ML16015A018: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML16015A018
| number = ML16015A018
| issue date = 11/17/2015
| issue date = 11/17/2015
| title = Revision 29 of the Quality Assurance Program Description
| title = 9 of the Quality Assurance Program Description
| author name = Nick B
| author name = Nick B
| author affiliation = Dairyland Power Cooperative
| author affiliation = Dairyland Power Cooperative
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:BARBARA A. NICK President and CEO DAIRYLAND POWER C_     0OP ER AT IV             E November 17, 2015                                                                 10 CFR 50.54(a)(4)
{{#Wiki_filter:BARBARA A. NICK President and CEO DAIRYLAND POWER C_
0 OP ER AT IV E
November 17, 2015 10 CFR 50.54(a) (4)
In reply, please refer to LAC-14359 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
In reply, please refer to LAC-14359 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Dairyland La Crosse Power BoilingCooperative Water Reactor (LACBWR)
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License DPR-45 Revision 29 of the LACBWR Quality Assurance Program Description (OAPD)
Possession-Only License DPR-45 Revision 29 of the LACBWR Quality Assurance Program Description (OAPD)


Line 29: Line 31:
Review Committee with an Independent Management Assessment process and replacing the Operations Review Committee with a Qualified Technical Review system. Justification for this reduction in commitment is defined in the enclosed Sunumary of Changes and QAPD RG 7.10(r2) Compliance Matrix. This QAPD revision is also being submitted for your review and approval prior to its implementation to ensure compliance with the requirements of the NRC Confirmatory Order dated September 15, 1994.
Review Committee with an Independent Management Assessment process and replacing the Operations Review Committee with a Qualified Technical Review system. Justification for this reduction in commitment is defined in the enclosed Sunumary of Changes and QAPD RG 7.10(r2) Compliance Matrix. This QAPD revision is also being submitted for your review and approval prior to its implementation to ensure compliance with the requirements of the NRC Confirmatory Order dated September 15, 1994.
If you have any questions concerning this submittal, please contact Cheryl Olson, LACBWR Plant/ISFSI Manager at (608) 689-4207.
If you have any questions concerning this submittal, please contact Cheryl Olson, LACBWR Plant/ISFSI Manager at (608) 689-4207.
Sincerely, QL 4 Barbara A. Nick, President and CEO                                                           ~S7ie BAN:CLO :tco A Touchstone Energye Cooperative ____
Sincerely, Barbara A. Nick, President and CEO BAN:CLO :tco QL4
3200 East Ave. S.
~S7ie A Touchstone Energye Cooperative 3200 East Ave. S.
* P0 Box 817
* P0 Box 817
* La Crosse, WI 54602-0817
* La Crosse, WI 54602-0817
Line 40: Line 42:


==Enclosures:==
==Enclosures:==
: 1) LACBWR Quality Assurance Program Description, Revision 29
1)
: 2) LACBWR QAPD, Revision 29, Summary of Changes cc w/
: 2) LACBWR Quality Assurance Program Description, Revision 29 LACBWR QAPD, Revision 29, Summary of Changes Marlayna Vaaler Project Manager U.S. Nuclear Regulatory Commission cc w/


==Enclosures:==
==Enclosures:==
Marlayna Vaaler Project Manager U.S. Nuclear Regulatory Commission Cynthia D. Pederson Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN             )
Cynthia D. Pederson Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN  
                                      )
))
COUNTY OF LA CROSSE )
COUNTY OF LA CROSSE )
Personally came before me this           O*   "'L     day of     */l'..'         -t       , 2015, the above named, Barbara A. Nick, to me known to be the person who executed the foregoing instrument and acknowledged the same.
Personally came before me this O*  
Notary'Pu~blic, La Crosse County Wisconsin My commission expires       5-i;?       5-/     ~'
"'L day of  
*/l'..'  
-t  
, 2015, the above named, Barbara A. Nick, to me known to be the person who executed the foregoing instrument and acknowledged the same.
Notary'Pu~blic, La Crosse County Wisconsin My commission expires 5-i;? 5-/  
~'
LAURIE A. ENGEN Notary Public State of Wisconsin A Touchstone Energy Cooperative__
LAURIE A. ENGEN Notary Public State of Wisconsin A Touchstone Energy Cooperative__
3200 East Ave. S.
3200 East Ave. S.
Line 56: Line 63:
* 608-787-1469 fax
* 608-787-1469 fax
* www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.
* www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.
LACBWR Q~uality Assurance Program Description, Revision 29


Enclosure 1 LACBWR Q~uality Assurance Program Description, Revision 29
i! iiii!i!!iil i*:;*,:
 
:'.;:*z:ili:i.i.i*i:*
i!iiii!i!!iil                                               i*:;*,:             !:,*:i.i*i
!:,*:i.i*i  
                                                                                                                                                                                ,.,::*:i:i*i:*;,i*::!*!!,!,i:i:,i:i:i:i:!:i:i*i
,., ::*:i:i*i:*;,i*::!*!!,!,i:i:,i:i:i:i:!:i:i*i
:'.;:*z:ili:i.i.i*i:*                    :,:i*:*
:,:i*:*  
                                                                                                                                                                                                              *:;*i LA: CR,OS                             BOILING
*:;*i LA: CR, OS  
                                                                                          ..,.E             WATER.::
..,.E BOILING WATER.::  
                                                                                                                  ...            ,.....REACTOR.......:..
,..... REACTOR.......:.. i
i              !ii QUALITY ASSURANCE PROGRAM DESCRIPTION REVISION 29 La Crosse Solutions, LLC
!ii QUALITY ASSURANCE PROGRAM DESCRIPTION REVISION 29 La Crosse Solutions, LLC Author:
(6/12.1 Anthony R. Bejms1i~dependent Consultant Dale /
(...
(...
Author:                                                                                                                                                                  (6/12.1 Dale /
QAApproval:
Anthony R. Bejms1i~dependent Consultant QAApproval:
~KJames E. Werner, SOLUTIONS QA Manager  
                                                  ~KJames E.Werner, SOLUTIONS QA Manager                                                                                             'Datel' Manager Approval:                                -
'Datel' Manager Approval:
                                                              ..... wak:    ::::*:.r:y::,LUIO: NS "'              P:roject::::::i:    Manager'.
:** n ~,Jvii Corporate QA Approval::ii:,:i::.ii:ii'ii'i~:!i::*~i~'*iii~i*:*i''*'~i':============
                                                                                                                                            '*Z:i:""::"; "":":!                        Date:
I wak:
:** n ~ ,Jvii                           : :*:::*    I Corporate QA Approval::ii:,:i::.ii:ii'ii'i~:!i::*~i~'*iii~i*:*i''*'~i':============
::::*:.r:y::, LUIO: NS P:roject::::::i:
                                                                      !!i;i:,.,i::: *:                           4* *9,I ' :*:i ::.i .,
Manager'.
'*Z:i:""::"; "":":!
!!i;i:,.,i::: *:
4* *9,I ' :*:i
::.i.,
iii:*:i~:!i*i:i:*i:
iii:*:i~:!i*i:i:*i:
:i*i~   :::*::. :*::.        A q*.-:
:i*i~
142015i;::ii935::
A q*.-:
i:~i~~i:::!::*:i~:   F* ::M       ::*::::::::::::::::
142015i;::ii 935::
                                                            ........  ... . ., ...            . * . ...    .. ...... ....    ... . . .. ....... .. i -             .. . ..                        :
i:~i~~i:::!::*:i~:
: ::::"::'' " ""!:!-:i*i*i!.:!iM']   ]: i           keii*
* F
i.. N..:col,~ii::olutionsne rgy...                       Corporate  ::::i           Director, Q:'Dat Dairyland Power Cooperative (DPC)i;:ii,:ii:*?*i
::M Date:
:::i:: 9 -:.3:.a:::::::::::::::
................ i -
                                                                                                                                                                  ..:*:*::::i:i:.;                        :::::::::::
::::"::'' " ""!:!-:i*i*i!.:!iM']
                                                                                                                                                                                              -iii::.****!,i:
i keii*  
:::QA Approval:::i Martn, Manage, :QualityAsu rance!.: :
]:
:::!::*i:::**:Edi
N..:
    . :::Manager Appi S. iPeters, Site Manager, Genoa~ii
i col,~ii ne rgy...
                                              ..i:iii*;*::*:.::ii;iLane i li                                                                                                                                                                                      ate ii:i~i:i~i:-:
::olutions
                                                                                                                                                                                *:i*!i*iil:!!iiiD i!i
::::i Corporate Director, Q:'Dat Dairyland Power Cooperative (DPC)i;:ii,:ii:*?*i
::: QA Approval:::i
. :::Manager Appi
:::!::*i:::**:Edi Martn, Manage, :QualityAsu rance!.: :
..i:iii*;*::*:.::ii;iLane S. iPeters, Site Manager, Genoa~ii
.. :*:*::::i:i:.;
:: :i::
9 -:. 3:. a -iii::.****!,i:
i lii
*:i*!i*iil:!!iiiD a te ii:i~i:i~i:-:
i!i


LA CROSSE BOILING WATER REACTOR
LA CROSSE BOILING WATER REACTOR
::?::::               STATEMENT OF QUALITYASSURANCE POLlICY:
::?::::
  ....... The Quality Assurance PrOgram Description (QAPD)* described: herein has been developed by Dairyland PowerS:Cooperative (DPC) and La Crosse Solutions,                                                                       L*LC:; :: I*
STATEMENT OF QUALITYASSURANCE POLlICY:
:        (SOLUTIONS) to prov~dea consoldatedovervlewof the qualitypro*gram controls that *I S gover~nthe operation and maintenance of the La Crosse Boiling Water Reactor (LACBWR) Independent Spent Fuel Storage Installation (ISFSI ), and thte                                                                                     ZIii:!i1;i decommissioning Oflthe LACBWR plant. The QAPD describes the qiualitY                                                                 asslurance                     i:::~I
The Quality Assurance PrOgram Description (QAPD)* described: herein has been developed by Dairyland PowerS:Cooperative (DPC) and La Crosse Solutions, L*LC:; :: I*
:organizational structure. fun:ctlonal responsibilities,, levels of authority and Inter'faces.* i::,
(SOLUTIONS) to prov~dea consoldatedovervlewof the qualitypro*gram controls that *I S gover~nthe operation and maintenance of the La Crosse Boiling Water Reactor (LACBWR) Independent Spent Fuel Storage Installation (ISFSI ), and thte 1;i ZIii:!i decommissioning Oflthe LACBWR plant. The QAPD describes the qiualitY asslurance i:::~I
~~The             QAPD applies to all activi~ties associated with structures, systems, !and*                                                                           * :*! I components which are important to Safety iun.der i1:0:CFR 72. *The QAPD also applies i :to transportation ipackages ~li:censed :by :the :NRC Under 1I0 CFR 71I.: ReqUirements: of                                                                                         :
:organizational structure. fun:ctlonal responsibilities,, levels of authority and Inter'faces.*
      ...:the !QAPD arel performed in                                 iia graded approach commensurate with an Item'sor* an
i::,
  * : activity's importance to safety. :This graded: approach is responsive to NRC                                                                                   ... :*;
~~The QAPD applies to all activi~ties associated with structures, systems, !and*
Regulatory Guide :7.10O. The applicablilty of he requirements of the QAPD to                                                                                                   .
I components which are important to Safety iun.der i1:0:CFR 72. *The QAPD also applies i : to transportation ipackages ~li:censed :by :the :NRC Under 1I0 CFR 71I.: ReqUirements: of  
decommissioning activities is *determined on a case by case basis. :The QAPDi!                                                                                             ;*l satisfies the requirements of 1i0CFR 50 AppendIx B, 10 CFR 71 ..............                                      Subpa~rtH; andO                         10i*!
...:the !QAPD arel performed in iia graded approach commensurate with an Item'sor* an
CFR 72 Subpart G.                                                                                              ...  .          .......                  .      ..        ,.
* : activity's importance to safety. :This graded: approach is responsive to NRC Regulatory Guide :7.10O. The applicablilty of he requirements of the QAPD to decommissioning activities is *determined on a case by case basis. :The QAPDi!  
;*l satisfies the requirements of 1i0CFR 50 AppendIx B, 10 CFR 71 Subpa~rtH; andO 10i*!
CFR 72 Subpart G.
SThe SOLUTIONS iExecutive Vi~ce: President and General Manager is :responsible forl:i;
SThe SOLUTIONS iExecutive Vi~ce: President and General Manager is :responsible forl:i;
      *:i:the. establishment iand implemrentatio)n of aquality !assurance progriam whiich meets all! -:I_
*:i:the. establishment iand implemrentatio)n of aquality !assurance progriam whiich meets all!
r*iii:legu~lator~yirequirements. i The quiality assuran~ce program, as described in lthis QAPD,
r*iii:legu~lator~yirequirements. i The quiality assuran~ce program, as described in lthis QAPD,
:Isi Isimplemented through the use:of approved pr'ocedures (I.e., poilcies:,:directives,:...
: Isi Isimplemented through the use:of approved pr'ocedures (I.e., poilcies:,:directives,:...
::~::/procedures, man~uals, instructionsr or. other documents) which provide written:: ; ::
::~::/procedures, man~uals, instructionsr or. other documents) which provide written::  
  . :~::i::gUidance for the ~conftrol :of ilmpor'tant to :Safety items iand activities and iprovides for":*:
. :~::i::gUidance for the ~conftrol :of ilmpor'tant to :Safety items iand activities and iprovides for":*:
:*::* the devielopment o:f documentation :to demonstrate objective evidence of compliance.:
:*::* the devielopment o:f documentation :to demonstrate objective evidence of compliance.:
with stated requirem ents. ;i!!::ii!*: :iii: ..                                     : ::.: :                      .                        * . ... .
with stated requirem ents. ;i!!::ii!*:
Solutioins Executive                                           ::                  Dairyland Executive::.                           * ::::i i                              . ..::
:iii:..  
                                                                                                                                                                                                    *: iI i
-:I_
:: : i::i::i*:: Preslden~t and CEOi:::                               * !i             :
Solutioins Executive Dairyland Executive::. * ::::i i
Executi....ve:
:: : i::i::i*:: Preslden~t and CEOi:::  
: : ..... E:, ., :* *:D ate                           :i: :           ;       :
* !i
                                                                                                                                                        -i... - ....    *    *- ,
: :..... E:,.,
:.i: ,:      ::::,:!i: i::!        , :,.i:i::_          "
:* *:D ate
QAPD....                            .....        Rev. 29          .. .
:i: : ;  
* : iI i Executi....ve:
-i... -
QAPDi: :*
QAPDi: :*
:.i:,: ::::,:!i: i::!
, :,.i:i::_
QAPD....
Rev...
29.


LA CROSSE BOILING WATER REACTOR, (LACBWR)I                                   / :: ::*
LA CROSSE BOILING WATER REACTOR, (LACBWR)I  
/ :: ::*
QUALITY ASSURANCE"PROGRAM DESCRIPTION (QAPD),
QUALITY ASSURANCE"PROGRAM DESCRIPTION (QAPD),
ST.QALTEMN   FPLC
ST.QALTEMN FPLC IlIII.
* IlIII. DESIGNVE CONTROL.....................AND......REVIEW..........,.,.
G -C N DESIGNVE CONTROL.....................AND......REVIEW..........,.,.
G -C  N                                                                                  ... ...      10...10 .
10...10.
IV. PROCUREMNTCOCUMENT.CONTROL :./:::...;.               ...            ...                            m         11;o::
IV. PROCUREMNTCOCUMENT.CONTROL
V. INSTRUCT1ON, PROCEDURES AND DRAWINGS ........           ....                          : i.,,::t,, ...         is V,. OO ~ E T O T O       .,:L .,!,..::                                   :::::::::-
:./:::...;.
                                                                                          ........        .:.    ,:::-:   14
m 11;o::
* V~i::I~i.IENTIFICTIN.AND CONTROL OF MATERIA:LPARTS,:ANID COMPONENTS i:::*..::.,m::::::!i;i                                 16: :;
V. INSTRUCT1ON, PROCEDURES AND DRAWINGS........
IX. CONTROLOFSPECIASPRONCADESS:ES~ P.N.............................................17:::::::::::::::::::2
i.,,::t,,...
          . CONTROL*] OF; lMEASRING XII:::                              TEST0EUIPMET AFT   TUCU AND     ssES                        ,....;.        ::::::            20-i; X
is V,.
::::IV:. INS*PECTIONB TES, ANDUOPERATOMINGMSTTUS A."E.A.V..A..*:P*N
OO ~ E T O T O  
                                                        .;                                                      ::*:"i*    22i:::::::!
.,:L.,!,..::  
::::i:.XV      CORGRECTIV:,EACION....O.T1....R.AN..A. ON....................................*, .. :....:_....22                     :
,:::-: 14
XAPI.       QULT ASUAC         RECRDv:23
* V~i::I~i.IENTIFICTIN.AND CONTROL OF MATERIA:LPARTS,:ANID COMPONENTS i:::*..::.,m::::::!i;i 16: :;
IX.
CONTROLOFSPECIASPRONCADESS:ES~ P.N.............................................17:::::::::::::::::::2 XII:::
CONTROL*] OF; lMEASRING AFT TUCU ssES AND TEST0EUIPMET 20-i; X
::::IV:. INS*PECTIONB TES, ANDUOPERATOMINGMSTTUS A."E.A.V..A..*:P*N 22i:::::::!
::*:"i*
XV
::::i:.
CORGRECTIV:,EACION....O.T1....R.AN..A. ON.................................... *,.. :....:_....22 XAPI.
QULT ASUAC RECRDv:23


                                                                                              *,:*:*i!i   :, i":::iii*: ::i::i:
*,:*:*i!i iI*
iI*
:, i":::iii*: :: i ::i:
:0.0 ,-INTRODUCTION
:0.0,-INTRODUCTION A
                    ....A          ,*.F. _  ....
F.
:      ..p- ':.",
p-  
                                ;:!i;*decomm*issioning iof the LEACBWR site. *i*;DPC'wiii r(etain o:wniership :;of thei~l::i*:::**:*ii~i:i:ii::ii:i:i::.i*:* i!*:!ii:
;:!i;*decomm*issioning iof the LEACBWR site. *i*;DPC'wiii r(etain o:wniership :;of thei~l::i*:::**:*ii~i:i:ii::ii:i:i::.i*:*
l*: :and ~s~p~ent :,fuel :andibe thie ownre-:lilcensee. *"DPC will:: be :subco tracted ;:1; *.::,,!:* :i iiand c*;::omnpletion obf:decommis~sioning, SOLUTIlONS will apply :to the NRC to6;: ;:                                                                                    .*: ;:::; ::
i!*:!ii:
!iili                            *!:;.:::wiillmaintabin t~he ISFS]I, and be r::esponsible: for th:                                                 uleutimate .dispos*ition obf!:..*::i :i~:!.: ::*.i::;:.:::i
l*:
: ;..::i::.:. In :order. toQubality,
iiand :and ~s~p~ent :,fuel :and ibe thie ownr e-:lilcensee. *"DPC will:: be :subco tracted ;:1; *.::,,!:* :i c*;::omnpletion obf :decommis~sioning, SOLUTIlONS will apply :to the NRC to6;: ;:  
          ;i::i iii~i;:i~L...i.*i.*l-:.*.!.ACBWR           minimize:          disruidpti0on Ass~urance             :and maximize',
*!:;.:::wiillmaintabin t~he ISFS]I, and be r::esponsible: for th:
:Progriam               Description                 efficienicy, I(.QAPD) !this:rlevision      of :the *:...i was ijointlyi;*i:i~:::::i::!:iii
uleutimate.dispos*ition obf!:..*::i :i~:!.: ::*.i::;:.:::i
!iili
;i::i
: ;..::i::.:. In :order. to minimize: disruidpti0on :and maximize', efficienicy, !this:rlevision of :the *:...i iii~i;:i~L...i.*i.*l-:.*.!.ACBWR Qubality, Ass~urance :Progriam Description I(.QAPD) was ijointlyi;*i:i~:::::i::!:iii
::*:i::*::::ic:-i.;": ien~se transition idescr~ibed: above. ::Duin:ig" the decomm~issionin~gi::*:ii::::i ~*:~~;;:!:
::*:i::*::::ic:-i.;": ien~se transition idescr~ibed: above. ::Duin:ig" the decomm~issionin~gi::*:ii::::i ~*:~~;;:!:
.:::i::::::i;i:
:::::-:*~ :a~ctiviities, ;!SOLUTi~oNS :will :subcontract ithe operatio)ns.and main.tenhan~ei: of::;;;*i**
:::::-:*~ :a~ctiviities, ;!SOLUTi~oNS :will :subcontract ithe operatio)ns.and main.tenhan~ei: of::;;;*i**
            .:::i::::::i;i:
:.!i:.
                .i**.::;.!ii. th~e ISFSI to D:*PC. Although iDPC p~roceduresand processe~s *willcontinue~i: .:i
.i**.::;.!ii.
:.!i:.
th~e ISFSI to D:*PC. Although iDPC p~roceduresand processe~s *willcontinue~i:  
            .i.::!.~i~l. toWl be ust ed: fiCns e.ithe
.:i
          -:i*:                                                            operain iaII :sond         maintenf:a nc ofathe orSI St                               OLesUreT e.IONS             i !!i: ,.
-:i*:  
            -:: .~~i:   .:: :::.QAPD requirements applicable, to ::the ISFSi "are effectively; implemented by;!--i-.
.i.::!.~i~l t
il i::.-i:*:" : .ii::tio all: ISFSI!.a*ctiVitiesi anddselected plant:d ecom missioning acetivities..:.i i.* ;:*::l ..l :.i
. oWl be ust ed: fi Cns e.ithe operain iaII :sond maintenf:a nc ofa the orSI St OLesUreT e.IONS i !!i:,.
            .;...The                       QAPD is. desig ned' to meet the requirements of 10:CFR 50 ppni
-::.~~i:  
            ... "::::      :i:!.B,: 10 CFR 71, :.Subpart.H, and. 10 CGFR :72,.Subpar't G :*and :reflet the...b::::. ::;::: :::.
.:: :::.QAPD requirements applicable, to ::the ISFSi "are effectively; implemented by;!--i-.
::::::.:.:::*:!*.:::thest
il i::.-i:*:"
                    ...                    ngru perford~l~miga                 n dime     ct.hly:b :responrsible:fori:th e wok u chasl pr:oj*0ik.::::                                                 i
:.ii::tio all: ISFSI !.a*ctiVitiesi and dselected plant:d ecom missioning acetivities..:.i i.* ;:*::l..l :.i
                                                                                                                                                                                            .:::!i::,**:et
.;...The QAPD is. desig ned' to meet the requirements of 10:CFR 50 ppni
:::::::::::::::::::::i::iThis includes. q:u"ality control" and :ve rification :th~at alliwork: is. pe:rformed In -. :: .: :
:i:!.B,: 10 CFR 71, :.Subpart.H, and. 10 CGFR :72,.Subpar't G :*and :reflet the...b::::. ::;::: :::.
::::i:.;.. ~*i'uditing: for;:a::i:i:, these igroups a nd assur~ing, manag em ent that ;thei QAi prog ram: -: : :
:::.:.:::*:!*.:::thest ngru perford~l~miga n dime ct.hly:b :responrsible: fori:th e wok u chasl pr:oj*0ik.::::  
            ...::!....is;_::       sbeing fully-and effectively implemented.* QA is recognized :asani:.;: ::.:*il-.:i
.:::!i::,**:et i
:::i::
:::::::::::::::::::::i::iThis includes. q:u"ality control" and :ve rification :th~at alliwork: is. pe:rformed In -. ::.: :
:i:: ::!:.:~.::i !:T:.i:he i::requi:remen~t~s iand icommitmen~ts c:*onta in ed:: in                                               iithis :QA:P:D ai:rei m:a ndabtor*y:.i !iiii:i*i:     !i*
::::i:.;.. for;: a::i:i:,  
            ..**::*-.*::i:*:::-and imus*t bie :implem-ented!, enforced,.' and :adher~ed to by-allin::divi~duals an~d: :::::::::::::
~*i'uditing: these igroups a nd assur~ing, manag em ent that ;thei QAi prog ram: -: : :
is;_::
sbeing fully-and effectively implemented.* QA is recognized :asani:.;: ::.:*il-.:i
:::i::.::i
:i:: ::!:.:~ !:T:.i:he i::requi:remen~t~s iand i commitmen~ts c:*onta in ed:: in iithis : QA:P:D ai:rei m:a ndabtor*y:.i !iiii:i*i:  
!i*
..**::*-.*::i:*:::-and imus*t bie :implem-ented!, enforced,.' and :adher~ed to by-allin::divi~duals an~d: :::::::::::::
ii:i:ii:iiii B.
ii:i:ii:iiii B.
:::i:The"terms i~and diefin~itioni0s t:H               ed below are used* frequentliy. throu*ghout :thlis docum ent. .'* *::::.     :::i*:.i :::i. ::i " "";!:: . i:.*.i!i.: :":' . :*.; : ..:--: ::* *.:.:::.:/:*:*::::!*::i::!;.!: ::::ii::::::.:*:!i::
:::i:The"terms i~and diefin~ition i0 s t:H ed below are used* frequentliy. throu*ghout :thlis d o c u m e n t..'* *::::.
                                  "LACBWR. La: Cross~e Boiling Water Re~actor.:
:::i*:.i
:::i. ::i " " ";!::. i:.*.i!i.: :":'. :*.; :..:--: ::* *.:.:::.:/:*:*::::!*::i::!;.!: ::::ii::::::.:*:!i::
"LACBWR. La: Cross~e Boiling Water Re~actor.:
:i.i*':::L.il" :
:i.i*':::L.il" :
:)A PD:::*:i                             :" : '*i!:::,:ii: *,*::ii :,i:::::!!:!
:)A P D :::*:i R ev. 29::*:::::;::**!
i !iiii:i : :i:                                 i i:Ii! !
:" : '*i!
R
:::,:ii: *,*::ii :,i:::::!!:!
                                                                                                                                                                          ..:!;:.,ev. 29::*:::::;::**!
i !iiii:i :::i:
ii*:!i::.":-!i*ii!:*!:,- ii::!:.::';i*:
i i:I i! !
                                                                                                                                                                                .;*;"i:!,i:::i*ii!
ii*:!i::.":-!i*ii!:*!:,-  
i!i
.; *;"i:!,i:::i*ii!
ii ::!:.::';i*:i!i


                          * .. ..i -                              "QUALIFIED TECHNiCAL REVIE.W.- Thorough reviews .ofthe documets*ii:"
*...i "QUALIFIED TECHNiCAL REVIE.W.- Thorough reviews.of the documets*ii:"
:.:::-.::...:::+:i::~ii!::"i+..:::i:i!::.necessary :to ,provide ;adeqcuate confidence thait! str~uctures , systems, or*
:.:::-.::...:::+:i::~ii!::"i+..:::i:i!::.necessary :to,provide ;adeqcuate confidence thait! str~uctures, systems, or*
:..      ::..*!i":i:: :;i:;! .to control and-!measu re the ~ch ara cter isics of: an ite m,iproces s ori: fa cilitiy!*to ii'
: *.:::: *! i" :i :: :;i:;!.to control and-!measu re the ~ch ara cter isics of: an ite m, iproces s ori: fa cilitiy! *toii' FACIL:ITY
                                                          *:.i:i.i   FACIL:ITY Encompasses
- Encompasses :the l P:ant site, which-iS:undergoing-i...
:..:i:.*decommissioning,                     -            i~iand i*thel :the        ISFS*:P:ant  l sitesite, wher~e                                   i..:: :::? ' :I+-.
i..:: :::? ' I :.
spent, fuel .is.Stored.:... ExclUded:
*:.i:i.i  
which-iS:undergoing-i..
..:i:.*decommissioning, i~iand i*thel ISFS*: site wher~e spent, fuel.is.Stored.:.. ExclUded: +-
tr:
tr:
::!::.;.!i!;!!;;;:[an~smis     sio*nil apparat us loc:a~ted !beyond the LACBWR: switchyar~d ".=; : -* i :-.+;
::!::.;.!i!;!!;;;:[an~smis sio*nil apparat us loc:a~ted !beyo nd the LACBWR: switch yar~d ".=; : -* i :-.+;
ii: :!?ii!i~!::IpLAN*T i:::                                                          -' Enc~ompasses tihe biuilidings t*het functionally supported t!he                                                         i!
i:::
:::::::.i~i'SCHEDULE         :*:i :!                                    INTERVAL:                          A
ii: :!?ii!i~!::IpLAN*T -' Enc~ompasses tihe biuilidings t*het functionally supported t!he i!
                                                                                                                                          *::i*time:frame
:::::::.i~i'SCHEDULE INTERVAL:
                                                                                                                                            -                            within :wh~ich a schieduled activity:
- A
: ::i::::I: *::::: shall be performed with amaximUm allowable extension not to exceed 25 givento01si*tructures,
:*:i  
:ii:::*:systems, iand :ompo'nents (IiTs)
*::i*time:frame within :wh~ich a schieduled activity:
:IMPO*RTANTITOSiAFETY                                                        (SSCsl)Athat  -  class~ification
::i: I:  
                                                                                                                                                                        ,provide nuclear safety] designi:
*::::: shall be performed with amaximUm allowable extension not to exceed 25
: .functionls. i(See Appendix A for complete details)i,:. i .:*::: *i:*!:.: :::ii:
:ii:
fl::+ANIml7AT+iA M.+                                 !i:ii                   ..  .
:IMPO*RTANTITOSiAFETY (IiTs) - A class~ification givento 01si*tructures,
                                                                                                                                              ?:i,, ,.+ + v , *                            ::+!!:
::*:systems, iand :ompo'nents (SSCsl) that,provide nuclear safety] designi:
                                                                                                                                                                                    !!i:::i+
:.functionls. i(See Appendix A for complete details)i,:. i.:*::: *i:*!:.:
                                                                                                                                                                                ,i.if!
:::ii:
fl::+ANIml7AT+iA M.+ !i: ii  
?:i,
,i.if! ! ! i:::i+
::+!!:
I.
I.
'-' .:  ....  "{ .   .  ....    ,.I.*.+.     "! !+.!-:.-:¥ 111¥     n   llllr,=l'*l         11=t111     +,:-::++..:-:-:-.;:....,:-.
"{.
....:.:....:+ :.: ::-::
,.I.*.+.  
i i.:i+!*::i*:*::*ii*i~*::*:***::i:1.       :**:This sec.tion d:*efines *:theerespons~ibilities o*f k"ey project m:embers::: ; il;
"! !+.!-:.-:¥ 111¥ n
                                      +iii./(.:!+.:. .:?ii+.::.i+:i!+i*accountable for Implementation of thelQAiPDt.Functions and. actions-:
llllr,=l'*l 11=t111  
:i:::i i:+:::i.:i: : ! cani.bi+ah:ie
+,:-::++..:-:-:-.;:....,:-...
                                      +i::'*-                                                          .delega+ted;i holwever, t++he r:iespni**ibi lity r.emains with: th~e: /::*
,,.+ + v,
:-":         .. .:-!. i::: :On~site. and* offsite organization**s shall be est~a bli~shed ifo!r statio~n a:*nd*i:
....:.:.... :+ :.: ::-::
::il.::::"2:
i i.:i+ !*::i*:*::*ii*i~*::*:***::i:1.
                                      ..::i:: .*i:: ...   : :~::. ::*:***     *:!*c rpojra te .ma niag em e nt, *re sp ec tiv ely. T::                                       h e .ons ite `a nd *o ffs ite :* : :.i*:.":..:i iiii:!i::!*:
:**:This sec.tion d:*efines *:the erespons~ibilities o*f k"ey project m:embers::: ; il;
                                                                                                                                                                                                                              !*i!i:i*!!++::i!*
+iii./(.:!+.:.  
:. . ::...: *::":i*;:!;/.:*
.:?ii+.::.i+:i!+i*accountable for Implementation of thelQAiPDt.Functions and. actions-:
::*:..:.:                :                          ;:::: organizatio~ns ;sh all Include :the :positions :for .activities :.affecting lthe :safe
+i::'*-
:i*:::i."::::i~."
:i:::i i:+:::i.:i:
                                .:.::!:ii."3."i:                                   S:i:i"::!:iince SOLUTiON                 N +an~d DiPC wilwil be working t+o tihe :requirements of th+is
cani.
                      *:?:: :;i*i*:~::i;:i:/:: i:*:i i:iii* :i :::i:::Soluti~on                         *.iOrga*nization.:i                           :This: QA PD:Identitifies :key. on-site p roject                 :*      ! :i
bi+ah:ie  
: ::i     , i : ::                                   i::::c~iiorpoate support groups. :The QAPD also definies the DPC.I:;:*::
.delega+ted;i holwever, t++he r:iespni**ibi lity r.emains w ith: th~e: /::*
:+ii . '4:.Lines     4:.                          of authority,. r.esponsibility,;.and communication: shall b~ie:.::+ ::: ..
::il.::::"2:  
                                                      +.:::::-i:established land :defined for the-"highest management :levels ;throughi++:
.:-! i::: :O n~site. and* offsite organization**s shall be est~a bli~shed ifo!r statio~n a:*nd*i:
                                                            --  .....            i ntermediate::levels to and !ncluding a~lloPerating organization:* *:
.. : : i::.*i::...: :~::. ::*:***  
*:!*c rp oj ra te.m a ni a g e m e n t, *re s p ec tiv ely. T::
h e.o n s ite `a n d
* o ff s ite :* : :.i*:.":..:iiiii:!i::!*:
!*i!i:i*!!++::i!*
:.. ::...: *::":i*;:!;/.:* ;:::: organizatio~ns ;sh all Include :the :positions :for.activities :.affecting lthe :safe
:i*:::i."::::i~."  
.:.::!:ii."3."i:
S:i:i"::!:iince SOLUTiON N +an~d DiPC wilwil be working t+o tihe :requirements of th+is
*:?:: :;i*i*:~::i;
:i:/:: i:*:i i: iii* :i :::i:::Soluti~on *.iOrga*nization.:i :This: QA PD:Identitifies :key. on-site p roject  
! :i
: ::i  
, i : ::
i::::c~iiorpoate support groups. :The QAPD also definies the DPC.I:;:*::
:+.
ii 4:.  
'4:.Lines of authority,. r.esponsibility,;. and communication: shall b~ie:.::+ :::..
+.:: :::-i:established land :defined for the-"highest management :levels ;throughi++:
i ntermediate::levels to and !ncluding a~lloPerating organization:* *:
::i!:i:
::i!:i:
::          : :ii:**p0sitions. :The~se rielationships shall be documente~d *and *updated,; as QAPD.::                                                                                                                 4   ...                                                Re~ 29i
: :ii:**p0sitions. :The~se rielationships shall be documente~d *and *updated,; as QAPD.::
                                                                                                                                                                                                        *Yiii:;*!*.*ii:i*i:i*:
4 i-i
                                                                                                                                                                                        *::*/i ?:if: 'i:i*;.i!,,i                       i iI i-i
*::*/i ?:if: 'i:i*;.i!,,i  
*Yiii:;*!*.*ii:i*i:i*:
Re~ 29i i iI


                                                                      * ,..:.:...: / * .. ':: ,* .,.--.*::: .:::.:......:                                                                                                   :.,,..- : ..: ,.'.t:""-.':', .
*,..:.:...: / *.. '::,*.,.--. *:: :.:::.:......:
                                                                                                                                                                                                              }:-: i::i.:;..,::,::i::::::::::::::
*:::;{}:!"*ii.  
                                                                                                                                                                                                                */ .............
~~ii::i}?.::~::;::ii*i::.}:i:
                                                                                                                                                                                                                              !!::*:i!!:!::!i:ii}iii i:!*:i*}i!ii:*ilS*
appr~oPriate, in:ii.the'*form~of o~rgantization charts, :functional, descriptionis: 4:
                                                                                                                                                                                                                ' .:.*-,.-.:iy!.:. !.: %y..
:.*{//::.::/".:.:?.i:*....:;}i~;i.'
    *:::;{}:!"*ii.
:.:.:fo'r key personnel p~ositions,.or in e*quivalent. forms oif idocumen~tation!..i::..i!;i
            ~~ii::i}?.::~::;::ii*i::.}:i:         appr~oPriate, in:ii .the'*form~of o~rgantization charts, :functional, descriptionis: 4:
..5.
                                                                                                                                                                                                                            ].:..:.::>..: -:
5;..The-ihj iu*
:.*{//::.::/".:.:?.i:*... .:;}i~;i.'       :.:.:fo'r key personnel p~ositions,.or in e*quivalent. forms oif idocumen~tation!..i::..i!;i
we ay uthatWhsics.:and: quality: assurance.:.<......
                                                                                                                                                                                                                ...:i::{:.*:*!*i:.:*::!*
}::::: !ac~tivi~tie's, may'ifunctionally reportto. an appropria~e onbtsite m*an~ager:**;:!i.:i.
            . .5.                            5;..The-ihj               iu* we ay uthatWhsics.:and: quality: assurance.: .<......
:{*.:.
              .::*                  :... }::::: !ac~tivi~tie's, may'ifunctionally reportto. an appropria~e onbtsite m*an~ager:**;:!i.:i. :{*.:.
...;:: *.,:however,. they*shall have-sufficientorganizatiornal freedom to e/.nsure;;}:.::*;*;
      . .:** .                  . ..;:: *.,:however,. they*shall have-sufficientorganizatiornal freedom to e/.nsure;;}:.::*;*;
}*.::*..
:.i!::! i}:"::.i:*!i:i*::i*i:::*]ii  :!ii:.
/.:::
                                                                                                                                                                                                                                                            *:ii*]!:
:: :i ;:i:i:::]* 1!:}Pr:esident:- Th:*eiPraesidentxrnarnag~es th~e p~atlo*n-ofEnergySolutions:*`.:
    /.::: ::.. :i ;:i:i:::]* 1!:}Pr:esident:- Th:*eiPraesidentxrnarnag~es th~e p~atlo*n-ofEnergySolutions:*`.:
,.::.3*.:: "-.
    }*.::*
i": :::i:}]: ::.:* :*.i; :::. *:: :*!;/stew a rd sh i :p!projects ~at: U.:..R eactor :sites,.an d-assu]res: that the:i:;::;-i;: *;; ;.; :
    ,.::.3*.::
i": :::i:}]:"-::.:*. :*.i; :::. *:: :*!;/stew ardsh i :p!projects ~at: U.: ..R eactor :sites,.an d-assu]res: that the:i:;::;-i;: *;;;.; :
:;]::*.::::*/:*.!:/:
:;]::*.::::*/:*.!:/:
: : ::.:u:i{*::..::.Y;-*:.L:{ ACBW R *project :*receive~s timhely :and*effective: supportfrm*:;:.::{.&*.::*:;.:**;]:
: : ::.:u:i{*::..::.Y;-*:.L:{
ii:-.: ::]:.:.:::.;:::]} .;:]]w-*ith th~e GM; and..other k~ey m*anagers ~to review the-.oper~ation of theii:~, }:!
ACBW R *project :*receive~s timhely :and*effective: supportfrm*:;:.::{.&*.::*:;.:**;]:
i.::ii:}.::q:
i.::ii:}.::q:
ii:-.: ::]:.:.:::.;:::]}.;:))w-*ith th~e GM; and..other k~ey m*anagers ~to review the-.oper~ation of theii:~, }:!
management, quality, 'dnd~ related !issues.: The President shali: have*;ii:i:::
management, quality, 'dnd~ related !issues.: The President shali: have*;ii:i:::
                                                    .corporate~responsibili~ty if6r, the safe' storage of nudiea~r fulad
.corporate~responsibili~ty if6r, the safe' storage of nudiea~r fulad shall.....
        " *: *}i I,}*I....::. ... take an~y me~asures ;needed to ensur~e acceptable:perfo`rmance o*f tjhe*i*:***;:i**
" *: *}i I,}*I....::.  
                                                                                                                                                                              ..     shall.....
... take an~y me~asures ;needed to ensur~e acceptable:perfo`rmance o*f tjhe*i*:***;:i**
"....... :. :staff in o eai*:*
~ ~ngria*in*t~aining,*and/ providing t`echnical *support toti*:he;:'"
-:.i]}::i~;
:: :::"plant-to ens~ire the, safe storage !.of nuclear. fuel.
A'-
:,,:, :::*-**:*v*#::-
:::2;.::ExecUtW&Vlce.Pressident and General Manaaqer (GM) i;- T:hisexecutivei <-
haor:
il.t adis
*niih frt~ es*tbliishmenet and.
:....i wi:.the management *tea~m *toreview pians and: progress and to,
.aidress stakei~oider,* quali ly and project'rnanagement issu es., The GM.,....
. deiegates!to: DPC*: a~nd the.man ageme nt team ~th~e day-to-d ay..*i;:.!].::;i.:~::~:::*..
...:/,r*espoipii**i~tles'ifor';tie (ISFSI ari*adjdeco*mmssioning b*iy ~a}pproved:i:Y:{*
:-:7 7.....
-:*3..
*;~i
-The::PM is: res )onsible for all.decommissioning::!:
*::::i:i?*:::<::y:::*k i* *:. :i::;**i/::/aotiwiies~includimg:firep~rotection and I'ndustrial safety activties
.t.th
:::::,;,:,,iiide,,ommiss
:ng site. Tl,::,PM.i*-ha,. have.authority over those on autsite
*i:..:*.:!.:".,;...:::
:.:. ::/. -:.:. ~ ~ ~te~n ~ s a yo,:a e*s o a e fn c e r~u tw lh h v :b en :*:...:c:
i,**::
forsa-.sor gef-.cl
.a fuel..
which..--. hav been:::::::::::::..*:*
-**:*:*d::*::i**:
*descr:*"b;id:
i..
i
'o tis~APD and for th~e Qualifiedi Tec5hnical:,.
:.i::}i}3-:ii:::
: 'i:i:}:.:i.:.:~.:!:;:.. :R ev iew. prpbcess,*tt.,ized;j*o rd e omm is sio n~ing g:iThe ePM retainsauhoid"to.jyi: *
-/: ::::::!::u
::i:: *:*!*!
for~::
!ftach*: prop6sed~tdst, experiment, ormodification to systenms or:/*}i:;:]:
i!i* ::::/::::: :: !~i :*}:=
eq uip ment ::that :affec*t *the ~safe :storage : of inu clear fu el: wh ich ha b~*i~Seen::!
Qiat!
ssra:eMnaer(A M) _T*:**he *QA M 're ports S.to; th e P M :*ianhd;i:i:*:
:::: :: : /:: **:::::k!;:.: :*r n:*att*s,. The P:M: is resp9op si bleI:f etabl Iis hing and: m aintai ning the -,
QAPO""'
mo i
,rn the.9 proec' s quali*s t
y objectives*,
tho ugh.... ove... view.. and,.:,.
i~;:}:} : i
*. ::}: ::i*;;;}:i:{:!:ii i
ns:**
::: :; ; iihiP~e c~t(i~n ctivitie s,;!apdi-proyidin g'*feeid bak t o: m an.agem ent onithe}. :. i*:
: i-:, *!"!:.}:ii
-:...':::ii~:i ef'fp.i!.
i,.:
ct:::i*:veness.*M.*of the QAPD.
i~n~tiohe
*a*(
ev[aluani es, acceap ts, a
nd performs:!:}i*:li!:
:.,,..- :..:,.'.t:" "-.': ',.
}:-: i::i.:;..,::,::i::::::::::::::
*/.............
!!::*:i!!:!::!i:ii}iii i:!*:i*}i!ii:*ilS*
'.:. *-,.-.:iy!.:. !.: %y..
].:..:.:: >..: -:
...:i::{:.*:*!*i:.:*::!*
:. i!::!
i}: "::.i:*!i:i*::i*i:::*]ii
:!ii:.
*:ii*]!:
Li
Li
      ............              "....... :. :staff in o eai*:*
....::4.,,,,::i,,i:i i::i:::*.*i*i!:i,!:}:i i]*::
              .-. ..:.... ..............                                    ~ ~ngria*in*t~aining,*and/ providing t`echnical *support toti*:he;:'" .;:::!}::'*';'.':i::.':::'.                            -:.i]}::i~;...::4. ,,,,::i,,i:i i::i:::*.*i*i!:i,!:}:i i]*::
;:::!}::'*';'.':i::.':::'.  
: : : ::* ::... :: :::"plant-to ens~ire the, safe storage !.of nuclear. fuel.                                                                                    A'- :::*-**:*v*#::-
*.. ::: ::::.. F ":! i.: :.:.: : i: ::* X:.:::i::i
                                                                                                                                                                                                                  *..:::::::..F ":!i.::.:.:
/,;!.:.!,:,;;,Y :  
                                                                                                                                                                                                                  /,;!.:.! ,:,;;,Y :
' ::*':i::'::.::*, *}
: i: ::*  X:.:::i::i
QAP D 5*
      !:.._                          :::2;.::ExecUtW&Vlce.Pressident and General Manaaqer (GM) i;-T:hisexecutivei <-                                                                                                                            ' ::*':i::'::.::*, *}
Rev.:294
haor:                        il.t                                  adis                  *niihfrt~ es*tbliishmenet and.                      :....i wi: .themanagement *tea~m *toreview pians and: progress and to,                                                                    "*:    :: ;::-.
:.requimrmets..to the *SOLUTION. :organization..Th0 QAM porlodloally:
                                                  .aidressstakei~oider,* quali ly and project'rnanagement issues., The GM.,....
                        - -          -          . deiegates!to: DPC*: a~nd the .man ageme nt team ~th~e day-to-d ay..*i;:.!].::;i.:~::~:::*..
:/ ,r*espoipii**i~tles'ifor';tie                                                        (ISFSI ari*adjdeco*mmssioning b*iy ~a}pproved:i:Y:{* '::
: ::                  :-:7
                          .            7.....
                                          -:*3..                    *;~i                                                  -The::PM is: res )onsible for all .decommissioning::!:
    *::::i:i?*:::<::y:::*k i* *:. :i::;**i/::/aotiwiies~includimg:firep~rotection and I'ndustrial safety activties .t.th
:ng ,:,,iiide,,ommiss                            :*                                                  site. Tl,::,PM.i*-ha,.have.authority        autsite over those on
    ...... *i:..:*.:!.:".,;...:::
                    . :.:. ...::/. -:.:. ~ ~ ~te~n                    i,**::~ s <"**,.":           a yo,:a        forsa-.sor  e*s o a gef-.cl
                                                                                                                            ,:,'":-,-",:  -..e fn :: c e r~u.afuel..
twwhich..--.
lh hav  h v :bbeen:::::::::::::..*:*
en :*:...:c:
      -**:*:*d::*::i**:
              *descr:*"b;id:                         ..                    i..
                                                                              .......                          ,i            'o tis~APD and for th~e Qualifiedi Tec5hnical:,.
:.i::}i}3-:ii:::
: 'i:i:}:.:i.:.:~.:!:;: .. :Rev iew. prpbcess,*tt.,ized;j*o rd e omm is sio n~ingg:iTheePM retainsauhoid"to.jyi: *
        -/: ::::::!::u
::i:: *:*!*!                  for~::
                                                  !ftach*:            prop6sed~tdst, experiment, ormodification to systenms or:/*}i:;:]:
i!i* ::::/::::: :: !~i :*}:=                  eq uip ment ::that :affec*t *the ~safe :storage :of inu clear fu el: wh ich ha b~*i~Seen::!                                                        - -
Qiat!              ssra:eMnaer(A M)_T*:**he *QA M're portsS.to; th e P M:*ianhd;i:i:*:
: /:: **:::::k!;:.: :*r n:*att*s,. The P:M: is resp9op si bleI:f
::::::: ::-!;.:                                                                                                                              etablIis hing and: m aintai ning the                    -,
    * '" ': " ""::;::         ".                  QAPO""'
                                                        ,-"*.'-..mo"., .;.i                ,rn              the.9proec' s quali*s        t    y objectives*,
                                                                                                                                                      .          tho ugh....ove...view.. and,.:, .
i~;:}:}
      *.::}: ::i*;;;}:i:{:!:ii
:i                                ns:**c~t(i~n
::::;i ; iihiP~e                          ctivitie s,;!apdi-proyidin g'*feeid bak                                t o: m an.agem ent onithe}. :. i*:
: i-:, -:...':::ii~:i
              *!"!:.}:ii              i,.:        ef'fp.i!.
ct:::i*:veness.*M.*of the QAPD.                                i~n~tiohe  *a*(        ev[aluani es, acceap    ts, a nd performs:!:}i*:li!:
QAP D                                                                                       ....              5*                                                 Rev.:294
 
: .requimrmets..to the *SOLUTION. :organization. .Th0 QAM porlodloally:                                        :iii*  :i*!*!I*I  :!i:::::*!:::
i!i: :i:!:
::.""i
::.""i
:.provtides *report..o n project :quahity, activitiei *to .tt .*,..t.     PM,he            ...:thi. .i*
:.provtides *report..o n project :quahity, activitiei *to.tt.*,..t.
::: mana~ eh 0 t team .                           ::i:::* ::: ' : ! :i: : :::i::::::. :::::::: :::
he PM,  
                      !n;Mn:
... :th i..i*
:- .".radiation        :er 5A 5.*met~i            p:"ect e n.i.
:: : m ana~ eh 0 t team.
Hsdiek:n protection,                        R pro*(e4~tion,
::i:::* ::: ' : ! :i: : :::i::::::. :::::::: :::
                                                                                                        -Thm    1RPM.
: 5. Hsdiek:n p:"ect
                                                                                                                      *Itei* olosur*,
!n;Mn:
tmponsibie  and.for waste all
:er R
: i*::..:. i*::::. *:i
5A  
                  ... .. . ~shipping actlvties at the entire site.- .                                             . .:":.-".:-                .:"'*
-Thm 1RPM. i* tmponsibie for all
                *:.. :: : :: :.::::::activi-ties :with. the RegItq*rs :such as ilcensing submlttsl, regula*toryi:
:-.".radiation protection, e n.i.  
                  *.:* :.:*:! :: -::*:.:::-reports,.!reporteability isesu~i~oQAPD revisiions,. REtvPIOLDCM r:epoi,::*!::                                   :- ..  :. .:., ..,...:.      ,. ,....
*met~i pro*(e4~tion, *Ite olosur*, and. waste
                * ...- :.. -: ..:financial. re~pottsDecon~iss~ion~ng.Plan revlsiona*.-$NM Inventory..-:*.::::                                                         ,, ,-:.:.:i:: .:i i::"! i :
~shipping actlvties at the entire site.-  
                          .:-.:: * *. :* * *.*i*,*,*.-:*nD*":-*,.*;*,,.*
.-:.::..:::!*:: :: :. ::::::activi-ties :with. the RegItq*rs :such as ilcensing submlttsl, regula*toryi:
:I '.:...: ..-. " """ '.'
*.:*.:*:! -::*:.:::-reports,.!reporteability isesu~i~oQAPD revisiions,. REtvPIOLDCM r:epoi,::*!::
*iiii:: ii*::
...- :.. -:..:financial. re~pottsDecon~iss~ion~ng.Plan revlsiona*.-$NM Inventory..-:*.::::
                            ':.-..-              a:.
:iii*
: i*!*!I*I
:!i:::::*!::
i!i:::i:!:
: i* ::..:. i* :: ::. *:i
,,,-:.:.:i::.:i i: :"! i :
*i iii:: ii* ::
* *. :* * *.*i*,*,*.-:*nD*":-*,.*;*,,.*
a:.
dmi.:"*mnistration and opration of th* LACBWR tSF$I and the Operation :
dmi.:"*mnistration and opration of th* LACBWR tSF$I and the Operation :
                            ... .:.::".' .:of Th6 00enoa 3 coa! fired plant and the QuaiUl ec.Thnical fRevlewi :
.:.::.:of Th6 00enoa 3 coa! fired plant and the QuaiUl ec.Thnical fRevlewi :
: :. -*-:.... *responsilbe for o0peration and rn~aIenance .oftIe* LACBWR ISFSI.:.
responsilbe for o0peration and rn~aIenance.of tIe* LACBWR ISFSI.:.
:: : ::i::.:.::..: within :the limits se~t fo:th in the De~Ommlsi8ni~nt Plan, Thc,hn~cl*li::
:: : :i::.:
                            .:"::-   -..-.   ::ISF$I Manager and is r s~ponisiblo for ensuring reg~ulatory :requirements
within :the limits se~t fo:th in the De~Ommlsi8ni~nt Plan, Thc, hn~cl*li::
:. ::" ar"e:
.:"::- -..-.::ISF$I Manager and is r s~ponisiblo for ensuring reg~ulatory :requirements ar"e:
amdequately niet :and.the $e~curity Pian,. related proceures, training
amdequately niet :and.the $e~curity Pian,. related proceures, training
                            *:            ~and contingency r'equirerments are developed *nd maintained current.:
~and contingency r'equirerments are developed *nd maintained current.:
                                      '*".4. OA S*ecia,~t         lit/ngi*             -, The. Q A* SpecIali~t /: Engineer is :responsible                 1 S for performing independent overviews of I$FSI related actvivtIes, "..::
'*".4.
                                          ' admin~isterIng.:the ISFSI'a correotiv ~action prograim, provldln9. ...-
OA S*ecia,~t lit/ngi*  
                            * .....  :..: ...orientation and training. on :applicabte q...                 uality program requirements tO ::
-, Th e. Q A* SpecIali~t /: Engineer is :responsible 1 S for performing independent overviews of I$FSI related actvivtIes, "..::
                            .::.:...: : :.: :D staff, end interfaelntg wth SOLUTION$ off-site QA st~ft..: . . . ::::
admin~isterIng.:the ISFSI'a correotiv ~action prograim, provldln9.
                              .:: ::..: :.:of lSFB! activities and for ensuring that adequatertechnical review Is**:
:..:...orientation and training on :applicabte q...
                            ,::*::i:pp ied to cha ::0 tests                     , :andi:i exper::::::::::::I ments.       :::: :!::::::::::, :i: :: :::::::::
uality program requirements tO ::
t              OU,AIJIY:         ASR*::: E PR:OGR       ::::,A:M ::::: :::         : : :::: :::i* :::: ::i :: :::*:
.::.:...: : :.: :D staff, end interfaelntg wth SOLUTION$ off-site QA st~ft..:... ::::
                        -:-:.-..         :The QA: program describe*d herein Sets forth th~ equiurements for the :QA.: ::
.:: ::..: :.:of lSFB! activities and for ensuring that adequatertechnical review Is**:
::.. .- .organi~ation, personnel :responsibilities,-controlS, :end measures. :.''.. .:.
,: :*::i:pp ied to cha :0 tests andi:i exper::::::::::::I m ents.
: .:.:.::"established .to achiev,: maintain,"end document qual~ty. -These .: :-:. . .
:::: :! ::::::::::, :i: :: :::::::::
                        -"::::: :requirements include, but are not limited to, the to~i[win~i: '::;                                                      -:r.
OU, AIJIY:
                              .*.: . -:desig*nbases for. ITS. SS&#xa2;$ Into. the I$F$I oeraetions and. ma*intena nce. .-
A SR*::: E PR:OGR
: .:::i:.'!::" procedures,:. ... :.::.                           .-. : . * : . .                  ' :. :.        . " -.. :
::::,A:M ::::: :::
: ' : :.i:.::"
: : :::: :::i* :::: ::i
::'"*          .:22. -*Performance of-all..installation,.
:I '.:...:..-. " "" " '.'
                                                                        * ..        ..          calibratlon, and :testing. on           necessary:
t
:' all ""'        '"-*          .
:The QA: program describe*d herein Sets forth th~ equiurements for the :QA.: ::
QA..:.                 ... . ..            .      : . :. . : .  .        6.:-.                                        .. .. . .      29..
.organi~ation, personnel :responsibilities,-controlS, :end measures. :.''...:.
:.:.:.::"established.to achiev,: maintain,"end document qual~ty. -These.: :-:.  
-"::::: :requirements include, but are not limited to, the to~i[win~i:  
-:r.
.::..:::::. -:desig*nbases for. ITS. SS&#xa2;$ Into. the I$F$I oeraetions and. ma*intena nce..-
:.::: i:.'!::" procedures,:.... :.::.
: 2.
i:.::"
: : :..:2 Performance of-all..installation,. calibratlon, and :testing. on all necessary:.
Q A..:.
6.:
2 9..


        *:::-                  . : '."::.:.": .:' '::': ':"'"."i '::":'.": " .': ":
'::': ':"'"."i '::":'.": ".': ":  
                                                , :::.:.:il;:i .*i*i,   :ii::!!:!i         ....'::":'"":"''
/:
                                                                                                        ;;;;. i .....ii*
:::.:.:il;:i.*i*i,
i!;i!"ii!!!ii*::i:il;*:*:*       /: :':": "          " '"
:ii::!!:!i i!;i!"ii!!!ii*::i:il;*:*:*  
                                                                                                                                        .:;.                           ** .. .!..i:' *..:..*:.i..;: .. ": '" ' ' : *:
;;;; i ii* -' :* * *.........  
                                                                                                                                                                                                                            *iiiii*
* *...!..i: ' *..:..*:.i..;:.. ": '" ' ' : *:
                                                                                                                                                                                                                                !:iiiiii::ii:iiiii::
iipli*ced:.u*i*bs!i* i*:i-
:iii::*.:i!ii:!!ii*.!I:II*
TS;SS*::!:
                                              !-I "!i*.-:i*l!sii*ii                      accordance ::w ith
                                                                          ;!;:in*;!" i;.i!ii~;i:!*!*i:;::::.:.i:!                      approved:!!;!
                                                                                                                                            .:;:"      ISFS iipli*ced:.u*i*bs!i*
procedures.:**i*:            i*:i-
:*i*i:-il;ii*
:*i*i:-il;ii*
i i;::
i i;::
ii.;;iiiiii iii!i-!
ii.;;iiiiii iii!i-!
                                    . 5o:.i Resolution of :itemsside~ntified a*s adiverse to ,quality wit h :!appropiSHate*:::::.:::-?:::ii
* iiiii*
                                .",":6.i P;erformance. of. auldits !and isurveiillances .by :QA personnel ito iverify *.thatii:*..:i:;*l ;
!:iiiiii::ii:iiiii::
                              .......:.::.*:....I S FSI*. ad m.inistrative: co ntrolIs, .pro&#xa2;ed ures,. a nd. p rocure ment: documenits:*: :;*:*:
:iii::*.:i!ii:!!ii*.!I:II*
;*Vi:: i::.n:;i :::.:*.
!-I TS; SS*::!:  
"!i*.-:i*l!sii*ii ;!;:in*;!" i;.i!ii~;i:!*!*i:;::::.:.i:! ::
accordance w ith.:;:"
approved:!!;!
ISFS procedures.:**i*:
;*Vi::
i::.n:;i :::.:*.
i:i:!i*i
i:i:!i*i
;;i: ii*:,::i
;;i: ii*:,::i  
        *!;;!:*i:i
*!;;!:*i:i
: :iI*:;
: :iI*:;
if!i:
if!i:  
                    ;i;;:
;i;;:
:.:;*:*:*:iii.i*i:*:i:::graded appoac*h: *to :quality :thaa*:is; cornmmensurate: with-a item' or a
5o:.i Resolution of :items side~ntified a*s adiverse to,qu ality wit h :!appropiSHate*:::::.:::-?:::ii
                                          *.""21. The folloWing- sections of the~iQA*pO idescribed hi:ere.in or..an in:.dustryi!..*ii.::.il
:6.i P; erformance. of. auldits !and isurveiillances.by :QA personnel ito iverify *.thatii:*..:i:;*l ;
:.i .: .;equivalen~t may *be aapplied *to t:he decommissioning of th~e LAO BWR.*:***:!:i.**.
:.::.*:....I S FSI*. ad m.inistrative: co ntrolIs,.pro&#xa2;ed ures,. a nd. p rocure ment: documenits:*: :;*:*:
                              */.- *:'i;::*{**       pl***an~t in *a i:graded appro*ach1 to quality that !is com~mensurate it~h an*:itiem1****
:.:;*:*:*:iii.i*i:*:i:::graded appoac*h: *to :quality :tha a*:is; cornmmensurate: with-a item' or a
                                  *ii*,**i-:*a. :i:;Forany* Raioactive Material* T~ran~s~portPa*ckage-s subject; to* the** :*i
*.""21.
                              .-.;i;**                                                                                                                                                                                    .:;*
The folloWing-sections of the~iQA*pO idescribed hi:ere.in or..an in:.dustryi!..*ii.::.il
i..i::i:!~~.:i~ii:.iiii~i iQ APD a pplies.*:! For ithes*e *activitiessa ssoci ated w~ith thfle:! iSF*SI, th:ie :::i I!
:.i.:.;equivalen~t may *be aapplied *to t:he decommissioning of th~e LAO BWR.*:***:!:i.**.
                                *i.i~.]i                                                                                                                                                                                              i!:!!i i:iil;ii
*/.- *:'i;::*{**
                                                                                                                                                                                                                                      ;i:!:*:..i!.i*:i;.!::*.i*
pl***an~t in *a i:graded appro*ach1 to quality that !is com~mensurate it~h an *:itiem1****
                                              .*:::;**:: :For *th ese :activ~'is associated with* decommissioning, ;the: ".**:..:.:..: .:;.:i;*...i *-i";
.-.;i;**
                                          .::-..: ~.impilementaionof0fithe QAPO ;Is *by itheia ppropriate *soLUTION S.i..*;::i...i;:i*! iii.i
*ii*,**i-:*a. :i:;Forany* Raioactive Material* T~ran~s~portPa*ckage-s subject; to* the** :*i  
:;:';ii..:;::
*i.i~.]i
                                *-:.ii.i::;ii:.*~i:Sections
: i..i::i:!~~.:i~ii:.iiii~i iQ APD a pplies.*:! For ithes*e *activities sa ssoci ated w~ith thfle:! iSF*SI, th:ie :::i I!
:.*.;                                            :I,:*:;illXV,.. X.V~and *XVII and* Appendix:C of thi:s iQAPD mayl*. ;..!,-
.*:::;**:: :For *th ese :activ~'is associated with* decommissioning, ;the: ". **:..:.:..:.:;.:i;*...i *-i";
* apply
:;:';ii..:;::
:;:i;;!*.
.::-..: ~.impilementaionof 0fithe QAPO ;Is *by itheia ppropriate *soLUTION S.i..*;::i...i;:i*! iii.i
                                        ~~*!*:i:;::*.*l I.::*De*om.:mis sioing acn.bti vi ties a-ra                                           e. otherw:ise :controlled .:by ~proce*.dure s,::;
-:.ii.i::;ii:.*~i:Sections :I,:*:;i llXV,.. X.V~and *XVII and* Appendix:C of thi:s iQAPD mayl*. ;..!,-
                                    *;,. :.:Iii*:*:.i~     i ocesses,:and; pol*icies di~ee med ad:*aeq u:ate! b:y ,th m*.*a n:a~geimen:t:*i ::.!:**
apply i!:!!i i: iil;ii
                                                      .*pr:::                                                                                                                                                        :;'. .ii:
;i:!:*:..i!.i*:i;.!::*.i*
                                                                                                                                                                                                                                      *    .  .:H :.*::
:;:i;;!*.  
                                                                                                                                                                                                                                      .::-.::***:*S!!:.;,:.!i
~~*!*:i:;::*.*l I.::*De*om.:mis sioing acn.bti vi ties a-ra
                                      . .Excep~twhen alternatives or :exceptions: a~re identified,. the implementing ii :i: :;i
: e. otherw:ise :controlled.:by ~proce*.dure s,::;
                                      'procedures for the QAPD shall* comply with the quality assuranice guidance:.; i:.
*;,. :.:I ii*:*:.i~  
.*pr:::
i ocesses,: and; pol*icies di~ee med ad:*aeq u:ate! b:y,th m*.*a n:a~geimen:t:*i ::.!:**
: ;'..ii:
.:H :.*::
.::-.::***:*S!!:.;,:.!i
..Excep~twhen alternatives or :exceptions: a~re identified,. the implementing ii :i: :;i
'procedures for the QAPD shall* comply with the quality assuranice guidance:.; i:.
::;:documents* listed in: AppendiX B:. Additionally., the following clarififcations:.i.:;:* !:--:
::;:documents* listed in: AppendiX B:. Additionally., the following clarififcations:.i.:;:* !:--:
1:":*:. the :guidance:: in anyi of .-the :listed documents is :in:: conflict :with :the :;!.; *:*: .i;i;'
1:":*:.  
                                          ;*I::!i;:*f
;*I::!i;:*f the :guidance:: in anyi of.-the :listed documents is :in:: conflict :with :the :;!.; *:*:.i;i;'
::;i:"QAPO,    ~*:*;i ~the- guidance provided :in "the QAPD is ithe, con~trolling docu menit;..ii..;i
::;i:" ~*:*;i QAPO, ~the-guidance provided :in "the QAPD is ithe, con~trolling docu menit;..ii..;i
                                                                                  -*;;li;i:**i!!!:;;*;:
-* ;;li;i: ! i ;i'::* *i* *:i **:
i;i'::* *i* ::i
:,; :*;!.:;i
                                                                                                                *:i :::;*
**i !!:;;*;: ::i
                                                                                                                      **::,;: i::*;!.:;i
:::;* : i: :? * *::;* i*:;* i? :/, :i ::? *ii ::; ;: ;;i!;: *;,*:;**z**;.*ii:;,
:? * *::;* i*:;*i?:/ , :i ::? *ii::; ;:;;i!;: *;,*:;**z**;.*ii:;,         *R* ev.;29i:!;:!***
R e v. 2 9i:
            -QAPO
* * ; 2 !;: !***
                                                                                                                                                                                                          !iiii::iiiiii!*
-QAPO
ii*
!ii ii::iiiiii!*
                                                                                                                                                                                                                    *:':ii
ii*  
                                                                                                                                                                                                                        ;ii*.i;*.i!iil;;*:i i*.**.*
*: ':ii  
;ii*.i;*.i!iil;;*:i i*.**.*


  ., . . ,.. , - .. ... :            ;Y:: .' ::'- * ' ::,':' :q: .':'.:'"".'., .:., ..,:..::.:,.., ..,:::. ,:,:, :..y::.- :.:%.,.:,::::     :-.:/...: ..:./ :. -:,:,:.
;Y::.' ::'- * ' ::,':' :q:.':'.:' "".'.,
i/{*".i !i*  :(. ilil :iii!!iiil; i:i:il ii!:i:
i/{*".i !i*
                                                                                ':i{!
:(..ilil :iii!!iiil; i:i:il ii!:i:
ii!i!:!
':i{!
{: !..::.;}.i.:i:: ::i:ii:2:...::i , Standar'ds, g~uides, codesi~ etc.,~iidentified in ~any commitment* document: i
..,:..::.:,..,..,:::.,:,:, :..y::.- :.:%.,.:,:::: :-.:/...:..:./
            " ::-iI}:*(   :.:* ":/. :{i :.are .not.qudalit~y assUr~ance :prog ram rei'quirem~ents unless !that-document* :
ii! i! :!
                                                *:< .i:,i3..
{: !..::.;}.i.
                                              ,*!!:i.::::!-!ii*i!i:::;,Guid~ance are :appl iciable:to;:         applicable*            com~p~ar~abl to sa fetyi            relatedand:
:i:: ::i:ii:2:...::i, Standar'ds, g~uides, codesi~ etc., ~iidentified in ~any commitment* document: i
                                                                                                                                                              !e:itemsi             items  anld act~ivit!ies activities       ( mporit~ant           CF:*
: iI}:*(  
                                                                                                                                                                                                                        !:(}1.0To    R ;5,0)*:*-iiii;i}:i b.!Safet~y)'     .*,,:!:;
":/. :{i :.are.not. qudalit~y assUr~ance :prog ram rei'quirem~ents unless !that-document* :
i                     7 : i..*....:.,.:. .i(;:at ithe compiletion ,of fuel tran~sfer to :support; decommissioning;i. T~he}. " ;-..
*:<.i:,i3..  
                      . -..y* .:.*..;.:Qualified -TechnicaliReview was added .at the time SOLUTIONS became::4; ii!:./!. ": .i;:i:the :licensee. *::The ifollowing .subjects shall .be .:independenitly irevitewed} by a; .
,Guid~ance applicable* to sa fetyi related items anld act~ivit!ies !:(}1.0 CF:*
                        .".'::""*i.;" ;.":*i1:..                         1..i0 .CFR 50.I59 and( 10O CFR 5*0.82 evalUatiOn~s for Changes in th fl~e.acility; :
R ;5,0)*:*-iiii;i}:i
                          .:v7:::::-.... :.:*.,. .:-.:::de*scrrib:)ed ~in the.DP and: PSDAR to"- verify that such a:ctionis do                                                                                                 Ibnot' :-;:/:::.
,*!!:i.::::!-!ii*i!i:::;
                          !:..}:.:.i:..:}:!}...":..     .. .:.:inv.,olve a :chang~e to: th~e. Technical :.SpecificatiOns or w:ill :no0t r~equir]ei~::{:i~*:i                                                                                                                   i{ ....
are :appl iciable:to;: com~p~ar~abl !e:itemsi and: activities ( mporit~ant To b.!Safet~y)'.*,,:!:;
:::::::::::::::17. :".,:/verify that ~such :changes :do. not :invol:ve ,a ,change to :th~e Techinical- -, .. .;
i 7 : i..*...  
: :.;i: :*":-. :*-:;::::.. S pe~cific ations :an*:.Will n ot requ*ire: NRC :approval: pu rsuan*:t t:io10 CFR:,::,:::
.:.,.:..i(;:at ithe compiletion,of fuel tran~sfer to :support; decommissioning;i. T~he}.  
:: :. ,....::**5 0 i5*9 a n d 10 .CF R :72.4 8 ; a nd ;*::****::.*:.:;:**** `.:: .:::*::}:::*.:;:::::{**::*.;*:*:::::E.::*:***::
..y
-. *.:.*..;.:Qualified -TechnicaliReview was added.at the time SOLUTIONS became::4; ii !.
!:./  
":.i;:i:the :licensee. *::The ifollowing.subjects shall.be.:independenitly irevitewed} by a;.
.".': :""*i.;" ;.":*i1:..
1..i0.CFR 50.I59 and( 10O CFR 5*0.82 evalUatiOn~s for Changes in th fl~e.acility; :
.:v7:::::-..  
.. :.:*.,..:-.:::de*scrrib:)ed ~in the.DP and: PSDAR to"- verify that such a:ctionis do Ibnot' :-;:/:::.
!:..}:.:.i:..:}:!}...":..  
...:.:inv.,olve a :chang~e to: th~e. Technical :.SpecificatiOns or w:ill :no0t r~equir]ei~::{:i~*:i
:::::::::::::::17.
:".,:/verify that ~such :changes :do. not :invol:ve,a,change to :th~e Techinical- -,...;
: ;i:
:. :*":-. :*-:;::::.. S pe~cific ations :an *:.Will n ot requ*ire: NRC :approval: pu rsuan*:t t:io 10 CFR:,::,:::
:: :.,....::**5 0 i5 *9 a n d 10.C F R :7 2.4 8 ; a n d ;*::****::.*:.:;:****  
`.::.:::*::}:::*.:;:::::{**::*.;*:*:::::E.::*:***::
i{....
:*:.::;*::::}:**::i1*:{. :I*nd*ividuals ;that are a;.s~sig:ne.d rtespons*ib:iliti~es *as described ;i~n S*ctioni*!i!,:
:*:.::;*::::}:**::i1*:{. :I*nd*ividuals ;that are a;.s~sig:ne.d rtespons*ib:iliti~es *as described ;i~n S*ctioni*!i!,:
: :i .: i:i.!:~.:.::!:,O.RGAN !ZA*IlON.. *.shall. prepare, admiin~istrative: and q uality :a:ssur~an*ce:;
:/*:::
:/*:::
:i i:i.!:~.:.::!:,O.RGAN !ZA*IlON.. *.shall. prepare, admiin~istrative: and q uality :a:ssur~an*ce:;
i"::;*i.:
i"::;*i.:
::i;*::: ::;   ::i:::;:;i*pr0cedue iis* as n!;ecessar to.                                                       0.impliemenlt the:.requl~irement*s of *th:J;is!:i!: i.::.!i:.i
::i;*::: ::; ::i:
                                      ..:*.:i:::: ;:*:::!!::.*pr~ogriam:: In/s~upporto~f oPe~ration a nd m:.*ain ten anice o0f:.the :LACBW R. ::: :/
::;:;i*pr0cedue iis* as n!;e cessar to.
:::i:,::i:::}::{i.::~l8SF1 i:::                                            an d decommissio ning activitie~s:, as applicable. Procedlures sh all."
0.impliemenlt the:. requl~irement*s of *th:J;is!:i!: i.::.!i:.i
: ::.i:.:: :~; *":.include appropriate quantitative and qualitative accep~tance .criteria :.::
..:*.:i:::: ;:*:::!!::.*pr~ogriam:: In/s~upporto~f oPe~ration a nd m:.*ain ten anice o0f:.the :LACBW R. ::: :/
                                    * :i.;i.::::::::::::::: ne~ces*sary :.to: deter~mine :that :the activity. is :being: prop*erly performed.;:.:.
: i:::
                                  .'                      2..:
::i:,::i:::}::{i.::~l8SF1 an d decommissio ning activitie~s:, as a pplicable. Procedlures sh all."
                                                        ",-Audit                       :or surveillance repo0rt~s .are- distributed ito management f.*or; their.::"
: ::.i
:" .. * ...":.review and assessment of the QA :program, as :to.effectiveness,: scope,-
:.:: :~; *":.include appropriate quantitative and qualitative accep~tance.criteria :.::
::::Y:: .{:}Y:*::ii:Employ*ee-.:                                Train ing shl*:l lbe!pr~ovided: to. all: facility .personn~el anhdi:!::q{
*.;i.:
:.:: : *:, .4.,contractor:s :performi~ng *activi~ties that coUld affect ,th~e quality .of***;:.- .
:i :::::::::::::: ne~ces*sary :.to: deter~mine :that :the activity. is :being: prop*erly performed.;:.:.
i      !.;:.: !:;::!:::}4*:*.: Inde*pe*nd ent ;:Manage*ment A*ssessme;nts ar*e perii od~ica~lly pe.rforimedi to :}
2..:  
: "': :i :: ' ;.monitor :*over*all performnance: and. confirm that -activities :affecting qUality:
",-Audit :or surveillance repo0rt~s.are-distributed ito management f.*or; their.::"
                                                                                                                                                                                                                                                -i!,:i!(, ii*/
*...":.review and assessment of the QA :program, as :to.effectiveness,: scope,-
QAPD.......                                           /:::;
:Y::
                                                                                .;i.: .::. ::t .;:!:*::;i,.",:::::i:
:::.{:}Y:*::ii:Employ*ee-Train ing shl*:l lbe! pr~ovided: to. all: facility.p ersonn~el anhdi:!::q{
::.*::}::.:::::.:i":.. .:.*., :.:::;i '81:: ::-:      :.:.:: ::::::
:.:: : *:,.4.,contractor:s :performi~ng *activi~ties that coUld affect,th~e quality.of***;:.-  
:4.     .i": ::: :::"..};:::
!:;::!:::}4*:*.: Inde*pe*nd ent ;:Manage*ment A*ssessme;nts ar*e perii od~ica~lly pe.rforimedi to :}
:i:}i:Ei;.;;!:::ii!}i
: "': :i :: ' ;.monitor :*over*all performnance: and. confirm that -activities :affecting qUality: -i!,:i!(, ii*/
                                                                                                                                                                                                                                  .:"Rev; :.2*i::!::I
i QAPD.......
/:::;  
.;i.:
::t.;:!
:*: :;i,.",:::::i:
::.*::}::.:::::.:i":....:.*., :. :: :;i  
'81:: ::-:
:4.
.i": ::: :: :"..} ;:::
:i :}i:Ei;.;;!:::ii!}i  
.:" Rev; :.2*i::!::I


I h:**::*:**::-:ik:::!:}:i/:*!*i*:co:i]]:mply             w:ith the QAPO and ithat `the !QAPD Is effectively implemented.i::;i:i!.il
I h:**::*:**::-:ik:::!:}:i/:*!*i*:co:i)):mply w:ith the QAPO and ithat `the !QAPD Is effectively implemented.i::;i:i!.il
:;{! :**:i} .::.:designated:                                     by:the. President, independentiga               of activities assessedt; pendet;o~atiit~s.,                         ssssd;;i'*           and :!*;/::i~
:;{! :**:i}.::.:designated:
                                      }17*}:*;!:/*i:!:::*:i:il ievel of
by: the. President, independentiga of activities assessedt; and pendet;o~atiit~s., ssssd;;i'* :! *;/::i~
{k:::yi::.:i                                        0im~anage6me~nt ihav~ing th*e- authority to e6ffect ~orr*ectivle a*ction.i :Iin~i
{k:::yi::.:i
                            *: :.:*..*:i;*Yi*,-i:*::.:.::.:y.*:}addlition,             tiihese :*resulits are rePorte d in a timel           *y :fa sh ion to0the Presi deni*t.::*
}17*}:*;!:/*i:!:::*:i:il ievel of 0im~anage6me~nt ihav~ing th*e-authority to e6ffect ~orr*ectivle a*ction.i :Iin~i
::. ...-: . .:...:... ..                      s-:...F::::..Pe n e Training. and: Q ualification.:.         ...- :. ..        :*  :      i ... "}:::*:::;i: i":::"": i::" -i:.:":
*: :.:*..*:i;*Yi*,-i:*::.:.::.:y.*:}addlition, tiih ese :*resulits are rePorte d i n a timel *y :fa sh ion to 0the Presi deni*t.::*
1*.}
-:...F::::..Pe s n e T raining. and: Q ualification.:.
                                                        !:iiEach
i... "}:::*:::;i: i":::"": i::" -i:.:":
                                                          ".*                    member of the fac&#xa2;ility staff (InclJuding audit, sUrveillance and~ii!:!i:i*!
1*.}  
::;.:.',:inspectio n person n el) shlli~ha Ve. s ufficie*n t.i q ualificatio ns: to0 periform.-k
!:iiEach member of the fac&#xa2;ility staff (InclJuding audit, sUrveillance and~ii!:!i:i*!
:k..*:::...*:
::;.:.',:inspectio n pe rson n el) shll i~ ha Ve. s uffi cie*n t.i q ualificatio ns: to0 periform.-k
                                                      .:ii}..:}ithe~irr*:a ssig ned. duties.i* Reg ulatory :Guide 1l*.8 :-19*77(ANSI ::N1.;I8 1:.;-i.:; :::iii
:k..*:::...*:  
                                              *i!iiii:i:iii!::*;!
.:ii}..:}it he~ir r*:a ssig ned. duties.i* Reg ulatory :Guide 1l*.8 :-19*77(ANSI ::N1.;I8 1:.;-i.:; :::iii
                                                          ;*:!;:!i   9717:l) I*s uiitilized* :ifor* detjermi n ing anda. aSssessin*g ;ap pro:priate staff;!::{;;:i!ii.!:!
*i!iiii:i:iii!::*;!  
                                                                                                                                                                                                                    .{!:
;*:!;:!i 9717:l) I*s uiitilized* :ifor* detjermi n ing anda. aSssessin*g ;ap pro:priate staff;!::{;;:i!ii.!:!
i:iii*i::iii >:: ;0 ::!
:i.;*/::;*..*.*.*p::ersonnel training :andqualification *:re~cords :are. mailntaine~d inii:*~i.*!*i:i :*
i:::* i:~
:i i.{'::!:.ai*:. Thie: !p os[:it*~ion ofthie IQA :Man ager iishallJJ* meet :it he :.ifolloin o i
!m inim*um::i:!
.{!:
i:iii*
i::iii >:: ;0 ::!
ii.i!i i!i'i:::.
ii.i!i i!i'i:::.
:i.;*/::;*..*.*.*p::ersonnel training :andqualification *:re~cords :are. mailntaine~d inii:*~i.*!*i:i :*                                                                    il*::}ii/;i!*iii::
il*
::}ii/;i! *iii::
i..
i..
: :'q":" >": ' i:.: :i, i:::*:i i.{'::!:.ai*:.
: :'q":" >": ' i:.: :i,
i:~                Thie: !pos[:it*~ion ofthie IQA :Man ager iishallJJ* meet :ithe :.ifolloin            o i !m inim*um::i:!
.:; :-.: " :- -i L:.:;:i ii!
* . *'- ,,... .  . ::.,* '." .'-. ..                  .:; :- .:" :--i L:.:;:i       Graduate of a four-year accredited engineering or science ii!            college or university, or the equivalent in practical experience plus five (5) or more years in positions of leadership, such as lead engineer, project engineer, audit team leader, etc.
Graduate of a four-year accredited engineering or science college or university, or the equivalent in practical experience plus five (5) or more years in positions of leadership, such as lead engineer, project engineer, audit team leader, etc.
                                      }..:": -.: ifi.:":i*:..:i:.:.i *i:: this: exper~ience sha~llbe in 'a quality *assurance organizationi./Y:: :
}.. :" ifi.:":i*:..:i:.:.i *i:: this: exper~ience sha~llbe in 'a quality *assurance organizationi./Y:: :
:. ":: .!.... :.-" :.} .. implelmen~tation- may be, substituted for the one-year experien~e:
:.... :.-" :.}.. implelmen~tation-may be, substituted for the one-year experien~e:
: .:.::i:]Yi-...:i~:.::::.!::iiw:ii. ."-wtthin*             a quality assu~ranice orga-nization:....:/ : i!::*iiii:::i..:;i.ii{;:i.-
:.:.::i:]Yi-...:i~:.::::.!::iiw:ii.."-wtthin*
a quality assu~ranice orga-nization:....:/ : i!::*iiii:::i..:;i.ii{;:i.-
* i::!/i:::.!
.-*:-b*.:ii T
::*!ihe ::pos~itilon !of Radiation Protectioni Manaiger :shall meet ~the:;!**i :;i: i
. *..: i- :
:.: ::. :.:::}: :!/: :*I:- ::r.ia dio~lo~gical ;Safety,:.thriee6: yearis :of :-whiich;Sh all :*be*in ::a~ppliedi:: :::!{:;i
{i
{i
* i::!/i:::.! .-*:-b*.:ii       ::*!ihe    T ::pos~itilon !of Radiation Protectioni Manaiger :shall meet ~the:;!**i :;i: i
.ii i:::i
                                                                                                                                                                                                              .iii:::i  {ii:i:,i::ii i- : :.:::}: :!/: :*I:- ::r.ia dio~lo~gical ;Safety,: .thriee6: yearis :of :-whiich;Sh all :*be*in ::a~ppliedi:: :::!{:;i
{ii: i:, i::ii
:        *" Technical:experience inTthe areaexe                       ofcradiologicalea          safetyd IlIsf~*         :beyond e~y::n :::i     :i::ii! i..
*" Technical: experience inT the areaexe ofc radiologicalea safetyd beyond I lIsf~* : e~y::n :::i :i : :ii! i..
:*!i!
:*!i!  
              ....' "' id,.!
' ' 'QAPDII
                          'QAPDII :....-:.,                   ;.::*::*,*::i* .:i*i*..i:"i:.
.... " id,.! :....-:.,
:*.*:{:*:i.*i.           Q APD,. 9
;.::*::*,*::i*.:i*i*..i:"i:.
                                                                                              !:i:i;::/!*:.*:::i:i*.*:
{:*:i.*i.  
                                                                                                        *!.!:!:.i*         i .::..i:,.*iii} i.!:,:...:.; ;.;:,i,.::I;.::: iii:::i;i!:"!,. R ee.v.!I229:}  :*:I.
!: i:i;::/!*:.*:::i:i*.*:  
 
*!.!:!:.i*
:::%*i:.:.i!{:"*(:/* >*ii iliiii!i*i:*!!!:!i*:Z::&#xb8;
Q A P D,.
                                                ., *....... ,,,...,..* ..              ::..t :.i':':"
9 R e.v. 29:}
                                                                                                  }::'.-.'::i:i:::*'*:':ii!}:.                                                                   !:t*::::ii.;::::;:::*:i.i*i{:::.:*i::.:
i.::..i:,.*iii} i.!:,:...:.; ;.;:,i,.::I;.::: iii:::i;i!:"!,.
                                                                                                                                    *:!/1:}::.*!:`:.:..:*:i*.`:*:;;*./*!:.i:*....*....:/y:*.::*:::*:(.,.*:.:.*:/
e !I2 :*:I.
:::.::.' .::""":. ..:**:';:,i*..: **i*-.1:!:::::.*::ii::*!:48*:I*::I ii:.!}:!::!i iii!::i:{i*;~
: ::%*i:.:.i!{:"*(:/* >*ii  
:.**!*!il' :::i*!:::**:basisstowarid s thIe:iacad emic. d egriee :requ1irieme n~t !(four ye:*ars o                                                                         :f, *:**
!* il i iii !i*i:*!!!:!i*:Z::&#xb8;
:.::!:!:,.::.:! i.ii:::; :ii*::{ :technical experiencel being :eq uivae!nt to!a fou r}year aaem.a                                                                                         ilc::::
::..t :.i':':"  
                                          * * ':ii*"*::.:.i::{   i.i **: i:A:*ca*demic a:nd- tech*nical~i experiie nce :must i~total: a: minimu                                                                             oi:::ef::.i ..i/:*::}::.:.
}:: '.-.'::i:i:::*'*:':ii!}:.
c.::::::::::::l Ti*iihei position ofQ*ualiffied iT =chn*ical .*:Reviewers shall: meetth::ie-:i ::::*-                                                                                     .;:*
:::.::.'.::""":...:**:';:,i*..: **i*-.1:!:::::.*::ii::*!:48*:I*::I
* followinggim        m i~i inimum      u q*aif   qualifications:  ati sii*i i:.!:!;. i:i:-:..:..i :!:i::.:ii::::::.ii:ii:::..~iii::l:.ii: .~iiii **:! i.:-:i :i::::*i~~:!:!:.-i:ii
*:!/1:}::.*!:`:.:..:*:i*.`:*:;;*./*!:.i:*....*....:/y:*.::*:::*:(.,.*:.:.*:/
: . :.     , ., ::::;.}i:::::!::*i;}i:i!!}i:
!:t*::::ii.;::::;:::*:i.i*i{:::.:*i::.:
                                                                                                                                                                                                                                                    .:::.:* :::i::-::::i!*::*:.*:i:::: *:
ii:.!}:!::!i iii!::i:{i*;~
                                                .: :: .::: Qu
:.**!*!il' :::i*  
                                          -.{.:.                                ralifaiedT cn icas~l                          Ren  v~iew rssal                    l ubegpefrindiiuaswtheout n!.. -
!: ::** :basis stowarid s th Ie:iacad emic. d egriee :requ1irieme n~t !(four ye:*ars o :f, *: **
;i .ii:
:.::!:!:,.::.:! i.ii:::; :ii*::{ :technical experiencel being :eq uivae!nt to! a fou r}year aaem.a ilc::::
                                                                      ,*Qualified TFechnical: Reviewers shall have at :least :5 years ;of . :;iI
* * ':ii*"*::.:.i::{
          !!!if Sii:            iiill:.:"i                              i'::::::/.q~u*alification*s evaluated o*n *a case !*by ca*se basis iand: approve:.dii*}
i.i **: i:A:*ca*demic a:nd-tech*nical~i experiie nce :must i~total: a: minimu oi:::ef::.i..i/
:*!.i:*Re~vieweris i..;.                   ifor[deco~mmisioning a:ictivities.iand ith Siii:ite~: ~i.:.!::::                                                       i} :!i*i:
c.::::::::::::l Ti*iihei position ofQ*ualiffied iT =chn*ical.*:Reviewers shall: meetth::ie-:i ::::*-
:i i*::::;*Manager, G enoa s*hall: appoi~nt Qui~alified *Tech~nic~al *!Reviewerts::i: i for ..ISF:SI*t la ed:ac
follow ing m inim um qualifications:
::i"::o                                           activities.*..::
gim i~i u q*aif ati sii*i i:.!:!;. i:i:-:..:..i :!:i::.:ii::::::.ii:ii:::..~iii::l:.ii:.~iiii **:! i.:-:i :i ::::*i~~:!:!:.-i:ii
i ite--rela.ted:                             :.:.... :; i:i*i~*i;i":" ;::i:i:..:.:i::: - : .:::
-.{.:.
:." ill:". DESIGN CONTROL.AND:REVIEW!;:.::: .:.!;::::: .::::/:                                                                                                       " ::-.          :        :::::: :;:}ii.                   .,.
::.: :: Qu ralifaiedT cn icas~l Ren v~iew rssal l beg u pefrindiiuaswtheout n!.. -
:i~**}i~.::.;:::: :i.:ili:*:::This* s;ectio e stabl!e
:*::}::.:.
:.::::-i                                                                          i* sh:es *the:re*quir~ements; :to :ass urie thi*at, Importa~nt: To ::!(::::!!:*::
. ::::;.}i:::::!::*i;}i:i!!}i:
:::i::-::::i!*::*:.*:i:::
;i
.ii:
!!!if iiill i Sii: :.: "
,*Qualified TFechnical: Reviewers shall have at :least :5 years ;of. :;iI i'::::::/.q~u*alification*s evaluated o*n *a case !*by ca*se basis iand: approve:.dii*}
:*!.i:* i..;.
Re~vieweris ifor [deco~mmisioning a:ictivities. iand ith Siii:ite~: ~ i.:.!::::
i} :! i*i:
:i i*::::;*Manager, G enoa s*hall: appoi~nt Qui~alified *Tech~nic~al *!Reviewerts::i: i for ISF:
::i"::o..
SI*t la ed:ac i ite--rela.ted:
activities.*..::
:.:.... :; i:i*i~*i;i":" ;::i:i:..:.:i::: - :.:::
:." ill:". DESIGN CONTROL.AND:REVIEW!;:.:::.:.!;:::::.::::/:
:::::: :;:}ii.
:.::::-i
:i~**}i~.::.;::::
:i.:ili:*:::This* s;ectio e stabl!e i* sh:es *the:re*quir~ements; :to :ass urie thi*at, Importa~nt: To ::! (::::!!:*::
::!* ::i::::*~i*::{
::!* ::i::::*~i*::{
:!:*:{:; ;::i*::iiiii; Safety (ITS
:!:*:{:; ;::i  
* st!*ruci:turie s,::syste*m s,; a*n d :com ponent*s *(SSCs )!:of !th:e: ELACBW:R *:*i.:*
*::iiiii; Safety ( ITS
i::::!*i:i~~* ISFiSi ar*
* st!*ruci:turie s, ::syste*m s,; a*n d :com p onent*s * (SSCs )! :of ! th:e: ELACBW:R * :*i.:*
:: /:i::i:.*:*:*::::                                        :e: ad * ;:deleted,: chi*a~n*ged: or moodified*:; in* a~ccordlance*:i with:::::::the ::::::ii:::::::::::
:: /: *:*:*::::
:.i:     .:. : :i::ii!:(c:.:o~des, s!itandards,!::: an~d r!e~gulationrs.:t thatg overned :th e oiriginla~l. de~sign,::::::::::::::::.!::
i::i:. i::::!*i:i~~* ISFiSi ar*
::::.!i::.
:e: ad * ;:deleted,: chi*a~n*ged: or moodified*:; in* a~ccordlance*:i with :::::::the
::~:":::i~-:i::~ii:excep*t .as lamehcide aindi approved. **M~easure~sshallbe establishec~ifo:r th~e i:::::.:.:{:.                                                                                                                                                                                                                          -::::*!:;i*
::::::ii:::::::::::
: : :!i:,:/*:.}. :.: : ir:ieview,; evaluation :da                                         and; pproval ~of all :de~sign: chianges ::goven inn.i:S FS i!:t.:::::;./
:.i:.:.
      * -. '::: " :SSCs. Th~e Engineering Manager (EM) :shall }en~sure .that the "design*controli:l
::::.!i::. : :i ::ii!:(c:.:o~des, s!itandards,!::: an~d r!e~gulationrs.:t thatg overned :th e oiriginla~l. de~sign,::::::::::::::::.!::
          /...               . -. and: review for .:ITS SS~s :shall be :performeci :by the appropria:te. .Design*::.*:.."!I
i:::::.:.:{:.
      * .- :./ ::::.Auth~ority (ref.; Appen~dix :A) utilizing thleir appr~oved: 1:0 :CFR: 50: Appe~n~dix iB;*:.:ii*-
::~:":::i~-:i::~ii:excep*t.as lamehcide aindi approved. **M~easure~sshallbe establishec~ifo:r th~e  
      .- : :::%.::::. ......::..Design,: fabrication, o)r modification :of storage and shipping :casks .used for :.::i.                                                                                                                     -.
-::::*!:;i*
i: .*.!. ::.*:"S.sh*::ii:
: :,:/*:
::*:T:::.:}:                                    pment iof~i radcioactive !materials :will :;not !be c~ondUcted u:6ndi*:erthiS::secti()n~i-:*i:i.i
:!i:.}. :.: : ir:ieview,; evaluation and;
:i: :::;i*i::
:da pproval ~of all :de~sign: chianges ::goven in n.i:S FS i!:t.:::::;./
                  . :::.::.:.::::::1i:!.             r:. The:i [e!:DP:C] s~taff: is :r~es ponsiible: fo:r establishiiing :p~roce~dures to{b:* implemb*en t:.i*:;l                                                                               -I:
" :SSCs. Th~e Engineering Manager (EM) :shall }en~sure.that the "design *controli:l
QAPD: i                                                                                                         :10:*:                                                           :-10.,.Rev:.:"
/...
                                                                                                                                                                                                      -A..:.                           29..':': .
and: review for.:ITS SS~s :shall be :performeci :by the appropria:te..Design*::.*:.."!I
 
