RCS Pressure Safety Limit...
Reactor in MODE 1 In accordance with Tech Specs, to prevent exceeding the RCS Pressure Safety Limit...
: 1) Credit (1)_ taken for operation of the PORV.
: 1) Credit (1)_ taken for operation of the PORV.
: 2) Credit is taken for operation of_(2) of the Pressurizer Safety Valves.
: 2) Credit is taken for operation of_(2) of the Pressurizer Safety Valves.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. is
A.
: 2. ONLY one B.       1. is
: 1. is
: 2. both C.       1. is NOT
: 2. ONLY one B.
: 2. ONLY one D.       1. is NOT
: 1. is
: 2. both C.
: 1. is NOT
: 2. ONLY one D.
: 1. is NOT
: 2. both Page 91 of 100
: 2. both Page 91 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 92 1LT48 ONS SRO NRC Examination (1 point)
92 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
* Reactor power = 100%
Reactor power = 100%
* Electrical malfunction results in loss of ALL Control Rod position indications
Electrical malfunction results in loss of ALL Control Rod position indications 1)
: 1) In accordance with Tech Spec 3.1.7 (Position Indicator Channels), the MAXIMUM time allowed to declare all Control Rods inoperable is_(1)_.
In accordance with Tech Spec 3.1.7 (Position Indicator Channels), the MAXIMUM time allowed to declare all Control Rods inoperable is_(1)_.
: 2) Assuming indications are NOT restored, Tech Spec 3.1 .4 (Control Rod Group alignment limits), _(2) require reducing Reactor Power to a MAXIMUM of 60%
: 2) Assuming indications are NOT restored, Tech Spec 3.1.4 (Control Rod Group alignment limits), _(2) require reducing Reactor Power to a MAXIMUM of 60%
RTP within 2 hours of declaring all Control Rods inoperable.
RTP within 2 hours of declaring all Control Rods inoperable.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED A.       1. immediately
REFERENCE PROVIDED A.
: 2. does B.       1. immediately
: 1. immediately
: 2. does NOT C.       1. one hour
: 2. does B.
: 2. does D.       1. one hour
: 1. immediately
: 2. does NOT C.
: 1. one hour
: 2. does D.
: 1. one hour
: 2. does NOT Page 92 of 100
: 2. does NOT Page 92 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 93 1LT48 ONSSRONRCExamination (1 point)
93 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time   = 1000:
Time = 1000:
* Mode6
Mode6 LPI aligned in Normal Decay Heat Removal mode IA and lB SGs in wet layup Fuel Transfer Canal flooded lBLPIpumpOOS Time = 1030:
* LPI aligned in Normal Decay Heat Removal mode
ALL available LPI pumps tripped and can NOT be restarted
* IA and lB SGs in wet layup
: 1) At Time = 1000, OP/I IA/I 104/004 (Low Pressure Injection System) directs operation of the _(1)
* Fuel Transfer Canal flooded
LPI pump.
* lBLPIpumpOOS Time = 1030:
* ALL available LPI pumps tripped and can NOT be restarted
: 1) At Time = 1000, OP/I IA/I 104/004 (Low Pressure Injection System) directs operation of the _(1) LPI pump.
: 2) At Time = 1030, AP126 (Loss of Decay Heat Removal) directs initiation of Enclosure
: 2) At Time = 1030, AP126 (Loss of Decay Heat Removal) directs initiation of Enclosure
_(2)_ for heat removal.
_(2)_ for heat removal.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1.1A
A.
1.1A
: 2. 5.18 (5SF Operation for Loss of DHR Events)
: 2. 5.18 (5SF Operation for Loss of DHR Events)
B.         1.1A
B.
1.1A
: 2. 5.7 (DHR Using SF Cooling)
: 2. 5.7 (DHR Using SF Cooling)
C.         1.1C
C.
1.1C
: 2. 5.18 (SSF Operation for Loss of DHR Events)
: 2. 5.18 (SSF Operation for Loss of DHR Events)
D.         1.1C
D.
1.1C
: 2. 5.7 (DHR Using SF Cooling)
: 2. 5.7 (DHR Using SF Cooling)
Page 93 of 100
Page 93 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 94 1LT48 ONS SRO NRC Examination (1 point)
94 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
* IA SG isolated due to a steam line break
IA SG isolated due to a steam line break I B SG has a tube rupture
* I B SG has a tube rupture
: 1) Without additional station management approval, the section of the EOP that would be used to cooldown to LPI would be the section using the (1)_ SG.
: 1) Without additional station management approval, the section of the EOP that would be used to cooldown to LPI would be the section using the (1)_ SG.
: 2) Once RCS temperature and pressure allow alignment of LPI, the (2)_ mode will be the INITIAL LPI alignment utilized.
: 2) Once RCS temperature and pressure allow alignment of LPI, the (2)_ mode will be the INITIAL LPI alignment utilized.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1.1A
A.
: 2. normal DHR B.         1.IA
1.1A
: 2. High Pressure C.         1.15
: 2. normal DHR B.
: 2. normal DHR D.         1.15
1.IA
: 2. High Pressure C.
1.15
: 2. normal DHR D.
1.15
: 2. High Pressure Page 94 of 100
: 2. High Pressure Page 94 of 100


Oconee Nuclear Station Question:    95 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
95 (1 point)
In accordance with the bases of SLC 16.13.1 (Minimum Station Staffing Requirements)...
In accordance with the bases of SLC 16.13.1 (Minimum Station Staffing Requirements)...
: 1) the NRC Communicator (1)_ required to be a licensed or previously licensed SRO.
: 1) the NRC Communicator (1)_ required to be a licensed or previously licensed SRO.
: 2) the NRC Communicator       (2) also be the Off-site Communicator.
: 2) the NRC Communicator (2) also be the Off-site Communicator.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. is
A.
: 2. can B.     1. is
: 1. is
: 2. can NOT C.     1. is NOT
: 2. can B.
: 2. can D.     1. is NOT
: 1. is
: 2. can NOT C.
: 1. is NOT
: 2. can D.
: 1. is NOT
: 2. can NOT Page 95 of 100
: 2. can NOT Page 95 of 100


Oconee Nuclear Station Question:    96 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
96 (1 point)
In accordance with OP/C/Ni 108/001 (Curves and General Information) End. 4.17 (Evaluation for Removal of Statalarms/Control Room Indications), which ONE of the following is the MINIMUM level of approval required to remove a Statalarm from service located on iVBi?
In accordance with OP/C/Ni 108/001 (Curves and General Information) End. 4.17 (Evaluation for Removal of Statalarms/Control Room Indications), which ONE of the following is the MINIMUM level of approval required to remove a Statalarm from service located on iVBi?
A.     AC Supervisor B.     Control Room Supervisor C.     Work Control Center SRO D.       Shift Manager Page 96 of 100
A.
AC Supervisor B.
Control Room Supervisor C.
Work Control Center SRO D.
Shift Manager Page 96 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 97 1LT48 ONSSRONRCExamination (1 point)
97 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
* Fuel offload in progress
Fuel offload in progress A fuel cask has been dropped in the spent fuel pool causing fuel damage 3RL-6 (Spent Fuel Pool Area Monitor) reaches the High Alarm setpoint
* A fuel cask has been dropped in the spent fuel pool causing fuel damage
: 1) 3RIA6 (1) sound a local alarm.
* 3RL-6 (Spent Fuel Pool Area Monitor) reaches the High Alarm setpoint
: 1) 3RIA6       (1)   sound a local alarm.
: 2) The HIGHEST classification for this event is an _(2)_.
: 2) The HIGHEST classification for this event is an _(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.       1. does
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.
: 2. Unusual Event B.       1. does
: 1. does
: 2. Alert C.       1. does NOT
: 2. Unusual Event B.
: 2. Unusual Event D.     1. does NOT
: 1. does
: 2. Alert C.
: 1. does NOT
: 2. Unusual Event D.
: 1. does NOT
: 2. Alert Page 97 of 100
: 2. Alert Page 97 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:
* 98 1LT48 ONS$RONRCExamination (1 point)
98 (1 point)
Given the following plant conditions:
Given the following plant conditions:
Time = 0400
Time = 0400 Reactor power = 100%
* Reactor power = 100%
JA GWD tank release in progress at 1/3 Station Limit Time = 0415 3B GWD tank release initiated at 1/3 Station Limit Time = 0430 Loss of power to RM-80 skid of 1 RIA-37 (Waste Gas Effluent Monitor) 1 SA-8/B-9 (Process Monitor Radiation High) actuated ISA-8/B-10 (Process Monitor Fault) actuated
* JA GWD tank release in progress at 1/3 Station Limit Time = 0415
: 1) At Time =0415, the HIGHEST level of approval required by OP/3/A/1104/018 (GWD System) for the 3B GWD tank release is the (1).
* 3B GWD tank release initiated at 1/3 Station Limit Time = 0430
: 2) At Time = 0430, GWD-4 _(2)_ AUTOMATICALLY closed.
* Loss of power to RM-80 skid of 1 RIA-37 (Waste Gas Effluent Monitor)
* 1 SA-8/B-9 (Process Monitor Radiation High) actuated
* ISA-8/B-10 (Process Monitor Fault) actuated
: 1) At Time =0415, the HIGHEST level of approval required by OP/3/A/1104/018 (GWD System) for the 3B GWD tank release is the     (1).
: 2) At Time   = 0430, GWD-4 _(2)_ AUTOMATICALLY closed.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. Unit 3CRS
A.
: 2. has NOT B.       1. Unit3CRS
: 1. Unit 3CRS
: 2. has C.       1.SM
: 2. has NOT B.
: 2. has NOT D.       1.SM
: 1. Unit3CRS
: 2. has C.
1.SM
: 2. has NOT D.
1.SM
: 2. has Page 98 of 100
: 2. has Page 98 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 99 1LT48 ONS SRO NRC Examination (1 point)
99 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 0000
Time = 0000 Reactor power = 75%
* Reactor power = 75%
All three seals on the I BI RCP fail Time = 0015 SCM = 0°F stable Time = 0019 IAI RCP remains operating LOSCM tab in progress Rapid depressurization of BOTH steam generators is in progress
* All three seals on the I BI RCP fail Time = 0015
: 1) The reason the 1AI RCP is NOT secured at Time = 0019 is to (1).
* SCM = 0°F stable Time = 0019
: 2) The MINIMUM condition(s) that will allow the section of the LOSCM tab to be performed that reinstates the requirement to adhere to Tech Spec cooldown rate limits is once (2) is/are greater than 0 degrees F.
* IAI RCP remains operating
* LOSCM tab in progress
* Rapid depressurization of BOTH steam generators is in progress
: 1) The reason the 1AI RCP is NOT secured at Time           = 0019 is to (1).
: 2) The MINIMUM condition(s) that will allow the section of the LOSCM tab to be performed that reinstates the requirement to adhere to Tech Spec cooldown rate limits is once (2)     is/are greater than 0 degrees F.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1. prevent core uncovery that could result from phase separation if the RCP were secured
A.
: 2. ALL subcooling margins B.         1. provide forced circulation which enhances heat removal even with a two phase mixture
: 1. prevent core uncovery that could result from phase separation if the RCP were secured
: 2. ALL subcooling margins C.         1. prevent core uncovery that could result from phase separation if the RCP were secured
: 2. ALL subcooling margins B.
: 2. ANY subcooling margin D.         1. provide forced circulation which enhances heat removal even with a two phase mixture
: 1. provide forced circulation which enhances heat removal even with a two phase mixture
: 2. ALL subcooling margins C.
: 1. prevent core uncovery that could result from phase separation if the RCP were secured
: 2. ANY subcooling margin D.
: 1. provide forced circulation which enhances heat removal even with a two phase mixture
: 2. ANY subcooling margin Page 99 of 100
: 2. ANY subcooling margin Page 99 of 100