:./ ::::.Auth~ority (ref.; Appen~dix :A) utilizing thleir appr~oved: 1:0 :CFR: 50: Appe~n~dix iB;*:.:ii*-
                ..: : iJ ::orders:,design.:control    and the
.- : :::%.::::.......::..Design,: fabrication, o)r modification :of storage and shipping :casks.used for -.
                                              .procedures-   and.incorporation instrUCtionS. ::of design
:.::i.
                                                                                        .*:.'.:.;."docume~nts
::*:T:::.:}:
                                                                                                            .*;:iz- into :i q work  j ?.:.*.: : ,I :
i:.*.!.
          "            : :~2.: :The EM is: respOnsible for :the iincor~poration of design lbases, regulatory I:
sh*::ii:
      .. "                    ::' requirementS, codes and standard~s into drawings and specifications ... ;:.i
::.*:"S. pment iof~i radcioactive !materials :will :;not !be c~ondUcted u:6ndi*:erthiS::secti()n~i-:*i:i.i
      .. :...:: :**.i.:::           related. to ITS SSCs: design :and ch*anges thereto:..The EM ;is*: also.*;*::*
:i: :. :::.::
::;i*i::.:.::::::1i:!.
The:i r:. [e!:DP:C] s~taff: is :r~es ponsiible: fo:r establishiiing :p~roce~dures to{b:* implemb*en t:.i*:;l  
-I:
QAPD: i
:10:*:
:- -A..:.
10.,.Rev:.:" 29..':
:.:.:.:. design.:control and the incorporation of design docume~nts into work
:; :...: : iJ ::orders:,.procedures-and. instrUCtionS. ::  
.*;:iz-
:i q j ?.:.*.:
: I :
: :~2.: :The EM is: respOnsible for :the iincor~poration of design lbases, regulatory I:
:: ' requirementS, codes and standard~s into drawings and specifications  
... ;:.i
.. :...:: :**.i.:::
r elated. to ITS SSCs: design :and ch*anges thereto:..The EM ;is*: also.*;*::*
:- : :!:::::i;.:!;.:
:- : :!:::::i;.:!;.:
:.i~i::;       respi:::;::
:.i~i::;
:onsi~ble for the r;ieview o~f d:esign drawin~gs, speci~fications,;i!                               ::*:
respi:::;::
:: ::i::::calculationad procurement documents: to assure *that: quality                                                                     ! :1:
:onsi~ble for the r;ieview o~f d:esign drawin~gs, speci~fications,;i!
::;:.. :: :.: i:::standa~rds :are *included or-refere nced.: 7:: - i i:::: : i: ;-;:i *::i:::                                             ;;i1!i:
:: ::i::::calculationad procurement documents: to assure *that: quality  
3.TeulfidTehialRviwrisrspnilefrprovidin~g an :.:                                                                            :*
! :1:
: i *;:i::. :*:*:**:i:*iin depe:nd ent* r*eview of: cha*nges :to *the i:SFSI* iTS. SSi3sl. i They ishall* ; r ;I
::;:.. :: :.: i:::standa~rds :are *included or-refere nced.: 7::
      ":' *':"::!:':"    :i::;i~i:::iprovide assurance ::that the :modification: m~eets :the design: bases,
i i:::: : i: ;-;:i *::i:::  
        --" ....                    regulatory requirements,:and applicable codes and standards. The                                                   .
;;i1!i:
review shall determine whether: the proposed .modifications: :requi~re:-
3.TeulfidTehialRviwrisrspnilefrprovidin~g an
prior NRC approval. if prior NRC approval is needed, any .license:;* ..
: i :i::  
*;. :*: *:** :i:*iin depe:nd ent* r*eview of: cha*nges :to *the i:SFSI* iTS. SSi3sl. i They ishall* ; r ;I
:": :i::;i~i:::iprovide assurance ::that the :modification: m~eets :the design: bases, regulatory requirements,: and applicable codes and standards. The review shall determine whether: the proposed.modifications: :requi~re:-
prior NRC approval. if prior NRC approval is needed, any.license:;*..
amendment request shall be referred to SOLUTIONS licensing sup0port.
amendment request shall be referred to SOLUTIONS licensing sup0port.
i ::"i*:i
i ::"i*:i  
          ~                   1.:::i.:...:
~
1.:::i.:...:
iiA W:or~k Order! shall b*,e *initiiated ifor all modification:s to iTS :SS~s :and:: :"*
iiA W:or~k Order! shall b*,e *initiiated ifor all modification:s to iTS :SS~s :and:: :"*
sytmsminane.peaioa.drng.FS.ctvtis.Wr.Odr
sytmsminane.peaioa.drng.FS.ctvtis.Wr.Odr
:ii*ii:iiiiiiii"i::iiiii*i2. :ii!Desigbn :ibases, :regulatory :requ~irements, a!n~d a~pplicabl~e codes :and                                       ,
:ii*ii:iiiiiiii"i::iiiii*i2. :ii!Desigbn :ibases, :regulatory :requ~irements, a!n~d a~pplicabl~e codes :and standards :and requirements for all proposed ISFSI modifications to ITS J, "iJ-S SCsi and sys~tems maintained operation~al duringisFiSi :activities.::
      . .... -                      standards :and requirements for all proposed ISFSI modifications to ITS J, "iJ-   :          ... S SCsi and sys~tems maintained operation~al duringisFiSi :activities.::
::i, These conditions shall be incorp~orated into drawings,: specifications*,
::i, " .                  These conditions shall be incorp~orated into drawings,: specifications*,                                           i
i
        "* : ; : . -:               pro c ure me n t d oc u m e n ts, an d proc ed u re s :. --.: :. : i :~:ii:: : . : . .i:.i :ii::.. : ::* .' ...            .
-: p r o c u r e m e n t d o c u m e n t s, a n d p r o c e d u r e s :. --. : :. : i :~ :i i :: :. :..i :. i :i i ::.. : :: *.'...
:i-ii*::!;
:i-ii*::!;
:i"i:3. ii.:All p.roposed I:SFSI m*odifications :shall be reviewed to determ~ine                                                       ::"I:
:i"i:3. ii.:All p.roposed I:SFSI m*odifications :shall be reviewed to determ~ine
::"I:
: iV.:* PROCUREMENT DOCUM:ENT C:ONTROL: :i::;::i;:i:;: :;;:.:;i: ii:::.:!
: iV.:* PROCUREMENT DOCUM:ENT C:ONTROL: :i::;::i;:i:;: :;;:.:;i: ii:::.:!
Ths ecio:etalihe te eaurs oassure that procurement; ::.i.J.::
Ths ecio:etalihe te eaurs oassure that procurement; ::.i.J.::
: : documents (purc(hase requisitions: and' orders) covering: material;:i::,::*..
: : documents (purc(hase requisitions: and' orders) covering: material;:i::,::*..
  ".              :.equipment, and serv~ices :for ISFSl ITS:SSCs..specify appropriate quality..* ..
:.equipment, and serv~ices :for ISFSl ITS:SSCs..specify appropriate quality..*  
          '            ' ~requirements;: Thie purchase order :specifies or r~eferences .:th:e *applicabile .~~.:.
' ~requirements;: Thie purchase order :specifies or r~eferences.:th:e *applicabile.~~.:.
      *                  ~~requiremen~ts,- d.esign bases, codes, :and stanida~rds to assure qual ityi: ;::.;:.
~~requiremen~ts,- d.esign bases, codes, :and stanida~rds to assure qual ityi: ;::.;:.
      . .::.. B.; Responsibilities .:..::!~::. .:.:.*:i:;.;:.::;                                     .. ,.                              :.*: it;:           .
..::.. B.; Responsibilities.:..::!~::..:.:.*:i:;.;:.::;
      ;i~~i::;The DC ::staff *;is respons~ible for; developing p;rocedures ito !cont~rol t~he:                                                               *
:.*: it;:  
:...i.i2i. ! 2:i.T~heDPiC staf~f is iresponsible for:initi~ation iof purchase requisition;:: ::ii 1
;i~~i::;The DC ::staff *;is respons~ible for; developing p;rocedures ito !cont~rol t~he:
::                  *wor~kSheets for mater~ial,: equipment, and services: require~d ::for; .::;                                         :
:...i.i2i. ! 2:i.T~heDPiC staf~f is iresponsible for:initi~ation iof purchase requisition;::
      *" : . : ":... .m aintenanice, ;repair:, and: m~odifications; . :.:i                             ':r"             *;*';" ]':' ;"'; *,];":
::ii 1
: 3. The Engineering Maniager is: responsible .for preparing engineering                                                   :-
*wor~kSheets for mater~ial,: equipment, and services: require~d ::for;.::;  
QAPD                                                                   1:1                                                           Rev.29
.m aintenanice, ;repair:, and: m ~odifications;.
:.:i  
':r"  
]':' ;"'; *,];":
: 3.
The Engineering Maniager is: responsible.for preparing engineering QAPD 1:1 Rev.29


    !!iiiili ii                       :*i: i ?:ii~i*li:;:*::::!pecifications :w~hich detail: the :technicall and quality r!;equi~remenits fiorii:!ii!:
! !iiiili ii
:*i: i ?:ii~i*li:;:*::
::!pecifications :w~hich detail: the :technicall and quality r!;equi~remenits fiorii:!ii!:
5
:III.
Pii:5i
,:*u rch*asing,is rjespo nsible forI prepa ri ngi, rieviewing,* approv~in g,:: is*s~uing,i !
t!~::~
t!~::~
                                            ". : 5 ,:*u
.... :*6.
:III.               Pii:5irch*asing ,is rjespo nsible forI prepa ri ngi, rieviewing,* approv~in g,:: is*s~uing ,i !
6 The QA Specialist I Engineer is respon!sible for review of IJTSi;i*:.i::i!.: :ii:;
i!+;?    :*6. 6 ircurement i;;;iii:p:ro*:/:        The QA Specialist         documents I Engineer     is respon!sible ito ensure  iinclusion for     review of IJTSi;i*:.i::i!.: ';::~ii of appro*priate~quiality::*                 :ii:;
i!+;?
I-i
i;;;iii:p:ro*:/: ircurement documents ito ensure iinclusion of appro*priate~quiality::*  
:::*:.::i..::;!
';::~ii
i--:.:1: .i:.::..puto                     l.. :Tie!rchaserqiiin for new matertiOn al,equripet
::: i--:.
                                                                                                                                  . tand           s erice*(     t h::sandi:*i:.
*:.::i..::;! :1:.i:. ::..puto l.. :Tie!rchaserqiiin for new matertiOn al,.
:..+*:i! .:*,?ias quantity, ..item idescr~iption,* and technical and qula~lity ;reqUlrementds:i!..*ii
equripet tand s
erice*(
t h::s andi:*i:.
:::i
:::i
                                                .i.2.+ Purchase orders shallinclude ispe*cifications th~at contain all the~i:?*+!**:!i+!:i:*::*:+::*+!I
:..+*:i!.:*,?ias quantity,..item idescr~iption,* and technical and qula~lity ;reqUlrementds:i!..*ii I-i i.i;*:::il;:i;i!iiii!::i!i:i!.iii:!+i:ii::!
                                                    +:.+ information necessary to* assure material,: equipment, and services are*:**::i: i+::
.i. 2.+ Purchase orders shallinclude ispe*cifications th~at contain all the~i:?*+!**:!i+!:i:*::*:+::*+!I
i:of: a d equa.teb qu*ialit. T~i::ih~is s*h~all!;in clude :material sele:**]ctioni: des ign d ata !ii.!:i, +!i: *.i::
+:. + information necessary to* assure material,: equipment, and services are*:**::i:
i+::
ii:::,i.:i::!.
ii:::,i.:i::!.
i.i;*:::il;:i;i!iiii!::i!i:i!.iii:!+i:ii::!
i:of: a d equa.teb qu*
                                                    !i:::.:*+:.:..:*delin~eated in;p+urcha~se or*der~s.. :Thm~:issha~ll include a :listing of each :item.:;!::-::,i:.::
ialit.
o;i*{:*!,iii
T~i::ih~is s*h~all !;in clude :material sele:**]ctioni: des ign d ata !ii.!:i, +!i : *.i::
                                                            ;:f     documnen tatio r:t;be-isub to          mitted,:wh*enh it[is:to bbe submittedi' wha~t~i:: i,::: ::::*: :: ;
!i:::.:*+:.:..:*delin~eated in;p+urcha~se or*der~s.. :Thm~:issha~ll include a :listing of each :item.:;!::-::,i:.::
req"-ubirtes approval:-""":
o;i*{:*!,iii  
                                                                                  ..            prio to manufacture,
;:f documnen tatio to r:t;be-isub m itted,:wh*en h it [is:to bbe submittedi' wha~t~i:: i,::: ::::*: :: ;
                                                                                                              ..              and. toy
req"-
                                                                                                                                    . whom
ubirtes..
                                                                                                                                        -: I t shall.::::!..:."i-be:?::::-.?i:i*::.:
approval:-""":
                                                  .44:...
prio to manufacture, and. toy whom  
:: .. To.:the extent necessary, ITS procurement documents shall:r~equire :. ..
-: I t shall.::::!..:."i-be:?::::-.?i:i*::.:
:.i:.::
4:...  
ii.ili::..::iii:*21,i;
.4.. To.:the extent necessary, ITS procurement documents shall:r~equire :...
:.*-:;                10 CQ:*FR I50, :*Ap pend!ix B,:. and/or* 1       *0.: CF*R 72,:+I Su bpart* G.:;::: Suppier~isii:*.:*!
:.i:.:: :.*-:;
                                    !i.iiiii : ;::i iisha~ll be r.tequire!d !to ::provid{e :acceSs .too.th~ei~r fac.*i!i~ti~essialn~d:i*
ii.ili::..::iii:*21,i; 10 CQ:*FR I50, :*Ap pend!ix B,:. and/or* 1  
:.ii-.                                                                                                            reods iifor:i:l .:*!..+!
*0.: CF*R 72,:+I Su bpart* G.:;::: Suppier~isii:*.:*!
i::ii:nspect[ion. and audit, as reqluireid,-t~o~determinei complianceb w*ithl!:!!i*:i::.:iii:::l
:.ii-.
::.i;: -:i~:.+.:.:ii*.:*i"
!i.iiiii : ;::i iisha~ll be r.tequire!d !to ::provid{e :acceSs.to o.th~ei~r fac.*i!i~ti~es sialn~d:i* reods iifor:i:l.:*!..+!
                                  ;::+      ~:i :+:::provisions o:f !thiei purch~ase ord:er. *=These: requirem ents shfiall ;exten~d i:to:ii.:ii
::.i;: -:i~:.+.:.:ii*.:*i" i::ii:nspect[ion. and audit, as reqluireid,-t~o~determinei complianceb w*ithl!:!!i*:i::.:iii:::l
                                        !i!i::::i;:;
;::+ ~:i
                                *:.:+::i~5;:.
!i!i::::i;:; :+:::provisions o:f !thiei pu rch~ase ord:er. *=These: requirem ents shfiall ;exten~d i:to:ii.:ii
:                      ITS;
:+::i~5;:.
:*.ispu~rchas~e                 requisitiOns :sh~all be :reviewed by: the. QA ::Specialist::.:I"-:.:::.
ITS;
::i/i*::i~:i~i:. ":*::in~itiated ia~nd revi~ewed in.                 i*:accordanice i:ith:tlhe. s~ame proceduries :u~tilized:*:.
:*.ispu~rchas~e requisitiOns :sh~all be :reviewed by: the. QA ::Specialist::.: I"-:.:::.
                                                                                                                                                                                        !;i+i::i:i!
::i/i* :.
            * ** +;':.:.+? : . . i.i.:.ii:               .                                                                                                    ?.::i i' .'" . ". : ?+ '.+.':' ." "',
::i~:i~i ":*::in~itiated ia~nd revi~ewed in.
i*:accordanice i:ith:tlhe. s~ame proceduries :u~tilized:*:.
!;i+ i::i:i!  
* * * +; ':.:.+? :.. i. i.:. ii:  
?.::i i'.'".
". : ?+ '.+.':'." "',


in preparation of the original document.                                                 i *ii i!ii!I*
in preparation of the original document.
V.                   INSTRUCTION
V.
INSTRUCTION


==S. PROCEDURE==
==S. PROCEDURE==
S. AND DRAWINGS A.         General This section establishes the measures to assure that activities relating to ISFSI activities are performed in accordance with approved instructions, procedures, and drawings.
S. AND DRAWINGS i
* i i i!ii!I*
A.
General This section establishes the measures to assure that activities relating to ISFSI activities are performed in accordance with approved instructions, procedures, and drawings.
B. Resoonsibilities
B. Resoonsibilities
: 1. The DPC staff is responsible for preparing or reviewing all procedures iiiii that are required for implementation of the QAPD.
: 1. The DPC staff is responsible for preparing or reviewing all procedures that are required for implementation of the QAPD.
* 2. The ISFSI Manager is responsible for approval of ISFSI related rirocedures that imDlement NRC-aooroved oroorams and olans.
* 2. The ISFSI Manager is responsible for approval of ISFSI related rirocedures that imDlement NRC-aooroved oroorams and olans. i iiii
iii!ili!i!:
: 3. The Qualified Technical Reviewer is responsible for reviewing all initial and revised procedures that 'affect ITS ISFSI operations and shall determine whether changes to these procedures require prior NRC approval.
: 3. The Qualified Technical Reviewer is responsible for reviewing all initial and revised procedures that 'affect ITS ISFSI operations and shall determine whether changes to these procedures require prior NRC approval.
C. Reauirements
C. Reauirements iii!ili!i!:
/i
!iiii!i:i!iii i
: 1. Detailed instruction for ISFSI activities shall be contained in procedures and checklists covering the following activities:
: 1. Detailed instruction for ISFSI activities shall be contained in procedures and checklists covering the following activities:
                                                                                                                                                                                                                      /i
: a. administrative control,
            !iiii!i:i!iii
*, ": *::*:..,* !,!'r:*-*'
          * , ": *::*:.. ,* !,!'r:*-*'
: b. general security system operation,
i                  a. administrative control,
: b. general security system operation,                                                     !!iii!!!i  i!!:
iii i!iii!ii!ii!
                                                                                                                                                                        !!iiii!!ii iii:*:
: c. Security Plan implementation,
: c. Security Plan implementation,
: d. quality assurance, i:;;:
: d. quality assurance,
!!i ii!!!i i!!:
iii i!iii!ii!ii!
!!iiii!!ii ii i:*:
i:;;:
e;*;. I::sur*veill.ance ::::alnd i::tea~t a ctivities of iequipme~nt,:
e;*;. I::sur*veill.ance ::::alnd i::tea~t a ctivities of iequipme~nt,:
f.:::::::::::::=================
f.:::::::::::::=================
fire::::!:::::
: !::i!
p:!::i!
fire::::!::::: :: ii ii:::::
rot ctio        : prog:i:raE.::
p ro t c tio p ro g ra m,:: a nd::
::iiii:::::      m,::     a nd::
:i: E.::
:f!::i:::::: ::i:!.E::,i i*~ :::::::::::: ::*~:ii::i i;i:*:i:i ii ii
:f!::i:::::: : :i:!. E::,i i*~ :::::::::::: ::*~:ii::i i;i:*:i:i ii ii
                    *.i ::i**;!::*i:*i::;iii*i!*ii:;::     For;iact*::t~iv
*.i ::i**;!::*i:*i::;iii*
:iii2:!;i:.i                       othr *:those
i!*ii:;::
:ities         th!an                   w*: ni:*ormal~*craf expertisei ith;*.in:;                                                    -;!~i;yt               ;: :::*ii:
: ii i2:!;i:.i For;i act*::t~iv
:::i::i:~*!::*i!
:ities othr th!an  
:::::;iEii:
*:those w*:
* i     nst:ru:ctionsii!:i;::
ith;*.in:;
                                                          .::*        !si ii for  :.i~maintenance ii* d :br ~*!land:        s ~repair  b i~s:a:pic of ISFSI equipment                  :::or:ii!::i
ni:*ormal~* craf expertisei  
                                                                                                                                                                    **: ;;:;! i::***i*.:     systems
-;!~i;yt  
                          *: ..:.: ":                     shall:   be:-::
;: :::*ii:
o cointsslaliirine                 in d      proced raes or WorkaOrdeors.Th guidnesallta~~::*:*:i*..*:;:!:ii:.;i:;~:i*l
:: ~ *!:: : : Ei *
                        . : . i..;.". :~i". - ::*:.i*,Ptai con.          isru:c:iteions f~or preprtemiongtl~,                         perorane,       c tes~tying,       a nd return:~iEi                 to
:i::i: *i!
                                                                                                                                                                                                        "::!i!i:**:
: : : ::;i i:
                        *::-"::::i::"i
i nst:ru ctionsii!:i;::
:::            :i: ::::;:ser ic.T             * :*egu dac em hsa*~                    ay refer:::**.::*/:*:*:::*.enc..*:::...;..e m anufactur.*   e r's:**:: Instruct*::::*::::::::**",:*:,*:::*:::*ion
: !si ii :.i~
ii* d : br ~*!l s ~ b i ~s:a:pic **: ; ;:;! i::***i*.:
::: :ii!::i for maintenance and: repair of ISFSI equipment or systems shall: be:-::
o cointsslaliirine d
in proced raes or WorkaOrdeors.Th guidnesallta~~::*:*:i*..*:;:!:ii:.;i:;~:i*l
. :. :~i".
i..;.".
con.
::*:.i*,Ptai isru:c:iteions f~or preprtemio n gtl~,
: perorane, c tes~tying, a
nd return:~iEi to  
"::!i!i:**:
-"::::i::"i :i: ::::;:ser ic. T hsa*~
* :*e gu dac em ay refer:::**.::*/:*:*:::*.enc..*:::...;..e m anufactur.*
e r's:**::
Instruct*::::*::::::::**",:*:,*:::*:::*ion
:iii.i*::E~i:i:::ii**
:iii.i*::E~i:i:::ii**
              *::i:: iii:,*           ii*ii
:!iiiii!ii!!iiii!*!iiiii!i!!ii!ili:ii!::*!ii:iil;i iiiiii*i
* i*!I* i;*                       QAPD                                                                                                             Rev.
*::i::
ii;!ii*:*:il ill: *29~i!iiii~iii;!i~**!i:!
i ii:,*
iii:!!*ii*:ili!!i!
ii*
:!iiiii!ii!!iiii!*!iiiii!i!!ii!ili:ii!::*!ii:iil;i iiiiii*i                                                                                                                                                              *- ::.::..;.
ii
* i*!I* i;*
QAPD Rev. 29~i!iiii~iii;!i~**!i:!
ii; !ii*:*:il ill:
* iii:!!*ii*:ili!!i!


-.: ::T&#xb8;/:::*:'::.'.:.::::* .:::'*::T :::                                                                                                                                     :::::::::::::;::,::':
-.: ::T&#xb8;/:::*:': :.'.:.:: :: *.: ::'*::T :::
                                                                                                                                                                                              +:':::;'::::::::
iii i
T ::::::,:./*:::"
+:':::;'::::::::
                                                                                                                                                                                                                                                                                      *:::...:::::*:.5::::
T ::::::,:./*:::" ::::.::::::::.:::.::::::::::::::,::::::;.:::::::::::.*::::*,
ii i
*:::...:::::*:.5::::
: 4. The department responsible for an activity shall be required to provide i!i!i!ii                      iilii!iiii!                                                    il
i!i!i!ii i ili i!iiiiil
                                                                                                                                                                                                                                                                *:.i:)::*:TiT*:!i*!::i::ii!i*Li!!!!i)iiiii:i*
: 4. The department responsible for an activity shall be required to provide the. necessary technical input and review of changes to instructions, procedures, or drawings~
the. necessary technical input and review of changes to instructions,                                                                                                                           iii!ii*ii!i:*i*:ii!*!):*iii:i::T procedures, or drawings~
: 5. Changes to or deviations from established instructions, procedures, or drawings will require the same review and approval as the original document However, temporary changes to procedures that do not change the intent of the original procedure may be made in ink, dated1 and approved by two people of the management staff.
: 5. Changes to or deviations from established instructions, procedures, or drawings will require the same review and approval as the original document However, temporary changes to procedures that do not change the intent of the original procedure may be made in ink, dated 1 and approved by two people of the management staff.in administrative
: 6. Procedures will be reviewed periodically as set forth in administrative
: 6. Procedures will be reviewed periodically as set forth i*:::;
*:.i:)::*:TiT*:!i*!::i::ii!i*Li!!!!i)iiiii:i iii!ii*ii!i:*i*:ii!*!):*iii:i::
: : :     ~:               o c ed u r es.:::::*:::::::::
i*:::; :
i! * :.ii *li* :::::           :: : :: :::::::::pr                                               ::::: :::::::: ::: :::: :...;
: ~ :
A. Generali* !; ii*~i*~*!i::ii~~iiii~iii:iiii!i~~~~:*i~):;ii*i!i!:iiiii!)**i!*)i)i*)i*i*~)iii*)ii~l     :ii:);*i:ji),*i:i                           ~             )i*l*i)**:*)):i)i)i ~
i! * :.ii *li* :::::
:* T hT:**))**:!)is
:: : :: :::::::::pr o c e d u r e s.:::::*:::::::::
                                                      *-))))))    s ci *ion*:****
A. G enerali*  
e t,):):))**i
!; ii*~i*~*!i::ii~~iiii~iii:iiii!i~~~~:*i~):;ii*i!i!:iiiii!)**i!*)i)i*)i*i*~)iii*)ii~l
                                                                            !:i!*))*:)   b J))i)    i) the:~):))~:*i)i
:ii:);*i:ji),*i:i  
:i**
~  
ishes~ :*ij)**')irequirem
)i*l*i)**:*)):i)i)ii~
                                                                                                                      *)::i)Y*))) *: ents        i*i:::fo d)*:):**)*
*-))))))
:!i:*        cu)i:!)en ] control)F) *i )Ti)))*i)))**)   ias*fT       ti.i!))i)))]iE~) i ::i:i:i.:])!TIiT             )) :):**
:* T hT:**))**:!)is s ci on*:****  
                                                  ~.       r~esDonsIDIIIIIes
*i !:i!*))*:)  
: 1. The DPC staff is responsible for preparing a standard procedure for                                                                                                                             iiili controlling the issuance.of procedures and for preparing, procedures Ifor controlling the distribution of operating, maintenance, repair, and modification procedures for the ISFSI.
,):):))**i J))i)
C. Requirements 1; Procedures shall be established for the issuance of procedures, drawings, and specifications. A document control procedure shall be prepared to provide a uniform system of document Identification.
:i** i) e t b ishes~ :*ij)*  
* ')i * )::i)Y*))) *:
the:~):))~:*i)i i*i:::
:!i:*
requirem ents
)*:):**)*  
)i: !) ]
fo d cu en control)F) as*
*i i
ti
) Ti )))*i)))**)
fT  
.i!))i)))]iE~) i : :i:i : i.:])!TIiT  
)) :):**
~.
r~esDonsIDIIIIIes
: 1. The DPC staff is responsible for preparing a standard procedure for controlling the issuance.of procedures and for preparing, procedures I controlling the distribution of operating, maintenance, repair, and modification procedures for the ISFSI.
C. Requirements iiili for 1; Procedures shall be established for the issuance of procedures, drawings, and specifications. A document control procedure shall be prepared to provide a uniform system of document Identification.
: 2. All documents shall have an identification number, title, date, and revision number. Documents shall be fi!ed and controlled by. use of
: 2. All documents shall have an identification number, title, date, and revision number. Documents shall be fi!ed and controlled by. use of
                                                                'this Identification. Each type of document shall be filed in a central location identified in a document control procedure.
'this Identification. Each type of document shall be filed in a central location identified in a document control procedure.
: 3. 'DrawIngs, specifications, and procedures', Including revisions, shall be reviewed for adequacy and approvedfor release by authorized personnel. The required reviews and approvals shall be specified' in a document control procedure.                                         '  .'
: 3. 'DrawIngs, specifications, and procedures', Including revisions, shall be reviewed for adequacy and approvedfor release by authorized personnel. The required reviews and approvals shall be specified' in a document control procedure.
: 4. The' administrative staff shall assure that current documents are distributed to and used at the location where the prescribed activity is~
: 4.
The' administrative staff shall assure that current documents are distributed to and used at the location where the prescribed activity is~
performed. Documents and revisions shall be distributed as specified in a document control procedure. Preliminary and superseded documents shall be clearly identified and closely controlled to preclude their misuse.
performed. Documents and revisions shall be distributed as specified in a document control procedure. Preliminary and superseded documents shall be clearly identified and closely controlled to preclude their misuse.
: 5. An index of each type of document shall be established and maintained to provide the current status of documents.
: 5. An index of each type of document shall be established and maintained to provide the current status of documents.
VII. CONTROL OF PURCHASED MATERIAL E ULPMENT AND SERVICES QAPO                                                                                                                                                                                   Rev. 29 i ii!i:ii!
VII.
ii!i i!i!i&#xb8;   i!!ili.:ili!!)ii!ii:il)ii!ili!Sii;!!i)!!i
CONTROL OF PURCHASED MATERIAL E ULPMENT AND SERVICES QAPO Rev. 29 i ii ! i :ii!
                                                                                                  ;i!:ii iii iil;iiii!i!!!!
ii! i i!i!i&#xb8;i!!ili.:ili!!)ii!ii:il)ii!ili!Sii;!!i)!!i  
;i!:ii iii iil;iiii!i!!!!
i
i


iii:ii i~i:iiiii:d!i i          i iii       r jelctly       ior throlughlc~ontriactors andl subcontriactor,:s conform tot~iihe i:iiiiiilI
iii:ii i i~ i:iiiii:d!i r
                                                                                                                                                                                                                                              !ii*iiii;*iiiiiiii!*!:*ii
i iii jelctly ior throlughlc~ontriactors andl subcontriactor,:s conform to t~iihe i:iiiiiilI
                                                                                                                                                                                                                                              !!ii*i!iiiiii!iiiiii:iiii%!ii*;i evalu*:*:*
!ii*iiii;*iiiiiiii!*!:*ii
i*ation, q"ua~lif&#xa2;ication,: !*and evaluating*: su PPlier q*Ualit~y pro                                                           *gr*am*s ii.!i:*iiii::!i i f ~iiiiii!
!!ii*i!iiiiii!iiiiii:iiii%!ii*;i evalu*:*:*
The
i*ation, q"ua~lif&#xa2;ication,: !*and evaluating*: su PPlier q*Ualit~y pro  
                                                    !;*!::       QAi~~iiSpeciai
*gr*am*s ii.!i:*iiii::!i The i  
::;!*Ii*ii* st:        E-ngineer is responsible for developing;i:                                         ::              ~li:!
!;*!:: f ~iiiiii!
procedures
QAi~~ii Speciai st:
                                                                                                                                                                                                              *ii::iii:                           I
::;!*Ii*ii*
                  *!i:iiiiili!ii!iiiiiiiiiiii*iii:,
E-ngineer is responsible for developing;i:
                  !!!iii!i!
procedures
iiiiiiii!iii   ii;iiiiiiiiiiiiiiiiiiiiii2iiil ii!iii!i!ili!ii!iiii!i!ii!iii!iiiiiiii ii!i!i ii:and:c itec*hnficial capa'bilities.i*.iiiiii                                                                                                                                       iiiiiiii!liii!iii Cii:C
~li:!  
                                          *ii*:;SSu* nolier
*ii::iii:
                                                      *~ ~ ~iQ   Qualificationi::ii
I
: 1. Q aiiaino upir
*!i:iiiiili!ii!iiiiiiiiiiii*iii:,
                                                                      ** i t*** i::i;::i**!i:!: ~i ~!i:*l                               :!;i: iii:~!:l:iii::i:iii:i:
ii;iiiiiiiiiiiiiiiiiiiiii2iiil
!!!iii!i!
iiiiiiii!iii ii!iii!i!ili!ii!iiii!i!ii!iii!iiiiiiii ii!i!i ii:and:c itec*hnficial capa'bilities.i*.iiiiii Cii:C  
*ii*:;S * *~ ~ ~iQ ** i t*** i::i;::i**!i:!: ~i ~!i:*l
:!;i: ii i:~!:l:iii::i:iii:i:
f:iiii.!ii!i!:i !::
f:iiii.!ii!i!:i !::
il!*i
il !*i  
                                                                                                                                                                                  ~ :::ii:*!i:i*;*
~ :::ii:  
:::*ii::
*!i:i*;*
                                                                                                                                                                                                  ~i.*~i!i:i ii!.                       i:ii!'i i!ii!ii!!ii!iiiii!!!
:::*ii::  
hl               oss fassigps xe                                                                 ience           :
~i.*~i!i:i ii!.
                                          *::i:::::!     wiiih te snUpplieriind:t~iii:;Q
S u nolier Q ualificationi::ii i:ii
:ii*!init                                  sup                     ier'rput~ration. and exp*t er iencosi:                                     th f:::::::::::ie, in                          andi:::i~~:
: 1. Q aiiaino upir hl oss fassigps xe ience  
: : :;:::         up~pliiers iofi c&#xa2;ask 2 .:::*Smaeilsal                        si us~e~dfor sh ipm~ent: :andcl eeauae.oesre*                                                that ithesto rage:   .:d~esign o*f :radioactiveJ a:nd :ifabrication            *:*:*.iii*iii::::
*::i:::::! wiii
f:o~f:
: ii *!init h te snUpplieriind:t~iii:;Q sup ier' rput~ration. and exp* t er iencosi:
*...._--"      ... ::!.i::*;i:::*i:
in th f:::::::::::ie, andi:::i~~:
: *: : i: *;::::',"::*'-:!:'*:i:                                      r       perfored iliacain :i:i~ '~:'*': undrl                    the control of an~ E:                    NRC-approvedi'!il~iii:iiiiii:ii
iiiiiiii!liii!iii i!ii!ii!!ii!iiiii!!!
:*!:: !:'                            andiii~iii:
!'i
                                                                                                                                                                                                                                *:!:!!!!i!
... ::!.i::*;i:::*i:
Source Inspection...............
: *: : i: *;::::',"::*'-:!:'*:i:
0!:;;:~!i:i.l
2.:::*S up~pliiers iofi c&#xa2;ask si us~e~dfor sh ipm~ent: :andcl sto rage: o*f :radioactiveJ *:*:*.iii*iii::::
maeilsal eeauae.oesre* that ithe.:d~esign a:n d :ifabrication f:o~f:
iliacain r perfored undrl
:i:i~ '~:'*':
the control E: :*! ::
of an~
NRC-approvedi'!il~iii:iiiiii:ii andiii~iii:  
*:!:!!!!i!
0!:;;:~!i:i.l Source Inspection...............
: 1. When appropriate, suppliers shall be requested to furnish DPC with sufficient information concerning their manufacturing and inspection plan to permit DPC or their designated agent to plan and implement a source inspection plan.
: 1. When appropriate, suppliers shall be requested to furnish DPC with sufficient information concerning their manufacturing and inspection plan to permit DPC or their designated agent to plan and implement a source inspection plan.
2.We                 prpitiseti!oni                                             plans s:*hfal                 I:nclueitn~
2.We prpitiseti!oni plans s:*hfal t
t                  ii*e~d*ss and: hold i*i~i*:i:~i~i::!                       il*i po!**ii~
I:nclueitn~
i ntsfori     nspec.:* f         :*t*ion of tem        : jjc   , wti**~   tne sin           ofpro ess s o tests,::i*i!~i::ii**i*i*
ii*e~d*ss and hold i*i~i*:i:~i~i::!
ii:: :!*:!::*i:*:i:i                                              auit:. ofii!i!:iiii:
il*i po!**ii~
requiredL       quality~do                um n ato
i ntsfori nspec.:*
                                                                                          .*i*i~::*:::.iii:ii:*ii::.               , nd v:i*:~*:ii:*i i**:i:ii!!l*!i::i*               rii ato      i iii: that~   :ii vendors:*i:!i*:i~i:! hav:i!ii:i~iiieiilii *iii:ii::!iiiii E.l
f
:*t
* ion
: jjc ti**~ ii:: :!*:!::*i:*:i:i of tem, w tne sin ofpro ess s o tests,::i*i!~i::ii**i*i*
auit:.
ofii!i!:iiii:
requiredL quality~.*i*i~::*:::.iii:ii:*ii::. i**:i:ii!!l*!i::i*
:i*:~*:ii:*i i iii:
:ii do um n ato, nd v rii ato that~
vendors:*i:!i*:i~i:! hav:i!ii:i~iiieiilii *iii:ii::!iiiii E.l
: 1. Items shall be examined by appropriately trained staff upon receipt for shipping damage, correctness of identification, and specified quality documentation, in accordance with approved instructions.
: 1. Items shall be examined by appropriately trained staff upon receipt for shipping damage, correctness of identification, and specified quality documentation, in accordance with approved instructions.
: 2. Documentary evidence attesting that items conform to purchase order requirements shall be available at the ISFSI prior to installation or use of the item.
: 2. Documentary evidence attesting that items conform to purchase order requirements shall be available at the ISFSI prior to installation or use of the item.
:. QAii:::i~~*!                   3.iDocumentary eidence!!shall be sul fiienin ode to Idnif                                                                                               that th                         .9!i:ii~*i!!:
:. Q Aii:::i~~*! 3.i Documentary eidence!!
shall be sul fiien in ode to Idnif that th
.9!i:ii~*i!!:


    .:*;:t;*!::.*:!:Y:..;::::;':*:.!*:.}t:i;>:.*;*:::specific r:!eqUirements,- such as codes,. standards,: anid specifications,                                                                                     i:: **:
.:*;:t;*!::.*:!:Y:..;::::;':*:.!*:.}t:i;>:.*;*:::specific r:!eqUirements,- such as codes,. standards,: anid specifications, i::  
    * :.*i: :.! .il:.i, ;;*:ii~:zi:!:
* :.*i: !.il ;;*:ii~:zi:!:
                              ~:ii:: :.*::i:               : *;ican~i n~be.*confir'med :fori thle pur~icha sed item, :This r-ieqU ire~ment !shall: ibe: .i::.ii. .! *:i!:
:. :.i, ~: ii:: :.*::i:
can~i
: *;i n~be.* confir'med :fori thle pur~icha sed item, :This r-ieqU ire~ment !s hall: ibe:.i::.ii..! *:i!:
::"{
::"{
i           :"::-: }:i -.                               sat:isfi ae by:;d umhaving ap~op                                ava fiabe copes ofrin                         the purchase order:and*ii!:.i:i*:           ii~i*:!:!ii:ii-!:.;il*.!:i::i: *'i
i
              ...                          ....                  appropriate...     docum ent referenced..                       .          th*. rein...
:"::-: }:i -.
                                                                                                                                                    ...::.:..        .:      ;i ; *:..*::.;:::::::::::::::::::i:;;::. *;tit:::.:.-:
sat:i sfi ap~op ae
                                  .                  :4!AlIT                   aeils at, n                                         o poet                     il       esgegtduo                                             i
:;d by umhaving ava fiabe copes ofrin the purchase order: and*ii!:.i:i*:
: ::;:;i
ii~i*:!:!ii:ii-!:.;il*.!:i::i:  
          !:;:* :I   ;. :'i:iiLi;i : :]E T                     rFeceip an will       b*;e         place in*:a; receivinginspection hold area*sb                                             EparTe     i;:*ii:~~l
*'i appropriate...
                                                                                                                                                                                                                    *i!ii:!ii;~!i i~:i*
docum ent referenced..
          *:"; 'r*..:.:*'*
th rein...  
                        *:::*:**: :*:m;from:*     *:]:":               sto rage*]:;*4**+:2:"*i**;::iZ::
;i ; *:..*::.;:::::::::::::::::::i:;;::. *;tit:::.:.-:
fa;**::* i +iies:*:;:**:;.*
i
                                                                                  ;::;;::::*                        A fter:       accep
:4!AlIT aeils at, n
:.*:"::" *::** : : tan ce,:
o poet il esgegtduo
                                                                                                                                      *=;::[*             t* *he:' m aterial; will:::::::::::::::
: ::;:;i ;. :'i:ii
:*: =*                          be:*:=identified:*
!: ;:* :I Li;i : :]E T rFece ip an will b*;e place in*: a; receivinginspection hold area* sb EparTe i;:* ii : ~~l  
                                                                                                                                                                                              " :':2:=*****:
*i!ii:!ii;~!i i~ :i*
:-it-a;hs accineptabl iesandplaed insecuifimednts.orag x~;:t;:;..:i;i!.t::i::.:;::::*:*o~*:i:}:                                                                                                                 ie.ntfct~ n;;n                           o~ f::i:i* :*i;: ;::*':=;;
"*:'': *: " 'r* :.:*'*
            ~::ii!;;:i;i!i ii!; 5.i;:iDui~a~rina!eciva~ing inspectin, If ~ non ii::: i;ii~~*:::*                                                                                                                      a s onformanie or di yscrepancy ~ii~;:!ii*i:: iiii:i*i ;:*
:.*:. ;.. *:: :*:** : :* :m ;from:*  
,:*i~i*;:iiii;;
*:]:" :
ii~i;:::!iii
sto rage*]:;*4**+:2:"*i**;::iZ::  
            *:i::i ;;;                               d exists,      i the    :f6material mi:~e i shall        ti:* ;tebe ;f~        placed        on hold in*tajito~;
;**::* +
ityiii*r*gh*:             and w.ill remain;;: usini::aiii:i::.:.
fa i iies:*:;:**:;.*
A fter:
:.*:"::" *::** *=;::[*
accep tan ce,: :* : =* * * : '
t he m aterial; w ill:::::::::::::::
be identified:*
:* := " :':2:=
x~;:t;:;..:i;i!.t::i::.:;::::*:*o~*:i:}:
:-it-a;hs accineptabl iesandplaed insecuifimednts.orag ie.ntfct~ n;;n o~ f::i:i* :* i;: ;::*':=;;
ii::: i;ii~~*:::*
~::ii!;;:i;i!i ii!;
5.i;:i Dui~a~rina!eciva~ing inspectin, ~
If a s non onformanie or di yscrepancy ~ii~;:!ii*i:: iiii:i*i ;:*
, ii~i;:::!iii :i ;;;
:*i~i*;:iiii;;  
* :i:
exists, the material shall be placed on hold and w.ill remain d
ini a i
hold
hold
                                                                                                                                                                                                        ;il:iii!i:i:i
:f6 mi :~e i ti:* ; te ;f~ ityiii*r*gh*: in*tajito~; ;;: us :: iii :i::.:.
                                                                                                                                                                                                                !ii!i~i:*!;;;~iii
;i l:iii!i:i:i  
                                                                                                                                                                                                                                ~~i *.
!i i! i i ~i:*!;;  
,,:~i;i
;~iii  
    *~ii;:::i:;:
~~i *.
:i;:i.::;;:i!i:i!i:i
,, :~i;i
::*:*!!: .                                         statuii:i suntil final,            disp
:i;:i.::;;:i!i:i!i:i  
::i::,i!!::::iii:!:i:i&#xa2;;:i&#xa2;   !i::iii::o::sitioni
*~ii;:::i:;:
                                                                                      -;i:i!:.i~.;.:;:::ii:;     .i:?:!i;i:!. is di.eterm ii::*!::: :i!i:;:*
sta tu su n til final, d isp o sitioni is d eterm in ed..i A: co rrective:! action.
:::!:.:in
ii:i
                                                                                                                                              .::i
::i::,i!!::::iii:!:i:i&#xa2;;:i&#xa2;  
                                                                                                                                                !:: ed..i
-;i:i!:.i~.;.:;:::ii:;  
:i:::i:i::i;:; A: corrective:!action.
!i::iii:: ::.i :?:! i; i:!.
:ii!;;i:::
ii: :*!:::
i*!:;*:::.i- :::*!  *: .:i*:::;:;i ii;i!i!:* ::;document:*:: *:.*!i;:::T e             shc~*all: beinitiatell:b~e~bihn* th*oe~l rq iie e:si:*:!                                                                                   *!,i:::::i
: i. :i!i:;:*  
  ...-../ITS                                                     mateial,.par., and c                                   mpoeteasb a o tsed                      ntheponentssyste m                       -. ,:            :::
.::i !::
. ..;;::;):i::::::ii::*:
: :i:::i:i::i;:;
          !::; :i:?:i}:;:.:*idesignat:iiil iii*:i?:i.i :         i on, fromi!::r6       rece.:i~*;u~
: ii! ; ;i:::
ip:!n t aiti theb*fai ity~e: throughidbnstallation or u~ste                                 .ti~i: .i! !:ii*;*
i* !:;*:::.i *:.:i*:::;:;i  
                * .* .::-...; t;!                               for3t;;:;
- :::*! ii;i!i!:* ::;document:*::  
hesi~a:;dentificati.on                 and controlc                   fa t~~iderias pabrtshandicomponents~h;"i;.
*:.*!i;:::T e shc~*all: be initiatell:b~e~bihn* th*oe~l rq iie e:si:*:! *!, i:
    '::::;"""; " .i: .!i.: ::} from recemm:ip){nt                                     th oug istall~oq:atio n goruse and/ort e v::.tran!;ielop                                       t0:ingpro icdures .}:::;!:;:.;;:.
::::i
 
... -../ITS mateial,.par.,
:*:7*:{**:::,: documentation.: I::dentific~ation *Shall: be either: o n the: item o r !recor~ds:i.
and c mpoeteasb a tsed o n theponentssyste m  
...;;::;):i::::::ii::*:  
!::; :i:?:i}:;:.:*idesignat:iiil iii*:i?:i.i :
i on, fromi!::r6 rece.:i~*;u~
ip:!n t aiti theb* fai ity~e: through idbnstallation or u~ste  
.ti~i:  
.i! !:ii*;*
t;!
for3 t;;:;
hesi~a:;dentificati.on and controlc f a t~~iderias pabrtshandicomponents~h;"i;.
:::: " ".i:.!i.:
from
::}
recemm:ip){nt th oug istall~oq:atio n goruse and/ort e
v::.tran!;ielop t0:ing pro icdures.} :::;!:;:.;;:.
:*: 7*:{**:::,:
documentation.: I::dentific~ation *Shall: be either: o n the: item o r !recor~ds:i.
{ :::::::i:::!)::
{ :::::::i:::!)::
:!::} i :traceable ito :the :.:item.iWhe re~plhysical. ide ntification .is*im practicali*:-.:iI :::
:!::} i :traceable ito :the :.:item. iWhe re~plhysical. ide ntification.is *im practicali*:-.:iI :: :
                                                          * :::..:.!/i{.
:::..:.!/i{. :i.:-:physicalisepa rationi~, /procedu*Jral 'cont~r.ol, :or other. approbpriate :means :i"i iii
iii
_:...- :.:/ -
:i.:-:physicalisepa rationi~, /procedu*Jral 'cont~r.ol, :or other. approbpriate :means :i"i
IX.
                                                                                                                                                                                                                                                .......                        _: ...- :.:/ -
CONTROL OF SPECIAL PROCESSES
IX.                 CONTROL OF SPECIAL PROCESSES
::A.i:
::A.i:     Gene~ral::
Gene~ral::
                                                                                                                                                                                                                                                            ..i.:::
.. i.:::
:i*i-:,,  :,,:,i:::}, ::: : "
This secti~o n es ta blishes, the:: m easurbes.to" assurie* s p ecial :proce~sses,.iii} :i*i::i)i:;. ii{:i*
This secti~o n es tablishes, the:: m easurbes .to"assurie* s pecial :proce~sses,.iii} :i*i::i)i:;. ii{:i*
id::i~:.*:i::iientified as I.lSFSi.ITi S,. a*:re c*ontrolled and ~accomplished byZ iqualifie~d*:ii;!.-:;i:: K:-ii~~:*:*..i~ii:
                                                      * .! :":... id::i~:.*:i::iientified as I.lSFSi .ITiS,. a*:re c*ontrolled and ~accomplished byZ iqualifie~d*:ii;!.-:;i::K:-ii~~:*:*..i~ii:
.i:}:::.
i:ii.}:iiip.;erison~nel iusing q:..ualiified ~procedue-i.s} in accordance. with:*i":i
i:ii.}:iiip.;er ison~nel iusing q:..ualiified ~procedue-i.s} in accordance. with:*i":i apicable cei*-as,7:*.! iiii:{: ~i st.eand nards n, sefiatinscriterieaioto and  
                                                      .i:}:::.                                                                                                                                                      apicable cei*-as,7:*.! iiii:{: ~i st.eand                 sefiatinscriterieaioto nards     n,                                                       and     ~oth         spcalsreuirementsrane.:"":
~oth r spcalsreuirementsrane.:"": ::.;::.:
r                                                  ::.;::.:
S  
S - -1. ThreOPO stafddfisresonsibeWor establising                                                                               S~capro~cedrs that d~esrib:*ed::;:-i:i
-1.
                                                      --: :.:..::.:.:. ::how p:q~Ja~fersonel a~ndpoedures                                     n           aorane w~tqualifiedfosijecalprcessres;::*:{.:.}!/:*}.:::*::*:*i*:E:
ThreOPO stafddf is resonsibeWor establising S~capro~cedrs that d~esrib:*ed::;:-i:i
K:!:.. K.:!!}*:~"**:.i.i]
--: :.:..::.:.:. ::how p:q~Ja~fersonel a~ndpoedures n
2:.:.:The QAi         Speiaist I g:e.in                   En:*  ::eer       oisrbe*:f)r.:asponsibne for rev*u~iewing o~i~ifi: :*::i !i [. :*:
aorane w~tqualifiedfosijecalprcessres;::*:{.:.}!/:*}.:::*::*:*i*:E:
* : ';' 7:::>,:.:>.**::
K:!:..
K.:!!}*:~"**:.i.i]
2:. The QAi Speiaist I En:*
g:e.in
::eer oisrbe*:f)r.:asponsibne for rev*u~iewing o~i~ifi: :*:: i !i [. :*:
:*-i{:i*}!
:*-i{:i*}!
:.:                    repa:!iii-:!ersand mdii.*h             0cedtion w eork                   nvling specal prcessife~s: :..is perform.;;iiil.::-.:::.:*{:iied                             *
repa:!iii-:!ersand mdii.*h 0cedtion w eork nvling specal prcessife~s : :..is perform.;;iiil.::-.:::.:*{:iied
:":i:.!i.
:":i:.!i.  
                                                              -i::.!-:::-           byi:!qualc:ifsi~ed       proniunde                             acntildcord         nce           ithiqualiie:a           prceduresi~.-*:~ .:-::
-i::.!-:::-
6da                                    .:..-:
byi:!
                          *i!:;*:iiii!-!:ii!:i
qualc:ifsi~ed proniunde acntildcord nce ithiqualiie:a 6da prceduresi~.-*:~.:-::  
                                                      .... : :.:...: ... using: qualified personnel :and :procedur~es. iQualification of..personnel:.i.: !.
.... : :.:...:... using: qualified personnel :and :procedur~es. iQualification of..personnel:.i.: !.
                                                        .":i.iii:i.:
:i.iii:i.: i.:/::*!..::*ard*st.n~dproc durs:!:*!::*:*!::
: i.:/::*!..::*ard*st.n~dproc durs:!:*!::*:*!::           shall com          .: ply::::::::::::::::::::::!:!*i with the req}{i .irements!:*.                       of! appl:":
shall.:
i cable.:.:/::   codes!:*::!:::{.!:i:.
com ply::::::::::::::::::::::!:!*i with the  
                                                                                                                                                                                                                                              .":}.::.
}{i.
::::{i:::i2.**: Wi:eiderSiand welding iprocedu~res: s hall:* be:q ualifi ed,-i as approi:pria*te,:: :in~i:;:::i:!i:*
req irem ents!:*.
  .{!::if-:: :---..: . t: }: .!.: {i : .:.:*.":*: -: :i ":i&#xb8;*:           :i :: :i::::iaccordance: w*ith iSection iX o:*f the ASME Boiler :and Pressure :Ves~sel::*;:*:!!~i ii!iiiii{,,iii*i
of! appl:":
    ......ii::i:!::i:i!i:iiii*i'"'i:'!::*ii;!*
i cable.:.:/::
                                      *. *.........:,V ::i:!*
codes!:*::!:::{.!:i:.  
  *::*:*.:::.:: ::.i:i*i*::
.":}.::.
:i*i-:,,
:,, :, i:::}, ::: : "
* : ';' 7:: :>,:.:>.* *::
*i!:;*:iiii!-!:ii!:i ii!iiiii{,,iii*i
.{!::if-::::---..::..t::}::.!.::{ii::.:.:*.":*::-:::ii":i&#xb8;*:
ii::i:!::i:i!i:iiii*i'"'i:'!::*ii;!*  
*. *......... :,V ::i:!*
::.i:i*i*::
i*i.::::.*!:i!.:!i.::::.i.:.*.;....
i*i.::::.*!:i!.:!i.::::.i.:.*.;....
:'.*:.:i:i:
:'.*:.:i:i:  
                                                            .i*i:.:,
.i*i:.:,
:i:*i.:::: accor*.dance
-..:, ""{. %.. "" :.:'
: :.                     w.:ithi:thhe Amer*ican :Society ifor .Non-destr*uctive :Testin~g:*!:::**::: .*;:
::,.'.{:", ::i:: ".: }".' : / ":
4.: Procedures shall, be established. to describe !themethod. used to control." ::
:!}:': 'i: "(::'4.:::;/" ":: :::'.*:A:*ai:*l-:t*,
4
:/...::!....> :!,:.:/:.....,# /.: ::: :::: :,
                                                                              " the receipt, storage, baking, drying, and disbursal of welding filler ..
::::{i:::i2.**:
i:::," /:*::,' ,,::/-'
Wi:eiderSiand welding iprocedu~res: s hall:* be:q ualifi ed,-i as approi:pria*te,:: :in~i:;:::i:!i:*
  * * ,":        -..:, ""{. %.."" :.:'            :      ""
:i :: :i::::iaccordance: w*ith iSection iX o:*f the ASME Boiler :and Pressure :Ves~sel::*;:*:!!~i
caibatdmaintained,":stored, :handled, -and :Issued :in .accor'dance with
:i ::: : :.
                                                                          '. :,.....applicable   ..        procedures orinstructions..-..........- ".-,...                                                             .:"'/!.....}'i.:.. ": "r ii:ii
:*i.: accor*.dance w.:ithi:thhe Amer*ican :Society ifor.Non-destr*uctive :Testin~g:*!:::**:::.*;:
  '      ::,.'.{:", ::i:: " .: }".' : / ":
4.: 4 Procedures shall, be established. to describe !the method. used to control." ::
:!}:': 'i: "(::'4.:::;/" ":::::'.*:A:*ai:*l-:t*,
" the receipt, storage, baking, drying, and disbursal of welding filler..
                                                                                                      .....;i*S
caibatdmaintained,":stored, :handled, -and :Issued :in.accor'dance with applicable procedures orinstructions..-..........- ".-,...  
                                                                                                        ;i'iii
.:"'/!.....}'i.:..  
                                                                                                            ..}*:i:ii~
": "r
                                                                                                                ;"*:;::i;i.
....;i'iii
i;i!;::i)
} *:i:ii~
                                                                                                                            .i:I*..
i;i!;::i) i:I*..  
                                                                                                                            '*'i :......:.
.;i*S ;"*:;::i;i..'*'i ll::*.
ll::*.
::::::::::::::::> 1 * : :
                                                                                                                                          ..:.....: 1*..: .: .. :.        i:::i::!*;ii*:
i:::i::!*;ii*: :Si.
                                                                                                                                                                              . . :.:Si.  ::: ; ..":.:.. :...::.:
R e v. 2 9:-
::::::" :"*:::"*      . .*R
: :,......*...***2... -..
                                                                                                                                                                                                                            ,.. ..*:*:"": ev. 29:-.. -..
i:: :," /:*::,',,::/-'ii: ii
                                                                                                                                                                                                                                          ***2.
: i.
:/...::!....> :!,:.:/: .. ...,# /.:::: :::::,                                                                                                                                                                                                                  .,. ., .. .        . , . .. . . .
:i
 
-i-  
                                                                                                                    -i-   -- ':;" " ' ' ':,': "i.":; -- ,:-- -:'       , "+ : ,': "", : "     -:' * '": :":'"; :' *':',::'. :. *'-.'i:ii'.:,', .':'. i:' ,.. , ::
-- ':;" " ' ' ':,': "i.":; --,:-- -:'  
                                                                                                                                                                                                                                                                      !:i:*i*i*!*i*:-:
, "+ :,': "", : "
: i.           :i                                                                                                                          S!ii                                  :, ,,, .. ..                        :,:-,:,:::.::- :, .. ::,,, ,::: , ,i!
S!ii
" -:' * '" : :":'"; :' * ':', ::'. :. *'-.'i :ii'.:, ',.':'. i:',.., ::
:,.. ::,,,,:::,,i!
!:i:*i*i*!*i*:-:
X.INSPECTION:
X.INSPECTION:
A.* General This section establishes a program for inspection of ISFSi activities to verify conformance with approved procedures, drawings, and specifications.
A.* General This section establishes a program for inspection of ISFSi activities to verify conformance with approved procedures, drawings, and specifications.
B* Responsibilities ii;.! ::;i:i;;i-i;::;:;:.r.i:.equir~ements ::ar~e :inClu ded:i n engineering;,specifications, alndi reviews *of.:::ii
* Responsibilities B
                                    ;ii.;. :i*-;-:.any
ii;.! ::;i:i;;i-i;::;:;:.r.i:.equir~ements ::ar~e :inClu ded:i n engineering;,specifications, alndi reviews *of.:::ii
* in~sp ection **pr~oce d Ures!: imp lemrne nting this Section. arecom p leted*:!:: . .*:!i.
;ii.;. :i*-;-:.any in~sp ection **pr~oce d Ures!: imp lemrne nti ng this Section. arecom p leted*:!::.
                                    . .~     ::;:! :T~he QAi Spec~iali:st I,Engi neer i~is;!:
.*:!i.
                                          *.2;.i:                                                                                reponisbleI for esta*bliishing ;inspection :!il.I
..~ ::;:!  
                                  .:i :.::i.i i!:: :.;;*proceduries and iassurin g adeq uate. ;inspection: req uir~em ents arie!:;:;; :::;!::i :;i:: ~*!.i.
*.2;.i: :T~he QAi Spec~iali:st I, Engi neer i~is;!:
                                  .: *****iincluded in procedures. They areualso responsiblrese                                                                         sibe,:frl     forcoordienatingi c o!;dnilt n *~th                           theo  e;::*:::*. :
reponisbleI for esta*bliishing ;inspection :!il.I
                                  ":;:~ii".,          assignments:         t ofsgnme  qualifiedfie isinspection personnel.                                                       : *:i:i ".i. i.:*!:*!::Y::i -:;;i~                               :-: :-*:.i :
.:i :.::i.i i!:: :.;;*proceduries and iass urin g adeq uate. ;inspection: req uir~em ents arie!:;:;; :::;!::i :;i:: ~*!.i.
    * ..:i..:..;:;::.:;.:..
.: *****iincluded in procedures. They areu also responsiblrese forcoordienatingi theo sibe,:frl c o!;dnilt n *~th e;::*:::*. :
:. :3-*.:                       The/.":.:"..:.
:~ii assignments: ofsgnme t
ISF :i:""-::::,:
qualifiedfie isinspection personnel.
: i. :i;i:?.?.        Manage I :,;,*:,:           shall::i.:,,::;:..i-,
: *:i:i ".i. i.:*!:*!::Y::i -:;;i~
be eson .. .::,ibe for ,approv,:,                                   ,ing,,- ..ISESI,             .inspecti .i:::.~..:,.:..::::::,. on.*
:-: :-*:.i :
      ;; ! ;i:;;;i::i:~i;
*..:i..:..;:;::.:;.:..
::i:}:*i;::*i ;               proci3::;iT e duresFor        a!insrcionsa nd-*shall ens ure suf~f~                                                 i c:*ient ;Inspect;ions are~i~!;!J
:. :3-*.:
::.;:*ii
The/.":.:"..:.
:!.:..~i-:.:.;!:
: i. :i;i:?.?. :i:""-::::,:
              ;;i!:ii: :*:!performed.         -                            to provide               adequate
ISF I :,;,*:,:
                                                                                            !::.ii-;:"::."./.;::::             confidence
Manage shall::i.:,,::;:..i-,
::ii*:::;*.i~::.:.;     ::::.:           that
be eson ibe for,approv,:,  
::;::;![-S:i*.:.:         project activities
,ing,,-..ISESI,  
                                                                                                                                                                    ;i:::::*?:;;::;**:**;;::i:;;;                                 meet;:~i:*-i::;:
.inspecti on.*
:':::;::i*::;;i;?:*:i:;:*;;;;.;::           : :::~i.     ::*: ;;
.i:::.~..:,.:..::::::,.
:;i:p :e :*!i::in redeterm:i:ed reiqui':*:
;; ! ;i ;i::i:~i;
:l:;:ii*!*:i:i*;**:;                                                                        reme;!;n!'     ts.*;l***:~i' i::;/ *i*;*;i:i;;il*:!!i;*:: *i:*
: ;; ::i:}:*i;::*i ;
                                                                                                                                .i:::;i:i*i!::::;:'i                i:*iii:!!!:;;**::!ii;ii'':!: ;iii*:: *:*: :;: *;~;'ij:*;i*!*!!!;: *;:               i*:i':*:;i***i*!i;
proci3::;iT e duresF or a!insrcions a nd-* shall ens ure suf~f~
i c:*ient ;Inspect;ions are~i~ !;!J
::.;:*ii ;;i!:ii:
: !.:..~i-:.:.;!: :*:!performed.
to provide adequate confidence that project activities meet;:~i:*-i::;:
!::.ii-;:"::."./.;:::: ::ii*:::;*.i~::.:.; ::::.:
::;::;![-S:i*.:.: ;i:::::*?:;;::;**:**;;::i:;;; :':::;::i*::;;i;?:*:i:;:*;;;;.;:: : :::~i.
: l : ;:ii*!*:i:i*;**:;
:; i:p re d e te rm:i:
:e :* !i: :in e d re qui':*:
i re m e n ts.
.i:::;i:i*i!::::;:'i
;!; !' *;l***:~i' i ::; / *i*;*;i:i;;il*:!!i;*:: *i:*
i:*iii:!!!:;;**::!ii;ii'':!: ;iii*:: *:*:::;::*;~;'ij:*;i*!*!!!;: *;: i*:i':*:;i***i*!i;
.i*:::i;.;ii: to..?
tpbe e;*stabl!i.shed.: Plannin:g activities shall. identify :the ~char!acteristicis:
;!l*.
::.:!i.:i:*l:
i!:.ii;accePltanice cicteraia, a~d the o:ibrganization r.iiesponsi!ble :for:performing~i.:: :. i
:i:;:;.*"i:,*
.. :inspectin~g of, an activity. beforie proce~eding, shall be in;:idicated in ithiei:;;:ii..::;:
:.i.i;i;.:.:i;:i
;-:appro*prijateprocedure, specification, ior :.work :order. Ti;;;he: inspect{ion:.~:;..}.:::::;::
.i::i:::;shall :be documnented, to indicate approvali and rel~ease: p~rior to
....: -:- / :
. ;i,.. continu~atio n iof the actvi ty. i.
.. i.,...
-,,,ii;-i;i:;ii;
:i*.:,:,li
:-:/::
:-:/::
                                      .i*:::i;.;ii:  to..?
iiI
tpbe e;*stabl!i.shed.: Plannin:g activities shall. identify :the ~char!acteristicis: ;!l*.
i!:.ii;accePltanice cicteraia, a~d the o:ibrganization r.iiesponsi!ble :for:performing~i.:: : . i
::.:!i.:i:*l:
                                                  .. :inspectin~g of, an activity. beforie proce~eding, shall be in;:idicated inithiei:;;:ii..::;:
:i:;:;.*"i:,*
                                                ;-:appro*prijateprocedure, specification, ior :.work :order. Ti;;;he: inspect{ion:.~:;..}.:::::;::
:.i.i;i;.:.:i;:i
                                      .i::i:::;shall :be documnented, to indicate approvali and rel~ease: p~rior to ....: -:- / :
                                      . ;i , .. continu~atio n iof the actvi ty . i.                                                  . . i., .. . ,:,,.; . ;:, -,,,ii;-i;i:;ii; :i*.:,:,li                                                                                            iiI
* by:cOm*panyi yipersonn eli or con:tractorii.pleriso0nn el,: ian~dii sh alli requir~ei t hat.:i"i.!:*; ::*i*i:*:::::.!
:*;*i;:...ii::iii*;:i::i::.i:-i::"
:*;*i;:...ii::iii*;:i::i::.i:-i::"
by:cOm*panyi yipersonn eli o r con:tractor ii.pleriso0nn el, : ian~dii sh alli requir~ei t hat.:i"i.!:*; ::*i*i:*:::::.!
:ii:.i:;:*:.:.;..;?.:;!i:;nspection *proced ures ;and :*inOstruc&#xa2;tion~s, alo!ng w.ith n*ecess:ar!y dra~lng s,il.!i~i~;.:jj::::.::ii~..
:ii:.i:;:*:.:.;..;?.:;!i:;nspection *proced ures ;and :*inOstruc&#xa2;tion~s, alo!ng w.ith n*ecess:ar!y dra~lng s,il.!i~i~;.:jj::::.::ii~..
...:: i::i~~ii/:::*;i; i!* ~-*:;*~il:i               5.ii:
...:: i::i~~ii/:::*;i; i!* ~-*:;*~il:i 5.ii:
:Insp. e ct*ionre uiemet       hai eint goverdning modificatieorgns, r ;epairs                                                                               an id i; :.....:.*
:Insp.
replae     : ment;shalli:               be
e ct*ionre uiemet hai eint goverdning modificatieorgns, r epairs an id i; :.....:.*
                                                                                    ;-i.;i:;.."           acc , .inrdanc with:.the,....                             origi:.:.
replae m ent; shalli:  
i nal des;;...         ..i gni             and.*.
;-i.;i:;.."
                                                                                                                                                                                                              .. ;;;;i.:/!*::;;;.:
be
inspctio               requirements::,               or., as amended.:                     ,     by approved chne                                                   to the, QAPD.......                                                   ;!;*!iiii;i!i*i:!;i*
,.in acc rdanc with:. the,....
                                                                                *!i*i!*       i!i;::i*
origi:.:.
i!i*i:!i:*:iil*  ***ii*i&#xb8;
i nal des;;...
:i 18                                                                                                                        Rev. 29:"
i gni and.*.  
Revi:i29
;;;;i.:/!*::;;;.:
::::*::i.i-ii::*.:     :. ::./i:::!.
inspctio requirements::,
or., as amended.:,
by approved chne to the, QAPD.......
18 Rev. 29
*!i*i!*
i! i*i:!i:*:iil*
:i
;!;*!iiii;i!i*i:!;i*
i!i;::i*  
* **ii*i&#xb8; Revi:i29 :"
::::*::i.i-ii::*.:
:. ::./i:::!.


section establishes the requirements for an ISFSI test program to demonstrate that ITS SSCs will perform satisfactorily in service. The test program shalt include, but not be limited to.surveitlance testing, special tests, post maintenance testing, and testing following ISFSI modification o significant changes in procedures.
section establishes the requirements for an ISFSI test program to demonstrate that ITS SSCs will perform satisfactorily in service. The test program shalt include, but not be limited to.surveitlance testing, special tests, post maintenance testing, and testing following ISFSI modification o significant changes in procedures.
Line 923: Line 1,305:
procedures or instructions.
procedures or instructions.
: 3. The Qualified Technical Reviewer is responsible for review of all ITS proposed test procedures, special testing procedures, performance testing procedures following ISFSI modification and performing 10 CFR 72~48 evalu~tion~ to verify that ISFSI tests do not require prior NRC~
: 3. The Qualified Technical Reviewer is responsible for review of all ITS proposed test procedures, special testing procedures, performance testing procedures following ISFSI modification and performing 10 CFR 72~48 evalu~tion~ to verify that ISFSI tests do not require prior NRC~
approval.                  .
approval.
C. Requirements
C. Requirements
: 1. A program shall be established to assure all testing required to demonstrate that ITS SSCs will perform satisfactorily in service is, Identified and documented.
: 1. A program shall be established to assure all testing required to demonstrate that ITS SSCs will perform satisfactorily in service is, Identified and documented.
Line 929: Line 1,311:
: 3. Test procedures shall incorporate, but not be limited to, requirements for such items as: hold points, witness points, caution notes,.
: 3. Test procedures shall incorporate, but not be limited to, requirements for such items as: hold points, witness points, caution notes,.
emergency reqLirements, and test jumper logs.
emergency reqLirements, and test jumper logs.
: 4. that:
: 4. Test procedures shall Include, as a minimum, provisions for assuring that:
Test procedures shall Include, as a minimum, provisions for assuring
: a. Prerequisites have been completed that include, as a minimum:
: a. Prerequisites have been completed that include, as a minimum:
: 1) Control of systems status as necessary.
: 1) Control of systems status as necessary.
Line 937: Line 1,318:
: c. Test results are documented.
: c. Test results are documented.
: d. Detailed instructions for performing the test are included.
: d. Detailed instructions for performing the test are included.
APD                                                                           Rev. 2
APD Rev. 2


i*:: .:'::.:::::*:*:*i::::*i:
i*::.:'::.:::::*:*:*i::::*i:  
                                                    .i*:-*,::::*!.:i*:
.i*:-*,::::*!.:i*: :i! ::!!
:i! ::!! i                               .,i:ii*!*
i
                                                                                                                                    !ii:ii!::ii*:          i: ii*i:..:,*,:i,:*!:;:i:!!*::::i*ii*ii;:**
.,i:ii*!*  
! ii:ii!::ii*:
:::*:*!ii*:;::iii
:::*:*!ii*:;::iii
:*!*i!::*:                                 :*:*,i*:!*:*!
:*!*i!::*:
:ii*!*ili*i:i!iI ili:!i i*i:i L!     :ii:iii!i!:
i:
iii !*'::!i e-.:i:l Test !results ar~e reviewed a nd :approve~d:.:
ii*i:..:,*,:i,:*!:;:i:!!*::::i*ii*ii;:**
cond::
:*:*,i*:!*:*!
                                                          .*:0uc~tin:g:the                       *:test, tihe:.data recorder:, the:: type:-of. observ9ation :made,:: ::
:ii*!*ili*i:i!iI ili L!
:.:...:the :equipment .used,. the test re~sults, :the acceptability of.the :test;::..;;.:
e-.:i:l Test !res ults ar~e reviewed a nd :approve~d:.:
r iesults,           .anid approved :dispositio*n for an~y deviaJtions::. :.*:.-;.:":.i":*:::::,
:!i i*i:i
::::::::::::::::::::::::::::    cr:::;
:ii:iii!i!:
ii i !*'::!i cond::  
.*:0uc~tin:g:the *:test, tihe :.data recorder:, the:: type:-of. observ9ation :made,:: ::
:.:...:the :equipment.used,. the test re~sults, :the acceptability of. the :test;::..;;.:
r iesults,.anid approved :dispositio*n for an~y deviaJtions::.
:.*:.-;.:":.i":*:::::,
cr:::;
iti::ieria :shall :be p:roperliy n:ot~ed :andl appropriate &#xa2;orrie~ctive a~ction tak*:ienii:::.i:
iti::ieria :shall :be p:roperliy n:ot~ed :andl appropriate &#xa2;orrie~ctive a~ction tak*:ienii:::.i:
XiII.           C:!!i*ONT OL:OF .MEASURI:NG AND TEST EQUp:IPMENT..: :;;-i!!i-:::*::~i: ::ii::.:;:i::*:!:: **iiiilii ii::!;::.:;::::i!iic:*,on*tr
XiII.
                                  ;:-                            ol,* :calib~rati on,:: andl p:)eri~o~d ic adjuistmient:; of :tools, *gau[g~es,;*: inst rum~ents,*::.* ::
C:!!i*ONT OL:OF.MEASURI:NG AND TEST EQUp:IPMENT..: :;;-i!!i-:::*::~i: ::ii::.:;:i::*:!:: ** iiiilii ii ;:-
                            ':.:.."!:::':,::~i:!a::*ndl othe r measurinirg :an~d:test!eq uipment-used, to verify confo rma nce ~toi .::.:-: .:
::!;::.:;::::i!iic:*,on*tr ol,* :calib~rati on,:: andl p:)eri~o~d ic adjuistmient:; of :tools, *gau[g~es,;*: in st rum~ents,*::.* ::
::: : : " established :iSFSI tec:hnical requlremients ".....                                                                       "."::..... .... ':'""-;
':.:.."!:::':,::~i:!a::*ndl othe r me asurinirg :an~d:test!eq uipment-used, to verify confo rma nce ~toi.::.:-:.:
B.           R es o s b i~ es :,!::: :"::" :"::. . .. "::onsib""il...:":ities'::" :::."":: :::::::i!!i.i:.i::. :::::::::::::
::: : : " established :iSFSI tec:hnical requlremients ".....
1...The DPC staff is rsponsible for establishing requremet for a .
B.
                                      .-:::::.... ; .... program :for.-the Econttrol, calibrat*ion,: and periodc ~:adjustment. of itoolSi::.
R es o s b i~ es :,!::: :"::" :"::.... "::onsib""il...:":ities'::" :::."":: :::::::i!!i.i:.i::. :::::::::::::
*..*.*:....*i*i::i!*:* :*:::.*:
1...The DPC staff is rsponsible for establishing requremet for a
:::::.. ;.... program :for.-the Econttrol, calibrat*ion,: and periodc ~:adjustment. of itoolSi::.
:*:::i!:*;::::ii
:*:::i!:*;::::ii
::::!.: *:en*suriingg:tool s, g auge s:;, instr umen ts,* andCothe r *m easurin g :anrd :test:.::. i
::::!.: *:en*suriing g:tool s, g auge s:;, instr umen ts,* and Cothe r *m easurin g :anrd : test:.::. i
                                      !*i-,:::.:**::!*.:::***::*::eq:uipmet               a:*re calibrated to a:s~sure co*:mp:iai*nce with *t~he imnplementing::*:;
!*i-,:::.:**::!*.:::***::*::eq:uipmet a:*re calibrated to a:s~sure co*:mp:iai*nce with *t~he imnplementing::*:;
*..*.*:....*i*i::i!*:* :*:::.*:::- .::::i*:::     ;3*:. T;*he~I:SF:SI!: Manag:errIsi ;resp)onsible for ensuriing iim~plement~ation*of the.i.*:;
::-.::::i*:::  
                                            .. :...: -!req uirements :of this sectioni:of ;the manual "for.ISFSI ::activities andrfor:..:;.
;3*:. T;*he~I:SF:SI!: Manag:er rIsi ;resp)onsible for ensuriing iim~plement~ation *of the.i.*:;
: *;                      aprovig I:SIprocdurs o insrucion ......                                                                       .    *:*i*i:i::;*::::    :      ::::::::::
:.::.-'.. -!req uirements :of this sectioni:of ;the manual "for. ISFSI ::activities andrfor:..:;.
: * ::::i *           .. -.*:* * *: : *:* i i*!***~!:/; ::::::::::::- :: . : : * : :- ! i:i !*::*;*:: Ji :.:; *: :: ::!; :;::: ~: ::*: :i :***::!: :.**i:::   :: .:.:!i *,:: :*::*::
aprovig I:SIprocdurs o insrucion......  
*:*i*i:i::;*::::
: * ::::i *  
...*:* * *: : *:* i i*!***~!:/ ; ::::::::::::-
: * : :- ! i:i !*::*; *:: Ji :.:; *: :: ::!; :;::: ~: ::*: :i :***::!: :.**i:::
::.:.:!i *,:: :*::*::
iili ill:i!
iili ill:i!
            * .. :*- "  . ,*,..    .*,,..:....I'*
i::ii:: :ii.!:
                                        , ,*H..                  UI[*III*li-         ".;:'..- :
i* iii:*.*
i::ii:: :ii.!:  i*iii:*.*1:.*:,*Insp'e~ctio'n, *::t~est, aind iwor p:ro:edure;s shall include pro*:!*ivision t:!:o!**: ::::i :!:
.*,,..:....I'*
::*:!:-.a.nd. t~est eqi p m~enrti an d: idev*i:e s :used: in :a::cti:vitieS affecting*: qu~ality::ar~e of:
UI[*III*li- ".;:'..- :
                                                                  *:t h~e .*pbrope :range
,*H.. 1 :. *:,*Insp'e~ctio'n, *::t~est, aind iwor p:ro:edure;s shall include pro*:!*ivision t:!:o!**: ::::i :!:
                                                                  *::::::::                                gb~tY pe,: and .!accu: rac(yi.{to ve rify !c~onhformanceb; to::*:** :"i:":.*
*: ! : a.n d. t~est eqi p m~enrti an d: idev*i:e s :u sed: in : a::cti:vi ti e S affecting*: qu~ality::ar~e of:  
established requirementseandm                                testan   parameters.e~i*;*:;* :::* :::.*;:.;;.*::;i..::::::!:::;i::::* :.*:il*
*:t h~e.*pbrope
E::::.:.:*.:equipment shall be.:.::                                                     controlled, calibrated, adjustedecl                           and maintained.........
:range gb~tY pe,: and.!accu: rac(yi.{ to ve rify !c~onhformanceb; to::*:** :"i:":.*
                                  .::.:.                       :period~ically,-o~r :pr{ior to :use.? Calibratio~ns are performned againSti!:;::"::::
established requirementse andm testan parameters.e~i*;*:;*
                        * - -:"- "                            -certified :measur~ement standards that,.are traceable-:to. nationally*::::,.:* ...
:::* :::.*;:.;;.*::;i..::::::!:::;i::::*
:. :                        ~recognrized standards. Where, national::standards do: not :exist, ================:
:.*:il*
                          * . ::. i-                 .,provision~s will :be established to dc~ument .the.basis for-calibration.:;.**Ei:*..::
E::::.:.:*.:equipment shall be.:.::
ii'
controlled, calibrated, adjustedecl and maintained.........
                        ... .::.    .. :::                    .:Contr~ol.m~easures :and, p~rocedures :shall: prevent the use o:f calibrated::.-*..:
::-.:-:.-....... :period~ically,-o~r :pr{ior to :use.? Calibratio~ns are performned againSti!:;::"::::
::=======================           un=
-certified :measur~ement standards that,.are traceable-:to. nationally*::::,.:*...
::*:auth*orizedi                     personnel. Special cialibration1.an~d controi :m~easures :ar*ei::
~recognrized standards. Where, national::standards do: not :exist,================:
                        * :.":-: ..-:::  ::;:!. :!. no.ii0t; required for d~evices when nhormal: commercial. practic~es provi~de:.i.:..--:.
*. i-  
:: i:*a de q ua te :ac c u ra cy . :::::::::::::::: .- : :
.,provision~s will :be established to dc~ument.the. basis for-calibration.:;.**Ei:*..::
                      .*=.....: *:.;:..*:..:::.iii;*::::*:                                                                               -..      ..:;*:".* : :::: ' : .. -.::.:- . : .:*:*::.: *::=i
.:Contr~ol.m~easures :and, p~rocedures :shall: prevent the use o:f calibrated::.-*..:
                              ...            :      3,!!*::I:::.:
::=======================
                                                          . W he...n an..                          of....
un=
                                                                                .- .:........:........,:,::m e s r.item n and test:':"!i::i'     eqi pmi:   e     nt!:.i:,'="=
::*:auth*orizedi personnel. Special cialibration 1.an~d controi :m~easures :ar*ei::
                                                                                                                                                                . ... :is found to,...         bei:::.
no.ii0t; required for d~evices when nhormal: commercial. practic~es provi~de:.i.:..--:.
out of':::*:*!,,:* :.:
.*=.....: *:.;:..*:..:::.iii;*::::*:
:QA.
:: i:*a d e q u a te :a c c u ra cy. ::::::::::::::::
:::..:PD:::.:
*::=i 3,!!*::I:::.:
:!i!::!!::i:* ::~:i:
W he...n.-.:........:........,:,::
:3*.                                           :*:f*     ea~~ing: 20  and; *este~p                     et:i ifurl~ !.ii:beo Rev.                      :~ ::::i;:29:!:!:*iiie
an..
:.::;::: ::::ii,: i*::i::i:i:i::: **!!i...::i::::i:, ::i*,
.item of.... m e s r n and test:':"!i::i' eqi pmi:
e nt!:.i:,'="=  
.... :is found to,... bei:::.
out of':::*:*!,,:*
QA.
PD:::.:
:::..:: !i!::!!::i:* ::~:i:
:3*.
20 Rev. 29:!:!:*iiie
:*:f*
ea~~ing: and; *este~p et:i ifurl~ !.ii:beo :~ : :::i;:ii'
:: ::::ii,: i*: :i::i:i:i::: ** !!i...::i::::i:,
::i *,
* i!ii*: !. :i*!*:i*i:!:*i*i
*.i:*
!i*:.il ! :!i*iil calibration, an, investigation* will be conducted and documented: to. "
deteri~mne :the validity of previous.inspections,. tests, or caliibrations.::
..which wereper~formed with: the use of that* item:.:..
:*:!*I
.:.. :;!i *.l..!i!.::i':*
.:'iii!i:,.
i i:*~
:ii:ii:iI4..*i*R ecords. or loii0gs Siof ithe icalibration nhist or iiof imea suring and dtest:'~~~!ii*::iiIi!:l:i*
: :;-::!i*:.-::!i::::ii~*:.:;:-?
:?::a**:ffixe*d iserial :n umb er.!.Cali br~atio n:.i decals iiitag s or i*s tickr i eis~ihalli;b e :. :I*
:=.:*.:;.i*::i;.:::::::::::::::::
.:.i:i
:.!.:~d :islyd enit::f prom iS n i:
entlyn
.! i-.,cal rt
: h. :::"
on each device and shall reflect. the


                                                                                                                                                          *i!ii*: !.:i*!*:i*i:!:*i*i                  *.i:* !i*: .il!:!i*iil calibration, an, investigation* will be conducted and documented: to. "
===
deteri~mne :the validity of previous .inspections,. tests, or caliibrations.::
date=======
                                                                ..which wereper~formed with: the use of that* item: .:.. :*:!*I                                                                                              .:.. :;!i *.l..!i!.::i':*
of===========iii::!-i:ii
                                .:'iii!i:,.
.:: i:-* T h is* s ecti on es:**:tablishle~s:*t:he* re qu ire~ment s fo lr:S FS p
i i:*~  :ii:ii:iI4. .*i*R ecords. or loii0gsSiof ithe icalibrationnhist oriiof imea suring anddtest:'~~~!ii*::iiIi!:l:i*
: roce*du re*s to
:?::a**:ffixe*d iserial :n umb er.! .Calibr~atio n:.idecalsiiitag s ori*s tickr
,on:':r t rol* : i.:
: :;-::!i*:.-::!i::::ii~*:.:;:-?                                                                                                                                                    i eis~ihalli;b e :. :I*
. :::*ii~:::
:=.:*.:;.i*::i;.:::::::::::::::::
the:::::::
                                                          .:.i:i:.!.:~d :islyd enit::f          prom iSn entlyn          i:on each device              .!i-.,cal  and rt    shallh.reflect.            :::"                  the date===             of===========iii::!-i:ii
:ieihan~dlinig, ;:storage, :sh ipping,* iclean*in~g,* pack agin g:,* and :preservation o::0f  
                                                                                                                                                                                                                                                        =======
*::i:
                                --*-:.,*::.*. :: i:-* T his* secti on es:**:tablishle~s:*t:he* re qu ire~ment s fo                                             lr:S FS :proce*du re*s ,on:':r                                           to              trol* :i.:
.:.?!::*IiTS*: m~ateriia~l**a~n*d ieq~uip~ment :*t o :prievent idam*ag e, deterio:ration;, or lioss:ii.:i:i!:*:*i:.-
                                . :::*ii~:::
:.ii.*:.:.through.::;.;shipm ent, inst lla io or. use..-.--:.:....  
::::::            the:::::::
-.-::.:..:-. :-.::.. :.-.::-:-:.-:~.i:.i- :::::i:*.~~:::::
:ieihan~dlinig,           ;:storage, :sh ipping,* iclean*in~g,* pack aging:,* and :preservation o::0f                                                                                                       *::i:
:!!::"i: : *.:i~.:!:2:..:.!.:::"2i:.-The.ISFSI ~Ma nag e~r: Is respon*sible::* t forappro*val o:f *allimpl**:
                                            .:.?!::*IiTS*: m~ateriia~l**a~n*d ieq~uip~ment :*t o :prievent idam*ag e, deterio:ration;, or lioss:ii.:i:i!:*:*i:.-
em:enting':i:::::i**:::*:::
:.ii.*:.:.through.::;.;shipm ent,                                     .::
" : '"";'" -:1.::
inst: lla io or. use..-.--:.:....               -.-:: .:..:-. :-.::.. : .-.::-:-:.-:~ .i: .i- :::::i:*.~~:::::
Th r:scaequsirements: for handing:,
:!!::"i: : *.:i~.:!:2:..:.!.:::"2i: .-The .ISFSI ~Ma nag e~r: Is respon*sible::*forappro*val
storagpleshippti~ng cl~teanembing,
              ' :.::..:.                                                                                                                                      t                                o:f *allimpl**:                   em:enting':i:::::i**:::*:::
:::i and~ :*"*i
              - "':"    " : '"";'" -:1.::                         Th r:scaequsirements: for handing:,                                           storagpleshippti~ng cl~teanembing, and~                                                             :::i :*"*i
-suprlserv *,ation ia l..
of-ma.erials, and:equ ipment :::::
shall be~ :::..i--"?.i.:
doc me te.:in::*.:.::::i
::.*: :" !:!:i~i :::::.:/
:::'*:ap p ro v ed p ro ced u res.
::::::...: i. :* ::: * :::i:i:
:::::::::::::: L.i:*:.:::: : *::i*::
:::;.*::.:::.c:bovrinand ::it~pr~oetvednviromentrs;, suhatspeinier!it vals a
*tmospherei::i::
:: i:.
hand::!
lting:tools,
.andi~ equip~mentto a
e sueafan adequatey mntied::.-:::
handling::.::
of;,"*,.*:::*ii*.ii::
:':i:! :i*I
:':i:! :i*I
                    *"                        -:':: .            -suprlserv *,ation of-ma.erials,      ia l.. and:equ                ::...:.                ipment  shall::::: be~                    doc
,:, ::,":::!i:!!:.:,..:
                                                                                                                                                                                                            .- :::..i--"?.i.: me te .:in::*.:.::::i
i :!i::':;:
                        "                          - : - .: :: p::.*:  roved
/.!:. !*....:. ::;::..;::-i.
:" !:!:i~ip roced  :::::.:/u res.:::'*:ap                    .                ::::::...: i.:* ::: * :::i:i:                                      :::::::::::::: L.i:*:.:::: : *::i*:: ,:,  .,.,,,. *:, ::,:,: : .,:.,,,, ,:,,, **:
*,:. :,"" *; ;,*:., ' LII.*,  
::,":::!i:!!:.:,..:   i :!i::':;:
*i,:*:.-:*-:i*:*.:
:::* :::;.*:: .:::.c:bovrinand::it~pr~oetvednviromentrs;, suhatspeinier!it
:::* i*il-
                      .:. *::::::*:                                                                                                                                                                                            valsa        *tmospherei::i::
, :,.
:: i:.                hand::!
* H L :L :-.
lting:tools,  .andi~ equip~mentto                          a        e          sueafan  adequatey mntied::.-:::                                                      handling::.::            of;,"*,.*:::*ii*.ii::
............... ':.i:***:*
                                                                                                                                                                                                                                                                                      /.!:.!*....         :.::;::..;::-i.
* -.,i: ::::::? :*: **:i*i:-!:!::i:**::ii
      *,:. :,"" *;;,*:., ' LII.*,   *i ,:*:.-:*-:i*:*.:
":, i;-
i*il-       ": , i;-
i i: *i !iii-!*:*I :, ili,.ii
........ . ... .               ::: .,      , :, .
.... **: :.:::i:i:::!* ** : *:!!::*
* HL :L :- . :
:-.. :*,:i!::*::..:::**  
                                                                                                                                                                      .,::,:.:L
,:.:L :....
: ...: :,,. :   .- .,-:I*."::-, :*i:*::
.-.,-:I*."::T iiI :::.i :.i* *.* !!i
:!!*:il:*.::.
:*i:*::
::!:   :::. : : : :*i:i
:..:::::::::i:i*:*i:i:.*9 i,*i:i*  
:i*:i**i:!i
*ii::*::::::*ii i.:::
:-:::::::::.:*!:::!  :*i:i:i:
:i
:.*::::i:::,*,
:! !*:il
9 i,*i:i*
*i:i  
                                                                                                                                                                                                                                                                              *ii::*::::::*ii
* *i:!i
:::::::::.!*.            i.:::
:i:
i::i:::::.:*   :i
::::i:::,*,
  ..... . . .. ......': .i:***:*     *-.,i:::::::? :*:**:i*i:-!:!::i:**::ii                                    ii:*i!iii-!*:*I :, ili, .ii iiI:::.i:.i**.*!!i
i::i:::::.:*
                                                                                                              ....**::.:::i:i:::!* **: *:!!::*
:-..:*,:i!::*::..:::**


                                *"*":"''*'***      *' ' **:.*handling                   personnel. :Other special shipments which requir~e sPecbial: .....                                                                                           ::*.-
*' ' **:.*handling personnel. :Other special shipments which requir~e sPecbial:.....
:... ;-*@:.::@i.:*:*@equipmenit and handling: willibe *handled by knowledgeable an~d trained !" !. *                                                                                                                        *
:... ;-*@:.::@i.:*:*@equipmenit and handling: willibe *handled by knowledgeable an~d trained !" !. *
:-i.!!;..-:::.:::.7,:Storage.o~f material and equipment will be in areas.free from fumes, . ..:.,:                                                                                                                  ...
:-i.!!;..-:::.:::.7,:Storage.o~f material and equipment will be in areas.free from fumes,
:; .:-::i::
:;.:-::i::
                                          ..::.- . :;vapors,                     s.iand :dust.Storage will be in areas protected frobm the weather, . : !/..:.*;
:;vapors, s.iand :dust.Storage will be in areas protected frobm the weather,. : !/..:.*;
:-:.";;::.::;*i! :                as approm~;     epr~ifjate, andinthorichemical                               wti*;:storage wislxludd:                   b::ih ecp              e a s:;-!.:.*:i.:::::*:.:::::.:!:;::::.:.
:-:.";;::.::;*i!
::: : .:.:"i:which s~atisfy :th~e h;andling and .storage: requirements specifiedO: for the;:: .:: ;::i::. . :
as approm~;
                                                                                                                                ~
epr~ifjate, andinthorichemical wti*;: storage wislxludd: ecp b::ih a
                    - +m
e s:;-!.:.*:i.:::::*:.:::::.:!:;::::.:.
                              .        :.XIV.        ;*            .    * .....      .                                  TI .. t :. ..
::: :.:.:"i:which s~atisfy :th~e h;andling and.storage: requirements specifiedO: for the;::.:: ;::i::.. :
                                                                                            ..:: .:,::.. :....:T......T..-..::.         ,:    . l...-..
:.XIV.  
i i!!.*:i!*:! :*i i : .*!!i i                                                                                                                                                                                                                                      :!!i!: !i!i: i!i::  !i:*ii:
..::.:,::.. :....:T......T..-..::...
iiiiii!                          iii:.":::!"1:.i::: i-:.The DPC istaff:is !.responsib*le for ensuring tha~t the status~of operating.:.'!I
TI ~ t :...
                                  - ..":'::":.::--.::".eq uip ment o.:r :systemss*to;.be ::removed: from .service for: m ain~tenance:,;;: i- .::
: l.
                                      .-.-... .-:test, :Inspection, r~epair, or: modification Is in .accordance with :;the:. ::.;i :.i;
i i!!.*:i!*
                                    -.-::*-i: -.-.. :c ompliance witth approved iproc~edures and shall ensUre in~spectioni~::i:*:ii:!::i::
iiii:.* !!i
                                                .*i:*..i"*results :are pro*perly rlogged.;,! :They:. shalli establish the :probedIurebs. ifo r : -i.* ;:
- + m iiii iii!
iili
i!i i!:
                                    * :: . i:iv:.....
iii:.":::!"1:.i::: i-:.The DPC istaff:is !.responsib*le for ensuring tha~t the status~of operating.:.'!I
i.-:              imple~m~enting :the work inspection or status sheets during imaintenance,;*::
-..":'::":.::--.::".eq uip ment o.:r :systems s*to;.be ::removed: from.se rvice fo r: m ain~tenance:,;;: i-.::
                                        *".'i:. ***:!properly loggebd. !:Th~e*D*PC staff *is *also responsibl*e fr ithe con~trol f *:.ii:!- :
.-:test, :Inspection, r~epair, or: modification Is in.accordance with :;the:. ::.;i
                                    /:*"i i!ii!:             " : :%.                      *,  * ......  "*.....": .','.. :   "'.,''"
:.i;
C. Reauirements
-.-::*-i:
:c ompliance witth approved iproc~edures and shall ensUre in~spectioni~::i:*:ii:!::i::
.!:::.*i:  
* ::!:; *..i"*results :are pro*perly rlogged.;,! :They:. s halli establish the :probedIurebs. ifo r : -i.* ;:
* :: i.-:
. i:iv:..... imple~m~enting :the work inspection or status sheets during imaintenance,;*::
/:*"i
*".'i:. ***:!properly loggebd. !:Th~e*D*PC staff *is *also responsibl*e fr ithe con~trol f *:.ii:!- :
:! !i!::!i!i: i!i:: !i:*ii:
iili C. Reauirements
: 1. Equipment or systems not ready for normal service shall be clearly identified by use of tags.
: 1. Equipment or systems not ready for normal service shall be clearly identified by use of tags.
                          ...::.:..:...:~i.*2;.:..:
: i. :..: ::'.
                                    .:                            Equipment :or syst~em ;inspec~tion :an~d :test statu~s ishall be .indicatedi:::::-.*::.i:.i::::.
* i:':.:"
                            .::i.:"!:!!::!:i~ii:::3;i:I.
:.:..:...:~i.*2;.:..: Equipment :or syst~em ;inspec~tion :an~d :test statu~s ishall be.indicatedi:::::-.*::.i:.i::::.
                        .::*::.    ...                          ::SS~s :that :!a~re fou~nd.itobe unac*eptable:i durin:g. !or :a fter tefsting :s hall::: :::!:::!*:!:i
:*.::i.:"!:!!::!:i~ii:::3;i:I. ::SS~s :that :!a~re fou~nd. itobe un ac*eptable:i durin:g. !or :a fter tefsting :s hall::: :::!:::!*:!:i
: i. : ..: ::'.
!:~i*ii***i:.:.!:iii:.,::
  *i:':.:"  :
Th~i..
                        !:~i*ii***i:.:.!:iii:.,::     Th~i..is section estbliishes measures t~o: :assure t:hat :onditions:advese *:. :::"*.i:
is section estbliishes measures t~o: :assure t:hat :onditions:advese *:. :::"*.i:
                        . : ::::*:..- :~ii!::       :devi atio ns:,, defe~ctive :m ate ri al a nd .,equipment,; a nd no0n-co0n form an ce:s aref!..:-'- :
:::.- :~ii!::
:::*... ..::.. . :* promptly Ideintified~a~n~d corrected.-, T:his inicldies: the control: of materials:;: :.:                                                                                                 ,
:devi atio n s:,, defe~ctive :m ate ri al a nd.,equip ment,; a nd no0n-co0n form an ce:s aref!..:-'- :
                        " " ....: parts, or-comp~onents thati do not: conform !to!requirements, .ther~eby..*:i::...:;i:... :::*i.
..::... :* promptly Ideintified~a~n~d corrected.-, T:his inicldies: the control: of materials:;: :.:
:              ~~preventing :their inadvertent: use ori :installation. ".::                                                               :-;: :::: ::.:..::i::..:::::::.:::.::.::::*i*i::
parts, or-comp~onents thati do not: conform !to! requirements,.ther~eby..*:i::...:;i:... :::*i.
:.B*::. :.ResponslbilitieS*:,: : ::...!...;                                                                                         procedures:.:            :.::*::.:the.-::!"!*!ii for.:::*..:               :!.ii*!. ::
~~preventing :their inadvertent: use ori :installation. ".::
: 1. Thi:*i:i e DPC.: stafi s ri::iespons:ibl:e :for iesta:blisini:gi
:-;: :::: ::.:..::i::..:::::::.:::.::.::::*i*i::
:.;!: :::!i:i         i:;::!: *!: :::i :::i~i: *i/ *.:ii:2 2 ::i!!ii*:::iii;::*:::: ::2:;:*;:::*
:.B*::. :.ResponslbilitieS*:,: : ::...!...;
ii*::~i*i::i.:;:i:!..i:                                                                   :*:::*:::*ii**.:*::*:*:!*:;i*;::*::!iR ev.::29:*:.,:
: Q A PO;i*
':*::ii:::::::
: 1. Thi:*i:iie DPC.: stafi s ri::iespons:ibl:e :for iesta:blisini:gi
:.;!: :::!i:i ii*::~i*i::i.:;:i:!..i:
i:;::!: *!: :::i :::i~i: *i/ *.:ii:2 2 ::i!!ii*:::iii;::*:::: ::2 2
procedures:.:
for.:::*..:
the
:.::*::.:.- ::!"!*!ii :!.ii*!. ::
:::::*:..:*i:*
:::::*:..:*i:*
: Q      APO;i*:
:*:::*:::*ii**.:*::*:*:!*:;i*;::*::!iR e v.::2 9 :*:.,:
                        ':*::ii:::::::
:::i.*! ii
 
;.. i.. ;:.::"-identification, !review,: and correction of conditions adverse to quality: :i
: :i.*! ii
.:!i:
                                          ; .. i.   . ;:.::"-identification, !review,: and correction of conditions adverse to quality: :i
.:~: *.: i ::]:!!,whi~ch :includes the control, evaluation, and disposition of deficien~t::i*, i-:.
                                          .:~: *.: i ::]:!! ,whi~ch :includes the control, evaluation, and disposition of deficien~t::i*, i-:.
;i*)?i?:-::.~i.:.:2;i:.: The D C p*sta~ff is Lrespon~sible :for reva*iewin*g. no nconfor~ming ;items ti*hat!*:i~~~
                                          .:!i:
.:::!:;..~*!*ii*
                                        ;i*)?i?:-::.~i.:.:2;i:.: The D p*sta~ff           C              is Lrespon~sible :for reva*iewin*g. no nconfor~ming ;items ti*hat!*:i~~~
!..:i::?i!*::canrnot:b~e co~rr~ected ;by )vendor a-ctilon anld :recomm~ending :dispositio)n*):.)
                                                      !..:i::?i!*::canrnot:b~e co~rr~ected ;by )vendor a-ctilon anld :recomm~ending :dispositio)n*):.)
':.:-i  
                                          .:::!:;..~*!*ii*                                                                                                                                              I.
;;*::::?I3. i?!Thie iDPC staff ;is irespo nsible: for: rev~iewing condition rsadve~rse: toi;*.:. ::i:*-
                                        ':.:-i
*: :.-:i:)::ii.:.quality to. determ~ine the: cause.of the condition; and for: rec*ommending;
                                          ;;*::::?I3. i?!Thie iDPC staff ;is irespo nsible: for: rev~iewing conditionrsadve~rse: toi;*.:. ::i:*-
:*..I-). !::i.i;:.
                                            *: : .- : :i:)::ii.:.quality to. determ~ine the: cause .of the condition; and for: rec*ommending;
correctivect action
:*..I-).!::i.i;:.           correctivect             action toe       :prpreclude repetition.i:* i.!~i:.)": :!i~::.::i:i~!-.-..I:IIi:/: :..]
:pr toe preclude repetition.i:* i.!~i:.)": :!i~::.::i:i~!-.-..I:IIi:/: :..]
                                                                                                                                                                                                        ~1.
I.
                                                    **!~i**:*:**i*:]:d~eficiencie*s,- *devi~atio:ns,~defective m*aterial *and equ*ipm~ent, shiall ~bei:*i:!; iii!*:;
~1.
i i;:::iii i,*:iir,*ieported ion ia corre[ctiveI *ac*tio0n :d~ocument.: Materials, iparts!,ib*::*i
i :::iii i; **!~i**:*:**i*:]:d~eficiencie*s,-  
                                              * :*:: ;:.:i:*:i!**:ii:                                                                                                        or          :i: i;~ii*ii*:*l*:i**
*devi~atio:ns,~defective m*aterial *and equ*ipm~ent, shiall ~bei:*i:!;
:!:.:.i::iil'-':i:!     !::placedi~ii~~:::
iii!*:;
i l::; n a holid *st atu[s,. No*nconforming items, shallii remai~n' in*:: a..i...::!?;!!i~!i*i :;:::i!
* :*:: ;:.:i:*:i!**:ii:
                                                    ..ii!)*.. : .-segregated *area :until *approved disposition: has been determined:i:)- :.i-:*. .:*
i,*:iir,*ieported ion ia corre[ctiveI *ac*tio0n :d~ocument.: Materials, iparts!,ib*::*i or
:*.-:i:i:
:i: i;~ii*ii*:*l*:i**
:!:.:.i::iil'-':i:!
placedi~ii~~:::
i n
l::;
a holid *st atu[s,. No*nconforming items, shallii remai~n' i n*:: a..i...::!?;!!i~!i*i :;:::i!
:*.-:i:i:
..ii!)*..
:.-segregated *area :until *approved disposition: has been determined:i:)- :.i-:*..:*
* 0L','. '... 0;': i'...i ): :.
* :...:).'.-:.:---i.:i.,i..'.:
2.: i:The corr~ec~tive action do~cument shall identify :the condition, :the cause- ;.!:l~
2.: i:The corr~ec~tive action do~cument shall identify :the condition, :the cause- ;.!:l~
all nonco~nforming items and requested to: correCt the deficiencies.:::;:                                                   *,::.*:
all nonco~nforming items and requested to: correCt the deficiencies.:::;:
  *0L','.'...0;': i'        ...i ): :.
r:
                                                                    ; ::r:e'spon ii ::i sible ~fo:r*i coor dinabting ::the !dispos ition* ofa deficienht: :i t~ems.Wit hi :!i*ii [iili o***!!*:*r reject..I:`t~e~ms :shall *be r*epaired or r:eworkedi only: in; ac*co~rdance withi-*i:::!*
:: ii ::i  
:::::;:approved probcedUres and sha~ll be re-inspected after rePair :by :the: QA: i::III: i:i:                                                      !*!i
; e'spon sible ~fo:r*i coor dinabting ::the !dis pos ition* ofa deficienht: :i t~ems.Wit hi : !i *ii [iili
* :...:).' .-:.:---i.:i.,i..'.:
- o***!!*:*r reject..I:`t~e~ms :shall *be r*epaired or r:eworkedi only: in; ac*co~rdance withi-*i:::!*
                                                                    .. specialist:I Engineer:. DPC staff :shall ensure ithat documented ~and:.: :i: :: :
:::::;:approved probcedUres and sha~ll be re-inspected after rePair :by :the: QA: i::III:
                                                                    ! iappro:ved
.. specialist:I Engineer:. DPC staff :shall ensure ithat documented ~and:.: :i: :: :
:;                      procedures are availabl~e prior t;!&deg; repair or irework.:::i!:**:i* ii!:!; !:::i
iappro:ved procedures are availabl~e prior t;!&deg; repair or irework.:::i!:**:i*
                                            ... ~:5...       .        l5ii:.;tem*s.iwhich iare accepted i~for us~e witha :known defiiciency shall b;ie fullyi
ii!:!; !:::i i:i : !*!i
::ii:i)::i:
~:5...
                                                  *:::i :i: :idocumente~td with ~th~especificatio n !:requirement, j]ustification*:f~or:i*i*:: ii::i ir;]i~:ac;eptanice, and effect !of such u:;se;*i Alli such :iitems lshall b*1e :a~p~provediii:
l5ii:.;tem*s.iwhich iare accepted i~for us~e witha :known defiiciency shall b;ie fullyi
                                            !;:i~!:ilL:i~:::i*
:: *:::i ii:i)::i: :i: :idocumente~td with ~th~especificatio n !:re quirement, j]ustification *:f~or:i*i*::
L            i      ii!
ii::i
                                                      !i!i!:::: :::i:!:.;irecommen:0d e~d or*rec*tive. a~ctio~n:s thaa*in*:voliv~e :a d*e~s~ignncha*nge,*:..shall! :b-e~i
!;:i~!:ilL:i~:::i*
:::: i!:iii::i
ir;]i~:ac;eptanice, and effect !of such u:;se;*i Alli such :iitems lshall b*1e :a~p~provediii:
                                                "::"'i*:!:========re=====viewedi
:::: i!:iii::i  
:-                                      by :DP   pcstaff or: appiciiable :Designn::Author*ity. (r~ef.: Appen*di~x :::...
!i!i!:::: :::i:!:.;irecommen:0d e~d or*rec*tive. a~ctio~n:s tha a*in*:voliv~e :a d*e~s~ign ncha*nge, *:..shall! :b-e~i
                                                                  ."'"10CFR21I.shall* be :reported In accordance with: approbved.:pr*ocedur~es'..". .
"::"'i*:!:========re=====viewedi by :DP pcstaff or: appiciiable :Design n::Author*ity. (r~ef.: Appen*di~x :::...
XVI.       QUALITY ASSURANCE RECORDS
i ii!
:. .. .. ,' ".- -. '.. * :. ,: ":::) ... ." : -.. " D':"      ".:
L
QD .                                .:...:*.!:*:: :.::..:.: *:..iL:
."'"10CFR21I.shall* be :reported In accordance with: approbved.:pr*ocedur~es'.."..
* i:       23 ;::)::
XVI.
                                                                                                                            .ii23                                                      Rev. 29i.::i.:*:*.*.
QUALITY ASSURANCE RECORDS Q D.
23 R ev. 29i.::i.:*:*.*.  
.:...:*.!:*:: :.::..:.: *:..iL:
* i:
.ii23 ;::)::
,: ":::)...." : -.. " D':"
:i:!iiiii
:i:!iiiii
 
:...-L. :..:..:.-...:-..'
:...-L.       :..:..:.-...:-..'
ii*.::.*ii!ill:I  
ii*.::.*ii!ill:I
*i: ' ::::*!i!:
                                                                                                                                                                                                                            *i:' ::::*!i!:
A.
                                                                                                                                                                  /. .-:: <..::;.:.,.:., ::'.-: .:::./::.- -:--.:..-:
General:
A.        General:                                                                                                          ::::**:*:.*:*iii'i:!!.
/..-:: <..::;.:.,.:., ::'.-:.:::./::.- -:--.:..-:
                                                                                                                                                                                    *i:i:::i*i::i::.i;!:i*:*i*::.*&#xb8;.
::::**:*:.*:*iii'i:!!.  
i:/thle oper~ati.on, mi:m.ntenance, :installation, rfepa~ir,: and modification o*f ISFS!::;;**I. ;*
*i:i:::i*i::i::.i;!:i*:*i*::.*&#xb8;.
                                            **:;SScs, :alnd ithe :decommissioning: activities, covered :by the QAP.Di:. Also**::!.*:;!***::
i:/thle oper~ati.on, mi:m.ntenance, :installation, rfepa~ir,: and modification o*f ISFS!::;;**I.  
::"-infclud ed iareh istorical~i reco rds gathe red and -coll!ected; d uringgpl!ant :*and ::i::*::i.: :: :!iii
**: ;SScs, :alnd ithe :decommissioning: activities, covered :by the QAP.Di:. Also**::!.*:;!***::
                                            ;:?ISFS I op*erations; which :are eithert*q                     re Uired toblsupporti th e dry~i               icaski sltor~age*i*:: ::.iii
"-infcl ud ed iareh i storical~i reco rds g athe red a nd -c oll!ected; d uring gpl!ant :*and ::i::*::i.: : : :!iii
                                            *;!;**exe~mpt from r~ecords ;keeping ir~equirements::inaccor~dance *:with :thei ter~ms iofi-*
;:?ISFS I op*erations; which :are either re t*q Uired to blsupporti th e dry~i icaski sltor~age*i*:: ::.iii
:i:iany iNRC- appro*ved irecords exem ptionnth*at"may be g ra nted :.to :!SOLUTi*ONS:::.
*;!;**exe~mpt from r~ecords ;keeping ir~equirements::inaccor~dance *:with :thei ter~ms iofi-*
                                                                                                                                                                                            .:::.,.i::i'i:
:i:iany iNRC-appro*ved irecords exem ption nth*at"may be g ra nted :.to :!SOLUTi*ONS:::.
  .*..*.*-...*......  .: :..            :- . *1.:
*1.:
:T*.::*he DPC staff::is:respor~sib~e for establishing the requirements of :this.
:- :T*.::*he DPC staff::is:respor~sib~e for establishing the requirements of :this.
        * ,,. , ,,              . :                        se c tion...
se c tion...  
::*'.i*:.:/;ii:.
.:::.,. i::i'i:
i:*                :*:c:ontrolled and stored in: accordabnce with iwritten !Pr~o~cedures.*; The riecordl:
::* i:*  
                                ;: ;.:;;. ;:::!~:system~;!].inlude~s theii@ *rete ntion of *thioseii d~esign, f!abricatio0n, *in~specttb?
'.i*:.:/;ii:.
                    ; (:. i:::!i:i                                                                                                                                                  ion, ::*:;
:*:c:ontrolled and stored in: accordabnce with iwritten !Pr~o~cedures.*; The riecordl:
                    ;::.iii:::
; (:. i:::!i:i
:**: ***.~~;:.:   :*i:::
;: ;.:;;. ;: ::!~:system~;!]. inlude~s theii@ *rete ntion of *thioseii d~esign, f!abricatio0n, *in~specttb?
:i:i*; ic::borr*es pondin     j :m anufactur:ing,,i:;nstalliation;,:. Insp~ctio:n, .itest, :and iaudeiti::i*i?*!:
ion, ::*:;
i*?::::.. -::*.:;:i:specified ini: approv*ed pro~cedur*ies::. QA riecor~ds shal be::pro*:
;::.iii:::
                    - .!ii::i;:::..i                                                                                                                          tected::** ::.;!.*::!~:!:!
:**: ***. ~~;:.:
:*i:::
:i:i*; ic::borr*es pondin j :m anufactur:ing,,i:;nstalliation;,:. Insp~ctio:n,.itest, :and iaudeiti::i*i?*!:
-.!ii::i;:::..i i*?::::.. -::*.:;:i:specified ini: approv*ed pro~cedur*ies::. QA riecor~ds shal be:: pro*:
tected::** ::.;!.*::!~:!:!
.i.!:. :i;~:::::/"::::.::
::;!:/;*;with :a *mean~s ob.f matching *therecord.d:;to the item; or activity ;to whlich;:f~ ::it
::;!:/;*;with :a *mean~s ob.f matching *therecord.d:;to the item; or activity ;to whlich;:f~ ::it
                    .i.!:. :i;~:::::/"::::.::                                                                                                                                                :::i
:::i
                      *"..:..:::::i i:                      *:*subcon~t'racto~rs/sub-supplier~s, .theorigin~alQA r~ecord of the ~deliverables.i iiii i iiii i -:will:be.transmitted to SOLUTIONS or DPC When applicable:i:.iii-::i:.i*.i-l:..
* i:
:*:~i:
"..:..:::::i *:*subcon~t'racto~rs/sub-supplier~s,.theorigin~alQA r~ecord of the ~deliverables.i iiii i iiii i -:will:be. transmitted to SOLUTIONS or DPC When applicable:i:.iii-::i:.i*.i-l:..
            *.ii:?:.:i.i ii:.I: :i2l.i                     2::uthie  A,.:i:i!:.:.ntic-ation:. Docum*ents s hall be!*onsid~ered valid~: ireco:rds .o nljy i*ifii~l l~~
:*: ii:.I:
:::i :":::":"::*i!!stamip~ed,:;' i~nitiale d, or *s ig ned :anda dated* by-a uth*ori'zed :.p ers oinel or!:*!ii:.*ii.!i:*:::i::
~i:  
          .:::*::;~i:i::::~i:::::
*.ii:?:.:i.i :i2l.i A,.:i:i!:.:.
        *:.:.*.:::*:.**i:*:!::i:i*i!**:/:**;:::!!:*:::*:ii:othritW~ise     authentlicated, :including th~e :u~se o*:felbectr~onic approval iarnd~i::i;.i.
2::uthie ntic-ation:. - Docum*ents s hall be! *onsid~ered valid~: ireco:rds.o nljy i*ifii~l l~~  
:-!i'.i:ii?!i!:~:;::~i*:.i:-ii:i;ii.::i:.**:*aUthur*ization. *iThis: authen~ticat~ion may t:!ake ithe form o.f ai*statemenht biy!:;i.:*                                                               * ::, ,<:..,,,-.:. ,: ,:..... ,.,: .:
. :*: :::i
        . *..iii* i/ *ii.::::: i::.:!:ii:ithe rei~sponisible, individu~ali or organlizat!Qion*.Han~dwriitten isignlatures i~arei**:i~:                                                                      ':: :* :..:*::*'i  ::"i,.:.*::.:::
: : :;~i:i::::~i::::: :":::":"::*i!!stamip~ed,:;' i~nitiale d, or *s ig ned :anda dated* by-a uth*ori'zed :.p ers oinel or!:*!ii:.*ii.!i:*:::i::
::ii*i::.*:;
*:.:.*.:::*:.**i:*:!::i:i*i!**:/:**;:::!!:*:::*:ii:othritW~ise authentlicated, :including th~e :u~se o*:fel bectr~onic approval iarnd~i::i;.i.
                  ;: i;:.i~~i:.:! : ::*;:::*;*.     *!::no require .. d; if* theadocu ment :is clearl! id entified as ia:st atement bY *th e:*;::::
:-!i'.i:ii?!i!:~:;::~i*:.i:-ii:i;ii.::i:.**:*aUthur*ization.  
                      !.:;:: ;*::. :: :;.: ;.repo rtin g* ciniv idu al ori:org anrizat ion. :,T hes e: reco0rds-m ay* b e !originoals or0*::i:!:
*iThis: authen~ticat~ion may t:!ake ithe form o.f a i*statemenht biy!:;i.:*
i ii:":"
. *..iii*
i .::ii;.:.::.:3:.:;:.3:
i/ *ii.::::: i::.:!:ii:ithe rei~sponisible, individu~ali or organlizat!Qion*.Han~dwriitten isignlatures i~arei**:i~:
: :"*                iIndexing dentif~ication,  Thel;ocation
::ii*i::.*:;  
                                                                          -*. records of indexing the record        system     :within  ~theincl
;: i;:.i~~i:.:! : ::*;:::*;*.  
                                                                                                                                    .must         ude :records:.*i.::
*!::no require.. d; if* thea docu ment :is clearl ! id enti fied as ia :st atement bY *th e:*;::::
isystem,     and~iminimum:.:ii.i           ;*:::. :
!.:;:: ;*: :. :: :;.: ;.repo rtin g*
                      .:--". ii;..:!:.:Hir etention. time. I:Th1e re~co rds and/or ind exinrig sy/ste m(s) :shallI ipro~videi:.;::.*
ciniv idu al or i:org anrizat ion. :,T h es e: reco0rds-m ay* b e !orig inoals or0*::i:!:
                                                                                                                                                              !i:*i:::i!i::::
':: :* :..: *::*'i ::"i,.:.* ::.:::
                                                                                                                                                                  .ii:,:*::i*v:i:!29 QAPD                                                                            24
i i ii;.:.::.:3:.:;:.3: Indexing -*. The records indexing system.must incl ude :records:.*i.::
                                                                                              , .,*+* . ,.,, ,,,:,,,: ,* ,:, ... ,:,
ii:":"
Rev. 29
i dentif~ication, l;ocation of the record :within ~the isystem, and ~iminimum:.:ii.i
                                                                                                                                        *::i:'i::: ! :i.:!:
-- ii;..:!:.:Hir etention. tim e. I:Th1e re~co rds and/or ind exinrig sy/ste m(s) :shall I ipro~videi:.;::.*
QAPD 24 Rev. 29
,.,*+*.,.,,,,,:,,,:,*,:,...,:,
!i:*i:::i!i::::
.ii :,:*::
i*v:i:!29
* ::i :'i::: ! :i.:!:
ii
ii


                                                                                                                                                                              .,:-.. : .'::" ; ':i":'-T:il* ' ":.:
!:i!i :i : i
                                                                                                                                              !:i!i :i : i
::::: :::i:i: ilili
.        : : : : :i:i: ilili
:*!:::!i!?:;::::-!sufficient; info.rmation to permit ;identtification between the: recor~d"anid the:.
:::!        :*!:::!i!?:;::::-!sufficient; info.rmation to permit ;identtification between the: recor~d"anid the:.
4*.li*i.!
4*.li*i.!
:": ;i 4:::~.Distirib~ut[     ion:: a:nd: Cntroli..; The records shlla. be distributed, h~ian dledi! ai!nd::
:": ;i 4:::~.Distirib~ut[ ion:: a:nd: Cntroli..; The records shlla. be distributed, h~ian dledi! ai!nd::
: .cntoledinacoranewitritten                                                 np rocedulres. Measuresa*iha!.!. ble.*.zi ;
:.cntoledinacoranewitritten np rocedulres. Measuresa*iha!.!. ble.*.zi ;
: -: ;::! ;:;-::established to preclude the entryi of :unauthorized personnel inito :the:.::i*::::
;:;-::established to preclude the entryi of :unauthorized personnel inito :the:.::i*::::
::i::*i.::~:stor~ag e requirements !aseither lfifetime o r nonpermanient'. R*eco*rds :~ithat:*
*:i::iiii.:.;!i:.;
                                        *:i::iiii.:.;!i:.;
::i::*i.::~:stor~ag e requirements !as either lfifetime o r nonpermanient'. R*eco*rds :~ithat:*
                                        .*i::i**?.:,:..:;::**::*.%~imeet .any..of :theefollo~wing 'criteria ~are idesignated Lifetimee"r~ecords ::anid~ii~.:;;i
.*i::i**?.:,:..:;::**::*.%~imeet.any..of :the efollo~wing 'criteria ~are idesignated Lifetime e"r~ecords ::anid~ii~.:;;i
:.!!!:i:*!:i.iii*!* m
*iii::I
                                        *iii::I                    m ust ds , be m aintained.;!::*-*
:.!!!:i:*!:i.iii*!* m ds,
a n d:              ..:::..:i *i.:*
m ust a n d :
                                                                                                                          *i -:; :: . . : . ..-i.: ::".. ~i:...:i.:~i*- -i:. .
be m aintained.;!::*-*..:::..:i *i.:*  
a.
*i -:; ::.
i! :" *: ..:aiProject             lifetime .*records shall.include, as a minimum, design: :*i.
:...-i.: ::".. ~i:...:i.:~i*-  
                                                          * :.. ...        and interface control drawings, copies of material i.test reports,.-...i
-i:..
                                                      . .;i.::/
:.'::" ; ':i":'-T:il*
i! : *:
: a.
..:aiProject lifetime.*records shall.include, as a minimum, design:
:*i.
and interface control drawings, copies of material i.test reports,.-...i
..;i.::/
ii~ ;: :;'::i:inclUding examination :reports*,' and nonconforman~cel re~portsii.;i!:~*:iii
ii~ ;: :;'::i:inclUding examination :reports*,' and nonconforman~cel re~portsii.;i!:~*:iii
:.: :*-:i*:*.:       of:** itemlm"!ife iof..the facility, ior life: of the license,i.as aiipplicable.:..:*
:.: :*-:i*:*.:
                                                                *:.:* : .:*f!the tandaa~rds (.le:g.i: O1C FR7.i,.::10:: C:FR :72) w)-:ill'-be iinclud ed:.ini thl
of:**
                                                  =============.::!::.s                                                                              *e: r*et entio n.:
:.:*f!the itemlm"!ife iof..the facility, ior life: of the license, i.as aiipplicable.:..:*
i:.*-.'::*...-
 
                              .. :6. - :.-6::Storage .                      Requirements.:-:.The :records shall be stored; rIn:             predetermined i:.i:*
=============.::!::.s tandaa~rds (.le:g.i: O1C FR 7.i,.::10:: C:FR :72) w)-:ill'-be iin clud ed:.ini thl  
*e: r*et entio n.:
i:.*-.'::*...-  
.. :6..
- :.-6::Storage Requirements.:-:.The :records shall be stored; rIn:
predetermined i:.i:*
::*:*::i======================
::*:*::i======================
:.i ::.;.:*::location(s) that         a:meet :the lrequir~ements..of appllicable standards, :codes,;i.:::::
:.i ::.;.:*::location(s) that a:meet :the lrequir~ements..of appllicable standards, :codes,;i.:::::
                        *i::*:ii::
*i::*:ii:: ::~.*i-.
i::::i!:*:..::::~.*i-.  : *::i::i*!and regulaorat:Yiige nc*ies ..i.Prio~r: *toisto:ra ge o!f r!ec ords,i: a w:ritte*n s:tor~iage*..i:*:
i: :::i!:*:..:: :!i~i
:!i~i Z '"
: *::i::i*!and regulaor at:Yiige nc*ies..i. Prio~r: *toisto:ra ge o!f r!e c ords,i: a w:ritte*n s:tor~iage*..i:*:
                                              -..:"""':l*
Z '"
                                                    ""*" "' I".Records         *shall be stored
:"""':l*  
:":temperatur~ei:.:A~ll     records.to.mprevent..damageifr'om aintained in hard:copymoistureor?.:"***
""*" "' I".Records  
fo:rm shiall b~e firmly:-     : '":..:::
*shall be stored.to. prevent..damageifr'om moistureor?.:"***
_.... ..... :: attac~hed: to bi!ndersi or..placed in: :folderts, e:nvelopes, o:r :boxes fo;{ri::!::::.i* ::.:;
:" :temperatur~ei:.:A~ll records m aintained in hard:copy fo:rm shiall b~e firmly:-
                                      .:::::.-: ::.-:*::storage in file :.cabinets or within :containreis on :shelving. :Records miay:**.
..... :: attac~hed: to bi!ndersi or..placed in: :folderts, e:nvelopes, o:r :boxes fo;{ri::!::::.i* ::.:;
                                      * ::*:i:.i:*i**.:!i.*i::;::*::i:::b:i!le::
::.-:*::storage in file :.cabinets or within :containreis on :shelving. :Records miay:**.
stored' iini:belectr onic :media: pro~vide~d that: the '*process :for mi:anha * *g::ingi..
* ::*:i:.i:*i**.:!i.*i::;::*::i:::b:i!le::
:ii ::*-:::.::.:::-         a.:*::
stored' i in i:belectr onic :media: pro~vide~d that: the '*process :for mi:anha * *g::ing i..
::i:*?Re~cords         :shall b:ie storied in fiacilities ~that minimize the :risk of damage
:ii ::*-:::.::.:::-
:.: 1!: :: i.,.&#xb8; QAPD                                                                           5.-....                                                 :: Rev:29 .".:::::":"
a.:*::
::i:*?Re~cords :shall b:ie stor ied in fiacilities ~that minimize the :risk of damage
:.: 1!: : : i.,.&#xb8; QAPD 5.-....
:: Rev:29.".:::::":"


                                      *-,, .b. Natural di sasters such .as :Win d, flood,, or fires;.. .,.:..:- .:. :..:/.:*f.V:i .:.:.
.b. Natural di sa sters suc h.a s :Win d, fl ood,, or fires;...,.:..:-.:. :..:/.:*f.V:i.:. :.
:-:c. E::Jnvi~ron*m-ental c:onditions : sucbh as{ hig S-:.                                                                                                    :i::a n d :low: temper*atures iand:a*::i : .
S-:.
:-:c.
E::Jnvi~ron*m-ental c:o nditions : sucbh as{ hig
:i::a n d :low: temper*atures iand:a*::i :.
S"d::. !Inf:jiestationby* :insects, moldi:. or r:odents.ii:~i:
S"d::. !Inf:jiestationby* :insects, moldi:. or r:odents.ii:~i:
                            !:.-:7:.:         D~isposition- Va~riou s i:reg ulatory agencies ihave: :req~u~irementsi~~*:i{ii:
!:.-:7:.:
D~isposition-Va~riou s i:reg ulatory agencies ihave: :req~u~irementsi~~*:i{ii:
c*:*:::.
c*:*:::.
on~cerning records- that are. withini th-e scope: of thie QAPD. :The::
on~cerning records-that are. withini th-e scope: of thie QAPD. :The::
::;:*:*;::}:::*stringent ir~equire~ments sha~ll be: usedl in !:determining ;the :.finhali:i::~::ii most .
::;:*:*;::}:::*stringent ir~equire~ments sha~ll be: usedl in !:determining ;the :.finhali:i::~::ii most.
!.i XVII.
!.i XVI I.
LUiT l-.}:, : : -:i::::'<:"
:: " A::"
                                                              ":x .i! ,:::::"",,':,:!i
LUiT l-.}:, : : -:i::::'<:"  
:: " A::"      \*:.-. G ene ral                         : "*.::
":x.i!,:::::"",,':,:!i  
:This section :establishes }the requir~ements for a system ::of planned and ii::"::::::::::::
\\*:.-. G ene ral
                                .documented .audits to} verify complianCe with all aspects of the :QA program..================
: This section :establishes }the requir~ements for a system ::of planned and ii::"::::::::::::
                                ,and to. assess the, effectiveness of the program as. it applies to .the ISF:SI,:. :::*::;!:: ...
.documented.audits to} verify complianCe with all aspects of the :QA program..================
The system provides for thee reporting andd review of audit                                                                             u results by :!*:*:.i~::(:::::!;:.:::*::::!:::i           !i:*~i:*::
,and to. assess the, effectiveness of the program as. it applies to.the ISF:SI,:.
The system provides for thee reporting d
and review u
of audit results by :!*:*:.i~::(:::::!;:.:::*::::!:::i
!i:*~i:*::
:*:;:::://:
:*:;:::://:
                  ;B.
chec:!~i:i/*
chec:!~i:i/*
kli~sts.i :des~igna:tin~g ::andc itraiani~nggaudit pei:                                               rsonnel, !:and*I conducting:#::::::k i:i*:! **d au* dits..*
kli~sts.i :des~igna:tin~g ::andc itraiani~ng gaudit pei:
i s *"i' *~ i b @*:**:*!:.,**:i *i:*:*i-                   i:i*:*:*:i:} i::::::: ::::::::::::::::::: :::::::.! ===============================                               *:~::d .U :
rsonnel, !:and*I con ducting:#::::::k i:i*:! **d a u d its..*
      .,::..*..:::!~2:
* d i s *" i' *~ i b @ *:**:*!:.,** :i *i:*:*i-i:i*:*:*:i:} i::::::: ::::::::::::::::::: :::::::.!===============================
: ":bv::. . " ThebiQA         verify that          :S~pe~ciaJi
*:~::d.U :
                                                                          *th~e ISFSi        stl /i:En
;B.
:is gbeing          peforims :in:consisstentt in~e* maintained
::..*..:::!~2:
:er                             depe n d en*trevieW                   an d auidit i:to:.:l:: :!
ThebiQA :S~pe~ciaJi stl / i:En g in~e* :er peforims :in depe n d en*trevieW an d aui dit i:to:.:l:: :!
w:ith ~company.::*::i:(::i:!i::::*i~
., : ": bv:: " verify that *th~e ISFSi :is being maintained :consisstentt w:ith ~company.::*::i:(::i:!i::::*i~
::.:i :!::!.                     safetyey administrative, andd llicensing provisions. :::. :!: :::::"::.. :::i::::}-!:V:.:-;:i,: ::ii !!::
::.: i :!::!.
C. .: Rbea~                 ulre  e ~m ~ennts::    s {*:i*!; :;iii:i*i:     ..:::i!i:
safetyey administrative, andd llicensing provisions.
:::. :!: :::::"::.. :::i::::}-!:V:.:-;:i,: ::ii !!::
C.
R e a u lre m e n ts::
.: b ~ e ~ ~ n s {*:i*!; :;iii:i*i:  
..:::i!i:
:*i ::::: *i:i!
:*i ::::: *i:i!
{*!iiE~*IEi::/: ;:::*::i i;:i*:*:::ii::: ::!{ *}.**     .:***i
{*!iiE~*IEi
:::i:'": i:::!
::/: ;:::*::i i; :i* :* :: :ii::: ::!{ *}.**  
                                                                                                                                                                                            .::i:::i-:{i :;:*i*i!! *}:
.:***i
:: :i:'": i:::!  
.:: i : :: i-:{i :;:*i*i!! *}:
i~ii*i": :*:,;
i~ii*i": :*:,;
:*i1.*:::*i;;
1.*:::*i;;
A udciti}Shal i:: be p~ierform;e d i~n a*ccorda*nc e ::w ith: written pi;*rocedur esi!or ii~! !::::                                                                       i:.ii:i*i!:
:*i A udcit i}Shal i:: be p~ierform;e d i~n a*ccorda*nc e ::w ith: written pi;*rocedur esi! or ii~! !: :::
:::::::::::::::::::::checkl!is~ts! by appropriately ~trained p~er*sonnel: haviing no6!*dir~ect:.ii:*: i::.:::!'I:: :{
i:.ii:i*i!:
                      -: =================:.i ri*-espo nsibil ities in.theeartea audi ted.: *Defici encie6s from iprev*io ussau dit s i -ii:*
:::::::::::::::::::::checkl!is~ts! by appropriately ~trained p~er*sonnel: haviing no 6!*dir~ect:.ii:*: i::.:::!'I:: :{
:::::; }::}::shall- be r~eViewed a nd re-;audited:, as appropriate:.-The checklists ar:e :::,: ::
-:=================:.i ri*-espo nsibil ities in.the eartea audi ted.: *Defici encie6s from ip rev*io us sau dit s i -ii:*
:. 2:;. AUdlits may b~e conducted by th~e' QA Specialist I :Eng~ineer :or: other. ::}::a
:::::; }::}::shall-be r~eViewed a nd re-;audited:, as appropriate:.-The checklists ar:e :::,: ::
                        .,... :.qualified personnel,. such ~as technical specialists from other: :;::-. . .;.::;i
:. 2:;. AUdlits may b~e conducted by th~e' QA Specialist I :Eng~ineer :or: other.
::Au~dit *ani :s u~rveillance iresults :sh alli b:e idocumented :a~n~d reviewed wi*th.,: :. :ii 3.::::::::::
::}::a
i:::i:::*:i:*!isu:pervisi~on r.ie~sponsible..for the ar.!ea audit~ed, who sh0::fall:take necessary!.:::{::
.,... :.qualified personnel,. such ~as technical specialists from other: :;::-...;.::;i 3.::::::::::
::.!~i
::Au~dit *an i :s u~rveillance iresults :sh alli b:e idocumented :a~n~d reviewed wi*th.,: :. :ii
::.!~i i:::i:::*:i:*!isu:pervisi~on r.ie~sponsible..for the ar.!ea audit~ed, who sh0::fall:take necessary!.:::{::
:.}:!:i.:::. action :to corr*ect r!epo~rted dleficiencies. i:Follow-up-actionin:rcludciJng r:ie- ::::ili:
:.}:!:i.:::. action :to corr*ect r!epo~rted dleficiencies. i:Follow-up-actionin:rcludciJng r:ie- ::::ili:
                      ,-:;:.s~l;:: :i.,:a~udit/re-survey of0d:eficien*t ara,,                                       !aS:is ini~tiated :a s }dee~medJappr*oprli~at~e:...,,:i:i::
,-:;:.s~l;::
                                                            ..: : :=:.*:~*:::*:::.*!*: , ~i: iii 6 ::i:i.i/:::i:!2
:i.,:a~udit/re-survey of0 d:eficien*t ara,,  
: :::: :::.::, :::::::::::::::::::::::::::::::::                                                                                                              Rev. }2299.ii~
!aS:is ini~tiated :a s }dee~med Jappr*oprli~at~e:...,,:i:i::
:.; : :.::}.!i!i::! :ii::i!::.:: .:ii}::::R                 :::i:
: :=:.*:~*:::*:::.*!*:  
, ~ i: iii 6 ::i:i.i/:::i:!2 6
R e v. 2 9.ii~
:.; : :.::}.!i!i::! :ii::i!::.::.:ii}::::R v }2 9 :::i:
QA..:.
QA..:.
P.
P.
 
: 4. i:i!iii!T~he Q:*A:iSpecialisti i!iEng*ine!er: s*hall *::assess :the following:~**~**
4.i:i!iii!T~he Q:*A:iSpecialisti i!iEng*ine!er: s*hall *::assess :the following:~**~**
iiiili:ii:
iiiili:ii:
ii!:iii::iii*i!!i:!
ii!:iii::iii*i!!i:!
i*!ii:ii iil iiiiiiiii!i:
i*!ii:ii iil iiiiiiiii!i:
                                                                                                                                                                                                                                                    *iiii*ii!*iiiiiiii*ii*iiii ii
*iiii*ii!*iiiiiiii*ii*iii ii
:a..!], cviaui:,:*1/
:a..!], cviaui:,:*1/
I!             !/U:!..! qua!i ii 1M!I     ty  dl ~i UlI!:d:IIUC         plli:aJ!ULl;iucb, p":i
I!
                                                                                                                                                                                    *!U UCU U5I               dIKED~J[
U:!..! qua!i  
                                                                                                                                                                                                                    ]i: ii]:i :::] i             i~:
!/
ii t
1M!I y dl ~i UlI!:d:IIUC plli:aJ!ULl;iucb, p":i  
*!U UCU U5I dIKED~J[  
]i: ii]:i :::] i i~:
i*,*:ii.:!::.
i*,*:ii.:!::.
iii ~~ii:* :        .:b: effecud t!ic vendUess ofimplremethati                      the oiowin;gand. aS reiiauitd:iiii                                                   i*ii:::~iii:!*iili: :
iii ~ ~ii:*
::i::ii~J                           cno
b:
:i!i~~ii:i:licii.iii !..:il: i:i*i ith      i A mac with approv01               ii e d~iiICaii proedureal os. iand;ia!* ~ b *ii~ !*eiili i:ii !*iii
effecud t!i v
:*:*!: !:i: :i*             Aud*:i::i.l
c endUess of implremethati the oiowin; gand. aS reiiauitd:iiii i*ii:::~iii:!*iili: :
::iii       sche:*ulesi ass~ii*i~i:*ur.
::i::ii~J
it:!iii*i**.d                                    e thatlii:i i**.:i the*folo in areasi1241 are.o:~i:                   audited at t~he.iii             i!ii**ii:** :i:i::ii*
:i!i~~ii:i:licii.iii !..: il : i :i* i i th i A cno mac wi th approv01 i i e d~iiICaiii proedureal os.
il::!3:ii**ii**i
iand;ia!* ~ b *ii~ !*eiili i:ii !:i: :i*  
:*i*ii ::: i *::        ndiiicated**:i:ii*
!*iii Aud*:i::i.l it:!i sche:*
i ii:*i:*i * [**i frequenc
::iii ii*i**.d ulesi ass~ii*i~i:*ur.
:* *d* i*ies or more frequently as :*:iii;::*i*                           perform        ance lii
e thatlii:i i**.:i the* folo in areasi1241 are.o:~i:
* i~ii:::**       dictates.
audited at t~he.iii i!ii**ii:**
                                                                                                                                                                                                  *l3**iiii*ii*:i
:i:i::ii*
il ::!3:ii**ii**i i*ii i
ndiii i
cated**:i:ii*  
*:: ii:*i:*i frequenc
* [*  
*i :* *d* i*ies or m ore frequently as perform ance dictates.
:*:iii;::*i*
lii
* i ~ii:::**
* l3**iiii*ii*:i
:i:i*i*3i:
:i:i*i*3i:
: i.**:i ii:i::*ii*:i*3i~ii:::::*:ii:i*i**
: i.**:i ii :i::*ii*:i*3i~ii:::::*:ii:i*i**
i::i:.ii Training and qualifications of the staff..
i::i:.
6:::::::::::
ii i!i 6:::::::::::Training and qualifications of the staff..
i!i          ::*:.
Actions taken to correct deficiencies occurring with equipment, structure, systems, or method of operation that affect nuclear safety.
Actions taken to correct deficiencies occurring with equipment, structure, systems, or method of operation that affect nuclear safety.
Perorm
.:-::..ill*
                                                                                            .: ,.:::::- :;            :::nc:- of,:.:..-
-:i::.:.
ac .:,:**
:.i.
ivities.. required:b
*,: : :;:::7:::::i :i,
::-*.3: :.:. -::* .::. the
,***/-.,
                                                                                                                                                                                        .) QA:
Perorm nc of,:.:..-.:,:**
* program         :,.i*:: to:::::
ac ivities.. ::-*. 3: :.:. -::*.::..)
meet:*:::.!::~u*arH:ai!l::i:O**CFR::7 thecrteia f 0 FR.i:i8*b                               0,Apen                    B 10:3, CFR:
required:b the
r :~ :3:*!:i:.:,i:::~l:
* QA: program to:::::
ix                     71::
:,.i*:: ::"
meet:*:::.!::~u*arH:ai!l::i:O**CFR::7  
.i:i8*b r :~ :3:*!:i:.:,i:::~l:
thecrteia f 0 FR 0,Apen ix B 3, 10: CFR: 71::
i:::::*:*~::~:iii*:*!:i:i**i*i,::
i:::::*:*~::~:iii*:*!:i:i**i*i,::
    .:-::..ill*
            -:i::.:.
:.i.
* ,: :  :;:::7:::::i :i ,    ,***/-.,
:i::::i:*:
:i::::i:*:
:;.i":               docume::::*::*!*
:;.i":
n0:ted   *.*andarog 1.etPo               ht th ate~nt~ioe                       n olefo!the       Pr       :~etsMaagder and..                 ,:          ill
docume::::*::*!*
:3:::::.::::::::::::::::::::::9.::::: External audits .or s*:urveys of: suppliers: providing3 Imp~ortant:*To afety::***! I
n 0:ted  
:::materials,.                                               parts, eq::::i;::i::*f* services U nyi~i*mom3:*rquipmentlo                                           1f imareperormd                            at
*.*andarog ht 1.etPo th ate~nt~ioe n olefo!the Pr  
:* th~e~s*::
~etsMaagder and.. ill 3:::
i:::ind*::*    cated*:::
: ::.::::::::::::::::::::::9.::::: External audits.or s*:urveys of: suppliers: providing3 Imp~ortant:* To afety::***! I
                                                                                                                                                                                                                          *:i**.::::::::::::::::::Ii*:::
:::materials,.
:!::!:*.*!3!*i:iiifrequency::.
parts, eq::::i;::i::*f*
ii(!i:~i: :i!iii!***::                                 o~*r*Smoefeunl                me~:j*''*i!erformanc as pn*'::i                            dici~i t:J~ :a~n:tes.         n*:~ iies*i:i::i:
U nyi~i*mom3:*rquipmentlo services 1f imare perormd at th~e~s*::
i ::::.!*::::::i*!::*: ::*:!:i:3::::ii:3i:i*0. 3a.Suppliers provdingdi.:by:.
:* i nd*::*
                            .i:;!-!*i::                                                                                    co m riali gradeicalibrationie a ndte stitng service:sin i::.::
:::i cated*:::  
i:ii~i~ii:::                                   who::::::::::
*:i**.::::::::::::::::::Ii*:::
:!::!: ii(!i:~i:
*.*!3!*i:iiifrequency::. :i!iii!***::
o~*r*S moefeunl as pn*'::i me~:j*''*i!erformanc dici~i t:J~ :a~n:tes.
n*:~ iies*i:i::i:
.i:;!-!*i::
i ::::.!*::::::i*!::*: :: *:!:i:3::::ii:3i:i*0.
3a.Suppliers provdingdi.:by:.
co m riali gradei calibrationie a ndte stitng service:sin i::.::
i:ii~i~ii:::
who::::::::::
ar::i:i*:*
ar::i:i*:*
en:accredited.                 m*by na iat*onally:co                   re3i gnized accredi*           i.Ttin:gil::~ : *lbody,         uiong:i::::i:
en :accredited. by a m*
ii:*:!:ii:::: *.!)::procedures. consistent i:::::* !:ii::i..                                                                          w-:!i.*::*i**!:..!:::*
n at*
ith:tho se.
i onally: re3i co gnize d accredi*
::i*i:.::::!;:*:!!:~i~!:*i*::                 found:::::::::::::::::::
i.T tin:gil::~ : *lbody, uiong:i::::i:
                                                                                                                                                *:i:::Z::::!**:i*::   In A N:::ili.iiF[:
ii:*:!:ii:::: !:ii::i..
SI/ISO"::     IIE  C 17025!3 i:":F:::..: ::: ! *:*i!* 3:*:!:*:3i:i .:( :*i i (::i~i *::::*Q       i:*:*:*:**:!.:*         General:::i*i!*ii**
i:::::* *.!)::procedures. consistent w ith: th o se. found In A N SI/ISO IIE C 17025!3
Requirements for the Competence::                                               of-::::J:;*:;*!:
::i*i:.::::!;:*:!!:~i~!:*i*::  
Testing::: and3:         'Calibration:::::::::::::::
-:!i.*::*i**!:..!:::*
 
*:i:::Z::::!**:i*:: ::::::::::::::::::: :::ili.iiF[: ":: i:":F:::..: ::: ! *:*i!* 3: *:! :*: 3 i:i.:( :*i i (::i~i *::::*Q i:*:*:*:**:!.:*
                                                                  * :Labo0rato0ries~i, do: not h a ve tob be p erio0dically :su rveyed: !ifth cbi*onditions ::::i:i*:i*:
General:::i*i!*ii**
* i;i of the N RC iSafetyi Evialualtion dated iFebruary 9, 20i15 :are*met (seei *':I ! ::
Requirements for the Competence::
* i*ii
of-::::J:;*:;*!:
* i i *i&#xb8;::: :i:: ;z:.* .:::::i:i:i*,:!.i:    :i.
Testing:::
Apeni                      xB. onros halbe etbise inap ical                                                                                                                           prcdue to ensure~ii.:
and3:  
::*.!!i ;ii:;i::*::*2   the::::::::: r qi rem         :*.::    entsii*:::2
'Calibration:::::::::::::::
::* *.::;i:   :*i*   ofi*:i the  .:: NRCiSafety::::::::::::::                           Evaluation?}:i:-.**: il~are
* i *i i
: .:i:**::*!::satisfied.)
* i i *i&#xb8; ::: :i:: ;z:.*.: :::: i:i:i*,:!.i:
:i;,i i:!: *:*!.:!i.: :*1:: ?:i;!i~: : .;i:
:i.
                            *... :. : .>i.:H, : : ...:...::... ,.....:.:.:.,....           ,+: :,: ,L.&#xb8;. -<-.>::::,
* :Labo0rato0ries~i, do: not h a ve tob be p erio0dically :su rveyed: !if th cbi*onditions ::::i:i*:i*:
: :/..:> :: :.   . :.....< :: ::.: .: .:..,.,:: ..:.:,::. ,::,:::                                                                                                       : :' ,.. :..:..:.-;:. * .:...:.::>:::.::: :::: :.. :..:;....:-: .... --
* i;i of the N RC iSafetyi Evialualtion dated iFebruary 9, 20i 15 :are *met (seei *':I ! ::
                                                                                                                                                                                                                                                                                                      *.* **!!!**ii*,**.              *ii*!i*.!**     .i..*iii/*.!  i *i**.
Apeni x B. onros hal be etbise in ap ical prcdue to ensure~ii.:
iI* ii*ii*il      *ii!*i!**I      .i*i* i:i*I i !i!
the:::::::::
                                                                                                                                                        .. . *:ii            ...            ill i i:ii:ii i ii*i
::*.!!i ;ii:;i::*::*2 r qi rem entsii*:::2
                                                                                                                                                                                                                                                *i* i*; *ii*,ii* i*!!*iii'!*iI                                    *iii*,
::* *.::;i: of
                                                                                                                                                                                                                                                        ***iiiI*i iiii!i*                                              !ii*
:*i*
                                                                                                                                          .!:ii:..i:i:i
i*:i.::
                                                                                                                                                    +.:i:::
the N RCi Safety::::::::::::::
                      !!! :**=*
E valuation?}:i:-.**:
: : i!i!!
are satisfied.)
::*
il~::.:i:**::*!::::i;,iii:!::*:*!.:!i.::
* i!&#xb8;
:*1:::?:i;!i~:::.;i:
                                      *!* i *IL*:*&#xb8;    ;*i::i:il;*!
*... :. :.>i.:H, : :...:...::...,.....:.:.:.,....
                                              . :.. :. :         . i;,*::. .
,+: :,:,L.&#xb8;. -<-.>::::,
                      -.' " ::':: * "* *i: :,'*:: * :.i'*-* ;:.:.,'.. ::,:;*.*
: :/..:> :: :.
ii* i ii"
*.* * *! !! **ii*,**.  
                      .          * . .. :: :.       . . . : . : :. .                                ,     . :r .-        : "'::'/,...    : :': ..
*ii*!i*.!**
ili*i*i*i* i;i!:* ii i i* *i!*
.i..*iii/*.
                                                                                                                                                        '..'..' i.i..*./.':        " i:i: *      ::,,*: -.-:*:i::: ::.:%1..
i *i**.
                                                                                                          !!i! !i!ill                                            il                                                                                                                          i *!i *i!                            ii!i**!*
iI* ii *i i*il
ii:*- /i*!i !ii*ii !i ii/i ii!iii!:i*
*i i!*i!**I
                                                                                                                                                                                                *i*:iii    *i i**.           *iii*!*iii*i    ill                                      *:-:i:i:i*!*:i::i*  .* :*:*: *:::iiii:               !*:!i:!::::    *.ilri:
.i*i*
QAPD                                                                    28                                                                                                                Rev.
i:i*I ii!i!
 
i!i!!
:::!. .,.i~i*.:-  ;":I.iMPOrT.ANT TO1 sAFETY STRUCTruRES. SYSTEMS AND CoMPONENTS:i,:.:. -. :.
i!&#xb8;
            . .:.-                . The pertinent qual~ity as~surance requirements of.10 CFR 50, *Appendix :B, 10::I                                                                              CFR :71!IIi i~i..                      Subpart H and 10 CFR: 72 Subpart G will be applied, as a. minimum, to all qualityi-::.* i:i:
:* *=*
        .. :..:.::..      ...i i.:activities .affecting .the I!mpo rtant TO Safety (ITS) StructuresiSystems and:                                                                            =* :.*          ;:* :; '**;'
*!* i *IL*:*&#xb8;
bi.i::ased on .e~ngineeringieval~uations:and :a revision ito t'he INAC-MPC FISA:R*I. :Th~ese!l~:!:::::I
;*i::i:il;*!
* not considered**a :redutionintihi~***le comnmitmenjs to :the ::QAPO.::v::*i
i;,*::
                                              ...                                                                                                                          *i~:*::::. !, ',!:!ii:-:::iiii:i::*:
-.' " ::':: * "* *i: :,'*:: * :.i'*-* ;:.:.,'.. ::,:;*.*
* The quality cl~assification:of NRC,-licensed Dry Spent"Fuel StorageComponents and.
.! :ii:..i:i:i
                                              ',..Transportation.:Pa~ckages.may.:not be r;evised:.using the iLACBW                                            W*Design ::Control!i:~~:*:!:!!
+.:i:::
:.:process. *Th~ese :modifica~tions must :be :made :by the Certifica.teHolder. *The*::::i*-:.:!::I::
*:ii ill i i:ii:ii i ii*i
il:Certificate:Holderis rlespOnsible for idesign and licensing~icontrolsf(orthesei:; I.!::.;:. I*:
. *i*
c.:::,omponentsubnder: their NRC-appro~ved Quality: A ssurance ;iProgram. SOLuTI/oNS!.:I.;
i*;
                                              ;*.:utilizes these:types ~of .componentsland*packages* under.:the provisions of a NRCii;::i:i:
*ii*,ii* i*!!*iii'!*iI
::.iGeneral-:Licensefori!Radioactive Material TransportationiPackages (10 :CFR 71ii) ~andi.
*i i i*,
* * *i iiI* i ii i i!i* !i i *
:r.-
: "'::'/,...
ii* i ii" ili*i*i*i*
i;i!:* ii i i* *i!*
'..'..' i.i..*./.':
" i:i: *
::,,*: -.-:*:i: :: ::.:%1..
!!i! !i! ill il i i:*- /i*!i !ii
*iii!i ii/i i i!iii!:i*
*i *:iii
*i i**.
*iii*!*iii*i ill i *! i *i!
ii!i**!*
*:-:i:i:i*!*:i::i*
*: ::iiii:  
!*: !i:!::::  
*.ilr i:
QAPD 28 Rev.
:::!..,.i~i*.:-
;":I.iMPOrT.ANT TO1 sAFETY STRUCTruRES. SYSTEMS AND CoMPONENTS:i,:.:. -. :.
. The pertinent qual~ity as~surance requirements of.10 CFR 50, *Appendix :B, 10::I CFR :71!IIi i~i..
Subpart H and 10 CFR: 72 Subpart G will be applied, as a. minimum, to all qualityi-::.*
i:i:
...i i.:activities.affecting.the I!mpo rtant TO Safety (ITS) StructuresiSystems and: =* :.*
bi.i::ased on.e~ngineering ieval~uations :and :a revision ito t'he INAC-MPC FISA:R*I. :Th~ese!l~:!:::::I
* not considered**a :redutionintihi~***le comnmitmenjs to :the ::QAPO.::v::*i  
*i~:*::::. !, ',!:!ii:-:::iiii:i::*:
* The quality cl~assification :of NRC,-licensed Dry Spent"Fuel Storage Components and.
',..Transportation.:Pa~ckages.
may.:not be r;evised:.using the iLACBW W*Design ::Control!i:~~:*:!:!!
:.:process. *Th~ese :modifica~tions must :be :made :by the Certifica.te Holder. *The*::::i*-:.:!::I::
il:Certificate :Holder is rlespOnsible for idesign and licensing ~icontrols f(orthesei:; I.!::.;:. I*:
c.:::,ompo nentsubn der: the ir NRC-appro~ved Quality: A ssuran ce ;iProgram. SOL uTI/oNS!.:I.;
;*.:utilizes these :types ~of.components land *packages* under.:the provisions of a NRCii;::i:i:
::.iGeneral-:License fori!Radioactive Material Transportationi Packages (10 :CFR 71ii) ~andi.
I::*:?tems and :services:associated with P:*ackaging and :Transportation of; Radioactive' i: ::
I::*:?tems and :services:associated with P:*ackaging and :Transportation of; Radioactive' i: ::
                                "*"i.Materdia s described ::in 10:i:C FR!71:,: andi i ndep*endent:; Sto6rag e: of:Spent N~fuclear: F~uelI.:
"*"i.Materdia s described ::in 10:i :C FR!71:,: andi i ndep*endent:; Sto6rag e: of:Spent N~fuclear: F~uelI.:
                              ..:,assdescribed*in 1.:;t0               C FR :72,; willials o* fall ;under ;the r*eq'uiremen*ts: of: the:QAPD."*:.ii-.:: :.
..:,as sdescribed*in 1.:;t0 C FR :72,; willials o* fall ;under ;the r*eq'uiremen*ts: of: the:QAPD."*:.ii-.:: :.
                                                                                                                                                                                                                            !!i*:i!"ii:
!!i* :i! "ii:
packages are defined below :...                                  :      *:             :            :::  :,      :,        ::::          :ii::L          ii:.iiii*;;ii!i!;;*
*'i!::ii  
*'i!::ii
!:: :'-i.:*::i.i::.
:'-i.:*::i.i::.
:i:i  
                ;!.. :i:i:.:.::!
*".i i.:::!
                                  *".i                                                                                                                                                                                   *!*:*ii!!ili:i,!?
i.:::!
:::::..iii::i:.::.:..ii::*
:::::..iii::i:.::.:..ii::*
:?:!*i.:'*
:?:!*i.:'*
:": ":. i:i:i:*:i:ii:::
i.i:.
:::i :::ii*.i?
packages are defined below :...
:ii::L ii:.iiii*;;ii!i!;;*
*!*:*ii!!ili:i,!?
:A.i: ::
:A.i: ::
Dry Spent:::::Fuel Storage *:ii!:i!i!**i;i~:    (10. C:FR             72)~i:!:.......
Dry Spent::::: Fuel Storage (10. C:FR 72)~i:!:.......  
*:ii!:i!i!**i;i~:
::i!iiiiiiiiiL:.:
::i!iiiiiiiiiL:.:
* ii*i:;:
* ii*i:;:
:!!*i:i!*!
:!!*i:i!*!  
                                                                                                                                                                !*?*i:!i*i!**
!* ?*i:!i*i!**
ii:iii*i*i!i*:::;*i iii*: !*
i i:iii*i*i!i*:::;*i ii i*
:":":.i:i:i:*:i:ii:::
Quality
i.i:.:::i :::ii*.i?
* Design
* Design Quality !::*:*:i::::**i:::.:iDesign::*!:'
;*.:'::..J
:i:..::i::.: .:: S-sc"":ii~i::
:i:..::i::.:.:: S-s c"":ii ~i::
                                                                        ;*.:'::..J                                                                        ....Cateaorv:.      :*:::%"*Auth0dtv:i:*!:...::;i"
Cateaorv:.
                                                                                                                                                                                                          .:.i:::i*:
!::*:*:i::::**i:::.:iDesign::*!:'.:.i:::i*:
T.ransportable Storage:Can~ister and Fuel Basket Assembly:.! i-:"I:". .. A':: :.* :.:-NAC Intl'.:..,I :..
:*:::%"*Auth0dtv:i:*!:...::;i" T.ransportable Storage:Can~ister and Fuel Basket Assembly:.! i-:"I:"... A'::  
ii&#xb8;;i:i.*!:i:::i::
.::-NAC Intl'.:..,I :..
                                                                                                                                                                                                                                    *.:i::*:ii:!':*.
ISFSI P ad.
                                                                                                                                                                                                                                              !:il ISFSI Pad .          .... " .. ..--: *: :.,: :, . . . : .... :-- . .: ' , .:- : - C ...                                         . ,. -D PC .....:
.... "....--: * : :.,: :,... :.... :--..: ',.:- : - C...  
Laaiftinn:g" Y oke                             ! ::i:::::*!i: :.i::::U :.:: .".*.:i ***:*:;:"i-::..::       "!::" .BA ::.:".:I .:*:: NAC  A :Intl. n L:::i... *:
.,. -D PC.....:
ii !* iii:I
Laaiftinn:g" Y oke  
: ?* :*: i!*i l i!::i*
.B NAC Intl.
i::::i
! ::i:::::*!i: :.i::::U :.::.".*.:i  
                                                                !i                                                                                                         i:                                     i:i'il QAPD QAD29Rv.2                                               .        .. .,
***:*:;:"i-::..::  
                                                                                                                                                                              -: . i:.:   : """ .*:::. ':". '::-; ::"::":" " ": "
"!::" A ::.:".:I.:*:: A : n L:::i... *:
i:i*:::*
ii&#xb8;;i:i.*!:i:::i::
                                                              *:!i::i::,:
*.:i::*:ii:!':*.
                                                                  *::ii*ii:::*i*:
!:il
i,                                     :: ::i!   :i::*::,
::?* :*:
i!*
iil i!::i*
i::::i  
!i i::
i:i' il ii !* ii i:I QAD29Rv.2 QAPD
-:. i:. :
i: i*:::*  
*:!i::i::,:  
*::ii*ii:::*i*:
i,
:: ::i!
:i::*::,
::i:i:!:!i:ii:
::i:i:!:!i:ii:
i!i*.i:i
i!i*.i:i
::*:L*:
::*:L*:
iii*i
i ii*i
::, : :!: i**,::
::, :::!: i**,::  


i..:""
i..:"" :*:i y: :": II::'" " i:...ii.i PP N I A:! :
y::*:i:": II::'" " i:.. .ii.i               PP N I A:!       A.ii:::
""APPENDIX A.ii:::
:      ""APPENDIX                i ./ ~ii: *!-:i
i./  
                  ...                                        (Page 2 of 2)
~ii: *!-:i (Page 2 of 2)
IMPORTANT TO SAFETY. STRUCTURES. SYSTEMS AND COMPONENTS B.       Transport of Spent Fuel and GTCC Waste (10 CFR 71)
IMPORTANT TO SAFETY. STRUCTURES. SYSTEMS AND COMPONENTS B.
                          .i::*:":.:. :.i:.}; : ::" SC .:. '     .-    " :: " : : "::              .Qa itgoy.-.,*;- Design"Authority" Transportable Stora e. Canisters and Fuel Basket Assembiy....I"                                         A...         ' NAG Intl: .
Transport of Spent Fuel and GTCC Waste (10 CFR 71)
Damaged Fuel Can:.-.:-..                           ::  *      '      :"        /     !"I;"" A :               ".:NAG Intl. :
,-:. :.:. :.i ;
Transportable Storage Canister and Basket Assembly For GTCC.I'                                         A"             -*NAGI*,: ;intl. :
.i::*:"
W aste Containers:                                                 .    "__"_____I___""._:-I__""''
:.} : ::" SC.:. '  
Storage Transp~ort-Cask. (STC): :"".                           ..:. .         -".   ..               A'.".         "NAG Intl..":
.Qa itgoy.-.,*;
Design"Authority" Transportable Stora e. Canisters and Fuel Basket Assembiy....I" A...  
' NAG Intl:.
Damaged Fuel Can:.-.:-..  
/  
!"I;"" A :  
".:NAG Intl.
Transportable Storage Canister and Basket Assembly For GTCC.I' A"
NAGI*,:  
;intl. :
W aste Containers:  
"__"_____I___""._:-I__""''
Storage Transp~ort-Cask. (STC): :"".
A'.".
"NAG Intl..":
C.
Radioactive-Material Transport Packages (10 CFR.71)
Radioactive M~aterial. Transport.Packages subject to the *provisions of 10. CFR 7:1, S~ubpart C,:. uG eneral.LicernSes,:=' are ;iim portant.:To..Safety and subject:.to i;the*
. a~pplicable :requ!irem ents.. of the6 QAPDi:::I..;:!
.::..":i ".::
.:.*.::~::.*:
;i.:.:::!:::
: 1. S::::i{::}ee NA*C-MPC **Final ~:*Sa~fety* A*na~yis.:
Report ifor additiionalJclassification:***::.i:}:!:::
in fo rm a tio n.
[ f r a lc *:*:
::::::::::: ::.i.":.:. :......./!:: i:: :i::.
.:.:i.. : ;: : ::::: :. :: :::::::::::::::::::
I:
I:
C.      Radioactive-Material Transport Packages (10 CFR.71)                                                                -
.2. See NAG Storage *Transport Cask (STC) Final Safety Analysis Report and
Radioactive M~aterial. Transport.Packages subject to the *provisions of 10. CFR 7:1, S~ubpart C,:. uG eneral.LicernSes,:=' are ;iim portant .:To..Safety and subject: .to i;the*
*associated NAC specifications for additional* classification information.
      . a~pplicable :requ!irem ents.. of the6 QAPDi:::I. .;:!                              ::      .::..":i ".:: .:.*.::~::.*: ;i.:.:::!:::
NA*C-MPC **Final ~:*Sa~fety* A*na~yis.:
: 1. S::::i{::}ee                                                      Report ifor additiionalJclassification:***::.i:}:!:::
[infforrm atio  lc n.*:*: ::::::::::: :: .i.":.:. :......./!:: i:::i::.                .:.:i. . : ;: : ::::: :. :: :::::::::::::::::::
  .2.
See NAG Storage
        *associated                          *Transport Cask NAC specifications                    (STC) Finalclassification for additional*            Safety Analysis             Report and information.
: 3. For the definitionof QualitY Categories A, B:, and C refer to NUREG/CR-6407:.
: 3. For the definitionof QualitY Categories A, B:, and C refer to NUREG/CR-6407:.
QAPD                                                                   30                                                           QAPD30Rev. 29
QAPD 30 QAPD 30Rev.
29


i:: ,.. :i.lrl:&#xb8;,:I:;&#xb8;:
i::,.. :i.lrl:&#xb8;,:I:;&#xb8;:
iA*iii;i
A*iii;i  
                                                                                                                                *~**
*~**
PPEND IXBi~. !i*i*i :!i ,i                                                                           EPT:         !*::IONS:                           ":" ii*:::***                                 *::.i~iii~:*
i PPEND IX Bi~. !i*i*i
:REG ULATORY C:OMMITMENTS. ALTERNATIVES ANDi EXCI
:!i,i EPT:  
                                                    *  .. -.. . .. . .  ..    . ..        . ..  ..., . . , ... . .      .        . l .                                .      .                    .      .
!*::IONS:  
11.0. .:REGULATORY :COMMITMENTs                                                                                         .:..
":" ii*:::***  
                                          .1.1               Regulatory Guide 1.8, 1I-R-5/7,                                                               Pesne Seletion end Training 1;;.;:,;::!:2..
*::.i~iii~:*
:.;;;::Regulatory iGuide 1.10, Ri;;evisIon 2.(3/05), "Establishing.Quialit~y                                                                                                                                                 iii                             *:
:REG ULATORY C:OMMITMENTS. ALTERNATIVES ANDi EXCI l
Assuanc           Proram                   forPacagig                                       Usd i                             theTrasporatin                                               o
11.0..:REGULATORY :COMMITMENTs  
  ........:i*i::iii:ii*..i*...i::
.1.1 Regulatory Guide 1.8, 1I-R-5/7, Pesne Seletion end Training 1;;.;:,;::!:2..
                      +.. - -.-.-.-...-.
:.;;;::Regulatory iGuide 1.10, Ri;;evisIon 2.(3/05), "Establishing.Quialit~y iii Assuanc Proram forPacagig Usd i theTrasporatin o
                                  ,:::. l -w*.* ...     "";*:i.1l.*TUI                                          .JiOC'liii..Wli.Jiir i ittislaljiliiu            US.II.:.:.C.J*tl                                  LCLIUIIl                                            OIIUi LIE 7
........ :i*i::iii:ii*..i*...i::
+.. -
l -w *.*...
:ii:i*!i;!i:!::*:;:iiiii!i:i:iiiiiii*i*iii*:*::
:ii:i*!i;!i:!::*:;:iiiii!i:i:iiiiiii*i*iii*:*::
i;i::Fueli iSitoria ge::: iSyte m* rC:Om*pon ents A~ccording ito:*il                                                                                             Iportant to ;Safety!i:;i,:i~i (2 /..9.6)...".                                                                                                                                         ,.:::::.                                                :,,:',_,.::
"";*:i.1l.*TUI
2.0 S2.1           iiN;iucl]ear; Energy:; Insti~tute :(N EEI)! N E !~4i-055ii"Guid elines for :the Us e o**f                                                                                                                                             : i~li li:~;I:i
.JiOC'liii..Wli.Jiir US.II.:.:.C.J*tl LCLIUIIl i ittislaljiliiu OIIUi LIE 7 i;
:          Accred ita tion ::in iLieuJi: of Commrre ci al* Grade !Survieys for P rocbureme n~t! obfi~lii::*::
i::Fueli iSitoria ge:::
S           Laboratory Calibration and :Testl Services,"; revision Q. and associated :;:*i
iSyte m* rC:Om*pon ents A~ccording ito:*il Iportant to ;Safety!i:;i,:i~i (2 /..9.6)...".
                                                                                                                                                                                                                                                                                                                                ...... ,. H..,.. ,..
2.0 S2.1 N;i ii ucl]ear; Energy:; Insti~tute :(N EEI)! N E !~4i-05 5ii" Guid elines for :the Us e o**f
i*/
: i~ li li:~;I:i Accred ita tion ::in iLieuJi: of Commrre ci al* Grade !S urvieys for P rocbureme n~t! obfi~lii::*::
!~; :*iii!:** ii:3.0~*:!:*&#xb8;
S Laboratory Calibration and :Testl Services,"; revision Q. and associated :;:*i i*/  
  - ""':* :: " :.                         None:.'
!~ ; :*iii!:** ii:3.0~*:!:*&#xb8;
:.*i/-::i.*ii i*.!*'. ;//:*:* :i.:,,*.*i*!*             i.i:ii.*iI *
......,. H..,..,..
                                                                                                                                                  .-.....-.....- - ..-.. H......           . H ......... ..... H .. ,.
None:.'
i:;*:}ili!i:!.;: i:!::============================2::*;::::*;;i:
:.*i/-::i.*ii i*.!*'.  
                                                                                                                                                                                                            *:::;: :/:*::!:}i
;//:*:* :i.:,,*.*i*!*
                                                                                                                                                                                                                                                                                                                          ,iii!
i.i:ii.*iI  
                                                                                                                                                                                                                                                                        . .:,:. : :-:. :-:* ..:r', :.'" r "....:        ::" :"*" ":: '  *. "':'.:::.',"
.-.....-.....- -..-.. H....... H.............. H..,.
: :i:::::!:i:,:,,:,:
i: ;*:}ili!i:!.;:
i::'..'i*,,":i! ii::.::i:,.!.!'.i:!;:'.: :"" : :.' i:i :
i:!::  
 
============================2::*;::::*;;i:
:/:*::!:}i
: :i:::: :!:i:,:,,:,:
i::'..'i*,, ":i ! ii::.::i :,.!.!'.i:!;:'.: :"" : :.' i:i :
/:., _ :. :.::... :.::.
iiil! i'
iiil! i'
                                                                                    /:., _ :. :.::... :.::.
..:,:. : :- :. :- :*..:r', :.'" r "....:
Q A
::" :"* " ":: ' *. "':'.:::.',", ii i!
PD~!ii:::il i ii~i*ii~i:-. 31'i*:*          :                                                                            *i;!;:i::'
::0*PD; Q
                                                                                                                                                                                                                                !i*:i:*i:*:,il *:i* i: *!i:*;*;*/;:i::*;*i'      :Rev.
A PD 31'i*:*
                                                                                                                                                                                                                                                                                    *:*i:;2*i*;!:*;:.
~ !i i:::il i ii~i*ii~i:-.
:il;i*i i :*:*iii*ii*i!ii::i*:*i     iii   29!;i~~~i*!~
Rev.
i:::i*i:i!i:*:i*i*i:il::&#xb8;
29!;i~~~i*!~
::0*PD;
*i ! i*:ii*:,ill *:i::*!i:il;i*iiii :* :*iii*ii*i!ii::i*:*i iii i:::i*i:i!i
:*:i*i*i:il::&#xb8;
;!;:i::':i:* i* :*;*;*/;:i::*;*i':*:*i:;2*i*;!:*;:.


                                                                                                                                                                            . . ..  "" .- ,-:'-,.' '.;-:b .. :  :.:.:.
i:!.-*itiii.:iii":i!i;}!*i:*!i(i:.i*i.
i:!.-*iti i.:i i":i!i;}!*i:*!i(i:.i*i.
.(Page 1l of 4).
:. .(Page 1l of 4) .
"".-,-:'-,.' '.;-:b.. :
:. ....                                                              ....,:,'' :."":i:.': :.:.i:":-:..   ,.:::-
....,:,' ' :."":i:.': :. :.i:":-:..
                                                " . : i,} . ::/               .,. 'i:i/i         .}i},ADMINISTRATIVE CGONTROLS.:I il ,. .i~I.~I:.:I::.ii ~,":i :.i}i}~
i,} ::/  
                              'i:These Administr~ative :Control
.,. 'i:i/i  
                                    '"hese
.}i},ADMINISTRATIVE CGONTROLS.:I il,..i~I.~I:.:I::.ii ~,":i :.i}i}~
:w:
'i:These Administr~ative :Control eedvloe osport; opertation of the L{ACBWR
eedvloe osport; opertation of the L{ACBWR
/;.ii:;planrti whiilie: :inh. SA:FSTOR Ri(d.i smantlem~ent)} and:-operationi~ of. the. LACBWRi i SF.Sii :i. :
                              /;.ii:;planrti whiilie: :inh. SA:FSTORRi(d.i smantlem~ent)} and:-operationi~ of. the. LACBWRi i SF.Sii :i. :
T3!;:i:  
T3!;:i:~iequ     r          ire~men ts~we re; pr~evious iyl :in clud ed :i n~ the: Tech nicail Speciifi cation0s :Zand~::. i iii:!iere: :relaei.*bid iL6!to                 th .xpD!udg.!c!ved~~missinQAPD during- active,:decommissioning.!:::i:iiii:i:!:i~i!i*:~i:i!i!:!:*:.i~l ji!!
'"hese r
:.::.}:;~..:*-;..;;}:::.
~iequ ire~men ts~we re; pr~evious iyl :in clud ed :i n~ the: Tech nicail Speciifi cation0s :Zand~::. i w:
                                                      .fi;/:: .i.:c:i overing :the :Pl ant dbcomm~is sio niJng acti vi~tie s ref-reien ce d ibe low anddin 1.1.3 Radiation Protection Program implementation.
: iii:!iere: :relaei.*bid iL6!to th.xpD!udg.!c!ved~~missinQAPD during-active,: decommissioning.!:::i:iiii:i:!:i~i!i*:~i:i!i!:!:*:.i~l
1.2             Each procedure required by Section 1.1 above and programs listed in Section 2.1 through 2.5, and any changes theretog shall be independently reviewed by a Qualified Technical Reviewer and approved by the Project Manager or designee prior to implementation.
:.::.}:;~..:*-;..;;}:::.  
.fi;/::.i.:c:i overing :the :Pl ant dbcomm~is sio niJng a cti vi~tie s ref-reien ce d ibe low and din ji!!
1.1.3 Radiation Protection Program implementation.
1.2 Each procedure required by Section 1.1 above and programs listed in Section 2.1 through 2.5, and any changes theretog shall be independently reviewed by a Qualified Technical Reviewer and approved by the Project Manager or designee prior to implementation.
2::.-20: :PROGRAMS AND :MANUALS ".::
2::.-20: :PROGRAMS AND :MANUALS ".::
i!i! i!i!:   ii             r:!:..::*:i:;.;eview.: Eice~nse~e-i nitiat ed]: chanoes. to {theg iPC     Cpshal i:b e su bmi[tted to*.iiii
:: *,.,.,.:..:i!i!
                                                *.!*!.;%{;!..i;;*.!i*which t.ihe chan.;.*ge(s) w*asma*d~ei~i. *This submittal shallicontai~ni :> ; ::
i!i!:
the :::.
ii r:!:..::*:i:;.;eview.: Eice~nse~e-i nitiat ed]: ch anoes. to {theg iPC Cpshal i:b e su bmi[tted to*.iiii the :::. i
i
*.!*!.;%{;!..i;;*.!i*which t.ihe chan.;.*ge(s) w*asma*d~ei~i. *This submittal shallicontai~ni :> ; ::  
                                                                                                                                                                                                                                ; **i!               :
; **i!
::i:::::~~i:*: con*:::!
: ::!::,;i:}**;:::::
: ::!:: ,;i:}**;:::::                  *:forman*e iof the solidifi~ed waste :pr~oduc:t to,*existin~g criter~ia* for! ::; ::* * ;: : i; 2.1.:3:: .Do:ume~ntaiotJn of :thie fact: that t:he change !has been reviewed a~nd :
::i:::::~~i:*:
i i::found
con*:::!
                                                                                      .          :acceptable :by a Qualified :Technical Reviewer.. ::: :*i:! ::i:
*:forman*e iof the solidifi~ed waste :pr~oduc:t to,*existin~g criter~ia* for! ::; ::* * ;: : i; 2.1.:3::.Do:ume~ntaiotJn of :thie fact: that t:he change !has been reviewed a~nd :
i:-!.*
i.i::found :acceptable :by a Qualified :Technical Reviewer.. ::: :*i:!
i:'::!::*
::i: I i:-!.*
                                                                                                                                                                      .:*!:)}::*::::::
i:'::!::*  
:i:}i i:ii:;*!:::::i:i*
.:*!:)}::*::::::
                                                                                                                                                                                                  }
:i:}i i:ii:;*!:::::i:i*  
I iii i}:!i ii; i: ::i :i'i                           i*:!:i i:ii*!*::::::i*
}
iii:!:!i*
iii i}:!i i i; i: ::i :i'i iii:!:!i*
:i:::!:i*ili                                            :i:ii:/i::!:117
:i:::!:i*ili i*
                                                                                                                                                                          ,....      .....  -..    ,..._...,*  .....      -', :.;..: : ".,'...'w::'::i Q;APD                                                 : :: *'!::}                       32 ...i...
:!:i i: ii*  
i..: ;!:ii: ::32::                                 *..:}....   . : ....
!*::::::i*
:;.i:;"
:i:ii:/i::!:117
                                                                                                                                                                      ,-..-          *" ..R Rev.
-', :.;..: : ".,'...'w::'::i Q;APD 32 Rev. 29:
                                                                                                                                                                                            ..ei!.:29    29:
: :: *'!::}
:.;:,:.,      ::-i
i..: ;!: ii : ::32::... i...
 
........ R ei!.:29 :-i
:APPENDiIXo::
*..: } :;.i:;"
(Page 2 of 4)}i   C;
:APPENDiIXo:: C; (Page 2 of 4)}i
:..**?:: i::.::i
.-,::*.:* :;:..::.3-
:;: *!..::.3-:;";:ADM                                                   INISTRA iVE CONTROLSi:;i.*ii~::i:&      ":i :./ :i* i.:...                           *~i/;:;
:..**?::
:*i:,i::i:iiiiiii!
i::.::i *! :;";:ADM INISTRA  
                                                                                                                                                                                                            -:.::'        :i; .:::  iili!:!
":i :./ :i* i.:...
::::.:/
iVE CONTROLSi:;i.*ii~::i:& *~i/;:;
:": 73/ii   ":.:{:: :-::::                           In:i~.:i.::!formation submitted should consist of a package of :those -pages:
::::.:/ ":.:{
:::.:::i:..:. }.:::ii::.i:.,.* ::: /i}.6of::.;
:": 73/ii :: :-::::
::.i/i.!                                                                  the 00*CM :changed iwithi each page numbered .and providedi: : :
In:i~.:i.::!formation submitted should consist of a package of :those -pages:
          . }:: ". :"i. ": :}::: "": ;.':{i-:w:itht an approval and date box, together with appropriatei:.!:; . }:::: i
::.i/i.! :.
                              '.:i ::-...::!:i:Sr~adioactive effluents and for maintaining the doses to miembers of the ... :.::.i:
:::.:::i:.. }.:::ii::.i:.,.* :::
                              .. ::.. {:/ ::;. .: progra~m (1I). shalli be cobntained :in: th~e: 0DCM,:(2:)shall: be: implementedI.:i.:ii::!!i
of::.;  
/i}.6 the 00* CM :changed iwithi each page numbered.and providedi: : :
}:. :"i
:}::: "": ;.':{i-:w:itht an approval and date box, together with appropriatei:.!:;. }:::: i
:*i:,i::i:iiiiiii iil i!:!
:i;.:::
'.:i ::-...::!:i:Sr~adioactive effluents and for maintaining the doses to miembers of the... :.::.i:
{:/ ::;..: progra~m (1I). shalli be cobntained :in: th~e: 0DCM,:(2:)shall: be: implementedI.:i.:ii::!!i
::i::: *:.by health :physics pr;*iocedu~res-ia nd: instru ctions,. anid :(3) shall :include !ii:}}:i;-;1* :~
::i::: *:.by health :physics pr;*iocedu~res-ia nd: instru ctions,. anid :(3) shall :include !ii:}}:i;-;1* :~
                              .-i T* *." remedial actions to be ta~ken whenever.the pro0gram limits are exceeded:..};. "
.- T i * *."
                              ..i.-:/}/,.:i: .:-:The program shall :include.'the following, elements:::.                                                         . .,. ?-} ..?} 7 . ; :.4.::
remedial actions to be ta~ken whenever.the pro0gram limits are exceeded:..};. "
....:.:.}.!*i:.:.-:&#xb8;,:.{..
..i.-:/}/,.:i:.:-:The program shall :include.'the following, elements:::.  
                                            " !:.::&#xb8;.. :!:,1 2.i3.1~:,:         imit:U !ation       on rinig*s *in.istrume i~*.the*   :operabii                      ctive li:iq uid :*.te:sts tyi iof-riad ioasurveillianrce          an d }ga~seo*us!*i and::ii:}! ::ii ii/
..,. ?- }..?} 7. ; :.4.::
iiiiii mo6n~ito
.... :.:.}.!*i:.:.-:&#xb8;,:.{..
                                                                      !:::i!.::*;::::                             ntation,,including:                                                 -i:*::i:::*.ii
Siii! iiiiii
                                                                        - -:- iset po6in0t:.deter~min*ation 1n{i
" !:.::&#xb8;.. :!:,1
                                                                              -                                              a ccor~dance :with .:the:.methOdology In.:ri the::~~
"' i:'. ": ::;..'.i*
Siii!                                    2.3.2 L:;:im:::
* -.:. : ::: i*
                                            "'i:'.":::;..'.i*
2.i3.1~:,: imit:U  
                                            * -.:. : :::i*
!ation *s on i~*.the* :o perabii tyi io f-riad i oa ctive li:iq ui d : an d } ga~seo*us!*i ::ii ii /
i tai*ii{io ns !on theico ncentratio~n s o;*f :rad~ioactive iia                 m :terial :!r*elesed..~
!:::i!.::*;::::
i.{i.liquid :effluent~s t;io:. unrestricted aeaas c;onfor~ming .to 10 Cii~:FR ::20,;i:
mo6n~ito rinig *in.istrume ntation,,including: surveillianrce *.te:sts and::ii:}!
:Y...In.I:                                                                                                                                            :!}:::i*i{ii!ii
-i:*::i:::*.ii
                                              .:ii:::2.:3.i3 *iMonritor~ing, si.ampling an~d-analysis of radioactive liqu~id andai }: :i:!*:i';i: :;:*::-/
-:- -iset po6in0t:.deter~min*ation 1n{i a ccor~dance :with.:the:.meth Odology In.:ri the::~~
                                            *<:{.:aiir::T-}a!borne
2.3.2 L:;:im:::
                                                  .. i:;*                                      particulate in accordance withi 10 :CFR :20 and withi: th~e~i:i:i
i tai*ii{io ns !on theico ncentratio~n s o;*f : rad~ioactive m iia :terial :!r*elesed..~
:iy.
:Y...In.I:
                                            .: }::/":.:: ::*::.                methodolo*gy and iparameters described :in the 00CM:;.:*:i*::/`:::::.*.;*::*:}.                                                                .
i.{i.liquid :effluent~s t;io:. unrestricted aeaas c;onfor~ming.to 10 Cii~:FR ::20,;i:
co:i:::&#xa2;m ]mitment: :to ,a miember-* of the :public:. from radio~activematerila~ls:* }: i:iiii
:! } :::i*i{ii!ii
:! i~;:i:      :;:*i{ii:ii/.:
                                                          ..i..
:i..i*.:
:i..i*.:
i*:
i*:  
              ;:*i&#xb8;
;:*i&#xb8;
:.{i:{Y::i:*ii::!ii*:"i::.
:. {i :{Y::i:*ii::!ii*:"i::.  
2*;{i::':.}:
.:ii: ::2.:3.i3 *iMonritor~ing, si.ampling an~d-analysis of radioactive liqu~id andai }: :i:!*:i';i: :iy.
:3.-5 ::;iDeterminaition :of: cumula.tive anid projected dose                                         co ntributions}               :.} ;. . .. :.i: .
*.. i:;*
                                            .:.:}::::.vi.::.!il":;.from radioactive :effluenits-for :the current calendar quarter *a~nd:!:: * " :*::
<:{.:aiir::T-}a!borne particulate in accordance withi 10 :CFR :20 and withi: th~e~i:i:i
::.:.::-:*:.:;:.:::.:.:: .icurrent :ca~lendar :year ;in* accor~dance" with the methodology :and...i-.. ,..-
:;:*::-/
                                            ": :":: ."-i                       parameters Inaa           te 00CM atMatlesteve the                    least:."-}
.: }::/":.::
every year.:;                   -        .:}::i:i:;":!.:i. .":"ii!,
methodolo*gy and iparameters described :in the 00CM:;.:*:i*::/`:::::.*.;*::*:}.
QAP..... . . O !:**i`*.i:i.:ii;*:i***.!*:!:!;;:9 33**`i*!
i~;:i:..i..
I..i::::i::!     * ::::i::                             Rev.:i*.!i!:!*iii*i-:i:ii::*
:;:*i{ii:ii/.:
i:i:ii*!:*!:::::    29.3    ::iii:
co:i:::&#xa2;m
*";:.:::":. .:;*::."::*,.!*.!:i}:*i:/:i
]mitment: :to,a miember-* of the :public:. from radio~activematerila~ls:* }: i:iiii 2*;{i::':.}:
:,:::":::!!*i:*-:.'' ........
:3.-5 ::;iDeterminaition :of: cumula.tive anid projected dose co ntributions} :.} ;.... :.i:.
                                                            . - -.                                                                                      i*:*: ;i* :i*{*ii :
.:.:}::::.vi.::.!il":;.from radioactive :effluenits-for :the current calendar quarter *a~nd:!:: * " :*::
                                                                                                                                                                                  .!: .-', .: :.:.    -.'.".- .: ,:..      * :.. i. " :!::;:
::.:.::-:*:.:;:.:::.:.::.icurrent :ca~lendar :year ;in* accor~dance" with the methodology :and...i-..,..-
": :"::."-i parameters Inaa the 00CM te atMatlesteve least:."-}
every year.:;  
.:}: :i:i:;":!.:i..":"ii!,
!*.!:i}:*i:/:i
:,:::":::!!*i:*-:
Q A P.....
O 33**`i*!
!:**i`*.i:i.:ii;*:i***.!*:!:!;;:9 I..i::::i::!
R ev. 29.3
* ::::i::
i*:*::;i*
:i*{*ii :
i:i:ii*!:*!:::::
:i*.!i!:!*iii*i-:i:ii::*
::ii i:
* :.. i. " :!::;:
7"::i
7"::i


...::{*i* *:*::*.*ii!iiiii:
APPENbIX c (Page 3 of 4)
APPENbIX c (Page 3 of 4)
                                                                                                    ~1STRATIVECONIEOL.......................
~1STRATIVECONIEOL.......................
2.3.6 Limitations on the annual and quarterly doses to a member of the public from tritlum and all radionuclides in particulate form with half-lives greater than eight days in gaseous effluents released to areas beyond the site boundary conforming to 10 CFR 50,                                                                                                 !i!:.:i:i*T*:*:!:iii:i!*::!):i!iii:
2.3.6 Limitations on the annual and quarterly doses to a member of the public from tritlum and all radionuclides in particulate form with half-lives greater than eight days in gaseous effluents released to areas beyond the site boundary conforming to 10 CFR 50, Appendix I; 2.3.7 LimItations on the annu'aI dose or dose commitment to any member of the public due to release of radioactivity and to' radiation from uranium fuel cycle sources conforming to 40 CFR -
        -.. ,- : ....                                                      Appendix I; 2.3.7 LimItations on the annu'aI dose or dose commitment to any iiii member of the public due to release of radioactivity and to' radiation from uranium fuel cycle sources conforming to 40 CFR                                                                               -
Part 190.
  ...::{*i* *:*::*.*ii!iiiii:                                              Part 190.
Radiological Environmental Monitorina Proa ram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. 'the' program shall provide representative measurements of radioacdvty In the highest potential exposure pathways. The program sha~l (1) be contained in the ODCM; (2) conform to the guidance of 10 CFR 50, Appendix I; and (3) Include the following:
Radiological Environmental Monitorina Proa ram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. 'the' program shall provide representative measurements of radioacdvty In the highest potential exposure pathways. The program sha~l (1) be contained in the ODCM; (2) conform to the guidance of 10 CFR 50, Appendix I; and (3) Include the following:
2.4.1 Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters'described in the ODOM.'
2.4.1 Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters'described in the ODOM.'
2.4.2 Participation in an Interlaboratory Comparison Program to~ensure that independent checks on the precision and accuracy of the measurements of radioactive material in the environmental' sample matrices are performed aspart of the Quality Assurance Program for environmental monitoring.
2.4.2 Participation in an Interlaboratory Comparison Program to~ensure that independent checks on the precision and accuracy of the measurements of radioactive material in the environmental' sample matrices are performed aspart of the Quality Assurance Program for environmental monitoring.
                                            .2...ii:i*::.:.
!i!:.:i:i*T*:*:!:iii:i!*::!):i!iii iiii 2...ii:i*::.:.
: ii,2:*5     i:
:.ii,2:*5 i:
o.:.**::::**:*/:f
o.:.**::::**:*/:f
:F.e~deral:R~egulations, i:the :following *:repo*rts shall be isub*mitted!:
:F.e~deral:R~egulations, i:the :following *:repo*rts shall be isub*mitted!:
priIOrit~iM~aric~h
priI
::*:}iori:::              to                     *1.:: off:eac~hy*e'ar. in: a~ccord ancewitjh~i:10 C FR !:50ii*::L.4.
::*:}iori to Orit~iM~aric~h *1.:: of f:eac~hy*e'ar. in: a~ccord ancewitjh ~i:10 C FR !:50ii*::L.4.
2.5.1 Annual Radiological Environmental Monitoring                                                 ni o inq ReM  e pi*-i!! iL::   i::::i:::!i::!liiE.ii:*:,orti:
2.5.1 Annual Radiolo gical Environmental Monitoring ReM ni o inq e pi*-i!! i L::
iiiii!           ii!:
i::::i:::!i::!liiE.ii:*:,orti:
                                                                !:{!::::::*!:::the report :ishall :ibe s::ubm*itted :notin1g :and iexplainin~g :the reasons:**:!:!:: :i*:
iiiii!
ii!:
!:{!::::::*!:::the report :ishall :ibe s::ubm*itted :notin1g :and iexplainin~g :the reasons:**:!:!::
:i*:
for*:::::-:**:
for*:::::-:**:
:: :o::the:               mis*sinig:i*           reuit~s. T he mim           ssing data shall* be sulb mitted: as:!i -::.::://*::!::::
:: :o::the: mis*sinig:i* reuit~s. T he mim ss ing data shall* be sulb mitted: as:!i -::.::://*::!::::
soon as possible In a supplementary                             le niar~ie       report.su o~:::.:i:. ::. ~i:i:*i!:: :::::::::::::::::*:i!:i:i:!*iii::: i*:!:*
soon as possible In a supplementary report.su le niar~ie o~:::.:i:. ::. ~i:i:*i!:: :::::::::::::::::*:i!:i:i:!*iii::: i*:!:*
::i)*:i:**
::i)*:i:**
QAPD.'      i: ' ; :..:!:::'i:'        R.i"::;:-:,'-::::-!'*!::.:
..; ;.:::i:::
ev": 29"-:                        '
:,:{  
                                ..; ;.:::i:::
.:. :::!:::i!.:  
:,:{
!::i.,
                                              .:.:::!:::i!.:
:!:i)i!i iiiiii:ii!
                                                    !::i.,                   :!:i)i!i iiiiii:ii!
il
: .'!i:*i:!:ii:::     il .::::i*4.i
:.'!i:*i:!:ii:::  
                                                                                        - *":.*i*):i::.*:
- * ":.*i*):i::.*:  
:!i*'
):)!!:!*::!::i
                                                                                                    ):)!!:!*::!::i i:,i::!:i:,
.::::i*4.i *:*::::*!!ii!
                                                                                                                            !*:,':*{*
::i*;*i*)i  
                                                                                                                              .*i:i :"ql ::i*..
! i: 4 :::;
                                                                                                                          *:*::::*!!ii!
::i*;*i*)i *!*i.:
i:4:ii:ii:*
                                                                                                                                                    *!i*:i!ii
:!i*:i!ii*::ii
:!i*:i!ii*::ii
:! i*' i:, i: :!:i:,
!*:,':*{*
.* i:i :"ql ::i*..
* *i.:
:ii:ii:*
*!i*:i!ii Q
A P D.'
R ev":
i: ' ; :..:!:::'i:'
29"-:
i"::;:-:,'-::::-!'*!::.:


                                                      ., 'ii:"i:::!:":::i:::::i:i:
., 'ii:"i:::!:":::i:::::i:i:
:::"i::::!::::::*:::i:::i::
:::"i::::!::::::*:::i:::i::
::ii3"i:-:.'::;:i:*i :!&#xb8;. :::::i.i* ::.:.
::ii 3"i:-:.'::;:i:*i : !&#xb8;. :::::i.i* ::.:.
                                                    ?:..i:":i:                                                                                                                                                                                                                                              i.i
.::*:!.:*::i:*i..::*i..:::::!i!.!:7.i:*;!:::::
":*.::*:!.:*::i:*i..::*i..:::::!i!.!:7.i:*;!:::::                                                                 i~::: :: :A
:i!
                                                                                                                --Z.:i::i                                     :.,: PPE
ii i': il
:.*.:: N"D IX::.:::."-::
!i!!i i!
C::         , :. ....:*                                                          Si'ii: ii!:ii ii::iii ii:
?:.. i:":i:
ii(Page                                                      4 of 4)
--i ~:::
                                                                        ' * *::::i z!iiiiPrtogramii; a.map of iallsampling locat*,ions keyed:*to a table givingi: i~:i:
Z.:i::i :: :A PPE N D IX:
                                                                ... ::;::i.?.::::!
C::
:i *:::;:i:.:*.::*-i.~ii*::   .:i;*,distances :an~d idirections ifrom~tlhe plant*; the: results of: the . :.! .*:;:,.
ii(Page 4 of 4)
                                                                                                  ~~ItraoaoyCmaio                                                                             rga;anda: discu ssion o:f :all.i*:::-i**"i:::!:
Si'ii: ii!
                                                                                                                                                                                                                                                                                                                      ! 'ii
:ii ii ::iii ii :
                                                                        .... :. .. *-:-Paragraph (a)(2) .of.:10 CF;R 50,.36a,. ~Technical Specifications on : .
i.i
                                                                *:":.::!:':*:*:::::~:!i;.*:!.::..'~:.*."iEffl uents:.: from Nu clear :!Po~wer* Rea ct ors," requires, that a.-re~port be:i:
... ' * *::::i
    !i!!i i!
::;::i.?.::::! z!iiiiPrtogramii; a.map of iallsampling locat*,ions keyed:*to a table givingi: i~:i:
                                                                ....-. :':i~ *::::quanitity of each :of the principal :radionuclides released to:-                                                                                                                                           :::: - -".
:i *:::;:i:.:*.::*-i.~ii*::  
:i! iii': il                                                  : * :" ...::" unrestricted areas bV:.liquld or gaseous effluents during the.:..::-.i-ii ..
.:i;*,distances :an~d idirections ifrom~tlhe plant*; the: results of: the.
                                                                -.: q.:..::i..i.previous
~~ItraoaoyCmaio rga;anda: d iscu ssion o:f :all.i*:::-i**"i:::!:
                                                                        .:.                                                            :ii'ear., ~:With ~the exception o.f the collection of :hourly~i:::iiii!::"::::
.:..,:.- :... *-:-Paragraph (a)(2).of.: 10 CF;R 50,.36a,. ~Technical Specifications on :.
                                                                ". *:. :- .. ::i..-meteorologilcal::data,: the *inforimation lisubmitted shall ibe ::in.. .. "i*::...:.
*:":.::!:':*:*:::::~:!i;.*:!.::..'~:.*."iEffl uents:.: from Nu cl ear :!Po~wer* Rea ct ors," requires, that a.-re~port be:i:
                                                                ;. ::.*::i:.::::..:.*:.1) dated June. 19.74 :with :data :summarized on at..least a :quarte~rly::i.:
... :':i~  
:f ?::::::":.!.. i::,::::i accorid a~nce witi.hth O DCM                                                             M...of rad:ciatio~n doses :to :m~embers :o~f .the.. :
*::::quanitity of each :of the principal :radionuclides released to:-
1 i!i              i!
: * :"... ::" unrestricted areas bV:.liquld or gaseous effluents during the.:..::-.i-ii q.:..::i..i.previous :ii'ear., ~:With ~the exception o.f the collection of :hourly~i:::iiii!::"::::
:::::: i"::::::::::Gpub!ic:.
:-.. ::i..-meteorologilcal::data,: the *inforimation lisubmitted shall ibe ::in.... "i*::...:.
:::                                        from raidioahctive* liquid! and( airborne particulate :release~di:;! ::
;. ::.*::i:.::::..:.*:.1) dated June. 19.74 :with :data :summarized on at..least a :quarte~rly::i.:
U**:U
:f ?::::::":.!.. i::,::::i accorid a~nce witi.h th O DCM M...of rad:ciatio~n doses :to :m~embers :o~f.th e.. :
:i*ili.::::?:i.:,beyond :the :effluentr*elease boundlaryi:..This ireport: shall contain~:*:I ii*i.", -:. any ch*ianges .made :to theiO DCM durin~g :thei previou~s .~tw~elve : ii~i:ii:i:*
:::::: i"::::::::::Gpub!ic:. from raidioahctive* liquid! and( airborne particulate :release~di:;! :: 1 U**:U
i~- :.,i::,)*
:i*ili.::::?:i.:,beyond :the :effluentr*elease boundlaryi:..This ireport: shall contain~:*:I i~- ii*i.",
                                                                \i...-:.-: : . *mo n~thsi!.::--: .i::i:i ..... *: :).:!" :::i:i.""":' ::: " ':: : : :".:? : ":i(:i.::i:*:*:.i :
:.,i::,)* -:. any ch*ianges.made :to theiO DCM durin~g :thei previou~s.~tw~elve
:::-iii!:*:::!!:*(:;:ii::!-!::&#xb8;i::Zii::!*ii:!:..::::
: ii~i:ii:i:*
\\i...- :.-: :  
. m o
* n~thsi!.::--:.i::i:i.....
:).:!" :::i:i.""":' ::: " ':: : : :".:? : ":i(:i.::i:*:*:.i  
! 'ii i!i i!
: ::i*:*j::::i:.iii:::-
:::..i::::  
..:.*::II:.:I"Z.:.
:::):.:i
:::):.:i
:!if!!:-:.iii:::
:!if!!:-:.iii:::
::*i:!3*iii.:   :ii*ii*i:!Z:                                                                                                                                                   : ::i*:*j::::i:.iii:::-
::*i:!3*iii.:
:::..i::::
:ii*ii*i:!Z:
                                                                                                                                                                                                                                                                                                                                        ..:.*::II:.:I"Z.:.
:::-iii!:*:::!!:*(:;:ii::!-!::&#xb8;i::Zii::!*ii:!:..::::
                                                                                                            *::   .: :-:-;:.i:i';,-:::::: i:i.i:.::::;:,i.::i                                                         '..::...
.: :-:- ;:.i:i';,- ::::: : i:i.i:.: ::: ;:,i.::i
:..: .. . :      .. .: :: :.,!:i:i:?i:.ii:).'::::: :::.
::.:i.:! %:!1111:.
:.i:i:;.                    .:.....      :: :, ::...
::::*:::i::*::i..i::)iii:.,:':::.i  
                                                                                                                                                                                                                                                                                                          !i::".::'                                ,.
!i::".::'
::.:i.:!%:!1111:.
i::ii::  
::::*:::i::*::i..i::)iii:.,:':::.i i::ii::
.i.i::i:.i::.
    .i.i::i:.i::.
::!:.i*i:ili
:"::!::!:.i*i:ili
:..... ::.* i ].'Z 'i
:**:i:;*:i*
:**:i:;*:i*
i}i;:i:.ii!!*ii!i
i} i;:i:.ii!!*ii!i
:.i:!::,*iiii-:;:::.*
:.i:!::,*iiii-:;:::.*
: . . ... ::.* i ] .'Z 'i i,:i:                                                                                                                        !:*:::
...: :: :.,!:i :i:?i:.ii:).':: : :::. :.i:i:;.
::i.i
i,:i:
                                                                                                                                                                                                                            !!i*:*
::i.i  
                                                                                                                                                                                                                      ......... *.!.::i:
!!i*:*  
i::::i,.:*-::!ii.!:*?::::
*.!.::i:
:.-..,          :.....f:::::
i:: ::i,. :*-::!ii.!:*?::::
                                                                                                                                                                                                                                                                  .:i:        ::.*:::::!i:*
:.. f::::: : :.*:::::!i:*
i,.. :.!Z.:..  "::i::").:*::i;-;*
::i::").:*::i;-;*
i::::-:!!i::::4-
i:::
                                                                                                                                                                                                                                                                                            .. :..,.../.,..   ,..i :::
:-:!!i::::4-
                                                                                                                                                                                                                                                                                  !i i
.:i:...i,.. :.!Z.:.. ".. :..,.../.,..,..i :::
:f*::i:i      iii!.:i*:*:.i:iiil.i!*.::,.i!*.!*i.:::::ii:
: *.!i.:::*: :-:..-...,.-!.::.:.:::: 'h:; :::*::!i::
i:::*:::**:.!         !i               :,:i::.*
..i-:!::*::  
....,..::::!::....: !.i::::i
:i!i:)i:
! i i i:i i ii ! !i
:f*:: i:::*:::**:.!  
.:i*:*:.i:iiil.i!*.::,.i!*.!*i.:::::ii:
:, :i::.*
:,i:;:,:::::
:,i:;:,:::::
: *.!i.:::*::-:..- ... , .-!.::.:.:::: 'h:; :::*::!i::    ..i-:!::*::
!i:ii!i%,i:;iiiiiiii!i
                                                                            ...., ..::::!::....: !.i::::i:i!i:)i:                                                                                                                                                                                  !i:ii!i%,i:;iiiiiiii!i
.QAPD
                                    .QAPD                                                                                                                                                                                                       PD ::::~:::.R~ev. 29::
":::.Ai PD ::: :~:::.R~ev. 29::
                                                                                                                                                                                                                                            ":::.Ai
 