Oconee Nuclear Station Question: 100 1LT48 ON$SRONRCExamination (1 point)
Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question: 100 (1 point) 1)
: 1) In accordance with RPIOIA/10001002 (Control Room Emergency Coordinator Procedure) implementation of the OSAG   (1) require the use of 10CFR5O.54(x) and (y) provisions.
In accordance with RPIOIA/10001002 (Control Room Emergency Coordinator Procedure) implementation of the OSAG (1) require the use of 10CFR5O.54(x) and (y) provisions.
: 2) If implemented, IOCFR5O.54(x) will require the MINIMUM level of approval to be
2)
_(2 )_.
If implemented, IOCFR5O.54(x) will require the MINIMUM level of approval to be
_(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. a licensed SRO B.       1. does
: 1. does
: 2. the Emergency Coordinator C.       1. does NOT
: 2. a licensed SRO B.
: 2. a licensed SRO D.       1. does NOT
: 1. does
: 2. the Emergency Coordinator C.
: 1. does NOT
: 2. a licensed SRO D.
: 1. does NOT
: 2. the Emergency Coordinator Page 100 of 100
: 2. the Emergency Coordinator Page 100 of 100


3-                                               3-a 3-:
3-3-
a 3-:
3-*
3-*
                        -                                     -*1-
-- *1-
                      -              -*                                    - r 7
- r 7
 
4
4
                -                            -ç 3-H                 -
-ç 3-H
                                                                                      -t
-t


Examination KEYfor: 1LT48 ON$$RONRCExamin Question             Answer Number 76                 A 77                 B 78                 A 79                 C 80                 D 81                 C 82                 A 83                 C 84                 C 85                 D 86                 B 87                 A 88                 D 89                 D 90                 D 91                 D 92                 A 93                 B 94                 D 95                 A 96                 B 97                 B 98                 D 99                 A 100                 A Printed 12/15/2015 11:34:41 AM       Paged of 4
Examination KEYfor: 1LT48 ON$$RONRCExamin Question Answer Number 76 A
77 B
78 A
79 C
80 D
81 C
82 A
83 C
84 C
85 D
86 B
87 A
88 D
89 D
90 D
91 D
92 A
93 B
94 D
95 A
96 B
97 B
98 D
99 A
100 A
Printed 12/15/2015 11:34:41 AM Paged of4


OCONEE 2015-302 SRO Written Exam References
OCONEE 2015-302 SRO Written Exam References
: 1. Question 80 and Question 97: RP/0/N1 000/001, Emergency Classification, rev 4 (entire procedure)
: 1. Question 80 and Question 97: RP/0/N1 000/001, Emergency Classification, rev 4 (entire procedure)
: 2. Question 88: AD-LS-ALL-0006, Notification/Reportability Evaluation, rev 0 (entire procedure)
: 2. Question 88: AD-LS-ALL-0006, Notification/Reportability Evaluation, rev 0 (entire procedure)
: 3. Question 92: Technical Specifications LCO 3.1 .4, CONTROL ROD Group alignment Limits, p.3.1.4-1 to 3.1.4-4
: 3. Question 92: Technical Specifications LCO 3.1.4, CONTROL ROD Group alignment Limits, p.3.1.4-1 to 3.1.4-4


Oconee Nuclear Station Question:       76 1LT48 ONSSRONRCExamination (1 point)
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
76 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
Initial conditions:
Initial conditions:
* Reactor trip due to loss of Main Feedwater Current conditions:
Reactor trip due to loss of Main Feedwater Current conditions:
* ALL sources of feedwater are lost
ALL sources of feedwater are lost SM declares an ALERT due to initiation of HPI Forced Cooling In accordance with RPIO/N10001002 (Control Room Emergency Coordinator Procedure), the SM is permitted to appoint a qualified individual to Which ONE of the following completes the statement above?
* SM declares an ALERT due to initiation of HPI Forced Cooling In accordance with RPIO/N10001002 (Control Room Emergency Coordinator Procedure), the SM is permitted to appoint a qualified individual to Which ONE of the following completes the statement above?
A.
A.       perform Enclosure 4.3 (Emergency Coordinator Parallel Actions)
perform Enclosure 4.3 (Emergency Coordinator Parallel Actions)
B.       perform Enclosure 4.5 (Emergency Classification Termination Criteria)
B.
C.       approve a follow-up notification form if conditions have not changed on Unit 3 D.       approve an off-site notification form for a NOUE on another unit.
perform Enclosure 4.5 (Emergency Classification Termination Criteria)
C.
approve a follow-up notification form if conditions have not changed on Unit 3 D.
approve an off-site notification form for a NOUE on another unit.
Page 76 of 100
Page 76 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:
* 77 1LT48 ON$SRONRCExamination (1 point)
77 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
Initial conditions:
Initial conditions:
* Reactor in MODE 5
Reactor in MODE 5 ALL LTOP requirements established in accordance with Tech Spec 3.4.12 (Low Temperature Overpressure Protection (LTOP) System)
* ALL LTOP requirements established in accordance with Tech Spec 3.4.12 (Low Temperature Overpressure Protection (LTOP) System)
Current conditions:
Current conditions:
* 3RC-66 (PORV) fails open
3RC-66 (PORV) fails open 1)
: 1) In accordance with OMP 1-18 (Implementation Standard During Abnormal and Emergency Events), closing 3RC-4 _(1) require CRS concurrence, if the CRS is available.
In accordance with OMP 1-18 (Implementation Standard During Abnormal and Emergency Events), closing 3RC-4 _(1) require CRS concurrence, if the CRS is available.
: 2) In accordance with Tech Spec 3.4.12, a dedicated LTOP operator _(2)_ allowed as a substitute for an inoperable PORV to prevent exceeding RCS brittle fracture pressure limits.
2)
In accordance with Tech Spec 3.4.12, a dedicated LTOP operator _(2)_ allowed as a substitute for an inoperable PORV to prevent exceeding RCS brittle fracture pressure limits.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. is B.       1. does
: 1. does
: 2. is NOT C.       1. does NOT
: 2. is B.
: 2. is D.       1. does NOT
: 1. does
: 2. is NOT C.
: 1. does NOT
: 2. is D.
: 1. does NOT
: 2. is NOT Page 77 of 100
: 2. is NOT Page 77 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 78 1LT48 ONS SRO NRC Examination (1 point)
78 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time   = 1000:
Time = 1000:
* 1A S/G developed a SGTR
1A S/G developed a SGTR EOP SGTR Tab in progress IA SIG level = 240 inches XSUR slowly decreasing SCM = 10°F stable Time = 1040:
* EOP SGTR Tab in progress
MSLB on lB SG outside containment and can NOT be steamed EOP EHT Tab complete 1A SIG has reached the level where water can enter the main steam lines Rule 4 has been initiated and the PORV has been opened Core SCM = 0°F
* IA SIG level = 240 inches XSUR slowly decreasing
* SCM = 10°F stable Time   = 1040:
* MSLB on lB SG outside containment and can NOT be steamed
* EOP EHT Tab complete
* 1A SIG has reached the level where water can enter the main steam lines
* Rule 4 has been initiated and the PORV has been opened
* Core SCM = 0°F
: 1) At Time = 1000, the SGTR tab _(1)_ requite that the lASteam Generator be isolated.
: 1) At Time = 1000, the SGTR tab _(1)_ requite that the lASteam Generator be isolated.
: 2) At Time   = 1040, the SGTR tab will direct initiation of the (2)_tab.
: 2) At Time = 1040, the SGTR tab will direct initiation of the (2)_tab.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. HPICD B.       1. does
: 1. does
: 2. LOCACD C.       1. does NOT
: 2. HPICD B.
: 2. HPICD D.       1. does NOT
: 1. does
: 2. LOCACD C.
: 1. does NOT
: 2. HPICD D.
: 1. does NOT
: 2. LOCACD Page 78 of 100
: 2. LOCACD Page 78 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 79 1LT48 ONS SRO NRC Examination (1 point)
79 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
* Reactor power = 50% stable
Reactor power = 50% stable iki and IKU panelboards are de-energized Which ONE of the following contains the procedure steps that will be used to maintain Steam Generator pressure and RCS temperature?
* iki and IKU panelboards are de-energized Which ONE of the following contains the procedure steps that will be used to maintain Steam Generator pressure and RCS temperature?
A.
A.     AP/23 (Loss of lOS Power)
AP/23 (Loss of lOS Power)
B.     AP/25 (Standby Shutdown Facility)
B.
C.     EOP Enclosure 5.24 (Operation of the ADVs)
AP/25 (Standby Shutdown Facility)
D.     EOP Enclosure 5.42 (Alignment of EFM Pump to Feed SG5)
C.
EOP Enclosure 5.24 (Operation of the ADVs)
D.
EOP Enclosure 5.42 (Alignment of EFM Pump to Feed SG5)
Page 79 of 100
Page 79 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 80 1LT48 ONS SRO NRC Examination (1 point)
80 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1200:
Time = 1200:
* Reactor trip from 100%
Reactor trip from 100%
* AP/22 (Loss of Instrument Air) in progress
AP/22 (Loss of Instrument Air) in progress Instrument Air (IA) and Auxiliary Instrument Air (AlA) pressure lost to the 1A Turbine Bypass Valves IA SG pressure 935 psig stable Maintaining 1A SG pressure with Atmospheric Dump Valves (ADVs) in accordance with EOP Subsequent Actions Time = 1210:
* Instrument Air (IA) and Auxiliary Instrument Air (AlA) pressure lost to the 1A Turbine Bypass Valves
IA SG Tube Leak = 15 gpm stable Time = 1230:
* IA SG pressure 935 psig stable
1A SG Tube Rupture = 180 gpm stable EOP SGTR in progress
* Maintaining 1A SG pressure with Atmospheric Dump Valves (ADVs) in accordance with EOP Subsequent Actions Time = 1210:
: 1) At time = 1210, the HIGHEST emergency classification (if any) is _(1)_.
* IA SG Tube Leak     = 15 gpm stable Time = 1230:
: 2) At time = 1230, the HIGHEST emergency classification is _(2)_.
* 1A SG Tube Rupture = 180 gpm stable
* EOP SGTR in progress
: 1) At time = 1210, the HIGHEST emergency classification (if any) is _(1)_.
: 2) At time = 1230, the HIGHEST emergency classification is _(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.     1. NONE
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.
: 2. ALERT B.     1. NONE
: 1. NONE
: 2. SITE AREA EMERGENCY C.     1. UNUSUAL EVENT
: 2. ALERT B.
: 2. ALERT D.     1. UNUSUAL EVENT
: 1. NONE
: 2. SITE AREA EMERGENCY C.
: 1. UNUSUAL EVENT
: 2. ALERT D.
: 1. UNUSUAL EVENT
: 2. SITE AREA EMERGENCY Page 80 of 100
: 2. SITE AREA EMERGENCY Page 80 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
        *        $1 1LT48 ONS SRO NRC Examination (1 point)
$1 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1200
Time = 1200 Reactor power 100% stable AFIS bypassed for maintenance SA-16/C-1 (230 KV Swyd Isolate ES Permit) actuated 230 KV Yellow Bus voltage = 224.2 KV increasing Time = 1201 AP/34 (Degraded Grid) in progress Main Turbine trips due to low grid frequency 230 KV Yellow Bus voltage = 226.8 Ky increasing RCS pressure = 1245 psig rapidly decreasing RB pressure = 11.4 psig rapidly increasing Tave = 545°F slowly decreasing Engineered Safeguards systems...
* Reactor power 100% stable
* AFIS bypassed for maintenance
* SA-16/C-1 (230 KV Swyd Isolate ES Permit) actuated
* 230 KV Yellow Bus voltage = 224.2 KV increasing Time     = 1201
* AP/34 (Degraded Grid) in progress
* Main Turbine trips due to low grid frequency
* 230 KV Yellow Bus voltage = 226.8 Ky increasing
* RCS pressure = 1245 psig rapidly decreasing
* RB pressure = 11 .4 psig rapidly increasing
* Tave = 545°F slowly decreasing Engineered Safeguards systems...
: 1) will be energized from _(1)_.
: 1) will be energized from _(1)_.
: 2)     j2)_ sufficient to maintain Reactor Building pressure within design limits.
2) j2)_ sufficient to maintain Reactor Building pressure within design limits.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1. CT-i
A.
: 2. are B.         1. CT-I
: 1. CT-i
: 2. are NOT C.         1. CT-4
: 2. are B.
: 2. are D.         I. CT-4
: 1. CT-I
: 2. are NOT C.
: 1. CT-4
: 2. are D.
I. CT-4
: 2. are NOT Page 81 of 100
: 2. are NOT Page 81 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 82 1LT48 ONSSRONRCExamination (1 point)
82 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
Initial conditions:
Initial conditions:
* Reactor power = 100%
Reactor power = 100%
* Control Rod 3 in Group 7 indicates 0% withdrawn
Control Rod 3 in Group 7 indicates 0% withdrawn AP/Ol (Unit Runback) initiated Current conditions:
* AP/Ol (Unit Runback) initiated Current conditions:
Reactor power = 70% decreasing
* Reactor power   = 70% decreasing
: 1) The AMBER lights on the P1 panel will illuminate when a control rod reaches a MINIMUM of(1) inches from its group average.
: 1) The AMBER lights on the P1 panel will illuminate when a control rod reaches a MINIMUM of(1)         inches from its group average.
2)
: 2) In accordance with TS 3.1 .4 (Control Rod Group Alignment Limits), the basis for the limit on Reactor power for the given conditions is to maintain 2)_ within design limits.
In accordance with TS 3.1.4 (Control Rod Group Alignment Limits), the basis for the limit on Reactor power for the given conditions is to maintain 2)_ within design limits.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1>7
A.
: 2. Linear Heat Rate B.       1.>7
1>7
: 2. Shutdown Margin C.       1>9
: 2. Linear Heat Rate B.
: 2. Linear Heat Rate D.       1>9
1.>7
: 2. Shutdown Margin C.
1>9
: 2. Linear Heat Rate D.
1>9
: 2. Shutdown Margin Page 82 of 100
: 2. Shutdown Margin Page 82 of 100