FIGURE 1 La Crosse Solutions Organization SOLUTIONS (off-site)                                                                    I I              PresidentI SOLUTIONS (on-site dismantlement)                                                ,.  *
                                            /                  rjc              a  grK  I
                                                      /                        I P                      I ISFSI ACTIVITIES (subcontracted to DPC)        [..............................
QAPD                                                36              QAPD36Rev.
29


Enclosure 2 LACBWR Q.APD, Revision 29, Summary of Changes
FIGURE 1 La Crosse Solutions Organization SOLUTIONS (off-site)
I I
PresidentI SOLUTIONS (on-site dismantlement)
/
rjc a grK I
/
I P
I ISFSI ACTIVITIES (subcontracted to DPC)
[..............................
QAPD 36 QAPD 36Rev.
29 LACBWR Q.APD, Revision 29, Summary of Changes


QAPD, Revision 29 Summary and Evaluation of Changes LACBWR QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD)
QAPD, Revision 29 Summary and Evaluation of Changes LACBWR QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD)
Revision 29 Summary of Changes The Dairyland Power Cooperative (DPC) and LaCrosse Solutions (SOLUTIONS) have recently submitted an application to transfer the La Crosse Boiling Water Reactor (LACBWR) Possession-Only License No. DPR-45 to from DPC to LaCrosse Solutions QAPD Revision 29 was developed in conjunction with the SOLUTIONS application for the Transfer of the NRC 10 CFR 50 license from DPC to SOLUTIONS for the completion of decommissioning. Upon NRC approval, SOLUTIONS will be the NRC licensee responsible for all activities under the LACBWR License. QAPD Revision 29 reflects the iicensee change from DPC to SOLUTIONS, and reflects the plan to subcontract the management and activities at the ISFSI to DPC. Upon completion of decommissioning, SOLUTIONS will apply to the NRC to transfer responsibility for the NRC License back to DPC.
Revision 29 Summary of Changes The Dairyland Power Cooperative (DPC) and LaCrosse Solutions (SOLUTIONS) have recently submitted an application to transfer the La Crosse Boiling Water Reactor (LACBWR) Possession-Only License No. DPR-45 to from DPC to LaCrosse Solutions QAPD Revision 29 was developed in conjunction with the SOLUTIONS application for the Transfer of the NRC 10 CFR 50 license from DPC to SOLUTIONS for the completion of decommissioning. Upon NRC approval, SOLUTIONS will be the NRC licensee responsible for all activities under the LACBWR License. QAPD Revision 29 reflects the iicensee change from DPC to SOLUTIONS, and reflects the plan to subcontract the management and activities at the ISFSI to DPC. Upon completion of decommissioning, SOLUTIONS will apply to the NRC to transfer responsibility for the NRC License back to DPC.
In order to minimize disruption and maximize efficiency, this revision of the QAPD was jointly developed by DPC and SOLUTIONS to facilitate the various stages of license transition described above.
In order to minimize disruption and maximize efficiency, this revision of the QAPD was jointly developed by DPC and SOLUTIONS to facilitate the various stages of license transition described above.
S The proposed revision is a substantial revision to the QAPD and will replace the current QAPD Revision i,28 in its entirety. Major or substantial changes are described along with the justifications for those
S The proposed revision is a substantial revision to the QAPD and will replace the current QAPD Revision i,28 in its entirety. Major or substantial changes are described along with the justifications for those changes.
changes. In addition, various minor changes are discussed in summary form.
In addition, various minor changes are discussed in summary form.
SMany of the following changes were based on similar changes that the NRC approved in the ZionSolutions Project Quality Assurance Project Plan, ZS-QA- 10, Revision 7. The LACBWR site status is substantially the same as that of Z~on at the time the Zion ZS-QA- 10, Rev. 7 was approved and implemented (i.e., fuel transfer completed, only decommissioning remaining). Note that by Revision 28 of the QAPD DPC had already completed the maj or QA Program transition to the Regulatory Guide 7.10 (RG 7.10) basis after fuel transfer was completed. Therefore, the ZS-QA-10 Revision 7 and the QAPD Revision 28 were already aligned in that the program basis both were aligned to RG 7.10.
SMany of the following changes were based on similar changes that the NRC approved in the ZionSolutions Project Quality Assurance Project Plan, ZS-QA-10, Revision 7. The LACBWR site status is substantially the same as that of Z~on at the time the Zion ZS-QA-10, Rev. 7 was approved and implemented (i.e., fuel transfer completed, only decommissioning remaining). Note that by Revision 28 of the QAPD DPC had already completed the maj or QA Program transition to the Regulatory Guide 7.10 (RG 7.10) basis after fuel transfer was completed. Therefore, the ZS-QA-10 Revision 7 and the QAPD Revision 28 were already aligned in that the program basis both were aligned to RG 7.10.
Chanwe 1 -Org~anization Changes:
Chanwe 1 -Org~anization Changes:
The license transfer application and the approach whereby SOLUTIONS will manage and perform decommissioning activities and will subcontract DPC to manage and perform ISFSI activities made extensive changes necessary to the QAPD Policy, Section 0.0 Introduction, Section I Organization, and Figure 1 Organization chart. These changes also made numerous changes necessary throughout the remainder of the QAPD, to align specific references and responsibilities accordingly.
The license transfer application and the approach whereby SOLUTIONS will manage and perform decommissioning activities and will subcontract DPC to manage and perform ISFSI activities made extensive changes necessary to the QAPD Policy, Section 0.0 Introduction, Section I Organization, and Figure 1 Organization chart. These changes also made numerous changes necessary throughout the remainder of the QAPD, to align specific references and responsibilities accordingly.
Line 1,722: Line 2,393:
Page 1 of 4
Page 1 of 4


QAPD, Revision 29 Summary and Evaluation of Changes Chang~e 2   - Substantive Chang~es:
QAPD, Revision 29 Summary and Evaluation of Changes Chang~e 2 - Substantive Chang~es:
Substantive Change 2A.: In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSJ and remaining D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Safety Review Committee (SRC) has been removed from QAPD Revision 29 and replaced by the Independent Management Assessment (IMA). Section II.E.4 identifies an Independent Management Assessment (IMA) functiOn.
Substantive Change 2A.: In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSJ and remaining D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Safety Review Committee (SRC) has been removed from QAPD Revision 29 and replaced by the Independent Management Assessment (IMA). Section II.E.4 identifies an Independent Management Assessment (IMA) functiOn.
Individual(s) that perform IMAs are assigned by the President.
Individual(s) that perform IMAs are assigned by the President.
Line 1,732: Line 2,403:
This change was approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, and Maine Yankee. This change is justified based on reduced scope and complexity of operations at the station, and reduced staff, making the continued operation of the ORC impractical and unnecessary.
This change was approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, and Maine Yankee. This change is justified based on reduced scope and complexity of operations at the station, and reduced staff, making the continued operation of the ORC impractical and unnecessary.
The responsibilities of the QTR will encompass the functions currently performed by the ORC and will be consistent with the scope of activities at a permanently defueled facility in an advanced stage of decommissioning.
The responsibilities of the QTR will encompass the functions currently performed by the ORC and will be consistent with the scope of activities at a permanently defueled facility in an advanced stage of decommissioning.
Substantive Change 2C. The applicability of the QAPD to the ISFSI and decommissioning scope was clarified in Section II.B. The QAPD Revision 28 Section fl.B stated that the QAPD was applicable to "Passive SAFSTOR decommissioning activities". The QAPD applicability to decommissioning scope is now described in the QAPD Revision 29 in the same way as in the Zion ZS-QA- 10, Revision 7. This change is justified based on reduced scope and complexity of operations at the station, and is consistent with the scope of activities at a permanently de fueled facility in an advanced stage of decommissioning.
Substantive Change 2C. The applicability of the QAPD to the ISFSI and decommissioning scope was clarified in Section II.B. The QAPD Revision 28 Section fl.B stated that the QAPD was applicable to "Passive SAFSTOR decommissioning activities".
The QAPD applicability to decommissioning scope is now described in the QAPD Revision 29 in the same way as in the Zion ZS-QA-10, Revision 7. This change is justified based on reduced scope and complexity of operations at the station, and is consistent with the scope of activities at a permanently de fueled facility in an advanced stage of decommissioning.
The applicability of the QAPD to ISFSI ITS activities and 10 CFR 71 licensed waste shipments remains unchanged in QAIPD Revision 29.
The applicability of the QAPD to ISFSI ITS activities and 10 CFR 71 licensed waste shipments remains unchanged in QAIPD Revision 29.
Substantive Change 2D: The QAPD Revision 28 Section XVII Records was replaced in its entirety with the language from the Zion ZS-QA- 10 Revision 7. This change represents practical records controls that have been approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, Maine Yankee and Zion.
Substantive Change 2D: The QAPD Revision 28 Section XVII Records was replaced in its entirety with the language from the Zion ZS-QA-10 Revision 7. This change represents practical records controls that have been approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, Maine Yankee and Zion.
Substantive Change 2E: In the Appendix B "alternatives", the 2005 APS submittal and NRC approval related to the calibration services for M&TE was updated to the recent Nuclear Energy Institute (NEI)
Substantive Change 2E: In the Appendix B "alternatives", the 2005 APS submittal and NRC approval related to the calibration services for M&TE was updated to the recent Nuclear Energy Institute (NEI)
Page 2 of 4
Page 2 of 4
Line 1,741: Line 2,413:
Substantive Change 2F. In Section XVI.C, the following sentence was added as an enhancement:
Substantive Change 2F. In Section XVI.C, the following sentence was added as an enhancement:
"Conditions that may be reportable per 10CFR72.242, 10CFR71.95, or 10CFR21 shall be reported in accordance with approved procedures."
"Conditions that may be reportable per 10CFR72.242, 10CFR71.95, or 10CFR21 shall be reported in accordance with approved procedures."
Substantive Change 2G:~In Appendix C, Section 1.1, the following references were removed, justified as follows:
Substantive Change 2G:~ In Appendix C, Section 1.1, the following references were removed, justified as follows:
1.1.1     ISFSI Operations and Maintenance: This was removed as a redundancy. The QAPD Section V already applies to ISFSI Operations and Maintenance, so it was not necessary for this to be listed in Appendix C also.
1.1.1 ISFSI Operations and Maintenance: This was removed as a redundancy. The QAPD Section V already applies to ISFSI Operations and Maintenance, so it was not necessary for this to be listed in Appendix C also.
1.1.5     Physical Security Plan implementation: The requirements for procedure to implement the Physical Security Plan are self-proscribed ther'ein, and it is not necessary to list this in Appendix C.
1.1.5 Physical Security Plan implementation: The requirements for procedure to implement the Physical Security Plan are self-proscribed ther'ein, and it is not necessary to list this in Appendix C.
1.1.6     Emergency Plan implementation: The requirements for procedure to implement the Emergency Plan are self-proscribed therein, and it is not necessary to list this in Appendix C.
1.1.6 Emergency Plan implementation: The requirements for procedure to implement the Emergency Plan are self-proscribed therein, and it is not necessary to list this in Appendix C.
1.1.7     Procedure for controlling temporary changes: Based on current status of ISFSI and decommissioning temporary changes are not required.
1.1.7 Procedure for controlling temporary changes: Based on current status of ISFSI and decommissioning temporary changes are not required.
Change 3 - Editorial / Administrative Improvements and Clarifications:
Change 3 - Editorial / Administrative Improvements and Clarifications:
Editorial changes to remove historical information no longer relevant after license transfer, make specific references more general in nature, and eliminate unnecessary detail of no QA program relevance were made. The types of changes of this nature are as follows:
Editorial changes to remove historical information no longer relevant after license transfer, make specific references more general in nature, and eliminate unnecessary detail of no QA program relevance were made. The types of changes of this nature are as follows:
EditorialChanges Type 3A: In a few instances, historical details that were not necessary were eliminated.
Editorial Changes Type 3A: In a few instances, historical details that were not necessary were eliminated.
These include changes to eliminate "Passive SAFSTOR" in Section 0.0B, and removing historical detail at the introduction to Appendix C.
These include changes to eliminate "Passive SAFSTOR" in Section 0.0B, and removing historical detail at the introduction to Appendix C.
EditorialChanges Type 3B: In a few instances, specific references were changed to be more general in nature. Examples include: Section XV, "Corrective Action Report (CAR)" was made "corrective action document", and "Purchasing" was made "procurement support staff." Vl.C.4, "Administrative Staff' was made "administrative staff." In Section V.C, "procedures" was replaced by "guidance" and "Work Orders" in places to provided flexibility.
Editorial Changes Type 3B: In a few instances, specific references were changed to be more general in nature. Examples include: Section XV, "Corrective Action Report (CAR)" was made "corrective action document", and "Purchasing" was made "procurement support staff." Vl.C.4, "Administrative Staff' was made "administrative staff." In Section V.C, "procedures" was replaced by "guidance" and "Work Orders" in places to provided flexibility.
EditorialChanges Type 3C." In a few instances, unnecessary detail of no QA program relevance was eliminated, such as "Company", "Administrative Control Procedure (ACP)" and "QA Manual" being removed from Section 0.0.B.
Editorial Changes Type 3C." In a few instances, unnecessary detail of no QA program relevance was eliminated, such as "Company", "Administrative Control Procedure (ACP)" and "QA Manual" being removed from Section 0.0.B.
In summary, these types of changes are considered editorial and do not alter the intent or purpose of the QAPD and continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72.
In summary, these types of changes are considered editorial and do not alter the intent or purpose of the QAPD and continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72.
OVERALL EVALUATION:
OVERALL EVALUATION:
Line 1,758: Line 2,430:
Page 3 of 4
Page 3 of 4


Al           .
Al QAPD, Revision 29" Summary and Evaluation of Changes The QAPD Revision 29 applies to all activities associated with structures, systems, and components (SSCs) which are important to safety (10 CFR 72). The QAPD also applies to transportation packages licensed by the NRC under 10 CFR 71. For other ISFSI and D&D activities, administrative programs and procedures ensure compliance with governing regulations and include appropriate controls for activities under the radiological control programs previously contained in the Technical Specifications.
QAPD, Revision 29" Summary and Evaluation of Changes The QAPD Revision 29 applies to all activities associated with structures, systems, and components (SSCs) which are important to safety (10 CFR 72). The QAPD also applies to transportation packages licensed by the NRC under 10 CFR 71. For other ISFSI and D&D activities, administrative programs and procedures ensure compliance with governing regulations and include appropriate controls for activities under the radiological control programs previously contained in the Technical Specifications.
The proposed revision to the QAPD is appropriate for the remaining D&D activities and ISFSI operations. All safety related systems have been removed from service and have undergone partial or complete demolition. Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI and Greater Than Class C (GTCC) waste has~
The proposed revision to the QAPD is appropriate for the remaining D&D activities and ISFSI operations. All safety related systems have been removed from service and have undergone partial or complete demolition. Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI and Greater Than Class C (GTCC) waste has~
been removed from the site. Should any Class B and Class C radioactive waste remain to be shipped offsite for disposal, the QAPD would still be applied to those activities.
been removed from the site. Should any Class B and Class C radioactive waste remain to be shipped offsite for disposal, the QAPD would still be applied to those activities.
The ISFSI has transitioned to long-term passive operations. The system is inherently safe by design. The main function of the ISFSI organization is to monitor the environment in a way that demonstrates the integrity of the system. While it continues to be important to maintain an appropriate quality standard that preserves the passive functionality of the system, it can be accomplished satisfactorily through conformance to RG 7.10.
The ISFSI has transitioned to long-term passive operations. The system is inherently safe by design. The main function of the ISFSI organization is to monitor the environment in a way that demonstrates the integrity of the system. While it continues to be important to maintain an appropriate quality standard that preserves the passive functionality of the system, it can be accomplished satisfactorily through conformance to RG 7.10.
The proposed revision will continue *o satisfy the criteria of 10 CFR 50, Appendix B and the QA requirements of 10 CFR 71, Subpart H, and 10 CFR 72, Subpart G.
The proposed revision will continue *o satisfy the criteria of 10 CFR 50, Appendix B and the QA requirements of 10 CFR 71, Subpart H, and 10 CFR 72, Subpart G.
                                              - End of Changes -
- End of Changes -
Page 4 of 4
Page 4 of 4


BARBARA A. NICK President and CEO DAIRYLAND POWER C_     0OP ER AT IV             E November 17, 2015                                                                 10 CFR 50.54(a)(4)
BARBARA A. NICK President and CEO DAIRYLAND POWER C_
0 OP ER AT IV E
November 17, 2015 10 CFR 50.54(a) (4)
In reply, please refer to LAC-14359 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
In reply, please refer to LAC-14359 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Dairyland La Crosse Power BoilingCooperative Water Reactor (LACBWR)
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License DPR-45 Revision 29 of the LACBWR Quality Assurance Program Description (OAPD)
Possession-Only License DPR-45 Revision 29 of the LACBWR Quality Assurance Program Description (OAPD)


Line 1,780: Line 2,453:
Review Committee with an Independent Management Assessment process and replacing the Operations Review Committee with a Qualified Technical Review system. Justification for this reduction in commitment is defined in the enclosed Sunumary of Changes and QAPD RG 7.10(r2) Compliance Matrix. This QAPD revision is also being submitted for your review and approval prior to its implementation to ensure compliance with the requirements of the NRC Confirmatory Order dated September 15, 1994.
Review Committee with an Independent Management Assessment process and replacing the Operations Review Committee with a Qualified Technical Review system. Justification for this reduction in commitment is defined in the enclosed Sunumary of Changes and QAPD RG 7.10(r2) Compliance Matrix. This QAPD revision is also being submitted for your review and approval prior to its implementation to ensure compliance with the requirements of the NRC Confirmatory Order dated September 15, 1994.
If you have any questions concerning this submittal, please contact Cheryl Olson, LACBWR Plant/ISFSI Manager at (608) 689-4207.
If you have any questions concerning this submittal, please contact Cheryl Olson, LACBWR Plant/ISFSI Manager at (608) 689-4207.
Sincerely, QL 4 Barbara A. Nick, President and CEO                                                           ~S7ie BAN:CLO :tco A Touchstone Energye Cooperative ____
Sincerely, Barbara A. Nick, President and CEO BAN:CLO :tco QL4
3200 East Ave. S.
~S7ie A Touchstone Energye Cooperative 3200 East Ave. S.
* P0 Box 817
* P0 Box 817
* La Crosse, WI 54602-0817
* La Crosse, WI 54602-0817
Line 1,791: Line 2,464:


==Enclosures:==
==Enclosures:==
: 1) LACBWR Quality Assurance Program Description, Revision 29
1)
: 2) LACBWR QAPD, Revision 29, Summary of Changes cc w/
: 2) LACBWR Quality Assurance Program Description, Revision 29 LACBWR QAPD, Revision 29, Summary of Changes Marlayna Vaaler Project Manager U.S. Nuclear Regulatory Commission cc w/


==Enclosures:==
==Enclosures:==
Marlayna Vaaler Project Manager U.S. Nuclear Regulatory Commission Cynthia D. Pederson Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN             )
Cynthia D. Pederson Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN  
                                      )
))
COUNTY OF LA CROSSE )
COUNTY OF LA CROSSE )
Personally came before me this           O*   "'L     day of     */l'..'         -t       , 2015, the above named, Barbara A. Nick, to me known to be the person who executed the foregoing instrument and acknowledged the same.
Personally came before me this O*  
Notary'Pu~blic, La Crosse County Wisconsin My commission expires       5-i;?       5-/     ~'
"'L day of  
*/l'..'  
-t  
, 2015, the above named, Barbara A. Nick, to me known to be the person who executed the foregoing instrument and acknowledged the same.
Notary'Pu~blic, La Crosse County Wisconsin My commission expires 5-i;? 5-/  
~'
LAURIE A. ENGEN Notary Public State of Wisconsin A Touchstone Energy Cooperative__
LAURIE A. ENGEN Notary Public State of Wisconsin A Touchstone Energy Cooperative__
3200 East Ave. S.
3200 East Ave. S.
Line 1,807: Line 2,485:
* 608-787-1469 fax
* 608-787-1469 fax
* www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.
* www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.
LACBWR Q~uality Assurance Program Description, Revision 29


Enclosure 1 LACBWR Q~uality Assurance Program Description, Revision 29
i! iiii!i!!iil i*:;*,:
 
:'.;:*z:ili:i.i.i*i:*
i!iiii!i!!iil                                               i*:;*,:             !:,*:i.i*i
!:,*:i.i*i  
                                                                                                                                                                                ,.,::*:i:i*i:*;,i*::!*!!,!,i:i:,i:i:i:i:!:i:i*i
,., ::*:i:i*i:*;,i*::!*!!,!,i:i:,i:i:i:i:!:i:i*i
:'.;:*z:ili:i.i.i*i:*                    :,:i*:*
:,:i*:*  
                                                                                                                                                                                                              *:;*i LA: CR,OS                             BOILING
*:;*i LA: CR, OS  
                                                                                          ..,.E             WATER.::
..,.E BOILING WATER.::  
                                                                                                                  ...            ,.....REACTOR.......:..
,..... REACTOR.......:.. i
i              !ii QUALITY ASSURANCE PROGRAM DESCRIPTION REVISION 29 La Crosse Solutions, LLC
!ii QUALITY ASSURANCE PROGRAM DESCRIPTION REVISION 29 La Crosse Solutions, LLC Author:
(6/12.1 Anthony R. Bejms1i~dependent Consultant Dale /
(...
(...
Author:                                                                                                                                                                  (6/12.1 Dale /
QAApproval:
Anthony R. Bejms1i~dependent Consultant QAApproval:
~KJames E. Werner, SOLUTIONS QA Manager  
                                                  ~KJames E.Werner, SOLUTIONS QA Manager                                                                                             'Datel' Manager Approval:                                -
'Datel' Manager Approval:
                                                              ..... wak:    ::::*:.r:y::,LUIO: NS "'              P:roject::::::i:    Manager'.
:** n ~,Jvii Corporate QA Approval::ii:,:i::.ii:ii'ii'i~:!i::*~i~'*iii~i*:*i''*'~i':============
                                                                                                                                            '*Z:i:""::"; "":":!                        Date:
I wak:
:** n ~ ,Jvii                           : :*:::*    I Corporate QA Approval::ii:,:i::.ii:ii'ii'i~:!i::*~i~'*iii~i*:*i''*'~i':============
::::*:.r:y::, LUIO: NS P:roject::::::i:
                                                                      !!i;i:,.,i::: *:                           4* *9,I ' :*:i ::.i .,
Manager'.
'*Z:i:""::"; "":":!
!!i;i:,.,i::: *:
4* *9,I ' :*:i
::.i.,
iii:*:i~:!i*i:i:*i:
iii:*:i~:!i*i:i:*i:
:i*i~   :::*::. :*::.        A q*.-:
:i*i~
142015i;::ii935::
A q*.-:
i:~i~~i:::!::*:i~:   F* ::M       ::*::::::::::::::::
142015i;::ii 935::
                                                            ........  ... . ., ...            . * . ...    .. ...... ....    ... . . .. ....... .. i -             .. . ..                        :
i:~i~~i:::!::*:i~:
: ::::"::'' " ""!:!-:i*i*i!.:!iM']   ]: i           keii*
* F
i.. N..:col,~ii::olutionsne rgy...                       Corporate  ::::i           Director, Q:'Dat Dairyland Power Cooperative (DPC)i;:ii,:ii:*?*i
::M Date:
:::i:: 9 -:.3:.a:::::::::::::::
................ i -
                                                                                                                                                                  ..:*:*::::i:i:.;                        :::::::::::
::::"::'' " ""!:!-:i*i*i!.:!iM']
                                                                                                                                                                                              -iii::.****!,i:
i keii*  
:::QA Approval:::i Martn, Manage, :QualityAsu rance!.: :
]:
:::!::*i:::**:Edi
N..:
    . :::Manager Appi S. iPeters, Site Manager, Genoa~ii
i col,~ii ne rgy...
                                              ..i:iii*;*::*:.::ii;iLane i li                                                                                                                                                                                      ate ii:i~i:i~i:-:
::olutions
                                                                                                                                                                                *:i*!i*iil:!!iiiD i!i
::::i Corporate Director, Q:'Dat Dairyland Power Cooperative (DPC)i;:ii,:ii:*?*i
::: QA Approval:::i
. :::Manager Appi
:::!::*i:::**:Edi Martn, Manage, :QualityAsu rance!.: :
..i:iii*;*::*:.::ii;iLane S. iPeters, Site Manager, Genoa~ii
.. :*:*::::i:i:.;
:: :i::
9 -:. 3:. a -iii::.****!,i:
i lii
*:i*!i*iil:!!iiiD a te ii:i~i:i~i:-:
i!i


LA CROSSE BOILING WATER REACTOR
LA CROSSE BOILING WATER REACTOR
::?::::               STATEMENT OF QUALITYASSURANCE POLlICY:
::?::::
  ....... The Quality Assurance PrOgram Description (QAPD)* described: herein has been developed by Dairyland PowerS:Cooperative (DPC) and La Crosse Solutions,                                                                       L*LC:; :: I*
STATEMENT OF QUALITYASSURANCE POLlICY:
:        (SOLUTIONS) to prov~dea consoldatedovervlewof the qualitypro*gram controls that *I S gover~nthe operation and maintenance of the La Crosse Boiling Water Reactor (LACBWR) Independent Spent Fuel Storage Installation (ISFSI ), and thte                                                                                     ZIii:!i1;i decommissioning Oflthe LACBWR plant. The QAPD describes the qiualitY                                                                 asslurance                     i:::~I
The Quality Assurance PrOgram Description (QAPD)* described: herein has been developed by Dairyland PowerS:Cooperative (DPC) and La Crosse Solutions, L*LC:; :: I*
:organizational structure. fun:ctlonal responsibilities,, levels of authority and Inter'faces.* i::,
(SOLUTIONS) to prov~dea consoldatedovervlewof the qualitypro*gram controls that *I S gover~nthe operation and maintenance of the La Crosse Boiling Water Reactor (LACBWR) Independent Spent Fuel Storage Installation (ISFSI ), and thte 1;i ZIii:!i decommissioning Oflthe LACBWR plant. The QAPD describes the qiualitY asslurance i:::~I
~~The             QAPD applies to all activi~ties associated with structures, systems, !and*                                                                           * :*! I components which are important to Safety iun.der i1:0:CFR 72. *The QAPD also applies i :to transportation ipackages ~li:censed :by :the :NRC Under 1I0 CFR 71I.: ReqUirements: of                                                                                         :
:organizational structure. fun:ctlonal responsibilities,, levels of authority and Inter'faces.*
      ...:the !QAPD arel performed in                                 iia graded approach commensurate with an Item'sor* an
i::,
  * : activity's importance to safety. :This graded: approach is responsive to NRC                                                                                   ... :*;
~~The QAPD applies to all activi~ties associated with structures, systems, !and*
Regulatory Guide :7.10O. The applicablilty of he requirements of the QAPD to                                                                                                   .
I components which are important to Safety iun.der i1:0:CFR 72. *The QAPD also applies i : to transportation ipackages ~li:censed :by :the :NRC Under 1I0 CFR 71I.: ReqUirements: of  
decommissioning activities is *determined on a case by case basis. :The QAPDi!                                                                                             ;*l satisfies the requirements of 1i0CFR 50 AppendIx B, 10 CFR 71 ..............                                      Subpa~rtH; andO                         10i*!
...:the !QAPD arel performed in iia graded approach commensurate with an Item'sor* an
CFR 72 Subpart G.                                                                                              ...  .          .......                  .      ..        ,.
* : activity's importance to safety. :This graded: approach is responsive to NRC Regulatory Guide :7.10O. The applicablilty of he requirements of the QAPD to decommissioning activities is *determined on a case by case basis. :The QAPDi!  
;*l satisfies the requirements of 1i0CFR 50 AppendIx B, 10 CFR 71 Subpa~rtH; andO 10i*!
CFR 72 Subpart G.
SThe SOLUTIONS iExecutive Vi~ce: President and General Manager is :responsible forl:i;
SThe SOLUTIONS iExecutive Vi~ce: President and General Manager is :responsible forl:i;
      *:i:the. establishment iand implemrentatio)n of aquality !assurance progriam whiich meets all! -:I_
*:i:the. establishment iand implemrentatio)n of aquality !assurance progriam whiich meets all!
r*iii:legu~lator~yirequirements. i The quiality assuran~ce program, as described in lthis QAPD,
r*iii:legu~lator~yirequirements. i The quiality assuran~ce program, as described in lthis QAPD,
:Isi Isimplemented through the use:of approved pr'ocedures (I.e., poilcies:,:directives,:...
: Isi Isimplemented through the use:of approved pr'ocedures (I.e., poilcies:,:directives,:...
::~::/procedures, man~uals, instructionsr or. other documents) which provide written:: ; ::
::~::/procedures, man~uals, instructionsr or. other documents) which provide written::  
  . :~::i::gUidance for the ~conftrol :of ilmpor'tant to :Safety items iand activities and iprovides for":*:
. :~::i::gUidance for the ~conftrol :of ilmpor'tant to :Safety items iand activities and iprovides for":*:
:*::* the devielopment o:f documentation :to demonstrate objective evidence of compliance.:
:*::* the devielopment o:f documentation :to demonstrate objective evidence of compliance.:
with stated requirem ents. ;i!!::ii!*: :iii: ..                                     : ::.: :                      .                        * . ... .
with stated requirem ents. ;i!!::ii!*:
Solutioins Executive                                           ::                  Dairyland Executive::.                           * ::::i i                              . ..::
:iii:..  
                                                                                                                                                                                                    *: iI i
-:I_
:: : i::i::i*:: Preslden~t and CEOi:::                               * !i             :
Solutioins Executive Dairyland Executive::. * ::::i i
Executi....ve:
:: : i::i::i*:: Preslden~t and CEOi:::  
: : ..... E:, ., :* *:D ate                           :i: :           ;       :
* !i
                                                                                                                                                        -i... - ....    *    *- ,
: :..... E:,.,
:.i: ,:      ::::,:!i: i::!        , :,.i:i::_          "
:* *:D ate
QAPD....                            .....        Rev. 29          .. .
:i: : ;  
* : iI i Executi....ve:
-i... -
QAPDi: :*
QAPDi: :*
:.i:,: ::::,:!i: i::!
, :,.i:i::_
QAPD....
Rev...
29.


LA CROSSE BOILING WATER REACTOR, (LACBWR)I                                   / :: ::*
LA CROSSE BOILING WATER REACTOR, (LACBWR)I  
/ :: ::*
QUALITY ASSURANCE"PROGRAM DESCRIPTION (QAPD),
QUALITY ASSURANCE"PROGRAM DESCRIPTION (QAPD),
ST.QALTEMN   FPLC
ST.QALTEMN FPLC IlIII.
* IlIII. DESIGNVE CONTROL.....................AND......REVIEW..........,.,.
G -C N DESIGNVE CONTROL.....................AND......REVIEW..........,.,.
G -C  N                                                                                  ... ...      10...10 .
10...10.
IV. PROCUREMNTCOCUMENT.CONTROL :./:::...;.               ...            ...                            m         11;o::
IV. PROCUREMNTCOCUMENT.CONTROL
V. INSTRUCT1ON, PROCEDURES AND DRAWINGS ........           ....                          : i.,,::t,, ...         is V,. OO ~ E T O T O       .,:L .,!,..::                                   :::::::::-
:./:::...;.
                                                                                          ........        .:.    ,:::-:   14
m 11;o::
* V~i::I~i.IENTIFICTIN.AND CONTROL OF MATERIA:LPARTS,:ANID COMPONENTS i:::*..::.,m::::::!i;i                                 16: :;
V. INSTRUCT1ON, PROCEDURES AND DRAWINGS........
IX. CONTROLOFSPECIASPRONCADESS:ES~ P.N.............................................17:::::::::::::::::::2
i.,,::t,,...
          . CONTROL*] OF; lMEASRING XII:::                              TEST0EUIPMET AFT   TUCU AND     ssES                        ,....;.        ::::::            20-i; X
is V,.
::::IV:. INS*PECTIONB TES, ANDUOPERATOMINGMSTTUS A."E.A.V..A..*:P*N
OO ~ E T O T O  
                                                        .;                                                      ::*:"i*    22i:::::::!
.,:L.,!,..::  
::::i:.XV      CORGRECTIV:,EACION....O.T1....R.AN..A. ON....................................*, .. :....:_....22                     :
,:::-: 14
XAPI.       QULT ASUAC         RECRDv:23
* V~i::I~i.IENTIFICTIN.AND CONTROL OF MATERIA:LPARTS,:ANID COMPONENTS i:::*..::.,m::::::!i;i 16: :;
IX.
CONTROLOFSPECIASPRONCADESS:ES~ P.N.............................................17:::::::::::::::::::2 XII:::
CONTROL*] OF; lMEASRING AFT TUCU ssES AND TEST0EUIPMET 20-i; X
::::IV:. INS*PECTIONB TES, ANDUOPERATOMINGMSTTUS A."E.A.V..A..*:P*N 22i:::::::!
::*:"i*
XV
::::i:.
CORGRECTIV:,EACION....O.T1....R.AN..A. ON.................................... *,.. :....:_....22 XAPI.
QULT ASUAC RECRDv:23


                                                                                              *,:*:*i!i   :, i":::iii*: ::i::i:
*,:*:*i!i iI*
iI*
:, i":::iii*: :: i ::i:
:0.0 ,-INTRODUCTION
:0.0,-INTRODUCTION A
                    ....A          ,*.F. _  ....
F.
:      ..p- ':.",
p-  
                                ;:!i;*decomm*issioning iof the LEACBWR site. *i*;DPC'wiii r(etain o:wniership :;of thei~l::i*:::**:*ii~i:i:ii::ii:i:i::.i*:* i!*:!ii:
;:!i;*decomm*issioning iof the LEACBWR site. *i*;DPC'wiii r(etain o:wniership :;of thei~l::i*:::**:*ii~i:i:ii::ii:i:i::.i*:*
l*: :and ~s~p~ent :,fuel :andibe thie ownre-:lilcensee. *"DPC will:: be :subco tracted ;:1; *.::,,!:* :i iiand c*;::omnpletion obf:decommis~sioning, SOLUTIlONS will apply :to the NRC to6;: ;:                                                                                    .*: ;:::; ::
i!*:!ii:
!iili                            *!:;.:::wiillmaintabin t~he ISFS]I, and be r::esponsible: for th:                                                 uleutimate .dispos*ition obf!:..*::i :i~:!.: ::*.i::;:.:::i
l*:
: ;..::i::.:. In :order. toQubality,
iiand :and ~s~p~ent :,fuel :and ibe thie ownr e-:lilcensee. *"DPC will:: be :subco tracted ;:1; *.::,,!:* :i c*;::omnpletion obf :decommis~sioning, SOLUTIlONS will apply :to the NRC to6;: ;:  
          ;i::i iii~i;:i~L...i.*i.*l-:.*.!.ACBWR           minimize:          disruidpti0on Ass~urance             :and maximize',
*!:;.:::wiillmaintabin t~he ISFS]I, and be r::esponsible: for th:
:Progriam               Description                 efficienicy, I(.QAPD) !this:rlevision      of :the *:...i was ijointlyi;*i:i~:::::i::!:iii
uleutimate.dispos*ition obf!:..*::i :i~:!.: ::*.i::;:.:::i
!iili
;i::i
: ;..::i::.:. In :order. to minimize: disruidpti0on :and maximize', efficienicy, !this:rlevision of :the *:...i iii~i;:i~L...i.*i.*l-:.*.!.ACBWR Qubality, Ass~urance :Progriam Description I(.QAPD) was ijointlyi;*i:i~:::::i::!:iii
::*:i::*::::ic:-i.;": ien~se transition idescr~ibed: above. ::Duin:ig" the decomm~issionin~gi::*:ii::::i ~*:~~;;:!:
::*:i::*::::ic:-i.;": ien~se transition idescr~ibed: above. ::Duin:ig" the decomm~issionin~gi::*:ii::::i ~*:~~;;:!:
.:::i::::::i;i:
:::::-:*~ :a~ctiviities, ;!SOLUTi~oNS :will :subcontract ithe operatio)ns.and main.tenhan~ei: of::;;;*i**
:::::-:*~ :a~ctiviities, ;!SOLUTi~oNS :will :subcontract ithe operatio)ns.and main.tenhan~ei: of::;;;*i**
            .:::i::::::i;i:
:.!i:.
                .i**.::;.!ii. th~e ISFSI to D:*PC. Although iDPC p~roceduresand processe~s *willcontinue~i: .:i
.i**.::;.!ii.
:.!i:.
th~e ISFSI to D:*PC. Although iDPC p~roceduresand processe~s *willcontinue~i:  
            .i.::!.~i~l. toWl be ust ed: fiCns e.ithe
.:i
          -:i*:                                                            operain iaII :sond         maintenf:a nc ofathe orSI St                               OLesUreT e.IONS             i !!i: ,.
-:i*:  
            -:: .~~i:   .:: :::.QAPD requirements applicable, to ::the ISFSi "are effectively; implemented by;!--i-.
.i.::!.~i~l t
il i::.-i:*:" : .ii::tio all: ISFSI!.a*ctiVitiesi anddselected plant:d ecom missioning acetivities..:.i i.* ;:*::l ..l :.i
. oWl be ust ed: fi Cns e.ithe operain iaII :sond maintenf:a nc ofa the orSI St OLesUreT e.IONS i !!i:,.
            .;...The                       QAPD is. desig ned' to meet the requirements of 10:CFR 50 ppni
-::.~~i:  
            ... "::::      :i:!.B,: 10 CFR 71, :.Subpart.H, and. 10 CGFR :72,.Subpar't G :*and :reflet the...b::::. ::;::: :::.
.:: :::.QAPD requirements applicable, to ::the ISFSi "are effectively; implemented by;!--i-.
::::::.:.:::*:!*.:::thest
il i::.-i:*:"
                    ...                    ngru perford~l~miga                 n dime     ct.hly:b :responrsible:fori:th e wok u chasl pr:oj*0ik.::::                                                 i
:.ii::tio all: ISFSI !.a*ctiVitiesi and dselected plant:d ecom missioning acetivities..:.i i.* ;:*::l..l :.i
                                                                                                                                                                                            .:::!i::,**:et
.;...The QAPD is. desig ned' to meet the requirements of 10:CFR 50 ppni
:::::::::::::::::::::i::iThis includes. q:u"ality control" and :ve rification :th~at alliwork: is. pe:rformed In -. :: .: :
:i:!.B,: 10 CFR 71, :.Subpart.H, and. 10 CGFR :72,.Subpar't G :*and :reflet the...b::::. ::;::: :::.
::::i:.;.. ~*i'uditing: for;:a::i:i:, these igroups a nd assur~ing, manag em ent that ;thei QAi prog ram: -: : :
:::.:.:::*:!*.:::thest ngru perford~l~miga n dime ct.hly:b :responrsible: fori:th e wok u chasl pr:oj*0ik.::::  
            ...::!....is;_::       sbeing fully-and effectively implemented.* QA is recognized :asani:.;: ::.:*il-.:i
.:::!i::,**:et i
:::i::
:::::::::::::::::::::i::iThis includes. q:u"ality control" and :ve rification :th~at alliwork: is. pe:rformed In -. ::.: :
:i:: ::!:.:~.::i !:T:.i:he i::requi:remen~t~s iand icommitmen~ts c:*onta in ed:: in                                               iithis :QA:P:D ai:rei m:a ndabtor*y:.i !iiii:i*i:     !i*
::::i:.;.. for;: a::i:i:,  
            ..**::*-.*::i:*:::-and imus*t bie :implem-ented!, enforced,.' and :adher~ed to by-allin::divi~duals an~d: :::::::::::::
~*i'uditing: these igroups a nd assur~ing, manag em ent that ;thei QAi prog ram: -: : :
is;_::
sbeing fully-and effectively implemented.* QA is recognized :asani:.;: ::.:*il-.:i
:::i::.::i
:i:: ::!:.:~ !:T:.i:he i::requi:remen~t~s iand i commitmen~ts c:*onta in ed:: in iithis : QA:P:D ai:rei m:a ndabtor*y:.i !iiii:i*i:  
!i*
..**::*-.*::i:*:::-and imus*t bie :implem-ented!, enforced,.' and :adher~ed to by-allin::divi~duals an~d: :::::::::::::
ii:i:ii:iiii B.
ii:i:ii:iiii B.
:::i:The"terms i~and diefin~itioni0s t:H               ed below are used* frequentliy. throu*ghout :thlis docum ent. .'* *::::.     :::i*:.i :::i. ::i " "";!:: . i:.*.i!i.: :":' . :*.; : ..:--: ::* *.:.:::.:/:*:*::::!*::i::!;.!: ::::ii::::::.:*:!i::
:::i:The"terms i~and diefin~ition i0 s t:H ed below are used* frequentliy. throu*ghout :thlis d o c u m e n t..'* *::::.
                                  "LACBWR. La: Cross~e Boiling Water Re~actor.:
:::i*:.i
:::i. ::i " " ";!::. i:.*.i!i.: :":'. :*.; :..:--: ::* *.:.:::.:/:*:*::::!*::i::!;.!: ::::ii::::::.:*:!i::
"LACBWR. La: Cross~e Boiling Water Re~actor.:
:i.i*':::L.il" :
:i.i*':::L.il" :
:)A PD:::*:i                             :" : '*i!:::,:ii: *,*::ii :,i:::::!!:!
:)A P D :::*:i R ev. 29::*:::::;::**!
i !iiii:i : :i:                                 i i:Ii! !
:" : '*i!
R
:::,:ii: *,*::ii :,i:::::!!:!
                                                                                                                                                                          ..:!;:.,ev. 29::*:::::;::**!
i !iiii:i :::i:
ii*:!i::.":-!i*ii!:*!:,- ii::!:.::';i*:
i i:I i! !
                                                                                                                                                                                .;*;"i:!,i:::i*ii!
ii*:!i::.":-!i*ii!:*!:,-  
i!i
.; *;"i:!,i:::i*ii!
ii ::!:.::';i*:i!i


                          * .. ..i -                              "QUALIFIED TECHNiCAL REVIE.W.- Thorough reviews .ofthe documets*ii:"
*...i "QUALIFIED TECHNiCAL REVIE.W.- Thorough reviews.of the documets*ii:"
:.:::-.::...:::+:i::~ii!::"i+..:::i:i!::.necessary :to ,provide ;adeqcuate confidence thait! str~uctures , systems, or*
:.:::-.::...:::+:i::~ii!::"i+..:::i:i!::.necessary :to,provide ;adeqcuate confidence thait! str~uctures, systems, or*
:..      ::..*!i":i:: :;i:;! .to control and-!measu re the ~ch ara cter isics of: an ite m,iproces s ori: fa cilitiy!*to ii'
: *.:::: *! i" :i :: :;i:;!.to control and-!measu re the ~ch ara cter isics of: an ite m, iproces s ori: fa cilitiy! *toii' FACIL:ITY
                                                          *:.i:i.i   FACIL:ITY Encompasses
- Encompasses :the l P:ant site, which-iS:undergoing-i...
:..:i:.*decommissioning,                     -            i~iand i*thel :the        ISFS*:P:ant  l sitesite, wher~e                                   i..:: :::? ' :I+-.
i..:: :::? ' I :.
spent, fuel .is.Stored.:... ExclUded:
*:.i:i.i  
which-iS:undergoing-i..
..:i:.*decommissioning, i~iand i*thel ISFS*: site wher~e spent, fuel.is.Stored.:.. ExclUded: +-
tr:
tr:
::!::.;.!i!;!!;;;:[an~smis     sio*nil apparat us loc:a~ted !beyond the LACBWR: switchyar~d ".=; : -* i :-.+;
::!::.;.!i!;!!;;;:[an~smis sio*nil apparat us loc:a~ted !beyo nd the LACBWR: switch yar~d ".=; : -* i :-.+;
ii: :!?ii!i~!::IpLAN*T i:::                                                          -' Enc~ompasses tihe biuilidings t*het functionally supported t!he                                                         i!
i:::
:::::::.i~i'SCHEDULE         :*:i :!                                    INTERVAL:                          A
ii: :!?ii!i~!::IpLAN*T -' Enc~ompasses tihe biuilidings t*het functionally supported t!he i!
                                                                                                                                          *::i*time:frame
:::::::.i~i'SCHEDULE INTERVAL:
                                                                                                                                            -                            within :wh~ich a schieduled activity:
- A
: ::i::::I: *::::: shall be performed with amaximUm allowable extension not to exceed 25 givento01si*tructures,
:*:i  
:ii:::*:systems, iand :ompo'nents (IiTs)
*::i*time:frame within :wh~ich a schieduled activity:
:IMPO*RTANTITOSiAFETY                                                        (SSCsl)Athat  -  class~ification
::i: I:  
                                                                                                                                                                        ,provide nuclear safety] designi:
*::::: shall be performed with amaximUm allowable extension not to exceed 25
: .functionls. i(See Appendix A for complete details)i,:. i .:*::: *i:*!:.: :::ii:
:ii:
fl::+ANIml7AT+iA M.+                                 !i:ii                   ..  .
:IMPO*RTANTITOSiAFETY (IiTs) - A class~ification givento 01si*tructures,
                                                                                                                                              ?:i,, ,.+ + v , *                            ::+!!:
::*:systems, iand :ompo'nents (SSCsl) that,provide nuclear safety] designi:
                                                                                                                                                                                    !!i:::i+
:.functionls. i(See Appendix A for complete details)i,:. i.:*::: *i:*!:.:
                                                                                                                                                                                ,i.if!
:::ii:
fl::+ANIml7AT+iA M.+ !i: ii  
?:i,
,i.if! ! ! i:::i+
::+!!:
I.
I.
'-' .:  ....  "{ .   .  ....    ,.I.*.+.     "! !+.!-:.-:&#xa5; 111&#xa5;     n   llllr,=l'*l         11=t111     +,:-::++..:-:-:-.;:....,:-.
"{.
....:.:....:+ :.: ::-::
,.I.*.+.  
i i.:i+!*::i*:*::*ii*i~*::*:***::i:1.       :**:This sec.tion d:*efines *:theerespons~ibilities o*f k"ey project m:embers::: ; il;
"! !+.!-:.-:&#xa5; 111&#xa5; n
                                      +iii./(.:!+.:. .:?ii+.::.i+:i!+i*accountable for Implementation of thelQAiPDt.Functions and. actions-:
llllr,=l'*l 11=t111  
:i:::i i:+:::i.:i: : ! cani.bi+ah:ie
+,:-::++..:-:-:-.;:....,:-...
                                      +i::'*-                                                          .delega+ted;i holwever, t++he r:iespni**ibi lity r.emains with: th~e: /::*
,,.+ + v,
:-":         .. .:-!. i::: :On~site. and* offsite organization**s shall be est~a bli~shed ifo!r statio~n a:*nd*i:
....:.:.... :+ :.: ::-::
::il.::::"2:
i i.:i+ !*::i*:*::*ii*i~*::*:***::i:1.
                                      ..::i:: .*i:: ...   : :~::. ::*:***     *:!*c rpojra te .ma niag em e nt, *re sp ec tiv ely. T::                                       h e .ons ite `a nd *o ffs ite :* : :.i*:.":..:i iiii:!i::!*:
:**:This sec.tion d:*efines *:the erespons~ibilities o*f k"ey project m:embers::: ; il;
                                                                                                                                                                                                                              !*i!i:i*!!++::i!*
+iii./(.:!+.:.  
:. . ::...: *::":i*;:!;/.:*
.:?ii+.::.i+:i!+i*accountable for Implementation of thelQAiPDt.Functions and. actions-:
::*:..:.:                :                          ;:::: organizatio~ns ;sh all Include :the :positions :for .activities :.affecting lthe :safe
+i::'*-
:i*:::i."::::i~."
:i:::i i:+:::i.:i:
                                .:.::!:ii."3."i:                                   S:i:i"::!:iince SOLUTiON                 N +an~d DiPC wilwil be working t+o tihe :requirements of th+is
cani.
                      *:?:: :;i*i*:~::i;:i:/:: i:*:i i:iii* :i :::i:::Soluti~on                         *.iOrga*nization.:i                           :This: QA PD:Identitifies :key. on-site p roject                 :*      ! :i
bi+ah:ie  
: ::i     , i : ::                                   i::::c~iiorpoate support groups. :The QAPD also definies the DPC.I:;:*::
.delega+ted;i holwever, t++he r:iespni**ibi lity r.emains w ith: th~e: /::*
:+ii . '4:.Lines     4:.                          of authority,. r.esponsibility,;.and communication: shall b~ie:.::+ ::: ..
::il.::::"2:  
                                                      +.:::::-i:established land :defined for the-"highest management :levels ;throughi++:
.:-! i::: :O n~site. and* offsite organization**s shall be est~a bli~shed ifo!r statio~n a:*nd*i:
                                                            --  .....            i ntermediate::levels to and !ncluding a~lloPerating organization:* *:
.. : : i::.*i::...: :~::. ::*:***  
*:!*c rp oj ra te.m a ni a g e m e n t, *re s p ec tiv ely. T::
h e.o n s ite `a n d
* o ff s ite :* : :.i*:.":..:iiiii:!i::!*:
!*i!i:i*!!++::i!*
:.. ::...: *::":i*;:!;/.:* ;:::: organizatio~ns ;sh all Include :the :positions :for.activities :.affecting lthe :safe
:i*:::i."::::i~."  
.:.::!:ii."3."i:
S:i:i"::!:iince SOLUTiON N +an~d DiPC wilwil be working t+o tihe :requirements of th+is
*:?:: :;i*i*:~::i;
:i:/:: i:*:i i: iii* :i :::i:::Soluti~on *.iOrga*nization.:i :This: QA PD:Identitifies :key. on-site p roject  
! :i
: ::i  
, i : ::
i::::c~iiorpoate support groups. :The QAPD also definies the DPC.I:;:*::
:+.
ii 4:.  
'4:.Lines of authority,. r.esponsibility,;. and communication: shall b~ie:.::+ :::..
+.:: :::-i:established land :defined for the-"highest management :levels ;throughi++:
i ntermediate::levels to and !ncluding a~lloPerating organization:* *:
::i!:i:
::i!:i:
::          : :ii:**p0sitions. :The~se rielationships shall be documente~d *and *updated,; as QAPD.::                                                                                                                 4   ...                                                Re~ 29i
: :ii:**p0sitions. :The~se rielationships shall be documente~d *and *updated,; as QAPD.::
                                                                                                                                                                                                        *Yiii:;*!*.*ii:i*i:i*:
4 i-i
                                                                                                                                                                                        *::*/i ?:if: 'i:i*;.i!,,i                       i iI i-i
*::*/i ?:if: 'i:i*;.i!,,i  
*Yiii:;*!*.*ii:i*i:i*:
Re~ 29i i iI


                                                                      * ,..:.:...: / * .. ':: ,* .,.--.*::: .:::.:......:                                                                                                   :.,,..- : ..: ,.'.t:""-.':', .
*,..:.:...: / *.. '::,*.,.--. *:: :.:::.:......:
                                                                                                                                                                                                              }:-: i::i.:;..,::,::i::::::::::::::
*:::;{}:!"*ii.  
                                                                                                                                                                                                                */ .............
~~ii::i}?.::~::;::ii*i::.}:i:
                                                                                                                                                                                                                              !!::*:i!!:!::!i:ii}iii i:!*:i*}i!ii:*ilS*
appr~oPriate, in:ii.the'*form~of o~rgantization charts, :functional, descriptionis: 4:
                                                                                                                                                                                                                ' .:.*-,.-.:iy!.:. !.: %y..
:.*{//::.::/".:.:?.i:*....:;}i~;i.'
    *:::;{}:!"*ii.
:.:.:fo'r key personnel p~ositions,.or in e*quivalent. forms oif idocumen~tation!..i::..i!;i
            ~~ii::i}?.::~::;::ii*i::.}:i:         appr~oPriate, in:ii .the'*form~of o~rgantization charts, :functional, descriptionis: 4:
..5.
                                                                                                                                                                                                                            ].:..:.::>..: -:
5;..The-ihj iu*
:.*{//::.::/".:.:?.i:*... .:;}i~;i.'       :.:.:fo'r key personnel p~ositions,.or in e*quivalent. forms oif idocumen~tation!..i::..i!;i
we ay uthatWhsics.:and: quality: assurance.:.<......
                                                                                                                                                                                                                ...:i::{:.*:*!*i:.:*::!*
}::::: !ac~tivi~tie's, may'ifunctionally reportto. an appropria~e onbtsite m*an~ager:**;:!i.:i.
            . .5.                            5;..The-ihj               iu* we ay uthatWhsics.:and: quality: assurance.: .<......
:{*.:.
              .::*                  :... }::::: !ac~tivi~tie's, may'ifunctionally reportto. an appropria~e onbtsite m*an~ager:**;:!i.:i. :{*.:.
...;:: *.,:however,. they*shall have-sufficientorganizatiornal freedom to e/.nsure;;}:.::*;*;
      . .:** .                  . ..;:: *.,:however,. they*shall have-sufficientorganizatiornal freedom to e/.nsure;;}:.::*;*;
}*.::*..
:.i!::! i}:"::.i:*!i:i*::i*i:::*]ii  :!ii:.
/.:::
                                                                                                                                                                                                                                                            *:ii*]!:
:: :i ;:i:i:::]* 1!:}Pr:esident:- Th:*eiPraesidentxrnarnag~es th~e p~atlo*n-ofEnergySolutions:*`.:
    /.::: ::.. :i ;:i:i:::]* 1!:}Pr:esident:- Th:*eiPraesidentxrnarnag~es th~e p~atlo*n-ofEnergySolutions:*`.:
,.::.3*.:: "-.
    }*.::*
i": :::i:}]: ::.:* :*.i; :::. *:: :*!;/stew a rd sh i :p!projects ~at: U.:..R eactor :sites,.an d-assu]res: that the:i:;::;-i;: *;; ;.; :
    ,.::.3*.::
i": :::i:}]:"-::.:*. :*.i; :::. *:: :*!;/stew ardsh i :p!projects ~at: U.: ..R eactor :sites,.an d-assu]res: that the:i:;::;-i;: *;;;.; :
:;]::*.::::*/:*.!:/:
:;]::*.::::*/:*.!:/:
: : ::.:u:i{*::..::.Y;-*:.L:{ ACBW R *project :*receive~s timhely :and*effective: supportfrm*:;:.::{.&*.::*:;.:**;]:
: : ::.:u:i{*::..::.Y;-*:.L:{
ii:-.: ::]:.:.:::.;:::]} .;:]]w-*ith th~e GM; and..other k~ey m*anagers ~to review the-.oper~ation of theii:~, }:!
ACBW R *project :*receive~s timhely :and*effective: supportfrm*:;:.::{.&*.::*:;.:**;]:
i.::ii:}.::q:
i.::ii:}.::q:
ii:-.: ::]:.:.:::.;:::]}.;:))w-*ith th~e GM; and..other k~ey m*anagers ~to review the-.oper~ation of theii:~, }:!
management, quality, 'dnd~ related !issues.: The President shali: have*;ii:i:::
management, quality, 'dnd~ related !issues.: The President shali: have*;ii:i:::
                                                    .corporate~responsibili~ty if6r, the safe' storage of nudiea~r fulad
.corporate~responsibili~ty if6r, the safe' storage of nudiea~r fulad shall.....
        " *: *}i I,}*I....::. ... take an~y me~asures ;needed to ensur~e acceptable:perfo`rmance o*f tjhe*i*:***;:i**
" *: *}i I,}*I....::.  
                                                                                                                                                                              ..     shall.....
... take an~y me~asures ;needed to ensur~e acceptable:perfo`rmance o*f tjhe*i*:***;:i**
"....... :. :staff in o eai*:*
~ ~ngria*in*t~aining,*and/ providing t`echnical *support toti*:he;:'"
-:.i]}::i~;
:: :::"plant-to ens~ire the, safe storage !.of nuclear. fuel.
A'-
:,,:, :::*-**:*v*#::-
:::2;.::ExecUtW&Vlce.Pressident and General Manaaqer (GM) i;- T:hisexecutivei <-
haor:
il.t adis
*niih frt~ es*tbliishmenet and.
:....i wi:.the management *tea~m *toreview pians and: progress and to,
.aidress stakei~oider,* quali ly and project'rnanagement issu es., The GM.,....
. deiegates!to: DPC*: a~nd the.man ageme nt team ~th~e day-to-d ay..*i;:.!].::;i.:~::~:::*..
...:/,r*espoipii**i~tles'ifor';tie (ISFSI ari*adjdeco*mmssioning b*iy ~a}pproved:i:Y:{*
:-:7 7.....
-:*3..
*;~i
-The::PM is: res )onsible for all.decommissioning::!:
*::::i:i?*:::<::y:::*k i* *:. :i::;**i/::/aotiwiies~includimg:firep~rotection and I'ndustrial safety activties
.t.th
:::::,;,:,,iiide,,ommiss
:ng site. Tl,::,PM.i*-ha,. have.authority over those on autsite
*i:..:*.:!.:".,;...:::
:.:. ::/. -:.:. ~ ~ ~te~n ~ s a yo,:a e*s o a e fn c e r~u tw lh h v :b en :*:...:c:
i,**::
forsa-.sor gef-.cl
.a fuel..
which..--. hav been:::::::::::::..*:*
-**:*:*d::*::i**:
*descr:*"b;id:
i..
i
'o tis~APD and for th~e Qualifiedi Tec5hnical:,.
:.i::}i}3-:ii:::
: 'i:i:}:.:i.:.:~.:!:;:.. :R ev iew. prpbcess,*tt.,ized;j*o rd e omm is sio n~ing g:iThe ePM retainsauhoid"to.jyi: *
-/: ::::::!::u
::i:: *:*!*!
for~::
!ftach*: prop6sed~tdst, experiment, ormodification to systenms or:/*}i:;:]:
i!i* ::::/::::: :: !~i :*}:=
eq uip ment ::that :affec*t *the ~safe :storage : of inu clear fu el: wh ich ha b~*i~Seen::!
Qiat!
ssra:eMnaer(A M) _T*:**he *QA M 're ports S.to; th e P M :*ianhd;i:i:*:
:::: :: : /:: **:::::k!;:.: :*r n:*att*s,. The P:M: is resp9op si bleI:f etabl Iis hing and: m aintai ning the -,
QAPO""'
mo i
,rn the.9 proec' s quali*s t
y objectives*,
tho ugh.... ove... view.. and,.:,.
i~;:}:} : i
*. ::}: ::i*;;;}:i:{:!:ii i
ns:**
::: :; ; iihiP~e c~t(i~n ctivitie s,;!apdi-proyidin g'*feeid bak t o: m an.agem ent onithe}. :. i*:
: i-:, *!"!:.}:ii
-:...':::ii~:i ef'fp.i!.
i,.:
ct:::i*:veness.*M.*of the QAPD.
i~n~tiohe
*a*(
ev[aluani es, acceap ts, a
nd performs:!:}i*:li!:
:.,,..- :..:,.'.t:" "-.': ',.
}:-: i::i.:;..,::,::i::::::::::::::
*/.............
!!::*:i!!:!::!i:ii}iii i:!*:i*}i!ii:*ilS*
'.:. *-,.-.:iy!.:. !.: %y..
].:..:.:: >..: -:
...:i::{:.*:*!*i:.:*::!*
:. i!::!
i}: "::.i:*!i:i*::i*i:::*]ii
:!ii:.
*:ii*]!:
Li
Li
      ............              "....... :. :staff in o eai*:*
....::4.,,,,::i,,i:i i::i:::*.*i*i!:i,!:}:i i]*::
              .-. ..:.... ..............                                    ~ ~ngria*in*t~aining,*and/ providing t`echnical *support toti*:he;:'" .;:::!}::'*';'.':i::.':::'.                            -:.i]}::i~;...::4. ,,,,::i,,i:i i::i:::*.*i*i!:i,!:}:i i]*::
;:::!}::'*';'.':i::.':::'.  
: : : ::* ::... :: :::"plant-to ens~ire the, safe storage !.of nuclear. fuel.                                                                                    A'- :::*-**:*v*#::-
*.. ::: ::::.. F ":! i.: :.:.: : i: ::* X:.:::i::i
                                                                                                                                                                                                                  *..:::::::..F ":!i.::.:.:
/,;!.:.!,:,;;,Y :  
                                                                                                                                                                                                                  /,;!.:.! ,:,;;,Y :
' ::*':i::'::.::*, *}
: i: ::*  X:.:::i::i
QAP D 5*
      !:.._                          :::2;.::ExecUtW&Vlce.Pressident and General Manaaqer (GM) i;-T:hisexecutivei <-                                                                                                                            ' ::*':i::'::.::*, *}
Rev.:294
haor:                        il.t                                  adis                  *niihfrt~ es*tbliishmenet and.                      :....i wi: .themanagement *tea~m *toreview pians and: progress and to,                                                                    "*:    :: ;::-.
:.requimrmets..to the *SOLUTION. :organization..Th0 QAM porlodloally:
                                                  .aidressstakei~oider,* quali ly and project'rnanagement issues., The GM.,....
                        - -          -          . deiegates!to: DPC*: a~nd the .man ageme nt team ~th~e day-to-d ay..*i;:.!].::;i.:~::~:::*..
:/ ,r*espoipii**i~tles'ifor';tie                                                        (ISFSI ari*adjdeco*mmssioning b*iy ~a}pproved:i:Y:{* '::
: ::                  :-:7
                          .            7.....
                                          -:*3..                    *;~i                                                  -The::PM is: res )onsible for all .decommissioning::!:
    *::::i:i?*:::<::y:::*k i* *:. :i::;**i/::/aotiwiies~includimg:firep~rotection and I'ndustrial safety activties .t.th
:ng ,:,,iiide,,ommiss                            :*                                                  site. Tl,::,PM.i*-ha,.have.authority        autsite over those on
    ...... *i:..:*.:!.:".,;...:::
                    . :.:. ...::/. -:.:. ~ ~ ~te~n                    i,**::~ s <"**,.":           a yo,:a        forsa-.sor  e*s o a gef-.cl
                                                                                                                            ,:,'":-,-",:  -..e fn :: c e r~u.afuel..
twwhich..--.
lh hav  h v :bbeen:::::::::::::..*:*
en :*:...:c:
      -**:*:*d::*::i**:
              *descr:*"b;id:                         ..                    i..
                                                                              .......                          ,i            'o tis~APD and for th~e Qualifiedi Tec5hnical:,.
:.i::}i}3-:ii:::
: 'i:i:}:.:i.:.:~.:!:;: .. :Rev iew. prpbcess,*tt.,ized;j*o rd e omm is sio n~ingg:iTheePM retainsauhoid"to.jyi: *
        -/: ::::::!::u
::i:: *:*!*!                  for~::
                                                  !ftach*:            prop6sed~tdst, experiment, ormodification to systenms or:/*}i:;:]:
i!i* ::::/::::: :: !~i :*}:=                  eq uip ment ::that :affec*t *the ~safe :storage :of inu clear fu el: wh ich ha b~*i~Seen::!                                                        - -
Qiat!              ssra:eMnaer(A M)_T*:**he *QA M're portsS.to; th e P M:*ianhd;i:i:*:
: /:: **:::::k!;:.: :*r n:*att*s,. The P:M: is resp9op si bleI:f
::::::: ::-!;.:                                                                                                                              etablIis hing and: m aintai ning the                    -,
    * '" ': " ""::;::         ".                  QAPO""'
                                                        ,-"*.'-..mo"., .;.i                ,rn              the.9proec' s quali*s        t    y objectives*,
                                                                                                                                                      .          tho ugh....ove...view.. and,.:, .
i~;:}:}
      *.::}: ::i*;;;}:i:{:!:ii
:i                                ns:**c~t(i~n
::::;i ; iihiP~e                          ctivitie s,;!apdi-proyidin g'*feeid bak                                t o: m an.agem ent onithe}. :. i*:
: i-:, -:...':::ii~:i
              *!"!:.}:ii              i,.:        ef'fp.i!.
ct:::i*:veness.*M.*of the QAPD.                                i~n~tiohe  *a*(        ev[aluani es, acceap    ts, a nd performs:!:}i*:li!:
QAP D                                                                                       ....              5*                                                 Rev.:294
 
: .requimrmets..to the *SOLUTION. :organization. .Th0 QAM porlodloally:                                        :iii*  :i*!*!I*I  :!i:::::*!:::
i!i: :i:!:
::.""i
::.""i
:.provtides *report..o n project :quahity, activitiei *to .tt .*,..t.     PM,he            ...:thi. .i*
:.provtides *report..o n project :quahity, activitiei *to.tt.*,..t.
::: mana~ eh 0 t team .                           ::i:::* ::: ' : ! :i: : :::i::::::. :::::::: :::
he PM,  
                      !n;Mn:
... :th i..i*
:- .".radiation        :er 5A 5.*met~i            p:"ect e n.i.
:: : m ana~ eh 0 t team.
Hsdiek:n protection,                        R pro*(e4~tion,
::i:::* ::: ' : ! :i: : :::i::::::. :::::::: :::
                                                                                                        -Thm    1RPM.
: 5. Hsdiek:n p:"ect
                                                                                                                      *Itei* olosur*,
!n;Mn:
tmponsibie  and.for waste all
:er R
: i*::..:. i*::::. *:i
5A  
                  ... .. . ~shipping actlvties at the entire site.- .                                             . .:":.-".:-                .:"'*
-Thm 1RPM. i* tmponsibie for all
                *:.. :: : :: :.::::::activi-ties :with. the RegItq*rs :such as ilcensing submlttsl, regula*toryi:
:-.".radiation protection, e n.i.  
                  *.:* :.:*:! :: -::*:.:::-reports,.!reporteability isesu~i~oQAPD revisiions,. REtvPIOLDCM r:epoi,::*!::                                   :- ..  :. .:., ..,...:.      ,. ,....
*met~i pro*(e4~tion, *Ite olosur*, and. waste
                * ...- :.. -: ..:financial. re~pottsDecon~iss~ion~ng.Plan revlsiona*.-$NM Inventory..-:*.::::                                                         ,, ,-:.:.:i:: .:i i::"! i :
~shipping actlvties at the entire site.-  
                          .:-.:: * *. :* * *.*i*,*,*.-:*nD*":-*,.*;*,,.*
.-:.::..:::!*:: :: :. ::::::activi-ties :with. the RegItq*rs :such as ilcensing submlttsl, regula*toryi:
:I '.:...: ..-. " """ '.'
*.:*.:*:! -::*:.:::-reports,.!reporteability isesu~i~oQAPD revisiions,. REtvPIOLDCM r:epoi,::*!::
*iiii:: ii*::
...- :.. -:..:financial. re~pottsDecon~iss~ion~ng.Plan revlsiona*.-$NM Inventory..-:*.::::
                            ':.-..-              a:.
:iii*
: i*!*!I*I
:!i:::::*!::
i!i:::i:!:
: i* ::..:. i* :: ::. *:i
,,,-:.:.:i::.:i i: :"! i :
*i iii:: ii* ::
* *. :* * *.*i*,*,*.-:*nD*":-*,.*;*,,.*
a:.
dmi.:"*mnistration and opration of th* LACBWR tSF$I and the Operation :
dmi.:"*mnistration and opration of th* LACBWR tSF$I and the Operation :
                            ... .:.::".' .:of Th6 00enoa 3 coa! fired plant and the QuaiUl ec.Thnical fRevlewi :
.:.::.:of Th6 00enoa 3 coa! fired plant and the QuaiUl ec.Thnical fRevlewi :
: :. -*-:.... *responsilbe for o0peration and rn~aIenance .oftIe* LACBWR ISFSI.:.
responsilbe for o0peration and rn~aIenance.of tIe* LACBWR ISFSI.:.
:: : ::i::.:.::..: within :the limits se~t fo:th in the De~Ommlsi8ni~nt Plan, Thc,hn~cl*li::
:: : :i::.:
                            .:"::-   -..-.   ::ISF$I Manager and is r s~ponisiblo for ensuring reg~ulatory :requirements
within :the limits se~t fo:th in the De~Ommlsi8ni~nt Plan, Thc, hn~cl*li::
:. ::" ar"e:
.:"::- -..-.::ISF$I Manager and is r s~ponisiblo for ensuring reg~ulatory :requirements ar"e:
amdequately niet :and.the $e~curity Pian,. related proceures, training
amdequately niet :and.the $e~curity Pian,. related proceures, training
                            *:            ~and contingency r'equirerments are developed *nd maintained current.:
~and contingency r'equirerments are developed *nd maintained current.:
                                      '*".4. OA S*ecia,~t         lit/ngi*             -, The. Q A* SpecIali~t /: Engineer is :responsible                 1 S for performing independent overviews of I$FSI related actvivtIes, "..::
'*".4.
                                          ' admin~isterIng.:the ISFSI'a correotiv ~action prograim, provldln9. ...-
OA S*ecia,~t lit/ngi*  
                            * .....  :..: ...orientation and training. on :applicabte q...                 uality program requirements tO ::
-, Th e. Q A* SpecIali~t /: Engineer is :responsible 1 S for performing independent overviews of I$FSI related actvivtIes, "..::
                            .::.:...: : :.: :D staff, end interfaelntg wth SOLUTION$ off-site QA st~ft..: . . . ::::
admin~isterIng.:the ISFSI'a correotiv ~action prograim, provldln9.
                              .:: ::..: :.:of lSFB! activities and for ensuring that adequatertechnical review Is**:
:..:...orientation and training on :applicabte q...
                            ,::*::i:pp ied to cha ::0 tests                     , :andi:i exper::::::::::::I ments.       :::: :!::::::::::, :i: :: :::::::::
uality program requirements tO ::
t              OU,AIJIY:         ASR*::: E PR:OGR       ::::,A:M ::::: :::         : : :::: :::i* :::: ::i :: :::*:
.::.:...: : :.: :D staff, end interfaelntg wth SOLUTION$ off-site QA st~ft..:... ::::
                        -:-:.-..         :The QA: program describe*d herein Sets forth th~ equiurements for the :QA.: ::
.:: ::..: :.:of lSFB! activities and for ensuring that adequatertechnical review Is**:
::.. .- .organi~ation, personnel :responsibilities,-controlS, :end measures. :.''.. .:.
,: :*::i:pp ied to cha :0 tests andi:i exper::::::::::::I m ents.
: .:.:.::"established .to achiev,: maintain,"end document qual~ty. -These .: :-:. . .
:::: :! ::::::::::, :i: :: :::::::::
                        -"::::: :requirements include, but are not limited to, the to~i[win~i: '::;                                                      -:r.
OU, AIJIY:
                              .*.: . -:desig*nbases for. ITS. SS&#xa2;$ Into. the I$F$I oeraetions and. ma*intena nce. .-
A SR*::: E PR:OGR
: .:::i:.'!::" procedures,:. ... :.::.                           .-. : . * : . .                  ' :. :.        . " -.. :
::::,A:M ::::: :::
: ' : :.i:.::"
: : :::: :::i* :::: ::i
::'"*          .:22. -*Performance of-all..installation,.
:I '.:...:..-. " "" " '.'
                                                                        * ..        ..          calibratlon, and :testing. on           necessary:
t
:' all ""'        '"-*          .
:The QA: program describe*d herein Sets forth th~ equiurements for the :QA.: ::
QA..:.                 ... . ..            .      : . :. . : .  .        6.:-.                                        .. .. . .      29..
.organi~ation, personnel :responsibilities,-controlS, :end measures. :.''...:.
:.:.:.::"established.to achiev,: maintain,"end document qual~ty. -These.: :-:.  
-"::::: :requirements include, but are not limited to, the to~i[win~i:  
-:r.
.::..:::::. -:desig*nbases for. ITS. SS&#xa2;$ Into. the I$F$I oeraetions and. ma*intena nce..-
:.::: i:.'!::" procedures,:.... :.::.
: 2.
i:.::"
: : :..:2 Performance of-all..installation,. calibratlon, and :testing. on all necessary:.
Q A..:.
6.:
2 9..


        *:::-                  . : '."::.:.": .:' '::': ':"'"."i '::":'.": " .': ":
'::': ':"'"."i '::":'.": ".': ":  
                                                , :::.:.:il;:i .*i*i,   :ii::!!:!i         ....'::":'"":"''
/:
                                                                                                        ;;;;. i .....ii*
:::.:.:il;:i.*i*i,
i!;i!"ii!!!ii*::i:il;*:*:*       /: :':": "          " '"
:ii::!!:!i i!;i!"ii!!!ii*::i:il;*:*:*  
                                                                                                                                        .:;.                           ** .. .!..i:' *..:..*:.i..;: .. ": '" ' ' : *:
;;;; i ii* -' :* * *.........  
                                                                                                                                                                                                                            *iiiii*
* *...!..i: ' *..:..*:.i..;:.. ": '" ' ' : *:
                                                                                                                                                                                                                                !:iiiiii::ii:iiiii::
iipli*ced:.u*i*bs!i* i*:i-
:iii::*.:i!ii:!!ii*.!I:II*
TS;SS*::!:
                                              !-I "!i*.-:i*l!sii*ii                      accordance ::w ith
                                                                          ;!;:in*;!" i;.i!ii~;i:!*!*i:;::::.:.i:!                      approved:!!;!
                                                                                                                                            .:;:"      ISFS iipli*ced:.u*i*bs!i*
procedures.:**i*:            i*:i-
:*i*i:-il;ii*
:*i*i:-il;ii*
i i;::
i i;::
ii.;;iiiiii iii!i-!
ii.;;iiiiii iii!i-!
                                    . 5o:.i Resolution of :itemsside~ntified a*s adiverse to ,quality wit h :!appropiSHate*:::::.:::-?:::ii
* iiiii*
                                .",":6.i P;erformance. of. auldits !and isurveiillances .by :QA personnel ito iverify *.thatii:*..:i:;*l ;
!:iiiiii::ii:iiiii::
                              .......:.::.*:....I S FSI*. ad m.inistrative: co ntrolIs, .pro&#xa2;ed ures,. a nd. p rocure ment: documenits:*: :;*:*:
:iii::*.:i!ii:!!ii*.!I:II*
;*Vi:: i::.n:;i :::.:*.
!-I TS; SS*::!:  
"!i*.-:i*l!sii*ii ;!;:in*;!" i;.i!ii~;i:!*!*i:;::::.:.i:! ::
accordance w ith.:;:"
approved:!!;!
ISFS procedures.:**i*:
;*Vi::
i::.n:;i :::.:*.
i:i:!i*i
i:i:!i*i
;;i: ii*:,::i
;;i: ii*:,::i  
        *!;;!:*i:i
*!;;!:*i:i
: :iI*:;
: :iI*:;
if!i:
if!i:  
                    ;i;;:
;i;;:
:.:;*:*:*:iii.i*i:*:i:::graded appoac*h: *to :quality :thaa*:is; cornmmensurate: with-a item' or a
5o:.i Resolution of :items side~ntified a*s adiverse to,qu ality wit h :!appropiSHate*:::::.:::-?:::ii
                                          *.""21. The folloWing- sections of the~iQA*pO idescribed hi:ere.in or..an in:.dustryi!..*ii.::.il
:6.i P; erformance. of. auldits !and isurveiillances.by :QA personnel ito iverify *.thatii:*..:i:;*l ;
:.i .: .;equivalen~t may *be aapplied *to t:he decommissioning of th~e LAO BWR.*:***:!:i.**.
:.::.*:....I S FSI*. ad m.inistrative: co ntrolIs,.pro&#xa2;ed ures,. a nd. p rocure ment: documenits:*: :;*:*:
                              */.- *:'i;::*{**       pl***an~t in *a i:graded appro*ach1 to quality that !is com~mensurate it~h an*:itiem1****
:.:;*:*:*:iii.i*i:*:i:::graded appoac*h: *to :quality :tha a*:is; cornmmensurate: with-a item' or a
                                  *ii*,**i-:*a. :i:;Forany* Raioactive Material* T~ran~s~portPa*ckage-s subject; to* the** :*i
*.""21.
                              .-.;i;**                                                                                                                                                                                    .:;*
The folloWing-sections of the~iQA*pO idescribed hi:ere.in or..an in:.dustryi!..*ii.::.il
i..i::i:!~~.:i~ii:.iiii~i iQ APD a pplies.*:! For ithes*e *activitiessa ssoci ated w~ith thfle:! iSF*SI, th:ie :::i I!
:.i.:.;equivalen~t may *be aapplied *to t:he decommissioning of th~e LAO BWR.*:***:!:i.**.
                                *i.i~.]i                                                                                                                                                                                              i!:!!i i:iil;ii
*/.- *:'i;::*{**
                                                                                                                                                                                                                                      ;i:!:*:..i!.i*:i;.!::*.i*
pl***an~t in *a i:graded appro*ach1 to quality that !is com~mensurate it~h an *:itiem1****
                                              .*:::;**:: :For *th ese :activ~'is associated with* decommissioning, ;the: ".**:..:.:..: .:;.:i;*...i *-i";
.-.;i;**
                                          .::-..: ~.impilementaionof0fithe QAPO ;Is *by itheia ppropriate *soLUTION S.i..*;::i...i;:i*! iii.i
*ii*,**i-:*a. :i:;Forany* Raioactive Material* T~ran~s~portPa*ckage-s subject; to* the** :*i  
:;:';ii..:;::
*i.i~.]i
                                *-:.ii.i::;ii:.*~i:Sections
: i..i::i:!~~.:i~ii:.iiii~i iQ APD a pplies.*:! For ithes*e *activities sa ssoci ated w~ith thfle:! iSF*SI, th:ie :::i I!
:.*.;                                            :I,:*:;illXV,.. X.V~and *XVII and* Appendix:C of thi:s iQAPD mayl*. ;..!,-
.*:::;**:: :For *th ese :activ~'is associated with* decommissioning, ;the: ". **:..:.:..:.:;.:i;*...i *-i";
* apply
:;:';ii..:;::
:;:i;;!*.
.::-..: ~.impilementaionof 0fithe QAPO ;Is *by itheia ppropriate *soLUTION S.i..*;::i...i;:i*! iii.i
                                        ~~*!*:i:;::*.*l I.::*De*om.:mis sioing acn.bti vi ties a-ra                                           e. otherw:ise :controlled .:by ~proce*.dure s,::;
-:.ii.i::;ii:.*~i:Sections :I,:*:;i llXV,.. X.V~and *XVII and* Appendix:C of thi:s iQAPD mayl*. ;..!,-
                                    *;,. :.:Iii*:*:.i~     i ocesses,:and; pol*icies di~ee med ad:*aeq u:ate! b:y ,th m*.*a n:a~geimen:t:*i ::.!:**
apply i!:!!i i: iil;ii
                                                      .*pr:::                                                                                                                                                        :;'. .ii:
;i:!:*:..i!.i*:i;.!::*.i*
                                                                                                                                                                                                                                      *    .  .:H :.*::
:;:i;;!*.  
                                                                                                                                                                                                                                      .::-.::***:*S!!:.;,:.!i
~~*!*:i:;::*.*l I.::*De*om.:mis sioing acn.bti vi ties a-ra
                                      . .Excep~twhen alternatives or :exceptions: a~re identified,. the implementing ii :i: :;i
: e. otherw:ise :controlled.:by ~proce*.dure s,::;
                                      'procedures for the QAPD shall* comply with the quality assuranice guidance:.; i:.
*;,. :.:I ii*:*:.i~  
.*pr:::
i ocesses,: and; pol*icies di~ee med ad:*aeq u:ate! b:y,th m*.*a n:a~geimen:t:*i ::.!:**
: ;'..ii:
.:H :.*::
.::-.::***:*S!!:.;,:.!i
..Excep~twhen alternatives or :exceptions: a~re identified,. the implementing ii :i: :;i
'procedures for the QAPD shall* comply with the quality assuranice guidance:.; i:.
::;:documents* listed in: AppendiX B:. Additionally., the following clarififcations:.i.:;:* !:--:
::;:documents* listed in: AppendiX B:. Additionally., the following clarififcations:.i.:;:* !:--:
1:":*:. the :guidance:: in anyi of .-the :listed documents is :in:: conflict :with :the :;!.; *:*: .i;i;'
1:":*:.  
                                          ;*I::!i;:*f
;*I::!i;:*f the :guidance:: in anyi of.-the :listed documents is :in:: conflict :with :the :;!.; *:*:.i;i;'
::;i:"QAPO,    ~*:*;i ~the- guidance provided :in "the QAPD is ithe, con~trolling docu menit;..ii..;i
::;i:" ~*:*;i QAPO, ~the-guidance provided :in "the QAPD is ithe, con~trolling docu menit;..ii..;i
                                                                                  -*;;li;i:**i!!!:;;*;:
-* ;;li;i: ! i ;i'::* *i* *:i **:
i;i'::* *i* ::i
:,; :*;!.:;i
                                                                                                                *:i :::;*
**i !!:;;*;: ::i
                                                                                                                      **::,;: i::*;!.:;i
:::;* : i: :? * *::;* i*:;* i? :/, :i ::? *ii ::; ;: ;;i!;: *;,*:;**z**;.*ii:;,
:? * *::;* i*:;*i?:/ , :i ::? *ii::; ;:;;i!;: *;,*:;**z**;.*ii:;,         *R* ev.;29i:!;:!***
R e v. 2 9i:
            -QAPO
* * ; 2 !;: !***
                                                                                                                                                                                                          !iiii::iiiiii!*
-QAPO
ii*
!ii ii::iiiiii!*
                                                                                                                                                                                                                    *:':ii
ii*  
                                                                                                                                                                                                                        ;ii*.i;*.i!iil;;*:i i*.**.*
*: ':ii  
;ii*.i;*.i!iil;;*:i i*.**.*


  ., . . ,.. , - .. ... :            ;Y:: .' ::'- * ' ::,':' :q: .':'.:'"".'., .:., ..,:..::.:,.., ..,:::. ,:,:, :..y::.- :.:%.,.:,::::     :-.:/...: ..:./ :. -:,:,:.
;Y::.' ::'- * ' ::,':' :q:.':'.:' "".'.,
i/{*".i !i*  :(. ilil :iii!!iiil; i:i:il ii!:i:
i/{*".i !i*
                                                                                ':i{!
:(..ilil :iii!!iiil; i:i:il ii!:i:
ii!i!:!
':i{!
{: !..::.;}.i.:i:: ::i:ii:2:...::i , Standar'ds, g~uides, codesi~ etc.,~iidentified in ~any commitment* document: i
..,:..::.:,..,..,:::.,:,:, :..y::.- :.:%.,.:,:::: :-.:/...:..:./
            " ::-iI}:*(   :.:* ":/. :{i :.are .not.qudalit~y assUr~ance :prog ram rei'quirem~ents unless !that-document* :
ii! i! :!
                                                *:< .i:,i3..
{: !..::.;}.i.
                                              ,*!!:i.::::!-!ii*i!i:::;,Guid~ance are :appl iciable:to;:         applicable*            com~p~ar~abl to sa fetyi            relatedand:
:i:: ::i:ii:2:...::i, Standar'ds, g~uides, codesi~ etc., ~iidentified in ~any commitment* document: i
                                                                                                                                                              !e:itemsi             items  anld act~ivit!ies activities       ( mporit~ant           CF:*
: iI}:*(  
                                                                                                                                                                                                                        !:(}1.0To    R ;5,0)*:*-iiii;i}:i b.!Safet~y)'     .*,,:!:;
":/. :{i :.are.not. qudalit~y assUr~ance :prog ram rei'quirem~ents unless !that-document* :
i                     7 : i..*....:.,.:. .i(;:at ithe compiletion ,of fuel tran~sfer to :support; decommissioning;i. T~he}. " ;-..
*:<.i:,i3..  
                      . -..y* .:.*..;.:Qualified -TechnicaliReview was added .at the time SOLUTIONS became::4; ii!:./!. ": .i;:i:the :licensee. *::The ifollowing .subjects shall .be .:independenitly irevitewed} by a; .
,Guid~ance applicable* to sa fetyi related items anld act~ivit!ies !:(}1.0 CF:*
                        .".'::""*i.;" ;.":*i1:..                         1..i0 .CFR 50.I59 and( 10O CFR 5*0.82 evalUatiOn~s for Changes in th fl~e.acility; :
R ;5,0)*:*-iiii;i}:i
                          .:v7:::::-.... :.:*.,. .:-.:::de*scrrib:)ed ~in the.DP and: PSDAR to"- verify that such a:ctionis do                                                                                                 Ibnot' :-;:/:::.
,*!!:i.::::!-!ii*i!i:::;
                          !:..}:.:.i:..:}:!}...":..     .. .:.:inv.,olve a :chang~e to: th~e. Technical :.SpecificatiOns or w:ill :no0t r~equir]ei~::{:i~*:i                                                                                                                   i{ ....
are :appl iciable:to;: com~p~ar~abl !e:itemsi and: activities ( mporit~ant To b.!Safet~y)'.*,,:!:;
:::::::::::::::17. :".,:/verify that ~such :changes :do. not :invol:ve ,a ,change to :th~e Techinical- -, .. .;
i 7 : i..*...  
: :.;i: :*":-. :*-:;::::.. S pe~cific ations :an*:.Will n ot requ*ire: NRC :approval: pu rsuan*:t t:io10 CFR:,::,:::
.:.,.:..i(;:at ithe compiletion,of fuel tran~sfer to :support; decommissioning;i. T~he}.  
:: :. ,....::**5 0 i5*9 a n d 10 .CF R :72.4 8 ; a nd ;*::****::.*:.:;:**** `.:: .:::*::}:::*.:;:::::{**::*.;*:*:::::E.::*:***::
..y
-. *.:.*..;.:Qualified -TechnicaliReview was added.at the time SOLUTIONS became::4; ii !.
!:./  
":.i;:i:the :licensee. *::The ifollowing.subjects shall.be.:independenitly irevitewed} by a;.
.".': :""*i.;" ;.":*i1:..
1..i0.CFR 50.I59 and( 10O CFR 5*0.82 evalUatiOn~s for Changes in th fl~e.acility; :
.:v7:::::-..  
.. :.:*.,..:-.:::de*scrrib:)ed ~in the.DP and: PSDAR to"- verify that such a:ctionis do Ibnot' :-;:/:::.
!:..}:.:.i:..:}:!}...":..  
...:.:inv.,olve a :chang~e to: th~e. Technical :.SpecificatiOns or w:ill :no0t r~equir]ei~::{:i~*:i
:::::::::::::::17.
:".,:/verify that ~such :changes :do. not :invol:ve,a,change to :th~e Techinical- -,...;
: ;i:
:. :*":-. :*-:;::::.. S pe~cific ations :an *:.Will n ot requ*ire: NRC :approval: pu rsuan*:t t:io 10 CFR:,::,:::
:: :.,....::**5 0 i5 *9 a n d 10.C F R :7 2.4 8 ; a n d ;*::****::.*:.:;:****  
`.::.:::*::}:::*.:;:::::{**::*.;*:*:::::E.::*:***::
i{....
:*:.::;*::::}:**::i1*:{. :I*nd*ividuals ;that are a;.s~sig:ne.d rtespons*ib:iliti~es *as described ;i~n S*ctioni*!i!,:
:*:.::;*::::}:**::i1*:{. :I*nd*ividuals ;that are a;.s~sig:ne.d rtespons*ib:iliti~es *as described ;i~n S*ctioni*!i!,:
: :i .: i:i.!:~.:.::!:,O.RGAN !ZA*IlON.. *.shall. prepare, admiin~istrative: and q uality :a:ssur~an*ce:;
:/*:::
:/*:::
:i i:i.!:~.:.::!:,O.RGAN !ZA*IlON.. *.shall. prepare, admiin~istrative: and q uality :a:ssur~an*ce:;
i"::;*i.:
i"::;*i.:
::i;*::: ::;   ::i:::;:;i*pr0cedue iis* as n!;ecessar to.                                                       0.impliemenlt the:.requl~irement*s of *th:J;is!:i!: i.::.!i:.i
::i;*::: ::; ::i:
                                      ..:*.:i:::: ;:*:::!!::.*pr~ogriam:: In/s~upporto~f oPe~ration a nd m:.*ain ten anice o0f:.the :LACBW R. ::: :/
::;:;i*pr0cedue iis* as n!;e cessar to.
:::i:,::i:::}::{i.::~l8SF1 i:::                                            an d decommissio ning activitie~s:, as applicable. Procedlures sh all."
0.impliemenlt the:. requl~irement*s of *th:J;is!:i!: i.::.!i:.i
: ::.i:.:: :~; *":.include appropriate quantitative and qualitative accep~tance .criteria :.::
..:*.:i:::: ;:*:::!!::.*pr~ogriam:: In/s~upporto~f oPe~ration a nd m:.*ain ten anice o0f:.the :LACBW R. ::: :/
                                    * :i.;i.::::::::::::::: ne~ces*sary :.to: deter~mine :that :the activity. is :being: prop*erly performed.;:.:.
: i:::
                                  .'                      2..:
::i:,::i:::}::{i.::~l8SF1 an d decommissio ning activitie~s:, as a pplicable. Procedlures sh all."
                                                        ",-Audit                       :or surveillance repo0rt~s .are- distributed ito management f.*or; their.::"
: ::.i
:" .. * ...":.review and assessment of the QA :program, as :to.effectiveness,: scope,-
:.:: :~; *":.include appropriate quantitative and qualitative accep~tance.criteria :.::
::::Y:: .{:}Y:*::ii:Employ*ee-.:                                Train ing shl*:l lbe!pr~ovided: to. all: facility .personn~el anhdi:!::q{
*.;i.:
:.:: : *:, .4.,contractor:s :performi~ng *activi~ties that coUld affect ,th~e quality .of***;:.- .
:i :::::::::::::: ne~ces*sary :.to: deter~mine :that :the activity. is :being: prop*erly performed.;:.:.
i      !.;:.: !:;::!:::}4*:*.: Inde*pe*nd ent ;:Manage*ment A*ssessme;nts ar*e perii od~ica~lly pe.rforimedi to :}
2..:  
: "': :i :: ' ;.monitor :*over*all performnance: and. confirm that -activities :affecting qUality:
",-Audit :or surveillance repo0rt~s.are-distributed ito management f.*or; their.::"
                                                                                                                                                                                                                                                -i!,:i!(, ii*/
*...":.review and assessment of the QA :program, as :to.effectiveness,: scope,-
QAPD.......                                           /:::;
:Y::
                                                                                .;i.: .::. ::t .;:!:*::;i,.",:::::i:
:::.{:}Y:*::ii:Employ*ee-Train ing shl*:l lbe! pr~ovided: to. all: facility.p ersonn~el anhdi:!::q{
::.*::}::.:::::.:i":.. .:.*., :.:::;i '81:: ::-:      :.:.:: ::::::
:.:: : *:,.4.,contractor:s :performi~ng *activi~ties that coUld affect,th~e quality.of***;:.-  
:4.     .i": ::: :::"..};:::
!:;::!:::}4*:*.: Inde*pe*nd ent ;:Manage*ment A*ssessme;nts ar*e perii od~ica~lly pe.rforimedi to :}
:i:}i:Ei;.;;!:::ii!}i
: "': :i :: ' ;.monitor :*over*all performnance: and. confirm that -activities :affecting qUality: -i!,:i!(, ii*/
                                                                                                                                                                                                                                  .:"Rev; :.2*i::!::I
i QAPD.......
/:::;  
.;i.:
::t.;:!
:*: :;i,.",:::::i:
::.*::}::.:::::.:i":....:.*., :. :: :;i  
'81:: ::-:
:4.
.i": ::: :: :"..} ;:::
:i :}i:Ei;.;;!:::ii!}i  
.:" Rev; :.2*i::!::I


I h:**::*:**::-:ik:::!:}:i/:*!*i*:co:i]]:mply             w:ith the QAPO and ithat `the !QAPD Is effectively implemented.i::;i:i!.il
I h:**::*:**::-:ik:::!:}:i/:*!*i*:co:i)):mply w:ith the QAPO and ithat `the !QAPD Is effectively implemented.i::;i:i!.il
:;{! :**:i} .::.:designated:                                     by:the. President, independentiga               of activities assessedt; pendet;o~atiit~s.,                         ssssd;;i'*           and :!*;/::i~
:;{! :**:i}.::.:designated:
                                      }17*}:*;!:/*i:!:::*:i:il ievel of
by: the. President, independentiga of activities assessedt; and pendet;o~atiit~s., ssssd;;i'* :! *;/::i~
{k:::yi::.:i                                        0im~anage6me~nt ihav~ing th*e- authority to e6ffect ~orr*ectivle a*ction.i :Iin~i
{k:::yi::.:i
                            *: :.:*..*:i;*Yi*,-i:*::.:.::.:y.*:}addlition,             tiihese :*resulits are rePorte d in a timel           *y :fa sh ion to0the Presi deni*t.::*
}17*}:*;!:/*i:!:::*:i:il ievel of 0im~anage6me~nt ihav~ing th*e-authority to e6ffect ~orr*ectivle a*ction.i :Iin~i
::. ...-: . .:...:... ..                      s-:...F::::..Pe n e Training. and: Q ualification.:.         ...- :. ..        :*  :      i ... "}:::*:::;i: i":::"": i::" -i:.:":
*: :.:*..*:i;*Yi*,-i:*::.:.::.:y.*:}addlition, tiih ese :*resulits are rePorte d i n a timel *y :fa sh ion to 0the Presi deni*t.::*
1*.}
-:...F::::..Pe s n e T raining. and: Q ualification.:.
                                                        !:iiEach
i... "}:::*:::;i: i":::"": i::" -i:.:":
                                                          ".*                    member of the fac&#xa2;ility staff (InclJuding audit, sUrveillance and~ii!:!i:i*!
1*.}  
::;.:.',:inspectio n person n el) shlli~ha Ve. s ufficie*n t.i q ualificatio ns: to0 periform.-k
!:iiEach member of the fac&#xa2;ility staff (InclJuding audit, sUrveillance and~ii!:!i:i*!
:k..*:::...*:
::;.:.',:inspectio n pe rson n el) shll i~ ha Ve. s uffi cie*n t.i q ualificatio ns: to0 periform.-k
                                                      .:ii}..:}ithe~irr*:a ssig ned. duties.i* Reg ulatory :Guide 1l*.8 :-19*77(ANSI ::N1.;I8 1:.;-i.:; :::iii
:k..*:::...*:  
                                              *i!iiii:i:iii!::*;!
.:ii}..:}it he~ir r*:a ssig ned. duties.i* Reg ulatory :Guide 1l*.8 :-19*77(ANSI ::N1.;I8 1:.;-i.:; :::iii
                                                          ;*:!;:!i   9717:l) I*s uiitilized* :ifor* detjermi n ing anda. aSssessin*g ;ap pro:priate staff;!::{;;:i!ii.!:!
*i!iiii:i:iii!::*;!  
                                                                                                                                                                                                                    .{!:
;*:!;:!i 9717:l) I*s uiitilized* :ifor* detjermi n ing anda. aSssessin*g ;ap pro:priate staff;!::{;;:i!ii.!:!
i:iii*i::iii >:: ;0 ::!
:i.;*/::;*..*.*.*p::ersonnel training :andqualification *:re~cords :are. mailntaine~d inii:*~i.*!*i:i :*
i:::* i:~
:i i.{'::!:.ai*:. Thie: !p os[:it*~ion ofthie IQA :Man ager iishallJJ* meet :it he :.ifolloin o i
!m inim*um::i:!
.{!:
i:iii*
i::iii >:: ;0 ::!
ii.i!i i!i'i:::.
ii.i!i i!i'i:::.
:i.;*/::;*..*.*.*p::ersonnel training :andqualification *:re~cords :are. mailntaine~d inii:*~i.*!*i:i :*                                                                    il*::}ii/;i!*iii::
il*
::}ii/;i! *iii::
i..
i..
: :'q":" >": ' i:.: :i, i:::*:i i.{'::!:.ai*:.
: :'q":" >": ' i:.: :i,
i:~                Thie: !pos[:it*~ion ofthie IQA :Man ager iishallJJ* meet :ithe :.ifolloin            o i !m inim*um::i:!
.:; :-.: " :- -i L:.:;:i ii!
* . *'- ,,... .  . ::.,* '." .'-. ..                  .:; :- .:" :--i L:.:;:i       Graduate of a four-year accredited engineering or science ii!            college or university, or the equivalent in practical experience plus five (5) or more years in positions of leadership, such as lead engineer, project engineer, audit team leader, etc.
Graduate of a four-year accredited engineering or science college or university, or the equivalent in practical experience plus five (5) or more years in positions of leadership, such as lead engineer, project engineer, audit team leader, etc.
                                      }..:": -.: ifi.:":i*:..:i:.:.i *i:: this: exper~ience sha~llbe in 'a quality *assurance organizationi./Y:: :
}.. :" ifi.:":i*:..:i:.:.i *i:: this: exper~ience sha~llbe in 'a quality *assurance organizationi./Y:: :
:. ":: .!.... :.-" :.} .. implelmen~tation- may be, substituted for the one-year experien~e:
:.... :.-" :.}.. implelmen~tation-may be, substituted for the one-year experien~e:
: .:.::i:]Yi-...:i~:.::::.!::iiw:ii. ."-wtthin*             a quality assu~ranice orga-nization:....:/ : i!::*iiii:::i..:;i.ii{;:i.-
:.:.::i:]Yi-...:i~:.::::.!::iiw:ii.."-wtthin*
a quality assu~ranice orga-nization:....:/ : i!::*iiii:::i..:;i.ii{;:i.-
* i::!/i:::.!
.-*:-b*.:ii T
::*!ihe ::pos~itilon !of Radiation Protectioni Manaiger :shall meet ~the:;!**i :;i: i
. *..: i- :
:.: ::. :.:::}: :!/: :*I:- ::r.ia dio~lo~gical ;Safety,:.thriee6: yearis :of :-whiich;Sh all :*be*in ::a~ppliedi:: :::!{:;i
{i
{i
* i::!/i:::.! .-*:-b*.:ii       ::*!ihe    T ::pos~itilon !of Radiation Protectioni Manaiger :shall meet ~the:;!**i :;i: i
.ii i:::i
                                                                                                                                                                                                              .iii:::i  {ii:i:,i::ii i- : :.:::}: :!/: :*I:- ::r.ia dio~lo~gical ;Safety,: .thriee6: yearis :of :-whiich;Sh all :*be*in ::a~ppliedi:: :::!{:;i
{ii: i:, i::ii
:        *" Technical:experience inTthe areaexe                       ofcradiologicalea          safetyd IlIsf~*         :beyond e~y::n :::i     :i::ii! i..
*" Technical: experience inT the areaexe ofc radiologicalea safetyd beyond I lIsf~* : e~y::n :::i :i : :ii! i..
:*!i!
:*!i!  
              ....' "' id,.!
' ' 'QAPDII
                          'QAPDII :....-:.,                   ;.::*::*,*::i* .:i*i*..i:"i:.
.... " id,.! :....-:.,
:*.*:{:*:i.*i.           Q APD,. 9
;.::*::*,*::i*.:i*i*..i:"i:.
                                                                                              !:i:i;::/!*:.*:::i:i*.*:
{:*:i.*i.  
                                                                                                        *!.!:!:.i*         i .::..i:,.*iii} i.!:,:...:.; ;.;:,i,.::I;.::: iii:::i;i!:"!,. R ee.v.!I229:}  :*:I.
!: i:i;::/!*:.*:::i:i*.*:  
 
*!.!:!:.i*
:::%*i:.:.i!{:"*(:/* >*ii iliiii!i*i:*!!!:!i*:Z::&#xb8;
Q A P D,.
                                                ., *....... ,,,...,..* ..              ::..t :.i':':"
9 R e.v. 29:}
                                                                                                  }::'.-.'::i:i:::*'*:':ii!}:.                                                                   !:t*::::ii.;::::;:::*:i.i*i{:::.:*i::.:
i.::..i:,.*iii} i.!:,:...:.; ;.;:,i,.::I;.::: iii:::i;i!:"!,.
                                                                                                                                    *:!/1:}::.*!:`:.:..:*:i*.`:*:;;*./*!:.i:*....*....:/y:*.::*:::*:(.,.*:.:.*:/
e !I2 :*:I.
:::.::.' .::""":. ..:**:';:,i*..: **i*-.1:!:::::.*::ii::*!:48*:I*::I ii:.!}:!::!i iii!::i:{i*;~
: ::%*i:.:.i!{:"*(:/* >*ii  
:.**!*!il' :::i*!:::**:basisstowarid s thIe:iacad emic. d egriee :requ1irieme n~t !(four ye:*ars o                                                                         :f, *:**
!* il i iii !i*i:*!!!:!i*:Z::&#xb8;
:.::!:!:,.::.:! i.ii:::; :ii*::{ :technical experiencel being :eq uivae!nt to!a fou r}year aaem.a                                                                                         ilc::::
::..t :.i':':"  
                                          * * ':ii*"*::.:.i::{   i.i **: i:A:*ca*demic a:nd- tech*nical~i experiie nce :must i~total: a: minimu                                                                             oi:::ef::.i ..i/:*::}::.:.
}:: '.-.'::i:i:::*'*:':ii!}:.
c.::::::::::::l Ti*iihei position ofQ*ualiffied iT =chn*ical .*:Reviewers shall: meetth::ie-:i ::::*-                                                                                     .;:*
:::.::.'.::""":...:**:';:,i*..: **i*-.1:!:::::.*::ii::*!:48*:I*::I
* followinggim        m i~i inimum      u q*aif   qualifications:  ati sii*i i:.!:!;. i:i:-:..:..i :!:i::.:ii::::::.ii:ii:::..~iii::l:.ii: .~iiii **:! i.:-:i :i::::*i~~:!:!:.-i:ii
*:!/1:}::.*!:`:.:..:*:i*.`:*:;;*./*!:.i:*....*....:/y:*.::*:::*:(.,.*:.:.*:/
: . :.     , ., ::::;.}i:::::!::*i;}i:i!!}i:
!:t*::::ii.;::::;:::*:i.i*i{:::.:*i::.:
                                                                                                                                                                                                                                                    .:::.:* :::i::-::::i!*::*:.*:i:::: *:
ii:.!}:!::!i iii!::i:{i*;~
                                                .: :: .::: Qu
:.**!*!il' :::i*  
                                          -.{.:.                                ralifaiedT cn icas~l                          Ren  v~iew rssal                    l ubegpefrindiiuaswtheout n!.. -
!: ::** :basis stowarid s th Ie:iacad emic. d egriee :requ1irieme n~t !(four ye:*ars o :f, *: **
;i .ii:
:.::!:!:,.::.:! i.ii:::; :ii*::{ :technical experiencel being :eq uivae!nt to! a fou r}year aaem.a ilc::::
                                                                      ,*Qualified TFechnical: Reviewers shall have at :least :5 years ;of . :;iI
* * ':ii*"*::.:.i::{
          !!!if Sii:            iiill:.:"i                              i'::::::/.q~u*alification*s evaluated o*n *a case !*by ca*se basis iand: approve:.dii*}
i.i **: i:A:*ca*demic a:nd-tech*nical~i experiie nce :must i~total: a: minimu oi:::ef::.i..i/
:*!.i:*Re~vieweris i..;.                   ifor[deco~mmisioning a:ictivities.iand ith Siii:ite~: ~i.:.!::::                                                       i} :!i*i:
c.::::::::::::l Ti*iihei position ofQ*ualiffied iT =chn*ical.*:Reviewers shall: meetth::ie-:i ::::*-
:i i*::::;*Manager, G enoa s*hall: appoi~nt Qui~alified *Tech~nic~al *!Reviewerts::i: i for ..ISF:SI*t la ed:ac
follow ing m inim um qualifications:
::i"::o                                           activities.*..::
gim i~i u q*aif ati sii*i i:.!:!;. i:i:-:..:..i :!:i::.:ii::::::.ii:ii:::..~iii::l:.ii:.~iiii **:! i.:-:i :i ::::*i~~:!:!:.-i:ii
i ite--rela.ted:                             :.:.... :; i:i*i~*i;i":" ;::i:i:..:.:i::: - : .:::
-.{.:.
:." ill:". DESIGN CONTROL.AND:REVIEW!;:.::: .:.!;::::: .::::/:                                                                                                       " ::-.          :        :::::: :;:}ii.                   .,.
::.: :: Qu ralifaiedT cn icas~l Ren v~iew rssal l beg u pefrindiiuaswtheout n!.. -
:i~**}i~.::.;:::: :i.:ili:*:::This* s;ectio e stabl!e
:*::}::.:.
:.::::-i                                                                          i* sh:es *the:re*quir~ements; :to :ass urie thi*at, Importa~nt: To ::!(::::!!:*::
. ::::;.}i:::::!::*i;}i:i!!}i:
:::i::-::::i!*::*:.*:i:::
;i
.ii:
!!!if iiill i Sii: :.: "
,*Qualified TFechnical: Reviewers shall have at :least :5 years ;of. :;iI i'::::::/.q~u*alification*s evaluated o*n *a case !*by ca*se basis iand: approve:.dii*}
:*!.i:* i..;.
Re~vieweris ifor [deco~mmisioning a:ictivities. iand ith Siii:ite~: ~ i.:.!::::
i} :! i*i:
:i i*::::;*Manager, G enoa s*hall: appoi~nt Qui~alified *Tech~nic~al *!Reviewerts::i: i for ISF:
::i"::o..
SI*t la ed:ac i ite--rela.ted:
activities.*..::
:.:.... :; i:i*i~*i;i":" ;::i:i:..:.:i::: - :.:::
:." ill:". DESIGN CONTROL.AND:REVIEW!;:.:::.:.!;:::::.::::/:
:::::: :;:}ii.
:.::::-i
:i~**}i~.::.;::::
:i.:ili:*:::This* s;ectio e stabl!e i* sh:es *the:re*quir~ements; :to :ass urie thi*at, Importa~nt: To ::! (::::!!:*::
::!* ::i::::*~i*::{
::!* ::i::::*~i*::{
:!:*:{:; ;::i*::iiiii; Safety (ITS
:!:*:{:; ;::i  
* st!*ruci:turie s,::syste*m s,; a*n d :com ponent*s *(SSCs )!:of !th:e: ELACBW:R *:*i.:*
*::iiiii; Safety ( ITS
i::::!*i:i~~* ISFiSi ar*
* st!*ruci:turie s, ::syste*m s,; a*n d :com p onent*s * (SSCs )! :of ! th:e: ELACBW:R * :*i.:*
:: /:i::i:.*:*:*::::                                        :e: ad * ;:deleted,: chi*a~n*ged: or moodified*:; in* a~ccordlance*:i with:::::::the ::::::ii:::::::::::
:: /: *:*:*::::
:.i:     .:. : :i::ii!:(c:.:o~des, s!itandards,!::: an~d r!e~gulationrs.:t thatg overned :th e oiriginla~l. de~sign,::::::::::::::::.!::
i::i:. i::::!*i:i~~* ISFiSi ar*
::::.!i::.
:e: ad * ;:deleted,: chi*a~n*ged: or moodified*:; in* a~ccordlance*:i with :::::::the
::~:":::i~-:i::~ii:excep*t .as lamehcide aindi approved. **M~easure~sshallbe establishec~ifo:r th~e i:::::.:.:{:.                                                                                                                                                                                                                          -::::*!:;i*
::::::ii:::::::::::
: : :!i:,:/*:.}. :.: : ir:ieview,; evaluation :da                                         and; pproval ~of all :de~sign: chianges ::goven inn.i:S FS i!:t.:::::;./
:.i:.:.
      * -. '::: " :SSCs. Th~e Engineering Manager (EM) :shall }en~sure .that the "design*controli:l
::::.!i::. : :i ::ii!:(c:.:o~des, s!itandards,!::: an~d r!e~gulationrs.:t thatg overned :th e oiriginla~l. de~sign,::::::::::::::::.!::
          /...               . -. and: review for .:ITS SS~s :shall be :performeci :by the appropria:te. .Design*::.*:.."!I
i:::::.:.:{:.
      * .- :./ ::::.Auth~ority (ref.; Appen~dix :A) utilizing thleir appr~oved: 1:0 :CFR: 50: Appe~n~dix iB;*:.:ii*-
::~:":::i~-:i::~ii:excep*t.as lamehcide aindi approved. **M~easure~sshallbe establishec~ifo:r th~e  
      .- : :::%.::::. ......::..Design,: fabrication, o)r modification :of storage and shipping :casks .used for :.::i.                                                                                                                     -.
-::::*!:;i*
i: .*.!. ::.*:"S.sh*::ii:
: :,:/*:
::*:T:::.:}:                                    pment iof~i radcioactive !materials :will :;not !be c~ondUcted u:6ndi*:erthiS::secti()n~i-:*i:i.i
:!i:.}. :.: : ir:ieview,; evaluation and;
:i: :::;i*i::
:da pproval ~of all :de~sign: chianges ::goven in n.i:S FS i!:t.:::::;./
                  . :::.::.:.::::::1i:!.             r:. The:i [e!:DP:C] s~taff: is :r~es ponsiible: fo:r establishiiing :p~roce~dures to{b:* implemb*en t:.i*:;l                                                                               -I:
" :SSCs. Th~e Engineering Manager (EM) :shall }en~sure.that the "design *controli:l
QAPD: i                                                                                                         :10:*:                                                           :-10.,.Rev:.:"
/...
                                                                                                                                                                                                      -A..:.                           29..':': .
and: review for.:ITS SS~s :shall be :performeci :by the appropria:te..Design*::.*:.."!I
 
:./ ::::.Auth~ority (ref.; Appen~dix :A) utilizing thleir appr~oved: 1:0 :CFR: 50: Appe~n~dix iB;*:.:ii*-
                ..: : iJ ::orders:,design.:control    and the
.- : :::%.::::.......::..Design,: fabrication, o)r modification :of storage and shipping :casks.used for -.
                                              .procedures-   and.incorporation instrUCtionS. ::of design
:.::i.
                                                                                        .*:.'.:.;."docume~nts
::*:T:::.:}:
                                                                                                            .*;:iz- into :i q work  j ?.:.*.: : ,I :
i:.*.!.
          "            : :~2.: :The EM is: respOnsible for :the iincor~poration of design lbases, regulatory I:
sh*::ii:
      .. "                    ::' requirementS, codes and standard~s into drawings and specifications ... ;:.i
::.*:"S. pment iof~i radcioactive !materials :will :;not !be c~ondUcted u:6ndi*:erthiS::secti()n~i-:*i:i.i
      .. :...:: :**.i.:::           related. to ITS SSCs: design :and ch*anges thereto:..The EM ;is*: also.*;*::*
:i: :. :::.::
::;i*i::.:.::::::1i:!.
The:i r:. [e!:DP:C] s~taff: is :r~es ponsiible: fo:r establishiiing :p~roce~dures to{b:* implemb*en t:.i*:;l  
-I:
QAPD: i
:10:*:
:- -A..:.
10.,.Rev:.:" 29..':
:.:.:.:. design.:control and the incorporation of design docume~nts into work
:; :...: : iJ ::orders:,.procedures-and. instrUCtionS. ::  
.*;:iz-
:i q j ?.:.*.:
: I :
: :~2.: :The EM is: respOnsible for :the iincor~poration of design lbases, regulatory I:
:: ' requirementS, codes and standard~s into drawings and specifications  
... ;:.i
.. :...:: :**.i.:::
r elated. to ITS SSCs: design :and ch*anges thereto:..The EM ;is*: also.*;*::*
:- : :!:::::i;.:!;.:
:- : :!:::::i;.:!;.:
:.i~i::;       respi:::;::
:.i~i::;
:onsi~ble for the r;ieview o~f d:esign drawin~gs, speci~fications,;i!                               ::*:
respi:::;::
:: ::i::::calculationad procurement documents: to assure *that: quality                                                                     ! :1:
:onsi~ble for the r;ieview o~f d:esign drawin~gs, speci~fications,;i!
::;:.. :: :.: i:::standa~rds :are *included or-refere nced.: 7:: - i i:::: : i: ;-;:i *::i:::                                             ;;i1!i:
:: ::i::::calculationad procurement documents: to assure *that: quality  
3.TeulfidTehialRviwrisrspnilefrprovidin~g an :.:                                                                            :*
! :1:
: i *;:i::. :*:*:**:i:*iin depe:nd ent* r*eview of: cha*nges :to *the i:SFSI* iTS. SSi3sl. i They ishall* ; r ;I
::;:.. :: :.: i:::standa~rds :are *included or-refere nced.: 7::
      ":' *':"::!:':"    :i::;i~i:::iprovide assurance ::that the :modification: m~eets :the design: bases,
i i:::: : i: ;-;:i *::i:::  
        --" ....                    regulatory requirements,:and applicable codes and standards. The                                                   .
;;i1!i:
review shall determine whether: the proposed .modifications: :requi~re:-
3.TeulfidTehialRviwrisrspnilefrprovidin~g an
prior NRC approval. if prior NRC approval is needed, any .license:;* ..
: i :i::  
*;. :*: *:** :i:*iin depe:nd ent* r*eview of: cha*nges :to *the i:SFSI* iTS. SSi3sl. i They ishall* ; r ;I
:": :i::;i~i:::iprovide assurance ::that the :modification: m~eets :the design: bases, regulatory requirements,: and applicable codes and standards. The review shall determine whether: the proposed.modifications: :requi~re:-
prior NRC approval. if prior NRC approval is needed, any.license:;*..
amendment request shall be referred to SOLUTIONS licensing sup0port.
amendment request shall be referred to SOLUTIONS licensing sup0port.
i ::"i*:i
i ::"i*:i  
          ~                   1.:::i.:...:
~
1.:::i.:...:
iiA W:or~k Order! shall b*,e *initiiated ifor all modification:s to iTS :SS~s :and:: :"*
iiA W:or~k Order! shall b*,e *initiiated ifor all modification:s to iTS :SS~s :and:: :"*
sytmsminane.peaioa.drng.FS.ctvtis.Wr.Odr
sytmsminane.peaioa.drng.FS.ctvtis.Wr.Odr
:ii*ii:iiiiiiii"i::iiiii*i2. :ii!Desigbn :ibases, :regulatory :requ~irements, a!n~d a~pplicabl~e codes :and                                       ,
:ii*ii:iiiiiiii"i::iiiii*i2. :ii!Desigbn :ibases, :regulatory :requ~irements, a!n~d a~pplicabl~e codes :and standards :and requirements for all proposed ISFSI modifications to ITS J, "iJ-S SCsi and sys~tems maintained operation~al duringisFiSi :activities.::
      . .... -                      standards :and requirements for all proposed ISFSI modifications to ITS J, "iJ-   :          ... S SCsi and sys~tems maintained operation~al duringisFiSi :activities.::
::i, These conditions shall be incorp~orated into drawings,: specifications*,
::i, " .                  These conditions shall be incorp~orated into drawings,: specifications*,                                           i
i
        "* : ; : . -:               pro c ure me n t d oc u m e n ts, an d proc ed u re s :. --.: :. : i :~:ii:: : . : . .i:.i :ii::.. : ::* .' ...            .
-: p r o c u r e m e n t d o c u m e n t s, a n d p r o c e d u r e s :. --. : :. : i :~ :i i :: :. :..i :. i :i i ::.. : :: *.'...
:i-ii*::!;
:i-ii*::!;
:i"i:3. ii.:All p.roposed I:SFSI m*odifications :shall be reviewed to determ~ine                                                       ::"I:
:i"i:3. ii.:All p.roposed I:SFSI m*odifications :shall be reviewed to determ~ine
::"I:
: iV.:* PROCUREMENT DOCUM:ENT C:ONTROL: :i::;::i;:i:;: :;;:.:;i: ii:::.:!
: iV.:* PROCUREMENT DOCUM:ENT C:ONTROL: :i::;::i;:i:;: :;;:.:;i: ii:::.:!
Ths ecio:etalihe te eaurs oassure that procurement; ::.i.J.::
Ths ecio:etalihe te eaurs oassure that procurement; ::.i.J.::
: : documents (purc(hase requisitions: and' orders) covering: material;:i::,::*..
: : documents (purc(hase requisitions: and' orders) covering: material;:i::,::*..
  ".              :.equipment, and serv~ices :for ISFSl ITS:SSCs..specify appropriate quality..* ..
:.equipment, and serv~ices :for ISFSl ITS:SSCs..specify appropriate quality..*  
          '            ' ~requirements;: Thie purchase order :specifies or r~eferences .:th:e *applicabile .~~.:.
' ~requirements;: Thie purchase order :specifies or r~eferences.:th:e *applicabile.~~.:.
      *                  ~~requiremen~ts,- d.esign bases, codes, :and stanida~rds to assure qual ityi: ;::.;:.
~~requiremen~ts,- d.esign bases, codes, :and stanida~rds to assure qual ityi: ;::.;:.
      . .::.. B.; Responsibilities .:..::!~::. .:.:.*:i:;.;:.::;                                     .. ,.                              :.*: it;:           .
..::.. B.; Responsibilities.:..::!~::..:.:.*:i:;.;:.::;
      ;i~~i::;The DC ::staff *;is respons~ible for; developing p;rocedures ito !cont~rol t~he:                                                               *
:.*: it;:  
:...i.i2i. ! 2:i.T~heDPiC staf~f is iresponsible for:initi~ation iof purchase requisition;:: ::ii 1
;i~~i::;The DC ::staff *;is respons~ible for; developing p;rocedures ito !cont~rol t~he:
::                  *wor~kSheets for mater~ial,: equipment, and services: require~d ::for; .::;                                         :
:...i.i2i. ! 2:i.T~heDPiC staf~f is iresponsible for:initi~ation iof purchase requisition;::
      *" : . : ":... .m aintenanice, ;repair:, and: m~odifications; . :.:i                             ':r"             *;*';" ]':' ;"'; *,];":
::ii 1
: 3. The Engineering Maniager is: responsible .for preparing engineering                                                   :-
*wor~kSheets for mater~ial,: equipment, and services: require~d ::for;.::;  
QAPD                                                                   1:1                                                           Rev.29
.m aintenanice, ;repair:, and: m ~odifications;.
:.:i  
':r"  
]':' ;"'; *,];":
: 3.
The Engineering Maniager is: responsible.for preparing engineering QAPD 1:1 Rev.29


    !!iiiili ii                       :*i: i ?:ii~i*li:;:*::::!pecifications :w~hich detail: the :technicall and quality r!;equi~remenits fiorii:!ii!:
! !iiiili ii
:*i: i ?:ii~i*li:;:*::
::!pecifications :w~hich detail: the :technicall and quality r!;equi~remenits fiorii:!ii!:
5
:III.
Pii:5i
,:*u rch*asing,is rjespo nsible forI prepa ri ngi, rieviewing,* approv~in g,:: is*s~uing,i !
t!~::~
t!~::~
                                            ". : 5 ,:*u
.... :*6.
:III.               Pii:5irch*asing ,is rjespo nsible forI prepa ri ngi, rieviewing,* approv~in g,:: is*s~uing ,i !
6 The QA Specialist I Engineer is respon!sible for review of IJTSi;i*:.i::i!.: :ii:;
i!+;?    :*6. 6 ircurement i;;;iii:p:ro*:/:        The QA Specialist         documents I Engineer     is respon!sible ito ensure  iinclusion for     review of IJTSi;i*:.i::i!.: ';::~ii of appro*priate~quiality::*                 :ii:;
i!+;?
I-i
i;;;iii:p:ro*:/: ircurement documents ito ensure iinclusion of appro*priate~quiality::*  
:::*:.::i..::;!
';::~ii
i--:.:1: .i:.::..puto                     l.. :Tie!rchaserqiiin for new matertiOn al,equripet
::: i--:.
                                                                                                                                  . tand           s erice*(     t h::sandi:*i:.
*:.::i..::;! :1:.i:. ::..puto l.. :Tie!rchaserqiiin for new matertiOn al,.
:..+*:i! .:*,?ias quantity, ..item idescr~iption,* and technical and qula~lity ;reqUlrementds:i!..*ii
equripet tand s
erice*(
t h::s andi:*i:.
:::i
:::i
                                                .i.2.+ Purchase orders shallinclude ispe*cifications th~at contain all the~i:?*+!**:!i+!:i:*::*:+::*+!I
:..+*:i!.:*,?ias quantity,..item idescr~iption,* and technical and qula~lity ;reqUlrementds:i!..*ii I-i i.i;*:::il;:i;i!iiii!::i!i:i!.iii:!+i:ii::!
                                                    +:.+ information necessary to* assure material,: equipment, and services are*:**::i: i+::
.i. 2.+ Purchase orders shallinclude ispe*cifications th~at contain all the~i:?*+!**:!i+!:i:*::*:+::*+!I
i:of: a d equa.teb qu*ialit. T~i::ih~is s*h~all!;in clude :material sele:**]ctioni: des ign d ata !ii.!:i, +!i: *.i::
+:. + information necessary to* assure material,: equipment, and services are*:**::i:
i+::
ii:::,i.:i::!.
ii:::,i.:i::!.
i.i;*:::il;:i;i!iiii!::i!i:i!.iii:!+i:ii::!
i:of: a d equa.teb qu*
                                                    !i:::.:*+:.:..:*delin~eated in;p+urcha~se or*der~s.. :Thm~:issha~ll include a :listing of each :item.:;!::-::,i:.::
ialit.
o;i*{:*!,iii
T~i::ih~is s*h~all !;in clude :material sele:**]ctioni: des ign d ata !ii.!:i, +!i : *.i::
                                                            ;:f     documnen tatio r:t;be-isub to          mitted,:wh*enh it[is:to bbe submittedi' wha~t~i:: i,::: ::::*: :: ;
!i:::.:*+:.:..:*delin~eated in;p+urcha~se or*der~s.. :Thm~:issha~ll include a :listing of each :item.:;!::-::,i:.::
req"-ubirtes approval:-""":
o;i*{:*!,iii  
                                                                                  ..            prio to manufacture,
;:f documnen tatio to r:t;be-isub m itted,:wh*en h it [is:to bbe submittedi' wha~t~i:: i,::: ::::*: :: ;
                                                                                                              ..              and. toy
req"-
                                                                                                                                    . whom
ubirtes..
                                                                                                                                        -: I t shall.::::!..:."i-be:?::::-.?i:i*::.:
approval:-""":
                                                  .44:...
prio to manufacture, and. toy whom  
:: .. To.:the extent necessary, ITS procurement documents shall:r~equire :. ..
-: I t shall.::::!..:."i-be:?::::-.?i:i*::.:
:.i:.::
4:...  
ii.ili::..::iii:*21,i;
.4.. To.:the extent necessary, ITS procurement documents shall:r~equire :...
:.*-:;                10 CQ:*FR I50, :*Ap pend!ix B,:. and/or* 1       *0.: CF*R 72,:+I Su bpart* G.:;::: Suppier~isii:*.:*!
:.i:.:: :.*-:;
                                    !i.iiiii : ;::i iisha~ll be r.tequire!d !to ::provid{e :acceSs .too.th~ei~r fac.*i!i~ti~essialn~d:i*
ii.ili::..::iii:*21,i; 10 CQ:*FR I50, :*Ap pend!ix B,:. and/or* 1  
:.ii-.                                                                                                            reods iifor:i:l .:*!..+!
*0.: CF*R 72,:+I Su bpart* G.:;::: Suppier~isii:*.:*!
i::ii:nspect[ion. and audit, as reqluireid,-t~o~determinei complianceb w*ithl!:!!i*:i::.:iii:::l
:.ii-.
::.i;: -:i~:.+.:.:ii*.:*i"
!i.iiiii : ;::i iisha~ll be r.tequire!d !to ::provid{e :acceSs.to o.th~ei~r fac.*i!i~ti~es sialn~d:i* reods iifor:i:l.:*!..+!
                                  ;::+      ~:i :+:::provisions o:f !thiei purch~ase ord:er. *=These: requirem ents shfiall ;exten~d i:to:ii.:ii
::.i;: -:i~:.+.:.:ii*.:*i" i::ii:nspect[ion. and audit, as reqluireid,-t~o~determinei complianceb w*ithl!:!!i*:i::.:iii:::l
                                        !i!i::::i;:;
;::+ ~:i
                                *:.:+::i~5;:.
!i!i::::i;:; :+:::provisions o:f !thiei pu rch~ase ord:er. *=These: requirem ents shfiall ;exten~d i:to:ii.:ii
:                      ITS;
:+::i~5;:.
:*.ispu~rchas~e                 requisitiOns :sh~all be :reviewed by: the. QA ::Specialist::.:I"-:.:::.
ITS;
::i/i*::i~:i~i:. ":*::in~itiated ia~nd revi~ewed in.                 i*:accordanice i:ith:tlhe. s~ame proceduries :u~tilized:*:.
:*.ispu~rchas~e requisitiOns :sh~all be :reviewed by: the. QA ::Specialist::.: I"-:.:::.
                                                                                                                                                                                        !;i+i::i:i!
::i/i* :.
            * ** +;':.:.+? : . . i.i.:.ii:               .                                                                                                    ?.::i i' .'" . ". : ?+ '.+.':' ." "',
::i~:i~i ":*::in~itiated ia~nd revi~ewed in.
i*:accordanice i:ith:tlhe. s~ame proceduries :u~tilized:*:.
!;i+ i::i:i!  
* * * +; ':.:.+? :.. i. i.:. ii:  
?.::i i'.'".
". : ?+ '.+.':'." "',


in preparation of the original document.                                                 i *ii i!ii!I*
in preparation of the original document.
V.                   INSTRUCTION
V.
INSTRUCTION


==S. PROCEDURE==
==S. PROCEDURE==
S. AND DRAWINGS A.         General This section establishes the measures to assure that activities relating to ISFSI activities are performed in accordance with approved instructions, procedures, and drawings.
S. AND DRAWINGS i
* i i i!ii!I*
A.
General This section establishes the measures to assure that activities relating to ISFSI activities are performed in accordance with approved instructions, procedures, and drawings.
B. Resoonsibilities
B. Resoonsibilities
: 1. The DPC staff is responsible for preparing or reviewing all procedures iiiii that are required for implementation of the QAPD.
: 1. The DPC staff is responsible for preparing or reviewing all procedures that are required for implementation of the QAPD.
* 2. The ISFSI Manager is responsible for approval of ISFSI related rirocedures that imDlement NRC-aooroved oroorams and olans.
* 2. The ISFSI Manager is responsible for approval of ISFSI related rirocedures that imDlement NRC-aooroved oroorams and olans. i iiii
iii!ili!i!:
: 3. The Qualified Technical Reviewer is responsible for reviewing all initial and revised procedures that 'affect ITS ISFSI operations and shall determine whether changes to these procedures require prior NRC approval.
: 3. The Qualified Technical Reviewer is responsible for reviewing all initial and revised procedures that 'affect ITS ISFSI operations and shall determine whether changes to these procedures require prior NRC approval.
C. Reauirements
C. Reauirements iii!ili!i!:
/i
!iiii!i:i!iii i
: 1. Detailed instruction for ISFSI activities shall be contained in procedures and checklists covering the following activities:
: 1. Detailed instruction for ISFSI activities shall be contained in procedures and checklists covering the following activities:
                                                                                                                                                                                                                      /i
: a. administrative control,
            !iiii!i:i!iii
*, ": *::*:..,* !,!'r:*-*'
          * , ": *::*:.. ,* !,!'r:*-*'
: b. general security system operation,
i                  a. administrative control,
: b. general security system operation,                                                     !!iii!!!i  i!!:
iii i!iii!ii!ii!
                                                                                                                                                                        !!iiii!!ii iii:*:
: c. Security Plan implementation,
: c. Security Plan implementation,
: d. quality assurance, i:;;:
: d. quality assurance,
!!i ii!!!i i!!:
iii i!iii!ii!ii!
!!iiii!!ii ii i:*:
i:;;:
e;*;. I::sur*veill.ance ::::alnd i::tea~t a ctivities of iequipme~nt,:
e;*;. I::sur*veill.ance ::::alnd i::tea~t a ctivities of iequipme~nt,:
f.:::::::::::::=================
f.:::::::::::::=================
fire::::!:::::
: !::i!
p:!::i!
fire::::!::::: :: ii ii:::::
rot ctio        : prog:i:raE.::
p ro t c tio p ro g ra m,:: a nd::
::iiii:::::      m,::     a nd::
:i: E.::
:f!::i:::::: ::i:!.E::,i i*~ :::::::::::: ::*~:ii::i i;i:*:i:i ii ii
:f!::i:::::: : :i:!. E::,i i*~ :::::::::::: ::*~:ii::i i;i:*:i:i ii ii
                    *.i ::i**;!::*i:*i::;iii*i!*ii:;::     For;iact*::t~iv
*.i ::i**;!::*i:*i::;iii*
:iii2:!;i:.i                       othr *:those
i!*ii:;::
:ities         th!an                   w*: ni:*ormal~*craf expertisei ith;*.in:;                                                    -;!~i;yt               ;: :::*ii:
: ii i2:!;i:.i For;i act*::t~iv
:::i::i:~*!::*i!
:ities othr th!an  
:::::;iEii:
*:those w*:
* i     nst:ru:ctionsii!:i;::
ith;*.in:;
                                                          .::*        !si ii for  :.i~maintenance ii* d :br ~*!land:        s ~repair  b i~s:a:pic of ISFSI equipment                  :::or:ii!::i
ni:*ormal~* craf expertisei  
                                                                                                                                                                    **: ;;:;! i::***i*.:     systems
-;!~i;yt  
                          *: ..:.: ":                     shall:   be:-::
;: :::*ii:
o cointsslaliirine                 in d      proced raes or WorkaOrdeors.Th guidnesallta~~::*:*:i*..*:;:!:ii:.;i:;~:i*l
:: ~ *!:: : : Ei *
                        . : . i..;.". :~i". - ::*:.i*,Ptai con.          isru:c:iteions f~or preprtemiongtl~,                         perorane,       c tes~tying,       a nd return:~iEi                 to
:i::i: *i!
                                                                                                                                                                                                        "::!i!i:**:
: : : ::;i i:
                        *::-"::::i::"i
i nst:ru ctionsii!:i;::
:::            :i: ::::;:ser ic.T             * :*egu dac em hsa*~                    ay refer:::**.::*/:*:*:::*.enc..*:::...;..e m anufactur.*   e r's:**:: Instruct*::::*::::::::**",:*:,*:::*:::*ion
: !si ii :.i~
ii* d : br ~*!l s ~ b i ~s:a:pic **: ; ;:;! i::***i*.:
::: :ii!::i for maintenance and: repair of ISFSI equipment or systems shall: be:-::
o cointsslaliirine d
in proced raes or WorkaOrdeors.Th guidnesallta~~::*:*:i*..*:;:!:ii:.;i:;~:i*l
. :. :~i".
i..;.".
con.
::*:.i*,Ptai isru:c:iteions f~or preprtemio n gtl~,
: perorane, c tes~tying, a
nd return:~iEi to  
"::!i!i:**:
-"::::i::"i :i: ::::;:ser ic. T hsa*~
* :*e gu dac em ay refer:::**.::*/:*:*:::*.enc..*:::...;..e m anufactur.*
e r's:**::
Instruct*::::*::::::::**",:*:,*:::*:::*ion
:iii.i*::E~i:i:::ii**
:iii.i*::E~i:i:::ii**
              *::i:: iii:,*           ii*ii
:!iiiii!ii!!iiii!*!iiiii!i!!ii!ili:ii!::*!ii:iil;i iiiiii*i
* i*!I* i;*                       QAPD                                                                                                             Rev.
*::i::
ii;!ii*:*:il ill: *29~i!iiii~iii;!i~**!i:!
i ii:,*
iii:!!*ii*:ili!!i!
ii*
:!iiiii!ii!!iiii!*!iiiii!i!!ii!ili:ii!::*!ii:iil;i iiiiii*i                                                                                                                                                              *- ::.::..;.
ii
* i*!I* i;*
QAPD Rev. 29~i!iiii~iii;!i~**!i:!
ii; !ii*:*:il ill:
* iii:!!*ii*:ili!!i!


-.: ::T&#xb8;/:::*:'::.'.:.::::* .:::'*::T :::                                                                                                                                     :::::::::::::;::,::':
-.: ::T&#xb8;/:::*:': :.'.:.:: :: *.: ::'*::T :::
                                                                                                                                                                                              +:':::;'::::::::
iii i
T ::::::,:./*:::"
+:':::;'::::::::
                                                                                                                                                                                                                                                                                      *:::...:::::*:.5::::
T ::::::,:./*:::" ::::.::::::::.:::.::::::::::::::,::::::;.:::::::::::.*::::*,
ii i
*:::...:::::*:.5::::
: 4. The department responsible for an activity shall be required to provide i!i!i!ii                      iilii!iiii!                                                    il
i!i!i!ii i ili i!iiiiil
                                                                                                                                                                                                                                                                *:.i:)::*:TiT*:!i*!::i::ii!i*Li!!!!i)iiiii:i*
: 4. The department responsible for an activity shall be required to provide the. necessary technical input and review of changes to instructions, procedures, or drawings~
the. necessary technical input and review of changes to instructions,                                                                                                                           iii!ii*ii!i:*i*:ii!*!):*iii:i::T procedures, or drawings~
: 5. Changes to or deviations from established instructions, procedures, or drawings will require the same review and approval as the original document However, temporary changes to procedures that do not change the intent of the original procedure may be made in ink, dated1 and approved by two people of the management staff.
: 5. Changes to or deviations from established instructions, procedures, or drawings will require the same review and approval as the original document However, temporary changes to procedures that do not change the intent of the original procedure may be made in ink, dated 1 and approved by two people of the management staff.in administrative
: 6. Procedures will be reviewed periodically as set forth in administrative
: 6. Procedures will be reviewed periodically as set forth i*:::;
*:.i:)::*:TiT*:!i*!::i::ii!i*Li!!!!i)iiiii:i iii!ii*ii!i:*i*:ii!*!):*iii:i::
: : :     ~:               o c ed u r es.:::::*:::::::::
i*:::; :
i! * :.ii *li* :::::           :: : :: :::::::::pr                                               ::::: :::::::: ::: :::: :...;
: ~ :
A. Generali* !; ii*~i*~*!i::ii~~iiii~iii:iiii!i~~~~:*i~):;ii*i!i!:iiiii!)**i!*)i)i*)i*i*~)iii*)ii~l     :ii:);*i:ji),*i:i                           ~             )i*l*i)**:*)):i)i)i ~
i! * :.ii *li* :::::
:* T hT:**))**:!)is
:: : :: :::::::::pr o c e d u r e s.:::::*:::::::::
                                                      *-))))))    s ci *ion*:****
A. G enerali*  
e t,):):))**i
!; ii*~i*~*!i::ii~~iiii~iii:iiii!i~~~~:*i~):;ii*i!i!:iiiii!)**i!*)i)i*)i*i*~)iii*)ii~l
                                                                            !:i!*))*:)   b J))i)    i) the:~):))~:*i)i
:ii:);*i:ji),*i:i  
:i**
~  
ishes~ :*ij)**')irequirem
)i*l*i)**:*)):i)i)ii~
                                                                                                                      *)::i)Y*))) *: ents        i*i:::fo d)*:):**)*
*-))))))
:!i:*        cu)i:!)en ] control)F) *i )Ti)))*i)))**)   ias*fT       ti.i!))i)))]iE~) i ::i:i:i.:])!TIiT             )) :):**
:* T hT:**))**:!)is s ci on*:****  
                                                  ~.       r~esDonsIDIIIIIes
*i !:i!*))*:)  
: 1. The DPC staff is responsible for preparing a standard procedure for                                                                                                                             iiili controlling the issuance.of procedures and for preparing, procedures Ifor controlling the distribution of operating, maintenance, repair, and modification procedures for the ISFSI.
,):):))**i J))i)
C. Requirements 1; Procedures shall be established for the issuance of procedures, drawings, and specifications. A document control procedure shall be prepared to provide a uniform system of document Identification.
:i** i) e t b ishes~ :*ij)*  
* ')i * )::i)Y*))) *:
the:~):))~:*i)i i*i:::
:!i:*
requirem ents
)*:):**)*  
)i: !) ]
fo d cu en control)F) as*
*i i
ti
) Ti )))*i)))**)
fT  
.i!))i)))]iE~) i : :i:i : i.:])!TIiT  
)) :):**
~.
r~esDonsIDIIIIIes
: 1. The DPC staff is responsible for preparing a standard procedure for controlling the issuance.of procedures and for preparing, procedures I controlling the distribution of operating, maintenance, repair, and modification procedures for the ISFSI.
C. Requirements iiili for 1; Procedures shall be established for the issuance of procedures, drawings, and specifications. A document control procedure shall be prepared to provide a uniform system of document Identification.
: 2. All documents shall have an identification number, title, date, and revision number. Documents shall be fi!ed and controlled by. use of
: 2. All documents shall have an identification number, title, date, and revision number. Documents shall be fi!ed and controlled by. use of
                                                                'this Identification. Each type of document shall be filed in a central location identified in a document control procedure.
'this Identification. Each type of document shall be filed in a central location identified in a document control procedure.
: 3. 'DrawIngs, specifications, and procedures', Including revisions, shall be reviewed for adequacy and approvedfor release by authorized personnel. The required reviews and approvals shall be specified' in a document control procedure.                                         '  .'
: 3. 'DrawIngs, specifications, and procedures', Including revisions, shall be reviewed for adequacy and approvedfor release by authorized personnel. The required reviews and approvals shall be specified' in a document control procedure.
: 4. The' administrative staff shall assure that current documents are distributed to and used at the location where the prescribed activity is~
: 4.
The' administrative staff shall assure that current documents are distributed to and used at the location where the prescribed activity is~
performed. Documents and revisions shall be distributed as specified in a document control procedure. Preliminary and superseded documents shall be clearly identified and closely controlled to preclude their misuse.
performed. Documents and revisions shall be distributed as specified in a document control procedure. Preliminary and superseded documents shall be clearly identified and closely controlled to preclude their misuse.
: 5. An index of each type of document shall be established and maintained to provide the current status of documents.
: 5. An index of each type of document shall be established and maintained to provide the current status of documents.
VII. CONTROL OF PURCHASED MATERIAL E ULPMENT AND SERVICES QAPO                                                                                                                                                                                   Rev. 29 i ii!i:ii!
VII.
ii!i i!i!i&#xb8;   i!!ili.:ili!!)ii!ii:il)ii!ili!Sii;!!i)!!i
CONTROL OF PURCHASED MATERIAL E ULPMENT AND SERVICES QAPO Rev. 29 i ii ! i :ii!
                                                                                                  ;i!:ii iii iil;iiii!i!!!!
ii! i i!i!i&#xb8;i!!ili.:ili!!)ii!ii:il)ii!ili!Sii;!!i)!!i  
;i!:ii iii iil;iiii!i!!!!
i
i


iii:ii i~i:iiiii:d!i i          i iii       r jelctly       ior throlughlc~ontriactors andl subcontriactor,:s conform tot~iihe i:iiiiiilI
iii:ii i i~ i:iiiii:d!i r
                                                                                                                                                                                                                                              !ii*iiii;*iiiiiiii!*!:*ii
i iii jelctly ior throlughlc~ontriactors andl subcontriactor,:s conform to t~iihe i:iiiiiilI
                                                                                                                                                                                                                                              !!ii*i!iiiiii!iiiiii:iiii%!ii*;i evalu*:*:*
!ii*iiii;*iiiiiiii!*!:*ii
i*ation, q"ua~lif&#xa2;ication,: !*and evaluating*: su PPlier q*Ualit~y pro                                                           *gr*am*s ii.!i:*iiii::!i i f ~iiiiii!
!!ii*i!iiiiii!iiiiii:iiii%!ii*;i evalu*:*:*
The
i*ation, q"ua~lif&#xa2;ication,: !*and evaluating*: su PPlier q*Ualit~y pro  
                                                    !;*!::       QAi~~iiSpeciai
*gr*am*s ii.!i:*iiii::!i The i  
::;!*Ii*ii* st:        E-ngineer is responsible for developing;i:                                         ::              ~li:!
!;*!:: f ~iiiiii!
procedures
QAi~~ii Speciai st:
                                                                                                                                                                                                              *ii::iii:                           I
::;!*Ii*ii*
                  *!i:iiiiili!ii!iiiiiiiiiiii*iii:,
E-ngineer is responsible for developing;i:
                  !!!iii!i!
procedures
iiiiiiii!iii   ii;iiiiiiiiiiiiiiiiiiiiii2iiil ii!iii!i!ili!ii!iiii!i!ii!iii!iiiiiiii ii!i!i ii:and:c itec*hnficial capa'bilities.i*.iiiiii                                                                                                                                       iiiiiiii!liii!iii Cii:C
~li:!  
                                          *ii*:;SSu* nolier
*ii::iii:
                                                      *~ ~ ~iQ   Qualificationi::ii
I
: 1. Q aiiaino upir
*!i:iiiiili!ii!iiiiiiiiiiii*iii:,
                                                                      ** i t*** i::i;::i**!i:!: ~i ~!i:*l                               :!;i: iii:~!:l:iii::i:iii:i:
ii;iiiiiiiiiiiiiiiiiiiiii2iiil
!!!iii!i!
iiiiiiii!iii ii!iii!i!ili!ii!iiii!i!ii!iii!iiiiiiii ii!i!i ii:and:c itec*hnficial capa'bilities.i*.iiiiii Cii:C  
*ii*:;S * *~ ~ ~iQ ** i t*** i::i;::i**!i:!: ~i ~!i:*l
:!;i: ii i:~!:l:iii::i:iii:i:
f:iiii.!ii!i!:i !::
f:iiii.!ii!i!:i !::
il!*i
il !*i  
                                                                                                                                                                                  ~ :::ii:*!i:i*;*
~ :::ii:  
:::*ii::
*!i:i*;*
                                                                                                                                                                                                  ~i.*~i!i:i ii!.                       i:ii!'i i!ii!ii!!ii!iiiii!!!
:::*ii::  
hl               oss fassigps xe                                                                 ience           :
~i.*~i!i:i ii!.
                                          *::i:::::!     wiiih te snUpplieriind:t~iii:;Q
S u nolier Q ualificationi::ii i:ii
:ii*!init                                  sup                     ier'rput~ration. and exp*t er iencosi:                                     th f:::::::::::ie, in                          andi:::i~~:
: 1. Q aiiaino upir hl oss fassigps xe ience  
: : :;:::         up~pliiers iofi c&#xa2;ask 2 .:::*Smaeilsal                        si us~e~dfor sh ipm~ent: :andcl eeauae.oesre*                                                that ithesto rage:   .:d~esign o*f :radioactiveJ a:nd :ifabrication            *:*:*.iii*iii::::
*::i:::::! wiii
f:o~f:
: ii *!init h te snUpplieriind:t~iii:;Q sup ier' rput~ration. and exp* t er iencosi:
*...._--"      ... ::!.i::*;i:::*i:
in th f:::::::::::ie, andi:::i~~:
: *: : i: *;::::',"::*'-:!:'*:i:                                      r       perfored iliacain :i:i~ '~:'*': undrl                    the control of an~ E:                    NRC-approvedi'!il~iii:iiiiii:ii
iiiiiiii!liii!iii i!ii!ii!!ii!iiiii!!!
:*!:: !:'                            andiii~iii:
!'i
                                                                                                                                                                                                                                *:!:!!!!i!
... ::!.i::*;i:::*i:
Source Inspection...............
: *: : i: *;::::',"::*'-:!:'*:i:
0!:;;:~!i:i.l
2.:::*S up~pliiers iofi c&#xa2;ask si us~e~dfor sh ipm~ent: :andcl sto rage: o*f :radioactiveJ *:*:*.iii*iii::::
maeilsal eeauae.oesre* that ithe.:d~esign a:n d :ifabrication f:o~f:
iliacain r perfored undrl
:i:i~ '~:'*':
the control E: :*! ::
of an~
NRC-approvedi'!il~iii:iiiiii:ii andiii~iii:  
*:!:!!!!i!
0!:;;:~!i:i.l Source Inspection...............
: 1. When appropriate, suppliers shall be requested to furnish DPC with sufficient information concerning their manufacturing and inspection plan to permit DPC or their designated agent to plan and implement a source inspection plan.
: 1. When appropriate, suppliers shall be requested to furnish DPC with sufficient information concerning their manufacturing and inspection plan to permit DPC or their designated agent to plan and implement a source inspection plan.
2.We                 prpitiseti!oni                                             plans s:*hfal                 I:nclueitn~
2.We prpitiseti!oni plans s:*hfal t
t                  ii*e~d*ss and: hold i*i~i*:i:~i~i::!                       il*i po!**ii~
I:nclueitn~
i ntsfori     nspec.:* f         :*t*ion of tem        : jjc   , wti**~   tne sin           ofpro ess s o tests,::i*i!~i::ii**i*i*
ii*e~d*ss and hold i*i~i*:i:~i~i::!
ii:: :!*:!::*i:*:i:i                                              auit:. ofii!i!:iiii:
il*i po!**ii~
requiredL       quality~do                um n ato
i ntsfori nspec.:*
                                                                                          .*i*i~::*:::.iii:ii:*ii::.               , nd v:i*:~*:ii:*i i**:i:ii!!l*!i::i*               rii ato      i iii: that~   :ii vendors:*i:!i*:i~i:! hav:i!ii:i~iiieiilii *iii:ii::!iiiii E.l
f
:*t
* ion
: jjc ti**~ ii:: :!*:!::*i:*:i:i of tem, w tne sin ofpro ess s o tests,::i*i!~i::ii**i*i*
auit:.
ofii!i!:iiii:
requiredL quality~.*i*i~::*:::.iii:ii:*ii::. i**:i:ii!!l*!i::i*
:i*:~*:ii:*i i iii:
:ii do um n ato, nd v rii ato that~
vendors:*i:!i*:i~i:! hav:i!ii:i~iiieiilii *iii:ii::!iiiii E.l
: 1. Items shall be examined by appropriately trained staff upon receipt for shipping damage, correctness of identification, and specified quality documentation, in accordance with approved instructions.
: 1. Items shall be examined by appropriately trained staff upon receipt for shipping damage, correctness of identification, and specified quality documentation, in accordance with approved instructions.
: 2. Documentary evidence attesting that items conform to purchase order requirements shall be available at the ISFSI prior to installation or use of the item.
: 2. Documentary evidence attesting that items conform to purchase order requirements shall be available at the ISFSI prior to installation or use of the item.
:. QAii:::i~~*!                   3.iDocumentary eidence!!shall be sul fiienin ode to Idnif                                                                                               that th                         .9!i:ii~*i!!:
:. Q Aii:::i~~*! 3.i Documentary eidence!!
shall be sul fiien in ode to Idnif that th
.9!i:ii~*i!!:


    .:*;:t;*!::.*:!:Y:..;::::;':*:.!*:.}t:i;>:.*;*:::specific r:!eqUirements,- such as codes,. standards,: anid specifications,                                                                                     i:: **:
.:*;:t;*!::.*:!:Y:..;::::;':*:.!*:.}t:i;>:.*;*:::specific r:!eqUirements,- such as codes,. standards,: anid specifications, i::  
    * :.*i: :.! .il:.i, ;;*:ii~:zi:!:
* :.*i: !.il ;;*:ii~:zi:!:
                              ~:ii:: :.*::i:               : *;ican~i n~be.*confir'med :fori thle pur~icha sed item, :This r-ieqU ire~ment !shall: ibe: .i::.ii. .! *:i!:
:. :.i, ~: ii:: :.*::i:
can~i
: *;i n~be.* confir'med :fori thle pur~icha sed item, :This r-ieqU ire~ment !s hall: ibe:.i::.ii..! *:i!:
::"{
::"{
i           :"::-: }:i -.                               sat:isfi ae by:;d umhaving ap~op                                ava fiabe copes ofrin                         the purchase order:and*ii!:.i:i*:           ii~i*:!:!ii:ii-!:.;il*.!:i::i: *'i
i
              ...                          ....                  appropriate...     docum ent referenced..                       .          th*. rein...
:"::-: }:i -.
                                                                                                                                                    ...::.:..        .:      ;i ; *:..*::.;:::::::::::::::::::i:;;::. *;tit:::.:.-:
sat:i sfi ap~op ae
                                  .                  :4!AlIT                   aeils at, n                                         o poet                     il       esgegtduo                                             i
:;d by umhaving ava fiabe copes ofrin the purchase order: and*ii!:.i:i*:
: ::;:;i
ii~i*:!:!ii:ii-!:.;il*.!:i::i:  
          !:;:* :I   ;. :'i:iiLi;i : :]E T                     rFeceip an will       b*;e         place in*:a; receivinginspection hold area*sb                                             EparTe     i;:*ii:~~l
*'i appropriate...
                                                                                                                                                                                                                    *i!ii:!ii;~!i i~:i*
docum ent referenced..
          *:"; 'r*..:.:*'*
th rein...  
                        *:::*:**: :*:m;from:*     *:]:":               sto rage*]:;*4**+:2:"*i**;::iZ::
;i ; *:..*::.;:::::::::::::::::::i:;;::. *;tit:::.:.-:
fa;**::* i +iies:*:;:**:;.*
i
                                                                                  ;::;;::::*                        A fter:       accep
:4!AlIT aeils at, n
:.*:"::" *::** : : tan ce,:
o poet il esgegtduo
                                                                                                                                      *=;::[*             t* *he:' m aterial; will:::::::::::::::
: ::;:;i ;. :'i:ii
:*: =*                          be:*:=identified:*
!: ;:* :I Li;i : :]E T rFece ip an will b*;e place in*: a; receivinginspection hold area* sb EparTe i;:* ii : ~~l  
                                                                                                                                                                                              " :':2:=*****:
*i!ii:!ii;~!i i~ :i*
:-it-a;hs accineptabl iesandplaed insecuifimednts.orag x~;:t;:;..:i;i!.t::i::.:;::::*:*o~*:i:}:                                                                                                                 ie.ntfct~ n;;n                           o~ f::i:i* :*i;: ;::*':=;;
"*:'': *: " 'r* :.:*'*
            ~::ii!;;:i;i!i ii!; 5.i;:iDui~a~rina!eciva~ing inspectin, If ~ non ii::: i;ii~~*:::*                                                                                                                      a s onformanie or di yscrepancy ~ii~;:!ii*i:: iiii:i*i ;:*
:.*:. ;.. *:: :*:** : :* :m ;from:*  
,:*i~i*;:iiii;;
*:]:" :
ii~i;:::!iii
sto rage*]:;*4**+:2:"*i**;::iZ::  
            *:i::i ;;;                               d exists,      i the    :f6material mi:~e i shall        ti:* ;tebe ;f~        placed        on hold in*tajito~;
;**::* +
ityiii*r*gh*:             and w.ill remain;;: usini::aiii:i::.:.
fa i iies:*:;:**:;.*
A fter:
:.*:"::" *::** *=;::[*
accep tan ce,: :* : =* * * : '
t he m aterial; w ill:::::::::::::::
be identified:*
:* := " :':2:=
x~;:t;:;..:i;i!.t::i::.:;::::*:*o~*:i:}:
:-it-a;hs accineptabl iesandplaed insecuifimednts.orag ie.ntfct~ n;;n o~ f::i:i* :* i;: ;::*':=;;
ii::: i;ii~~*:::*
~::ii!;;:i;i!i ii!;
5.i;:i Dui~a~rina!eciva~ing inspectin, ~
If a s non onformanie or di yscrepancy ~ii~;:!ii*i:: iiii:i*i ;:*
, ii~i;:::!iii :i ;;;
:*i~i*;:iiii;;  
* :i:
exists, the material shall be placed on hold and w.ill remain d
ini a i
hold
hold
                                                                                                                                                                                                        ;il:iii!i:i:i
:f6 mi :~e i ti:* ; te ;f~ ityiii*r*gh*: in*tajito~; ;;: us :: iii :i::.:.
                                                                                                                                                                                                                !ii!i~i:*!;;;~iii
;i l:iii!i:i:i  
                                                                                                                                                                                                                                ~~i *.
!i i! i i ~i:*!;;  
,,:~i;i
;~iii  
    *~ii;:::i:;:
~~i *.
:i;:i.::;;:i!i:i!i:i
,, :~i;i
::*:*!!: .                                         statuii:i suntil final,            disp
:i;:i.::;;:i!i:i!i:i  
::i::,i!!::::iii:!:i:i&#xa2;;:i&#xa2;   !i::iii::o::sitioni
*~ii;:::i:;:
                                                                                      -;i:i!:.i~.;.:;:::ii:;     .i:?:!i;i:!. is di.eterm ii::*!::: :i!i:;:*
sta tu su n til final, d isp o sitioni is d eterm in ed..i A: co rrective:! action.
:::!:.:in
ii:i
                                                                                                                                              .::i
::i::,i!!::::iii:!:i:i&#xa2;;:i&#xa2;  
                                                                                                                                                !:: ed..i
-;i:i!:.i~.;.:;:::ii:;  
:i:::i:i::i;:; A: corrective:!action.
!i::iii:: ::.i :?:! i; i:!.
:ii!;;i:::
ii: :*!:::
i*!:;*:::.i- :::*!  *: .:i*:::;:;i ii;i!i!:* ::;document:*:: *:.*!i;:::T e             shc~*all: beinitiatell:b~e~bihn* th*oe~l rq iie e:si:*:!                                                                                   *!,i:::::i
: i. :i!i:;:*  
  ...-../ITS                                                     mateial,.par., and c                                   mpoeteasb a o tsed                      ntheponentssyste m                       -. ,:            :::
.::i !::
. ..;;::;):i::::::ii::*:
: :i:::i:i::i;:;
          !::; :i:?:i}:;:.:*idesignat:iiil iii*:i?:i.i :         i on, fromi!::r6       rece.:i~*;u~
: ii! ; ;i:::
ip:!n t aiti theb*fai ity~e: throughidbnstallation or u~ste                                 .ti~i: .i! !:ii*;*
i* !:;*:::.i *:.:i*:::;:;i  
                * .* .::-...; t;!                               for3t;;:;
- :::*! ii;i!i!:* ::;document:*::  
hesi~a:;dentificati.on                 and controlc                   fa t~~iderias pabrtshandicomponents~h;"i;.
*:.*!i;:::T e shc~*all: be initiatell:b~e~bihn* th*oe~l rq iie e:si:*:! *!, i:
    '::::;"""; " .i: .!i.: ::} from recemm:ip){nt                                     th oug istall~oq:atio n goruse and/ort e v::.tran!;ielop                                       t0:ingpro icdures .}:::;!:;:.;;:.
::::i
 
... -../ITS mateial,.par.,
:*:7*:{**:::,: documentation.: I::dentific~ation *Shall: be either: o n the: item o r !recor~ds:i.
and c mpoeteasb a tsed o n theponentssyste m  
...;;::;):i::::::ii::*:  
!::; :i:?:i}:;:.:*idesignat:iiil iii*:i?:i.i :
i on, fromi!::r6 rece.:i~*;u~
ip:!n t aiti theb* fai ity~e: through idbnstallation or u~ste  
.ti~i:  
.i! !:ii*;*
t;!
for3 t;;:;
hesi~a:;dentificati.on and controlc f a t~~iderias pabrtshandicomponents~h;"i;.
:::: " ".i:.!i.:
from
::}
recemm:ip){nt th oug istall~oq:atio n goruse and/ort e
v::.tran!;ielop t0:ing pro icdures.} :::;!:;:.;;:.
:*: 7*:{**:::,:
documentation.: I::dentific~ation *Shall: be either: o n the: item o r !recor~ds:i.
{ :::::::i:::!)::
{ :::::::i:::!)::
:!::} i :traceable ito :the :.:item.iWhe re~plhysical. ide ntification .is*im practicali*:-.:iI :::
:!::} i :traceable ito :the :.:item. iWhe re~plhysical. ide ntification.is *im practicali*:-.:iI :: :
                                                          * :::..:.!/i{.
:::..:.!/i{. :i.:-:physicalisepa rationi~, /procedu*Jral 'cont~r.ol, :or other. approbpriate :means :i"i iii
iii
_:...- :.:/ -
:i.:-:physicalisepa rationi~, /procedu*Jral 'cont~r.ol, :or other. approbpriate :means :i"i
IX.
                                                                                                                                                                                                                                                .......                        _: ...- :.:/ -
CONTROL OF SPECIAL PROCESSES
IX.                 CONTROL OF SPECIAL PROCESSES
::A.i:
::A.i:     Gene~ral::
Gene~ral::
                                                                                                                                                                                                                                                            ..i.:::
.. i.:::
:i*i-:,,  :,,:,i:::}, ::: : "
This secti~o n es ta blishes, the:: m easurbes.to" assurie* s p ecial :proce~sses,.iii} :i*i::i)i:;. ii{:i*
This secti~o n es tablishes, the:: m easurbes .to"assurie* s pecial :proce~sses,.iii} :i*i::i)i:;. ii{:i*
id::i~:.*:i::iientified as I.lSFSi.ITi S,. a*:re c*ontrolled and ~accomplished byZ iqualifie~d*:ii;!.-:;i:: K:-ii~~:*:*..i~ii:
                                                      * .! :":... id::i~:.*:i::iientified as I.lSFSi .ITiS,. a*:re c*ontrolled and ~accomplished byZ iqualifie~d*:ii;!.-:;i::K:-ii~~:*:*..i~ii:
.i:}:::.
i:ii.}:iiip.;erison~nel iusing q:..ualiified ~procedue-i.s} in accordance. with:*i":i
i:ii.}:iiip.;er ison~nel iusing q:..ualiified ~procedue-i.s} in accordance. with:*i":i apicable cei*-as,7:*.! iiii:{: ~i st.eand nards n, sefiatinscriterieaioto and  
                                                      .i:}:::.                                                                                                                                                      apicable cei*-as,7:*.! iiii:{: ~i st.eand                 sefiatinscriterieaioto nards     n,                                                       and     ~oth         spcalsreuirementsrane.:"":
~oth r spcalsreuirementsrane.:"": ::.;::.:
r                                                  ::.;::.:
S  
S - -1. ThreOPO stafddfisresonsibeWor establising                                                                               S~capro~cedrs that d~esrib:*ed::;:-i:i
-1.
                                                      --: :.:..::.:.:. ::how p:q~Ja~fersonel a~ndpoedures                                     n           aorane w~tqualifiedfosijecalprcessres;::*:{.:.}!/:*}.:::*::*:*i*:E:
ThreOPO stafddf is resonsibeWor establising S~capro~cedrs that d~esrib:*ed::;:-i:i
K:!:.. K.:!!}*:~"**:.i.i]
--: :.:..::.:.:. ::how p:q~Ja~fersonel a~ndpoedures n
2:.:.:The QAi         Speiaist I g:e.in                   En:*  ::eer       oisrbe*:f)r.:asponsibne for rev*u~iewing o~i~ifi: :*::i !i [. :*:
aorane w~tqualifiedfosijecalprcessres;::*:{.:.}!/:*}.:::*::*:*i*:E:
* : ';' 7:::>,:.:>.**::
K:!:..
K.:!!}*:~"**:.i.i]
2:. The QAi Speiaist I En:*
g:e.in
::eer oisrbe*:f)r.:asponsibne for rev*u~iewing o~i~ifi: :*:: i !i [. :*:
:*-i{:i*}!
:*-i{:i*}!
:.:                    repa:!iii-:!ersand mdii.*h             0cedtion w eork                   nvling specal prcessife~s: :..is perform.;;iiil.::-.:::.:*{:iied                             *
repa:!iii-:!ersand mdii.*h 0cedtion w eork nvling specal prcessife~s : :..is perform.;;iiil.::-.:::.:*{:iied
:":i:.!i.
:":i:.!i.  
                                                              -i::.!-:::-           byi:!qualc:ifsi~ed       proniunde                             acntildcord         nce           ithiqualiie:a           prceduresi~.-*:~ .:-::
-i::.!-:::-
6da                                    .:..-:
byi:!
                          *i!:;*:iiii!-!:ii!:i
qualc:ifsi~ed proniunde acntildcord nce ithiqualiie:a 6da prceduresi~.-*:~.:-::  
                                                      .... : :.:...: ... using: qualified personnel :and :procedur~es. iQualification of..personnel:.i.: !.
.... : :.:...:... using: qualified personnel :and :procedur~es. iQualification of..personnel:.i.: !.
                                                        .":i.iii:i.:
:i.iii:i.: i.:/::*!..::*ard*st.n~dproc durs:!:*!::*:*!::
: i.:/::*!..::*ard*st.n~dproc durs:!:*!::*:*!::           shall com          .: ply::::::::::::::::::::::!:!*i with the req}{i .irements!:*.                       of! appl:":
shall.:
i cable.:.:/::   codes!:*::!:::{.!:i:.
com ply::::::::::::::::::::::!:!*i with the  
                                                                                                                                                                                                                                              .":}.::.
}{i.
::::{i:::i2.**: Wi:eiderSiand welding iprocedu~res: s hall:* be:q ualifi ed,-i as approi:pria*te,:: :in~i:;:::i:!i:*
req irem ents!:*.
  .{!::if-:: :---..: . t: }: .!.: {i : .:.:*.":*: -: :i ":i&#xb8;*:           :i :: :i::::iaccordance: w*ith iSection iX o:*f the ASME Boiler :and Pressure :Ves~sel::*;:*:!!~i ii!iiiii{,,iii*i
of! appl:":
    ......ii::i:!::i:i!i:iiii*i'"'i:'!::*ii;!*
i cable.:.:/::
                                      *. *.........:,V ::i:!*
codes!:*::!:::{.!:i:.  
  *::*:*.:::.:: ::.i:i*i*::
.":}.::.
:i*i-:,,
:,, :, i:::}, ::: : "
* : ';' 7:: :>,:.:>.* *::
*i!:;*:iiii!-!:ii!:i ii!iiiii{,,iii*i
.{!::if-::::---..::..t::}::.!.::{ii::.:.:*.":*::-:::ii":i&#xb8;*:
ii::i:!::i:i!i:iiii*i'"'i:'!::*ii;!*  
*. *......... :,V ::i:!*
::.i:i*i*::
i*i.::::.*!:i!.:!i.::::.i.:.*.;....
i*i.::::.*!:i!.:!i.::::.i.:.*.;....
:'.*:.:i:i:
:'.*:.:i:i:  
                                                            .i*i:.:,
.i*i:.:,
:i:*i.:::: accor*.dance
-..:, ""{. %.. "" :.:'
: :.                     w.:ithi:thhe Amer*ican :Society ifor .Non-destr*uctive :Testin~g:*!:::**::: .*;:
::,.'.{:", ::i:: ".: }".' : / ":
4.: Procedures shall, be established. to describe !themethod. used to control." ::
:!}:': 'i: "(::'4.:::;/" ":: :::'.*:A:*ai:*l-:t*,
4
:/...::!....> :!,:.:/:.....,# /.: ::: :::: :,
                                                                              " the receipt, storage, baking, drying, and disbursal of welding filler ..
::::{i:::i2.**:
i:::," /:*::,' ,,::/-'
Wi:eiderSiand welding iprocedu~res: s hall:* be:q ualifi ed,-i as approi:pria*te,:: :in~i:;:::i:!i:*
  * * ,":        -..:, ""{. %.."" :.:'            :      ""
:i :: :i::::iaccordance: w*ith iSection iX o:*f the ASME Boiler :and Pressure :Ves~sel::*;:*:!!~i
caibatdmaintained,":stored, :handled, -and :Issued :in .accor'dance with
:i ::: : :.
                                                                          '. :,.....applicable   ..        procedures orinstructions..-..........- ".-,...                                                             .:"'/!.....}'i.:.. ": "r ii:ii
:*i.: accor*.dance w.:ithi:thhe Amer*ican :Society ifor.Non-destr*uctive :Testin~g:*!:::**:::.*;:
  '      ::,.'.{:", ::i:: " .: }".' : / ":
4.: 4 Procedures shall, be established. to describe !the method. used to control." ::
:!}:': 'i: "(::'4.:::;/" ":::::'.*:A:*ai:*l-:t*,
" the receipt, storage, baking, drying, and disbursal of welding filler..
                                                                                                      .....;i*S
caibatdmaintained,":stored, :handled, -and :Issued :in.accor'dance with applicable procedures orinstructions..-..........- ".-,...  
                                                                                                        ;i'iii
.:"'/!.....}'i.:..  
                                                                                                            ..}*:i:ii~
": "r
                                                                                                                ;"*:;::i;i.
....;i'iii
i;i!;::i)
} *:i:ii~
                                                                                                                            .i:I*..
i;i!;::i) i:I*..  
                                                                                                                            '*'i :......:.
.;i*S ;"*:;::i;i..'*'i ll::*.
ll::*.
::::::::::::::::> 1 * : :
                                                                                                                                          ..:.....: 1*..: .: .. :.        i:::i::!*;ii*:
i:::i::!*;ii*: :Si.
                                                                                                                                                                              . . :.:Si.  ::: ; ..":.:.. :...::.:
R e v. 2 9:-
::::::" :"*:::"*      . .*R
: :,......*...***2... -..
                                                                                                                                                                                                                            ,.. ..*:*:"": ev. 29:-.. -..
i:: :," /:*::,',,::/-'ii: ii
                                                                                                                                                                                                                                          ***2.
: i.
:/...::!....> :!,:.:/: .. ...,# /.:::: :::::,                                                                                                                                                                                                                  .,. ., .. .        . , . .. . . .
:i
 
-i-  
                                                                                                                    -i-   -- ':;" " ' ' ':,': "i.":; -- ,:-- -:'       , "+ : ,': "", : "     -:' * '": :":'"; :' *':',::'. :. *'-.'i:ii'.:,', .':'. i:' ,.. , ::
-- ':;" " ' ' ':,': "i.":; --,:-- -:'  
                                                                                                                                                                                                                                                                      !:i:*i*i*!*i*:-:
, "+ :,': "", : "
: i.           :i                                                                                                                          S!ii                                  :, ,,, .. ..                        :,:-,:,:::.::- :, .. ::,,, ,::: , ,i!
S!ii
" -:' * '" : :":'"; :' * ':', ::'. :. *'-.'i :ii'.:, ',.':'. i:',.., ::
:,.. ::,,,,:::,,i!
!:i:*i*i*!*i*:-:
X.INSPECTION:
X.INSPECTION:
A.* General This section establishes a program for inspection of ISFSi activities to verify conformance with approved procedures, drawings, and specifications.
A.* General This section establishes a program for inspection of ISFSi activities to verify conformance with approved procedures, drawings, and specifications.
B* Responsibilities ii;.! ::;i:i;;i-i;::;:;:.r.i:.equir~ements ::ar~e :inClu ded:i n engineering;,specifications, alndi reviews *of.:::ii
* Responsibilities B
                                    ;ii.;. :i*-;-:.any
ii;.! ::;i:i;;i-i;::;:;:.r.i:.equir~ements ::ar~e :inClu ded:i n engineering;,specifications, alndi reviews *of.:::ii
* in~sp ection **pr~oce d Ures!: imp lemrne nting this Section. arecom p leted*:!:: . .*:!i.
;ii.;. :i*-;-:.any in~sp ection **pr~oce d Ures!: imp lemrne nti ng this Section. arecom p leted*:!::.
                                    . .~     ::;:! :T~he QAi Spec~iali:st I,Engi neer i~is;!:
.*:!i.
                                          *.2;.i:                                                                                reponisbleI for esta*bliishing ;inspection :!il.I
..~ ::;:!  
                                  .:i :.::i.i i!:: :.;;*proceduries and iassurin g adeq uate. ;inspection: req uir~em ents arie!:;:;; :::;!::i :;i:: ~*!.i.
*.2;.i: :T~he QAi Spec~iali:st I, Engi neer i~is;!:
                                  .: *****iincluded in procedures. They areualso responsiblrese                                                                         sibe,:frl     forcoordienatingi c o!;dnilt n *~th                           theo  e;::*:::*. :
reponisbleI for esta*bliishing ;inspection :!il.I
                                  ":;:~ii".,          assignments:         t ofsgnme  qualifiedfie isinspection personnel.                                                       : *:i:i ".i. i.:*!:*!::Y::i -:;;i~                               :-: :-*:.i :
.:i :.::i.i i!:: :.;;*proceduries and iass urin g adeq uate. ;inspection: req uir~em ents arie!:;:;; :::;!::i :;i:: ~*!.i.
    * ..:i..:..;:;::.:;.:..
.: *****iincluded in procedures. They areu also responsiblrese forcoordienatingi theo sibe,:frl c o!;dnilt n *~th e;::*:::*. :
:. :3-*.:                       The/.":.:"..:.
:~ii assignments: ofsgnme t
ISF :i:""-::::,:
qualifiedfie isinspection personnel.
: i. :i;i:?.?.        Manage I :,;,*:,:           shall::i.:,,::;:..i-,
: *:i:i ".i. i.:*!:*!::Y::i -:;;i~
be eson .. .::,ibe for ,approv,:,                                   ,ing,,- ..ISESI,             .inspecti .i:::.~..:,.:..::::::,. on.*
:-: :-*:.i :
      ;; ! ;i:;;;i::i:~i;
*..:i..:..;:;::.:;.:..
::i:}:*i;::*i ;               proci3::;iT e duresFor        a!insrcionsa nd-*shall ens ure suf~f~                                                 i c:*ient ;Inspect;ions are~i~!;!J
:. :3-*.:
::.;:*ii
The/.":.:"..:.
:!.:..~i-:.:.;!:
: i. :i;i:?.?. :i:""-::::,:
              ;;i!:ii: :*:!performed.         -                            to provide               adequate
ISF I :,;,*:,:
                                                                                            !::.ii-;:"::."./.;::::             confidence
Manage shall::i.:,,::;:..i-,
::ii*:::;*.i~::.:.;     ::::.:           that
be eson ibe for,approv,:,  
::;::;![-S:i*.:.:         project activities
,ing,,-..ISESI,  
                                                                                                                                                                    ;i:::::*?:;;::;**:**;;::i:;;;                                 meet;:~i:*-i::;:
.inspecti on.*
:':::;::i*::;;i;?:*:i:;:*;;;;.;::           : :::~i.     ::*: ;;
.i:::.~..:,.:..::::::,.
:;i:p :e :*!i::in redeterm:i:ed reiqui':*:
;; ! ;i ;i::i:~i;
:l:;:ii*!*:i:i*;**:;                                                                        reme;!;n!'     ts.*;l***:~i' i::;/ *i*;*;i:i;;il*:!!i;*:: *i:*
: ;; ::i:}:*i;::*i ;
                                                                                                                                .i:::;i:i*i!::::;:'i                i:*iii:!!!:;;**::!ii;ii'':!: ;iii*:: *:*: :;: *;~;'ij:*;i*!*!!!;: *;:               i*:i':*:;i***i*!i;
proci3::;iT e duresF or a!insrcions a nd-* shall ens ure suf~f~
i c:*ient ;Inspect;ions are~i~ !;!J
::.;:*ii ;;i!:ii:
: !.:..~i-:.:.;!: :*:!performed.
to provide adequate confidence that project activities meet;:~i:*-i::;:
!::.ii-;:"::."./.;:::: ::ii*:::;*.i~::.:.; ::::.:
::;::;![-S:i*.:.: ;i:::::*?:;;::;**:**;;::i:;;; :':::;::i*::;;i;?:*:i:;:*;;;;.;:: : :::~i.
: l : ;:ii*!*:i:i*;**:;
:; i:p re d e te rm:i:
:e :* !i: :in e d re qui':*:
i re m e n ts.
.i:::;i:i*i!::::;:'i
;!; !' *;l***:~i' i ::; / *i*;*;i:i;;il*:!!i;*:: *i:*
i:*iii:!!!:;;**::!ii;ii'':!: ;iii*:: *:*:::;::*;~;'ij:*;i*!*!!!;: *;: i*:i':*:;i***i*!i;
.i*:::i;.;ii: to..?
tpbe e;*stabl!i.shed.: Plannin:g activities shall. identify :the ~char!acteristicis:
;!l*.
::.:!i.:i:*l:
i!:.ii;accePltanice cicteraia, a~d the o:ibrganization r.iiesponsi!ble :for:performing~i.:: :. i
:i:;:;.*"i:,*
.. :inspectin~g of, an activity. beforie proce~eding, shall be in;:idicated in ithiei:;;:ii..::;:
:.i.i;i;.:.:i;:i
;-:appro*prijateprocedure, specification, ior :.work :order. Ti;;;he: inspect{ion:.~:;..}.:::::;::
.i::i:::;shall :be documnented, to indicate approvali and rel~ease: p~rior to
....: -:- / :
. ;i,.. continu~atio n iof the actvi ty. i.
.. i.,...
-,,,ii;-i;i:;ii;
:i*.:,:,li
:-:/::
:-:/::
                                      .i*:::i;.;ii:  to..?
iiI
tpbe e;*stabl!i.shed.: Plannin:g activities shall. identify :the ~char!acteristicis: ;!l*.
i!:.ii;accePltanice cicteraia, a~d the o:ibrganization r.iiesponsi!ble :for:performing~i.:: : . i
::.:!i.:i:*l:
                                                  .. :inspectin~g of, an activity. beforie proce~eding, shall be in;:idicated inithiei:;;:ii..::;:
:i:;:;.*"i:,*
                                                ;-:appro*prijateprocedure, specification, ior :.work :order. Ti;;;he: inspect{ion:.~:;..}.:::::;::
:.i.i;i;.:.:i;:i
                                      .i::i:::;shall :be documnented, to indicate approvali and rel~ease: p~rior to ....: -:- / :
                                      . ;i , .. continu~atio n iof the actvi ty . i.                                                  . . i., .. . ,:,,.; . ;:, -,,,ii;-i;i:;ii; :i*.:,:,li                                                                                            iiI
* by:cOm*panyi yipersonn eli or con:tractorii.pleriso0nn el,: ian~dii sh alli requir~ei t hat.:i"i.!:*; ::*i*i:*:::::.!
:*;*i;:...ii::iii*;:i::i::.i:-i::"
:*;*i;:...ii::iii*;:i::i::.i:-i::"
by:cOm*panyi yipersonn eli o r con:tractor ii.pleriso0nn el, : ian~dii sh alli requir~ei t hat.:i"i.!:*; ::*i*i:*:::::.!
:ii:.i:;:*:.:.;..;?.:;!i:;nspection *proced ures ;and :*inOstruc&#xa2;tion~s, alo!ng w.ith n*ecess:ar!y dra~lng s,il.!i~i~;.:jj::::.::ii~..
:ii:.i:;:*:.:.;..;?.:;!i:;nspection *proced ures ;and :*inOstruc&#xa2;tion~s, alo!ng w.ith n*ecess:ar!y dra~lng s,il.!i~i~;.:jj::::.::ii~..
...:: i::i~~ii/:::*;i; i!* ~-*:;*~il:i               5.ii:
...:: i::i~~ii/:::*;i; i!* ~-*:;*~il:i 5.ii:
:Insp. e ct*ionre uiemet       hai eint goverdning modificatieorgns, r ;epairs                                                                               an id i; :.....:.*
:Insp.
replae     : ment;shalli:               be
e ct*ionre uiemet hai eint goverdning modificatieorgns, r epairs an id i; :.....:.*
                                                                                    ;-i.;i:;.."           acc , .inrdanc with:.the,....                             origi:.:.
replae m ent; shalli:  
i nal des;;...         ..i gni             and.*.
;-i.;i:;.."
                                                                                                                                                                                                              .. ;;;;i.:/!*::;;;.:
be
inspctio               requirements::,               or., as amended.:                     ,     by approved chne                                                   to the, QAPD.......                                                   ;!;*!iiii;i!i*i:!;i*
,.in acc rdanc with:. the,....
                                                                                *!i*i!*       i!i;::i*
origi:.:.
i!i*i:!i:*:iil*  ***ii*i&#xb8;
i nal des;;...
:i 18                                                                                                                        Rev. 29:"
i gni and.*.  
Revi:i29
;;;;i.:/!*::;;;.:
::::*::i.i-ii::*.:     :. ::./i:::!.
inspctio requirements::,
or., as amended.:,
by approved chne to the, QAPD.......
18 Rev. 29
*!i*i!*
i! i*i:!i:*:iil*
:i
;!;*!iiii;i!i*i:!;i*
i!i;::i*  
* **ii*i&#xb8; Revi:i29 :"
::::*::i.i-ii::*.:
:. ::./i:::!.


section establishes the requirements for an ISFSI test program to demonstrate that ITS SSCs will perform satisfactorily in service. The test program shalt include, but not be limited to.surveitlance testing, special tests, post maintenance testing, and testing following ISFSI modification o significant changes in procedures.
section establishes the requirements for an ISFSI test program to demonstrate that ITS SSCs will perform satisfactorily in service. The test program shalt include, but not be limited to.surveitlance testing, special tests, post maintenance testing, and testing following ISFSI modification o significant changes in procedures.
Line 2,674: Line 3,727:
procedures or instructions.
procedures or instructions.
: 3. The Qualified Technical Reviewer is responsible for review of all ITS proposed test procedures, special testing procedures, performance testing procedures following ISFSI modification and performing 10 CFR 72~48 evalu~tion~ to verify that ISFSI tests do not require prior NRC~
: 3. The Qualified Technical Reviewer is responsible for review of all ITS proposed test procedures, special testing procedures, performance testing procedures following ISFSI modification and performing 10 CFR 72~48 evalu~tion~ to verify that ISFSI tests do not require prior NRC~
approval.                  .
approval.
C. Requirements
C. Requirements
: 1. A program shall be established to assure all testing required to demonstrate that ITS SSCs will perform satisfactorily in service is, Identified and documented.
: 1. A program shall be established to assure all testing required to demonstrate that ITS SSCs will perform satisfactorily in service is, Identified and documented.
Line 2,680: Line 3,733:
: 3. Test procedures shall incorporate, but not be limited to, requirements for such items as: hold points, witness points, caution notes,.
: 3. Test procedures shall incorporate, but not be limited to, requirements for such items as: hold points, witness points, caution notes,.
emergency reqLirements, and test jumper logs.
emergency reqLirements, and test jumper logs.
: 4. that:
: 4. Test procedures shall Include, as a minimum, provisions for assuring that:
Test procedures shall Include, as a minimum, provisions for assuring
: a. Prerequisites have been completed that include, as a minimum:
: a. Prerequisites have been completed that include, as a minimum:
: 1) Control of systems status as necessary.
: 1) Control of systems status as necessary.
Line 2,688: Line 3,740:
: c. Test results are documented.
: c. Test results are documented.
: d. Detailed instructions for performing the test are included.
: d. Detailed instructions for performing the test are included.
APD                                                                           Rev. 2
APD Rev. 2


i*:: .:'::.:::::*:*:*i::::*i:
i*::.:'::.:::::*:*:*i::::*i:  
                                                    .i*:-*,::::*!.:i*:
.i*:-*,::::*!.:i*: :i! ::!!
:i! ::!! i                               .,i:ii*!*
i
                                                                                                                                    !ii:ii!::ii*:          i: ii*i:..:,*,:i,:*!:;:i:!!*::::i*ii*ii;:**
.,i:ii*!*  
! ii:ii!::ii*:
:::*:*!ii*:;::iii
:::*:*!ii*:;::iii
:*!*i!::*:                                 :*:*,i*:!*:*!
:*!*i!::*:
:ii*!*ili*i:i!iI ili:!i i*i:i L!     :ii:iii!i!:
i:
iii !*'::!i e-.:i:l Test !results ar~e reviewed a nd :approve~d:.:
ii*i:..:,*,:i,:*!:;:i:!!*::::i*ii*ii;:**
cond::
:*:*,i*:!*:*!
                                                          .*:0uc~tin:g:the                       *:test, tihe:.data recorder:, the:: type:-of. observ9ation :made,:: ::
:ii*!*ili*i:i!iI ili L!
:.:...:the :equipment .used,. the test re~sults, :the acceptability of.the :test;::..;;.:
e-.:i:l Test !res ults ar~e reviewed a nd :approve~d:.:
r iesults,           .anid approved :dispositio*n for an~y deviaJtions::. :.*:.-;.:":.i":*:::::,
:!i i*i:i
::::::::::::::::::::::::::::    cr:::;
:ii:iii!i!:
ii i !*'::!i cond::  
.*:0uc~tin:g:the *:test, tihe :.data recorder:, the:: type:-of. observ9ation :made,:: ::
:.:...:the :equipment.used,. the test re~sults, :the acceptability of. the :test;::..;;.:
r iesults,.anid approved :dispositio*n for an~y deviaJtions::.
:.*:.-;.:":.i":*:::::,
cr:::;
iti::ieria :shall :be p:roperliy n:ot~ed :andl appropriate &#xa2;orrie~ctive a~ction tak*:ienii:::.i:
iti::ieria :shall :be p:roperliy n:ot~ed :andl appropriate &#xa2;orrie~ctive a~ction tak*:ienii:::.i:
XiII.           C:!!i*ONT OL:OF .MEASURI:NG AND TEST EQUp:IPMENT..: :;;-i!!i-:::*::~i: ::ii::.:;:i::*:!:: **iiiilii ii::!;::.:;::::i!iic:*,on*tr
XiII.
                                  ;:-                            ol,* :calib~rati on,:: andl p:)eri~o~d ic adjuistmient:; of :tools, *gau[g~es,;*: inst rum~ents,*::.* ::
C:!!i*ONT OL:OF.MEASURI:NG AND TEST EQUp:IPMENT..: :;;-i!!i-:::*::~i: ::ii::.:;:i::*:!:: ** iiiilii ii ;:-
                            ':.:.."!:::':,::~i:!a::*ndl othe r measurinirg :an~d:test!eq uipment-used, to verify confo rma nce ~toi .::.:-: .:
::!;::.:;::::i!iic:*,on*tr ol,* :calib~rati on,:: andl p:)eri~o~d ic adjuistmient:; of :tools, *gau[g~es,;*: in st rum~ents,*::.* ::
::: : : " established :iSFSI tec:hnical requlremients ".....                                                                       "."::..... .... ':'""-;
':.:.."!:::':,::~i:!a::*ndl othe r me asurinirg :an~d:test!eq uipment-used, to verify confo rma nce ~toi.::.:-:.:
B.           R es o s b i~ es :,!::: :"::" :"::. . .. "::onsib""il...:":ities'::" :::."":: :::::::i!!i.i:.i::. :::::::::::::
::: : : " established :iSFSI tec:hnical requlremients ".....
1...The DPC staff is rsponsible for establishing requremet for a .
B.
                                      .-:::::.... ; .... program :for.-the Econttrol, calibrat*ion,: and periodc ~:adjustment. of itoolSi::.
R es o s b i~ es :,!::: :"::" :"::.... "::onsib""il...:":ities'::" :::."":: :::::::i!!i.i:.i::. :::::::::::::
*..*.*:....*i*i::i!*:* :*:::.*:
1...The DPC staff is rsponsible for establishing requremet for a
:::::.. ;.... program :for.-the Econttrol, calibrat*ion,: and periodc ~:adjustment. of itoolSi::.
:*:::i!:*;::::ii
:*:::i!:*;::::ii
::::!.: *:en*suriingg:tool s, g auge s:;, instr umen ts,* andCothe r *m easurin g :anrd :test:.::. i
::::!.: *:en*suriing g:tool s, g auge s:;, instr umen ts,* and Cothe r *m easurin g :anrd : test:.::. i
                                      !*i-,:::.:**::!*.:::***::*::eq:uipmet               a:*re calibrated to a:s~sure co*:mp:iai*nce with *t~he imnplementing::*:;
!*i-,:::.:**::!*.:::***::*::eq:uipmet a:*re calibrated to a:s~sure co*:mp:iai*nce with *t~he imnplementing::*:;
*..*.*:....*i*i::i!*:* :*:::.*:::- .::::i*:::     ;3*:. T;*he~I:SF:SI!: Manag:errIsi ;resp)onsible for ensuriing iim~plement~ation*of the.i.*:;
::-.::::i*:::  
                                            .. :...: -!req uirements :of this sectioni:of ;the manual "for.ISFSI ::activities andrfor:..:;.
;3*:. T;*he~I:SF:SI!: Manag:er rIsi ;resp)onsible for ensuriing iim~plement~ation *of the.i.*:;
: *;                      aprovig I:SIprocdurs o insrucion ......                                                                       .    *:*i*i:i::;*::::    :      ::::::::::
:.::.-'.. -!req uirements :of this sectioni:of ;the manual "for. ISFSI ::activities andrfor:..:;.
: * ::::i *           .. -.*:* * *: : *:* i i*!***~!:/; ::::::::::::- :: . : : * : :- ! i:i !*::*;*:: Ji :.:; *: :: ::!; :;::: ~: ::*: :i :***::!: :.**i:::   :: .:.:!i *,:: :*::*::
aprovig I:SIprocdurs o insrucion......  
*:*i*i:i::;*::::
: * ::::i *  
...*:* * *: : *:* i i*!***~!:/ ; ::::::::::::-
: * : :- ! i:i !*::*; *:: Ji :.:; *: :: ::!; :;::: ~: ::*: :i :***::!: :.**i:::
::.:.:!i *,:: :*::*::
iili ill:i!
iili ill:i!
            * .. :*- "  . ,*,..    .*,,..:....I'*
i::ii:: :ii.!:
                                        , ,*H..                  UI[*III*li-         ".;:'..- :
i* iii:*.*
i::ii:: :ii.!:  i*iii:*.*1:.*:,*Insp'e~ctio'n, *::t~est, aind iwor p:ro:edure;s shall include pro*:!*ivision t:!:o!**: ::::i :!:
.*,,..:....I'*
::*:!:-.a.nd. t~est eqi p m~enrti an d: idev*i:e s :used: in :a::cti:vitieS affecting*: qu~ality::ar~e of:
UI[*III*li- ".;:'..- :
                                                                  *:t h~e .*pbrope :range
,*H.. 1 :. *:,*Insp'e~ctio'n, *::t~est, aind iwor p:ro:edure;s shall include pro*:!*ivision t:!:o!**: ::::i :!:
                                                                  *::::::::                                gb~tY pe,: and .!accu: rac(yi.{to ve rify !c~onhformanceb; to::*:** :"i:":.*
*: ! : a.n d. t~est eqi p m~enrti an d: idev*i:e s :u sed: in : a::cti:vi ti e S affecting*: qu~ality::ar~e of:  
established requirementseandm                                testan   parameters.e~i*;*:;* :::* :::.*;:.;;.*::;i..::::::!:::;i::::* :.*:il*
*:t h~e.*pbrope
E::::.:.:*.:equipment shall be.:.::                                                     controlled, calibrated, adjustedecl                           and maintained.........
:range gb~tY pe,: and.!accu: rac(yi.{ to ve rify !c~onhformanceb; to::*:** :"i:":.*
                                  .::.:.                       :period~ically,-o~r :pr{ior to :use.? Calibratio~ns are performned againSti!:;::"::::
established requirementse andm testan parameters.e~i*;*:;*
                        * - -:"- "                            -certified :measur~ement standards that,.are traceable-:to. nationally*::::,.:* ...
:::* :::.*;:.;;.*::;i..::::::!:::;i::::*
:. :                        ~recognrized standards. Where, national::standards do: not :exist, ================:
:.*:il*
                          * . ::. i-                 .,provision~s will :be established to dc~ument .the.basis for-calibration.:;.**Ei:*..::
E::::.:.:*.:equipment shall be.:.::
ii'
controlled, calibrated, adjustedecl and maintained.........
                        ... .::.    .. :::                    .:Contr~ol.m~easures :and, p~rocedures :shall: prevent the use o:f calibrated::.-*..:
::-.:-:.-....... :period~ically,-o~r :pr{ior to :use.? Calibratio~ns are performned againSti!:;::"::::
::=======================           un=
-certified :measur~ement standards that,.are traceable-:to. nationally*::::,.:*...
::*:auth*orizedi                     personnel. Special cialibration1.an~d controi :m~easures :ar*ei::
~recognrized standards. Where, national::standards do: not :exist,================:
                        * :.":-: ..-:::  ::;:!. :!. no.ii0t; required for d~evices when nhormal: commercial. practic~es provi~de:.i.:..--:.
*. i-  
:: i:*a de q ua te :ac c u ra cy . :::::::::::::::: .- : :
.,provision~s will :be established to dc~ument.the. basis for-calibration.:;.**Ei:*..::
                      .*=.....: *:.;:..*:..:::.iii;*::::*:                                                                               -..      ..:;*:".* : :::: ' : .. -.::.:- . : .:*:*::.: *::=i
.:Contr~ol.m~easures :and, p~rocedures :shall: prevent the use o:f calibrated::.-*..:
                              ...            :      3,!!*::I:::.:
::=======================
                                                          . W he...n an..                          of....
un=
                                                                                .- .:........:........,:,::m e s r.item n and test:':"!i::i'     eqi pmi:   e     nt!:.i:,'="=
::*:auth*orizedi personnel. Special cialibration 1.an~d controi :m~easures :ar*ei::
                                                                                                                                                                . ... :is found to,...         bei:::.
no.ii0t; required for d~evices when nhormal: commercial. practic~es provi~de:.i.:..--:.
out of':::*:*!,,:* :.:
.*=.....: *:.;:..*:..:::.iii;*::::*:
:QA.
:: i:*a d e q u a te :a c c u ra cy. ::::::::::::::::
:::..:PD:::.:
*::=i 3,!!*::I:::.:
:!i!::!!::i:* ::~:i:
W he...n.-.:........:........,:,::
:3*.                                           :*:f*     ea~~ing: 20  and; *este~p                     et:i ifurl~ !.ii:beo Rev.                      :~ ::::i;:29:!:!:*iiie
an..
:.::;::: ::::ii,: i*::i::i:i:i::: **!!i...::i::::i:, ::i*,
.item of.... m e s r n and test:':"!i::i' eqi pmi:
e nt!:.i:,'="=  
.... :is found to,... bei:::.
out of':::*:*!,,:*
QA.
PD:::.:
:::..:: !i!::!!::i:* ::~:i:
:3*.
20 Rev. 29:!:!:*iiie
:*:f*
ea~~ing: and; *este~p et:i ifurl~ !.ii:beo :~ : :::i;:ii'
:: ::::ii,: i*: :i::i:i:i::: ** !!i...::i::::i:,
::i *,
* i!ii*: !. :i*!*:i*i:!:*i*i
*.i:*
!i*:.il ! :!i*iil calibration, an, investigation* will be conducted and documented: to. "
deteri~mne :the validity of previous.inspections,. tests, or caliibrations.::
..which wereper~formed with: the use of that* item:.:..
:*:!*I
.:.. :;!i *.l..!i!.::i':*
.:'iii!i:,.
i i:*~
:ii:ii:iI4..*i*R ecords. or loii0gs Siof ithe icalibration nhist or iiof imea suring and dtest:'~~~!ii*::iiIi!:l:i*
: :;-::!i*:.-::!i::::ii~*:.:;:-?
:?::a**:ffixe*d iserial :n umb er.!.Cali br~atio n:.i decals iiitag s or i*s tickr i eis~ihalli;b e :. :I*
:=.:*.:;.i*::i;.:::::::::::::::::
.:.i:i
:.!.:~d :islyd enit::f prom iS n i:
entlyn
.! i-.,cal rt
: h. :::"
on each device and shall reflect. the