Oconee Nuclear Station Question:    83 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
83 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1200
Time = 1200 Reactor power = 75% stable Group 7 rod position = 72% withdrawn stable Makeup to LDST initiated Time = 1230 Reactor power = 75% stable Group 7 rod position = 55% slowly inserting CRS determines Tech Spec 3.2.1 (Regulating Rod Position Limits) requirements are NOT met
* Reactor power = 75% stable
* Group 7 rod position = 72% withdrawn stable
* Makeup to LDST initiated Time = 1230
* Reactor power = 75% stable
* Group 7 rod position = 55% slowly inserting
* CRS determines Tech Spec 3.2.1 (Regulating Rod Position Limits) requirements are NOT met
: 1) Makeup to the LDST has resulted in an RCS _(1)_ event.
: 1) Makeup to the LDST has resulted in an RCS _(1)_ event.
: 2) At Time 1230, Tech Spec 3.1.1 (Shutdown Margin) requires that the RCS makeup source be either the _(2)_ or the Concentrated Boric Acid Storage Tank.
: 2) At Time 1230, Tech Spec 3.1.1 (Shutdown Margin) requires that the RCS makeup source be either the _(2)_ or the Concentrated Boric Acid Storage Tank.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. boration
A.
: 2. BWST B.     1. boration
: 1. boration
: 2. A BHUT C.     1. dilution
: 2. BWST B.
: 2. BWST D.     1. dilution
: 1. boration
: 2. A BHUT Page 83 of 100
: 2. A BHUT C.
: 1. dilution
: 2. BWST D.
: 1. dilution 2.
A BHUT Page 83 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ON$$RONRCExamination Question:
* 84 1LT48 ON$$RONRCExamination (1 point)
84 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
Initial conditions:
Initial conditions:
* Reactor power     = 100%
Reactor power = 100%
* ACB-3 closed Current conditions:
ACB-3 closed Current conditions:
* 2SA-1 7/A-i (GEN #1 EMERG. LOCKOUT) actuated
2SA-1 7/A-i (GEN #1 EMERG. LOCKOUT) actuated 1TC, ITD, and ITE 4l6oVswitchgear are Locked Out Blackout tab in progress EOP Enclosure 5.38 (Restoration of Power) has been initiated
* 1TC, ITD, and ITE 4l6oVswitchgear are Locked Out
: 1) Enclosure 5.38 will ensure that Main Feeder Buses are energized from (1).
* Blackout tab in progress
2)
* EOP Enclosure 5.38 (Restoration of Power) has been initiated
In accordance with the Blackout tab, once the Main Feeder Buses are energized, the CRS will be directed to _(2)_.
: 1) Enclosure 5.38 will ensure that Main Feeder Buses are energized from   (1).
: 2) In accordance with the Blackout tab, once the Main Feeder Buses are energized, the CRS will be directed to _(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. CT-S
A.
: 2. continue in the Blackout Tab B.       1. CT-5
: 1. CT-S
: 2. transfer back to Subsequent Actions Tab C.       1. KHU-2
: 2. continue in the Blackout Tab B.
: 2. continue in the Blackout Tab D.       1. KHU-2
: 1. CT-5
: 2. transfer back to Subsequent Actions Tab C.
: 1. KHU-2
: 2. continue in the Blackout Tab D.
: 1. KHU-2
: 2. transfer back to Subsequent Actions Tab Page 84 of 100
: 2. transfer back to Subsequent Actions Tab Page 84 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 85 1LT48 ONS SRO NRC Examination (1 point)
85 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
Time = 1200:
Time = 1200:
* Notified by Unit 2 that 2SA-18/A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL) in alarm
Notified by Unit 2 that 2SA-18/A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL) in alarm Reactor tripped from 100%
* Reactor tripped from 100%
EOP Turbine Building Flood (TBF) tab initiated Time = 1300:
* EOP Turbine Building Flood (TBF) tab initiated Time = 1300:
Core SCM = 0°F due to heatup In accordance with the EOP TBF tab...
* Core SCM   = 0°F due to heatup In accordance with the EOP TBF tab...
: 1) At Time = 1200, initiate feeding SGs with Main and Emergency Feedwater while maintaining a MINIMUM Tave of _(1)_°F.
: 1) At Time = 1200, initiate feeding SGs with Main and Emergency Feedwater while maintaining a MINIMUM Tave of _(1)_°F.
: 2) At Time     1300, the CRS is required to implement (2).
: 2) At Time 1300, the CRS is required to implement (2).
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. 550
A.
: 2. the LOSCM Tab B.     1. 532
: 1. 550
: 2. the LOS CM Tab C.     1. 550
: 2. the LOSCM Tab B.
: 1. 532
: 2. the LOS CM Tab C.
: 1. 550
: 2. Rule 4 (Initiation of HPI Forced Cooling)
: 2. Rule 4 (Initiation of HPI Forced Cooling)
D.     1. 532
D.
: 1. 532
: 2. Rule 4 (Initiation of HPI Forced Cooling)
: 2. Rule 4 (Initiation of HPI Forced Cooling)
Page 85 of 100
Page 85 of 100


Oconee Nuclear Station Question:       86 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station Question:
86 1LT48 ONS SRO NRC Examination (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 1215
Time = 1215 Unit shutdown in progress 1A1 RCP in operation Tcold = 220°F slowly decreasing RCS pressure 325 psig slowly decreasing LPI Cooler outlet temperature = 110°F stable Time = 1230 Tcold = 200°F slowly decreasing RCS pressure = 275 psig stable LPI Cooler outlet temperature = 110°F stable 1A LPI Pump is started Time = 1240 Tcold = 197°F stable 1A1 RCP secured Time = 1245 LPI Cooler outlet temperature = 180°F stable
* Unit shutdown in progress
: 1) The RCS cooldown rate _(1) violate the maximum cooldown rate allowed per Tech Specs.
* 1A1 RCP in operation
: 2) When the 1A LPI pump is started at Time = 1230, the temperature transient that results from the difference in LPI Cooler Outlet temperature and Tcold (2) outside the bounds of the Reactor Vessel stress analysis.
* Tcold = 220°F slowly decreasing
* RCS pressure 325 psig slowly decreasing
* LPI Cooler outlet temperature = 110°F stable Time   = 1230
* Tcold = 200°F slowly decreasing
* RCS pressure = 275 psig stable
* LPI Cooler outlet temperature = 110°F stable
* 1A LPI Pump is started Time = 1240
* Tcold = 197°F stable
* 1A1 RCP secured Time = 1245
* LPI Cooler outlet temperature     = 180°F stable
: 1) The RCS cooldown rate _(1)           violate the maximum cooldown rate allowed per Tech Specs.
: 2) When the 1A LPI pump is started at Time = 1230, the temperature transient that results from the difference in LPI Cooler Outlet temperature and Tcold   (2) outside the bounds of the Reactor Vessel stress analysis.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. is B.       1. does
: 1. does
: 2. is NOT C.       1. does NOT
: 2. is B.
: 2. is D.       1. does NOT
: 1. does
: 2. is NOT C.
: 1. does NOT
: 2. is D.
: 1. does NOT
: 2. is NOT Page 86 of 100
: 2. is NOT Page 86 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 87 1LT48 ONSSRONRCExamination (1 point)
87 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Initial conditions:
Initial conditions:
* Reactor power = 100%
Reactor power = 100%
* l&E performing Reactor Protective System (RPS) calibration procedure Current conditions:
l&E performing Reactor Protective System (RPS) calibration procedure Current conditions:
* The RCS High Pressure trip setpoint is determined to be 2351 psig in 1A and 1 B RPS Channels
The RCS High Pressure trip setpoint is determined to be 2351 psig in 1A and 1 B RPS Channels
: 1) The required actual RPS trip setpoint for RCS High Pressure is(1)       psig.
: 1) The required actual RPS trip setpoint for RCS High Pressure is(1) psig.
: 2) In accordance with the bases of Tech Spec 3.3.1 (Reactor Protective System (RPS) Instrumentation), the 1A and I B RCS High Pressure Trip Functions are Which ONE of the following completes the statements above?
2)
A.         1. 2345
In accordance with the bases of Tech Spec 3.3.1 (Reactor Protective System (RPS) Instrumentation), the 1A and I B RCS High Pressure Trip Functions are Which ONE of the following completes the statements above?
: 2. operable B.         1. 2345
A.
: 2. inoperable C.         1. 2355
: 1. 2345
: 2. operable D.         1. 2355
: 2. operable B.
: 1. 2345
: 2. inoperable C.
: 1. 2355
: 2. operable D.
: 1. 2355
: 2. inoperable Page 87 of 100
: 2. inoperable Page 87 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:
* 88 1LT48 ON$SRONRCExamination (1 point)
88 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
* Reactor power = 100%
Reactor power = 100%
* RCS pressure = 2155 psig stable
RCS pressure = 2155 psig stable RB pressure 0.1 psig stable ES Channel 2 actuation
* RB pressure 0.1 psig stable
: 1) AP/42 Enclosure 5.3 (SSF Restoration)
* ES Channel 2 actuation
(1)_ required to be performed.
: 1) AP/42 Enclosure 5.3 (SSF Restoration)       (1)_ required to be performed.
2)
: 2) In accordance with AD-LS-ALL-0006 (Notification/Reportability Evaluation), a 4 hour ENS notification   (2)   requited.
In accordance with AD-LS-ALL-0006 (Notification/Reportability Evaluation), a 4 hour ENS notification (2) requited.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED A.       1. is
REFERENCE PROVIDED A.
: 2. is B.       1. is NOT
: 1. is
: 2. is C.       1. is
: 2. is B.
: 2. is NOT D.       1. is NOT
: 1. is NOT
: 2. is C.
: 1. is
: 2. is NOT D.
: 1. is NOT
: 2. is NOT Page 88 of 100
: 2. is NOT Page 88 of 100


Oconee Nuclear Station Question:        89 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
89 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 0800:
Time = 0800:
* Reactor power = 20%
Reactor power = 20%
* Reactor is being shutdown to repair 1A2 RCP (tripped due to high vibration)
Reactor is being shutdown to repair 1A2 RCP (tripped due to high vibration)
Time   = 0801:
Time = 0801:
* 1TA loses power
1TA loses power Reactor trip occurs 1RL-16 in HIGH alarm SGTR tab entered Time = 0830:
* Reactor trip occurs
Power is restored to 1TA Time = 0845:
* 1RL-16 in HIGH alarm
IA1 RCP restarted per End. 5.6 (RCP Restart)
* SGTR tab entered Time = 0830:
SCM=0°F Time = 0847:
* Power is restored to 1TA Time = 0845:
SCM=0°F
* IA1 RCP restarted per End. 5.6 (RCP Restart)
* SCM=0°F Time = 0847:
* SCM=0°F
: 1) Per the SGTR tab, initial RCS cooldown is performed by reducing SG pressure in
: 1) Per the SGTR tab, initial RCS cooldown is performed by reducing SG pressure in
_(1) SG(s) to 835 to 845 psig.
_(1) SG(s) to 835 to 845 psig.
: 2) The EARLIEST time that a transfer to the LOSCM tab is required is   j2)_.
: 2) The EARLIEST time that a transfer to the LOSCM tab is required is j2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. one
A.
: 2. 0845 B.         1. one
: 1. one
: 2. 0847 C.         1. both
: 2. 0845 B.
: 2. 0845 D.       1. both
: 1. one
: 2. 0847 C.
: 1. both
: 2. 0845 D.
: 1. both
: 2. 0847 Page 89 of 100
: 2. 0847 Page 89 of 100


Oconee Nuclear Station Question:      90 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
: 1) Actuating Unit I & 2 Keowee Emergency Start Channel B switch in the Unit 2 Control Room will start (I)   KHU(s).
90 (1 point)
: 1) Actuating Unit I & 2 Keowee Emergency Start Channel B switch in the Unit 2 Control Room will start (I)
KHU(s).
: 2) The switch in part I above _(2)_ be used to satisfy the Unit 2 Manual Keowee Emergency Start requirements of Tech Spec 3.3.22 (EPSL Manual Keowee Emergency Start Function).
: 2) The switch in part I above _(2)_ be used to satisfy the Unit 2 Manual Keowee Emergency Start requirements of Tech Spec 3.3.22 (EPSL Manual Keowee Emergency Start Function).
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. ONLY one
A.
: 2. can B.       1. BOTH
: 1. ONLY one
: 2. can C.       1. ONLY one
: 2. can B.
: 2. can NOT D.       I. BOTH
: 1. BOTH
: 2. can C.
: 1. ONLY one
: 2. can NOT D.
I. BOTH
: 2. can NOT Page 90 of 100
: 2. can NOT Page 90 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:
* 91 1LT48 ONS$RONRCExamination (1 point)
91 (1 point)
Given the following Unit 3 plant conditions:
Given the following Unit 3 plant conditions:
* Reactor in MODE 1 In accordance with Tech Specs, to prevent exceeding the RCS Pressure Safety Limit...
Reactor in MODE 1 In accordance with Tech Specs, to prevent exceeding the RCS Pressure Safety Limit...
: 1) Credit (1)_ taken for operation of the PORV.
: 1) Credit (1)_ taken for operation of the PORV.
: 2) Credit is taken for operation of_(2) of the Pressurizer Safety Valves.
: 2) Credit is taken for operation of_(2) of the Pressurizer Safety Valves.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. is
A.
: 2. ONLY one B.       1. is
: 1. is
: 2. both C.       1. is NOT
: 2. ONLY one B.
: 2. ONLY one D.       1. is NOT
: 1. is
: 2. both C.
: 1. is NOT
: 2. ONLY one D.
: 1. is NOT
: 2. both Page 91 of 100
: 2. both Page 91 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 92 1LT48 ONS SRO NRC Examination (1 point)
92 (1 point)
Given the following Unit I conditions:
Given the following Unit I conditions:
* Reactor power = 100%
Reactor power = 100%
* Electrical malfunction results in loss of ALL Control Rod position indications
Electrical malfunction results in loss of ALL Control Rod position indications 1)
: 1) In accordance with Tech Spec 3.1.7 (Position Indicator Channels), the MAXIMUM time allowed to declare all Control Rods inoperable is_(1)_.
In accordance with Tech Spec 3.1.7 (Position Indicator Channels), the MAXIMUM time allowed to declare all Control Rods inoperable is_(1)_.
: 2) Assuming indications are NOT restored, Tech Spec 3.1 .4 (Control Rod Group alignment limits), _(2) require reducing Reactor Power to a MAXIMUM of 60%
: 2) Assuming indications are NOT restored, Tech Spec 3.1.4 (Control Rod Group alignment limits), _(2) require reducing Reactor Power to a MAXIMUM of 60%
RTP within 2 hours of declaring all Control Rods inoperable.
RTP within 2 hours of declaring all Control Rods inoperable.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED A.       1. immediately
REFERENCE PROVIDED A.
: 2. does B.       1. immediately
: 1. immediately
: 2. does NOT C.       1. one hour
: 2. does B.
: 2. does D.       1. one hour
: 1. immediately
: 2. does NOT C.
: 1. one hour
: 2. does D.
: 1. one hour
: 2. does NOT Page 92 of 100
: 2. does NOT Page 92 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 93 1LT48 ONSSRONRCExamination (1 point)
93 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time   = 1000:
Time = 1000:
* Mode6
Mode6 LPI aligned in Normal Decay Heat Removal mode IA and lB SGs in wet layup Fuel Transfer Canal flooded lBLPIpumpOOS Time = 1030:
* LPI aligned in Normal Decay Heat Removal mode
ALL available LPI pumps tripped and can NOT be restarted
* IA and lB SGs in wet layup
: 1) At Time = 1000, OP/I IA/I 104/004 (Low Pressure Injection System) directs operation of the _(1)
* Fuel Transfer Canal flooded
LPI pump.
* lBLPIpumpOOS Time = 1030:
* ALL available LPI pumps tripped and can NOT be restarted
: 1) At Time = 1000, OP/I IA/I 104/004 (Low Pressure Injection System) directs operation of the _(1) LPI pump.
: 2) At Time = 1030, AP126 (Loss of Decay Heat Removal) directs initiation of Enclosure
: 2) At Time = 1030, AP126 (Loss of Decay Heat Removal) directs initiation of Enclosure
_(2)_ for heat removal.
_(2)_ for heat removal.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1.1A
A.
1.1A
: 2. 5.18 (5SF Operation for Loss of DHR Events)
: 2. 5.18 (5SF Operation for Loss of DHR Events)
B.         1.1A
B.
1.1A
: 2. 5.7 (DHR Using SF Cooling)
: 2. 5.7 (DHR Using SF Cooling)
C.         1.1C
C.
1.1C
: 2. 5.18 (SSF Operation for Loss of DHR Events)
: 2. 5.18 (SSF Operation for Loss of DHR Events)
D.         1.1C
D.
1.1C
: 2. 5.7 (DHR Using SF Cooling)
: 2. 5.7 (DHR Using SF Cooling)
Page 93 of 100
Page 93 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 94 1LT48 ONS SRO NRC Examination (1 point)
94 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
* IA SG isolated due to a steam line break
IA SG isolated due to a steam line break I B SG has a tube rupture
* I B SG has a tube rupture
: 1) Without additional station management approval, the section of the EOP that would be used to cooldown to LPI would be the section using the (1)_ SG.
: 1) Without additional station management approval, the section of the EOP that would be used to cooldown to LPI would be the section using the (1)_ SG.
: 2) Once RCS temperature and pressure allow alignment of LPI, the (2)_ mode will be the INITIAL LPI alignment utilized.
: 2) Once RCS temperature and pressure allow alignment of LPI, the (2)_ mode will be the INITIAL LPI alignment utilized.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1.1A
A.
: 2. normal DHR B.         1.IA
1.1A
: 2. High Pressure C.         1.15
: 2. normal DHR B.
: 2. normal DHR D.         1.15
1.IA
: 2. High Pressure C.
1.15
: 2. normal DHR D.
1.15
: 2. High Pressure Page 94 of 100
: 2. High Pressure Page 94 of 100


Oconee Nuclear Station Question:    95 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
95 (1 point)
In accordance with the bases of SLC 16.13.1 (Minimum Station Staffing Requirements)...
In accordance with the bases of SLC 16.13.1 (Minimum Station Staffing Requirements)...
: 1) the NRC Communicator (1)_ required to be a licensed or previously licensed SRO.
: 1) the NRC Communicator (1)_ required to be a licensed or previously licensed SRO.
: 2) the NRC Communicator       (2) also be the Off-site Communicator.
: 2) the NRC Communicator (2) also be the Off-site Communicator.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.     1. is
A.
: 2. can B.     1. is
: 1. is
: 2. can NOT C.     1. is NOT
: 2. can B.
: 2. can D.     1. is NOT
: 1. is
: 2. can NOT C.
: 1. is NOT
: 2. can D.
: 1. is NOT
: 2. can NOT Page 95 of 100
: 2. can NOT Page 95 of 100


Oconee Nuclear Station Question:    96 1LT48 ONS SRO NRC Examination (1 point)
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
96 (1 point)
In accordance with OP/C/Ni 108/001 (Curves and General Information) End. 4.17 (Evaluation for Removal of Statalarms/Control Room Indications), which ONE of the following is the MINIMUM level of approval required to remove a Statalarm from service located on iVBi?
In accordance with OP/C/Ni 108/001 (Curves and General Information) End. 4.17 (Evaluation for Removal of Statalarms/Control Room Indications), which ONE of the following is the MINIMUM level of approval required to remove a Statalarm from service located on iVBi?
A.     AC Supervisor B.     Control Room Supervisor C.     Work Control Center SRO D.       Shift Manager Page 96 of 100
A.
AC Supervisor B.
Control Room Supervisor C.
Work Control Center SRO D.
Shift Manager Page 96 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:
* 97 1LT48 ONSSRONRCExamination (1 point)
97 (1 point)
Given the following Unit 3 conditions:
Given the following Unit 3 conditions:
* Fuel offload in progress
Fuel offload in progress A fuel cask has been dropped in the spent fuel pool causing fuel damage 3RL-6 (Spent Fuel Pool Area Monitor) reaches the High Alarm setpoint
* A fuel cask has been dropped in the spent fuel pool causing fuel damage
: 1) 3RIA6 (1) sound a local alarm.
* 3RL-6 (Spent Fuel Pool Area Monitor) reaches the High Alarm setpoint
: 1) 3RIA6       (1)   sound a local alarm.
: 2) The HIGHEST classification for this event is an _(2)_.
: 2) The HIGHEST classification for this event is an _(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.       1. does
REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.
: 2. Unusual Event B.       1. does
: 1. does
: 2. Alert C.       1. does NOT
: 2. Unusual Event B.
: 2. Unusual Event D.     1. does NOT
: 1. does
: 2. Alert C.
: 1. does NOT
: 2. Unusual Event D.
: 1. does NOT
: 2. Alert Page 97 of 100
: 2. Alert Page 97 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:
* 98 1LT48 ONS$RONRCExamination (1 point)
98 (1 point)
Given the following plant conditions:
Given the following plant conditions:
Time = 0400
Time = 0400 Reactor power = 100%
* Reactor power = 100%
JA GWD tank release in progress at 1/3 Station Limit Time = 0415 3B GWD tank release initiated at 1/3 Station Limit Time = 0430 Loss of power to RM-80 skid of 1 RIA-37 (Waste Gas Effluent Monitor) 1 SA-8/B-9 (Process Monitor Radiation High) actuated ISA-8/B-10 (Process Monitor Fault) actuated
* JA GWD tank release in progress at 1/3 Station Limit Time = 0415
: 1) At Time =0415, the HIGHEST level of approval required by OP/3/A/1104/018 (GWD System) for the 3B GWD tank release is the (1).
* 3B GWD tank release initiated at 1/3 Station Limit Time = 0430
: 2) At Time = 0430, GWD-4 _(2)_ AUTOMATICALLY closed.
* Loss of power to RM-80 skid of 1 RIA-37 (Waste Gas Effluent Monitor)
* 1 SA-8/B-9 (Process Monitor Radiation High) actuated
* ISA-8/B-10 (Process Monitor Fault) actuated
: 1) At Time =0415, the HIGHEST level of approval required by OP/3/A/1104/018 (GWD System) for the 3B GWD tank release is the     (1).
: 2) At Time   = 0430, GWD-4 _(2)_ AUTOMATICALLY closed.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. Unit 3CRS
A.
: 2. has NOT B.       1. Unit3CRS
: 1. Unit 3CRS
: 2. has C.       1.SM
: 2. has NOT B.
: 2. has NOT D.       1.SM
: 1. Unit3CRS
: 2. has C.
1.SM
: 2. has NOT D.
1.SM
: 2. has Page 98 of 100
: 2. has Page 98 of 100