                                                                                                                                                          *i!ii*: !.:i*!*:i*i:!:*i*i                  *.i:* !i*: .il!:!i*iil calibration, an, investigation* will be conducted and documented: to. "
===
deteri~mne :the validity of previous .inspections,. tests, or caliibrations.::
date=======
                                                                ..which wereper~formed with: the use of that* item: .:.. :*:!*I                                                                                              .:.. :;!i *.l..!i!.::i':*
of===========iii::!-i:ii
                                .:'iii!i:,.
.:: i:-* T h is* s ecti on es:**:tablishle~s:*t:he* re qu ire~ment s fo lr:S FS p
i i:*~  :ii:ii:iI4. .*i*R ecords. or loii0gsSiof ithe icalibrationnhist oriiof imea suring anddtest:'~~~!ii*::iiIi!:l:i*
: roce*du re*s to
:?::a**:ffixe*d iserial :n umb er.! .Calibr~atio n:.idecalsiiitag s ori*s tickr
,on:':r t rol* : i.:
: :;-::!i*:.-::!i::::ii~*:.:;:-?                                                                                                                                                    i eis~ihalli;b e :. :I*
. :::*ii~:::
:=.:*.:;.i*::i;.:::::::::::::::::
the:::::::
                                                          .:.i:i:.!.:~d :islyd enit::f          prom iSn entlyn          i:on each device              .!i-.,cal  and rt    shallh.reflect.            :::"                  the date===             of===========iii::!-i:ii
:ieihan~dlinig, ;:storage, :sh ipping,* iclean*in~g,* pack agin g:,* and :preservation o::0f  
                                                                                                                                                                                                                                                        =======
*::i:
                                --*-:.,*::.*. :: i:-* T his* secti on es:**:tablishle~s:*t:he* re qu ire~ment s fo                                             lr:S FS :proce*du re*s ,on:':r                                           to              trol* :i.:
.:.?!::*IiTS*: m~ateriia~l**a~n*d ieq~uip~ment :*t o :prievent idam*ag e, deterio:ration;, or lioss:ii.:i:i!:*:*i:.-
                                . :::*ii~:::
:.ii.*:.:.through.::;.;shipm ent, inst lla io or. use..-.--:.:....  
::::::            the:::::::
-.-::.:..:-. :-.::.. :.-.::-:-:.-:~.i:.i- :::::i:*.~~:::::
:ieihan~dlinig,           ;:storage, :sh ipping,* iclean*in~g,* pack aging:,* and :preservation o::0f                                                                                                       *::i:
:!!::"i: : *.:i~.:!:2:..:.!.:::"2i:.-The.ISFSI ~Ma nag e~r: Is respon*sible::* t forappro*val o:f *allimpl**:
                                            .:.?!::*IiTS*: m~ateriia~l**a~n*d ieq~uip~ment :*t o :prievent idam*ag e, deterio:ration;, or lioss:ii.:i:i!:*:*i:.-
em:enting':i:::::i**:::*:::
:.ii.*:.:.through.::;.;shipm ent,                                     .::
" : '"";'" -:1.::
inst: lla io or. use..-.--:.:....               -.-:: .:..:-. :-.::.. : .-.::-:-:.-:~ .i: .i- :::::i:*.~~:::::
Th r:scaequsirements: for handing:,
:!!::"i: : *.:i~.:!:2:..:.!.:::"2i: .-The .ISFSI ~Ma nag e~r: Is respon*sible::*forappro*val
storagpleshippti~ng cl~teanembing,
              ' :.::..:.                                                                                                                                      t                                o:f *allimpl**:                   em:enting':i:::::i**:::*:::
:::i and~ :*"*i
              - "':"    " : '"";'" -:1.::                         Th r:scaequsirements: for handing:,                                           storagpleshippti~ng cl~teanembing, and~                                                             :::i :*"*i
-suprlserv *,ation ia l..
of-ma.erials, and:equ ipment :::::
shall be~ :::..i--"?.i.:
doc me te.:in::*.:.::::i
::.*: :" !:!:i~i :::::.:/
:::'*:ap p ro v ed p ro ced u res.
::::::...: i. :* ::: * :::i:i:
:::::::::::::: L.i:*:.:::: : *::i*::
:::;.*::.:::.c:bovrinand ::it~pr~oetvednviromentrs;, suhatspeinier!it vals a
*tmospherei::i::
:: i:.
hand::!
lting:tools,
.andi~ equip~mentto a
e sueafan adequatey mntied::.-:::
handling::.::
of;,"*,.*:::*ii*.ii::
:':i:! :i*I
:':i:! :i*I
                    *"                        -:':: .            -suprlserv *,ation of-ma.erials,      ia l.. and:equ                ::...:.                ipment  shall::::: be~                    doc
,:, ::,":::!i:!!:.:,..:
                                                                                                                                                                                                            .- :::..i--"?.i.: me te .:in::*.:.::::i
i :!i::':;:
                        "                          - : - .: :: p::.*:  roved
/.!:. !*....:. ::;::..;::-i.
:" !:!:i~ip roced  :::::.:/u res.:::'*:ap                    .                ::::::...: i.:* ::: * :::i:i:                                      :::::::::::::: L.i:*:.:::: : *::i*:: ,:,  .,.,,,. *:, ::,:,: : .,:.,,,, ,:,,, **:
*,:. :,"" *; ;,*:., ' LII.*,  
::,":::!i:!!:.:,..:   i :!i::':;:
*i,:*:.-:*-:i*:*.:
:::* :::;.*:: .:::.c:bovrinand::it~pr~oetvednviromentrs;, suhatspeinier!it
:::* i*il-
                      .:. *::::::*:                                                                                                                                                                                            valsa        *tmospherei::i::
, :,.
:: i:.                hand::!
* H L :L :-.
lting:tools,  .andi~ equip~mentto                          a        e          sueafan  adequatey mntied::.-:::                                                      handling::.::            of;,"*,.*:::*ii*.ii::
............... ':.i:***:*
                                                                                                                                                                                                                                                                                      /.!:.!*....         :.::;::..;::-i.
* -.,i: ::::::? :*: **:i*i:-!:!::i:**::ii
      *,:. :,"" *;;,*:., ' LII.*,   *i ,:*:.-:*-:i*:*.:
":, i;-
i*il-       ": , i;-
i i: *i !iii-!*:*I :, ili,.ii
........ . ... .               ::: .,      , :, .
.... **: :.:::i:i:::!* ** : *:!!::*
* HL :L :- . :
:-.. :*,:i!::*::..:::**  
                                                                                                                                                                      .,::,:.:L
,:.:L :....
: ...: :,,. :   .- .,-:I*."::-, :*i:*::
.-.,-:I*."::T iiI :::.i :.i* *.* !!i
:!!*:il:*.::.
:*i:*::
::!:   :::. : : : :*i:i
:..:::::::::i:i*:*i:i:.*9 i,*i:i*  
:i*:i**i:!i
*ii::*::::::*ii i.:::
:-:::::::::.:*!:::!  :*i:i:i:
:i
:.*::::i:::,*,
:! !*:il
9 i,*i:i*
*i:i  
                                                                                                                                                                                                                                                                              *ii::*::::::*ii
* *i:!i
:::::::::.!*.            i.:::
:i:
i::i:::::.:*   :i
::::i:::,*,
  ..... . . .. ......': .i:***:*     *-.,i:::::::? :*:**:i*i:-!:!::i:**::ii                                    ii:*i!iii-!*:*I :, ili, .ii iiI:::.i:.i**.*!!i
i::i:::::.:*
                                                                                                              ....**::.:::i:i:::!* **: *:!!::*
:-..:*,:i!::*::..:::**


                                *"*":"''*'***      *' ' **:.*handling                   personnel. :Other special shipments which requir~e sPecbial: .....                                                                                           ::*.-
*' ' **:.*handling personnel. :Other special shipments which requir~e sPecbial:.....
:... ;-*@:.::@i.:*:*@equipmenit and handling: willibe *handled by knowledgeable an~d trained !" !. *                                                                                                                        *
:... ;-*@:.::@i.:*:*@equipmenit and handling: willibe *handled by knowledgeable an~d trained !" !. *
:-i.!!;..-:::.:::.7,:Storage.o~f material and equipment will be in areas.free from fumes, . ..:.,:                                                                                                                  ...
:-i.!!;..-:::.:::.7,:Storage.o~f material and equipment will be in areas.free from fumes,
:; .:-::i::
:;.:-::i::
                                          ..::.- . :;vapors,                     s.iand :dust.Storage will be in areas protected frobm the weather, . : !/..:.*;
:;vapors, s.iand :dust.Storage will be in areas protected frobm the weather,. : !/..:.*;
:-:.";;::.::;*i! :                as approm~;     epr~ifjate, andinthorichemical                               wti*;:storage wislxludd:                   b::ih ecp              e a s:;-!.:.*:i.:::::*:.:::::.:!:;::::.:.
:-:.";;::.::;*i!
::: : .:.:"i:which s~atisfy :th~e h;andling and .storage: requirements specifiedO: for the;:: .:: ;::i::. . :
as approm~;
                                                                                                                                ~
epr~ifjate, andinthorichemical wti*;: storage wislxludd: ecp b::ih a
                    - +m
e s:;-!.:.*:i.:::::*:.:::::.:!:;::::.:.
                              .        :.XIV.        ;*            .    * .....      .                                  TI .. t :. ..
::: :.:.:"i:which s~atisfy :th~e h;andling and.storage: requirements specifiedO: for the;::.:: ;::i::.. :
                                                                                            ..:: .:,::.. :....:T......T..-..::.         ,:    . l...-..
:.XIV.  
i i!!.*:i!*:! :*i i : .*!!i i                                                                                                                                                                                                                                      :!!i!: !i!i: i!i::  !i:*ii:
..::.:,::.. :....:T......T..-..::...
iiiiii!                          iii:.":::!"1:.i::: i-:.The DPC istaff:is !.responsib*le for ensuring tha~t the status~of operating.:.'!I
TI ~ t :...
                                  - ..":'::":.::--.::".eq uip ment o.:r :systemss*to;.be ::removed: from .service for: m ain~tenance:,;;: i- .::
: l.
                                      .-.-... .-:test, :Inspection, r~epair, or: modification Is in .accordance with :;the:. ::.;i :.i;
i i!!.*:i!*
                                    -.-::*-i: -.-.. :c ompliance witth approved iproc~edures and shall ensUre in~spectioni~::i:*:ii:!::i::
iiii:.* !!i
                                                .*i:*..i"*results :are pro*perly rlogged.;,! :They:. shalli establish the :probedIurebs. ifo r : -i.* ;:
- + m iiii iii!
iili
i!i i!:
                                    * :: . i:iv:.....
iii:.":::!"1:.i::: i-:.The DPC istaff:is !.responsib*le for ensuring tha~t the status~of operating.:.'!I
i.-:              imple~m~enting :the work inspection or status sheets during imaintenance,;*::
-..":'::":.::--.::".eq uip ment o.:r :systems s*to;.be ::removed: from.se rvice fo r: m ain~tenance:,;;: i-.::
                                        *".'i:. ***:!properly loggebd. !:Th~e*D*PC staff *is *also responsibl*e fr ithe con~trol f *:.ii:!- :
.-:test, :Inspection, r~epair, or: modification Is in.accordance with :;the:. ::.;i
                                    /:*"i i!ii!:             " : :%.                      *,  * ......  "*.....": .','.. :   "'.,''"
:.i;
C. Reauirements
-.-::*-i:
:c ompliance witth approved iproc~edures and shall ensUre in~spectioni~::i:*:ii:!::i::
.!:::.*i:  
* ::!:; *..i"*results :are pro*perly rlogged.;,! :They:. s halli establish the :probedIurebs. ifo r : -i.* ;:
* :: i.-:
. i:iv:..... imple~m~enting :the work inspection or status sheets during imaintenance,;*::
/:*"i
*".'i:. ***:!properly loggebd. !:Th~e*D*PC staff *is *also responsibl*e fr ithe con~trol f *:.ii:!- :
:! !i!::!i!i: i!i:: !i:*ii:
iili C. Reauirements
: 1. Equipment or systems not ready for normal service shall be clearly identified by use of tags.
: 1. Equipment or systems not ready for normal service shall be clearly identified by use of tags.
                          ...::.:..:...:~i.*2;.:..:
: i. :..: ::'.
                                    .:                            Equipment :or syst~em ;inspec~tion :an~d :test statu~s ishall be .indicatedi:::::-.*::.i:.i::::.
* i:':.:"
                            .::i.:"!:!!::!:i~ii:::3;i:I.
:.:..:...:~i.*2;.:..: Equipment :or syst~em ;inspec~tion :an~d :test statu~s ishall be.indicatedi:::::-.*::.i:.i::::.
                        .::*::.    ...                          ::SS~s :that :!a~re fou~nd.itobe unac*eptable:i durin:g. !or :a fter tefsting :s hall::: :::!:::!*:!:i
:*.::i.:"!:!!::!:i~ii:::3;i:I. ::SS~s :that :!a~re fou~nd. itobe un ac*eptable:i durin:g. !or :a fter tefsting :s hall::: :::!:::!*:!:i
: i. : ..: ::'.
!:~i*ii***i:.:.!:iii:.,::
  *i:':.:"  :
Th~i..
                        !:~i*ii***i:.:.!:iii:.,::     Th~i..is section estbliishes measures t~o: :assure t:hat :onditions:advese *:. :::"*.i:
is section estbliishes measures t~o: :assure t:hat :onditions:advese *:. :::"*.i:
                        . : ::::*:..- :~ii!::       :devi atio ns:,, defe~ctive :m ate ri al a nd .,equipment,; a nd no0n-co0n form an ce:s aref!..:-'- :
:::.- :~ii!::
:::*... ..::.. . :* promptly Ideintified~a~n~d corrected.-, T:his inicldies: the control: of materials:;: :.:                                                                                                 ,
:devi atio n s:,, defe~ctive :m ate ri al a nd.,equip ment,; a nd no0n-co0n form an ce:s aref!..:-'- :
                        " " ....: parts, or-comp~onents thati do not: conform !to!requirements, .ther~eby..*:i::...:;i:... :::*i.
..::... :* promptly Ideintified~a~n~d corrected.-, T:his inicldies: the control: of materials:;: :.:
:              ~~preventing :their inadvertent: use ori :installation. ".::                                                               :-;: :::: ::.:..::i::..:::::::.:::.::.::::*i*i::
parts, or-comp~onents thati do not: conform !to! requirements,.ther~eby..*:i::...:;i:... :::*i.
:.B*::. :.ResponslbilitieS*:,: : ::...!...;                                                                                         procedures:.:            :.::*::.:the.-::!"!*!ii for.:::*..:               :!.ii*!. ::
~~preventing :their inadvertent: use ori :installation. ".::
: 1. Thi:*i:i e DPC.: stafi s ri::iespons:ibl:e :for iesta:blisini:gi
:-;: :::: ::.:..::i::..:::::::.:::.::.::::*i*i::
:.;!: :::!i:i         i:;::!: *!: :::i :::i~i: *i/ *.:ii:2 2 ::i!!ii*:::iii;::*:::: ::2:;:*;:::*
:.B*::. :.ResponslbilitieS*:,: : ::...!...;
ii*::~i*i::i.:;:i:!..i:                                                                   :*:::*:::*ii**.:*::*:*:!*:;i*;::*::!iR ev.::29:*:.,:
: Q A PO;i*
':*::ii:::::::
: 1. Thi:*i:iie DPC.: stafi s ri::iespons:ibl:e :for iesta:blisini:gi
:.;!: :::!i:i ii*::~i*i::i.:;:i:!..i:
i:;::!: *!: :::i :::i~i: *i/ *.:ii:2 2 ::i!!ii*:::iii;::*:::: ::2 2
procedures:.:
for.:::*..:
the
:.::*::.:.- ::!"!*!ii :!.ii*!. ::
:::::*:..:*i:*
:::::*:..:*i:*
: Q      APO;i*:
:*:::*:::*ii**.:*::*:*:!*:;i*;::*::!iR e v.::2 9 :*:.,:
                        ':*::ii:::::::
:::i.*! ii
 
;.. i.. ;:.::"-identification, !review,: and correction of conditions adverse to quality: :i
: :i.*! ii
.:!i:
                                          ; .. i.   . ;:.::"-identification, !review,: and correction of conditions adverse to quality: :i
.:~: *.: i ::]:!!,whi~ch :includes the control, evaluation, and disposition of deficien~t::i*, i-:.
                                          .:~: *.: i ::]:!! ,whi~ch :includes the control, evaluation, and disposition of deficien~t::i*, i-:.
;i*)?i?:-::.~i.:.:2;i:.: The D C p*sta~ff is Lrespon~sible :for reva*iewin*g. no nconfor~ming ;items ti*hat!*:i~~~
                                          .:!i:
.:::!:;..~*!*ii*
                                        ;i*)?i?:-::.~i.:.:2;i:.: The D p*sta~ff           C              is Lrespon~sible :for reva*iewin*g. no nconfor~ming ;items ti*hat!*:i~~~
!..:i::?i!*::canrnot:b~e co~rr~ected ;by )vendor a-ctilon anld :recomm~ending :dispositio)n*):.)
                                                      !..:i::?i!*::canrnot:b~e co~rr~ected ;by )vendor a-ctilon anld :recomm~ending :dispositio)n*):.)
':.:-i  
                                          .:::!:;..~*!*ii*                                                                                                                                              I.
;;*::::?I3. i?!Thie iDPC staff ;is irespo nsible: for: rev~iewing condition rsadve~rse: toi;*.:. ::i:*-
                                        ':.:-i
*: :.-:i:)::ii.:.quality to. determ~ine the: cause.of the condition; and for: rec*ommending;
                                          ;;*::::?I3. i?!Thie iDPC staff ;is irespo nsible: for: rev~iewing conditionrsadve~rse: toi;*.:. ::i:*-
:*..I-). !::i.i;:.
                                            *: : .- : :i:)::ii.:.quality to. determ~ine the: cause .of the condition; and for: rec*ommending;
correctivect action
:*..I-).!::i.i;:.           correctivect             action toe       :prpreclude repetition.i:* i.!~i:.)": :!i~::.::i:i~!-.-..I:IIi:/: :..]
:pr toe preclude repetition.i:* i.!~i:.)": :!i~::.::i:i~!-.-..I:IIi:/: :..]
                                                                                                                                                                                                        ~1.
I.
                                                    **!~i**:*:**i*:]:d~eficiencie*s,- *devi~atio:ns,~defective m*aterial *and equ*ipm~ent, shiall ~bei:*i:!; iii!*:;
~1.
i i;:::iii i,*:iir,*ieported ion ia corre[ctiveI *ac*tio0n :d~ocument.: Materials, iparts!,ib*::*i
i :::iii i; **!~i**:*:**i*:]:d~eficiencie*s,-  
                                              * :*:: ;:.:i:*:i!**:ii:                                                                                                        or          :i: i;~ii*ii*:*l*:i**
*devi~atio:ns,~defective m*aterial *and equ*ipm~ent, shiall ~bei:*i:!;
:!:.:.i::iil'-':i:!     !::placedi~ii~~:::
iii!*:;
i l::; n a holid *st atu[s,. No*nconforming items, shallii remai~n' in*:: a..i...::!?;!!i~!i*i :;:::i!
* :*:: ;:.:i:*:i!**:ii:
                                                    ..ii!)*.. : .-segregated *area :until *approved disposition: has been determined:i:)- :.i-:*. .:*
i,*:iir,*ieported ion ia corre[ctiveI *ac*tio0n :d~ocument.: Materials, iparts!,ib*::*i or
:*.-:i:i:
:i: i;~ii*ii*:*l*:i**
:!:.:.i::iil'-':i:!
placedi~ii~~:::
i n
l::;
a holid *st atu[s,. No*nconforming items, shallii remai~n' i n*:: a..i...::!?;!!i~!i*i :;:::i!
:*.-:i:i:
..ii!)*..
:.-segregated *area :until *approved disposition: has been determined:i:)- :.i-:*..:*
* 0L','. '... 0;': i'...i ): :.
* :...:).'.-:.:---i.:i.,i..'.:
2.: i:The corr~ec~tive action do~cument shall identify :the condition, :the cause- ;.!:l~
2.: i:The corr~ec~tive action do~cument shall identify :the condition, :the cause- ;.!:l~
all nonco~nforming items and requested to: correCt the deficiencies.:::;:                                                   *,::.*:
all nonco~nforming items and requested to: correCt the deficiencies.:::;:
  *0L','.'...0;': i'        ...i ): :.
r:
                                                                    ; ::r:e'spon ii ::i sible ~fo:r*i coor dinabting ::the !dispos ition* ofa deficienht: :i t~ems.Wit hi :!i*ii [iili o***!!*:*r reject..I:`t~e~ms :shall *be r*epaired or r:eworkedi only: in; ac*co~rdance withi-*i:::!*
:: ii ::i  
:::::;:approved probcedUres and sha~ll be re-inspected after rePair :by :the: QA: i::III: i:i:                                                      !*!i
; e'spon sible ~fo:r*i coor dinabting ::the !dis pos ition* ofa deficienht: :i t~ems.Wit hi : !i *ii [iili
* :...:).' .-:.:---i.:i.,i..'.:
- o***!!*:*r reject..I:`t~e~ms :shall *be r*epaired or r:eworkedi only: in; ac*co~rdance withi-*i:::!*
                                                                    .. specialist:I Engineer:. DPC staff :shall ensure ithat documented ~and:.: :i: :: :
:::::;:approved probcedUres and sha~ll be re-inspected after rePair :by :the: QA: i::III:
                                                                    ! iappro:ved
.. specialist:I Engineer:. DPC staff :shall ensure ithat documented ~and:.: :i: :: :
:;                      procedures are availabl~e prior t;!&deg; repair or irework.:::i!:**:i* ii!:!; !:::i
iappro:ved procedures are availabl~e prior t;!&deg; repair or irework.:::i!:**:i*
                                            ... ~:5...       .        l5ii:.;tem*s.iwhich iare accepted i~for us~e witha :known defiiciency shall b;ie fullyi
ii!:!; !:::i i:i : !*!i
::ii:i)::i:
~:5...
                                                  *:::i :i: :idocumente~td with ~th~especificatio n !:requirement, j]ustification*:f~or:i*i*:: ii::i ir;]i~:ac;eptanice, and effect !of such u:;se;*i Alli such :iitems lshall b*1e :a~p~provediii:
l5ii:.;tem*s.iwhich iare accepted i~for us~e witha :known defiiciency shall b;ie fullyi
                                            !;:i~!:ilL:i~:::i*
:: *:::i ii:i)::i: :i: :idocumente~td with ~th~especificatio n !:re quirement, j]ustification *:f~or:i*i*::
L            i      ii!
ii::i
                                                      !i!i!:::: :::i:!:.;irecommen:0d e~d or*rec*tive. a~ctio~n:s thaa*in*:voliv~e :a d*e~s~ignncha*nge,*:..shall! :b-e~i
!;:i~!:ilL:i~:::i*
:::: i!:iii::i
ir;]i~:ac;eptanice, and effect !of such u:;se;*i Alli such :iitems lshall b*1e :a~p~provediii:
                                                "::"'i*:!:========re=====viewedi
:::: i!:iii::i  
:-                                      by :DP   pcstaff or: appiciiable :Designn::Author*ity. (r~ef.: Appen*di~x :::...
!i!i!:::: :::i:!:.;irecommen:0d e~d or*rec*tive. a~ctio~n:s tha a*in*:voliv~e :a d*e~s~ign ncha*nge, *:..shall! :b-e~i
                                                                  ."'"10CFR21I.shall* be :reported In accordance with: approbved.:pr*ocedur~es'..". .
"::"'i*:!:========re=====viewedi by :DP pcstaff or: appiciiable :Design n::Author*ity. (r~ef.: Appen*di~x :::...
XVI.       QUALITY ASSURANCE RECORDS
i ii!
:. .. .. ,' ".- -. '.. * :. ,: ":::) ... ." : -.. " D':"      ".:
L
QD .                                .:...:*.!:*:: :.::..:.: *:..iL:
."'"10CFR21I.shall* be :reported In accordance with: approbved.:pr*ocedur~es'.."..
* i:       23 ;::)::
XVI.
                                                                                                                            .ii23                                                      Rev. 29i.::i.:*:*.*.
QUALITY ASSURANCE RECORDS Q D.
23 R ev. 29i.::i.:*:*.*.  
.:...:*.!:*:: :.::..:.: *:..iL:
* i:
.ii23 ;::)::
,: ":::)...." : -.. " D':"
:i:!iiiii
:i:!iiiii
 
:...-L. :..:..:.-...:-..'
:...-L.       :..:..:.-...:-..'
ii*.::.*ii!ill:I  
ii*.::.*ii!ill:I
*i: ' ::::*!i!:
                                                                                                                                                                                                                            *i:' ::::*!i!:
A.
                                                                                                                                                                  /. .-:: <..::;.:.,.:., ::'.-: .:::./::.- -:--.:..-:
General:
A.        General:                                                                                                          ::::**:*:.*:*iii'i:!!.
/..-:: <..::;.:.,.:., ::'.-:.:::./::.- -:--.:..-:
                                                                                                                                                                                    *i:i:::i*i::i::.i;!:i*:*i*::.*&#xb8;.
::::**:*:.*:*iii'i:!!.  
i:/thle oper~ati.on, mi:m.ntenance, :installation, rfepa~ir,: and modification o*f ISFS!::;;**I. ;*
*i:i:::i*i::i::.i;!:i*:*i*::.*&#xb8;.
                                            **:;SScs, :alnd ithe :decommissioning: activities, covered :by the QAP.Di:. Also**::!.*:;!***::
i:/thle oper~ati.on, mi:m.ntenance, :installation, rfepa~ir,: and modification o*f ISFS!::;;**I.  
::"-infclud ed iareh istorical~i reco rds gathe red and -coll!ected; d uringgpl!ant :*and ::i::*::i.: :: :!iii
**: ;SScs, :alnd ithe :decommissioning: activities, covered :by the QAP.Di:. Also**::!.*:;!***::
                                            ;:?ISFS I op*erations; which :are eithert*q                     re Uired toblsupporti th e dry~i               icaski sltor~age*i*:: ::.iii
"-infcl ud ed iareh i storical~i reco rds g athe red a nd -c oll!ected; d uring gpl!ant :*and ::i::*::i.: : : :!iii
                                            *;!;**exe~mpt from r~ecords ;keeping ir~equirements::inaccor~dance *:with :thei ter~ms iofi-*
;:?ISFS I op*erations; which :are either re t*q Uired to blsupporti th e dry~i icaski sltor~age*i*:: ::.iii
:i:iany iNRC- appro*ved irecords exem ptionnth*at"may be g ra nted :.to :!SOLUTi*ONS:::.
*;!;**exe~mpt from r~ecords ;keeping ir~equirements::inaccor~dance *:with :thei ter~ms iofi-*
                                                                                                                                                                                            .:::.,.i::i'i:
:i:iany iNRC-appro*ved irecords exem ption nth*at"may be g ra nted :.to :!SOLUTi*ONS:::.
  .*..*.*-...*......  .: :..            :- . *1.:
*1.:
:T*.::*he DPC staff::is:respor~sib~e for establishing the requirements of :this.
:- :T*.::*he DPC staff::is:respor~sib~e for establishing the requirements of :this.
        * ,,. , ,,              . :                        se c tion...
se c tion...  
::*'.i*:.:/;ii:.
.:::.,. i::i'i:
i:*                :*:c:ontrolled and stored in: accordabnce with iwritten !Pr~o~cedures.*; The riecordl:
::* i:*  
                                ;: ;.:;;. ;:::!~:system~;!].inlude~s theii@ *rete ntion of *thioseii d~esign, f!abricatio0n, *in~specttb?
'.i*:.:/;ii:.
                    ; (:. i:::!i:i                                                                                                                                                  ion, ::*:;
:*:c:ontrolled and stored in: accordabnce with iwritten !Pr~o~cedures.*; The riecordl:
                    ;::.iii:::
; (:. i:::!i:i
:**: ***.~~;:.:   :*i:::
;: ;.:;;. ;: ::!~:system~;!]. inlude~s theii@ *rete ntion of *thioseii d~esign, f!abricatio0n, *in~specttb?
:i:i*; ic::borr*es pondin     j :m anufactur:ing,,i:;nstalliation;,:. Insp~ctio:n, .itest, :and iaudeiti::i*i?*!:
ion, ::*:;
i*?::::.. -::*.:;:i:specified ini: approv*ed pro~cedur*ies::. QA riecor~ds shal be::pro*:
;::.iii:::
                    - .!ii::i;:::..i                                                                                                                          tected::** ::.;!.*::!~:!:!
:**: ***. ~~;:.:
:*i:::
:i:i*; ic::borr*es pondin j :m anufactur:ing,,i:;nstalliation;,:. Insp~ctio:n,.itest, :and iaudeiti::i*i?*!:
-.!ii::i;:::..i i*?::::.. -::*.:;:i:specified ini: approv*ed pro~cedur*ies::. QA riecor~ds shal be:: pro*:
tected::** ::.;!.*::!~:!:!
.i.!:. :i;~:::::/"::::.::
::;!:/;*;with :a *mean~s ob.f matching *therecord.d:;to the item; or activity ;to whlich;:f~ ::it
::;!:/;*;with :a *mean~s ob.f matching *therecord.d:;to the item; or activity ;to whlich;:f~ ::it
                    .i.!:. :i;~:::::/"::::.::                                                                                                                                                :::i
:::i
                      *"..:..:::::i i:                      *:*subcon~t'racto~rs/sub-supplier~s, .theorigin~alQA r~ecord of the ~deliverables.i iiii i iiii i -:will:be.transmitted to SOLUTIONS or DPC When applicable:i:.iii-::i:.i*.i-l:..
* i:
:*:~i:
"..:..:::::i *:*subcon~t'racto~rs/sub-supplier~s,.theorigin~alQA r~ecord of the ~deliverables.i iiii i iiii i -:will:be. transmitted to SOLUTIONS or DPC When applicable:i:.iii-::i:.i*.i-l:..
            *.ii:?:.:i.i ii:.I: :i2l.i                     2::uthie  A,.:i:i!:.:.ntic-ation:. Docum*ents s hall be!*onsid~ered valid~: ireco:rds .o nljy i*ifii~l l~~
:*: ii:.I:
:::i :":::":"::*i!!stamip~ed,:;' i~nitiale d, or *s ig ned :anda dated* by-a uth*ori'zed :.p ers oinel or!:*!ii:.*ii.!i:*:::i::
~i:  
          .:::*::;~i:i::::~i:::::
*.ii:?:.:i.i :i2l.i A,.:i:i!:.:.
        *:.:.*.:::*:.**i:*:!::i:i*i!**:/:**;:::!!:*:::*:ii:othritW~ise     authentlicated, :including th~e :u~se o*:felbectr~onic approval iarnd~i::i;.i.
2::uthie ntic-ation:. - Docum*ents s hall be! *onsid~ered valid~: ireco:rds.o nljy i*ifii~l l~~  
:-!i'.i:ii?!i!:~:;::~i*:.i:-ii:i;ii.::i:.**:*aUthur*ization. *iThis: authen~ticat~ion may t:!ake ithe form o.f ai*statemenht biy!:;i.:*                                                               * ::, ,<:..,,,-.:. ,: ,:..... ,.,: .:
. :*: :::i
        . *..iii* i/ *ii.::::: i::.:!:ii:ithe rei~sponisible, individu~ali or organlizat!Qion*.Han~dwriitten isignlatures i~arei**:i~:                                                                      ':: :* :..:*::*'i  ::"i,.:.*::.:::
: : :;~i:i::::~i::::: :":::":"::*i!!stamip~ed,:;' i~nitiale d, or *s ig ned :anda dated* by-a uth*ori'zed :.p ers oinel or!:*!ii:.*ii.!i:*:::i::
::ii*i::.*:;
*:.:.*.:::*:.**i:*:!::i:i*i!**:/:**;:::!!:*:::*:ii:othritW~ise authentlicated, :including th~e :u~se o*:fel bectr~onic approval iarnd~i::i;.i.
                  ;: i;:.i~~i:.:! : ::*;:::*;*.     *!::no require .. d; if* theadocu ment :is clearl! id entified as ia:st atement bY *th e:*;::::
:-!i'.i:ii?!i!:~:;::~i*:.i:-ii:i;ii.::i:.**:*aUthur*ization.  
                      !.:;:: ;*::. :: :;.: ;.repo rtin g* ciniv idu al ori:org anrizat ion. :,T hes e: reco0rds-m ay* b e !originoals or0*::i:!:
*iThis: authen~ticat~ion may t:!ake ithe form o.f a i*statemenht biy!:;i.:*
i ii:":"
. *..iii*
i .::ii;.:.::.:3:.:;:.3:
i/ *ii.::::: i::.:!:ii:ithe rei~sponisible, individu~ali or organlizat!Qion*.Han~dwriitten isignlatures i~arei**:i~:
: :"*                iIndexing dentif~ication,  Thel;ocation
::ii*i::.*:;  
                                                                          -*. records of indexing the record        system     :within  ~theincl
;: i;:.i~~i:.:! : ::*;:::*;*.  
                                                                                                                                    .must         ude :records:.*i.::
*!::no require.. d; if* thea docu ment :is clearl ! id enti fied as ia :st atement bY *th e:*;::::
isystem,     and~iminimum:.:ii.i           ;*:::. :
!.:;:: ;*: :. :: :;.: ;.repo rtin g*
                      .:--". ii;..:!:.:Hir etention. time. I:Th1e re~co rds and/or ind exinrig sy/ste m(s) :shallI ipro~videi:.;::.*
ciniv idu al or i:org anrizat ion. :,T h es e: reco0rds-m ay* b e !orig inoals or0*::i:!:
                                                                                                                                                              !i:*i:::i!i::::
':: :* :..: *::*'i ::"i,.:.* ::.:::
                                                                                                                                                                  .ii:,:*::i*v:i:!29 QAPD                                                                            24
i i ii;.:.::.:3:.:;:.3: Indexing -*. The records indexing system.must incl ude :records:.*i.::
                                                                                              , .,*+* . ,.,, ,,,:,,,: ,* ,:, ... ,:,
ii:":"
Rev. 29
i dentif~ication, l;ocation of the record :within ~the isystem, and ~iminimum:.:ii.i
                                                                                                                                        *::i:'i::: ! :i.:!:
-- ii;..:!:.:Hir etention. tim e. I:Th1e re~co rds and/or ind exinrig sy/ste m(s) :shall I ipro~videi:.;::.*
QAPD 24 Rev. 29
,.,*+*.,.,,,,,:,,,:,*,:,...,:,
!i:*i:::i!i::::
.ii :,:*::
i*v:i:!29
* ::i :'i::: ! :i.:!:
ii
ii


                                                                                                                                                                              .,:-.. : .'::" ; ':i":'-T:il* ' ":.:
!:i!i :i : i
                                                                                                                                              !:i!i :i : i
::::: :::i:i: ilili
.        : : : : :i:i: ilili
:*!:::!i!?:;::::-!sufficient; info.rmation to permit ;identtification between the: recor~d"anid the:.
:::!        :*!:::!i!?:;::::-!sufficient; info.rmation to permit ;identtification between the: recor~d"anid the:.
4*.li*i.!
4*.li*i.!
:": ;i 4:::~.Distirib~ut[     ion:: a:nd: Cntroli..; The records shlla. be distributed, h~ian dledi! ai!nd::
:": ;i 4:::~.Distirib~ut[ ion:: a:nd: Cntroli..; The records shlla. be distributed, h~ian dledi! ai!nd::
: .cntoledinacoranewitritten                                                 np rocedulres. Measuresa*iha!.!. ble.*.zi ;
:.cntoledinacoranewitritten np rocedulres. Measuresa*iha!.!. ble.*.zi ;
: -: ;::! ;:;-::established to preclude the entryi of :unauthorized personnel inito :the:.::i*::::
;:;-::established to preclude the entryi of :unauthorized personnel inito :the:.::i*::::
::i::*i.::~:stor~ag e requirements !aseither lfifetime o r nonpermanient'. R*eco*rds :~ithat:*
*:i::iiii.:.;!i:.;
                                        *:i::iiii.:.;!i:.;
::i::*i.::~:stor~ag e requirements !as either lfifetime o r nonpermanient'. R*eco*rds :~ithat:*
                                        .*i::i**?.:,:..:;::**::*.%~imeet .any..of :theefollo~wing 'criteria ~are idesignated Lifetimee"r~ecords ::anid~ii~.:;;i
.*i::i**?.:,:..:;::**::*.%~imeet.any..of :the efollo~wing 'criteria ~are idesignated Lifetime e"r~ecords ::anid~ii~.:;;i
:.!!!:i:*!:i.iii*!* m
*iii::I
                                        *iii::I                    m ust ds , be m aintained.;!::*-*
:.!!!:i:*!:i.iii*!* m ds,
a n d:              ..:::..:i *i.:*
m ust a n d :
                                                                                                                          *i -:; :: . . : . ..-i.: ::".. ~i:...:i.:~i*- -i:. .
be m aintained.;!::*-*..:::..:i *i.:*  
a.
*i -:; ::.
i! :" *: ..:aiProject             lifetime .*records shall.include, as a minimum, design: :*i.
:...-i.: ::".. ~i:...:i.:~i*-  
                                                          * :.. ...        and interface control drawings, copies of material i.test reports,.-...i
-i:..
                                                      . .;i.::/
:.'::" ; ':i":'-T:il*
i! : *:
: a.
..:aiProject lifetime.*records shall.include, as a minimum, design:
:*i.
and interface control drawings, copies of material i.test reports,.-...i
..;i.::/
ii~ ;: :;'::i:inclUding examination :reports*,' and nonconforman~cel re~portsii.;i!:~*:iii
ii~ ;: :;'::i:inclUding examination :reports*,' and nonconforman~cel re~portsii.;i!:~*:iii
:.: :*-:i*:*.:       of:** itemlm"!ife iof..the facility, ior life: of the license,i.as aiipplicable.:..:*
:.: :*-:i*:*.:
                                                                *:.:* : .:*f!the tandaa~rds (.le:g.i: O1C FR7.i,.::10:: C:FR :72) w)-:ill'-be iinclud ed:.ini thl
of:**
                                                  =============.::!::.s                                                                              *e: r*et entio n.:
:.:*f!the itemlm"!ife iof..the facility, ior life: of the license, i.as aiipplicable.:..:*
i:.*-.'::*...-
 
                              .. :6. - :.-6::Storage .                      Requirements.:-:.The :records shall be stored; rIn:             predetermined i:.i:*
=============.::!::.s tandaa~rds (.le:g.i: O1C FR 7.i,.::10:: C:FR :72) w)-:ill'-be iin clud ed:.ini thl  
*e: r*et entio n.:
i:.*-.'::*...-  
.. :6..
- :.-6::Storage Requirements.:-:.The :records shall be stored; rIn:
predetermined i:.i:*
::*:*::i======================
::*:*::i======================
:.i ::.;.:*::location(s) that         a:meet :the lrequir~ements..of appllicable standards, :codes,;i.:::::
:.i ::.;.:*::location(s) that a:meet :the lrequir~ements..of appllicable standards, :codes,;i.:::::
                        *i::*:ii::
*i::*:ii:: ::~.*i-.
i::::i!:*:..::::~.*i-.  : *::i::i*!and regulaorat:Yiige nc*ies ..i.Prio~r: *toisto:ra ge o!f r!ec ords,i: a w:ritte*n s:tor~iage*..i:*:
i: :::i!:*:..:: :!i~i
:!i~i Z '"
: *::i::i*!and regulaor at:Yiige nc*ies..i. Prio~r: *toisto:ra ge o!f r!e c ords,i: a w:ritte*n s:tor~iage*..i:*:
                                              -..:"""':l*
Z '"
                                                    ""*" "' I".Records         *shall be stored
:"""':l*  
:":temperatur~ei:.:A~ll     records.to.mprevent..damageifr'om aintained in hard:copymoistureor?.:"***
""*" "' I".Records  
fo:rm shiall b~e firmly:-     : '":..:::
*shall be stored.to. prevent..damageifr'om moistureor?.:"***
_.... ..... :: attac~hed: to bi!ndersi or..placed in: :folderts, e:nvelopes, o:r :boxes fo;{ri::!::::.i* ::.:;
:" :temperatur~ei:.:A~ll records m aintained in hard:copy fo:rm shiall b~e firmly:-
                                      .:::::.-: ::.-:*::storage in file :.cabinets or within :containreis on :shelving. :Records miay:**.
..... :: attac~hed: to bi!ndersi or..placed in: :folderts, e:nvelopes, o:r :boxes fo;{ri::!::::.i* ::.:;
                                      * ::*:i:.i:*i**.:!i.*i::;::*::i:::b:i!le::
::.-:*::storage in file :.cabinets or within :containreis on :shelving. :Records miay:**.
stored' iini:belectr onic :media: pro~vide~d that: the '*process :for mi:anha * *g::ingi..
* ::*:i:.i:*i**.:!i.*i::;::*::i:::b:i!le::
:ii ::*-:::.::.:::-         a.:*::
stored' i in i:belectr onic :media: pro~vide~d that: the '*process :for mi:anha * *g::ing i..
::i:*?Re~cords         :shall b:ie storied in fiacilities ~that minimize the :risk of damage
:ii ::*-:::.::.:::-
:.: 1!: :: i.,.&#xb8; QAPD                                                                           5.-....                                                 :: Rev:29 .".:::::":"
a.:*::
::i:*?Re~cords :shall b:ie stor ied in fiacilities ~that minimize the :risk of damage
:.: 1!: : : i.,.&#xb8; QAPD 5.-....
:: Rev:29.".:::::":"


                                      *-,, .b. Natural di sasters such .as :Win d, flood,, or fires;.. .,.:..:- .:. :..:/.:*f.V:i .:.:.
.b. Natural di sa sters suc h.a s :Win d, fl ood,, or fires;...,.:..:-.:. :..:/.:*f.V:i.:. :.
:-:c. E::Jnvi~ron*m-ental c:onditions : sucbh as{ hig S-:.                                                                                                    :i::a n d :low: temper*atures iand:a*::i : .
S-:.
:-:c.
E::Jnvi~ron*m-ental c:o nditions : sucbh as{ hig
:i::a n d :low: temper*atures iand:a*::i :.
S"d::. !Inf:jiestationby* :insects, moldi:. or r:odents.ii:~i:
S"d::. !Inf:jiestationby* :insects, moldi:. or r:odents.ii:~i:
                            !:.-:7:.:         D~isposition- Va~riou s i:reg ulatory agencies ihave: :req~u~irementsi~~*:i{ii:
!:.-:7:.:
D~isposition-Va~riou s i:reg ulatory agencies ihave: :req~u~irementsi~~*:i{ii:
c*:*:::.
c*:*:::.
on~cerning records- that are. withini th-e scope: of thie QAPD. :The::
on~cerning records-that are. withini th-e scope: of thie QAPD. :The::
::;:*:*;::}:::*stringent ir~equire~ments sha~ll be: usedl in !:determining ;the :.finhali:i::~::ii most .
::;:*:*;::}:::*stringent ir~equire~ments sha~ll be: usedl in !:determining ;the :.finhali:i::~::ii most.
!.i XVII.
!.i XVI I.
LUiT l-.}:, : : -:i::::'<:"
:: " A::"
                                                              ":x .i! ,:::::"",,':,:!i
LUiT l-.}:, : : -:i::::'<:"  
:: " A::"      \*:.-. G ene ral                         : "*.::
":x.i!,:::::"",,':,:!i  
:This section :establishes }the requir~ements for a system ::of planned and ii::"::::::::::::
\\*:.-. G ene ral
                                .documented .audits to} verify complianCe with all aspects of the :QA program..================
: This section :establishes }the requir~ements for a system ::of planned and ii::"::::::::::::
                                ,and to. assess the, effectiveness of the program as. it applies to .the ISF:SI,:. :::*::;!:: ...
.documented.audits to} verify complianCe with all aspects of the :QA program..================
The system provides for thee reporting andd review of audit                                                                             u results by :!*:*:.i~::(:::::!;:.:::*::::!:::i           !i:*~i:*::
,and to. assess the, effectiveness of the program as. it applies to.the ISF:SI,:.
The system provides for thee reporting d
and review u
of audit results by :!*:*:.i~::(:::::!;:.:::*::::!:::i
!i:*~i:*::
:*:;:::://:
:*:;:::://:
                  ;B.
chec:!~i:i/*
chec:!~i:i/*
kli~sts.i :des~igna:tin~g ::andc itraiani~nggaudit pei:                                               rsonnel, !:and*I conducting:#::::::k i:i*:! **d au* dits..*
kli~sts.i :des~igna:tin~g ::andc itraiani~ng gaudit pei:
i s *"i' *~ i b @*:**:*!:.,**:i *i:*:*i-                   i:i*:*:*:i:} i::::::: ::::::::::::::::::: :::::::.! ===============================                               *:~::d .U :
rsonnel, !:and*I con ducting:#::::::k i:i*:! **d a u d its..*
      .,::..*..:::!~2:
* d i s *" i' *~ i b @ *:**:*!:.,** :i *i:*:*i-i:i*:*:*:i:} i::::::: ::::::::::::::::::: :::::::.!===============================
: ":bv::. . " ThebiQA         verify that          :S~pe~ciaJi
*:~::d.U :
                                                                          *th~e ISFSi        stl /i:En
;B.
:is gbeing          peforims :in:consisstentt in~e* maintained
::..*..:::!~2:
:er                             depe n d en*trevieW                   an d auidit i:to:.:l:: :!
ThebiQA :S~pe~ciaJi stl / i:En g in~e* :er peforims :in depe n d en*trevieW an d aui dit i:to:.:l:: :!
w:ith ~company.::*::i:(::i:!i::::*i~
., : ": bv:: " verify that *th~e ISFSi :is being maintained :consisstentt w:ith ~company.::*::i:(::i:!i::::*i~
::.:i :!::!.                     safetyey administrative, andd llicensing provisions. :::. :!: :::::"::.. :::i::::}-!:V:.:-;:i,: ::ii !!::
::.: i :!::!.
C. .: Rbea~                 ulre  e ~m ~ennts::    s {*:i*!; :;iii:i*i:     ..:::i!i:
safetyey administrative, andd llicensing provisions.
:::. :!: :::::"::.. :::i::::}-!:V:.:-;:i,: ::ii !!::
C.
R e a u lre m e n ts::
.: b ~ e ~ ~ n s {*:i*!; :;iii:i*i:  
..:::i!i:
:*i ::::: *i:i!
:*i ::::: *i:i!
{*!iiE~*IEi::/: ;:::*::i i;:i*:*:::ii::: ::!{ *}.**     .:***i
{*!iiE~*IEi
:::i:'": i:::!
::/: ;:::*::i i; :i* :* :: :ii::: ::!{ *}.**  
                                                                                                                                                                                            .::i:::i-:{i :;:*i*i!! *}:
.:***i
:: :i:'": i:::!  
.:: i : :: i-:{i :;:*i*i!! *}:
i~ii*i": :*:,;
i~ii*i": :*:,;
:*i1.*:::*i;;
1.*:::*i;;
A udciti}Shal i:: be p~ierform;e d i~n a*ccorda*nc e ::w ith: written pi;*rocedur esi!or ii~! !::::                                                                       i:.ii:i*i!:
:*i A udcit i}Shal i:: be p~ierform;e d i~n a*ccorda*nc e ::w ith: written pi;*rocedur esi! or ii~! !: :::
:::::::::::::::::::::checkl!is~ts! by appropriately ~trained p~er*sonnel: haviing no6!*dir~ect:.ii:*: i::.:::!'I:: :{
i:.ii:i*i!:
                      -: =================:.i ri*-espo nsibil ities in.theeartea audi ted.: *Defici encie6s from iprev*io ussau dit s i -ii:*
:::::::::::::::::::::checkl!is~ts! by appropriately ~trained p~er*sonnel: haviing no 6!*dir~ect:.ii:*: i::.:::!'I:: :{
:::::; }::}::shall- be r~eViewed a nd re-;audited:, as appropriate:.-The checklists ar:e :::,: ::
-:=================:.i ri*-espo nsibil ities in.the eartea audi ted.: *Defici encie6s from ip rev*io us sau dit s i -ii:*
:. 2:;. AUdlits may b~e conducted by th~e' QA Specialist I :Eng~ineer :or: other. ::}::a
:::::; }::}::shall-be r~eViewed a nd re-;audited:, as appropriate:.-The checklists ar:e :::,: ::
                        .,... :.qualified personnel,. such ~as technical specialists from other: :;::-. . .;.::;i
:. 2:;. AUdlits may b~e conducted by th~e' QA Specialist I :Eng~ineer :or: other.
::Au~dit *ani :s u~rveillance iresults :sh alli b:e idocumented :a~n~d reviewed wi*th.,: :. :ii 3.::::::::::
::}::a
i:::i:::*:i:*!isu:pervisi~on r.ie~sponsible..for the ar.!ea audit~ed, who sh0::fall:take necessary!.:::{::
.,... :.qualified personnel,. such ~as technical specialists from other: :;::-...;.::;i 3.::::::::::
::.!~i
::Au~dit *an i :s u~rveillance iresults :sh alli b:e idocumented :a~n~d reviewed wi*th.,: :. :ii
::.!~i i:::i:::*:i:*!isu:pervisi~on r.ie~sponsible..for the ar.!ea audit~ed, who sh0::fall:take necessary!.:::{::
:.}:!:i.:::. action :to corr*ect r!epo~rted dleficiencies. i:Follow-up-actionin:rcludciJng r:ie- ::::ili:
:.}:!:i.:::. action :to corr*ect r!epo~rted dleficiencies. i:Follow-up-actionin:rcludciJng r:ie- ::::ili:
                      ,-:;:.s~l;:: :i.,:a~udit/re-survey of0d:eficien*t ara,,                                       !aS:is ini~tiated :a s }dee~medJappr*oprli~at~e:...,,:i:i::
,-:;:.s~l;::
                                                            ..: : :=:.*:~*:::*:::.*!*: , ~i: iii 6 ::i:i.i/:::i:!2
:i.,:a~udit/re-survey of0 d:eficien*t ara,,  
: :::: :::.::, :::::::::::::::::::::::::::::::::                                                                                                              Rev. }2299.ii~
!aS:is ini~tiated :a s }dee~med Jappr*oprli~at~e:...,,:i:i::
:.; : :.::}.!i!i::! :ii::i!::.:: .:ii}::::R                 :::i:
: :=:.*:~*:::*:::.*!*:  
, ~ i: iii 6 ::i:i.i/:::i:!2 6
R e v. 2 9.ii~
:.; : :.::}.!i!i::! :ii::i!::.::.:ii}::::R v }2 9 :::i:
QA..:.
QA..:.
P.
P.
 
: 4. i:i!iii!T~he Q:*A:iSpecialisti i!iEng*ine!er: s*hall *::assess :the following:~**~**
4.i:i!iii!T~he Q:*A:iSpecialisti i!iEng*ine!er: s*hall *::assess :the following:~**~**
iiiili:ii:
iiiili:ii:
ii!:iii::iii*i!!i:!
ii!:iii::iii*i!!i:!
i*!ii:ii iil iiiiiiiii!i:
i*!ii:ii iil iiiiiiiii!i:
                                                                                                                                                                                                                                                    *iiii*ii!*iiiiiiii*ii*iiii ii
*iiii*ii!*iiiiiiii*ii*iii ii
:a..!], cviaui:,:*1/
:a..!], cviaui:,:*1/
I!             !/U:!..! qua!i ii 1M!I     ty  dl ~i UlI!:d:IIUC         plli:aJ!ULl;iucb, p":i
I!
                                                                                                                                                                                    *!U UCU U5I               dIKED~J[
U:!..! qua!i  
                                                                                                                                                                                                                    ]i: ii]:i :::] i             i~:
!/
ii t
1M!I y dl ~i UlI!:d:IIUC plli:aJ!ULl;iucb, p":i  
*!U UCU U5I dIKED~J[  
]i: ii]:i :::] i i~:
i*,*:ii.:!::.
i*,*:ii.:!::.
iii ~~ii:* :        .:b: effecud t!ic vendUess ofimplremethati                      the oiowin;gand. aS reiiauitd:iiii                                                   i*ii:::~iii:!*iili: :
iii ~ ~ii:*
::i::ii~J                           cno
b:
:i!i~~ii:i:licii.iii !..:il: i:i*i ith      i A mac with approv01               ii e d~iiICaii proedureal os. iand;ia!* ~ b *ii~ !*eiili i:ii !*iii
effecud t!i v
:*:*!: !:i: :i*             Aud*:i::i.l
c endUess of implremethati the oiowin; gand. aS reiiauitd:iiii i*ii:::~iii:!*iili: :
::iii       sche:*ulesi ass~ii*i~i:*ur.
::i::ii~J
it:!iii*i**.d                                    e thatlii:i i**.:i the*folo in areasi1241 are.o:~i:                   audited at t~he.iii             i!ii**ii:** :i:i::ii*
:i!i~~ii:i:licii.iii !..: il : i :i* i i th i A cno mac wi th approv01 i i e d~iiICaiii proedureal os.
il::!3:ii**ii**i
iand;ia!* ~ b *ii~ !*eiili i:ii !:i: :i*  
:*i*ii ::: i *::        ndiiicated**:i:ii*
!*iii Aud*:i::i.l it:!i sche:*
i ii:*i:*i * [**i frequenc
::iii ii*i**.d ulesi ass~ii*i~i:*ur.
:* *d* i*ies or more frequently as :*:iii;::*i*                           perform        ance lii
e thatlii:i i**.:i the* folo in areasi1241 are.o:~i:
* i~ii:::**       dictates.
audited at t~he.iii i!ii**ii:**
                                                                                                                                                                                                  *l3**iiii*ii*:i
:i:i::ii*
il ::!3:ii**ii**i i*ii i
ndiii i
cated**:i:ii*  
*:: ii:*i:*i frequenc
* [*  
*i :* *d* i*ies or m ore frequently as perform ance dictates.
:*:iii;::*i*
lii
* i ~ii:::**
* l3**iiii*ii*:i
:i:i*i*3i:
:i:i*i*3i:
: i.**:i ii:i::*ii*:i*3i~ii:::::*:ii:i*i**
: i.**:i ii :i::*ii*:i*3i~ii:::::*:ii:i*i**
i::i:.ii Training and qualifications of the staff..
i::i:.
6:::::::::::
ii i!i 6:::::::::::Training and qualifications of the staff..
i!i          ::*:.
Actions taken to correct deficiencies occurring with equipment, structure, systems, or method of operation that affect nuclear safety.
Actions taken to correct deficiencies occurring with equipment, structure, systems, or method of operation that affect nuclear safety.
Perorm
.:-::..ill*
                                                                                            .: ,.:::::- :;            :::nc:- of,:.:..-
-:i::.:.
ac .:,:**
:.i.
ivities.. required:b
*,: : :;:::7:::::i :i,
::-*.3: :.:. -::* .::. the
,***/-.,
                                                                                                                                                                                        .) QA:
Perorm nc of,:.:..-.:,:**
* program         :,.i*:: to:::::
ac ivities.. ::-*. 3: :.:. -::*.::..)
meet:*:::.!::~u*arH:ai!l::i:O**CFR::7 thecrteia f 0 FR.i:i8*b                               0,Apen                    B 10:3, CFR:
required:b the
r :~ :3:*!:i:.:,i:::~l:
* QA: program to:::::
ix                     71::
:,.i*:: ::"
meet:*:::.!::~u*arH:ai!l::i:O**CFR::7  
.i:i8*b r :~ :3:*!:i:.:,i:::~l:
thecrteia f 0 FR 0,Apen ix B 3, 10: CFR: 71::
i:::::*:*~::~:iii*:*!:i:i**i*i,::
i:::::*:*~::~:iii*:*!:i:i**i*i,::
    .:-::..ill*
            -:i::.:.
:.i.
* ,: :  :;:::7:::::i :i ,    ,***/-.,
:i::::i:*:
:i::::i:*:
:;.i":               docume::::*::*!*
:;.i":
n0:ted   *.*andarog 1.etPo               ht th ate~nt~ioe                       n olefo!the       Pr       :~etsMaagder and..                 ,:          ill
docume::::*::*!*
:3:::::.::::::::::::::::::::::9.::::: External audits .or s*:urveys of: suppliers: providing3 Imp~ortant:*To afety::***! I
n 0:ted  
:::materials,.                                               parts, eq::::i;::i::*f* services U nyi~i*mom3:*rquipmentlo                                           1f imareperormd                            at
*.*andarog ht 1.etPo th ate~nt~ioe n olefo!the Pr  
:* th~e~s*::
~etsMaagder and.. ill 3:::
i:::ind*::*    cated*:::
: ::.::::::::::::::::::::::9.::::: External audits.or s*:urveys of: suppliers: providing3 Imp~ortant:* To afety::***! I
                                                                                                                                                                                                                          *:i**.::::::::::::::::::Ii*:::
:::materials,.
:!::!:*.*!3!*i:iiifrequency::.
parts, eq::::i;::i::*f*
ii(!i:~i: :i!iii!***::                                 o~*r*Smoefeunl                me~:j*''*i!erformanc as pn*'::i                            dici~i t:J~ :a~n:tes.         n*:~ iies*i:i::i:
U nyi~i*mom3:*rquipmentlo services 1f imare perormd at th~e~s*::
i ::::.!*::::::i*!::*: ::*:!:i:3::::ii:3i:i*0. 3a.Suppliers provdingdi.:by:.
:* i nd*::*
                            .i:;!-!*i::                                                                                    co m riali gradeicalibrationie a ndte stitng service:sin i::.::
:::i cated*:::  
i:ii~i~ii:::                                   who::::::::::
*:i**.::::::::::::::::::Ii*:::
:!::!: ii(!i:~i:
*.*!3!*i:iiifrequency::. :i!iii!***::
o~*r*S moefeunl as pn*'::i me~:j*''*i!erformanc dici~i t:J~ :a~n:tes.
n*:~ iies*i:i::i:
.i:;!-!*i::
i ::::.!*::::::i*!::*: :: *:!:i:3::::ii:3i:i*0.
3a.Suppliers provdingdi.:by:.
co m riali gradei calibrationie a ndte stitng service:sin i::.::
i:ii~i~ii:::
who::::::::::
ar::i:i*:*
ar::i:i*:*
en:accredited.                 m*by na iat*onally:co                   re3i gnized accredi*           i.Ttin:gil::~ : *lbody,         uiong:i::::i:
en :accredited. by a m*
ii:*:!:ii:::: *.!)::procedures. consistent i:::::* !:ii::i..                                                                          w-:!i.*::*i**!:..!:::*
n at*
ith:tho se.
i onally: re3i co gnize d accredi*
::i*i:.::::!;:*:!!:~i~!:*i*::                 found:::::::::::::::::::
i.T tin:gil::~ : *lbody, uiong:i::::i:
                                                                                                                                                *:i:::Z::::!**:i*::   In A N:::ili.iiF[:
ii:*:!:ii:::: !:ii::i..
SI/ISO"::     IIE  C 17025!3 i:":F:::..: ::: ! *:*i!* 3:*:!:*:3i:i .:( :*i i (::i~i *::::*Q       i:*:*:*:**:!.:*         General:::i*i!*ii**
i:::::* *.!)::procedures. consistent w ith: th o se. found In A N SI/ISO IIE C 17025!3
Requirements for the Competence::                                               of-::::J:;*:;*!:
::i*i:.::::!;:*:!!:~i~!:*i*::  
Testing::: and3:         'Calibration:::::::::::::::
-:!i.*::*i**!:..!:::*
 
*:i:::Z::::!**:i*:: ::::::::::::::::::: :::ili.iiF[: ":: i:":F:::..: ::: ! *:*i!* 3: *:! :*: 3 i:i.:( :*i i (::i~i *::::*Q i:*:*:*:**:!.:*
                                                                  * :Labo0rato0ries~i, do: not h a ve tob be p erio0dically :su rveyed: !ifth cbi*onditions ::::i:i*:i*:
General:::i*i!*ii**
* i;i of the N RC iSafetyi Evialualtion dated iFebruary 9, 20i15 :are*met (seei *':I ! ::
Requirements for the Competence::
* i*ii
of-::::J:;*:;*!:
* i i *i&#xb8;::: :i:: ;z:.* .:::::i:i:i*,:!.i:    :i.
Testing:::
Apeni                      xB. onros halbe etbise inap ical                                                                                                                           prcdue to ensure~ii.:
and3:  
::*.!!i ;ii:;i::*::*2   the::::::::: r qi rem         :*.::    entsii*:::2
'Calibration:::::::::::::::
::* *.::;i:   :*i*   ofi*:i the  .:: NRCiSafety::::::::::::::                           Evaluation?}:i:-.**: il~are
* i *i i
: .:i:**::*!::satisfied.)
* i i *i&#xb8; ::: :i:: ;z:.*.: :::: i:i:i*,:!.i:
:i;,i i:!: *:*!.:!i.: :*1:: ?:i;!i~: : .;i:
:i.
                            *... :. : .>i.:H, : : ...:...::... ,.....:.:.:.,....           ,+: :,: ,L.&#xb8;. -<-.>::::,
* :Labo0rato0ries~i, do: not h a ve tob be p erio0dically :su rveyed: !if th cbi*onditions ::::i:i*:i*:
: :/..:> :: :.   . :.....< :: ::.: .: .:..,.,:: ..:.:,::. ,::,:::                                                                                                       : :' ,.. :..:..:.-;:. * .:...:.::>:::.::: :::: :.. :..:;....:-: .... --
* i;i of the N RC iSafetyi Evialualtion dated iFebruary 9, 20i 15 :are *met (seei *':I ! ::
                                                                                                                                                                                                                                                                                                      *.* **!!!**ii*,**.              *ii*!i*.!**     .i..*iii/*.!  i *i**.
Apeni x B. onros hal be etbise in ap ical prcdue to ensure~ii.:
iI* ii*ii*il      *ii!*i!**I      .i*i* i:i*I i !i!
the:::::::::
                                                                                                                                                        .. . *:ii            ...            ill i i:ii:ii i ii*i
::*.!!i ;ii:;i::*::*2 r qi rem entsii*:::2
                                                                                                                                                                                                                                                *i* i*; *ii*,ii* i*!!*iii'!*iI                                    *iii*,
::* *.::;i: of
                                                                                                                                                                                                                                                        ***iiiI*i iiii!i*                                              !ii*
:*i*
                                                                                                                                          .!:ii:..i:i:i
i*:i.::
                                                                                                                                                    +.:i:::
the N RCi Safety::::::::::::::
                      !!! :**=*
E valuation?}:i:-.**:
: : i!i!!
are satisfied.)
::*
il~::.:i:**::*!::::i;,iii:!::*:*!.:!i.::
* i!&#xb8;
:*1:::?:i;!i~:::.;i:
                                      *!* i *IL*:*&#xb8;    ;*i::i:il;*!
*... :. :.>i.:H, : :...:...::...,.....:.:.:.,....
                                              . :.. :. :         . i;,*::. .
,+: :,:,L.&#xb8;. -<-.>::::,
                      -.' " ::':: * "* *i: :,'*:: * :.i'*-* ;:.:.,'.. ::,:;*.*
: :/..:> :: :.
ii* i ii"
*.* * *! !! **ii*,**.  
                      .          * . .. :: :.       . . . : . : :. .                                ,     . :r .-        : "'::'/,...    : :': ..
*ii*!i*.!**
ili*i*i*i* i;i!:* ii i i* *i!*
.i..*iii/*.
                                                                                                                                                        '..'..' i.i..*./.':        " i:i: *      ::,,*: -.-:*:i::: ::.:%1..
i *i**.
                                                                                                          !!i! !i!ill                                            il                                                                                                                          i *!i *i!                            ii!i**!*
iI* ii *i i*il
ii:*- /i*!i !ii*ii !i ii/i ii!iii!:i*
*i i!*i!**I
                                                                                                                                                                                                *i*:iii    *i i**.           *iii*!*iii*i    ill                                      *:-:i:i:i*!*:i::i*  .* :*:*: *:::iiii:               !*:!i:!::::    *.ilri:
.i*i*
QAPD                                                                    28                                                                                                                Rev.
i:i*I ii!i!
 
i!i!!
:::!. .,.i~i*.:-  ;":I.iMPOrT.ANT TO1 sAFETY STRUCTruRES. SYSTEMS AND CoMPONENTS:i,:.:. -. :.
i!&#xb8;
            . .:.-                . The pertinent qual~ity as~surance requirements of.10 CFR 50, *Appendix :B, 10::I                                                                              CFR :71!IIi i~i..                      Subpart H and 10 CFR: 72 Subpart G will be applied, as a. minimum, to all qualityi-::.* i:i:
:* *=*
        .. :..:.::..      ...i i.:activities .affecting .the I!mpo rtant TO Safety (ITS) StructuresiSystems and:                                                                            =* :.*          ;:* :; '**;'
*!* i *IL*:*&#xb8;
bi.i::ased on .e~ngineeringieval~uations:and :a revision ito t'he INAC-MPC FISA:R*I. :Th~ese!l~:!:::::I
;*i::i:il;*!
* not considered**a :redutionintihi~***le comnmitmenjs to :the ::QAPO.::v::*i
i;,*::
                                              ...                                                                                                                          *i~:*::::. !, ',!:!ii:-:::iiii:i::*:
-.' " ::':: * "* *i: :,'*:: * :.i'*-* ;:.:.,'.. ::,:;*.*
* The quality cl~assification:of NRC,-licensed Dry Spent"Fuel StorageComponents and.
.! :ii:..i:i:i
                                              ',..Transportation.:Pa~ckages.may.:not be r;evised:.using the iLACBW                                            W*Design ::Control!i:~~:*:!:!!
+.:i:::
:.:process. *Th~ese :modifica~tions must :be :made :by the Certifica.teHolder. *The*::::i*-:.:!::I::
*:ii ill i i:ii:ii i ii*i
il:Certificate:Holderis rlespOnsible for idesign and licensing~icontrolsf(orthesei:; I.!::.;:. I*:
. *i*
c.:::,omponentsubnder: their NRC-appro~ved Quality: A ssurance ;iProgram. SOLuTI/oNS!.:I.;
i*;
                                              ;*.:utilizes these:types ~of .componentsland*packages* under.:the provisions of a NRCii;::i:i:
*ii*,ii* i*!!*iii'!*iI
::.iGeneral-:Licensefori!Radioactive Material TransportationiPackages (10 :CFR 71ii) ~andi.
*i i i*,
* * *i iiI* i ii i i!i* !i i *
:r.-
: "'::'/,...
ii* i ii" ili*i*i*i*
i;i!:* ii i i* *i!*
'..'..' i.i..*./.':
" i:i: *
::,,*: -.-:*:i: :: ::.:%1..
!!i! !i! ill il i i:*- /i*!i !ii
*iii!i ii/i i i!iii!:i*
*i *:iii
*i i**.
*iii*!*iii*i ill i *! i *i!
ii!i**!*
*:-:i:i:i*!*:i::i*
*: ::iiii:  
!*: !i:!::::  
*.ilr i:
QAPD 28 Rev.
:::!..,.i~i*.:-
;":I.iMPOrT.ANT TO1 sAFETY STRUCTruRES. SYSTEMS AND CoMPONENTS:i,:.:. -. :.
. The pertinent qual~ity as~surance requirements of.10 CFR 50, *Appendix :B, 10::I CFR :71!IIi i~i..
Subpart H and 10 CFR: 72 Subpart G will be applied, as a. minimum, to all qualityi-::.*
i:i:
...i i.:activities.affecting.the I!mpo rtant TO Safety (ITS) StructuresiSystems and: =* :.*
bi.i::ased on.e~ngineering ieval~uations :and :a revision ito t'he INAC-MPC FISA:R*I. :Th~ese!l~:!:::::I
* not considered**a :redutionintihi~***le comnmitmenjs to :the ::QAPO.::v::*i  
*i~:*::::. !, ',!:!ii:-:::iiii:i::*:
* The quality cl~assification :of NRC,-licensed Dry Spent"Fuel Storage Components and.
',..Transportation.:Pa~ckages.
may.:not be r;evised:.using the iLACBW W*Design ::Control!i:~~:*:!:!!
:.:process. *Th~ese :modifica~tions must :be :made :by the Certifica.te Holder. *The*::::i*-:.:!::I::
il:Certificate :Holder is rlespOnsible for idesign and licensing ~icontrols f(orthesei:; I.!::.;:. I*:
c.:::,ompo nentsubn der: the ir NRC-appro~ved Quality: A ssuran ce ;iProgram. SOL uTI/oNS!.:I.;
;*.:utilizes these :types ~of.components land *packages* under.:the provisions of a NRCii;::i:i:
::.iGeneral-:License fori!Radioactive Material Transportationi Packages (10 :CFR 71ii) ~andi.
I::*:?tems and :services:associated with P:*ackaging and :Transportation of; Radioactive' i: ::
I::*:?tems and :services:associated with P:*ackaging and :Transportation of; Radioactive' i: ::
                                "*"i.Materdia s described ::in 10:i:C FR!71:,: andi i ndep*endent:; Sto6rag e: of:Spent N~fuclear: F~uelI.:
"*"i.Materdia s described ::in 10:i :C FR!71:,: andi i ndep*endent:; Sto6rag e: of:Spent N~fuclear: F~uelI.:
                              ..:,assdescribed*in 1.:;t0               C FR :72,; willials o* fall ;under ;the r*eq'uiremen*ts: of: the:QAPD."*:.ii-.:: :.
..:,as sdescribed*in 1.:;t0 C FR :72,; willials o* fall ;under ;the r*eq'uiremen*ts: of: the:QAPD."*:.ii-.:: :.
                                                                                                                                                                                                                            !!i*:i!"ii:
!!i* :i! "ii:
packages are defined below :...                                  :      *:             :            :::  :,      :,        ::::          :ii::L          ii:.iiii*;;ii!i!;;*
*'i!::ii  
*'i!::ii
!:: :'-i.:*::i.i::.
:'-i.:*::i.i::.
:i:i  
                ;!.. :i:i:.:.::!
*".i i.:::!
                                  *".i                                                                                                                                                                                   *!*:*ii!!ili:i,!?
i.:::!
:::::..iii::i:.::.:..ii::*
:::::..iii::i:.::.:..ii::*
:?:!*i.:'*
:?:!*i.:'*
:": ":. i:i:i:*:i:ii:::
i.i:.
:::i :::ii*.i?
packages are defined below :...
:ii::L ii:.iiii*;;ii!i!;;*
*!*:*ii!!ili:i,!?
:A.i: ::
:A.i: ::
Dry Spent:::::Fuel Storage *:ii!:i!i!**i;i~:    (10. C:FR             72)~i:!:.......
Dry Spent::::: Fuel Storage (10. C:FR 72)~i:!:.......  
*:ii!:i!i!**i;i~:
::i!iiiiiiiiiL:.:
::i!iiiiiiiiiL:.:
* ii*i:;:
* ii*i:;:
:!!*i:i!*!
:!!*i:i!*!  
                                                                                                                                                                !*?*i:!i*i!**
!* ?*i:!i*i!**
ii:iii*i*i!i*:::;*i iii*: !*
i i:iii*i*i!i*:::;*i ii i*
:":":.i:i:i:*:i:ii:::
Quality
i.i:.:::i :::ii*.i?
* Design
* Design Quality !::*:*:i::::**i:::.:iDesign::*!:'
;*.:'::..J
:i:..::i::.: .:: S-sc"":ii~i::
:i:..::i::.:.:: S-s c"":ii ~i::
                                                                        ;*.:'::..J                                                                        ....Cateaorv:.      :*:::%"*Auth0dtv:i:*!:...::;i"
Cateaorv:.
                                                                                                                                                                                                          .:.i:::i*:
!::*:*:i::::**i:::.:iDesign::*!:'.:.i:::i*:
T.ransportable Storage:Can~ister and Fuel Basket Assembly:.! i-:"I:". .. A':: :.* :.:-NAC Intl'.:..,I :..
:*:::%"*Auth0dtv:i:*!:...::;i" T.ransportable Storage:Can~ister and Fuel Basket Assembly:.! i-:"I:"... A'::  
ii&#xb8;;i:i.*!:i:::i::
.::-NAC Intl'.:..,I :..
                                                                                                                                                                                                                                    *.:i::*:ii:!':*.
ISFSI P ad.
                                                                                                                                                                                                                                              !:il ISFSI Pad .          .... " .. ..--: *: :.,: :, . . . : .... :-- . .: ' , .:- : - C ...                                         . ,. -D PC .....:
.... "....--: * : :.,: :,... :.... :--..: ',.:- : - C...  
Laaiftinn:g" Y oke                             ! ::i:::::*!i: :.i::::U :.:: .".*.:i ***:*:;:"i-::..::       "!::" .BA ::.:".:I .:*:: NAC  A :Intl. n L:::i... *:
.,. -D PC.....:
ii !* iii:I
Laaiftinn:g" Y oke  
: ?* :*: i!*i l i!::i*
.B NAC Intl.
i::::i
! ::i:::::*!i: :.i::::U :.::.".*.:i  
                                                                !i                                                                                                         i:                                     i:i'il QAPD QAD29Rv.2                                               .        .. .,
***:*:;:"i-::..::  
                                                                                                                                                                              -: . i:.:   : """ .*:::. ':". '::-; ::"::":" " ": "
"!::" A ::.:".:I.:*:: A : n L:::i... *:
i:i*:::*
ii&#xb8;;i:i.*!:i:::i::
                                                              *:!i::i::,:
*.:i::*:ii:!':*.
                                                                  *::ii*ii:::*i*:
!:il
i,                                     :: ::i!   :i::*::,
::?* :*:
i!*
iil i!::i*
i::::i  
!i i::
i:i' il ii !* ii i:I QAD29Rv.2 QAPD
-:. i:. :
i: i*:::*  
*:!i::i::,:  
*::ii*ii:::*i*:
i,
:: ::i!
:i::*::,
::i:i:!:!i:ii:
::i:i:!:!i:ii:
i!i*.i:i
i!i*.i:i
::*:L*:
::*:L*:
iii*i
i ii*i
::, : :!: i**,::
::, :::!: i**,::  


i..:""
i..:"" :*:i y: :": II::'" " i:...ii.i PP N I A:! :
y::*:i:": II::'" " i:.. .ii.i               PP N I A:!       A.ii:::
""APPENDIX A.ii:::
:      ""APPENDIX                i ./ ~ii: *!-:i
i./  
                  ...                                        (Page 2 of 2)
~ii: *!-:i (Page 2 of 2)
IMPORTANT TO SAFETY. STRUCTURES. SYSTEMS AND COMPONENTS B.       Transport of Spent Fuel and GTCC Waste (10 CFR 71)
IMPORTANT TO SAFETY. STRUCTURES. SYSTEMS AND COMPONENTS B.
                          .i::*:":.:. :.i:.}; : ::" SC .:. '     .-    " :: " : : "::              .Qa itgoy.-.,*;- Design"Authority" Transportable Stora e. Canisters and Fuel Basket Assembiy....I"                                         A...         ' NAG Intl: .
Transport of Spent Fuel and GTCC Waste (10 CFR 71)
Damaged Fuel Can:.-.:-..                           ::  *      '      :"        /     !"I;"" A :               ".:NAG Intl. :
,-:. :.:. :.i ;
Transportable Storage Canister and Basket Assembly For GTCC.I'                                         A"             -*NAGI*,: ;intl. :
.i::*:"
W aste Containers:                                                 .    "__"_____I___""._:-I__""''
:.} : ::" SC.:. '  
Storage Transp~ort-Cask. (STC): :"".                           ..:. .         -".   ..               A'.".         "NAG Intl..":
.Qa itgoy.-.,*;
Design"Authority" Transportable Stora e. Canisters and Fuel Basket Assembiy....I" A...  
' NAG Intl:.
Damaged Fuel Can:.-.:-..  
/  
!"I;"" A :  
".:NAG Intl.
Transportable Storage Canister and Basket Assembly For GTCC.I' A"
NAGI*,:  
;intl. :
W aste Containers:  
"__"_____I___""._:-I__""''
Storage Transp~ort-Cask. (STC): :"".
A'.".
"NAG Intl..":
C.
Radioactive-Material Transport Packages (10 CFR.71)
Radioactive M~aterial. Transport.Packages subject to the *provisions of 10. CFR 7:1, S~ubpart C,:. uG eneral.LicernSes,:=' are ;iim portant.:To..Safety and subject:.to i;the*
. a~pplicable :requ!irem ents.. of the6 QAPDi:::I..;:!
.::..":i ".::
.:.*.::~::.*:
;i.:.:::!:::
: 1. S::::i{::}ee NA*C-MPC **Final ~:*Sa~fety* A*na~yis.:
Report ifor additiionalJclassification:***::.i:}:!:::
in fo rm a tio n.
[ f r a lc *:*:
::::::::::: ::.i.":.:. :......./!:: i:: :i::.
.:.:i.. : ;: : ::::: :. :: :::::::::::::::::::
I:
I:
C.      Radioactive-Material Transport Packages (10 CFR.71)                                                                -
.2. See NAG Storage *Transport Cask (STC) Final Safety Analysis Report and
Radioactive M~aterial. Transport.Packages subject to the *provisions of 10. CFR 7:1, S~ubpart C,:. uG eneral.LicernSes,:=' are ;iim portant .:To..Safety and subject: .to i;the*
*associated NAC specifications for additional* classification information.
      . a~pplicable :requ!irem ents.. of the6 QAPDi:::I. .;:!                              ::      .::..":i ".:: .:.*.::~::.*: ;i.:.:::!:::
NA*C-MPC **Final ~:*Sa~fety* A*na~yis.:
: 1. S::::i{::}ee                                                      Report ifor additiionalJclassification:***::.i:}:!:::
[infforrm atio  lc n.*:*: ::::::::::: :: .i.":.:. :......./!:: i:::i::.                .:.:i. . : ;: : ::::: :. :: :::::::::::::::::::
  .2.
See NAG Storage
        *associated                          *Transport Cask NAC specifications                    (STC) Finalclassification for additional*            Safety Analysis             Report and information.
: 3. For the definitionof QualitY Categories A, B:, and C refer to NUREG/CR-6407:.
: 3. For the definitionof QualitY Categories A, B:, and C refer to NUREG/CR-6407:.
QAPD                                                                   30                                                           QAPD30Rev. 29
QAPD 30 QAPD 30Rev.
29


i:: ,.. :i.lrl:&#xb8;,:I:;&#xb8;:
i::,.. :i.lrl:&#xb8;,:I:;&#xb8;:
iA*iii;i
A*iii;i  
                                                                                                                                *~**
*~**
PPEND IXBi~. !i*i*i :!i ,i                                                                           EPT:         !*::IONS:                           ":" ii*:::***                                 *::.i~iii~:*
i PPEND IX Bi~. !i*i*i
:REG ULATORY C:OMMITMENTS. ALTERNATIVES ANDi EXCI
:!i,i EPT:  
                                                    *  .. -.. . .. . .  ..    . ..        . ..  ..., . . , ... . .      .        . l .                                .      .                    .      .
!*::IONS:  
11.0. .:REGULATORY :COMMITMENTs                                                                                         .:..
":" ii*:::***  
                                          .1.1               Regulatory Guide 1.8, 1I-R-5/7,                                                               Pesne Seletion end Training 1;;.;:,;::!:2..
*::.i~iii~:*
:.;;;::Regulatory iGuide 1.10, Ri;;evisIon 2.(3/05), "Establishing.Quialit~y                                                                                                                                                 iii                             *:
:REG ULATORY C:OMMITMENTS. ALTERNATIVES ANDi EXCI l
Assuanc           Proram                   forPacagig                                       Usd i                             theTrasporatin                                               o
11.0..:REGULATORY :COMMITMENTs  
  ........:i*i::iii:ii*..i*...i::
.1.1 Regulatory Guide 1.8, 1I-R-5/7, Pesne Seletion end Training 1;;.;:,;::!:2..
                      +.. - -.-.-.-...-.
:.;;;::Regulatory iGuide 1.10, Ri;;evisIon 2.(3/05), "Establishing.Quialit~y iii Assuanc Proram forPacagig Usd i theTrasporatin o
                                  ,:::. l -w*.* ...     "";*:i.1l.*TUI                                          .JiOC'liii..Wli.Jiir i ittislaljiliiu            US.II.:.:.C.J*tl                                  LCLIUIIl                                            OIIUi LIE 7
........ :i*i::iii:ii*..i*...i::
+.. -
l -w *.*...
:ii:i*!i;!i:!::*:;:iiiii!i:i:iiiiiii*i*iii*:*::
:ii:i*!i;!i:!::*:;:iiiii!i:i:iiiiiii*i*iii*:*::
i;i::Fueli iSitoria ge::: iSyte m* rC:Om*pon ents A~ccording ito:*il                                                                                             Iportant to ;Safety!i:;i,:i~i (2 /..9.6)...".                                                                                                                                         ,.:::::.                                                :,,:',_,.::
"";*:i.1l.*TUI
2.0 S2.1           iiN;iucl]ear; Energy:; Insti~tute :(N EEI)! N E !~4i-055ii"Guid elines for :the Us e o**f                                                                                                                                             : i~li li:~;I:i
.JiOC'liii..Wli.Jiir US.II.:.:.C.J*tl LCLIUIIl i ittislaljiliiu OIIUi LIE 7 i;
:          Accred ita tion ::in iLieuJi: of Commrre ci al* Grade !Survieys for P rocbureme n~t! obfi~lii::*::
i::Fueli iSitoria ge:::
S           Laboratory Calibration and :Testl Services,"; revision Q. and associated :;:*i
iSyte m* rC:Om*pon ents A~ccording ito:*il Iportant to ;Safety!i:;i,:i~i (2 /..9.6)...".
                                                                                                                                                                                                                                                                                                                                ...... ,. H..,.. ,..
2.0 S2.1 N;i ii ucl]ear; Energy:; Insti~tute :(N EEI)! N E !~4i-05 5ii" Guid elines for :the Us e o**f
i*/
: i~ li li:~;I:i Accred ita tion ::in iLieuJi: of Commrre ci al* Grade !S urvieys for P rocbureme n~t! obfi~lii::*::
!~; :*iii!:** ii:3.0~*:!:*&#xb8;
S Laboratory Calibration and :Testl Services,"; revision Q. and associated :;:*i i*/  
  - ""':* :: " :.                         None:.'
!~ ; :*iii!:** ii:3.0~*:!:*&#xb8;
:.*i/-::i.*ii i*.!*'. ;//:*:* :i.:,,*.*i*!*             i.i:ii.*iI *
......,. H..,..,..
                                                                                                                                                  .-.....-.....- - ..-.. H......           . H ......... ..... H .. ,.
None:.'
i:;*:}ili!i:!.;: i:!::============================2::*;::::*;;i:
:.*i/-::i.*ii i*.!*'.  
                                                                                                                                                                                                            *:::;: :/:*::!:}i
;//:*:* :i.:,,*.*i*!*
                                                                                                                                                                                                                                                                                                                          ,iii!
i.i:ii.*iI  
                                                                                                                                                                                                                                                                        . .:,:. : :-:. :-:* ..:r', :.'" r "....:        ::" :"*" ":: '  *. "':'.:::.',"
.-.....-.....- -..-.. H....... H.............. H..,.
: :i:::::!:i:,:,,:,:
i: ;*:}ili!i:!.;:
i::'..'i*,,":i! ii::.::i:,.!.!'.i:!;:'.: :"" : :.' i:i :
i:!::  
 
============================2::*;::::*;;i:
:/:*::!:}i
: :i:::: :!:i:,:,,:,:
i::'..'i*,, ":i ! ii::.::i :,.!.!'.i:!;:'.: :"" : :.' i:i :
/:., _ :. :.::... :.::.
iiil! i'
iiil! i'
                                                                                    /:., _ :. :.::... :.::.
..:,:. : :- :. :- :*..:r', :.'" r "....:
Q A
::" :"* " ":: ' *. "':'.:::.',", ii i!
PD~!ii:::il i ii~i*ii~i:-. 31'i*:*          :                                                                            *i;!;:i::'
::0*PD; Q
                                                                                                                                                                                                                                !i*:i:*i:*:,il *:i* i: *!i:*;*;*/;:i::*;*i'      :Rev.
A PD 31'i*:*
                                                                                                                                                                                                                                                                                    *:*i:;2*i*;!:*;:.
~ !i i:::il i ii~i*ii~i:-.
:il;i*i i :*:*iii*ii*i!ii::i*:*i     iii   29!;i~~~i*!~
Rev.
i:::i*i:i!i:*:i*i*i:il::&#xb8;
29!;i~~~i*!~
::0*PD;
*i ! i*:ii*:,ill *:i::*!i:il;i*iiii :* :*iii*ii*i!ii::i*:*i iii i:::i*i:i!i
:*:i*i*i:il::&#xb8;
;!;:i::':i:* i* :*;*;*/;:i::*;*i':*:*i:;2*i*;!:*;:.


                                                                                                                                                                            . . ..  "" .- ,-:'-,.' '.;-:b .. :  :.:.:.
i:!.-*itiii.:iii":i!i;}!*i:*!i(i:.i*i.
i:!.-*iti i.:i i":i!i;}!*i:*!i(i:.i*i.
.(Page 1l of 4).
:. .(Page 1l of 4) .
"".-,-:'-,.' '.;-:b.. :
:. ....                                                              ....,:,'' :."":i:.': :.:.i:":-:..   ,.:::-
....,:,' ' :."":i:.': :. :.i:":-:..
                                                " . : i,} . ::/               .,. 'i:i/i         .}i},ADMINISTRATIVE CGONTROLS.:I il ,. .i~I.~I:.:I::.ii ~,":i :.i}i}~
i,} ::/  
                              'i:These Administr~ative :Control
.,. 'i:i/i  
                                    '"hese
.}i},ADMINISTRATIVE CGONTROLS.:I il,..i~I.~I:.:I::.ii ~,":i :.i}i}~
:w:
'i:These Administr~ative :Control eedvloe osport; opertation of the L{ACBWR
eedvloe osport; opertation of the L{ACBWR
/;.ii:;planrti whiilie: :inh. SA:FSTOR Ri(d.i smantlem~ent)} and:-operationi~ of. the. LACBWRi i SF.Sii :i. :
                              /;.ii:;planrti whiilie: :inh. SA:FSTORRi(d.i smantlem~ent)} and:-operationi~ of. the. LACBWRi i SF.Sii :i. :
T3!;:i:  
T3!;:i:~iequ     r          ire~men ts~we re; pr~evious iyl :in clud ed :i n~ the: Tech nicail Speciifi cation0s :Zand~::. i iii:!iere: :relaei.*bid iL6!to                 th .xpD!udg.!c!ved~~missinQAPD during- active,:decommissioning.!:::i:iiii:i:!:i~i!i*:~i:i!i!:!:*:.i~l ji!!
'"hese r
:.::.}:;~..:*-;..;;}:::.
~iequ ire~men ts~we re; pr~evious iyl :in clud ed :i n~ the: Tech nicail Speciifi cation0s :Zand~::. i w:
                                                      .fi;/:: .i.:c:i overing :the :Pl ant dbcomm~is sio niJng acti vi~tie s ref-reien ce d ibe low anddin 1.1.3 Radiation Protection Program implementation.
: iii:!iere: :relaei.*bid iL6!to th.xpD!udg.!c!ved~~missinQAPD during-active,: decommissioning.!:::i:iiii:i:!:i~i!i*:~i:i!i!:!:*:.i~l
1.2             Each procedure required by Section 1.1 above and programs listed in Section 2.1 through 2.5, and any changes theretog shall be independently reviewed by a Qualified Technical Reviewer and approved by the Project Manager or designee prior to implementation.
:.::.}:;~..:*-;..;;}:::.  
.fi;/::.i.:c:i overing :the :Pl ant dbcomm~is sio niJng a cti vi~tie s ref-reien ce d ibe low and din ji!!
1.1.3 Radiation Protection Program implementation.
1.2 Each procedure required by Section 1.1 above and programs listed in Section 2.1 through 2.5, and any changes theretog shall be independently reviewed by a Qualified Technical Reviewer and approved by the Project Manager or designee prior to implementation.
2::.-20: :PROGRAMS AND :MANUALS ".::
2::.-20: :PROGRAMS AND :MANUALS ".::
i!i! i!i!:   ii             r:!:..::*:i:;.;eview.: Eice~nse~e-i nitiat ed]: chanoes. to {theg iPC     Cpshal i:b e su bmi[tted to*.iiii
:: *,.,.,.:..:i!i!
                                                *.!*!.;%{;!..i;;*.!i*which t.ihe chan.;.*ge(s) w*asma*d~ei~i. *This submittal shallicontai~ni :> ; ::
i!i!:
the :::.
ii r:!:..::*:i:;.;eview.: Eice~nse~e-i nitiat ed]: ch anoes. to {theg iPC Cpshal i:b e su bmi[tted to*.iiii the :::. i
i
*.!*!.;%{;!..i;;*.!i*which t.ihe chan.;.*ge(s) w*asma*d~ei~i. *This submittal shallicontai~ni :> ; ::  
                                                                                                                                                                                                                                ; **i!               :
; **i!
::i:::::~~i:*: con*:::!
: ::!::,;i:}**;:::::
: ::!:: ,;i:}**;:::::                  *:forman*e iof the solidifi~ed waste :pr~oduc:t to,*existin~g criter~ia* for! ::; ::* * ;: : i; 2.1.:3:: .Do:ume~ntaiotJn of :thie fact: that t:he change !has been reviewed a~nd :
::i:::::~~i:*:
i i::found
con*:::!
                                                                                      .          :acceptable :by a Qualified :Technical Reviewer.. ::: :*i:! ::i:
*:forman*e iof the solidifi~ed waste :pr~oduc:t to,*existin~g criter~ia* for! ::; ::* * ;: : i; 2.1.:3::.Do:ume~ntaiotJn of :thie fact: that t:he change !has been reviewed a~nd :
i:-!.*
i.i::found :acceptable :by a Qualified :Technical Reviewer.. ::: :*i:!
i:'::!::*
::i: I i:-!.*
                                                                                                                                                                      .:*!:)}::*::::::
i:'::!::*  
:i:}i i:ii:;*!:::::i:i*
.:*!:)}::*::::::
                                                                                                                                                                                                  }
:i:}i i:ii:;*!:::::i:i*  
I iii i}:!i ii; i: ::i :i'i                           i*:!:i i:ii*!*::::::i*
}
iii:!:!i*
iii i}:!i i i; i: ::i :i'i iii:!:!i*
:i:::!:i*ili                                            :i:ii:/i::!:117
:i:::!:i*ili i*
                                                                                                                                                                          ,....      .....  -..    ,..._...,*  .....      -', :.;..: : ".,'...'w::'::i Q;APD                                                 : :: *'!::}                       32 ...i...
:!:i i: ii*  
i..: ;!:ii: ::32::                                 *..:}....   . : ....
!*::::::i*
:;.i:;"
:i:ii:/i::!:117
                                                                                                                                                                      ,-..-          *" ..R Rev.
-', :.;..: : ".,'...'w::'::i Q;APD 32 Rev. 29:
                                                                                                                                                                                            ..ei!.:29    29:
: :: *'!::}
:.;:,:.,      ::-i
i..: ;!: ii : ::32::... i...
 