Oconee Nuclear Station Question:
Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:
* 99 1LT48 ONS SRO NRC Examination (1 point)
99 (1 point)
Given the following Unit 1 conditions:
Given the following Unit 1 conditions:
Time = 0000
Time = 0000 Reactor power = 75%
* Reactor power = 75%
All three seals on the I BI RCP fail Time = 0015 SCM = 0°F stable Time = 0019 IAI RCP remains operating LOSCM tab in progress Rapid depressurization of BOTH steam generators is in progress
* All three seals on the I BI RCP fail Time = 0015
: 1) The reason the 1AI RCP is NOT secured at Time = 0019 is to (1).
* SCM = 0°F stable Time = 0019
: 2) The MINIMUM condition(s) that will allow the section of the LOSCM tab to be performed that reinstates the requirement to adhere to Tech Spec cooldown rate limits is once (2) is/are greater than 0 degrees F.
* IAI RCP remains operating
* LOSCM tab in progress
* Rapid depressurization of BOTH steam generators is in progress
: 1) The reason the 1AI RCP is NOT secured at Time           = 0019 is to (1).
: 2) The MINIMUM condition(s) that will allow the section of the LOSCM tab to be performed that reinstates the requirement to adhere to Tech Spec cooldown rate limits is once (2)     is/are greater than 0 degrees F.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.         1. prevent core uncovery that could result from phase separation if the RCP were secured
A.
: 2. ALL subcooling margins B.         1. provide forced circulation which enhances heat removal even with a two phase mixture
: 1. prevent core uncovery that could result from phase separation if the RCP were secured
: 2. ALL subcooling margins C.         1. prevent core uncovery that could result from phase separation if the RCP were secured
: 2. ALL subcooling margins B.
: 2. ANY subcooling margin D.         1. provide forced circulation which enhances heat removal even with a two phase mixture
: 1. provide forced circulation which enhances heat removal even with a two phase mixture
: 2. ALL subcooling margins C.
: 1. prevent core uncovery that could result from phase separation if the RCP were secured
: 2. ANY subcooling margin D.
: 1. provide forced circulation which enhances heat removal even with a two phase mixture
: 2. ANY subcooling margin Page 99 of 100
: 2. ANY subcooling margin Page 99 of 100


Oconee Nuclear Station Question: 100 1LT48 ON$SRONRCExamination (1 point)
Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question: 100 (1 point) 1)
: 1) In accordance with RPIOIA/10001002 (Control Room Emergency Coordinator Procedure) implementation of the OSAG   (1) require the use of 10CFR5O.54(x) and (y) provisions.
In accordance with RPIOIA/10001002 (Control Room Emergency Coordinator Procedure) implementation of the OSAG (1) require the use of 10CFR5O.54(x) and (y) provisions.
: 2) If implemented, IOCFR5O.54(x) will require the MINIMUM level of approval to be
2)
_(2 )_.
If implemented, IOCFR5O.54(x) will require the MINIMUM level of approval to be
_(2)_.
Which ONE of the following completes the statements above?
Which ONE of the following completes the statements above?
A.       1. does
A.
: 2. a licensed SRO B.       1. does
: 1. does
: 2. the Emergency Coordinator C.       1. does NOT
: 2. a licensed SRO B.
: 2. a licensed SRO D.       1. does NOT
: 1. does
: 2. the Emergency Coordinator C.
: 1. does NOT
: 2. a licensed SRO D.
: 1. does NOT
: 2. the Emergency Coordinator Page 100 of 100
: 2. the Emergency Coordinator Page 100 of 100


3-                                               3-a 3-:
3-3-
a 3-:
3-*
3-*
                        -                                     -*1-
-- *1-
                      -              -*                                    - r 7
- r 7
 
4
4
                -                            -ç 3-H                 -
-ç 3-H
                                                                                      -t
-t


Examination KEYfor: 1LT48 ON$$RONRCExamin Question             Answer Number 76                 A 77                 B 78                 A 79                 C 80                 D 81                 C 82                 A 83                 C 84                 C 85                 D 86                 B 87                 A 88                 D 89                 D 90                 D 91                 D 92                 A 93                 B 94                 D 95                 A 96                 B 97                 B 98                 D 99                 A 100                 A Printed 12/15/2015 11:34:41 AM       Paged of 4
Examination KEYfor: 1LT48 ON$$RONRCExamin Question Answer Number 76 A
77 B
78 A
79 C
80 D
81 C
82 A
83 C
84 C
85 D
86 B
87 A
88 D
89 D
90 D
91 D
92 A
93 B
94 D
95 A
96 B
97 B
98 D
99 A
100 A
Printed 12/15/2015 11:34:41 AM Paged of4


OCONEE 2015-302 SRO Written Exam References
OCONEE 2015-302 SRO Written Exam References
: 1. Question 80 and Question 97: RP/0/N1 000/001, Emergency Classification, rev 4 (entire procedure)
: 1. Question 80 and Question 97: RP/0/N1 000/001, Emergency Classification, rev 4 (entire procedure)
: 2. Question 88: AD-LS-ALL-0006, Notification/Reportability Evaluation, rev 0 (entire procedure)
: 2. Question 88: AD-LS-ALL-0006, Notification/Reportability Evaluation, rev 0 (entire procedure)
: 3. Question 92: Technical Specifications LCO 3.1 .4, CONTROL ROD Group alignment Limits, p.3.1.4-1 to 3.1.4-4}}
: 3. Question 92: Technical Specifications LCO 3.1.4, CONTROL ROD Group alignment Limits, p.3.1.4-1 to 3.1.4-4}}

Latest revision as of 05:38, 10 January 2025

302 as Given SRO Written Exam with References and Answer Key
ML16013A057
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/13/2016
From:
NRC/RGN-II
To:
Duke Energy Progress
References
50-269/15-302, 50-270/15-302, 50-287/15-302
Download: ML16013A057 (28)


Text

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

76 (1 point)

Given the following Unit 3 conditions:

Initial conditions:

Reactor trip due to loss of Main Feedwater Current conditions:

ALL sources of feedwater are lost SM declares an ALERT due to initiation of HPI Forced Cooling In accordance with RPIO/N10001002 (Control Room Emergency Coordinator Procedure), the SM is permitted to appoint a qualified individual to Which ONE of the following completes the statement above?

A.

perform Enclosure 4.3 (Emergency Coordinator Parallel Actions)

B.

perform Enclosure 4.5 (Emergency Classification Termination Criteria)

C.

approve a follow-up notification form if conditions have not changed on Unit 3 D.

approve an off-site notification form for a NOUE on another unit.

Page 76 of 100

Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:

77 (1 point)

Given the following Unit 3 conditions:

Initial conditions:

Reactor in MODE 5 ALL LTOP requirements established in accordance with Tech Spec 3.4.12 (Low Temperature Overpressure Protection (LTOP) System)

Current conditions:

3RC-66 (PORV) fails open 1)

In accordance with OMP 1-18 (Implementation Standard During Abnormal and Emergency Events), closing 3RC-4 _(1) require CRS concurrence, if the CRS is available.

2)

In accordance with Tech Spec 3.4.12, a dedicated LTOP operator _(2)_ allowed as a substitute for an inoperable PORV to prevent exceeding RCS brittle fracture pressure limits.

Which ONE of the following completes the statements above?

A.

1. does
2. is B.
1. does
2. is NOT C.
1. does NOT
2. is D.
1. does NOT
2. is NOT Page 77 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

78 (1 point)

Given the following Unit 1 conditions:

Time = 1000:

1A S/G developed a SGTR EOP SGTR Tab in progress IA SIG level = 240 inches XSUR slowly decreasing SCM = 10°F stable Time = 1040:

MSLB on lB SG outside containment and can NOT be steamed EOP EHT Tab complete 1A SIG has reached the level where water can enter the main steam lines Rule 4 has been initiated and the PORV has been opened Core SCM = 0°F

1) At Time = 1000, the SGTR tab _(1)_ requite that the lASteam Generator be isolated.
2) At Time = 1040, the SGTR tab will direct initiation of the (2)_tab.

Which ONE of the following completes the statements above?

A.

1. does
2. HPICD B.
1. does
2. LOCACD C.
1. does NOT
2. HPICD D.
1. does NOT
2. LOCACD Page 78 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

79 (1 point)

Given the following Unit I conditions:

Reactor power = 50% stable iki and IKU panelboards are de-energized Which ONE of the following contains the procedure steps that will be used to maintain Steam Generator pressure and RCS temperature?

A.

AP/23 (Loss of lOS Power)

B.

AP/25 (Standby Shutdown Facility)

C.

EOP Enclosure 5.24 (Operation of the ADVs)

D.

EOP Enclosure 5.42 (Alignment of EFM Pump to Feed SG5)

Page 79 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

80 (1 point)

Given the following Unit 1 conditions:

Time = 1200:

Reactor trip from 100%

AP/22 (Loss of Instrument Air) in progress Instrument Air (IA) and Auxiliary Instrument Air (AlA) pressure lost to the 1A Turbine Bypass Valves IA SG pressure 935 psig stable Maintaining 1A SG pressure with Atmospheric Dump Valves (ADVs) in accordance with EOP Subsequent Actions Time = 1210:

IA SG Tube Leak = 15 gpm stable Time = 1230:

1A SG Tube Rupture = 180 gpm stable EOP SGTR in progress

1) At time = 1210, the HIGHEST emergency classification (if any) is _(1)_.
2) At time = 1230, the HIGHEST emergency classification is _(2)_.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.

1. NONE
2. ALERT B.
1. NONE
2. SITE AREA EMERGENCY C.
1. UNUSUAL EVENT
2. ALERT D.
1. UNUSUAL EVENT
2. SITE AREA EMERGENCY Page 80 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

$1 (1 point)

Given the following Unit 1 conditions:

Time = 1200 Reactor power 100% stable AFIS bypassed for maintenance SA-16/C-1 (230 KV Swyd Isolate ES Permit) actuated 230 KV Yellow Bus voltage = 224.2 KV increasing Time = 1201 AP/34 (Degraded Grid) in progress Main Turbine trips due to low grid frequency 230 KV Yellow Bus voltage = 226.8 Ky increasing RCS pressure = 1245 psig rapidly decreasing RB pressure = 11.4 psig rapidly increasing Tave = 545°F slowly decreasing Engineered Safeguards systems...