........ R ei!.:29 :-i
:APPENDiIXo::
*..: } :;.i:;"
(Page 2 of 4)}i   C;
:APPENDiIXo:: C; (Page 2 of 4)}i
:..**?:: i::.::i
.-,::*.:* :;:..::.3-
:;: *!..::.3-:;";:ADM                                                   INISTRA iVE CONTROLSi:;i.*ii~::i:&      ":i :./ :i* i.:...                           *~i/;:;
:..**?::
:*i:,i::i:iiiiiii!
i::.::i *! :;";:ADM INISTRA  
                                                                                                                                                                                                            -:.::'        :i; .:::  iili!:!
":i :./ :i* i.:...
::::.:/
iVE CONTROLSi:;i.*ii~::i:& *~i/;:;
:": 73/ii   ":.:{:: :-::::                           In:i~.:i.::!formation submitted should consist of a package of :those -pages:
::::.:/ ":.:{
:::.:::i:..:. }.:::ii::.i:.,.* ::: /i}.6of::.;
:": 73/ii :: :-::::
::.i/i.!                                                                  the 00*CM :changed iwithi each page numbered .and providedi: : :
In:i~.:i.::!formation submitted should consist of a package of :those -pages:
          . }:: ". :"i. ": :}::: "": ;.':{i-:w:itht an approval and date box, together with appropriatei:.!:; . }:::: i
::.i/i.! :.
                              '.:i ::-...::!:i:Sr~adioactive effluents and for maintaining the doses to miembers of the ... :.::.i:
:::.:::i:.. }.:::ii::.i:.,.* :::
                              .. ::.. {:/ ::;. .: progra~m (1I). shalli be cobntained :in: th~e: 0DCM,:(2:)shall: be: implementedI.:i.:ii::!!i
of::.;  
/i}.6 the 00* CM :changed iwithi each page numbered.and providedi: : :
}:. :"i
:}::: "": ;.':{i-:w:itht an approval and date box, together with appropriatei:.!:;. }:::: i
:*i:,i::i:iiiiiii iil i!:!
:i;.:::
'.:i ::-...::!:i:Sr~adioactive effluents and for maintaining the doses to miembers of the... :.::.i:
{:/ ::;..: progra~m (1I). shalli be cobntained :in: th~e: 0DCM,:(2:)shall: be: implementedI.:i.:ii::!!i
::i::: *:.by health :physics pr;*iocedu~res-ia nd: instru ctions,. anid :(3) shall :include !ii:}}:i;-;1* :~
::i::: *:.by health :physics pr;*iocedu~res-ia nd: instru ctions,. anid :(3) shall :include !ii:}}:i;-;1* :~
                              .-i T* *." remedial actions to be ta~ken whenever.the pro0gram limits are exceeded:..};. "
.- T i * *."
                              ..i.-:/}/,.:i: .:-:The program shall :include.'the following, elements:::.                                                         . .,. ?-} ..?} 7 . ; :.4.::
remedial actions to be ta~ken whenever.the pro0gram limits are exceeded:..};. "
....:.:.}.!*i:.:.-:&#xb8;,:.{..
..i.-:/}/,.:i:.:-:The program shall :include.'the following, elements:::.  
                                            " !:.::&#xb8;.. :!:,1 2.i3.1~:,:         imit:U !ation       on rinig*s *in.istrume i~*.the*   :operabii                      ctive li:iq uid :*.te:sts tyi iof-riad ioasurveillianrce          an d }ga~seo*us!*i and::ii:}! ::ii ii/
..,. ?- }..?} 7. ; :.4.::
iiiiii mo6n~ito
.... :.:.}.!*i:.:.-:&#xb8;,:.{..
                                                                      !:::i!.::*;::::                             ntation,,including:                                                 -i:*::i:::*.ii
Siii! iiiiii
                                                                        - -:- iset po6in0t:.deter~min*ation 1n{i
" !:.::&#xb8;.. :!:,1
                                                                              -                                              a ccor~dance :with .:the:.methOdology In.:ri the::~~
"' i:'. ": ::;..'.i*
Siii!                                    2.3.2 L:;:im:::
* -.:. : ::: i*
                                            "'i:'.":::;..'.i*
2.i3.1~:,: imit:U  
                                            * -.:. : :::i*
!ation *s on i~*.the* :o perabii tyi io f-riad i oa ctive li:iq ui d : an d } ga~seo*us!*i ::ii ii /
i tai*ii{io ns !on theico ncentratio~n s o;*f :rad~ioactive iia                 m :terial :!r*elesed..~
!:::i!.::*;::::
i.{i.liquid :effluent~s t;io:. unrestricted aeaas c;onfor~ming .to 10 Cii~:FR ::20,;i:
mo6n~ito rinig *in.istrume ntation,,including: surveillianrce *.te:sts and::ii:}!
:Y...In.I:                                                                                                                                            :!}:::i*i{ii!ii
-i:*::i:::*.ii
                                              .:ii:::2.:3.i3 *iMonritor~ing, si.ampling an~d-analysis of radioactive liqu~id andai }: :i:!*:i';i: :;:*::-/
-:- -iset po6in0t:.deter~min*ation 1n{i a ccor~dance :with.:the:.meth Odology In.:ri the::~~
                                            *<:{.:aiir::T-}a!borne
2.3.2 L:;:im:::
                                                  .. i:;*                                      particulate in accordance withi 10 :CFR :20 and withi: th~e~i:i:i
i tai*ii{io ns !on theico ncentratio~n s o;*f : rad~ioactive m iia :terial :!r*elesed..~
:iy.
:Y...In.I:
                                            .: }::/":.:: ::*::.                methodolo*gy and iparameters described :in the 00CM:;.:*:i*::/`:::::.*.;*::*:}.                                                                .
i.{i.liquid :effluent~s t;io:. unrestricted aeaas c;onfor~ming.to 10 Cii~:FR ::20,;i:
co:i:::&#xa2;m ]mitment: :to ,a miember-* of the :public:. from radio~activematerila~ls:* }: i:iiii
:! } :::i*i{ii!ii
:! i~;:i:      :;:*i{ii:ii/.:
                                                          ..i..
:i..i*.:
:i..i*.:
i*:
i*:  
              ;:*i&#xb8;
;:*i&#xb8;
:.{i:{Y::i:*ii::!ii*:"i::.
:. {i :{Y::i:*ii::!ii*:"i::.  
2*;{i::':.}:
.:ii: ::2.:3.i3 *iMonritor~ing, si.ampling an~d-analysis of radioactive liqu~id andai }: :i:!*:i';i: :iy.
:3.-5 ::;iDeterminaition :of: cumula.tive anid projected dose                                         co ntributions}               :.} ;. . .. :.i: .
*.. i:;*
                                            .:.:}::::.vi.::.!il":;.from radioactive :effluenits-for :the current calendar quarter *a~nd:!:: * " :*::
<:{.:aiir::T-}a!borne particulate in accordance withi 10 :CFR :20 and withi: th~e~i:i:i
::.:.::-:*:.:;:.:::.:.:: .icurrent :ca~lendar :year ;in* accor~dance" with the methodology :and...i-.. ,..-
:;:*::-/
                                            ": :":: ."-i                       parameters Inaa           te 00CM atMatlesteve the                    least:."-}
.: }::/":.::
every year.:;                   -        .:}::i:i:;":!.:i. .":"ii!,
methodolo*gy and iparameters described :in the 00CM:;.:*:i*::/`:::::.*.;*::*:}.
QAP..... . . O !:**i`*.i:i.:ii;*:i***.!*:!:!;;:9 33**`i*!
i~;:i:..i..
I..i::::i::!     * ::::i::                             Rev.:i*.!i!:!*iii*i-:i:ii::*
:;:*i{ii:ii/.:
i:i:ii*!:*!:::::    29.3    ::iii:
co:i:::&#xa2;m
*";:.:::":. .:;*::."::*,.!*.!:i}:*i:/:i
]mitment: :to,a miember-* of the :public:. from radio~activematerila~ls:* }: i:iiii 2*;{i::':.}:
:,:::":::!!*i:*-:.'' ........
:3.-5 ::;iDeterminaition :of: cumula.tive anid projected dose co ntributions} :.} ;.... :.i:.
                                                            . - -.                                                                                      i*:*: ;i* :i*{*ii :
.:.:}::::.vi.::.!il":;.from radioactive :effluenits-for :the current calendar quarter *a~nd:!:: * " :*::
                                                                                                                                                                                  .!: .-', .: :.:.    -.'.".- .: ,:..      * :.. i. " :!::;:
::.:.::-:*:.:;:.:::.:.::.icurrent :ca~lendar :year ;in* accor~dance" with the methodology :and...i-..,..-
": :"::."-i parameters Inaa the 00CM te atMatlesteve least:."-}
every year.:;  
.:}: :i:i:;":!.:i..":"ii!,
!*.!:i}:*i:/:i
:,:::":::!!*i:*-:
Q A P.....
O 33**`i*!
!:**i`*.i:i.:ii;*:i***.!*:!:!;;:9 I..i::::i::!
R ev. 29.3
* ::::i::
i*:*::;i*
:i*{*ii :
i:i:ii*!:*!:::::
:i*.!i!:!*iii*i-:i:ii::*
::ii i:
* :.. i. " :!::;:
7"::i
7"::i


...::{*i* *:*::*.*ii!iiiii:
APPENbIX c (Page 3 of 4)
APPENbIX c (Page 3 of 4)
                                                                                                    ~1STRATIVECONIEOL.......................
~1STRATIVECONIEOL.......................
2.3.6 Limitations on the annual and quarterly doses to a member of the public from tritlum and all radionuclides in particulate form with half-lives greater than eight days in gaseous effluents released to areas beyond the site boundary conforming to 10 CFR 50,                                                                                                 !i!:.:i:i*T*:*:!:iii:i!*::!):i!iii:
2.3.6 Limitations on the annual and quarterly doses to a member of the public from tritlum and all radionuclides in particulate form with half-lives greater than eight days in gaseous effluents released to areas beyond the site boundary conforming to 10 CFR 50, Appendix I; 2.3.7 LimItations on the annu'aI dose or dose commitment to any member of the public due to release of radioactivity and to' radiation from uranium fuel cycle sources conforming to 40 CFR -
        -.. ,- : ....                                                      Appendix I; 2.3.7 LimItations on the annu'aI dose or dose commitment to any iiii member of the public due to release of radioactivity and to' radiation from uranium fuel cycle sources conforming to 40 CFR                                                                               -
Part 190.
  ...::{*i* *:*::*.*ii!iiiii:                                              Part 190.
Radiological Environmental Monitorina Proa ram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. 'the' program shall provide representative measurements of radioacdvty In the highest potential exposure pathways. The program sha~l (1) be contained in the ODCM; (2) conform to the guidance of 10 CFR 50, Appendix I; and (3) Include the following:
Radiological Environmental Monitorina Proa ram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. 'the' program shall provide representative measurements of radioacdvty In the highest potential exposure pathways. The program sha~l (1) be contained in the ODCM; (2) conform to the guidance of 10 CFR 50, Appendix I; and (3) Include the following:
2.4.1 Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters'described in the ODOM.'
2.4.1 Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters'described in the ODOM.'
2.4.2 Participation in an Interlaboratory Comparison Program to~ensure that independent checks on the precision and accuracy of the measurements of radioactive material in the environmental' sample matrices are performed aspart of the Quality Assurance Program for environmental monitoring.
2.4.2 Participation in an Interlaboratory Comparison Program to~ensure that independent checks on the precision and accuracy of the measurements of radioactive material in the environmental' sample matrices are performed aspart of the Quality Assurance Program for environmental monitoring.
                                            .2...ii:i*::.:.
!i!:.:i:i*T*:*:!:iii:i!*::!):i!iii iiii 2...ii:i*::.:.
: ii,2:*5     i:
:.ii,2:*5 i:
o.:.**::::**:*/:f
o.:.**::::**:*/:f
:F.e~deral:R~egulations, i:the :following *:repo*rts shall be isub*mitted!:
:F.e~deral:R~egulations, i:the :following *:repo*rts shall be isub*mitted!:
priIOrit~iM~aric~h
priI
::*:}iori:::              to                     *1.:: off:eac~hy*e'ar. in: a~ccord ancewitjh~i:10 C FR !:50ii*::L.4.
::*:}iori to Orit~iM~aric~h *1.:: of f:eac~hy*e'ar. in: a~ccord ancewitjh ~i:10 C FR !:50ii*::L.4.
2.5.1 Annual Radiological Environmental Monitoring                                                 ni o inq ReM  e pi*-i!! iL::   i::::i:::!i::!liiE.ii:*:,orti:
2.5.1 Annual Radiolo gical Environmental Monitoring ReM ni o inq e pi*-i!! i L::
iiiii!           ii!:
i::::i:::!i::!liiE.ii:*:,orti:
                                                                !:{!::::::*!:::the report :ishall :ibe s::ubm*itted :notin1g :and iexplainin~g :the reasons:**:!:!:: :i*:
iiiii!
ii!:
!:{!::::::*!:::the report :ishall :ibe s::ubm*itted :notin1g :and iexplainin~g :the reasons:**:!:!::
:i*:
for*:::::-:**:
for*:::::-:**:
:: :o::the:               mis*sinig:i*           reuit~s. T he mim           ssing data shall* be sulb mitted: as:!i -::.::://*::!::::
:: :o::the: mis*sinig:i* reuit~s. T he mim ss ing data shall* be sulb mitted: as:!i -::.::://*::!::::
soon as possible In a supplementary                             le niar~ie       report.su o~:::.:i:. ::. ~i:i:*i!:: :::::::::::::::::*:i!:i:i:!*iii::: i*:!:*
soon as possible In a supplementary report.su le niar~ie o~:::.:i:. ::. ~i:i:*i!:: :::::::::::::::::*:i!:i:i:!*iii::: i*:!:*
::i)*:i:**
::i)*:i:**
QAPD.'      i: ' ; :..:!:::'i:'        R.i"::;:-:,'-::::-!'*!::.:
..; ;.:::i:::
ev": 29"-:                        '
:,:{  
                                ..; ;.:::i:::
.:. :::!:::i!.:  
:,:{
!::i.,
                                              .:.:::!:::i!.:
:!:i)i!i iiiiii:ii!
                                                    !::i.,                   :!:i)i!i iiiiii:ii!
il
: .'!i:*i:!:ii:::     il .::::i*4.i
:.'!i:*i:!:ii:::  
                                                                                        - *":.*i*):i::.*:
- * ":.*i*):i::.*:  
:!i*'
):)!!:!*::!::i
                                                                                                    ):)!!:!*::!::i i:,i::!:i:,
.::::i*4.i *:*::::*!!ii!
                                                                                                                            !*:,':*{*
::i*;*i*)i  
                                                                                                                              .*i:i :"ql ::i*..
! i: 4 :::;
                                                                                                                          *:*::::*!!ii!
::i*;*i*)i *!*i.:
i:4:ii:ii:*
                                                                                                                                                    *!i*:i!ii
:!i*:i!ii*::ii
:!i*:i!ii*::ii
:! i*' i:, i: :!:i:,
!*:,':*{*
.* i:i :"ql ::i*..
* *i.:
:ii:ii:*
*!i*:i!ii Q
A P D.'
R ev":
i: ' ; :..:!:::'i:'
29"-:
i"::;:-:,'-::::-!'*!::.:


                                                      ., 'ii:"i:::!:":::i:::::i:i:
., 'ii:"i:::!:":::i:::::i:i:
:::"i::::!::::::*:::i:::i::
:::"i::::!::::::*:::i:::i::
::ii3"i:-:.'::;:i:*i :!&#xb8;. :::::i.i* ::.:.
::ii 3"i:-:.'::;:i:*i : !&#xb8;. :::::i.i* ::.:.
                                                    ?:..i:":i:                                                                                                                                                                                                                                              i.i
.::*:!.:*::i:*i..::*i..:::::!i!.!:7.i:*;!:::::
":*.::*:!.:*::i:*i..::*i..:::::!i!.!:7.i:*;!:::::                                                                 i~::: :: :A
:i!
                                                                                                                --Z.:i::i                                     :.,: PPE
ii i': il
:.*.:: N"D IX::.:::."-::
!i!!i i!
C::         , :. ....:*                                                          Si'ii: ii!:ii ii::iii ii:
?:.. i:":i:
ii(Page                                                      4 of 4)
--i ~:::
                                                                        ' * *::::i z!iiiiPrtogramii; a.map of iallsampling locat*,ions keyed:*to a table givingi: i~:i:
Z.:i::i :: :A PPE N D IX:
                                                                ... ::;::i.?.::::!
C::
:i *:::;:i:.:*.::*-i.~ii*::   .:i;*,distances :an~d idirections ifrom~tlhe plant*; the: results of: the . :.! .*:;:,.
ii(Page 4 of 4)
                                                                                                  ~~ItraoaoyCmaio                                                                             rga;anda: discu ssion o:f :all.i*:::-i**"i:::!:
Si'ii: ii!
                                                                                                                                                                                                                                                                                                                      ! 'ii
:ii ii ::iii ii :
                                                                        .... :. .. *-:-Paragraph (a)(2) .of.:10 CF;R 50,.36a,. ~Technical Specifications on : .
i.i
                                                                *:":.::!:':*:*:::::~:!i;.*:!.::..'~:.*."iEffl uents:.: from Nu clear :!Po~wer* Rea ct ors," requires, that a.-re~port be:i:
... ' * *::::i
    !i!!i i!
::;::i.?.::::! z!iiiiPrtogramii; a.map of iallsampling locat*,ions keyed:*to a table givingi: i~:i:
                                                                ....-. :':i~ *::::quanitity of each :of the principal :radionuclides released to:-                                                                                                                                           :::: - -".
:i *:::;:i:.:*.::*-i.~ii*::  
:i! iii': il                                                  : * :" ...::" unrestricted areas bV:.liquld or gaseous effluents during the.:..::-.i-ii ..
.:i;*,distances :an~d idirections ifrom~tlhe plant*; the: results of: the.
                                                                -.: q.:..::i..i.previous
~~ItraoaoyCmaio rga;anda: d iscu ssion o:f :all.i*:::-i**"i:::!:
                                                                        .:.                                                            :ii'ear., ~:With ~the exception o.f the collection of :hourly~i:::iiii!::"::::
.:..,:.- :... *-:-Paragraph (a)(2).of.: 10 CF;R 50,.36a,. ~Technical Specifications on :.
                                                                ". *:. :- .. ::i..-meteorologilcal::data,: the *inforimation lisubmitted shall ibe ::in.. .. "i*::...:.
*:":.::!:':*:*:::::~:!i;.*:!.::..'~:.*."iEffl uents:.: from Nu cl ear :!Po~wer* Rea ct ors," requires, that a.-re~port be:i:
                                                                ;. ::.*::i:.::::..:.*:.1) dated June. 19.74 :with :data :summarized on at..least a :quarte~rly::i.:
... :':i~  
:f ?::::::":.!.. i::,::::i accorid a~nce witi.hth O DCM                                                             M...of rad:ciatio~n doses :to :m~embers :o~f .the.. :
*::::quanitity of each :of the principal :radionuclides released to:-
1 i!i              i!
: * :"... ::" unrestricted areas bV:.liquld or gaseous effluents during the.:..::-.i-ii q.:..::i..i.previous :ii'ear., ~:With ~the exception o.f the collection of :hourly~i:::iiii!::"::::
:::::: i"::::::::::Gpub!ic:.
:-.. ::i..-meteorologilcal::data,: the *inforimation lisubmitted shall ibe ::in.... "i*::...:.
:::                                        from raidioahctive* liquid! and( airborne particulate :release~di:;! ::
;. ::.*::i:.::::..:.*:.1) dated June. 19.74 :with :data :summarized on at..least a :quarte~rly::i.:
U**:U
:f ?::::::":.!.. i::,::::i accorid a~nce witi.h th O DCM M...of rad:ciatio~n doses :to :m~embers :o~f.th e.. :
:i*ili.::::?:i.:,beyond :the :effluentr*elease boundlaryi:..This ireport: shall contain~:*:I ii*i.", -:. any ch*ianges .made :to theiO DCM durin~g :thei previou~s .~tw~elve : ii~i:ii:i:*
:::::: i"::::::::::Gpub!ic:. from raidioahctive* liquid! and( airborne particulate :release~di:;! :: 1 U**:U
i~- :.,i::,)*
:i*ili.::::?:i.:,beyond :the :effluentr*elease boundlaryi:..This ireport: shall contain~:*:I i~- ii*i.",
                                                                \i...-:.-: : . *mo n~thsi!.::--: .i::i:i ..... *: :).:!" :::i:i.""":' ::: " ':: : : :".:? : ":i(:i.::i:*:*:.i :
:.,i::,)* -:. any ch*ianges.made :to theiO DCM durin~g :thei previou~s.~tw~elve
:::-iii!:*:::!!:*(:;:ii::!-!::&#xb8;i::Zii::!*ii:!:..::::
: ii~i:ii:i:*
\\i...- :.-: :  
. m o
* n~thsi!.::--:.i::i:i.....
:).:!" :::i:i.""":' ::: " ':: : : :".:? : ":i(:i.::i:*:*:.i  
! 'ii i!i i!
: ::i*:*j::::i:.iii:::-
:::..i::::  
..:.*::II:.:I"Z.:.
:::):.:i
:::):.:i
:!if!!:-:.iii:::
:!if!!:-:.iii:::
::*i:!3*iii.:   :ii*ii*i:!Z:                                                                                                                                                   : ::i*:*j::::i:.iii:::-
::*i:!3*iii.:
:::..i::::
:ii*ii*i:!Z:
                                                                                                                                                                                                                                                                                                                                        ..:.*::II:.:I"Z.:.
:::-iii!:*:::!!:*(:;:ii::!-!::&#xb8;i::Zii::!*ii:!:..::::
                                                                                                            *::   .: :-:-;:.i:i';,-:::::: i:i.i:.::::;:,i.::i                                                         '..::...
.: :-:- ;:.i:i';,- ::::: : i:i.i:.: ::: ;:,i.::i
:..: .. . :      .. .: :: :.,!:i:i:?i:.ii:).'::::: :::.
::.:i.:! %:!1111:.
:.i:i:;.                    .:.....      :: :, ::...
::::*:::i::*::i..i::)iii:.,:':::.i  
                                                                                                                                                                                                                                                                                                          !i::".::'                                ,.
!i::".::'
::.:i.:!%:!1111:.
i::ii::  
::::*:::i::*::i..i::)iii:.,:':::.i i::ii::
.i.i::i:.i::.
    .i.i::i:.i::.
::!:.i*i:ili
:"::!::!:.i*i:ili
:..... ::.* i ].'Z 'i
:**:i:;*:i*
:**:i:;*:i*
i}i;:i:.ii!!*ii!i
i} i;:i:.ii!!*ii!i
:.i:!::,*iiii-:;:::.*
:.i:!::,*iiii-:;:::.*
: . . ... ::.* i ] .'Z 'i i,:i:                                                                                                                        !:*:::
...: :: :.,!:i :i:?i:.ii:).':: : :::. :.i:i:;.
::i.i
i,:i:
                                                                                                                                                                                                                            !!i*:*
::i.i  
                                                                                                                                                                                                                      ......... *.!.::i:
!!i*:*  
i::::i,.:*-::!ii.!:*?::::
*.!.::i:
:.-..,          :.....f:::::
i:: ::i,. :*-::!ii.!:*?::::
                                                                                                                                                                                                                                                                  .:i:        ::.*:::::!i:*
:.. f::::: : :.*:::::!i:*
i,.. :.!Z.:..  "::i::").:*::i;-;*
::i::").:*::i;-;*
i::::-:!!i::::4-
i:::
                                                                                                                                                                                                                                                                                            .. :..,.../.,..   ,..i :::
:-:!!i::::4-
                                                                                                                                                                                                                                                                                  !i i
.:i:...i,.. :.!Z.:.. ".. :..,.../.,..,..i :::
:f*::i:i      iii!.:i*:*:.i:iiil.i!*.::,.i!*.!*i.:::::ii:
: *.!i.:::*: :-:..-...,.-!.::.:.:::: 'h:; :::*::!i::
i:::*:::**:.!         !i               :,:i::.*
..i-:!::*::  
....,..::::!::....: !.i::::i
:i!i:)i:
! i i i:i i ii ! !i
:f*:: i:::*:::**:.!  
.:i*:*:.i:iiil.i!*.::,.i!*.!*i.:::::ii:
:, :i::.*
:,i:;:,:::::
:,i:;:,:::::
: *.!i.:::*::-:..- ... , .-!.::.:.:::: 'h:; :::*::!i::    ..i-:!::*::
!i:ii!i%,i:;iiiiiiii!i
                                                                            ...., ..::::!::....: !.i::::i:i!i:)i:                                                                                                                                                                                  !i:ii!i%,i:;iiiiiiii!i
.QAPD
                                    .QAPD                                                                                                                                                                                                       PD ::::~:::.R~ev. 29::
":::.Ai PD ::: :~:::.R~ev. 29::
                                                                                                                                                                                                                                            ":::.Ai
 
FIGURE 1 La Crosse Solutions Organization SOLUTIONS (off-site)                                                                    I I              PresidentI SOLUTIONS (on-site dismantlement)                                                ,.  *
                                            /                  rjc              a  grK  I
                                                      /                        I P                      I ISFSI ACTIVITIES (subcontracted to DPC)        [..............................
QAPD                                                36              QAPD36Rev.
29


Enclosure 2 LACBWR Q.APD, Revision 29, Summary of Changes
FIGURE 1 La Crosse Solutions Organization SOLUTIONS (off-site)
I I
PresidentI SOLUTIONS (on-site dismantlement)
/
rjc a grK I
/
I P
I ISFSI ACTIVITIES (subcontracted to DPC)
[..............................
QAPD 36 QAPD 36Rev.
29 LACBWR Q.APD, Revision 29, Summary of Changes


QAPD, Revision 29 Summary and Evaluation of Changes LACBWR QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD)
QAPD, Revision 29 Summary and Evaluation of Changes LACBWR QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD)
Revision 29 Summary of Changes The Dairyland Power Cooperative (DPC) and LaCrosse Solutions (SOLUTIONS) have recently submitted an application to transfer the La Crosse Boiling Water Reactor (LACBWR) Possession-Only License No. DPR-45 to from DPC to LaCrosse Solutions QAPD Revision 29 was developed in conjunction with the SOLUTIONS application for the Transfer of the NRC 10 CFR 50 license from DPC to SOLUTIONS for the completion of decommissioning. Upon NRC approval, SOLUTIONS will be the NRC licensee responsible for all activities under the LACBWR License. QAPD Revision 29 reflects the iicensee change from DPC to SOLUTIONS, and reflects the plan to subcontract the management and activities at the ISFSI to DPC. Upon completion of decommissioning, SOLUTIONS will apply to the NRC to transfer responsibility for the NRC License back to DPC.
Revision 29 Summary of Changes The Dairyland Power Cooperative (DPC) and LaCrosse Solutions (SOLUTIONS) have recently submitted an application to transfer the La Crosse Boiling Water Reactor (LACBWR) Possession-Only License No. DPR-45 to from DPC to LaCrosse Solutions QAPD Revision 29 was developed in conjunction with the SOLUTIONS application for the Transfer of the NRC 10 CFR 50 license from DPC to SOLUTIONS for the completion of decommissioning. Upon NRC approval, SOLUTIONS will be the NRC licensee responsible for all activities under the LACBWR License. QAPD Revision 29 reflects the iicensee change from DPC to SOLUTIONS, and reflects the plan to subcontract the management and activities at the ISFSI to DPC. Upon completion of decommissioning, SOLUTIONS will apply to the NRC to transfer responsibility for the NRC License back to DPC.
In order to minimize disruption and maximize efficiency, this revision of the QAPD was jointly developed by DPC and SOLUTIONS to facilitate the various stages of license transition described above.
In order to minimize disruption and maximize efficiency, this revision of the QAPD was jointly developed by DPC and SOLUTIONS to facilitate the various stages of license transition described above.
S The proposed revision is a substantial revision to the QAPD and will replace the current QAPD Revision i,28 in its entirety. Major or substantial changes are described along with the justifications for those
S The proposed revision is a substantial revision to the QAPD and will replace the current QAPD Revision i,28 in its entirety. Major or substantial changes are described along with the justifications for those changes.
changes. In addition, various minor changes are discussed in summary form.
In addition, various minor changes are discussed in summary form.
SMany of the following changes were based on similar changes that the NRC approved in the ZionSolutions Project Quality Assurance Project Plan, ZS-QA- 10, Revision 7. The LACBWR site status is substantially the same as that of Z~on at the time the Zion ZS-QA- 10, Rev. 7 was approved and implemented (i.e., fuel transfer completed, only decommissioning remaining). Note that by Revision 28 of the QAPD DPC had already completed the maj or QA Program transition to the Regulatory Guide 7.10 (RG 7.10) basis after fuel transfer was completed. Therefore, the ZS-QA-10 Revision 7 and the QAPD Revision 28 were already aligned in that the program basis both were aligned to RG 7.10.
SMany of the following changes were based on similar changes that the NRC approved in the ZionSolutions Project Quality Assurance Project Plan, ZS-QA-10, Revision 7. The LACBWR site status is substantially the same as that of Z~on at the time the Zion ZS-QA-10, Rev. 7 was approved and implemented (i.e., fuel transfer completed, only decommissioning remaining). Note that by Revision 28 of the QAPD DPC had already completed the maj or QA Program transition to the Regulatory Guide 7.10 (RG 7.10) basis after fuel transfer was completed. Therefore, the ZS-QA-10 Revision 7 and the QAPD Revision 28 were already aligned in that the program basis both were aligned to RG 7.10.
Chanwe 1 -Org~anization Changes:
Chanwe 1 -Org~anization Changes:
The license transfer application and the approach whereby SOLUTIONS will manage and perform decommissioning activities and will subcontract DPC to manage and perform ISFSI activities made extensive changes necessary to the QAPD Policy, Section 0.0 Introduction, Section I Organization, and Figure 1 Organization chart. These changes also made numerous changes necessary throughout the remainder of the QAPD, to align specific references and responsibilities accordingly.
The license transfer application and the approach whereby SOLUTIONS will manage and perform decommissioning activities and will subcontract DPC to manage and perform ISFSI activities made extensive changes necessary to the QAPD Policy, Section 0.0 Introduction, Section I Organization, and Figure 1 Organization chart. These changes also made numerous changes necessary throughout the remainder of the QAPD, to align specific references and responsibilities accordingly.
Line 3,473: Line 4,815:
Page 1 of 4
Page 1 of 4


QAPD, Revision 29 Summary and Evaluation of Changes Chang~e 2   - Substantive Chang~es:
QAPD, Revision 29 Summary and Evaluation of Changes Chang~e 2 - Substantive Chang~es:
Substantive Change 2A.: In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSJ and remaining D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Safety Review Committee (SRC) has been removed from QAPD Revision 29 and replaced by the Independent Management Assessment (IMA). Section II.E.4 identifies an Independent Management Assessment (IMA) functiOn.
Substantive Change 2A.: In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSJ and remaining D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Safety Review Committee (SRC) has been removed from QAPD Revision 29 and replaced by the Independent Management Assessment (IMA). Section II.E.4 identifies an Independent Management Assessment (IMA) functiOn.
Individual(s) that perform IMAs are assigned by the President.
Individual(s) that perform IMAs are assigned by the President.
Line 3,483: Line 4,825:
This change was approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, and Maine Yankee. This change is justified based on reduced scope and complexity of operations at the station, and reduced staff, making the continued operation of the ORC impractical and unnecessary.
This change was approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, and Maine Yankee. This change is justified based on reduced scope and complexity of operations at the station, and reduced staff, making the continued operation of the ORC impractical and unnecessary.
The responsibilities of the QTR will encompass the functions currently performed by the ORC and will be consistent with the scope of activities at a permanently defueled facility in an advanced stage of decommissioning.
The responsibilities of the QTR will encompass the functions currently performed by the ORC and will be consistent with the scope of activities at a permanently defueled facility in an advanced stage of decommissioning.
Substantive Change 2C. The applicability of the QAPD to the ISFSI and decommissioning scope was clarified in Section II.B. The QAPD Revision 28 Section fl.B stated that the QAPD was applicable to "Passive SAFSTOR decommissioning activities". The QAPD applicability to decommissioning scope is now described in the QAPD Revision 29 in the same way as in the Zion ZS-QA- 10, Revision 7. This change is justified based on reduced scope and complexity of operations at the station, and is consistent with the scope of activities at a permanently de fueled facility in an advanced stage of decommissioning.
Substantive Change 2C. The applicability of the QAPD to the ISFSI and decommissioning scope was clarified in Section II.B. The QAPD Revision 28 Section fl.B stated that the QAPD was applicable to "Passive SAFSTOR decommissioning activities".
The QAPD applicability to decommissioning scope is now described in the QAPD Revision 29 in the same way as in the Zion ZS-QA-10, Revision 7. This change is justified based on reduced scope and complexity of operations at the station, and is consistent with the scope of activities at a permanently de fueled facility in an advanced stage of decommissioning.
The applicability of the QAPD to ISFSI ITS activities and 10 CFR 71 licensed waste shipments remains unchanged in QAIPD Revision 29.
The applicability of the QAPD to ISFSI ITS activities and 10 CFR 71 licensed waste shipments remains unchanged in QAIPD Revision 29.
Substantive Change 2D: The QAPD Revision 28 Section XVII Records was replaced in its entirety with the language from the Zion ZS-QA- 10 Revision 7. This change represents practical records controls that have been approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, Maine Yankee and Zion.
Substantive Change 2D: The QAPD Revision 28 Section XVII Records was replaced in its entirety with the language from the Zion ZS-QA-10 Revision 7. This change represents practical records controls that have been approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, Maine Yankee and Zion.
Substantive Change 2E: In the Appendix B "alternatives", the 2005 APS submittal and NRC approval related to the calibration services for M&TE was updated to the recent Nuclear Energy Institute (NEI)
Substantive Change 2E: In the Appendix B "alternatives", the 2005 APS submittal and NRC approval related to the calibration services for M&TE was updated to the recent Nuclear Energy Institute (NEI)
Page 2 of 4
Page 2 of 4
Line 3,492: Line 4,835:
Substantive Change 2F. In Section XVI.C, the following sentence was added as an enhancement:
Substantive Change 2F. In Section XVI.C, the following sentence was added as an enhancement:
"Conditions that may be reportable per 10CFR72.242, 10CFR71.95, or 10CFR21 shall be reported in accordance with approved procedures."
"Conditions that may be reportable per 10CFR72.242, 10CFR71.95, or 10CFR21 shall be reported in accordance with approved procedures."
Substantive Change 2G:~In Appendix C, Section 1.1, the following references were removed, justified as follows:
Substantive Change 2G:~ In Appendix C, Section 1.1, the following references were removed, justified as follows:
1.1.1     ISFSI Operations and Maintenance: This was removed as a redundancy. The QAPD Section V already applies to ISFSI Operations and Maintenance, so it was not necessary for this to be listed in Appendix C also.
1.1.1 ISFSI Operations and Maintenance: This was removed as a redundancy. The QAPD Section V already applies to ISFSI Operations and Maintenance, so it was not necessary for this to be listed in Appendix C also.
1.1.5     Physical Security Plan implementation: The requirements for procedure to implement the Physical Security Plan are self-proscribed ther'ein, and it is not necessary to list this in Appendix C.
1.1.5 Physical Security Plan implementation: The requirements for procedure to implement the Physical Security Plan are self-proscribed ther'ein, and it is not necessary to list this in Appendix C.
1.1.6     Emergency Plan implementation: The requirements for procedure to implement the Emergency Plan are self-proscribed therein, and it is not necessary to list this in Appendix C.
1.1.6 Emergency Plan implementation: The requirements for procedure to implement the Emergency Plan are self-proscribed therein, and it is not necessary to list this in Appendix C.
1.1.7     Procedure for controlling temporary changes: Based on current status of ISFSI and decommissioning temporary changes are not required.
1.1.7 Procedure for controlling temporary changes: Based on current status of ISFSI and decommissioning temporary changes are not required.
Change 3 - Editorial / Administrative Improvements and Clarifications:
Change 3 - Editorial / Administrative Improvements and Clarifications:
Editorial changes to remove historical information no longer relevant after license transfer, make specific references more general in nature, and eliminate unnecessary detail of no QA program relevance were made. The types of changes of this nature are as follows:
Editorial changes to remove historical information no longer relevant after license transfer, make specific references more general in nature, and eliminate unnecessary detail of no QA program relevance were made. The types of changes of this nature are as follows:
EditorialChanges Type 3A: In a few instances, historical details that were not necessary were eliminated.
Editorial Changes Type 3A: In a few instances, historical details that were not necessary were eliminated.
These include changes to eliminate "Passive SAFSTOR" in Section 0.0B, and removing historical detail at the introduction to Appendix C.
These include changes to eliminate "Passive SAFSTOR" in Section 0.0B, and removing historical detail at the introduction to Appendix C.
EditorialChanges Type 3B: In a few instances, specific references were changed to be more general in nature. Examples include: Section XV, "Corrective Action Report (CAR)" was made "corrective action document", and "Purchasing" was made "procurement support staff." Vl.C.4, "Administrative Staff' was made "administrative staff." In Section V.C, "procedures" was replaced by "guidance" and "Work Orders" in places to provided flexibility.
Editorial Changes Type 3B: In a few instances, specific references were changed to be more general in nature. Examples include: Section XV, "Corrective Action Report (CAR)" was made "corrective action document", and "Purchasing" was made "procurement support staff." Vl.C.4, "Administrative Staff' was made "administrative staff." In Section V.C, "procedures" was replaced by "guidance" and "Work Orders" in places to provided flexibility.
EditorialChanges Type 3C." In a few instances, unnecessary detail of no QA program relevance was eliminated, such as "Company", "Administrative Control Procedure (ACP)" and "QA Manual" being removed from Section 0.0.B.
Editorial Changes Type 3C." In a few instances, unnecessary detail of no QA program relevance was eliminated, such as "Company", "Administrative Control Procedure (ACP)" and "QA Manual" being removed from Section 0.0.B.
In summary, these types of changes are considered editorial and do not alter the intent or purpose of the QAPD and continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72.
In summary, these types of changes are considered editorial and do not alter the intent or purpose of the QAPD and continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72.
OVERALL EVALUATION:
OVERALL EVALUATION:
Line 3,509: Line 4,852:
Page 3 of 4
Page 3 of 4


Al           .
Al QAPD, Revision 29" Summary and Evaluation of Changes The QAPD Revision 29 applies to all activities associated with structures, systems, and components (SSCs) which are important to safety (10 CFR 72). The QAPD also applies to transportation packages licensed by the NRC under 10 CFR 71. For other ISFSI and D&D activities, administrative programs and procedures ensure compliance with governing regulations and include appropriate controls for activities under the radiological control programs previously contained in the Technical Specifications.
QAPD, Revision 29" Summary and Evaluation of Changes The QAPD Revision 29 applies to all activities associated with structures, systems, and components (SSCs) which are important to safety (10 CFR 72). The QAPD also applies to transportation packages licensed by the NRC under 10 CFR 71. For other ISFSI and D&D activities, administrative programs and procedures ensure compliance with governing regulations and include appropriate controls for activities under the radiological control programs previously contained in the Technical Specifications.
The proposed revision to the QAPD is appropriate for the remaining D&D activities and ISFSI operations. All safety related systems have been removed from service and have undergone partial or complete demolition. Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI and Greater Than Class C (GTCC) waste has~
The proposed revision to the QAPD is appropriate for the remaining D&D activities and ISFSI operations. All safety related systems have been removed from service and have undergone partial or complete demolition. Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI and Greater Than Class C (GTCC) waste has~
been removed from the site. Should any Class B and Class C radioactive waste remain to be shipped offsite for disposal, the QAPD would still be applied to those activities.
been removed from the site. Should any Class B and Class C radioactive waste remain to be shipped offsite for disposal, the QAPD would still be applied to those activities.
The ISFSI has transitioned to long-term passive operations. The system is inherently safe by design. The main function of the ISFSI organization is to monitor the environment in a way that demonstrates the integrity of the system. While it continues to be important to maintain an appropriate quality standard that preserves the passive functionality of the system, it can be accomplished satisfactorily through conformance to RG 7.10.
The ISFSI has transitioned to long-term passive operations. The system is inherently safe by design. The main function of the ISFSI organization is to monitor the environment in a way that demonstrates the integrity of the system. While it continues to be important to maintain an appropriate quality standard that preserves the passive functionality of the system, it can be accomplished satisfactorily through conformance to RG 7.10.
The proposed revision will continue *o satisfy the criteria of 10 CFR 50, Appendix B and the QA requirements of 10 CFR 71, Subpart H, and 10 CFR 72, Subpart G.
The proposed revision will continue *o satisfy the criteria of 10 CFR 50, Appendix B and the QA requirements of 10 CFR 71, Subpart H, and 10 CFR 72, Subpart G.
                                              - End of Changes -
- End of Changes -
Page 4 of 4}}
Page 4 of 4}}

Latest revision as of 05:35, 10 January 2025

9 of the Quality Assurance Program Description
ML16015A018
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 11/17/2015
From: Nick B
Dairyland Power Cooperative
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LAC-14359
Download: ML16015A018 (45)


Text

BARBARA A. NICK President and CEO DAIRYLAND POWER C_

0 OP ER AT IV E

November 17, 2015 10 CFR 50.54(a) (4)

In reply, please refer to LAC-14359 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License DPR-45 Revision 29 of the LACBWR Quality Assurance Program Description (OAPD)

REFERENCES:

1) LACBWR Possession-Only License No. DPR-45
2) LACBWR Quality Assurance Program Description, Revision 28 The purpose of this letter is to submit Revision 29 of the LACBWR QAPD for USNRC approval prior to implementation. Dairyland Power Cooperative and LaCrosseSolutions, LLC have recently submitted an application to transfer the LACBWR Possession-Only License No. DPR-45 to LaCrosseSolutions, LLC. Revision 29 of the QAPD is reflective of that change and, with NRC approval, would be implemented at the time of the license transfer.

The proposed QAPD revision represents a reduction in commitment by replacing the Safety.

Review Committee with an Independent Management Assessment process and replacing the Operations Review Committee with a Qualified Technical Review system. Justification for this reduction in commitment is defined in the enclosed Sunumary of Changes and QAPD RG 7.10(r2) Compliance Matrix. This QAPD revision is also being submitted for your review and approval prior to its implementation to ensure compliance with the requirements of the NRC Confirmatory Order dated September 15, 1994.

If you have any questions concerning this submittal, please contact Cheryl Olson, LACBWR Plant/ISFSI Manager at (608) 689-4207.

Sincerely, Barbara A. Nick, President and CEO BAN:CLO :tco QL4

~S7ie A Touchstone Energye Cooperative 3200 East Ave. S.

  • P0 Box 817
  • La Crosse, WI 54602-0817
  • 608-787-1258
  • 608-787-1469 fax
  • www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider arid employer.

Document Control Desk LAC-14359 Page 2 November 17, 2015

Enclosures:

1)

2) LACBWR Quality Assurance Program Description, Revision 29 LACBWR QAPD, Revision 29, Summary of Changes Marlayna Vaaler Project Manager U.S. Nuclear Regulatory Commission cc w/

Enclosures:

Cynthia D. Pederson Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN

))

COUNTY OF LA CROSSE )

Personally came before me this O*

"'L day of

  • /l'..'

-t

, 2015, the above named, Barbara A. Nick, to me known to be the person who executed the foregoing instrument and acknowledged the same.

Notary'Pu~blic, La Crosse County Wisconsin My commission expires 5-i;? 5-/

~'

LAURIE A. ENGEN Notary Public State of Wisconsin A Touchstone Energy Cooperative__

3200 East Ave. S.

  • PO Box 817
  • La Crosse, WI 54602-0817
  • 608-787-1258
  • 608-787-1469 fax
  • www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.

LACBWR Q~uality Assurance Program Description, Revision 29

i! iiii!i!!iil i*:;*,:

'.;:*z:ili:i.i.i*i:*

!:,*:i.i*i

,., ::*:i:i*i:*;,i*::!*!!,!,i:i:,i:i:i:i:!:i:i*i

,:i*:*
  • i LA
    • CR, OS

..,.E BOILING WATER.::

,..... REACTOR.......:.. i

!ii QUALITY ASSURANCE PROGRAM DESCRIPTION REVISION 29 La Crosse Solutions, LLC Author:

(6/12.1 Anthony R. Bejms1i~dependent Consultant Dale /

(...

QAApproval:

~KJames E. Werner, SOLUTIONS QA Manager

'Datel' Manager Approval:

    • n ~,Jvii Corporate QA Approval::ii:,:i::.ii:ii'ii'i~:!i::*~i~'*iii~i*:*i*'~i':============

I wak:

  • .r:y::, LUIO: NS P:roject::::::i:

Manager'.

'*Z:i:""::"; "":":!

!!i;i:,.,i::: *:

4* *9,I ' :*:i

.i.,

iii:*:i~:!i*i:i:*i:

i*i~

A q*.-:

142015i;::ii 935::

i:~i~~i:::!::*:i~:

  • F
M Date:

................ i -

":: " ""!:!-:i*i*i!.:!iM']

i keii*

]:

N..:

i col,~ii ne rgy...

olutions
i Corporate Director, Q:'Dat Dairyland Power Cooperative (DPC)i;:ii,:ii:*?*i
QA Approval:::i

. :::Manager Appi

!::*i:::**:Edi Martn, Manage, :QualityAsu rance!.: :

..i:iii*;*::*:.::ii;iLane S. iPeters, Site Manager, Genoa~ii

.. :*:*::::i:i:.;

:i::

9 -:. 3:. a -iii::.****!,i:

i lii

  • i*!i*iil:!!iiiD a te ii:i~i:i~i:-:

i!i

LA CROSSE BOILING WATER REACTOR

?::::

STATEMENT OF QUALITYASSURANCE POLlICY:

The Quality Assurance PrOgram Description (QAPD)* described: herein has been developed by Dairyland PowerS:Cooperative (DPC) and La Crosse Solutions, L*LC:; :: I*

(SOLUTIONS) to prov~dea consoldatedovervlewof the qualitypro*gram controls that *I S gover~nthe operation and maintenance of the La Crosse Boiling Water Reactor (LACBWR) Independent Spent Fuel Storage Installation (ISFSI ), and thte 1;i ZIii:!i decommissioning Oflthe LACBWR plant. The QAPD describes the qiualitY asslurance i:::~I

organizational structure. fun:ctlonal responsibilities,, levels of authority and Inter'faces.*

i::,

~~The QAPD applies to all activi~ties associated with structures, systems, !and*

I components which are important to Safety iun.der i1:0:CFR 72. *The QAPD also applies i : to transportation ipackages ~li:censed :by :the :NRC Under 1I0 CFR 71I.: ReqUirements: of

...:the !QAPD arel performed in iia graded approach commensurate with an Item'sor* an

  • : activity's importance to safety. :This graded: approach is responsive to NRC Regulatory Guide :7.10O. The applicablilty of he requirements of the QAPD to decommissioning activities is *determined on a case by case basis. :The QAPDi!
  • l satisfies the requirements of 1i0CFR 50 AppendIx B, 10 CFR 71 Subpa~rtH; andO 10i*!

CFR 72 Subpart G.

SThe SOLUTIONS iExecutive Vi~ce: President and General Manager is :responsible forl:i;

  • i:the. establishment iand implemrentatio)n of aquality !assurance progriam whiich meets all!

r*iii:legu~lator~yirequirements. i The quiality assuran~ce program, as described in lthis QAPD,

Isi Isimplemented through the use:of approved pr'ocedures (I.e., poilcies:,:directives,:...
~::/procedures, man~uals, instructionsr or. other documents) which provide written::

. :~::i::gUidance for the ~conftrol :of ilmpor'tant to :Safety items iand activities and iprovides for":*:

    • the devielopment o:f documentation :to demonstrate objective evidence of compliance.:

with stated requirem ents. ;i!!::ii!*:

iii:..

-:I_

Solutioins Executive Dairyland Executive::. * ::::i i

: i::i::i*:: Preslden~t and CEOi:::
  • !i
:..... E:,.,
  • *:D ate
i: : ;
  • : iI i Executi....ve:

-i... -

QAPDi: :*

.i:,: ::::,:!i: i::!

, :,.i:i::_

QAPD....

Rev...

29.

LA CROSSE BOILING WATER REACTOR, (LACBWR)I

/ :: ::*

QUALITY ASSURANCE"PROGRAM DESCRIPTION (QAPD),

ST.QALTEMN FPLC IlIII.

G -C N DESIGNVE CONTROL.....................AND......REVIEW..........,.,.

10...10.

IV. PROCUREMNTCOCUMENT.CONTROL

./:::...;.

m 11;o::

V. INSTRUCT1ON, PROCEDURES AND DRAWINGS........

i.,,::t,,...

is V,.

OO ~ E T O T O

.,:L.,!,..::

,:::-: 14

  • V~i::I~i.IENTIFICTIN.AND CONTROL OF MATERIA:LPARTS,:ANID COMPONENTS i:::*..::.,m::::::!i;i 16: :;

IX.

CONTROLOFSPECIASPRONCADESS:ES~ P.N.............................................17:::::::::::::::::::2 XII:::

CONTROL*] OF; lMEASRING AFT TUCU ssES AND TEST0EUIPMET 20-i; X

IV:. INS*PECTIONB TES, ANDUOPERATOMINGMSTTUS A."E.A.V..A..*:P*N 22i:::::::!
  • "i*

XV

i:.

CORGRECTIV:,EACION....O.T1....R.AN..A. ON.................................... *,.. :....:_....22 XAPI.

QULT ASUAC RECRDv:23

  • ,:*:*i!i iI*
, i":::iii*: :: i ::i:
0.0,-INTRODUCTION A

F.

p-

!i;*decomm*issioning iof the LEACBWR site. *i*;DPC'wiii r(etain o
wniership :;of thei~l::i*:::**:*ii~i:i:ii::ii:i:i::.i*:*

i!*:!ii:

l*:

iiand :and ~s~p~ent :,fuel :and ibe thie ownr e-:lilcensee. *"DPC will:: be :subco tracted ;:1; *.::,,!:* :i c*;::omnpletion obf :decommis~sioning, SOLUTIlONS will apply :to the NRC to6;: ;:

  • !:;.:::wiillmaintabin t~he ISFS]I, and be r::esponsible: for th:

uleutimate.dispos*ition obf!:..*::i :i~:!.: ::*.i::;:.:::i

!iili

i
:i
;..::i::.:. In :order. to minimize: disruidpti0on :and maximize', efficienicy, !this:rlevision of :the *:...i iii~i;:i~L...i.*i.*l-:.*.!.ACBWR Qubality, Ass~urance :Progriam Description I(.QAPD) was ijointlyi;*i:i~:::::i::!:iii
  • i::*::::ic:-i.;": ien~se transition idescr~ibed: above. ::Duin:ig" the decomm~issionin~gi::*:ii::::i ~*:~~;;:!:

.:::i::::::i;i:

-:*~ :a~ctiviities, ;!SOLUTi~oNS :will :subcontract ithe operatio)ns.and main.tenhan~ei: of::;;;*i**
.!i:.

.i**.::;.!ii.

th~e ISFSI to D:*PC. Although iDPC p~roceduresand processe~s *willcontinue~i:

.:i

-:i*:

.i.::!.~i~l t

. oWl be ust ed: fi Cns e.ithe operain iaII :sond maintenf:a nc ofa the orSI St OLesUreT e.IONS i !!i:,.

-::.~~i:

.:: :::.QAPD requirements applicable, to ::the ISFSi "are effectively; implemented by;!--i-.

il i::.-i:*:"

.ii::tio all: ISFSI !.a*ctiVitiesi and dselected plant:d ecom missioning acetivities..:.i i.* ;:*::l..l :.i

.;...The QAPD is. desig ned' to meet the requirements of 10:CFR 50 ppni

i:!.B,: 10 CFR 71, :.Subpart.H, and. 10 CGFR :72,.Subpar't G :*and :reflet the...b::::. ::;::: :::.
.:.:::*:!*.:::thest ngru perford~l~miga n dime ct.hly:b :responrsible: fori:th e wok u chasl pr:oj*0ik.::::

.:::!i::,**:et i

i::iThis includes. q:u"ality control" and :ve rification :th~at alliwork: is. pe:rformed In -. ::.: :
i:.;.. for;: a::i:i:,

~*i'uditing: these igroups a nd assur~ing, manag em ent that ;thei QAi prog ram: -: : :

is;_::

sbeing fully-and effectively implemented.* QA is recognized :asani:.;: ::.:*il-.:i

i::.::i
i:: ::!:.:~ !:T:.i:he i::requi:remen~t~s iand i commitmen~ts c:*onta in ed:: in iithis : QA:P:D ai:rei m:a ndabtor*y:.i !iiii:i*i:

!i*

..**::*-.*::i:*:::-and imus*t bie :implem-ented!, enforced,.' and :adher~ed to by-allin::divi~duals an~d: :::::::::::::

ii:i:ii:iiii B.

i:The"terms i~and diefin~ition i0 s t:H ed below are used* frequentliy. throu*ghout :thlis d o c u m e n t..'* *::::.
i*:.i
i. ::i " " ";!::. i:.*.i!i.: :":'. :*.; :..:--: ::* *.:.:::.:/:*:*::::!*::i::!;.!: ::::ii::::::.:*:!i::

"LACBWR. La: Cross~e Boiling Water Re~actor.:

i.i*':::L.il" :
)A P D :::*:i R ev. 29::*:::::;::**!
" : '*i!
,:ii: *,*::ii :,i:::::!!:!

i !iiii:i :::i:

i i:I i! !

ii*:!i::.":-!i*ii!:*!:,-

.; *;"i:!,i:::i*ii!

ii ::!:.::';i*:i!i

  • ...i "QUALIFIED TECHNiCAL REVIE.W.- Thorough reviews.of the documets*ii:"
.:::-.::...:::+:i::~ii!::"i+..:::i:i!::.necessary :to,provide ;adeqcuate confidence thait! str~uctures, systems, or*
*.:::: *! i" :i :: :;i:;!.to control and-!measu re the ~ch ara cter isics of: an ite m, iproces s ori: fa cilitiy! *toii' FACIL:ITY

- Encompasses :the l P:ant site, which-iS:undergoing-i...

i..:: :::? ' I :.

  • .i:i.i

..:i:.*decommissioning, i~iand i*thel ISFS*: site wher~e spent, fuel.is.Stored.:.. ExclUded: +-

tr:

!::.;.!i!;!!;;;:[an~smis sio*nil apparat us loc:a~ted !beyo nd the LACBWR: switch yar~d ".=; : -* i :-.+;

i:::

ii: :!?ii!i~!::IpLAN*T -' Enc~ompasses tihe biuilidings t*het functionally supported t!he i!

.i~i'SCHEDULE INTERVAL:

- A

  • i
  • i*time:frame within :wh~ich a schieduled activity:
i: I:
  • shall be performed with amaximUm allowable extension not to exceed 25
ii:
IMPO*RTANTITOSiAFETY (IiTs) - A class~ification givento 01si*tructures,
  • systems, iand :ompo'nents (SSCsl) that,provide nuclear safety] designi:
.functionls. i(See Appendix A for complete details)i,:. i.:*::: *i:*!:.:
ii:

fl::+ANIml7AT+iA M.+ !i: ii

?:i,

,i.if! ! ! i:::i+

+!!:

I.

"{.

,.I.*.+.

"! !+.!-:.-:¥ 111¥ n

llllr,=l'*l 11=t111

+,:-::++..:-:-:-.;:....,:-...

,,.+ + v,

....:.:.... :+ :.: ::-::

i i.:i+ !*::i*:*::*ii*i~*::*:***::i:1.

    • This sec.tion d:*efines *:the erespons~ibilities o*f k"ey project m:embers::: ; il;

+iii./(.:!+.:.

.:?ii+.::.i+:i!+i*accountable for Implementation of thelQAiPDt.Functions and. actions-:

+i::'*-

i:::i i:+:::i.:i:

cani.

bi+ah:ie

.delega+ted;i holwever, t++he r:iespni**ibi lity r.emains w ith: th~e: /::*

il.::::"2:

.:-! i::: :O n~site. and* offsite organization**s shall be est~a bli~shed ifo!r statio~n a:*nd*i:

.. : : i::.*i::...: :~::. ::*:***

  • !*c rp oj ra te.m a ni a g e m e n t, *re s p ec tiv ely. T::

h e.o n s ite `a n d

  • o ff s ite :* : :.i*:.":..:iiiii:!i::!*:

!*i!i:i*!!++::i!*

.. ::...: *::":i*;:!;/.:* ;:::: organizatio~ns ;sh all Include :the :positions :for.activities :.affecting lthe :safe
i*:::i."::::i~."

.:.::!:ii."3."i:

S:i:i"::!:iince SOLUTiON N +an~d DiPC wilwil be working t+o tihe :requirements of th+is

  • ?:: :;i*i*:~::i;
i:/:: i:*:i i: iii* :i :::i:::Soluti~on *.iOrga*nization.:i :This: QA PD:Identitifies :key. on-site p roject

! :i

::i

, i : ::

i::::c~iiorpoate support groups. :The QAPD also definies the DPC.I:;:*::

+.

ii 4:.

'4:.Lines of authority,. r.esponsibility,;. and communication: shall b~ie:.::+ :::..

+.:: :::-i:established land :defined for the-"highest management :levels ;throughi++:

i ntermediate::levels to and !ncluding a~lloPerating organization:* *:

i!:i:
:ii:**p0sitions. :The~se rielationships shall be documente~d *and *updated,; as QAPD.::

4 i-i

    • /i ?:if: 'i:i*;.i!,,i
  • Yiii:;*!*.*ii:i*i:i*:

Re~ 29i i iI

  • ,..:.:...: / *.. '::,*.,.--. *:: :.:::.:......:
  • {}
    !"*ii.

~~ii::i}?.::~::;::ii*i::.}:i:

appr~oPriate, in:ii.the'*form~of o~rgantization charts, :functional, descriptionis: 4:

.*{//::.::/".:.:?.i:*....:;}i~;i.'
.:.:fo'r key personnel p~ositions,.or in e*quivalent. forms oif idocumen~tation!..i::..i!;i

..5.

5;..The-ihj iu*

we ay uthatWhsics.:and: quality: assurance.:.<......

}::::: !ac~tivi~tie's, may'ifunctionally reportto. an appropria~e onbtsite m*an~ager:**;:!i.:i.

{*.:.

...;:: *.,:however,. they*shall have-sufficientorganizatiornal freedom to e/.nsure;;}:.::*;*;

}*.::*..

/.:::

:i ;:i:i:::]* 1!:}Pr:esident:- Th:*eiPraesidentxrnarnag~es th~e p~atlo*n-ofEnergySolutions:*`.:

,.::.3*.:: "-.

i": :::i:}]: ::.:* :*.i; :::. *:: :*!;/stew a rd sh i :p!projects ~at: U.:..R eactor :sites,.an d-assu]res: that the:i:;::;-i;: *;; ;.; :

]
:*.::::*/:*.!:/:
: ::.:u:i{*::..::.Y;-*:.L:{

ACBW R *project :*receive~s timhely :and*effective: supportfrm*:;:.::{.&*.::*:;.:**;]:

i.::ii:}.::q:

ii:-.: ::]:.:.:::.;:::]}.;:))w-*ith th~e GM; and..other k~ey m*anagers ~to review the-.oper~ation of theii:~, }:!

management, quality, 'dnd~ related !issues.: The President shali: have*;ii:i:::

.corporate~responsibili~ty if6r, the safe' storage of nudiea~r fulad shall.....

" *: *}i I,}*I....::.

... take an~y me~asures ;needed to ensur~e acceptable:perfo`rmance o*f tjhe*i*:***;:i**

"....... :. :staff in o eai*:*

~ ~ngria*in*t~aining,*and/ providing t`echnical *support toti*:he;:'"

-:.i]}::i~;

:::"plant-to ens~ire the, safe storage !.of nuclear. fuel.

A'-

,,:, :::*-**:*v*#::-
2;.::ExecUtW&Vlce.Pressident and General Manaaqer (GM) i;- T:hisexecutivei <-

haor:

il.t adis

  • niih frt~ es*tbliishmenet and.
....i wi:.the management *tea~m *toreview pians and: progress and to,

.aidress stakei~oider,* quali ly and project'rnanagement issu es., The GM.,....

. deiegates!to: DPC*: a~nd the.man ageme nt team ~th~e day-to-d ay..*i;:.!].::;i.:~::~:::*..

...:/,r*espoipii**i~tles'ifor';tie (ISFSI ari*adjdeco*mmssioning b*iy ~a}pproved:i:Y:{*

-:7 7.....

-:*3..

  • ~i

-The::PM is: res )onsible for all.decommissioning::!:

  • i:i?*:::<::y:::*k i* *:. :i::;**i/::/aotiwiies~includimg:firep~rotection and I'ndustrial safety activties

.t.th

,;,:,,iiide,,ommiss
ng site. Tl,::,PM.i*-ha,. have.authority over those on autsite
  • i:..:*.:!.:".,;...:::
.:. ::/. -:.:. ~ ~ ~te~n ~ s a yo,:a e*s o a e fn c e r~u tw lh h v :b en :*:...:c:

i,**::

forsa-.sor gef-.cl

.a fuel..

which..--. hav been:::::::::::::..*:*

-**:*:*d::*::i**:

  • descr:*"b;id:

i..

i

'o tis~APD and for th~e Qualifiedi Tec5hnical:,.

.i::}i}3-:ii:::
'i:i:}:.:i.:.:~.:!:;:.. :R ev iew. prpbcess,*tt.,ized;j*o rd e omm is sio n~ing g:iThe ePM retainsauhoid"to.jyi: *

-/: ::::::!::u

i:: *:*!*!

for~::

!ftach*: prop6sed~tdst, experiment, ormodification to systenms or:/*}i:;:]:

i!i* ::::/::::: :: !~i :*}:=

eq uip ment ::that :affec*t *the ~safe :storage : of inu clear fu el: wh ich ha b~*i~Seen::!

Qiat!

ssra:eMnaer(A M) _T*:**he *QA M 're ports S.to; th e P M :*ianhd;i:i:*:

:: : /:: **:::::k!;:.: :*r n:*att*s,. The P:M: is resp9op si bleI:f etabl Iis hing and: m aintai ning the -,

QAPO""'

mo i

,rn the.9 proec' s quali*s t

y objectives*,

tho ugh.... ove... view.. and,.:,.

i~;:}:} : i

  • . ::}: ::i*;;;}:i:{:!:ii i

ns:**

:; ; iihiP~e c~t(i~n ctivitie s,;!apdi-proyidin g'*feeid bak t o: m an.agem ent onithe}. :. i*:
i-:, *!"!:.}:ii

-:...':::ii~:i ef'fp.i!.

i,.:

ct:::i*:veness.*M.*of the QAPD.

i~n~tiohe

  • a*(

ev[aluani es, acceap ts, a

nd performs:!:}i*:li!:

.,,..- :..:,.'.t:" "-.': ',.

}:-: i::i.:;..,::,::i::::::::::::::

  • /.............

!!::*:i!!:!::!i:ii}iii i:!*:i*}i!ii:*ilS*

'.:. *-,.-.:iy!.:. !.: %y..

].:..:.:: >..: -:

...:i::{:.*:*!*i:.:*::!*

. i!::!

i}: "::.i:*!i:i*::i*i:::*]ii

!ii:.
  • ii*]!:

Li

....::4.,,,,::i,,i:i i::i:::*.*i*i!:i,!:}:i i]*::

!}
:'*';'.':i::.':::'.
  • .. ::: ::::.. F ":! i.: :.:.: : i: ::* X:.:::i::i

/,;!.:.!,:,;;,Y :

' ::*':i::'::.::*, *}

QAP D 5*

Rev.:294

.requimrmets..to the *SOLUTION. :organization..Th0 QAM porlodloally:
.""i
.provtides *report..o n project :quahity, activitiei *to.tt.*,..t.

he PM,

... :th i..i*

: m ana~ eh 0 t team.
i:::* ::: ' : ! :i: : :::i::::::. :::::::: :::
5. Hsdiek:n p:"ect

!n;Mn:

er R

5A

-Thm 1RPM. i* tmponsibie for all

-.".radiation protection, e n.i.
  • met~i pro*(e4~tion, *Ite olosur*, and. waste

~shipping actlvties at the entire site.-

.-:.::..:::!*:: :: :. ::::::activi-ties :with. the RegItq*rs :such as ilcensing submlttsl, regula*toryi:

  • .:*.:*:! -::*:.:::-reports,.!reporteability isesu~i~oQAPD revisiions,. REtvPIOLDCM r:epoi,::*!::

...- :.. -:..:financial. re~pottsDecon~iss~ion~ng.Plan revlsiona*.-$NM Inventory..-:*.::::

iii*
i*!*!I*I
!i:::::*!::

i!i:::i:!:

i* ::..:. i* :: ::. *:i

,,,-:.:.:i::.:i i: :"! i :

  • i iii:: ii* ::
  • *. :* * *.*i*,*,*.-:*nD*":-*,.*;*,,.*

a:.

dmi.:"*mnistration and opration of th* LACBWR tSF$I and the Operation :

.:.::.:of Th6 00enoa 3 coa! fired plant and the QuaiUl ec.Thnical fRevlewi :

responsilbe for o0peration and rn~aIenance.of tIe* LACBWR ISFSI.:.

: :i::.:

within :the limits se~t fo:th in the De~Ommlsi8ni~nt Plan, Thc, hn~cl*li::

.:"::- -..-.::ISF$I Manager and is r s~ponisiblo for ensuring reg~ulatory :requirements ar"e:

amdequately niet :and.the $e~curity Pian,. related proceures, training

~and contingency r'equirerments are developed *nd maintained current.:

'*".4.

OA S*ecia,~t lit/ngi*

-, Th e. Q A* SpecIali~t /: Engineer is :responsible 1 S for performing independent overviews of I$FSI related actvivtIes, "..::

admin~isterIng.:the ISFSI'a correotiv ~action prograim, provldln9.

..:...orientation and training on :applicabte q...

uality program requirements tO ::

.::.:...: : :.: :D staff, end interfaelntg wth SOLUTION$ off-site QA st~ft..:... ::::

.:: ::..: :.:of lSFB! activities and for ensuring that adequatertechnical review Is**:

,: :*::i:pp ied to cha :0 tests andi:i exper::::::::::::I m ents.

:! ::::::::::, :i: :: :::::::::

OU, AIJIY:

A SR*::: E PR:OGR

,A:M ::::: :::
: :::: :::i* :::: ::i
I '.:...:..-. " "" " '.'

t

The QA: program describe*d herein Sets forth th~ equiurements for the :QA.: ::

.organi~ation, personnel :responsibilities,-controlS, :end measures. :....:.

.:.:.::"established.to achiev,: maintain,"end document qual~ty. -These.: :-:.

-"::::: :requirements include, but are not limited to, the to~i[win~i:

-:r.

.::..:::::. -:desig*nbases for. ITS. SS¢$ Into. the I$F$I oeraetions and. ma*intena nce..-

.::: i:.'!::" procedures,:.... :.::.
2.

i:.::"

: :..:2 Performance of-all..installation,. calibratlon, and :testing. on all necessary:.

Q A..:.

6.:

2 9..

'::': ':"'"."i '::":'.": ".': ":

/:

.:.:il;:i.*i*i,
ii::!!:!i i!;i!"ii!!!ii*::i:il;*:*:*
i ii* -'
* * *.........
  • *...!..i: ' *..:..*:.i..;:.. ": '" ' ' : *:

iipli*ced:.u*i*bs!i* i*:i-

  • i*i:-il;ii*

i i;::

ii.;;iiiiii iii!i-!

  • iiiii*

!:iiiiii::ii:iiiii::

iii::*.:i!ii:!!ii*.!I:II*

!-I TS; SS*::!:

"!i*.-:i*l!sii*ii ;!;:in*;!" i;.i!ii~;i:!*!*i:;::::.:.i:! ::

accordance w ith.:;:"

approved:!!;!

ISFS procedures.:**i*:

Vi
  • :

i::.n:;i :::.:*.

i:i:!i*i

i
ii*
,::i
  • !;;!:*i:i
:iI*:;

if!i:

i;;

5o:.i Resolution of :items side~ntified a*s adiverse to,qu ality wit h :!appropiSHate*:::::.:::-?:::ii

6.i P; erformance. of. auldits !and isurveiillances.by :QA personnel ito iverify *.thatii:*..:i:;*l ;
.::.*:....I S FSI*. ad m.inistrative: co ntrolIs,.pro¢ed ures,. a nd. p rocure ment: documenits:*: :;*:*:
.:;*:*:*:iii.i*i:*:i:::graded appoac*h: *to :quality :tha a*:is; cornmmensurate: with-a item' or a
  • .""21.

The folloWing-sections of the~iQA*pO idescribed hi:ere.in or..an in:.dustryi!..*ii.::.il

.i.:.;equivalen~t may *be aapplied *to t:he decommissioning of th~e LAO BWR.*:***:!:i.**.
  • /.- *:'i;::*{**

pl***an~t in *a i:graded appro*ach1 to quality that !is com~mensurate it~h an *:itiem1****

.-.;i;**

  • ii*,**i-:*a. :i:;Forany* Raioactive Material* T~ran~s~portPa*ckage-s subject; to* the** :*i
  • i.i~.]i
i..i::i:!~~.:i~ii:.iiii~i iQ APD a pplies.*:! For ithes*e *activities sa ssoci ated w~ith thfle:! iSF*SI, th:ie :::i I!

.*:::;**:: :For *th ese :activ~'is associated with* decommissioning, ;the: ". **:..:.:..:.:;.:i;*...i *-i";

';ii..
;::

.::-..: ~.impilementaionof 0fithe QAPO ;Is *by itheia ppropriate *soLUTION S.i..*;::i...i;:i*! iii.i

-:.ii.i::;ii:.*~i:Sections :I,:*:;i llXV,.. X.V~and *XVII and* Appendix:C of thi:s iQAPD mayl*. ;..!,-

apply i!:!!i i: iil;ii

i
!:*:..i!.i*:i;.!::*.i*
i;;!*.

~~*!*:i:;::*.*l I.::*De*om.:mis sioing acn.bti vi ties a-ra

e. otherw:ise :controlled.:by ~proce*.dure s,::;
  • ,.
    .:I ii*:*:.i~

.*pr:::

i ocesses,: and; pol*icies di~ee med ad:*aeq u:ate! b:y,th m*.*a n:a~geimen:t:*i ::.!:**

;'..ii:

.:H :.*::

.::-.::***:*S!!:.;,:.!i

..Excep~twhen alternatives or :exceptions: a~re identified,. the implementing ii :i: :;i

'procedures for the QAPD shall* comply with the quality assuranice guidance:.; i:.

documents* listed in
AppendiX B:. Additionally., the following clarififcations:.i.:;:* !:--:

1:":*:.

I
  • :!i;:*f the :guidance:: in anyi of.-the :listed documents is :in:: conflict :with :the :;!.; *:*:.i;i;'
i
" ~*:*;i QAPO, ~the-guidance provided :in "the QAPD is ithe, con~trolling docu menit;..ii..;i

-* ;;li;i: ! i ;i'::* *i* *:i **:

,; :*;!.:;i
    • i !!:;;*;: ::i
  • i: :? * *::;* i*:;* i? :/, :i ::? *ii ::; ;: ;;i!;: *;,*:;**z**;.*ii:;,

R e v. 2 9i:

  • * ; 2 !;: !***

-QAPO

!ii ii::iiiiii!*

ii*

  • ':ii
ii*.i;*.i!iil;;*
i i*.**.*
Y
:.' ::'- * ' ::,':' :q:.':'.:' "".'.,

i/{*".i !i*

(..ilil :iii!!iiil; i:i:il ii!:i:

':i{!

..,:..::.:,..,..,:::.,:,:, :..y::.- :.:%.,.:,:::: :-.:/...:..:./

ii! i! :!

{: !..::.;}.i.

i:: ::i:ii:2:...::i, Standar'ds, g~uides, codesi~ etc., ~iidentified in ~any commitment* document: i
iI}:*(

":/. :{i :.are.not. qudalit~y assUr~ance :prog ram rei'quirem~ents unless !that-document* :

  • <.i:,i3..

,Guid~ance applicable* to sa fetyi related items anld act~ivit!ies !:(}1.0 CF:*

R ;5,0)*:*-iiii;i}:i

,*!!:i.::::!-!ii*i!i:::;

are :appl iciable:to;: com~p~ar~abl !e:itemsi and: activities ( mporit~ant To b.!Safet~y)'.*,,:!:;

i 7 : i..*...

.:.,.:..i(;:at ithe compiletion,of fuel tran~sfer to :support; decommissioning;i. T~he}.

..y

-. *.:.*..;.:Qualified -TechnicaliReview was added.at the time SOLUTIONS became::4; ii !.

!:./

":.i;:i:the :licensee. *::The ifollowing.subjects shall.be.:independenitly irevitewed} by a;.

.".': :""*i.;" ;.":*i1:..

1..i0.CFR 50.I59 and( 10O CFR 5*0.82 evalUatiOn~s for Changes in th fl~e.acility; :

.:v7:::::-..

.. :.:*.,..:-.:::de*scrrib:)ed ~in the.DP and: PSDAR to"- verify that such a:ctionis do Ibnot' :-;:/:::.

!:..}:.:.i:..:}:!}...":..

...:.:inv.,olve a :chang~e to: th~e. Technical :.SpecificatiOns or w:ill :no0t r~equir]ei~::{:i~*:i

17.
".,:/verify that ~such :changes :do. not :invol:ve,a,change to :th~e Techinical- -,...;
;i:
. :*":-. :*-:;::::.. S pe~cific ations :an *:.Will n ot requ*ire: NRC :approval: pu rsuan*:t t:io 10 CFR:,::,:::
:.,....::**5 0 i5 *9 a n d 10.C F R :7 2.4 8 ; a n d ;*::****::.*:.:;:****

`.::.:::*::}:::*.:;:::::{**::*.;*:*:::::E.::*:***::

i{....

  • .::;*::::}:**::i1*:{. :I*nd*ividuals ;that are a;.s~sig:ne.d rtespons*ib:iliti~es *as described ;i~n S*ctioni*!i!,:
/*:::
i i:i.!:~.:.::!:,O.RGAN !ZA*IlON.. *.shall. prepare, admiin~istrative: and q uality :a:ssur~an*ce:;

i"::;*i.:

i;*::: ::; ::i:
i*pr0cedue iis* as n!;e cessar to.

0.impliemenlt the:. requl~irement*s of *th:J;is!:i!: i.::.!i:.i

..:*.:i:::: ;:*:::!!::.*pr~ogriam:: In/s~upporto~f oPe~ration a nd m:.*ain ten anice o0f:.the :LACBW R. ::: :/

i:::
i:,::i:::}::{i.::~l8SF1 an d decommissio ning activitie~s:, as a pplicable. Procedlures sh all."
::.i
.:: :~; *":.include appropriate quantitative and qualitative accep~tance.criteria :.::
  • .;i.:
i :::::::::::::: ne~ces*sary :.to: deter~mine :that :the activity. is :being: prop*erly performed.;:.:.

2..:

",-Audit :or surveillance repo0rt~s.are-distributed ito management f.*or; their.::"

  • ...":.review and assessment of the QA :program, as :to.effectiveness,: scope,-
Y::
.{:}Y:*::ii:Employ*ee-Train ing shl*:l lbe! pr~ovided: to. all: facility.p ersonn~el anhdi:!::q{
.:: : *:,.4.,contractor:s :performi~ng *activi~ties that coUld affect,th~e quality.of***;:.-

!:;::!:::}4*:*.: Inde*pe*nd ent ;:Manage*ment A*ssessme;nts ar*e perii od~ica~lly pe.rforimedi to :}

"': :i :: ' ;.monitor :*over*all performnance: and. confirm that -activities :affecting qUality: -i!,:i!(, ii*/

i QAPD.......

/:::;

.;i.:

t.;:!
  • :;i,.",:::::i:
.*::}::.:::::.:i":....:.*., :. :: :;i

'81:: ::-:

4.

.i": ::: :: :"..} ;:::

i :}i:Ei;.;;!:::ii!}i

.:" Rev; :.2*i::!::I

I h:**::*:**::-:ik:::!:}:i/:*!*i*:co:i)):mply w:ith the QAPO and ithat `the !QAPD Is effectively implemented.i::;i:i!.il

{!
**:i}.::.:designated:

by: the. President, independentiga of activities assessedt; and pendet;o~atiit~s., ssssd;;i'* :! *;/::i~

{k:::yi::.:i

}17*}:*;!:/*i:!:::*:i:il ievel of 0im~anage6me~nt ihav~ing th*e-authority to e6ffect ~orr*ectivle a*ction.i :Iin~i

  • :.:*..*:i;*Yi*,-i:*::.:.::.:y.*:}addlition, tiih ese :*resulits are rePorte d i n a timel *y :fa sh ion to 0the Presi deni*t.::*

-:...F::::..Pe s n e T raining. and: Q ualification.:.

i... "}:::*:::;i: i":::"": i::" -i:.:":

1*.}

!:iiEach member of the fac¢ility staff (InclJuding audit, sUrveillance and~ii!:!i:i*!

.
.',:inspectio n pe rson n el) shll i~ ha Ve. s uffi cie*n t.i q ualificatio ns: to0 periform.-k
k..*:::...*:

.:ii}..:}it he~ir r*:a ssig ned. duties.i* Reg ulatory :Guide 1l*.8 :-19*77(ANSI ::N1.;I8 1:.;-i.:; :::iii

  • i!iiii:i:iii!::*;!
!;
  • !i 9717:l) I*s uiitilized* :ifor* detjermi n ing anda. aSssessin*g ;ap pro:priate staff;!::{;;:i!ii.!:!
i.;*/::;*..*.*.*p::ersonnel training :andqualification *:re~cords :are. mailntaine~d inii:*~i.*!*i:i :*

i:::* i:~

i i.{'::!:.ai*:. Thie: !p os[:it*~ion ofthie IQA :Man ager iishallJJ* meet :it he :.ifolloin o i

!m inim*um::i:!

.{!:

i:iii*

i::iii >:: ;0 ::!

ii.i!i i!i'i:::.

il*

}ii/;i! *iii::

i..

:'q":" >": ' i:.: :i,

.:; :-.: " :- -i L:.:;:i ii!

Graduate of a four-year accredited engineering or science college or university, or the equivalent in practical experience plus five (5) or more years in positions of leadership, such as lead engineer, project engineer, audit team leader, etc.

}.. :" ifi.:":i*:..:i:.:.i *i:: this: exper~ience sha~llbe in 'a quality *assurance organizationi./Y:: :

.... :.-" :.}.. implelmen~tation-may be, substituted for the one-year experien~e:
.:.::i:]Yi-...:i~:.::::.!::iiw:ii.."-wtthin*

a quality assu~ranice orga-nization:....:/ : i!::*iiii:::i..:;i.ii{;:i.-

  • i::!/i:::.!

.-*:-b*.:ii T

  • !ihe ::pos~itilon !of Radiation Protectioni Manaiger :shall meet ~the:;!**i :;i: i

. *..: i- :

.: ::. :.:::}: :!/: :*I:- ::r.ia dio~lo~gical ;Safety,:.thriee6: yearis :of :-whiich;Sh all :*be*in ::a~ppliedi:: :::!{:;i

{i

.ii i:::i

{ii: i:, i::ii

  • " Technical: experience inT the areaexe ofc radiologicalea safetyd beyond I lIsf~* : e~y::n :::i :i : :ii! i..
  • !i!

' ' 'QAPDII

.... " id,.! :....-:.,

.
:*::*,*::i*.:i*i*..i:"i:.

{:*:i.*i.

!: i:i;::/!*:.*:::i:i*.*:

  • !.!:!:.i*

Q A P D,.

9 R e.v. 29:}

i.::..i:,.*iii} i.!:,:...:.; ;.;:,i,.::I;.::: iii:::i;i!:"!,.

e !I2 :*:I.

::%*i:.:.i!{:"*(:/* >*ii

!* il i iii !i*i:*!!!:!i*:Z::¸

..t :.i':':"

}:: '.-.'::i:i:::*'*:':ii!}:.

.::.'.::""":...:**:';:,i*..: **i*-.1:!:::::.*::ii::*!:48*:I*::I
  • !/1:}::.*!:`:.:..:*:i*.`:*:;;*./*!:.i:*....*....:/y:*.::*:::*:(.,.*:.:.*:/

!:t*::::ii.;::::;:::*:i.i*i{:::.:*i::.:

ii:.!}:!::!i iii!::i:{i*;~

.**!*!il' :::i*

!: ::** :basis stowarid s th Ie:iacad emic. d egriee :requ1irieme n~t !(four ye:*ars o :f, *: **

.::!:!:,.::.:! i.ii:::; :ii*::{ :technical experiencel being :eq uivae!nt to! a fou r}year aaem.a ilc::::
  • * ':ii*"*::.:.i::{

i.i **: i:A:*ca*demic a:nd-tech*nical~i experiie nce :must i~total: a: minimu oi:::ef::.i..i/

c.::::::::::::l Ti*iihei position ofQ*ualiffied iT =chn*ical.*:Reviewers shall: meetth::ie-:i ::::*-

follow ing m inim um qualifications:

gim i~i u q*aif ati sii*i i:.!:!;. i:i:-:..:..i :!:i::.:ii::::::.ii:ii:::..~iii::l:.ii:.~iiii **:! i.:-:i :i ::::*i~~:!:!:.-i:ii

-.{.:.

.: :: Qu ralifaiedT cn icas~l Ren v~iew rssal l beg u pefrindiiuaswtheout n!.. -
  • }::.:.

. ::::;.}i:::::!::*i;}i:i!!}i:

i::-::::i!*::*:.*:i:::
i

.ii:

!!!if iiill i Sii: :.: "

,*Qualified TFechnical: Reviewers shall have at :least :5 years ;of. :;iI i'::::::/.q~u*alification*s evaluated o*n *a case !*by ca*se basis iand: approve:.dii*}

  • !.i:* i..;.

Re~vieweris ifor [deco~mmisioning a:ictivities. iand ith Siii:ite~: ~ i.:.!::::

i} :! i*i:

i i*::::;*Manager, G enoa s*hall: appoi~nt Qui~alified *Tech~nic~al *!Reviewerts::i: i for ISF:
i"::o..

SI*t la ed:ac i ite--rela.ted:

activities.*..::

.:.... :; i:i*i~*i;i":" ;::i:i:..:.:i::: - :.:::
." ill:". DESIGN CONTROL.AND:REVIEW!;:.:::.:.!;:::::.::::/:
:;:}ii.
.::::-i
i~**}i~.::.;::::
i.:ili:*:::This* s;ectio e stabl!e i* sh:es *the:re*quir~ements; :to :ass urie thi*at, Importa~nt: To ::! (::::!!:*::
!* ::i::::*~i*::{
!:*:{:; ;::i
  • iiiii; Safety ( ITS
  • st!*ruci:turie s, ::syste*m s,; a*n d :com p onent*s * (SSCs )! :of ! th:e: ELACBW:R * :*i.:*
/: *:*:*::::

i::i:. i::::!*i:i~~* ISFiSi ar*

e: ad * ;:deleted,: chi*a~n*ged: or moodified*:; in* a~ccordlance*:i with :::::::the
ii:::::::::::
.i:.:.
.!i::. : :i ::ii!:(c:.:o~des, s!itandards,!::: an~d r!e~gulationrs.:t thatg overned :th e oiriginla~l. de~sign,::::::::::::::::.!::

i:::::.:.:{:.

~:":::i~-:i::~ii:excep*t.as lamehcide aindi approved. **M~easure~sshallbe establishec~ifo:r th~e

-::::*!:;i*

:,:/*:
!i:.}. :.: : ir:ieview,; evaluation and;
da pproval ~of all :de~sign: chianges ::goven in n.i:S FS i!:t.:::::;./

" :SSCs. Th~e Engineering Manager (EM) :shall }en~sure.that the "design *controli:l

/...

and: review for.:ITS SS~s :shall be :performeci :by the appropria:te..Design*::.*:.."!I

./ ::::.Auth~ority (ref.; Appen~dix :A) utilizing thleir appr~oved: 1:0 :CFR: 50: Appe~n~dix iB;*:.:ii*-

.- : :::%.::::.......::..Design,: fabrication, o)r modification :of storage and shipping :casks.used for -.

.::i.
  • T:::.:}:

i:.*.!.

sh*::ii:

.*:"S. pment iof~i radcioactive !materials :will :;not !be c~ondUcted u:6ndi*:erthiS::secti()n~i-:*i:i.i
i: :. :::.::
i*i
:.:.::::::1i:!.

The:i r:. [e!:DP:C] s~taff: is :r~es ponsiible: fo:r establishiiing :p~roce~dures to{b:* implemb*en t:.i*:;l

-I:

QAPD: i

10:*:
- -A..:.

10.,.Rev:.:" 29..':

.:.:.:. design.:control and the incorporation of design docume~nts into work
...: : iJ ::orders:,.procedures-and. instrUCtionS. ::

.*;:iz-

i q j ?.:.*.:
I :
:~2.: :The EM is: respOnsible for :the iincor~poration of design lbases, regulatory I:
' requirementS, codes and standard~s into drawings and specifications

... ;:.i

.. :...:: :**.i.:::

r elated. to ITS SSCs: design :and ch*anges thereto:..The EM ;is*: also.*;*::*

- : :!:::::i;.:!;.:
.i~i::;

respi:::;::

onsi~ble for the r;ieview o~f d:esign drawin~gs, speci~fications,;i!
::i::::calculationad procurement documents: to assure *that: quality

! :1:

..
: :.: i:::standa~rds :are *included or-refere nced.: 7::

i i:::: : i: ;-;:i *::i:::

i1!i

3.TeulfidTehialRviwrisrspnilefrprovidin~g an

i :i::
  • .
    *: *:** :i:*iin depe:nd ent* r*eview of: cha*nges :to *the i:SFSI* iTS. SSi3sl. i They ishall* ; r ;I
": :i::;i~i:::iprovide assurance ::that the :modification: m~eets :the design: bases, regulatory requirements,: and applicable codes and standards. The review shall determine whether: the proposed.modifications: :requi~re:-

prior NRC approval. if prior NRC approval is needed, any.license:;*..

amendment request shall be referred to SOLUTIONS licensing sup0port.

i ::"i*:i

~

1.:::i.:...:

iiA W:or~k Order! shall b*,e *initiiated ifor all modification:s to iTS :SS~s :and:: :"*

sytmsminane.peaioa.drng.FS.ctvtis.Wr.Odr

ii*ii:iiiiiiii"i::iiiii*i2. :ii!Desigbn :ibases, :regulatory :requ~irements, a!n~d a~pplicabl~e codes :and standards :and requirements for all proposed ISFSI modifications to ITS J, "iJ-S SCsi and sys~tems maintained operation~al duringisFiSi :activities.::
i, These conditions shall be incorp~orated into drawings,: specifications*,

i

-: p r o c u r e m e n t d o c u m e n t s, a n d p r o c e d u r e s :. --. : :. : i :~ :i i :: :. :..i :. i :i i ::.. : :: *.'...

i-ii*::!;
i"i:3. ii.:All p.roposed I:SFSI m*odifications :shall be reviewed to determ~ine
"I:
iV.:* PROCUREMENT DOCUM:ENT C:ONTROL: :i::;::i;:i:;: :;;:.:;i: ii:::.:!

Ths ecio:etalihe te eaurs oassure that procurement; ::.i.J.::

: documents (purc(hase requisitions: and' orders) covering: material;:i::,::*..
.equipment, and serv~ices :for ISFSl ITS:SSCs..specify appropriate quality..*

' ~requirements;: Thie purchase order :specifies or r~eferences.:th:e *applicabile.~~.:.

~~requiremen~ts,- d.esign bases, codes, :and stanida~rds to assure qual ityi: ;::.;:.

..::.. B.; Responsibilities.:..::!~::..:.:.*:i:;.;:.::;

.*: it;:
i~~i
:;The DC ::staff *;is respons~ible for; developing p;rocedures ito !cont~rol t~he:
...i.i2i. ! 2:i.T~heDPiC staf~f is iresponsible for:initi~ation iof purchase requisition;::
ii 1
  • wor~kSheets for mater~ial,: equipment, and services: require~d ::for;.::;

.m aintenanice, ;repair:, and: m ~odifications;.

.:i

':r"

]':' ;"'; *,];":

3.

The Engineering Maniager is: responsible.for preparing engineering QAPD 1:1 Rev.29

! !iiiili ii

  • i: i ?:ii~i*li:;:*::
!pecifications :w~hich detail: the :technicall and quality r!;equi~remenits fiorii:!ii!:

5

III.

Pii:5i

,:*u rch*asing,is rjespo nsible forI prepa ri ngi, rieviewing,* approv~in g,:: is*s~uing,i !

t!~::~

.... :*6.

6 The QA Specialist I Engineer is respon!sible for review of IJTSi;i*:.i::i!.: :ii:;

i!+;?

i;;;iii:p:ro*:/: ircurement documents ito ensure iinclusion of appro*priate~quiality::*

';::~ii

i--:.
  • .::i..::;! :1:.i:. ::..puto l.. :Tie!rchaserqiiin for new matertiOn al,.

equripet tand s

erice*(

t h::s andi:*i:.

i
..+*:i!.:*,?ias quantity,..item idescr~iption,* and technical and qula~lity ;reqUlrementds:i!..*ii I-i i.i;*:::il;:i;i!iiii!::i!i:i!.iii:!+i:ii::!

.i. 2.+ Purchase orders shallinclude ispe*cifications th~at contain all the~i:?*+!**:!i+!:i:*::*:+::*+!I

+:. + information necessary to* assure material,: equipment, and services are*:**::i:

i+::

ii:::,i.:i::!.

i:of: a d equa.teb qu*

ialit.

T~i::ih~is s*h~all !;in clude :material sele:**]ctioni: des ign d ata !ii.!:i, +!i : *.i::

!i:::.:*+:.:..:*delin~eated in;p+urcha~se or*der~s.. :Thm~:issha~ll include a :listing of each :item.:;!::-::,i:.::

o;i*{:*!,iii

f documnen tatio to r
t;be-isub m itted,:wh*en h it [is:to bbe submittedi' wha~t~i:: i,::: ::::*: :: ;

req"-

ubirtes..

approval:-""":

prio to manufacture, and. toy whom

-: I t shall.::::!..:."i-be:?::::-.?i:i*::.:

4:...

.4.. To.:the extent necessary, ITS procurement documents shall:r~equire :...

.i:.:: :.*-:;

ii.ili::..::iii:*21,i; 10 CQ:*FR I50, :*Ap pend!ix B,:. and/or* 1

  • 0.: CF*R 72,:+I Su bpart* G.:;::: Suppier~isii:*.:*!
.ii-.

!i.iiiii : ;::i iisha~ll be r.tequire!d !to ::provid{e :acceSs.to o.th~ei~r fac.*i!i~ti~es sialn~d:i* reods iifor:i:l.:*!..+!

.i;: -:i~:.+.:.:ii*.:*i" i::ii:nspect[ion. and audit, as reqluireid,-t~o~determinei complianceb w*ithl!:!!i*:i::.:iii:::l
+ ~
i

!i!i::::i;:; :+:::provisions o:f !thiei pu rch~ase ord:er. *=These: requirem ents shfiall ;exten~d i:to:ii.:ii

+::i~5;:.

ITS;

  • .ispu~rchas~e requisitiOns :sh~all be :reviewed by: the. QA ::Specialist::.: I"-:.:::.
i/i* :.
i~:i~i ":*::in~itiated ia~nd revi~ewed in.

i*:accordanice i:ith:tlhe. s~ame proceduries :u~tilized:*:.

!;i+ i::i:i!

  • * * +; ':.:.+? :.. i. i.:. ii:

?.::i i'.'".

". : ?+ '.+.':'." "',

in preparation of the original document.

V.

INSTRUCTION

S. PROCEDURE

S. AND DRAWINGS i

  • i i i!ii!I*

A.

General This section establishes the measures to assure that activities relating to ISFSI activities are performed in accordance with approved instructions, procedures, and drawings.

B. Resoonsibilities

1. The DPC staff is responsible for preparing or reviewing all procedures that are required for implementation of the QAPD.
  • 2. The ISFSI Manager is responsible for approval of ISFSI related rirocedures that imDlement NRC-aooroved oroorams and olans. i iiii
3. The Qualified Technical Reviewer is responsible for reviewing all initial and revised procedures that 'affect ITS ISFSI operations and shall determine whether changes to these procedures require prior NRC approval.

C. Reauirements iii!ili!i!:

/i

!iiii!i:i!iii i

1. Detailed instruction for ISFSI activities shall be contained in procedures and checklists covering the following activities:
a. administrative control,
  • , ": *::*:..,* !,!'r:*-*'
b. general security system operation,
c. Security Plan implementation,
d. quality assurance,

!!i ii!!!i i!!:

iii i!iii!ii!ii!

!!iiii!!ii ii i:*:

i:;;:

e;*;. I::sur*veill.ance ::::alnd i::tea~t a ctivities of iequipme~nt,:

f.:::::::::::::=================

!::i!

fire::::!::::: :: ii ii:::::

p ro t c tio p ro g ra m,:: a nd::

i: E.::
f!::i:::::: : :i:!. E::,i i*~ :::::::::::: ::*~:ii::i i;i:*:i:i ii ii
  • .i ::i**;!::*i:*i::;iii*

i!*ii:;::

ii i2:!;i:.i For;i act*::t~iv
ities othr th!an
  • those w*:

ith;*.in:;

ni:*ormal~* craf expertisei

-;!~i;yt

::*ii:
~ *!:: : : Ei *
i::i: *i!
: : ::;i i:

i nst:ru ctionsii!:i;::

!si ii :.i~

ii* d : br ~*!l s ~ b i ~s:a:pic **: ; ;:;! i::***i*.:

:ii!::i for maintenance and: repair of ISFSI equipment or systems shall: be:-::

o cointsslaliirine d

in proced raes or WorkaOrdeors.Th guidnesallta~~::*:*:i*..*:;:!:ii:.;i:;~:i*l

. :. :~i".

i..;.".

con.

  • .i*,Ptai isru:c:iteions f~or preprtemio n gtl~,
perorane, c tes~tying, a

nd return:~iEi to

"::!i!i:**:

-"::::i::"i :i: ::::;:ser ic. T hsa*~

  • :*e gu dac em ay refer:::**.::*/:*:*:::*.enc..*:::...;..e m anufactur.*

e r's:**::

Instruct*::::*::::::::**",:*:,*:::*:::*ion

iii.i*::E~i:i:::ii**
!iiiii!ii!!iiii!*!iiiii!i!!ii!ili:ii!::*!ii:iil;i iiiiii*i
  • i::

i ii:,*

ii*

ii

  • i*!I* i;*

QAPD Rev. 29~i!iiii~iii;!i~**!i:!

ii; !ii*:*:il ill:

  • iii:!!*ii*:ili!!i!

-.: ::T¸/:::*:': :.'.:.:: :: *.: ::'*::T :::

iii i

+:':::;'::::::::

T ::::::,:./*:::" ::::.::::::::.:::.::::::::::::::,::::::;.:::::::::::.*::::*,

  • ...:::::*:.5::::

i!i!i!ii i ili i!iiiiil

4. The department responsible for an activity shall be required to provide the. necessary technical input and review of changes to instructions, procedures, or drawings~
5. Changes to or deviations from established instructions, procedures, or drawings will require the same review and approval as the original document However, temporary changes to procedures that do not change the intent of the original procedure may be made in ink, dated1 and approved by two people of the management staff.
6. Procedures will be reviewed periodically as set forth in administrative
  • .i:)::*:TiT*:!i*!::i::ii!i*Li!!!!i)iiiii:i iii!ii*ii!i:*i*:ii!*!):*iii:i::

i*:::; :

~ :

i! * :.ii *li* :::::

: :: :::::::::pr o c e d u r e s.:::::*:::::::::

A. G enerali*

!; ii*~i*~*!i::ii~~iiii~iii:iiii!i~~~~:*i~):;ii*i!i!:iiiii!)**i!*)i)i*)i*i*~)iii*)ii~l

ii:);*i:ji),*i:i

~

)i*l*i)**:*)):i)i)ii~

  • -))))))
  • T hT:**))**:!)is s ci on*:****
  • i !:i!*))*:)

,):):))**i J))i)

i** i) e t b ishes~ :*ij)*
  • ')i * )::i)Y*))) *:

the:~):))~:*i)i i*i:::

!i:*

requirem ents

)*:):**)*

)i: !) ]

fo d cu en control)F) as*

  • i i

ti

) Ti )))*i)))**)

fT

.i!))i)))]iE~) i : :i:i : i.:])!TIiT

)) :):**

~.

r~esDonsIDIIIIIes

1. The DPC staff is responsible for preparing a standard procedure for controlling the issuance.of procedures and for preparing, procedures I controlling the distribution of operating, maintenance, repair, and modification procedures for the ISFSI.

C. Requirements iiili for 1; Procedures shall be established for the issuance of procedures, drawings, and specifications. A document control procedure shall be prepared to provide a uniform system of document Identification.

2. All documents shall have an identification number, title, date, and revision number. Documents shall be fi!ed and controlled by. use of

'this Identification. Each type of document shall be filed in a central location identified in a document control procedure.

3. 'DrawIngs, specifications, and procedures', Including revisions, shall be reviewed for adequacy and approvedfor release by authorized personnel. The required reviews and approvals shall be specified' in a document control procedure.
4.

The' administrative staff shall assure that current documents are distributed to and used at the location where the prescribed activity is~

performed. Documents and revisions shall be distributed as specified in a document control procedure. Preliminary and superseded documents shall be clearly identified and closely controlled to preclude their misuse.

5. An index of each type of document shall be established and maintained to provide the current status of documents.

VII.

CONTROL OF PURCHASED MATERIAL E ULPMENT AND SERVICES QAPO Rev. 29 i ii ! i :ii!

ii! i i!i!i¸i!!ili.:ili!!)ii!ii:il)ii!ili!Sii;!!i)!!i

i!
ii iii iil;iiii!i!!!!

i

iii:ii i i~ i:iiiii:d!i r

i iii jelctly ior throlughlc~ontriactors andl subcontriactor,:s conform to t~iihe i:iiiiiilI

!ii*iiii;*iiiiiiii!*!:*ii

!!ii*i!iiiiii!iiiiii:iiii%!ii*;i evalu*:*:*

i*ation, q"ua~lif¢ication,: !*and evaluating*: su PPlier q*Ualit~y pro

  • gr*am*s ii.!i:*iiii::!i The i

!;*!:: f ~iiiiii!

QAi~~ii Speciai st:

!*Ii*ii*

E-ngineer is responsible for developing;i:

procedures

~li:!

  • ii::iii:

I

  • !i:iiiiili!ii!iiiiiiiiiiii*iii:,

ii;iiiiiiiiiiiiiiiiiiiiii2iiil

!!!iii!i!

iiiiiiii!iii ii!iii!i!ili!ii!iiii!i!ii!iii!iiiiiiii ii!i!i ii:and:c itec*hnficial capa'bilities.i*.iiiiii Cii:C

  • ii*:;S * *~ ~ ~iQ ** i t*** i::i;::i**!i:!: ~i ~!i:*l
!;i: ii i:~!:l:iii::i:iii:i:

f:iiii.!ii!i!:i !::

il !*i

~ :::ii:

  • !i:i*;*
  • ii::

~i.*~i!i:i ii!.

S u nolier Q ualificationi::ii i:ii

1. Q aiiaino upir hl oss fassigps xe ience
  • i:::::! wiii
ii *!init h te snUpplieriind:t~iii:;Q sup ier' rput~ration. and exp* t er iencosi:

in th f:::::::::::ie, andi:::i~~:

iiiiiiii!liii!iii i!ii!ii!!ii!iiiii!!!

!'i

... ::!.i::*;i:::*i:

*: : i: *;::::',"::*'-:!:'*:i:

2.:::*S up~pliiers iofi c¢ask si us~e~dfor sh ipm~ent: :andcl sto rage: o*f :radioactiveJ *:*:*.iii*iii::::

maeilsal eeauae.oesre* that ithe.:d~esign a:n d :ifabrication f:o~f:

iliacain r perfored undrl

i:i~ '~:'*':

the control E: :*! ::

of an~

NRC-approvedi'!il~iii:iiiiii:ii andiii~iii:

  • !:!!!!i!

0!:;;:~!i:i.l Source Inspection...............

1. When appropriate, suppliers shall be requested to furnish DPC with sufficient information concerning their manufacturing and inspection plan to permit DPC or their designated agent to plan and implement a source inspection plan.

2.We prpitiseti!oni plans s:*hfal t

I:nclueitn~

ii*e~d*ss and hold i*i~i*:i:~i~i::!

il*i po!**ii~

i ntsfori nspec.:*

f

  • t
  • ion
jjc ti**~ ii:: :!*:!::*i:*:i:i of tem, w tne sin ofpro ess s o tests,::i*i!~i::ii**i*i*

auit:.

ofii!i!:iiii:

requiredL quality~.*i*i~::*:::.iii:ii:*ii::. i**:i:ii!!l*!i::i*

i*:~*:ii:*i i iii:
ii do um n ato, nd v rii ato that~

vendors:*i:!i*:i~i:! hav:i!ii:i~iiieiilii *iii:ii::!iiiii E.l

1. Items shall be examined by appropriately trained staff upon receipt for shipping damage, correctness of identification, and specified quality documentation, in accordance with approved instructions.
2. Documentary evidence attesting that items conform to purchase order requirements shall be available at the ISFSI prior to installation or use of the item.
. Q Aii:::i~~*! 3.i Documentary eidence!!

shall be sul fiien in ode to Idnif that th

.9!i:ii~*i!!:

.:*;:t;*!::.*:!:Y:..;::::;':*:.!*:.}t:i;>:.*;*:::specific r:!eqUirements,- such as codes,. standards,: anid specifications, i::

  • :.*i: !.il ;;*:ii~:zi:!:
. :.i, ~: ii:: :.*::i:

can~i

*;i n~be.* confir'med :fori thle pur~icha sed item, :This r-ieqU ire~ment !s hall: ibe:.i::.ii..! *:i!:
"{

i

"::-: }:i -.

sat:i sfi ap~op ae

d by umhaving ava fiabe copes ofrin the purchase order
and*ii!:.i:i*:

ii~i*:!:!ii:ii-!:.;il*.!:i::i:

  • 'i appropriate...

docum ent referenced..

th rein...

i ; *
..*::.;:::::::::::::::::::i:;;::. *;tit:::.:.-:

i

4!AlIT aeils at, n

o poet il esgegtduo

::;:;i ;. :'i:ii

!: ;:* :I Li;i : :]E T rFece ip an will b*;e place in*: a; receivinginspection hold area* sb EparTe i;:* ii : ~~l

  • i!ii:!ii;~!i i~ :i*

"*:: *: " 'r* :.:*'*

.*:. ;.. *:: :*:** : :* :m ;from:*
  • ]:" :

sto rage*]:;*4**+:2:"*i**;::iZ::

      • +

fa i iies:*:;:**:;.*

A fter:

.*:"::" *::** *=;::[*

accep tan ce,: :* : =* * * : '

t he m aterial; w ill:::::::::::::::

be identified:*

  • := " :':2:=

x~;:t;:;..:i;i!.t::i::.:;::::*:*o~*:i:}:

-it-a;hs accineptabl iesandplaed insecuifimednts.orag ie.ntfct~ n;;n o~ f::i:i* :* i;: ;::*':=;;

ii::: i;ii~~*:::*

~::ii!;;:i;i!i ii!;

5.i;:i Dui~a~rina!eciva~ing inspectin, ~

If a s non onformanie or di yscrepancy ~ii~;:!ii*i:: iiii:i*i ;:*

, ii~i;:::!iii :i ;;;

  • i~i*;:iiii;;
  • :i:

exists, the material shall be placed on hold and w.ill remain d

ini a i

hold

f6 mi :~e i ti:* ; te ;f~ ityiii*r*gh*: in*tajito~; ;;: us :: iii :i::.:.
i l
iii!i:i:i

!i i! i i ~i:*!;;

~iii

~~i *.