1) will be energized from _(1)_.

2) j2)_ sufficient to maintain Reactor Building pressure within design limits.

Which ONE of the following completes the statements above?

A.

1. CT-i
2. are B.
1. CT-I
2. are NOT C.
1. CT-4
2. are D.

I. CT-4

2. are NOT Page 81 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

82 (1 point)

Given the following Unit 3 conditions:

Initial conditions:

Reactor power = 100%

Control Rod 3 in Group 7 indicates 0% withdrawn AP/Ol (Unit Runback) initiated Current conditions:

Reactor power = 70% decreasing

1) The AMBER lights on the P1 panel will illuminate when a control rod reaches a MINIMUM of(1) inches from its group average.

2)

In accordance with TS 3.1.4 (Control Rod Group Alignment Limits), the basis for the limit on Reactor power for the given conditions is to maintain 2)_ within design limits.

Which ONE of the following completes the statements above?

A.

1>7

2. Linear Heat Rate B.

1.>7

2. Shutdown Margin C.

1>9

2. Linear Heat Rate D.

1>9

2. Shutdown Margin Page 82 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

83 (1 point)

Given the following Unit 1 conditions:

Time = 1200 Reactor power = 75% stable Group 7 rod position = 72% withdrawn stable Makeup to LDST initiated Time = 1230 Reactor power = 75% stable Group 7 rod position = 55% slowly inserting CRS determines Tech Spec 3.2.1 (Regulating Rod Position Limits) requirements are NOT met

1) Makeup to the LDST has resulted in an RCS _(1)_ event.
2) At Time 1230, Tech Spec 3.1.1 (Shutdown Margin) requires that the RCS makeup source be either the _(2)_ or the Concentrated Boric Acid Storage Tank.

Which ONE of the following completes the statements above?

A.

1. boration
2. BWST B.
1. boration
2. A BHUT C.
1. dilution
2. BWST D.
1. dilution 2.

A BHUT Page 83 of 100

Oconee Nuclear Station 1LT48 ON$$RONRCExamination Question:

84 (1 point)

Given the following Unit I conditions:

Initial conditions:

Reactor power = 100%

ACB-3 closed Current conditions:

2SA-1 7/A-i (GEN #1 EMERG. LOCKOUT) actuated 1TC, ITD, and ITE 4l6oVswitchgear are Locked Out Blackout tab in progress EOP Enclosure 5.38 (Restoration of Power) has been initiated

1) Enclosure 5.38 will ensure that Main Feeder Buses are energized from (1).

2)

In accordance with the Blackout tab, once the Main Feeder Buses are energized, the CRS will be directed to _(2)_.

Which ONE of the following completes the statements above?

A.

1. CT-S
2. continue in the Blackout Tab B.
1. CT-5
2. transfer back to Subsequent Actions Tab C.
1. KHU-2
2. continue in the Blackout Tab D.
1. KHU-2
2. transfer back to Subsequent Actions Tab Page 84 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

85 (1 point)

Given the following Unit I conditions:

Time = 1200:

Notified by Unit 2 that 2SA-18/A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL) in alarm Reactor tripped from 100%

EOP Turbine Building Flood (TBF) tab initiated Time = 1300:

Core SCM = 0°F due to heatup In accordance with the EOP TBF tab...

1) At Time = 1200, initiate feeding SGs with Main and Emergency Feedwater while maintaining a MINIMUM Tave of _(1)_°F.
2) At Time 1300, the CRS is required to implement (2).

Which ONE of the following completes the statements above?

A.

1. 550
2. the LOSCM Tab B.
1. 532
2. the LOS CM Tab C.
1. 550
2. Rule 4 (Initiation of HPI Forced Cooling)

D.

1. 532
2. Rule 4 (Initiation of HPI Forced Cooling)

Page 85 of 100

Oconee Nuclear Station Question:

86 1LT48 ONS SRO NRC Examination (1 point)

Given the following Unit 1 conditions:

Time = 1215 Unit shutdown in progress 1A1 RCP in operation Tcold = 220°F slowly decreasing RCS pressure 325 psig slowly decreasing LPI Cooler outlet temperature = 110°F stable Time = 1230 Tcold = 200°F slowly decreasing RCS pressure = 275 psig stable LPI Cooler outlet temperature = 110°F stable 1A LPI Pump is started Time = 1240 Tcold = 197°F stable 1A1 RCP secured Time = 1245 LPI Cooler outlet temperature = 180°F stable

1) The RCS cooldown rate _(1) violate the maximum cooldown rate allowed per Tech Specs.
2) When the 1A LPI pump is started at Time = 1230, the temperature transient that results from the difference in LPI Cooler Outlet temperature and Tcold (2) outside the bounds of the Reactor Vessel stress analysis.

Which ONE of the following completes the statements above?

A.

1. does
2. is B.
1. does
2. is NOT C.
1. does NOT
2. is D.
1. does NOT
2. is NOT Page 86 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

87 (1 point)

Given the following Unit 1 conditions:

Initial conditions:

Reactor power = 100%

l&E performing Reactor Protective System (RPS) calibration procedure Current conditions:

The RCS High Pressure trip setpoint is determined to be 2351 psig in 1A and 1 B RPS Channels

1) The required actual RPS trip setpoint for RCS High Pressure is(1) psig.

2)

In accordance with the bases of Tech Spec 3.3.1 (Reactor Protective System (RPS) Instrumentation), the 1A and I B RCS High Pressure Trip Functions are Which ONE of the following completes the statements above?

A.

1. 2345
2. operable B.
1. 2345
2. inoperable C.
1. 2355
2. operable D.
1. 2355
2. inoperable Page 87 of 100

Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:

88 (1 point)

Given the following Unit 1 conditions:

Reactor power = 100%

RCS pressure = 2155 psig stable RB pressure 0.1 psig stable ES Channel 2 actuation

1) AP/42 Enclosure 5.3 (SSF Restoration)

(1)_ required to be performed.

2)

In accordance with AD-LS-ALL-0006 (Notification/Reportability Evaluation), a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ENS notification (2) requited.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A.

1. is
2. is B.
1. is NOT
2. is C.
1. is
2. is NOT D.
1. is NOT
2. is NOT Page 88 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

89 (1 point)

Given the following Unit 1 conditions:

Time = 0800:

Reactor power = 20%

Reactor is being shutdown to repair 1A2 RCP (tripped due to high vibration)

Time = 0801:

1TA loses power Reactor trip occurs 1RL-16 in HIGH alarm SGTR tab entered Time = 0830:

Power is restored to 1TA Time = 0845:

IA1 RCP restarted per End. 5.6 (RCP Restart)

SCM=0°F Time = 0847:

SCM=0°F

1) Per the SGTR tab, initial RCS cooldown is performed by reducing SG pressure in

_(1) SG(s) to 835 to 845 psig.

2) The EARLIEST time that a transfer to the LOSCM tab is required is j2)_.

Which ONE of the following completes the statements above?

A.

1. one
2. 0845 B.
1. one
2. 0847 C.
1. both
2. 0845 D.
1. both
2. 0847 Page 89 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

90 (1 point)

1) Actuating Unit I & 2 Keowee Emergency Start Channel B switch in the Unit 2 Control Room will start (I)

KHU(s).

2) The switch in part I above _(2)_ be used to satisfy the Unit 2 Manual Keowee Emergency Start requirements of Tech Spec 3.3.22 (EPSL Manual Keowee Emergency Start Function).

Which ONE of the following completes the statements above?

A.

1. ONLY one
2. can B.
1. BOTH
2. can C.
1. ONLY one
2. can NOT D.

I. BOTH

2. can NOT Page 90 of 100

Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:

91 (1 point)

Given the following Unit 3 plant conditions:

Reactor in MODE 1 In accordance with Tech Specs, to prevent exceeding the RCS Pressure Safety Limit...

1) Credit (1)_ taken for operation of the PORV.
2) Credit is taken for operation of_(2) of the Pressurizer Safety Valves.

Which ONE of the following completes the statements above?

A.

1. is
2. ONLY one B.
1. is
2. both C.
1. is NOT
2. ONLY one D.
1. is NOT
2. both Page 91 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

92 (1 point)

Given the following Unit I conditions:

Reactor power = 100%

Electrical malfunction results in loss of ALL Control Rod position indications 1)

In accordance with Tech Spec 3.1.7 (Position Indicator Channels), the MAXIMUM time allowed to declare all Control Rods inoperable is_(1)_.

2) Assuming indications are NOT restored, Tech Spec 3.1.4 (Control Rod Group alignment limits), _(2) require reducing Reactor Power to a MAXIMUM of 60%

RTP within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of declaring all Control Rods inoperable.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A.

1. immediately
2. does B.
1. immediately
2. does NOT C.
1. one hour
2. does D.
1. one hour
2. does NOT Page 92 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

93 (1 point)

Given the following Unit 1 conditions:

Time = 1000:

Mode6 LPI aligned in Normal Decay Heat Removal mode IA and lB SGs in wet layup Fuel Transfer Canal flooded lBLPIpumpOOS Time = 1030:

ALL available LPI pumps tripped and can NOT be restarted

1) At Time = 1000, OP/I IA/I 104/004 (Low Pressure Injection System) directs operation of the _(1)

LPI pump.

2) At Time = 1030, AP126 (Loss of Decay Heat Removal) directs initiation of Enclosure

_(2)_ for heat removal.

Which ONE of the following completes the statements above?

A.

1.1A

2. 5.18 (5SF Operation for Loss of DHR Events)

B.

1.1A

2. 5.7 (DHR Using SF Cooling)

C.

1.1C

2. 5.18 (SSF Operation for Loss of DHR Events)

D.

1.1C

2. 5.7 (DHR Using SF Cooling)

Page 93 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

94 (1 point)

Given the following Unit 1 conditions:

IA SG isolated due to a steam line break I B SG has a tube rupture

1) Without additional station management approval, the section of the EOP that would be used to cooldown to LPI would be the section using the (1)_ SG.
2) Once RCS temperature and pressure allow alignment of LPI, the (2)_ mode will be the INITIAL LPI alignment utilized.

Which ONE of the following completes the statements above?

A.

1.1A

2. normal DHR B.

1.IA

2. High Pressure C.

1.15

2. normal DHR D.

1.15

2. High Pressure Page 94 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

95 (1 point)

In accordance with the bases of SLC 16.13.1 (Minimum Station Staffing Requirements)...

1) the NRC Communicator (1)_ required to be a licensed or previously licensed SRO.
2) the NRC Communicator (2) also be the Off-site Communicator.

Which ONE of the following completes the statements above?

A.

1. is
2. can B.
1. is
2. can NOT C.
1. is NOT
2. can D.
1. is NOT
2. can NOT Page 95 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

96 (1 point)

In accordance with OP/C/Ni 108/001 (Curves and General Information) End. 4.17 (Evaluation for Removal of Statalarms/Control Room Indications), which ONE of the following is the MINIMUM level of approval required to remove a Statalarm from service located on iVBi?

A.

AC Supervisor B.

Control Room Supervisor C.

Work Control Center SRO D.

Shift Manager Page 96 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

97 (1 point)

Given the following Unit 3 conditions:

Fuel offload in progress A fuel cask has been dropped in the spent fuel pool causing fuel damage 3RL-6 (Spent Fuel Pool Area Monitor) reaches the High Alarm setpoint

1) 3RIA6 (1) sound a local alarm.
2) The HIGHEST classification for this event is an _(2)_.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.

1. does
2. Unusual Event B.
1. does
2. Alert C.
1. does NOT
2. Unusual Event D.
1. does NOT
2. Alert Page 97 of 100

Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:

98 (1 point)

Given the following plant conditions:

Time = 0400 Reactor power = 100%

JA GWD tank release in progress at 1/3 Station Limit Time = 0415 3B GWD tank release initiated at 1/3 Station Limit Time = 0430 Loss of power to RM-80 skid of 1 RIA-37 (Waste Gas Effluent Monitor) 1 SA-8/B-9 (Process Monitor Radiation High) actuated ISA-8/B-10 (Process Monitor Fault) actuated

1) At Time =0415, the HIGHEST level of approval required by OP/3/A/1104/018 (GWD System) for the 3B GWD tank release is the (1).
2) At Time = 0430, GWD-4 _(2)_ AUTOMATICALLY closed.

Which ONE of the following completes the statements above?

A.

1. Unit 3CRS
2. has NOT B.
1. Unit3CRS
2. has C.

1.SM

2. has NOT D.

1.SM

2. has Page 98 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

99 (1 point)

Given the following Unit 1 conditions:

Time = 0000 Reactor power = 75%

All three seals on the I BI RCP fail Time = 0015 SCM = 0°F stable Time = 0019 IAI RCP remains operating LOSCM tab in progress Rapid depressurization of BOTH steam generators is in progress

1) The reason the 1AI RCP is NOT secured at Time = 0019 is to (1).
2) The MINIMUM condition(s) that will allow the section of the LOSCM tab to be performed that reinstates the requirement to adhere to Tech Spec cooldown rate limits is once (2) is/are greater than 0 degrees F.

Which ONE of the following completes the statements above?

A.

1. prevent core uncovery that could result from phase separation if the RCP were secured
2. ALL subcooling margins B.
1. provide forced circulation which enhances heat removal even with a two phase mixture
2. ALL subcooling margins C.
1. prevent core uncovery that could result from phase separation if the RCP were secured
2. ANY subcooling margin D.
1. provide forced circulation which enhances heat removal even with a two phase mixture
2. ANY subcooling margin Page 99 of 100

Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question: 100 (1 point) 1)

In accordance with RPIOIA/10001002 (Control Room Emergency Coordinator Procedure) implementation of the OSAG (1) require the use of 10CFR5O.54(x) and (y) provisions.

2)

If implemented, IOCFR5O.54(x) will require the MINIMUM level of approval to be

_(2)_.

Which ONE of the following completes the statements above?

A.

1. does
2. a licensed SRO B.
1. does
2. the Emergency Coordinator C.
1. does NOT
2. a licensed SRO D.
1. does NOT
2. the Emergency Coordinator Page 100 of 100

3-3-

a 3-:

3-*

-- *1-

- r 7

4

-ç 3-H

-t

Examination KEYfor: 1LT48 ON$$RONRCExamin Question Answer Number 76 A

77 B

78 A

79 C

80 D

81 C

82 A

83 C

84 C

85 D

86 B

87 A

88 D

89 D

90 D

91 D

92 A

93 B

94 D

95 A

96 B

97 B

98 D

99 A

100 A

Printed 12/15/2015 11:34:41 AM Paged of4

OCONEE 2015-302 SRO Written Exam References

1. Question 80 and Question 97: RP/0/N1 000/001, Emergency Classification, rev 4 (entire procedure)
2. Question 88: AD-LS-ALL-0006, Notification/Reportability Evaluation, rev 0 (entire procedure)
3. Question 92: Technical Specifications LCO 3.1.4, CONTROL ROD Group alignment Limits, p.3.1.4-1 to 3.1.4-4

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

76 (1 point)

Given the following Unit 3 conditions:

Initial conditions:

Reactor trip due to loss of Main Feedwater Current conditions:

ALL sources of feedwater are lost SM declares an ALERT due to initiation of HPI Forced Cooling In accordance with RPIO/N10001002 (Control Room Emergency Coordinator Procedure), the SM is permitted to appoint a qualified individual to Which ONE of the following completes the statement above?

A.

perform Enclosure 4.3 (Emergency Coordinator Parallel Actions)

B.

perform Enclosure 4.5 (Emergency Classification Termination Criteria)

C.

approve a follow-up notification form if conditions have not changed on Unit 3 D.

approve an off-site notification form for a NOUE on another unit.

Page 76 of 100

Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:

77 (1 point)

Given the following Unit 3 conditions:

Initial conditions:

Reactor in MODE 5 ALL LTOP requirements established in accordance with Tech Spec 3.4.12 (Low Temperature Overpressure Protection (LTOP) System)

Current conditions:

3RC-66 (PORV) fails open 1)

In accordance with OMP 1-18 (Implementation Standard During Abnormal and Emergency Events), closing 3RC-4 _(1) require CRS concurrence, if the CRS is available.

2)

In accordance with Tech Spec 3.4.12, a dedicated LTOP operator _(2)_ allowed as a substitute for an inoperable PORV to prevent exceeding RCS brittle fracture pressure limits.

Which ONE of the following completes the statements above?

A.

1. does
2. is B.
1. does
2. is NOT C.
1. does NOT
2. is D.
1. does NOT
2. is NOT Page 77 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

78 (1 point)

Given the following Unit 1 conditions:

Time = 1000:

1A S/G developed a SGTR EOP SGTR Tab in progress IA SIG level = 240 inches XSUR slowly decreasing SCM = 10°F stable Time = 1040:

MSLB on lB SG outside containment and can NOT be steamed EOP EHT Tab complete 1A SIG has reached the level where water can enter the main steam lines Rule 4 has been initiated and the PORV has been opened Core SCM = 0°F

1) At Time = 1000, the SGTR tab _(1)_ requite that the lASteam Generator be isolated.
2) At Time = 1040, the SGTR tab will direct initiation of the (2)_tab.

Which ONE of the following completes the statements above?

A.

1. does
2. HPICD B.
1. does
2. LOCACD C.
1. does NOT
2. HPICD D.
1. does NOT
2. LOCACD Page 78 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

79 (1 point)

Given the following Unit I conditions:

Reactor power = 50% stable iki and IKU panelboards are de-energized Which ONE of the following contains the procedure steps that will be used to maintain Steam Generator pressure and RCS temperature?

A.

AP/23 (Loss of lOS Power)

B.

AP/25 (Standby Shutdown Facility)

C.

EOP Enclosure 5.24 (Operation of the ADVs)

D.

EOP Enclosure 5.42 (Alignment of EFM Pump to Feed SG5)

Page 79 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

80 (1 point)

Given the following Unit 1 conditions:

Time = 1200:

Reactor trip from 100%

AP/22 (Loss of Instrument Air) in progress Instrument Air (IA) and Auxiliary Instrument Air (AlA) pressure lost to the 1A Turbine Bypass Valves IA SG pressure 935 psig stable Maintaining 1A SG pressure with Atmospheric Dump Valves (ADVs) in accordance with EOP Subsequent Actions Time = 1210:

IA SG Tube Leak = 15 gpm stable Time = 1230:

1A SG Tube Rupture = 180 gpm stable EOP SGTR in progress

1) At time = 1210, the HIGHEST emergency classification (if any) is _(1)_.
2) At time = 1230, the HIGHEST emergency classification is _(2)_.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.

1. NONE
2. ALERT B.
1. NONE
2. SITE AREA EMERGENCY C.
1. UNUSUAL EVENT
2. ALERT D.
1. UNUSUAL EVENT
2. SITE AREA EMERGENCY Page 80 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

$1 (1 point)

Given the following Unit 1 conditions:

Time = 1200 Reactor power 100% stable AFIS bypassed for maintenance SA-16/C-1 (230 KV Swyd Isolate ES Permit) actuated 230 KV Yellow Bus voltage = 224.2 KV increasing Time = 1201 AP/34 (Degraded Grid) in progress Main Turbine trips due to low grid frequency 230 KV Yellow Bus voltage = 226.8 Ky increasing RCS pressure = 1245 psig rapidly decreasing RB pressure = 11.4 psig rapidly increasing Tave = 545°F slowly decreasing Engineered Safeguards systems...

1) will be energized from _(1)_.

2) j2)_ sufficient to maintain Reactor Building pressure within design limits.

Which ONE of the following completes the statements above?

A.

1. CT-i
2. are B.
1. CT-I
2. are NOT C.
1. CT-4
2. are D.

I. CT-4

2. are NOT Page 81 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

82 (1 point)

Given the following Unit 3 conditions:

Initial conditions:

Reactor power = 100%

Control Rod 3 in Group 7 indicates 0% withdrawn AP/Ol (Unit Runback) initiated Current conditions:

Reactor power = 70% decreasing

1) The AMBER lights on the P1 panel will illuminate when a control rod reaches a MINIMUM of(1) inches from its group average.

2)

In accordance with TS 3.1.4 (Control Rod Group Alignment Limits), the basis for the limit on Reactor power for the given conditions is to maintain 2)_ within design limits.

Which ONE of the following completes the statements above?

A.

1>7

2. Linear Heat Rate B.

1.>7

2. Shutdown Margin C.

1>9

2. Linear Heat Rate D.

1>9

2. Shutdown Margin Page 82 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

83 (1 point)

Given the following Unit 1 conditions:

Time = 1200 Reactor power = 75% stable Group 7 rod position = 72% withdrawn stable Makeup to LDST initiated Time = 1230 Reactor power = 75% stable Group 7 rod position = 55% slowly inserting CRS determines Tech Spec 3.2.1 (Regulating Rod Position Limits) requirements are NOT met

1) Makeup to the LDST has resulted in an RCS _(1)_ event.
2) At Time 1230, Tech Spec 3.1.1 (Shutdown Margin) requires that the RCS makeup source be either the _(2)_ or the Concentrated Boric Acid Storage Tank.

Which ONE of the following completes the statements above?

A.

1. boration
2. BWST B.
1. boration
2. A BHUT C.
1. dilution
2. BWST D.
1. dilution 2.

A BHUT Page 83 of 100

Oconee Nuclear Station 1LT48 ON$$RONRCExamination Question:

84 (1 point)

Given the following Unit I conditions:

Initial conditions:

Reactor power = 100%

ACB-3 closed Current conditions:

2SA-1 7/A-i (GEN #1 EMERG. LOCKOUT) actuated 1TC, ITD, and ITE 4l6oVswitchgear are Locked Out Blackout tab in progress EOP Enclosure 5.38 (Restoration of Power) has been initiated

1) Enclosure 5.38 will ensure that Main Feeder Buses are energized from (1).

2)

In accordance with the Blackout tab, once the Main Feeder Buses are energized, the CRS will be directed to _(2)_.

Which ONE of the following completes the statements above?

A.

1. CT-S
2. continue in the Blackout Tab B.
1. CT-5
2. transfer back to Subsequent Actions Tab C.
1. KHU-2
2. continue in the Blackout Tab D.
1. KHU-2
2. transfer back to Subsequent Actions Tab Page 84 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

85 (1 point)

Given the following Unit I conditions:

Time = 1200:

Notified by Unit 2 that 2SA-18/A-11 (TURBINE BSMT WATER EMERGENCY HIGH LEVEL) in alarm Reactor tripped from 100%

EOP Turbine Building Flood (TBF) tab initiated Time = 1300:

Core SCM = 0°F due to heatup In accordance with the EOP TBF tab...

1) At Time = 1200, initiate feeding SGs with Main and Emergency Feedwater while maintaining a MINIMUM Tave of _(1)_°F.
2) At Time 1300, the CRS is required to implement (2).

Which ONE of the following completes the statements above?

A.

1. 550
2. the LOSCM Tab B.
1. 532
2. the LOS CM Tab C.
1. 550
2. Rule 4 (Initiation of HPI Forced Cooling)

D.

1. 532
2. Rule 4 (Initiation of HPI Forced Cooling)

Page 85 of 100

Oconee Nuclear Station Question:

86 1LT48 ONS SRO NRC Examination (1 point)

Given the following Unit 1 conditions:

Time = 1215 Unit shutdown in progress 1A1 RCP in operation Tcold = 220°F slowly decreasing RCS pressure 325 psig slowly decreasing LPI Cooler outlet temperature = 110°F stable Time = 1230 Tcold = 200°F slowly decreasing RCS pressure = 275 psig stable LPI Cooler outlet temperature = 110°F stable 1A LPI Pump is started Time = 1240 Tcold = 197°F stable 1A1 RCP secured Time = 1245 LPI Cooler outlet temperature = 180°F stable

1) The RCS cooldown rate _(1) violate the maximum cooldown rate allowed per Tech Specs.
2) When the 1A LPI pump is started at Time = 1230, the temperature transient that results from the difference in LPI Cooler Outlet temperature and Tcold (2) outside the bounds of the Reactor Vessel stress analysis.

Which ONE of the following completes the statements above?

A.

1. does
2. is B.
1. does
2. is NOT C.
1. does NOT
2. is D.
1. does NOT
2. is NOT Page 86 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

87 (1 point)

Given the following Unit 1 conditions:

Initial conditions:

Reactor power = 100%

l&E performing Reactor Protective System (RPS) calibration procedure Current conditions:

The RCS High Pressure trip setpoint is determined to be 2351 psig in 1A and 1 B RPS Channels

1) The required actual RPS trip setpoint for RCS High Pressure is(1) psig.

2)

In accordance with the bases of Tech Spec 3.3.1 (Reactor Protective System (RPS) Instrumentation), the 1A and I B RCS High Pressure Trip Functions are Which ONE of the following completes the statements above?

A.

1. 2345
2. operable B.
1. 2345
2. inoperable C.
1. 2355
2. operable D.
1. 2355
2. inoperable Page 87 of 100

Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question:

88 (1 point)

Given the following Unit 1 conditions:

Reactor power = 100%

RCS pressure = 2155 psig stable RB pressure 0.1 psig stable ES Channel 2 actuation

1) AP/42 Enclosure 5.3 (SSF Restoration)

(1)_ required to be performed.

2)

In accordance with AD-LS-ALL-0006 (Notification/Reportability Evaluation), a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ENS notification (2) requited.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A.

1. is
2. is B.
1. is NOT
2. is C.
1. is
2. is NOT D.
1. is NOT
2. is NOT Page 88 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

89 (1 point)

Given the following Unit 1 conditions:

Time = 0800:

Reactor power = 20%

Reactor is being shutdown to repair 1A2 RCP (tripped due to high vibration)

Time = 0801:

1TA loses power Reactor trip occurs 1RL-16 in HIGH alarm SGTR tab entered Time = 0830:

Power is restored to 1TA Time = 0845:

IA1 RCP restarted per End. 5.6 (RCP Restart)

SCM=0°F Time = 0847:

SCM=0°F

1) Per the SGTR tab, initial RCS cooldown is performed by reducing SG pressure in

_(1) SG(s) to 835 to 845 psig.

2) The EARLIEST time that a transfer to the LOSCM tab is required is j2)_.

Which ONE of the following completes the statements above?

A.

1. one
2. 0845 B.
1. one
2. 0847 C.
1. both
2. 0845 D.
1. both
2. 0847 Page 89 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

90 (1 point)

1) Actuating Unit I & 2 Keowee Emergency Start Channel B switch in the Unit 2 Control Room will start (I)

KHU(s).

2) The switch in part I above _(2)_ be used to satisfy the Unit 2 Manual Keowee Emergency Start requirements of Tech Spec 3.3.22 (EPSL Manual Keowee Emergency Start Function).

Which ONE of the following completes the statements above?

A.

1. ONLY one
2. can B.
1. BOTH
2. can C.
1. ONLY one
2. can NOT D.

I. BOTH

2. can NOT Page 90 of 100

Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:

91 (1 point)

Given the following Unit 3 plant conditions:

Reactor in MODE 1 In accordance with Tech Specs, to prevent exceeding the RCS Pressure Safety Limit...

1) Credit (1)_ taken for operation of the PORV.
2) Credit is taken for operation of_(2) of the Pressurizer Safety Valves.

Which ONE of the following completes the statements above?

A.

1. is
2. ONLY one B.
1. is
2. both C.
1. is NOT
2. ONLY one D.
1. is NOT
2. both Page 91 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

92 (1 point)

Given the following Unit I conditions:

Reactor power = 100%

Electrical malfunction results in loss of ALL Control Rod position indications 1)

In accordance with Tech Spec 3.1.7 (Position Indicator Channels), the MAXIMUM time allowed to declare all Control Rods inoperable is_(1)_.

2) Assuming indications are NOT restored, Tech Spec 3.1.4 (Control Rod Group alignment limits), _(2) require reducing Reactor Power to a MAXIMUM of 60%

RTP within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of declaring all Control Rods inoperable.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A.

1. immediately
2. does B.
1. immediately
2. does NOT C.
1. one hour
2. does D.
1. one hour
2. does NOT Page 92 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

93 (1 point)

Given the following Unit 1 conditions:

Time = 1000:

Mode6 LPI aligned in Normal Decay Heat Removal mode IA and lB SGs in wet layup Fuel Transfer Canal flooded lBLPIpumpOOS Time = 1030:

ALL available LPI pumps tripped and can NOT be restarted

1) At Time = 1000, OP/I IA/I 104/004 (Low Pressure Injection System) directs operation of the _(1)

LPI pump.

2) At Time = 1030, AP126 (Loss of Decay Heat Removal) directs initiation of Enclosure

_(2)_ for heat removal.

Which ONE of the following completes the statements above?

A.

1.1A

2. 5.18 (5SF Operation for Loss of DHR Events)

B.

1.1A

2. 5.7 (DHR Using SF Cooling)

C.

1.1C

2. 5.18 (SSF Operation for Loss of DHR Events)

D.

1.1C

2. 5.7 (DHR Using SF Cooling)

Page 93 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

94 (1 point)

Given the following Unit 1 conditions:

IA SG isolated due to a steam line break I B SG has a tube rupture

1) Without additional station management approval, the section of the EOP that would be used to cooldown to LPI would be the section using the (1)_ SG.
2) Once RCS temperature and pressure allow alignment of LPI, the (2)_ mode will be the INITIAL LPI alignment utilized.

Which ONE of the following completes the statements above?

A.

1.1A

2. normal DHR B.

1.IA

2. High Pressure C.

1.15

2. normal DHR D.

1.15

2. High Pressure Page 94 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

95 (1 point)

In accordance with the bases of SLC 16.13.1 (Minimum Station Staffing Requirements)...

1) the NRC Communicator (1)_ required to be a licensed or previously licensed SRO.
2) the NRC Communicator (2) also be the Off-site Communicator.

Which ONE of the following completes the statements above?

A.

1. is
2. can B.
1. is
2. can NOT C.
1. is NOT
2. can D.
1. is NOT
2. can NOT Page 95 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

96 (1 point)

In accordance with OP/C/Ni 108/001 (Curves and General Information) End. 4.17 (Evaluation for Removal of Statalarms/Control Room Indications), which ONE of the following is the MINIMUM level of approval required to remove a Statalarm from service located on iVBi?

A.

AC Supervisor B.

Control Room Supervisor C.

Work Control Center SRO D.

Shift Manager Page 96 of 100

Oconee Nuclear Station 1LT48 ONSSRONRCExamination Question:

97 (1 point)

Given the following Unit 3 conditions:

Fuel offload in progress A fuel cask has been dropped in the spent fuel pool causing fuel damage 3RL-6 (Spent Fuel Pool Area Monitor) reaches the High Alarm setpoint

1) 3RIA6 (1) sound a local alarm.
2) The HIGHEST classification for this event is an _(2)_.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED DO NOT USE EMERGENCY COORDINATOR JUDGEMENT A.

1. does
2. Unusual Event B.
1. does
2. Alert C.
1. does NOT
2. Unusual Event D.
1. does NOT
2. Alert Page 97 of 100

Oconee Nuclear Station 1LT48 ONS$RONRCExamination Question:

98 (1 point)

Given the following plant conditions:

Time = 0400 Reactor power = 100%

JA GWD tank release in progress at 1/3 Station Limit Time = 0415 3B GWD tank release initiated at 1/3 Station Limit Time = 0430 Loss of power to RM-80 skid of 1 RIA-37 (Waste Gas Effluent Monitor) 1 SA-8/B-9 (Process Monitor Radiation High) actuated ISA-8/B-10 (Process Monitor Fault) actuated

1) At Time =0415, the HIGHEST level of approval required by OP/3/A/1104/018 (GWD System) for the 3B GWD tank release is the (1).
2) At Time = 0430, GWD-4 _(2)_ AUTOMATICALLY closed.

Which ONE of the following completes the statements above?

A.

1. Unit 3CRS
2. has NOT B.
1. Unit3CRS
2. has C.

1.SM

2. has NOT D.

1.SM

2. has Page 98 of 100

Oconee Nuclear Station 1LT48 ONS SRO NRC Examination Question:

99 (1 point)

Given the following Unit 1 conditions:

Time = 0000 Reactor power = 75%

All three seals on the I BI RCP fail Time = 0015 SCM = 0°F stable Time = 0019 IAI RCP remains operating LOSCM tab in progress Rapid depressurization of BOTH steam generators is in progress

1) The reason the 1AI RCP is NOT secured at Time = 0019 is to (1).
2) The MINIMUM condition(s) that will allow the section of the LOSCM tab to be performed that reinstates the requirement to adhere to Tech Spec cooldown rate limits is once (2) is/are greater than 0 degrees F.

Which ONE of the following completes the statements above?

A.

1. prevent core uncovery that could result from phase separation if the RCP were secured
2. ALL subcooling margins B.
1. provide forced circulation which enhances heat removal even with a two phase mixture
2. ALL subcooling margins C.
1. prevent core uncovery that could result from phase separation if the RCP were secured
2. ANY subcooling margin D.
1. provide forced circulation which enhances heat removal even with a two phase mixture
2. ANY subcooling margin Page 99 of 100

Oconee Nuclear Station 1LT48 ON$SRONRCExamination Question: 100 (1 point) 1)

In accordance with RPIOIA/10001002 (Control Room Emergency Coordinator Procedure) implementation of the OSAG (1) require the use of 10CFR5O.54(x) and (y) provisions.

2)

If implemented, IOCFR5O.54(x) will require the MINIMUM level of approval to be

_(2)_.

Which ONE of the following completes the statements above?

A.

1. does
2. a licensed SRO B.
1. does
2. the Emergency Coordinator C.
1. does NOT
2. a licensed SRO D.
1. does NOT
2. the Emergency Coordinator Page 100 of 100

3-3-

a 3-:

3-*

-- *1-

- r 7

4

-ç 3-H

-t

Examination KEYfor: 1LT48 ON$$RONRCExamin Question Answer Number 76 A

77 B

78 A

79 C

80 D

81 C

82 A

83 C

84 C

85 D

86 B

87 A

88 D

89 D

90 D

91 D

92 A

93 B

94 D

95 A

96 B

97 B

98 D

99 A

100 A

Printed 12/15/2015 11:34:41 AM Paged of4

OCONEE 2015-302 SRO Written Exam References

1. Question 80 and Question 97: RP/0/N1 000/001, Emergency Classification, rev 4 (entire procedure)
2. Question 88: AD-LS-ALL-0006, Notification/Reportability Evaluation, rev 0 (entire procedure)
3. Question 92: Technical Specifications LCO 3.1.4, CONTROL ROD Group alignment Limits, p.3.1.4-1 to 3.1.4-4