,, :~i;i

i;:i.::;;:i!i:i!i:i
  • ~ii;:::i:;:

sta tu su n til final, d isp o sitioni is d eterm in ed..i A: co rrective:! action.

ii:i

i::,i!!::::iii:!:i:i¢;:i¢

-;i:i!:.i~.;.:;:::ii:;

!i::iii:: ::.i :?:! i; i:!.

ii: :*!:::

i. :i!i:;:*

.::i !::

:i:::i:i::i;:;
ii! ; ;i:::

i* !:;*:::.i *:.:i*:::;:;i

- :::*! ii;i!i!:* ::;document:*::

  • .*!i;:::T e shc~*all: be initiatell:b~e~bihn* th*oe~l rq iie e:si:*:! *!, i:
i

... -../ITS mateial,.par.,

and c mpoeteasb a tsed o n theponentssyste m

...;;::;):i::::::ii::*:

!::; :i:?:i}:;:.:*idesignat:iiil iii*:i?:i.i :

i on, fromi!::r6 rece.:i~*;u~

ip:!n t aiti theb* fai ity~e: through idbnstallation or u~ste

.ti~i:

.i! !:ii*;*

t;!

for3 t;;:;

hesi~a:;dentificati.on and controlc f a t~~iderias pabrtshandicomponents~h;"i;.

" ".i:.!i.:

from

}

recemm:ip){nt th oug istall~oq:atio n goruse and/ort e

v::.tran!;ielop t0:ing pro icdures.} :::;!:;:.;;:.

  • 7*:{**:::,:

documentation.: I::dentific~ation *Shall: be either: o n the: item o r !recor~ds:i.

{ :::::::i:::!)::

!::} i :traceable ito :the :.:item. iWhe re~plhysical. ide ntification.is *im practicali*:-.:iI :: :
..:.!/i{. :i.:-:physicalisepa rationi~, /procedu*Jral 'cont~r.ol, :or other. approbpriate :means :i"i iii

_:...- :.:/ -

IX.

CONTROL OF SPECIAL PROCESSES

A.i:

Gene~ral::

.. i.:::

This secti~o n es ta blishes, the:: m easurbes.to" assurie* s p ecial :proce~sses,.iii} :i*i::i)i:;. ii{:i*

id::i~:.*:i::iientified as I.lSFSi.ITi S,. a*:re c*ontrolled and ~accomplished byZ iqualifie~d*:ii;!.-:;i:: K:-ii~~:*:*..i~ii:

.i:}:::.

i:ii.}:iiip.;er ison~nel iusing q:..ualiified ~procedue-i.s} in accordance. with:*i":i apicable cei*-as,7:*.! iiii:{: ~i st.eand nards n, sefiatinscriterieaioto and

~oth r spcalsreuirementsrane.:"": ::.;::.:

S

-1.

ThreOPO stafddf is resonsibeWor establising S~capro~cedrs that d~esrib:*ed::;:-i:i

--: :.:..::.:.:. ::how p:q~Ja~fersonel a~ndpoedures n

aorane w~tqualifiedfosijecalprcessres;::*:{.:.}!/:*}.:::*::*:*i*:E:

K:!:..

K.:!!}*:~"**:.i.i]

2:. The QAi Speiaist I En:*

g:e.in

eer oisrbe*:f)r.:asponsibne for rev*u~iewing o~i~ifi: :*:: i !i [. :*:
  • -i{:i*}!

repa:!iii-:!ersand mdii.*h 0cedtion w eork nvling specal prcessife~s : :..is perform.;;iiil.::-.:::.:*{:iied

":i:.!i.

-i::.!-:::-

byi:!

qualc:ifsi~ed proniunde acntildcord nce ithiqualiie:a 6da prceduresi~.-*:~.:-::

.... : :.:...:... using: qualified personnel :and :procedur~es. iQualification of..personnel:.i.: !.

i.iii:i.: i.:/::*!..::*ard*st.n~dproc durs:!:*!::*:*!::

shall.:

com ply::::::::::::::::::::::!:!*i with the

}{i.

req irem ents!:*.

of! appl:":

i cable.:.:/::

codes!:*::!:::{.!:i:.

.":}.::.

i*i-:,,
,, :, i:::}, ::: : "
  • : ';' 7:: :>,:.:>.* *::
  • i!:;*:iiii!-!:ii!:i ii!iiiii{,,iii*i

.{!::if-::::---..::..t::}::.!.::{ii::.:.:*.":*::-:::ii":i¸*:

ii::i:!::i:i!i:iiii*i'"'i:'!::*ii;!*

  • . *......... :,V ::i:!*
.i:i*i*::

i*i.::::.*!:i!.:!i.::::.i.:.*.;....

'.*:.:i:i:

.i*i:.:,

-..:, ""{. %.. "" :.:'

,.'.{:", ::i:: ".: }".' : / ":
!}:': 'i: "(::'4.:::;/" ":: :::'.*:A:*ai:*l-:t*,
/...::!....> :!,:.:/:.....,# /.: ::: :::: :,
{i:::i2.**:

Wi:eiderSiand welding iprocedu~res: s hall:* be:q ualifi ed,-i as approi:pria*te,:: :in~i:;:::i:!i:*

i :: :i::::iaccordance: w*ith iSection iX o:*f the ASME Boiler :and Pressure :Ves~sel::*;:*:!!~i
i ::: : :.
  • i.: accor*.dance w.:ithi:thhe Amer*ican :Society ifor.Non-destr*uctive :Testin~g:*!:::**:::.*;:

4.: 4 Procedures shall, be established. to describe !the method. used to control." ::

" the receipt, storage, baking, drying, and disbursal of welding filler..

caibatdmaintained,":stored, :handled, -and :Issued :in.accor'dance with applicable procedures orinstructions..-..........- ".-,...

.:"'/!.....}'i.:..

": "r

....;i'iii

} *:i:ii~

i;i!;::i) i:I*..

.;i*S ;"*:;::i;i..'*'i ll::*.

> 1 * : :

i:::i::!*;ii*: :Si.

R e v. 2 9:-

:,......*...***2... -..

i:: :," /:*::,',,::/-'ii: ii

i.
i

-i-

-- ':;" " ' ' ':,': "i.":; --,:-- -:'

, "+ :,': "", : "

S!ii

" -:' * '" : :":'"; :' * ':', ::'. :. *'-.'i :ii'.:, ',.':'. i:',.., ::

,.. ::,,,,:::,,i!

!:i:*i*i*!*i*:-:

X.INSPECTION:

A.* General This section establishes a program for inspection of ISFSi activities to verify conformance with approved procedures, drawings, and specifications.

  • Responsibilities B

ii;.! ::;i:i;;i-i;::;:;:.r.i:.equir~ements ::ar~e :inClu ded:i n engineering;,specifications, alndi reviews *of.:::ii

ii.;.
i*-;-:.any in~sp ection **pr~oce d Ures!: imp lemrne nti ng this Section. arecom p leted*:!::.

.*:!i.

..~ ::;:!

  • .2;.i: :T~he QAi Spec~iali:st I, Engi neer i~is;!:

reponisbleI for esta*bliishing ;inspection :!il.I

.:i :.::i.i i!:: :.;;*proceduries and iass urin g adeq uate. ;inspection: req uir~em ents arie!:;:;; :::;!::i :;i:: ~*!.i.

.: *****iincluded in procedures. They areu also responsiblrese forcoordienatingi theo sibe,:frl c o!;dnilt n *~th e;::*:::*. :

~ii assignments: ofsgnme t

qualifiedfie isinspection personnel.

*:i:i ".i. i.:*!:*!::Y::i -:;;i~
-: :-*:.i :
  • ..:i..:..;:;::.:;.:..
. :3-*.:

The/.":.:"..:.

i. :i;i:?.?. :i:""-::::,:

ISF I :,;,*:,:

Manage shall::i.:,,::;:..i-,

be eson ibe for,approv,:,

,ing,,-..ISESI,

.inspecti on.*

.i:::.~..:,.:..::::::,.

! ;i ;i
i:~i;
;; ::i:}:*i;::*i ;

proci3::;iT e duresF or a!insrcions a nd-* shall ens ure suf~f~

i c:*ient ;Inspect;ions are~i~ !;!J

.;:*ii ;;i!:ii:
!.:..~i-:.:.;!: :*:!performed.

to provide adequate confidence that project activities meet;:~i:*-i::;:

!::.ii-;:"::."./.;:::: ::ii*:::;*.i~::.:.; ::::.:

![-S
i*.
.: ;i:::::*?:;;::;**:**;;::i:;;; :':::;::i*::;;i;?:*:i:;:*;;;;.;:: : :::~i.
l : ;:ii*!*:i:i*;**:;
i
p re d e te rm:i:
e :* !i: :in e d re qui':*:

i re m e n ts.

.i:::;i:i*i!::::;:'i

!; !' *;l***
~i' i ::; / *i*;*;i:i;;il*:!!i;*:: *i:*

i:*iii:!!!:;;**::!ii;ii:!: ;iii*:: *:*:::;::*;~;'ij:*;i*!*!!!;: *;: i*:i':*:;i***i*!i;

.i*:::i;.;ii: to..?

tpbe e;*stabl!i.shed.: Plannin:g activities shall. identify :the ~char!acteristicis:

!l*.
.:!i.:i:*l:

i!:.ii;accePltanice cicteraia, a~d the o:ibrganization r.iiesponsi!ble :for:performing~i.:: :. i

i:;:;.*"i:,*

.. :inspectin~g of, an activity. beforie proce~eding, shall be in;:idicated in ithiei:;;:ii..::;:

.i.i;i;.:.:i;:i
-
appro*prijateprocedure, specification, ior :.work :order. Ti;;;he: inspect{ion:.~:;..}.:::::;::

.i::i:::;shall :be documnented, to indicate approvali and rel~ease: p~rior to

....: -:- / :

. ;i,.. continu~atio n iof the actvi ty. i.

.. i.,...

-,,,ii;-i;i:;ii;

i*.:,:,li
-:/::

iiI

  • i;
    • ...ii::iii*;:i::i::.i:-i::"

by:cOm*panyi yipersonn eli o r con:tractor ii.pleriso0nn el, : ian~dii sh alli requir~ei t hat.:i"i.!:*; ::*i*i:*:::::.!

ii:.i:;:*:.:.;..;?.:;!i:;nspection *proced ures ;and :*inOstruc¢tion~s, alo!ng w.ith n*ecess:ar!y dra~lng s,il.!i~i~;.:jj::::.::ii~..

...:: i::i~~ii/:::*;i; i!* ~-*:;*~il:i 5.ii:

Insp.

e ct*ionre uiemet hai eint goverdning modificatieorgns, r epairs an id i; :.....:.*

replae m ent; shalli:

-i.;i
;.."

be

,.in acc rdanc with:. the,....

origi:.:.

i nal des;;...

i gni and.*.

i.
/!*
;;;.

inspctio requirements::,

or., as amended.:,

by approved chne to the, QAPD.......

18 Rev. 29

  • !i*i!*

i! i*i:!i:*:iil*

i
!;*!iiii;i!i*i
!;i*

i!i;::i*

  • **ii*i¸ Revi:i29 :"
  • i.i-ii::*.:
. ::./i:::!.

section establishes the requirements for an ISFSI test program to demonstrate that ITS SSCs will perform satisfactorily in service. The test program shalt include, but not be limited to.surveitlance testing, special tests, post maintenance testing, and testing following ISFSI modification o significant changes in procedures.

B. Resoonsibilities..........

1. The DPC staff is responsible for establishing the requirements to control the test program and for preparation and review of test procedures, surveillance during testing, and review and documentatio of test results. The DPC staff is also responsible for establishing specifications, requirements and acceptance criteria for testing following ISFSJ modifications or installation activities and the review o results for testing following modifications.
2. The ISFSI Manager 'is responsible for the approval of ISFSI test~

procedures or instructions.

3. The Qualified Technical Reviewer is responsible for review of all ITS proposed test procedures, special testing procedures, performance testing procedures following ISFSI modification and performing 10 CFR 72~48 evalu~tion~ to verify that ISFSI tests do not require prior NRC~

approval.

C. Requirements

1. A program shall be established to assure all testing required to demonstrate that ITS SSCs will perform satisfactorily in service is, Identified and documented.
2. Testing shall be performed in accordance with approved test procedures that incorporate or reference the requirements and acceptance criteria containedin a'*~~l*i~able design documents and Technical Specifications:
3. Test procedures shall incorporate, but not be limited to, requirements for such items as: hold points, witness points, caution notes,.

emergency reqLirements, and test jumper logs.

4. Test procedures shall Include, as a minimum, provisions for assuring that:
a. Prerequisites have been completed that include, as a minimum:
1) Control of systems status as necessary.
2) Availability of calibrated Instrumentation and special equipmen
b. Test objectives and applicable acceptance limits are stated.
c. Test results are documented.
d. Detailed instructions for performing the test are included.

APD Rev. 2

i*::.:'::.:::::*:*:*i::::*i:

.i*:-*,::::*!.:i*: :i! ::!!

i

.,i:ii*!*

! ii:ii!::ii*:

    • !ii*:;::iii
  • !*i!::*:

i:

ii*i:..:,*,:i,:*!:;:i:!!*::::i*ii*ii;:**

    • ,i*:!*:*!
ii*!*ili*i:i!iI ili L!

e-.:i:l Test !res ults ar~e reviewed a nd :approve~d:.:

!i i*i:i
ii:iii!i!:

ii i !*'::!i cond::

.*:0uc~tin:g:the *:test, tihe :.data recorder:, the:: type:-of. observ9ation :made,:: ::

.:...:the :equipment.used,. the test re~sults, :the acceptability of. the :test;::..;;.:

r iesults,.anid approved :dispositio*n for an~y deviaJtions::.

.*:.-;.:":.i":*:::::,

cr:::;

iti::ieria :shall :be p:roperliy n:ot~ed :andl appropriate ¢orrie~ctive a~ction tak*:ienii:::.i:

XiII.

C:!!i*ONT OL:OF.MEASURI:NG AND TEST EQUp:IPMENT..: :;;-i!!i-:::*::~i: ::ii::.:;:i::*:!:: ** iiiilii ii ;:-

!;::.:;::::i!iic:*,on*tr ol,* :calib~rati on,:: andl p:)eri~o~d ic adjuistmient:; of :tools, *gau[g~es,;*: in st rum~ents,*::.* ::

':.:.."!:::':,::~i:!a::*ndl othe r me asurinirg :an~d:test!eq uipment-used, to verify confo rma nce ~toi.::.:-:.:

: : " established :iSFSI tec:hnical requlremients ".....

B.

R es o s b i~ es :,!::: :"::" :"::.... "::onsib""il...:":ities'::" :::."":: :::::::i!!i.i:.i::. :::::::::::::

  • ..*.*:....*i*i::i!*:* :*:::.*:

1...The DPC staff is rsponsible for establishing requremet for a

.. ;.... program :for.-the Econttrol, calibrat*ion,: and periodc ~:adjustment. of itoolSi::.
  • i!:*;::::ii
!.: *:en*suriing g:tool s, g auge s:;, instr umen ts,* and Cothe r *m easurin g :anrd : test:.::. i

!*i-,:::.:**::!*.:::***::*::eq:uipmet a:*re calibrated to a:s~sure co*:mp:iai*nce with *t~he imnplementing::*:;

-.::::i*:::
3*
. T;*he~I:SF:SI!: Manag:er rIsi ;resp)onsible for ensuriing iim~plement~ation *of the.i.*:;
.::.-'.. -!req uirements :of this sectioni:of ;the manual "for. ISFSI ::activities andrfor:..:;.

aprovig I:SIprocdurs o insrucion......

    • i*i:i::;*::::
* ::::i *

...*:* * *: : *:* i i*!***~!:/ ; ::::::::::::-

* : :- ! i:i !*::*; *:: Ji :.:; *: :: ::!; :;::: ~: ::*: :i :***::!: :.**i:::
.:.:!i *,:: :*::*::

iili ill:i!

i::ii:: :ii.!:

i* iii:*.*

.*,,..:....I'*

UI[*III*li- ".;:'..- :

,*H.. 1 :. *:,*Insp'e~ctio'n, *::t~est, aind iwor p:ro:edure;s shall include pro*:!*ivision t:!:o!**: ::::i :!:

  • ! : a.n d. t~est eqi p m~enrti an d: idev*i:e s :u sed: in : a::cti:vi ti e S affecting*: qu~ality::ar~e of:
  • t h~e.*pbrope
range gb~tY pe,: and.!accu: rac(yi.{ to ve rify !c~onhformanceb; to::*:** :"i:":.*

established requirementse andm testan parameters.e~i*;*:;*

  • :::.*;:.;;.*::;i..::::::!:::;i::::*
.*:il*

E::::.:.:*.:equipment shall be.:.::

controlled, calibrated, adjustedecl and maintained.........

-.:-:.-....... :period~ically,-o~r :pr{ior to :use.? Calibratio~ns are performned againSti!:;::"::::

-certified :measur~ement standards that,.are traceable-:to. nationally*::::,.:*...

~recognrized standards. Where, national::standards do: not :exist,================:

  • . i-

.,provision~s will :be established to dc~ument.the. basis for-calibration.:;.**Ei:*..::

.:Contr~ol.m~easures :and, p~rocedures :shall: prevent the use o:f calibrated::.-*..:

=======================

un=

  • auth*orizedi personnel. Special cialibration 1.an~d controi :m~easures :ar*ei::

no.ii0t; required for d~evices when nhormal: commercial. practic~es provi~de:.i.:..--:.

.*=.....: *:.;:..*:..:::.iii;*::::*:

i:*a d e q u a te :a c c u ra cy. ::::::::::::::::
  • =i 3,!!*::I:::.:

W he...n.-.:........:........,:,::

an..

.item of.... m e s r n and test:':"!i::i' eqi pmi:

e nt!:.i:,'="=

.... :is found to,... bei:::.

out of':::*:*!,,:*

QA.

PD:::.:

..:: !i!::!!::i:* ::~:i:
3*.

20 Rev. 29:!:!:*iiie

  • f*

ea~~ing: and; *este~p et:i ifurl~ !.ii:beo :~ : :::i;:ii'

::::ii,: i*: :i::i:i:i::: ** !!i...::i::::i:,
i *,
  • i!ii*: !. :i*!*:i*i:!:*i*i
  • .i:*

!i*:.il ! :!i*iil calibration, an, investigation* will be conducted and documented: to. "

deteri~mne :the validity of previous.inspections,. tests, or caliibrations.::

..which wereper~formed with: the use of that* item:.:..

  • !*I

.:.. :;!i *.l..!i!.::i':*

.:'iii!i:,.

i i:*~

ii:ii:iI4..*i*R ecords. or loii0gs Siof ithe icalibration nhist or iiof imea suring and dtest:'~~~!ii*::iiIi!:l:i*
:;-::!i*:.-::!i::::ii~*:.:;:-?
?::a**:ffixe*d iserial :n umb er.!.Cali br~atio n:.i decals iiitag s or i*s tickr i eis~ihalli;b e :. :I*
=.:*.:;.i*::i;.:::::::::::::::::

.:.i:i

.!.:~d :islyd enit::f prom iS n i:

entlyn

.! i-.,cal rt

h. :::"

on each device and shall reflect. the

=

date=======

of===========iii::!-i:ii

.:: i:-* T h is* s ecti on es:**:tablishle~s:*t:he* re qu ire~ment s fo lr:S FS p

roce*du re*s to

,on:':r t rol* : i.:

. :::*ii~:::

the:::::::

ieihan~dlinig, ;:storage, :sh ipping,* iclean*in~g,* pack agin g:,* and :preservation o::0f
  • i:

.:.?!::*IiTS*: m~ateriia~l**a~n*d ieq~uip~ment :*t o :prievent idam*ag e, deterio:ration;, or lioss:ii.:i:i!:*:*i:.-

.ii.*:.:.through.::;.;shipm ent, inst lla io or. use..-.--:.:....

-.-::.:..:-. :-.::.. :.-.::-:-:.-:~.i:.i- :::::i:*.~~:::::

!!::"i: : *.:i~.:!:2:..:.!.:::"2i:.-The.ISFSI ~Ma nag e~r: Is respon*sible::* t forappro*val o:f *allimpl**:

em:enting':i:::::i**:::*:::

" : '"";'" -:1.::

Th r:scaequsirements: for handing:,

storagpleshippti~ng cl~teanembing,

i and~ :*"*i

-suprlserv *,ation ia l..

of-ma.erials, and:equ ipment :::::

shall be~ :::..i--"?.i.:

doc me te.:in::*.:.::::i

.*: :" !:!:i~i :::::.:/
'*:ap p ro v ed p ro ced u res.
...: i. :* ::: * :::i:i:
L.i:*:.:::: : *::i*::
.*
:.:::.c:bovrinand ::it~pr~oetvednviromentrs;, suhatspeinier!it vals a
  • tmospherei::i::
i:.

hand::!

lting:tools,

.andi~ equip~mentto a

e sueafan adequatey mntied::.-:::

handling::.::

of;,"*,.*:::*ii*.ii::

':i:! :i*I

,:, ::,":::!i:!!:.:,..:

i :!i::':;:

/.!:. !*....:. ::;::..;::-i.

  • ,:. :,"" *; ;,*:., ' LII.*,
  • i,:*:.-:*-:i*:*.:
  • i*il-

, :,.

  • H L :L :-.

............... ':.i:***:*

  • -.,i: ::::::? :*: **:i*i:-!:!::i:**::ii

":, i;-

i i: *i !iii-!*:*I :, ili,.ii

.... **: :.:::i:i:::!* ** : *:!!::*

-.. :*,:i!::*::..:::**

,:.:L :....

.-.,-:I*."::T iiI :::.i :.i* *.* !!i

  • i:*::
..:::::::::i:i*:*i:i:.*9 i,*i:i*
  • ii::*::::::*ii i.:::
i
! !*:il
  • i:i
  • *i:!i
i:
i:::,*,

i::i:::::.:*

  • ' ' **:.*handling personnel. :Other special shipments which requir~e sPecbial:.....
... ;-*@:.::@i.:*:*@equipmenit and handling: willibe *handled by knowledgeable an~d trained !" !. *
-i.!!;..-:::.:::.7,:Storage.o~f material and equipment will be in areas.free from fumes,
.
-::i::
vapors, s.iand
dust.Storage will be in areas protected frobm the weather,. : !/..:.*;
-:.";;::.::;*i!

as approm~;

epr~ifjate, andinthorichemical wti*;: storage wislxludd: ecp b::ih a

e s:;-!.:.*:i.:::::*:.:::::.:!:;::::.:.

:.:.:"i:which s~atisfy :th~e h;andling and.storage: requirements specifiedO: for the;::.:: ;::i::.. :
.XIV.

..::.:,::.. :....:T......T..-..::...

TI ~ t :...

l.

i i!!.*:i!*

iiii:.* !!i

- + m iiii iii!

i!i i!:

iii:.":::!"1:.i::: i-:.The DPC istaff:is !.responsib*le for ensuring tha~t the status~of operating.:.'!I

-..":'::":.::--.::".eq uip ment o.:r :systems s*to;.be ::removed: from.se rvice fo r: m ain~tenance:,;;: i-.::

.-:test, :Inspection, r~epair, or: modification Is in.accordance with :;the:. ::.;i

.i;

-.-::*-i:

c ompliance witth approved iproc~edures and shall ensUre in~spectioni~::i:*:ii:!::i::

.!:::.*i:

  • ::!:; *..i"*results :are pro*perly rlogged.;,! :They:. s halli establish the :probedIurebs. ifo r : -i.* ;:
  • :: i.-:

. i:iv:..... imple~m~enting :the work inspection or status sheets during imaintenance,;*::

/:*"i

  • ".'i:. ***:!properly loggebd. !:Th~e*D*PC staff *is *also responsibl*e fr ithe con~trol f *:.ii:!- :
! !i!::!i!i: i!i:: !i:*ii:

iili C. Reauirements

1. Equipment or systems not ready for normal service shall be clearly identified by use of tags.
i. :..: ::'.
  • i:':.:"
.:..:...:~i.*2;.:..: Equipment :or syst~em ;inspec~tion :an~d :test statu~s ishall be.indicatedi:::::-.*::.i:.i::::.
  • .::i.:"!:!!::!:i~ii:::3;i:I. ::SS~s :that :!a~re fou~nd. itobe un ac*eptable:i durin:g. !or :a fter tefsting :s hall::: :::!:::!*:!:i

!:~i*ii***i:.:.!:iii:.,::

Th~i..

is section estbliishes measures t~o: :assure t:hat :onditions:advese *:. :::"*.i:

.- :~ii!::
devi atio n s:,, defe~ctive :m ate ri al a nd.,equip ment,; a nd no0n-co0n form an ce:s aref!..:-'- :

..::... :* promptly Ideintified~a~n~d corrected.-, T:his inicldies: the control: of materials:;: :.:

parts, or-comp~onents thati do not: conform !to! requirements,.ther~eby..*:i::...:;i:... :::*i.

~~preventing :their inadvertent: use ori :installation. ".::

-;: :::: ::.:..::i::..:::::::.:::.::.::::*i*i::
.B*::. :.ResponslbilitieS*:,: : ::...!...;
Q A PO;i*

':*::ii:::::::

1. Thi:*i:iie DPC.: stafi s ri::iespons:ibl:e :for iesta:blisini:gi
.;!: :::!i:i ii*::~i*i::i.:;:i:!..i:

i:;::!: *!: :::i :::i~i: *i/ *.:ii:2 2 ::i!!ii*:::iii;::*:::: ::2 2

procedures:.:

for.:::*..:

the

.::*::.:.- ::!"!*!ii :!.ii*!. ::
  • ..:*i:*
      • ii**.:*::*:*:!*:;i*;::*::!iR e v.::2 9 :*:.,:
i.*! ii
.. i.. ;
.::"-identification, !review,: and correction of conditions adverse to quality: :i

.:!i:

.:~: *.: i ::]:!!,whi~ch :includes the control, evaluation, and disposition of deficien~t::i*, i-:.

i*)?i?
-::.~i.:.:2;i:.: The D C p*sta~ff is Lrespon~sible :for reva*iewin*g. no nconfor~ming ;items ti*hat!*:i~~~

.:::!:;..~*!*ii*

!..:i::?i!*::canrnot:b~e co~rr~ected ;by )vendor a-ctilon anld :recomm~ending :dispositio)n*):.)

':.:-i

?I3. i?!Thie iDPC staff ;is irespo nsible
for
  • rev~iewing condition rsadve~rse: toi;*.:. ::i:*-
  • :.-:i:)::ii.:.quality to. determ~ine the: cause.of the condition; and for: rec*ommending;
  • ..I-). !::i.i;:.

correctivect action

pr toe preclude repetition.i:* i.!~i:.)": :!i~::.::i:i~!-.-..I:IIi:/: :..]

I.

~1.

i :::iii i; **!~i**:*:**i*:]:d~eficiencie*s,-

  • devi~atio:ns,~defective m*aterial *and equ*ipm~ent, shiall ~bei:*i:!;

iii!*:;

  • :*:: ;:.:i:*:i!**:ii:

i,*:iir,*ieported ion ia corre[ctiveI *ac*tio0n :d~ocument.: Materials, iparts!,ib*::*i or

i: i;~ii*ii*:*l*:i**
!:.:.i::iil'-':i:!

placedi~ii~~:::

i n

l::;

a holid *st atu[s,. No*nconforming items, shallii remai~n' i n*:: a..i...::!?;!!i~!i*i :;:::i!

  • .-:i:i:

..ii!)*..

.-segregated *area :until *approved disposition: has been determined:i:)- :.i-:*..:*
  • 0L','. '... 0;': i'...i ): :.
  • :...:).'.-:.:---i.:i.,i..'.:

2.: i:The corr~ec~tive action do~cument shall identify :the condition, :the cause- ;.!:l~

all nonco~nforming items and requested to: correCt the deficiencies.:::;:

r:

ii ::i
e'spon sible ~fo
r*i coor dinabting ::the !dis pos ition* ofa deficienht: :i t~ems.Wit hi : !i *ii [iili

- o***!!*:*r reject..I:`t~e~ms :shall *be r*epaired or r:eworkedi only: in; ac*co~rdance withi-*i:::!*

approved probcedUres and sha~ll be re-inspected after rePair
by :the: QA: i::III:

.. specialist:I Engineer:. DPC staff :shall ensure ithat documented ~and:.: :i: :: :

iappro:ved procedures are availabl~e prior t;!° repair or irework.:::i!:**:i*

ii!:!; !:::i i:i : !*!i

~:5...

l5ii:.;tem*s.iwhich iare accepted i~for us~e witha :known defiiciency shall b;ie fullyi

*:::i ii:i)::i: :i: :idocumente~td with ~th~especificatio n !:re quirement, j]ustification *:f~or:i*i*::

ii::i

!;:i~!:ilL:i~:::i*

ir;]i~:ac;eptanice, and effect !of such u:;se;*i Alli such :iitems lshall b*1e :a~p~provediii:

i!:iii::i

!i!i!:::: :::i:!:.;irecommen:0d e~d or*rec*tive. a~ctio~n:s tha a*in*:voliv~e :a d*e~s~ign ncha*nge, *:..shall! :b-e~i

"::"'i*:!:========re=====viewedi by :DP pcstaff or: appiciiable :Design n::Author*ity. (r~ef.: Appen*di~x :::...

i ii!

L

."'"10CFR21I.shall* be :reported In accordance with: approbved.:pr*ocedur~es'.."..

XVI.

QUALITY ASSURANCE RECORDS Q D.

23 R ev. 29i.::i.:*:*.*.

.:...:*.!:*:: :.::..:.: *:..iL:

  • i:

.ii23 ;::)::

,: ":::)...." : -.. " D':"

i:!iiiii
...-L. :..:..:.-...:-..'

ii*.::.*ii!ill:I

  • i: ' ::::*!i!:

A.

General:

/..-:: <..::;.:.,.:., ::'.-:.:::./::.- -:--.:..-:

      • .*:*iii'i:!!.
  • i:i:::i*i::i::.i;!:i*:*i*::.*¸.

i:/thle oper~ati.on, mi:m.ntenance, :installation, rfepa~ir,: and modification o*f ISFS!::;;**I.

    • ;SScs, :alnd ithe :decommissioning: activities, covered :by the QAP.Di:. Also**::!.*:;!***::

"-infcl ud ed iareh i storical~i reco rds g athe red a nd -c oll!ected; d uring gpl!ant :*and ::i::*::i.: : : :!iii

?ISFS I op*erations; which
are either re t*q Uired to blsupporti th e dry~i icaski sltor~age*i*:: ::.iii
  • !;**exe~mpt from r~ecords ;keeping ir~equirements
    :inaccor~dance *:with :thei ter~ms iofi-*
i:iany iNRC-appro*ved irecords exem ption nth*at"may be g ra nted :.to :!SOLUTi*ONS:::.
  • 1.:
- :T*.::*he DPC staff::is:respor~sib~e for establishing the requirements of :this.

se c tion...

.:::.,. i::i'i:

  • i:*

'.i*:.:/;ii:.

  • c:ontrolled and stored in: accordabnce with iwritten !Pr~o~cedures.*; The riecordl:
(
. i:::!i:i
;.
;;. ;: ::!~:system~;!]. inlude~s theii@ *rete ntion of *thioseii d~esign, f!abricatio0n, *in~specttb?

ion, ::*:;

.iii
::
    • ***. ~~;:.:
  • i:::
i:i*; ic::borr*es pondin j :m anufactur:ing,,i:;nstalliation;,:. Insp~ctio:n,.itest, :and iaudeiti::i*i?*!:

-.!ii::i;:::..i i*?::::.. -::*.:;:i:specified ini: approv*ed pro~cedur*ies::. QA riecor~ds shal be:: pro*:

tected::** ::.;!.*::!~:!:!

.i.!:. :i;~:::::/"::::.::

!
/;*;with :a *mean~s ob.f matching *therecord.d:;to the item; or activity ;to whlich;:f~ ::it
i
  • i:

"..:..:::::i *:*subcon~t'racto~rs/sub-supplier~s,.theorigin~alQA r~ecord of the ~deliverables.i iiii i iiii i -:will:be. transmitted to SOLUTIONS or DPC When applicable:i:.iii-::i:.i*.i-l:..

  • ii:.I:

~i:

  • .ii:?:.:i.i :i2l.i A,.:i:i!:.:.

2::uthie ntic-ation:. - Docum*ents s hall be! *onsid~ered valid~: ireco:rds.o nljy i*ifii~l l~~

. :*: :::i

: :;~i:i::::~i::::: :":::":"::*i!!stamip~ed,:;' i~nitiale d, or *s ig ned :anda dated* by-a uth*ori'zed :.p ers oinel or!:*!ii:.*ii.!i:*:::i::
  • .:.*.:::*:.**i:*:!::i:i*i!**:/:**;:::!!:*:::*:ii:othritW~ise authentlicated, :including th~e :u~se o*:fel bectr~onic approval iarnd~i::i;.i.
-!i'.i:ii?!i!:~:;::~i*:.i:-ii:i;ii.::i:.**:*aUthur*ization.
  • iThis: authen~ticat~ion may t:!ake ithe form o.f a i*statemenht biy!:;i.:*

. *..iii*

i/ *ii.::::: i::.:!:ii:ithe rei~sponisible, individu~ali or organlizat!Qion*.Han~dwriitten isignlatures i~arei**:i~:

ii*i::.*:;
i;
.i~~i:.:! : ::*;:::*;*.
  • !::no require.. d; if* thea docu ment :is clearl ! id enti fied as ia :st atement bY *th e:*;::::

!.:;:: ;*: :. :: :;.: ;.repo rtin g*

ciniv idu al or i:org anrizat ion. :,T h es e: reco0rds-m ay* b e !orig inoals or0*::i:!:

':: :* :..: *::*'i ::"i,.:.* ::.:::

i i ii;.:.::.:3:.:;:.3: Indexing -*. The records indexing system.must incl ude :records:.*i.::

ii:":"

i dentif~ication, l;ocation of the record :within ~the isystem, and ~iminimum:.:ii.i

-- ii;..:!:.:Hir etention. tim e. I:Th1e re~co rds and/or ind exinrig sy/ste m(s) :shall I ipro~videi:.;::.*

QAPD 24 Rev. 29

,.,*+*.,.,,,,,:,,,:,*,:,...,:,

!i:*i:::i!i::::

.ii :,:*::

i*v:i:!29

  • ::i :'i::: ! :i.:!:

ii

!:i!i :i : i

:::i:i: ilili
  • !:::!i!?:;::::-!sufficient; info.rmation to permit ;identtification between the: recor~d"anid the:.

4*.li*i.!

": ;i 4:::~.Distirib~ut[ ion:: a:nd: Cntroli..; The records shlla. be distributed, h~ian dledi! ai!nd::
.cntoledinacoranewitritten np rocedulres. Measuresa*iha!.!. ble.*.zi ;
-
established to preclude the entryi of :unauthorized personnel inito :the:.::i*::::
  • i::iiii.:.;!i:.;
i::*i.::~:stor~ag e requirements !as either lfifetime o r nonpermanient'. R*eco*rds :~ithat:*

.*i::i**?.:,:..:;::**::*.%~imeet.any..of :the efollo~wing 'criteria ~are idesignated Lifetime e"r~ecords ::anid~ii~.:;;i

  • iii::I
.!!!:i:*!:i.iii*!* m ds,

m ust a n d :

be m aintained.;!::*-*..:::..:i *i.:*

  • i -:; ::.
...-i.: ::".. ~i:...:i.:~i*-

-i:..

.'::" ; ':i":'-T:il*

i! : *:

a.

..:aiProject lifetime.*records shall.include, as a minimum, design:

  • i.

and interface control drawings, copies of material i.test reports,.-...i

..;i.::/

ii~ ;: :;'::i:inclUding examination :reports*,' and nonconforman~cel re~portsii.;i!:~*:iii

.: :*-:i*:*.:

of:**

.:*f!the itemlm"!ife iof..the facility, ior life: of the license, i.as aiipplicable.:..:*

=============.::!::.s tandaa~rds (.le:g.i: O1C FR 7.i,.::10:: C:FR :72) w)-:ill'-be iin clud ed:.ini thl

  • e: r*et entio n.:

i:.*-.'::*...-

.. :6..

- :.-6::Storage Requirements.:-:.The :records shall be stored; rIn:

predetermined i:.i:*

    • i======================
.i ::.;.:*::location(s) that a:meet :the lrequir~ements..of appllicable standards, :codes,;i.:::::
  • i::*:ii:: ::~.*i-.

i: :::i!:*:..:: :!i~i

*::i::i*!and regulaor at:Yiige nc*ies..i. Prio~r: *toisto:ra ge o!f r!e c ords,i: a w:ritte*n s:tor~iage*..i:*:

Z '"

"""':l*

""*" "' I".Records

  • shall be stored.to. prevent..damageifr'om moistureor?.:"***
" :temperatur~ei:.:A~ll records m aintained in hard:copy fo:rm shiall b~e firmly:-

..... :: attac~hed: to bi!ndersi or..placed in: :folderts, e:nvelopes, o:r :boxes fo;{ri::!::::.i* ::.:;

.-:*::storage in file :.cabinets or within :containreis on :shelving. :Records miay:**.
  • ::*:i:.i:*i**.:!i.*i::;::*::i:::b:i!le::

stored' i in i:belectr onic :media: pro~vide~d that: the '*process :for mi:anha * *g::ing i..

ii ::*-:::.::.:::-

a.:*::

i:*?Re~cords :shall b:ie stor ied in fiacilities ~that minimize the :risk of damage
.: 1!: : : i.,.¸ QAPD 5.-....
Rev:29.".:::::":"

.b. Natural di sa sters suc h.a s :Win d, fl ood,, or fires;...,.:..:-.:. :..:/.:*f.V:i.:. :.

S-:.

-:c.

E::Jnvi~ron*m-ental c:o nditions : sucbh as{ hig

i::a n d :low: temper*atures iand:a*::i :.

S"d::. !Inf:jiestationby* :insects, moldi:. or r:odents.ii:~i:

!:.-:7:.:

D~isposition-Va~riou s i:reg ulatory agencies ihave: :req~u~irementsi~~*:i{ii:

c*:*:::.

on~cerning records-that are. withini th-e scope: of thie QAPD. :The::

}
    • :*stringent ir~equire~ments sha~ll be: usedl in !:determining ;the :.finhali:i::~::ii most.

!.i XVI I.

" A::"

LUiT l-.}:, : : -:i::::'<:"

":x.i!,:::::"",,':,:!i

\\*:.-. G ene ral

This section :establishes }the requir~ements for a system ::of planned and ii::"::::::::::::

.documented.audits to} verify complianCe with all aspects of the :QA program..================

,and to. assess the, effectiveness of the program as. it applies to.the ISF:SI,:.

The system provides for thee reporting d

and review u

of audit results by :!*:*:.i~::(:::::!;:.:::*::::!:::i

!i:*~i:*::

  • //

chec:!~i:i/*

kli~sts.i :des~igna:tin~g ::andc itraiani~ng gaudit pei:

rsonnel, !:and*I con ducting:#::::::k i:i*:! **d a u d its..*

  • d i s *" i' *~ i b @ *:**:*!:.,** :i *i:*:*i-i:i*:*:*:i:} i::::::: ::::::::::::::::::: :::::::.!===============================
  • ~::d.U :
B.
..*..:::!~2:

ThebiQA :S~pe~ciaJi stl / i:En g in~e* :er peforims :in depe n d en*trevieW an d aui dit i:to:.:l:: :!

., : ": bv:: " verify that *th~e ISFSi :is being maintained :consisstentt w:ith ~company.::*::i:(::i:!i::::*i~

.: i :!::!.

safetyey administrative, andd llicensing provisions.

. :!: :::::"::.. :::i::::}-!:V:.:-;:i,: ::ii !!::

C.

R e a u lre m e n ts::

.: b ~ e ~ ~ n s {*:i*!; :;iii:i*i:

..:::i!i:

  • i ::::: *i:i!

{*!iiE~*IEi

/: ;:::*::i i; :i* :* :: :ii::: ::!{ *}.**

.:***i

:i:'": i:::!

.:: i : :: i-:{i :;:*i*i!! *}:

i~ii*i": :*:,;

1.*:::*i;;

  • i A udcit i}Shal i:: be p~ierform;e d i~n a*ccorda*nc e ::w ith: written pi;*rocedur esi! or ii~! !: :::

i:.ii:i*i!:

checkl!is~ts! by appropriately ~trained p~er*sonnel: haviing no 6!*dir~ect:.ii:*: i::.:::!'I:: :{

-:=================:.i ri*-espo nsibil ities in.the eartea audi ted.: *Defici encie6s from ip rev*io us sau dit s i -ii:*

}
:}::shall-be r~eViewed a nd re-;audited:, as appropriate:.-The checklists ar:e :::,: ::
. 2:;. AUdlits may b~e conducted by th~e' QA Specialist I :Eng~ineer :or: other.
}::a

.,... :.qualified personnel,. such ~as technical specialists from other: :;::-...;.::;i 3.::::::::::

Au~dit *an i :s u~rveillance iresults :sh alli b:e idocumented :a~n~d reviewed wi*th.,: :. :ii
.!~i i:::i:::*:i:*!isu:pervisi~on r.ie~sponsible..for the ar.!ea audit~ed, who sh0::fall:take necessary!.:::{::
.}:!:i.:::. action :to corr*ect r!epo~rted dleficiencies. i:Follow-up-actionin:rcludciJng r:ie- ::::ili:

,-:;:.s~l;::

i.,:a~udit/re-survey of0 d:eficien*t ara,,

!aS:is ini~tiated :a s }dee~med Jappr*oprli~at~e:...,,:i:i::

:=:.*:~*:::*:::.*!*:

, ~ i: iii 6 ::i:i.i/:::i:!2 6

R e v. 2 9.ii~

.; : :.::}.!i!i::! :ii::i!::.::.:ii}::::R v }2 9 :::i:

QA..:.

P.

4. i:i!iii!T~he Q:*A:iSpecialisti i!iEng*ine!er: s*hall *::assess :the following:~**~**

iiiili:ii:

ii!:iii::iii*i!!i:!

i*!ii:ii iil iiiiiiiii!i:

  • iiii*ii!*iiiiiiii*ii*iii ii
a..!], cviaui:,:*1/

I!

U:!..! qua!i

!/

ii t

1M!I y dl ~i UlI!:d:IIUC plli:aJ!ULl;iucb, p":i

  • !U UCU U5I dIKED~J[

]i: ii]:i :::] i i~:

i*,*:ii.:!::.

iii ~ ~ii:*

b:

effecud t!i v

c endUess of implremethati the oiowin; gand. aS reiiauitd:iiii i*ii:::~iii:!*iili: :

i::ii~J
i!i~~ii:i:licii.iii !..: il : i :i* i i th i A cno mac wi th approv01 i i e d~iiICaiii proedureal os.

iand;ia!* ~ b *ii~ !*eiili i:ii !:i: :i*

!*iii Aud*:i::i.l it:!i sche:*

iii ii*i**.d ulesi ass~ii*i~i:*ur.

e thatlii:i i**.:i the* folo in areasi1241 are.o:~i:

audited at t~he.iii i!ii**ii:**

i:i::ii*

il ::!3:ii**ii**i i*ii i

ndiii i

cated**:i:ii*

  • ii:*i:*i frequenc
  • [*
  • i :* *d* i*ies or m ore frequently as perform ance dictates.
  • iii;::*i*

lii

  • i ~ii:::**
  • l3**iiii*ii*:i
i:i*i*3i:
i.**:i ii :i::*ii*:i*3i~ii:::::*:ii:i*i**

i::i:.

ii i!i 6:::::::::::Training and qualifications of the staff..

Actions taken to correct deficiencies occurring with equipment, structure, systems, or method of operation that affect nuclear safety.

.:-::..ill*

-:i::.:.

.i.
  • ,: : :;:::7:::::i :i,

,***/-.,

Perorm nc of,:.:..-.:,:**

ac ivities.. ::-*. 3: :.:. -::*.::..)

required:b the

  • QA: program to:::::
,.i*:: ::"

meet:*:::.!::~u*arH:ai!l::i:O**CFR::7

.i:i8*b r :~ :3:*!:i:.:,i:::~l:

thecrteia f 0 FR 0,Apen ix B 3, 10: CFR: 71::

i:::::*:*~::~:iii*:*!:i:i**i*i,::

i::::i:*:
.i"

docume::::*::*!*

n 0:ted

  • .*andarog ht 1.etPo th ate~nt~ioe n olefo!the Pr

~etsMaagder and.. ill 3:::

::.::::::::::::::::::::::9.::::: External audits.or s*:urveys of: suppliers: providing3 Imp~ortant:* To afety::***! I
materials,.

parts, eq::::i;::i::*f*

U nyi~i*mom3:*rquipmentlo services 1f imare perormd at th~e~s*::

  • i nd*::*
i cated*:::
  • i**.::::::::::::::::::Ii*:::
!::!: ii(!i:~i:
  • .*!3!*i:iiifrequency::. :i!iii!***::

o~*r*S moefeunl as pn*'::i me~:j**i!erformanc dici~i t:J~ :a~n:tes.

n*:~ iies*i:i::i:

.i:;!-!*i::

i ::::.!*::::::i*!::*: :: *:!:i:3::::ii:3i:i*0.

3a.Suppliers provdingdi.:by:.

co m riali gradei calibrationie a ndte stitng service:sin i::.::

i:ii~i~ii:::

who::::::::::

ar::i:i*:*

en :accredited. by a m*

n at*

i onally: re3i co gnize d accredi*

i.T tin:gil::~ : *lbody, uiong:i::::i:

ii:*:!:ii:::: !:ii::i..

i:::::* *.!)::procedures. consistent w ith: th o se. found In A N SI/ISO IIE C 17025!3

i*i:.::::!;:*:!!:~i~!:*i*::

-:!i.*::*i**!:..!:::*

  • i:::Z::::!**:i*:: ::::::::::::::::::: :::ili.iiF[: ":: i:":F:::..: ::: ! *:*i!* 3: *:! :*: 3 i:i.:( :*i i (::i~i *::::*Q i:*:*:*:**:!.:*

General:::i*i!*ii**

Requirements for the Competence::

of-::::J:;*:;*!:

Testing:::

and3:

'Calibration:::::::::::::::

  • i *i i
  • i i *i¸ ::: :i:: ;z:.*.: :::: i:i:i*,:!.i:
i.
  • :Labo0rato0ries~i, do: not h a ve tob be p erio0dically :su rveyed: !if th cbi*onditions ::::i:i*:i*:
  • i;i of the N RC iSafetyi Evialualtion dated iFebruary 9, 20i 15 :are *met (seei *':I ! ::

Apeni x B. onros hal be etbise in ap ical prcdue to ensure~ii.:

the:::::::::

  • .!!i ;ii:;i::*::*2 r qi rem entsii*:::2
  • *.::;i: of
  • i*

i*:i.::

the N RCi Safety::::::::::::::

E valuation?}:i:-.**:

are satisfied.)

il~::.:i:**::*!::::i;,iii:!::*:*!.:!i.::

  • 1:::?:i;!i~:::.;i:
  • ... :. :.>i.:H, : :...:...::...,.....:.:.:.,....

,+: :,:,L.¸. -<-.>::::,

:/..:> :: :.
  • .* * *! !! **ii*,**.
  • ii*!i*.!**

.i..*iii/*.

i *i**.

iI* ii *i i*il

  • i i!*i!**I

.i*i*

i:i*I ii!i!

i!i!!

i!¸

  • *=*
  • !* i *IL*:*¸
i
  • :i:il;*!

i;,*::

-.' " ::':: * "* *i: :,'*:: * :.i'*-* ;:.:.,'.. ::,:;*.*

.! :ii:..i:i:i

+.:i:::

  • ii ill i i:ii:ii i ii*i

. *i*

i*;

  • ii*,ii* i*!!*iii'!*iI
  • i i i*,
  • * *i iiI* i ii i i!i* !i i *
r.-
"'::'/,...

ii* i ii" ili*i*i*i*

i;i!:* ii i i* *i!*

'..'..' i.i..*./.':

" i:i: *

,,*: -.-:*:i: :: ::.:%1..

!!i! !i! ill il i i:*- /i*!i !ii

  • iii!i ii/i i i!iii!:i*
  • i *:iii
  • i i**.
  • iii*!*iii*i ill i *! i *i!

ii!i**!*

  • -:i:i:i*!*:i::i*
  • ::iiii:

!*: !i:!::::

  • .ilr i:

QAPD 28 Rev.

!..,.i~i*.:-
"
I.iMPOrT.ANT TO1 sAFETY STRUCTruRES. SYSTEMS AND CoMPONENTS:i,:.:. -. :.

. The pertinent qual~ity as~surance requirements of.10 CFR 50, *Appendix :B, 10::I CFR :71!IIi i~i..

Subpart H and 10 CFR: 72 Subpart G will be applied, as a. minimum, to all qualityi-::.*

i:i:

...i i.:activities.affecting.the I!mpo rtant TO Safety (ITS) StructuresiSystems and: =* :.*

bi.i::ased on.e~ngineering ieval~uations :and :a revision ito t'he INAC-MPC FISA:R*I. :Th~ese!l~:!:::::I

  • not considered**a :redutionintihi~***le comnmitmenjs to :the ::QAPO.::v::*i
  • i~:*::::. !, ',!:!ii:-:::iiii:i::*:
  • The quality cl~assification :of NRC,-licensed Dry Spent"Fuel Storage Components and.

',..Transportation.:Pa~ckages.

may.:not be r;evised:.using the iLACBW W*Design ::Control!i:~~:*:!:!!

.:process. *Th~ese :modifica~tions must :be :made :by the Certifica.te Holder. *The*::::i*-:.:!::I::

il:Certificate :Holder is rlespOnsible for idesign and licensing ~icontrols f(orthesei:; I.!::.;:. I*:

c.:::,ompo nentsubn der: the ir NRC-appro~ved Quality: A ssuran ce ;iProgram. SOL uTI/oNS!.:I.;

.
  • utilizes these :types ~of.components land *packages* under.:the provisions of a NRCii;::i:i:
.iGeneral-:License fori!Radioactive Material Transportationi Packages (10 :CFR 71ii) ~andi.

I::*:?tems and :services:associated with P:*ackaging and :Transportation of; Radioactive' i: ::

"*"i.Materdia s described ::in 10:i :C FR!71:,: andi i ndep*endent:; Sto6rag e: of:Spent N~fuclear: F~uelI.:

..:,as sdescribed*in 1.:;t0 C FR :72,; willials o* fall ;under ;the r*eq'uiremen*ts: of: the:QAPD."*:.ii-.:: :.

!!i* :i! "ii:

  • 'i!::ii

!:: :'-i.:*::i.i::.

i:i
  • ".i i.:::!
..iii::i:.::.:..ii::*
?:!*i.:'*
": ":. i:i:i:*:i:ii:::

i.i:.

i :::ii*.i?

packages are defined below :...

ii::L ii:.iiii*;;ii!i!;;*
  • !*:*ii!!ili:i,!?
A.i: ::

Dry Spent::::: Fuel Storage (10. C:FR 72)~i:!:.......

  • ii!:i!i!**i;i~:
i!iiiiiiiiiL:.:
  • ii*i:;:
!!*i:i!*!

!* ?*i:!i*i!**

i i:iii*i*i!i*:::;*i ii i*

Quality

  • Design
.
  • '::..J
i:..::i::.:.:: S-s c"":ii ~i::

Cateaorv:.

!::*:*:i::::**i:::.:iDesign::*!:'.:.i:::i*:

  • %"*Auth0dtv:i:*!:...::;i" T.ransportable Storage:Can~ister and Fuel Basket Assembly:.! i-:"I:"... A'::

.::-NAC Intl'.:..,I :..

ISFSI P ad.

.... "....--: * : :.,: :,... :.... :--..: ',.:- : - C...

.,. -D PC.....:

Laaiftinn:g" Y oke

.B NAC Intl.

! ::i:::::*!i: :.i::::U :.::.".*.:i

        • "i-
          :..::

"!::" A ::.:".:I.:*:: A : n L:::i... *:

ii¸;i:i.*!:i:::i::

  • .:i::*:ii:!':*.

!:il

?* :*:

i!*

iil i!::i*

i::::i

!i i::

i:i' il ii !* ii i:I QAD29Rv.2 QAPD

-:. i:. :

i: i*:::*

  • !i::i::,:
  • ii*ii:::*i*:

i,

::i!
i::*::,
i:i:!:!i:ii:

i!i*.i:i

  • L*:

i ii*i

, :::!: i**,::

i..:"" :*:i y: :": II::'" " i:...ii.i PP N I A:! :

""APPENDIX A.ii:::

i./

~ii: *!-:i (Page 2 of 2)

IMPORTANT TO SAFETY. STRUCTURES. SYSTEMS AND COMPONENTS B.

Transport of Spent Fuel and GTCC Waste (10 CFR 71)

,-:. :.:. :.i ;

.i::*:"

.} : ::" SC.:. '

.Qa itgoy.-.,*;

Design"Authority" Transportable Stora e. Canisters and Fuel Basket Assembiy....I" A...

' NAG Intl:.

Damaged Fuel Can:.-.:-..

/

!"I;"" A :

".:NAG Intl.

Transportable Storage Canister and Basket Assembly For GTCC.I' A"

NAGI*,:

intl.

W aste Containers:

"__"_____I___""._:-I__""

Storage Transp~ort-Cask. (STC): :"".

A'.".

"NAG Intl..":

C.

Radioactive-Material Transport Packages (10 CFR.71)

Radioactive M~aterial. Transport.Packages subject to the *provisions of 10. CFR 7:1, S~ubpart C,:. uG eneral.LicernSes,:=' are ;iim portant.:To..Safety and subject:.to i;the*

. a~pplicable :requ!irem ents.. of the6 QAPDi:::I..;:!

.::..":i ".::

.:.*.::~::.*:

i.
.:::!:::
1. S::::i{::}ee NA*C-MPC **Final ~:*Sa~fety* A*na~yis.:

Report ifor additiionalJclassification:***::.i:}:!:::

in fo rm a tio n.

[ f r a lc *:*:

::.i.":.:. :......./!:: i:: :i::.

.:.:i.. : ;: : ::::: :. :: :::::::::::::::::::

I:

.2. See NAG Storage *Transport Cask (STC) Final Safety Analysis Report and

  • associated NAC specifications for additional* classification information.
3. For the definitionof QualitY Categories A, B:, and C refer to NUREG/CR-6407:.

QAPD 30 QAPD 30Rev.

29

i::,.. :i.lrl:¸,:I:;¸:

A*iii;i

  • ~**

i PPEND IX Bi~. !i*i*i

!i,i EPT:

!*::IONS:

":" ii*:::***

  • .i~iii~:*
REG ULATORY C:OMMITMENTS. ALTERNATIVES ANDi EXCI l

11.0..:REGULATORY :COMMITMENTs

.1.1 Regulatory Guide 1.8, 1I-R-5/7, Pesne Seletion end Training 1;;.;:,;::!:2..

.;;;::Regulatory iGuide 1.10, Ri;;evisIon 2.(3/05), "Establishing.Quialit~y iii Assuanc Proram forPacagig Usd i theTrasporatin o

........ :i*i::iii:ii*..i*...i::

+.. -

l -w *.*...

ii:i*!i;!i:!::*:;:iiiii!i:i:iiiiiii*i*iii*:*::

"";*:i.1l.*TUI

.JiOC'liii..Wli.Jiir US.II.:.:.C.J*tl LCLIUIIl i ittislaljiliiu OIIUi LIE 7 i;

i::Fueli iSitoria ge:::

iSyte m* rC:Om*pon ents A~ccording ito:*il Iportant to ;Safety!i:;i,:i~i (2 /..9.6)...".

2.0 S2.1 N;i ii ucl]ear; Energy:; Insti~tute :(N EEI)! N E !~4i-05 5ii" Guid elines for :the Us e o**f

i~ li li:~;I:i Accred ita tion ::in iLieuJi: of Commrre ci al* Grade !S urvieys for P rocbureme n~t! obfi~lii::*::

S Laboratory Calibration and :Testl Services,"; revision Q. and associated :;:*i i*/

!~ ; :*iii!:** ii:3.0~*:!:*¸

......,. H..,..,..

None:.'

.*i/-::i.*ii i*.!*'.
//
*:* :i.:,,*.*i*!*

i.i:ii.*iI

.-.....-.....- -..-.. H....... H.............. H..,.

i: ;*:}ili!i:!.;:

i:!::

============================2::*;::::*;;i:

/:*::!:}i
:i:::: :!:i:,:,,:,:

i::'..'i*,, ":i ! ii::.::i :,.!.!'.i:!;:'.: :"" : :.' i:i :

/:., _ :. :.::... :.::.

iiil! i'

..:,:. : :- :. :- :*..:r', :.'" r "....:

" :"* " ":: ' *. "':'.:::.',", ii i!
0*PD; Q

A PD 31'i*:*

~ !i i:::il i ii~i*ii~i:-.

Rev.

29!;i~~~i*!~

  • i ! i*:ii*:,ill *:i::*!i:il;i*iiii :* :*iii*ii*i!ii::i*:*i iii i:::i*i:i!i
  • i*i*i:il::¸
!;
i::':i:* i* :*;*;*/;:i::*;*i':*:*i:;2*i*;!:*;:.

i:!.-*itiii.:iii":i!i;}!*i:*!i(i:.i*i.

.(Page 1l of 4).

"".-,-:'-,.' '.;-:b.. :

....,:,' ' :."":i:.': :. :.i:":-:..

i,} ::/

.,. 'i:i/i

.}i},ADMINISTRATIVE CGONTROLS.:I il,..i~I.~I:.:I::.ii ~,":i :.i}i}~

'i:These Administr~ative :Control eedvloe osport; opertation of the L{ACBWR

/;.ii:;planrti whiilie: :inh. SA:FSTOR Ri(d.i smantlem~ent)} and:-operationi~ of. the. LACBWRi i SF.Sii :i. :

T3!;:i:

'"hese r

~iequ ire~men ts~we re; pr~evious iyl :in clud ed :i n~ the: Tech nicail Speciifi cation0s :Zand~::. i w:

iii:!iere: :relaei.*bid iL6!to th.xpD!udg.!c!ved~~missinQAPD during-active,: decommissioning.!:::i:iiii:i:!:i~i!i*:~i:i!i!:!:*:.i~l
.::.}:;~..:*-;..;;}:::.

.fi;/::.i.:c:i overing :the :Pl ant dbcomm~is sio niJng a cti vi~tie s ref-reien ce d ibe low and din ji!!

1.1.3 Radiation Protection Program implementation.

1.2 Each procedure required by Section 1.1 above and programs listed in Section 2.1 through 2.5, and any changes theretog shall be independently reviewed by a Qualified Technical Reviewer and approved by the Project Manager or designee prior to implementation.

2::.-20: :PROGRAMS AND :MANUALS ".::

*,.,.,.:..:i!i!

i!i!:

ii r:!:..::*:i:;.;eview.: Eice~nse~e-i nitiat ed]: ch anoes. to {theg iPC Cpshal i:b e su bmi[tted to*.iiii the :::. i

  • .!*!.;%{;!..i;;*.!i*which t.ihe chan.;.*ge(s) w*asma*d~ei~i. *This submittal shallicontai~ni :> ; ::
**i!
::!::,;i:}**;:::::
i:::::~~i:*:

con*:::!

  • forman*e iof the solidifi~ed waste :pr~oduc:t to,*existin~g criter~ia* for! ::; ::* * ;: : i; 2.1.:3::.Do:ume~ntaiotJn of :thie fact: that t:he change !has been reviewed a~nd :

i.i::found :acceptable :by a Qualified :Technical Reviewer.. ::: :*i:!

i: I i:-!.*

i:'::!::*

.:*!:)}::*::::::

i:}i i:ii:;*!:::::i:i*

}

iii i}:!i i i; i: ::i :i'i iii:!:!i*

i:::!:i*ili i*
!:i i: ii*

!*::::::i*

i:ii:/i::!:117

-', :.;..: : ".,'...'w::'::i Q;APD 32 Rev. 29:

:: *'!::}

i..: ;!: ii : ::32::... i...

........ R ei!.:29 :-i

  • ..: } :;.i:;"
APPENDiIXo:: C; (Page 2 of 4)}i

.-,::*.:* :;:..::.3-

..**?::

i::.::i *! :;";:ADM INISTRA

":i :./ :i* i.:...

iVE CONTROLSi:;i.*ii~::i:& *~i/;:;

.:/ ":.:{
": 73/ii :: :-::::

In:i~.:i.::!formation submitted should consist of a package of :those -pages:

.i/i.! :.
.:::i:.. }.:::ii::.i:.,.* :::

of::.;

/i}.6 the 00* CM :changed iwithi each page numbered.and providedi: : :

}:. :"i

}::: "": ;.':{i-:w:itht an approval and date box, together with appropriatei:.!:;. }:::: i
  • i:,i::i:iiiiiii iil i!:!
i;.:::

'.:i ::-...::!:i:Sr~adioactive effluents and for maintaining the doses to miembers of the... :.::.i:

{:/ ::;..: progra~m (1I). shalli be cobntained :in: th~e: 0DCM,:(2:)shall: be: implementedI.:i.:ii::!!i

i::: *:.by health :physics pr;*iocedu~res-ia nd: instru ctions,. anid :(3) shall :include !ii::i;-;1* :~

.- T i * *." remedial actions to be ta~ken whenever.the pro0gram limits are exceeded:..};. " ..i.-:/}/,.:i:.:-:The program shall :include.'the following, elements:::. ..,. ?- }..?} 7. ; :.4.:: .... :.:.}.!*i:.:.-:¸,:.{.. Siii! iiiiii " !:.::¸.. :!:,1 "' i:'. ": ::;..'.i*

  • -.:. : ::: i*

2.i3.1~:,: imit:U !ation *s on i~*.the* :o perabii tyi io f-riad i oa ctive li:iq ui d : an d } ga~seo*us!*i ::ii ii / !:::i!.::*;:::: mo6n~ito rinig *in.istrume ntation,,including: surveillianrce *.te:sts and::ii:}! -i:*::i:::*.ii -:- -iset po6in0t:.deter~min*ation 1n{i a ccor~dance :with.:the:.meth Odology In.:ri the::~~ 2.3.2 L:;:im::: i tai*ii{io ns !on theico ncentratio~n s o;*f : rad~ioactive m iia :terial :!r*elesed..~

Y...In.I:

i.{i.liquid :effluent~s t;io:. unrestricted aeaas c;onfor~ming.to 10 Cii~:FR ::20,;i:

! } :::i*i{ii!ii
i..i*.:

i*:

. {i :{Y::i:*ii::!ii*:"i::.

.:ii: ::2.:3.i3 *iMonritor~ing, si.ampling an~d-analysis of radioactive liqu~id andai }: :i:!*:i';i: :iy.

  • .. i:;*

<:{.:aiir::T-}a!borne particulate in accordance withi 10 :CFR :20 and withi: th~e~i:i:i

  • -/

.: }::/":.:: methodolo*gy and iparameters described :in the 00CM:;.:*:i*::/`:::::.*.;*::*:}. i~;:i:..i..

i{ii
  • ii/.:

co:i:::¢m ]mitment: :to,a miember-* of the :public:. from radio~activematerila~ls:* }: i:iiii 2*;{i::':.}:

3.-5 ::;iDeterminaition :of: cumula.tive anid projected dose co ntributions} :.} ;.... :.i:.

.:.:}::::.vi.::.!il":;.from radioactive :effluenits-for :the current calendar quarter *a~nd:!:: * " :*::

.:.::-:*:.:;:.:::.:.::.icurrent :ca~lendar :year ;in* accor~dance" with the methodology :and...i-..,..-

": :"::."-i parameters Inaa the 00CM te atMatlesteve least:."-} every year.:; .:}: :i:i:;":!.:i..":"ii!, !*.!:i}:*i:/:i

,:::":::!!*i:*-:

Q A P..... O 33**`i*! !:**i`*.i:i.:ii;*:i***.!*:!:!;;:9 I..i::::i::! R ev. 29.3

  • ::::i::

i*:*::;i*

i*{*ii :

i:i:ii*!:*!:::::

i*.!i!:!*iii*i-:i:ii::*
ii i:
  • :.. i. " :!::;:

7"::i

...::{*i* *:*::*.*ii!iiiii: APPENbIX c (Page 3 of 4) ~1STRATIVECONIEOL....................... 2.3.6 Limitations on the annual and quarterly doses to a member of the public from tritlum and all radionuclides in particulate form with half-lives greater than eight days in gaseous effluents released to areas beyond the site boundary conforming to 10 CFR 50, Appendix I; 2.3.7 LimItations on the annu'aI dose or dose commitment to any member of the public due to release of radioactivity and to' radiation from uranium fuel cycle sources conforming to 40 CFR - Part 190. Radiological Environmental Monitorina Proa ram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. 'the' program shall provide representative measurements of radioacdvty In the highest potential exposure pathways. The program sha~l (1) be contained in the ODCM; (2) conform to the guidance of 10 CFR 50, Appendix I; and (3) Include the following: 2.4.1 Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters'described in the ODOM.' 2.4.2 Participation in an Interlaboratory Comparison Program to~ensure that independent checks on the precision and accuracy of the measurements of radioactive material in the environmental' sample matrices are performed aspart of the Quality Assurance Program for environmental monitoring. !i!:.:i:i*T*:*:!:iii:i!*::!):i!iii iiii 2...ii:i*::.:.

.ii,2:*5 i:

o.:.**::::**:*/:f

F.e~deral:R~egulations, i:the :following *:repo*rts shall be isub*mitted!:

priI

  • }iori to Orit~iM~aric~h *1.:: of f:eac~hy*e'ar. in: a~ccord ancewitjh ~i:10 C FR !:50ii*::L.4.

2.5.1 Annual Radiolo gical Environmental Monitoring ReM ni o inq e pi*-i!! i L:: i::::i:::!i::!liiE.ii:*:,orti: iiiii! ii!: !:{!::::::*!:::the report :ishall :ibe s::ubm*itted :notin1g :and iexplainin~g :the reasons:**:!:!::

i*:

for*:::::-:**:

:o::the: mis*sinig:i* reuit~s. T he mim ss ing data shall* be sulb mitted: as:!i -::.::://*::!::::

soon as possible In a supplementary report.su le niar~ie o~:::.:i:. ::. ~i:i:*i!:: :::::::::::::::::*:i!:i:i:!*iii::: i*:!:*

i)*:i:**

..; ;.:::i:::

,:{

.:. :::!:::i!.: !::i.,

!:i)i!i iiiiii:ii!

il

.'!i:*i:!:ii:::

- * ":.*i*):i::.*: ):)!!:!*::!::i .::::i*4.i *:*::::*!!ii!

i*;*i*)i

! i: 4 :::;

!i*:i!ii*::ii
! i*' i:, i: :!:i:,

!*:,':*{* .* i:i :"ql ::i*..

  • *i.:
ii:ii:*
  • !i*:i!ii Q

A P D.' R ev": i: ' ; :..:!:::'i:' 29"-: i"::;:-:,'-::::-!'*!::.:

., 'ii:"i:::!:":::i:::::i:i:

"i::::!::::::*:::i:::i::
ii 3"i:-:.'::;:i:*i : !¸. :::::i.i* ::.:.

.::*:!.:*::i:*i..::*i..:::::!i!.!:7.i:*;!:::::

i!

ii i': il !i!!i i! ?:.. i:":i: --i ~::: Z.:i::i :: :A PPE N D IX: C:: ii(Page 4 of 4) Si'ii: ii!

ii ii ::iii ii :

i.i ... ' * *::::i

i.?.
:::! z!iiiiPrtogramii; a.map of iallsampling locat*,ions keyed:*to a table givingi: i~:i:
i *:::;:i:.:*.::*-i.~ii*::

.:i;*,distances :an~d idirections ifrom~tlhe plant*; the: results of: the. ~~ItraoaoyCmaio rga;anda: d iscu ssion o:f :all.i*:::-i**"i:::!: .:..,:.- :... *-:-Paragraph (a)(2).of.: 10 CF;R 50,.36a,. ~Technical Specifications on :.

  • ":.::!:':*:*:::::~:!i;.*:!.::..'~:.*."iEffl uents:.: from Nu cl ear :!Po~wer* Rea ct ors," requires, that a.-re~port be:i:

... :':i~

  • quanitity of each :of the principal :radionuclides released to:-
* :"... ::" unrestricted areas bV:.liquld or gaseous effluents during the.:..::-.i-ii q.:..::i..i.previous :ii'ear., ~:With ~the exception o.f the collection of :hourly~i:::iiii!::"::::
-.. ::i..-meteorologilcal::data,: the *inforimation lisubmitted shall ibe ::in.... "i*::...:.
.
:.*::i:.::::..:.*:.1) dated June. 19.74 :with :data :summarized on at..least a :quarte~rly::i.:
f ?::::::":.!.. i::,::::i accorid a~nce witi.h th O DCM M...of rad:ciatio~n doses :to :m~embers :o~f.th e.. :
i"::::::::::Gpub!ic:. from raidioahctive* liquid! and( airborne particulate :release~di:;! :: 1 U**:U
i*ili.::::?:i.:,beyond :the :effluentr*elease boundlaryi:..This ireport: shall contain~:*:I i~- ii*i.",
.,i::,)* -:. any ch*ianges.made :to theiO DCM durin~g :thei previou~s.~tw~elve
ii~i:ii:i:*

\\i...- :.-: : . m o

  • n~thsi!.::--:.i::i:i.....
).:!" :::i:i.""":' ::: " ':: : : :".:? : ":i(:i.::i:*:*:.i

! 'ii i!i i!

::i*:*j::::i:.iii:::-
..i::::

..:.*::II:.:I"Z.:.

):.:i
!if!!:-:.iii:::
  • i:!3*iii.:
ii*ii*i:!Z:
-iii!:*:::!!:*(:;:ii::!-!::¸i::Zii::!*ii:!:..::::

.: :-:- ;:.i:i';,- ::::: : i:i.i:.: ::: ;:,i.::i

.:i.:! %:!1111:.
  • i::*::i..i::)iii:.,:':::.i

!i::".::' i::ii:: .i.i::i:.i::.

!:.i*i:ili
..... ::.* i ].'Z 'i
    • i:;*:i*

i} i;:i:.ii!!*ii!i

.i:!::,*iiii-:;:::.*

...: :: :.,!:i :i:?i:.ii:).':: : :::. :.i:i:;. i,:i:

i.i

!!i*:*

  • .!.::i:

i:: ::i,. :*-::!ii.!:*?::::

.. f::::: : :.*:::::!i:*
i::").:*::i;-;*

i:::

-:!!i::::4-

.:i:...i,.. :.!Z.:.. ".. :..,.../.,..,..i :::

*.!i.:::*: :-:..-...,.-!.::.:.:::: 'h:; :::*::!i::

..i-:!::*:: ....,..::::!::....: !.i::::i

i!i:)i:

! i i i:i i ii ! !i

f*:: i:::*:::**:.!

.:i*:*:.i:iiil.i!*.::,.i!*.!*i.:::::ii:

, :i::.*
,i:;:,:::::

!i:ii!i%,i:;iiiiiiii!i .QAPD ":::.Ai PD ::: :~:::.R~ev. 29::

FIGURE 1 La Crosse Solutions Organization SOLUTIONS (off-site) I I PresidentI SOLUTIONS (on-site dismantlement) / rjc a grK I / I P I ISFSI ACTIVITIES (subcontracted to DPC) [.............................. QAPD 36 QAPD 36Rev. 29 LACBWR Q.APD, Revision 29, Summary of Changes

QAPD, Revision 29 Summary and Evaluation of Changes LACBWR QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD) Revision 29 Summary of Changes The Dairyland Power Cooperative (DPC) and LaCrosse Solutions (SOLUTIONS) have recently submitted an application to transfer the La Crosse Boiling Water Reactor (LACBWR) Possession-Only License No. DPR-45 to from DPC to LaCrosse Solutions QAPD Revision 29 was developed in conjunction with the SOLUTIONS application for the Transfer of the NRC 10 CFR 50 license from DPC to SOLUTIONS for the completion of decommissioning. Upon NRC approval, SOLUTIONS will be the NRC licensee responsible for all activities under the LACBWR License. QAPD Revision 29 reflects the iicensee change from DPC to SOLUTIONS, and reflects the plan to subcontract the management and activities at the ISFSI to DPC. Upon completion of decommissioning, SOLUTIONS will apply to the NRC to transfer responsibility for the NRC License back to DPC. In order to minimize disruption and maximize efficiency, this revision of the QAPD was jointly developed by DPC and SOLUTIONS to facilitate the various stages of license transition described above. S The proposed revision is a substantial revision to the QAPD and will replace the current QAPD Revision i,28 in its entirety. Major or substantial changes are described along with the justifications for those changes. In addition, various minor changes are discussed in summary form. SMany of the following changes were based on similar changes that the NRC approved in the ZionSolutions Project Quality Assurance Project Plan, ZS-QA-10, Revision 7. The LACBWR site status is substantially the same as that of Z~on at the time the Zion ZS-QA-10, Rev. 7 was approved and implemented (i.e., fuel transfer completed, only decommissioning remaining). Note that by Revision 28 of the QAPD DPC had already completed the maj or QA Program transition to the Regulatory Guide 7.10 (RG 7.10) basis after fuel transfer was completed. Therefore, the ZS-QA-10 Revision 7 and the QAPD Revision 28 were already aligned in that the program basis both were aligned to RG 7.10. Chanwe 1 -Org~anization Changes: The license transfer application and the approach whereby SOLUTIONS will manage and perform decommissioning activities and will subcontract DPC to manage and perform ISFSI activities made extensive changes necessary to the QAPD Policy, Section 0.0 Introduction, Section I Organization, and Figure 1 Organization chart. These changes also made numerous changes necessary throughout the remainder of the QAPD, to align specific references and responsibilities accordingly. The specific changes to the Organization describe and reflect the language contained in the overall license transfer submittal to the NRC. It is understood that the QAPD Revision 29 would only be implemented in conjunction with the NRC approved license transfer from DPC to SOLUTIONS. Given the precondition of NRC approval of the license transfer, the Organization changes herein are specifically identified under 10 CFR 50.54(a)(3)(iii) as not representing a reduction in commitment, and therefore the QAPD Revision 29 changes of this nature continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72. Page 1 of 4

QAPD, Revision 29 Summary and Evaluation of Changes Chang~e 2 - Substantive Chang~es: Substantive Change 2A.: In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSJ and remaining D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Safety Review Committee (SRC) has been removed from QAPD Revision 29 and replaced by the Independent Management Assessment (IMA). Section II.E.4 identifies an Independent Management Assessment (IMA) functiOn. Individual(s) that perform IMAs are assigned by the President. The requirements for an independent review function was based on ANSI Ni18.7-1976 as endorsed by Regulatory Guide 1.33, Revision 2, and were satisfied by the SRC. The composition and function of the SRC as was described in the QAPD revision 28 followed the guidance provided in ANSI Nl8.7-1976, Section 4.3.1. The program described therein was intended for operating nuclear power plants. 10 CFR 50, Appendix B, does not specifically require an independent review function (as described in ANSI Ni18.7) as part of its quality assurance program requirements. Appendix B, 10 CFR 50, Criterion II States in part: "The applicant shall regularly review the status and adequacy of the quality assurance program." The JMA as described in the QAPD revision 29 meets this 10 CFR 50 requirement. Substantive Change 2B:" In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSI and rema~ning D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Operations Review Committee (ORC) has been removed from QAPD Revision 29 and replaced with the Qualified Technical Review (QTR). The QTR is defined in Section 00.B, and QTR qualifications are established in Section II.F.3.c. The

  • documentation that requires QTR is identified in several places in the QAPD: Section II.D, Section III.B.3, Section V.B.3, Section XI.B.3, and Appendix C Sections 1.0 and 2.1.3 all specify' documents that require a QTR. The Project Manager and the Site Manager, Genoa are responsible for the QTR function.

This change was approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, and Maine Yankee. This change is justified based on reduced scope and complexity of operations at the station, and reduced staff, making the continued operation of the ORC impractical and unnecessary. The responsibilities of the QTR will encompass the functions currently performed by the ORC and will be consistent with the scope of activities at a permanently defueled facility in an advanced stage of decommissioning. Substantive Change 2C. The applicability of the QAPD to the ISFSI and decommissioning scope was clarified in Section II.B. The QAPD Revision 28 Section fl.B stated that the QAPD was applicable to "Passive SAFSTOR decommissioning activities". The QAPD applicability to decommissioning scope is now described in the QAPD Revision 29 in the same way as in the Zion ZS-QA-10, Revision 7. This change is justified based on reduced scope and complexity of operations at the station, and is consistent with the scope of activities at a permanently de fueled facility in an advanced stage of decommissioning. The applicability of the QAPD to ISFSI ITS activities and 10 CFR 71 licensed waste shipments remains unchanged in QAIPD Revision 29. Substantive Change 2D: The QAPD Revision 28 Section XVII Records was replaced in its entirety with the language from the Zion ZS-QA-10 Revision 7. This change represents practical records controls that have been approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, Maine Yankee and Zion. Substantive Change 2E: In the Appendix B "alternatives", the 2005 APS submittal and NRC approval related to the calibration services for M&TE was updated to the recent Nuclear Energy Institute (NEI) Page 2 of 4

QAPD, Revision 29 Summary and Evaluation of Changes NEI 14-05, "Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services," Revision 0, and associated NRC Safety Evaluation dated February 9, 2015. This is acceptable since it is approved by NRC Safety Evaluation, and provides more flexibility for acceptance of testing and calibration services. Substantive Change 2F. In Section XVI.C, the following sentence was added as an enhancement: "Conditions that may be reportable per 10CFR72.242, 10CFR71.95, or 10CFR21 shall be reported in accordance with approved procedures." Substantive Change 2G:~ In Appendix C, Section 1.1, the following references were removed, justified as follows: 1.1.1 ISFSI Operations and Maintenance: This was removed as a redundancy. The QAPD Section V already applies to ISFSI Operations and Maintenance, so it was not necessary for this to be listed in Appendix C also. 1.1.5 Physical Security Plan implementation: The requirements for procedure to implement the Physical Security Plan are self-proscribed ther'ein, and it is not necessary to list this in Appendix C. 1.1.6 Emergency Plan implementation: The requirements for procedure to implement the Emergency Plan are self-proscribed therein, and it is not necessary to list this in Appendix C. 1.1.7 Procedure for controlling temporary changes: Based on current status of ISFSI and decommissioning temporary changes are not required. Change 3 - Editorial / Administrative Improvements and Clarifications: Editorial changes to remove historical information no longer relevant after license transfer, make specific references more general in nature, and eliminate unnecessary detail of no QA program relevance were made. The types of changes of this nature are as follows: Editorial Changes Type 3A: In a few instances, historical details that were not necessary were eliminated. These include changes to eliminate "Passive SAFSTOR" in Section 0.0B, and removing historical detail at the introduction to Appendix C. Editorial Changes Type 3B: In a few instances, specific references were changed to be more general in nature. Examples include: Section XV, "Corrective Action Report (CAR)" was made "corrective action document", and "Purchasing" was made "procurement support staff." Vl.C.4, "Administrative Staff' was made "administrative staff." In Section V.C, "procedures" was replaced by "guidance" and "Work Orders" in places to provided flexibility. Editorial Changes Type 3C." In a few instances, unnecessary detail of no QA program relevance was eliminated, such as "Company", "Administrative Control Procedure (ACP)" and "QA Manual" being removed from Section 0.0.B. In summary, these types of changes are considered editorial and do not alter the intent or purpose of the QAPD and continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72. OVERALL EVALUATION: Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI. The ISFSI has transitioned to long-term passive operations. Additionally, although not known for certain, there is a remote possibility that Class B and Class C radioactive waste may be required to be shipped offsite for disposal, so the QAPD still applies to those activities should they be necessary. Page 3 of 4

Al QAPD, Revision 29" Summary and Evaluation of Changes The QAPD Revision 29 applies to all activities associated with structures, systems, and components (SSCs) which are important to safety (10 CFR 72). The QAPD also applies to transportation packages licensed by the NRC under 10 CFR 71. For other ISFSI and D&D activities, administrative programs and procedures ensure compliance with governing regulations and include appropriate controls for activities under the radiological control programs previously contained in the Technical Specifications. The proposed revision to the QAPD is appropriate for the remaining D&D activities and ISFSI operations. All safety related systems have been removed from service and have undergone partial or complete demolition. Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI and Greater Than Class C (GTCC) waste has~ been removed from the site. Should any Class B and Class C radioactive waste remain to be shipped offsite for disposal, the QAPD would still be applied to those activities. The ISFSI has transitioned to long-term passive operations. The system is inherently safe by design. The main function of the ISFSI organization is to monitor the environment in a way that demonstrates the integrity of the system. While it continues to be important to maintain an appropriate quality standard that preserves the passive functionality of the system, it can be accomplished satisfactorily through conformance to RG 7.10. The proposed revision will continue *o satisfy the criteria of 10 CFR 50, Appendix B and the QA requirements of 10 CFR 71, Subpart H, and 10 CFR 72, Subpart G. - End of Changes - Page 4 of 4

BARBARA A. NICK President and CEO DAIRYLAND POWER C_ 0 OP ER AT IV E November 17, 2015 10 CFR 50.54(a) (4) In reply, please refer to LAC-14359 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR) Possession-Only License DPR-45 Revision 29 of the LACBWR Quality Assurance Program Description (OAPD)

REFERENCES:

1) LACBWR Possession-Only License No. DPR-45
2) LACBWR Quality Assurance Program Description, Revision 28 The purpose of this letter is to submit Revision 29 of the LACBWR QAPD for USNRC approval prior to implementation. Dairyland Power Cooperative and LaCrosseSolutions, LLC have recently submitted an application to transfer the LACBWR Possession-Only License No. DPR-45 to LaCrosseSolutions, LLC. Revision 29 of the QAPD is reflective of that change and, with NRC approval, would be implemented at the time of the license transfer.

The proposed QAPD revision represents a reduction in commitment by replacing the Safety. Review Committee with an Independent Management Assessment process and replacing the Operations Review Committee with a Qualified Technical Review system. Justification for this reduction in commitment is defined in the enclosed Sunumary of Changes and QAPD RG 7.10(r2) Compliance Matrix. This QAPD revision is also being submitted for your review and approval prior to its implementation to ensure compliance with the requirements of the NRC Confirmatory Order dated September 15, 1994. If you have any questions concerning this submittal, please contact Cheryl Olson, LACBWR Plant/ISFSI Manager at (608) 689-4207. Sincerely, Barbara A. Nick, President and CEO BAN:CLO :tco QL4 ~S7ie A Touchstone Energye Cooperative 3200 East Ave. S.

  • P0 Box 817
  • La Crosse, WI 54602-0817
  • 608-787-1258
  • 608-787-1469 fax
  • www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider arid employer.

Document Control Desk LAC-14359 Page 2 November 17, 2015

Enclosures:

1)

2) LACBWR Quality Assurance Program Description, Revision 29 LACBWR QAPD, Revision 29, Summary of Changes Marlayna Vaaler Project Manager U.S. Nuclear Regulatory Commission cc w/

Enclosures:

Cynthia D. Pederson Regional Administrator, Region III U.S. Nuclear Regulatory Commission STATE OF WISCONSIN )) COUNTY OF LA CROSSE ) Personally came before me this O* "'L day of

  • /l'..'

-t , 2015, the above named, Barbara A. Nick, to me known to be the person who executed the foregoing instrument and acknowledged the same. Notary'Pu~blic, La Crosse County Wisconsin My commission expires 5-i;? 5-/ ~' LAURIE A. ENGEN Notary Public State of Wisconsin A Touchstone Energy Cooperative__ 3200 East Ave. S.

  • PO Box 817
  • La Crosse, WI 54602-0817
  • 608-787-1258
  • 608-787-1469 fax
  • www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.

LACBWR Q~uality Assurance Program Description, Revision 29

i! iiii!i!!iil i*:;*,:

'.;:*z:ili:i.i.i*i:*

!:,*:i.i*i ,., ::*:i:i*i:*;,i*::!*!!,!,i:i:,i:i:i:i:!:i:i*i

,:i*:*
  • i LA
    • CR, OS

..,.E BOILING WATER.:: ,..... REACTOR.......:.. i !ii QUALITY ASSURANCE PROGRAM DESCRIPTION REVISION 29 La Crosse Solutions, LLC Author: (6/12.1 Anthony R. Bejms1i~dependent Consultant Dale / (... QAApproval: ~KJames E. Werner, SOLUTIONS QA Manager 'Datel' Manager Approval:

    • n ~,Jvii Corporate QA Approval::ii:,:i::.ii:ii'ii'i~:!i::*~i~'*iii~i*:*i*'~i':============

I wak:

  • .r:y::, LUIO: NS P:roject::::::i:

Manager'. '*Z:i:""::"; "":":! !!i;i:,.,i::: *: 4* *9,I ' :*:i

.i.,

iii:*:i~:!i*i:i:*i:

i*i~

A q*.-: 142015i;::ii 935:: i:~i~~i:::!::*:i~:

  • F
M Date:

................ i -

":: " ""!:!-:i*i*i!.:!iM']

i keii* ]: N..: i col,~ii ne rgy...

olutions
i Corporate Director, Q:'Dat Dairyland Power Cooperative (DPC)i;:ii,:ii:*?*i
QA Approval:::i

. :::Manager Appi

!::*i:::**:Edi Martn, Manage, :QualityAsu rance!.: :

..i:iii*;*::*:.::ii;iLane S. iPeters, Site Manager, Genoa~ii .. :*:*::::i:i:.;

:i::

9 -:. 3:. a -iii::.****!,i: i lii

  • i*!i*iil:!!iiiD a te ii:i~i:i~i:-:

i!i

LA CROSSE BOILING WATER REACTOR

?::::

STATEMENT OF QUALITYASSURANCE POLlICY: The Quality Assurance PrOgram Description (QAPD)* described: herein has been developed by Dairyland PowerS:Cooperative (DPC) and La Crosse Solutions, L*LC:; :: I* (SOLUTIONS) to prov~dea consoldatedovervlewof the qualitypro*gram controls that *I S gover~nthe operation and maintenance of the La Crosse Boiling Water Reactor (LACBWR) Independent Spent Fuel Storage Installation (ISFSI ), and thte 1;i ZIii:!i decommissioning Oflthe LACBWR plant. The QAPD describes the qiualitY asslurance i:::~I

organizational structure. fun:ctlonal responsibilities,, levels of authority and Inter'faces.*

i::, ~~The QAPD applies to all activi~ties associated with structures, systems, !and* I components which are important to Safety iun.der i1:0:CFR 72. *The QAPD also applies i : to transportation ipackages ~li:censed :by :the :NRC Under 1I0 CFR 71I.: ReqUirements: of ...:the !QAPD arel performed in iia graded approach commensurate with an Item'sor* an

  • : activity's importance to safety. :This graded: approach is responsive to NRC Regulatory Guide :7.10O. The applicablilty of he requirements of the QAPD to decommissioning activities is *determined on a case by case basis. :The QAPDi!
  • l satisfies the requirements of 1i0CFR 50 AppendIx B, 10 CFR 71 Subpa~rtH; andO 10i*!

CFR 72 Subpart G. SThe SOLUTIONS iExecutive Vi~ce: President and General Manager is :responsible forl:i;

  • i:the. establishment iand implemrentatio)n of aquality !assurance progriam whiich meets all!

r*iii:legu~lator~yirequirements. i The quiality assuran~ce program, as described in lthis QAPD,

Isi Isimplemented through the use:of approved pr'ocedures (I.e., poilcies:,:directives,:...
~::/procedures, man~uals, instructionsr or. other documents) which provide written::

. :~::i::gUidance for the ~conftrol :of ilmpor'tant to :Safety items iand activities and iprovides for":*:

    • the devielopment o:f documentation :to demonstrate objective evidence of compliance.:

with stated requirem ents. ;i!!::ii!*:

iii:..

-:I_ Solutioins Executive Dairyland Executive::. * ::::i i

: i::i::i*:: Preslden~t and CEOi:::
  • !i
:..... E:,.,
  • *:D ate
i: : ;
  • : iI i Executi....ve:

-i... - QAPDi: :*

.i:,: ::::,:!i: i::!

, :,.i:i::_ QAPD.... Rev... 29.

LA CROSSE BOILING WATER REACTOR, (LACBWR)I / :: ::* QUALITY ASSURANCE"PROGRAM DESCRIPTION (QAPD), ST.QALTEMN FPLC IlIII. G -C N DESIGNVE CONTROL.....................AND......REVIEW..........,.,. 10...10. IV. PROCUREMNTCOCUMENT.CONTROL

./:::...;.

m 11;o:: V. INSTRUCT1ON, PROCEDURES AND DRAWINGS........ i.,,::t,,... is V,. OO ~ E T O T O .,:L.,!,..:: ,:::-: 14

  • V~i::I~i.IENTIFICTIN.AND CONTROL OF MATERIA:LPARTS,:ANID COMPONENTS i:::*..::.,m::::::!i;i 16: :;

IX. CONTROLOFSPECIASPRONCADESS:ES~ P.N.............................................17:::::::::::::::::::2 XII::: CONTROL*] OF; lMEASRING AFT TUCU ssES AND TEST0EUIPMET 20-i; X

IV:. INS*PECTIONB TES, ANDUOPERATOMINGMSTTUS A."E.A.V..A..*:P*N 22i:::::::!
  • "i*

XV

i:.

CORGRECTIV:,EACION....O.T1....R.AN..A. ON.................................... *,.. :....:_....22 XAPI. QULT ASUAC RECRDv:23

  • ,:*:*i!i iI*
, i":::iii*: :: i ::i:
0.0,-INTRODUCTION A

F. p-

!i;*decomm*issioning iof the LEACBWR site. *i*;DPC'wiii r(etain o
wniership :;of thei~l::i*:::**:*ii~i:i:ii::ii:i:i::.i*:*

i!*:!ii: l*: iiand :and ~s~p~ent :,fuel :and ibe thie ownr e-:lilcensee. *"DPC will:: be :subco tracted ;:1; *.::,,!:* :i c*;::omnpletion obf :decommis~sioning, SOLUTIlONS will apply :to the NRC to6;: ;:

  • !:;.:::wiillmaintabin t~he ISFS]I, and be r::esponsible: for th:

uleutimate.dispos*ition obf!:..*::i :i~:!.: ::*.i::;:.:::i !iili

i
:i
;..::i::.:. In :order. to minimize: disruidpti0on :and maximize', efficienicy, !this:rlevision of :the *:...i iii~i;:i~L...i.*i.*l-:.*.!.ACBWR Qubality, Ass~urance :Progriam Description I(.QAPD) was ijointlyi;*i:i~:::::i::!:iii
  • i::*::::ic:-i.;": ien~se transition idescr~ibed: above. ::Duin:ig" the decomm~issionin~gi::*:ii::::i ~*:~~;;:!:

.:::i::::::i;i:

-:*~ :a~ctiviities, ;!SOLUTi~oNS :will :subcontract ithe operatio)ns.and main.tenhan~ei: of::;;;*i**
.!i:.

.i**.::;.!ii. th~e ISFSI to D:*PC. Although iDPC p~roceduresand processe~s *willcontinue~i: .:i -:i*: .i.::!.~i~l t . oWl be ust ed: fi Cns e.ithe operain iaII :sond maintenf:a nc ofa the orSI St OLesUreT e.IONS i !!i:,. -::.~~i: .:: :::.QAPD requirements applicable, to ::the ISFSi "are effectively; implemented by;!--i-. il i::.-i:*:"

.ii::tio all: ISFSI !.a*ctiVitiesi and dselected plant:d ecom missioning acetivities..:.i i.* ;:*::l..l :.i

.;...The QAPD is. desig ned' to meet the requirements of 10:CFR 50 ppni

i:!.B,: 10 CFR 71, :.Subpart.H, and. 10 CGFR :72,.Subpar't G :*and :reflet the...b::::. ::;::: :::.
.:.:::*:!*.:::thest ngru perford~l~miga n dime ct.hly:b :responrsible: fori:th e wok u chasl pr:oj*0ik.::::

.:::!i::,**:et i

i::iThis includes. q:u"ality control" and :ve rification :th~at alliwork: is. pe:rformed In -. ::.: :
i:.;.. for;: a::i:i:,

~*i'uditing: these igroups a nd assur~ing, manag em ent that ;thei QAi prog ram: -: : : is;_:: sbeing fully-and effectively implemented.* QA is recognized :asani:.;: ::.:*il-.:i

i::.::i
i:: ::!:.:~ !:T:.i:he i::requi:remen~t~s iand i commitmen~ts c:*onta in ed:: in iithis : QA:P:D ai:rei m:a ndabtor*y:.i !iiii:i*i:

!i* ..**::*-.*::i:*:::-and imus*t bie :implem-ented!, enforced,.' and :adher~ed to by-allin::divi~duals an~d: ::::::::::::: ii:i:ii:iiii B.

i:The"terms i~and diefin~ition i0 s t:H ed below are used* frequentliy. throu*ghout :thlis d o c u m e n t..'* *::::.
i*:.i
i. ::i " " ";!::. i:.*.i!i.: :":'. :*.; :..:--: ::* *.:.:::.:/:*:*::::!*::i::!;.!: ::::ii::::::.:*:!i::

"LACBWR. La: Cross~e Boiling Water Re~actor.:

i.i*':::L.il" :
)A P D :::*:i R ev. 29::*:::::;::**!
" : '*i!
,:ii: *,*::ii :,i:::::!!:!

i !iiii:i :::i: i i:I i! ! ii*:!i::.":-!i*ii!:*!:,- .; *;"i:!,i:::i*ii! ii ::!:.::';i*:i!i

  • ...i "QUALIFIED TECHNiCAL REVIE.W.- Thorough reviews.of the documets*ii:"
.:::-.::...:::+:i::~ii!::"i+..:::i:i!::.necessary :to,provide ;adeqcuate confidence thait! str~uctures, systems, or*
*.:::: *! i" :i :: :;i:;!.to control and-!measu re the ~ch ara cter isics of: an ite m, iproces s ori: fa cilitiy! *toii' FACIL:ITY

- Encompasses :the l P:ant site, which-iS:undergoing-i... i..:: :::? ' I :.

  • .i:i.i

..:i:.*decommissioning, i~iand i*thel ISFS*: site wher~e spent, fuel.is.Stored.:.. ExclUded: +- tr:

!::.;.!i!;!!;;;:[an~smis sio*nil apparat us loc:a~ted !beyo nd the LACBWR: switch yar~d ".=; : -* i :-.+;

i::: ii: :!?ii!i~!::IpLAN*T -' Enc~ompasses tihe biuilidings t*het functionally supported t!he i!

.i~i'SCHEDULE INTERVAL:

- A

  • i
  • i*time:frame within :wh~ich a schieduled activity:
i: I:
  • shall be performed with amaximUm allowable extension not to exceed 25
ii:
IMPO*RTANTITOSiAFETY (IiTs) - A class~ification givento 01si*tructures,
  • systems, iand :ompo'nents (SSCsl) that,provide nuclear safety] designi:
.functionls. i(See Appendix A for complete details)i,:. i.:*::: *i:*!:.:
ii:

fl::+ANIml7AT+iA M.+ !i: ii ?:i, ,i.if! ! ! i:::i+

+!!:

I. "{. ,.I.*.+. "! !+.!-:.-:¥ 111¥ n llllr,=l'*l 11=t111 +,:-::++..:-:-:-.;:....,:-... ,,.+ + v, ....:.:.... :+ :.: ::-:: i i.:i+ !*::i*:*::*ii*i~*::*:***::i:1.

    • This sec.tion d:*efines *:the erespons~ibilities o*f k"ey project m:embers::: ; il;

+iii./(.:!+.:. .:?ii+.::.i+:i!+i*accountable for Implementation of thelQAiPDt.Functions and. actions-: +i::'*-

i:::i i:+:::i.:i:

cani. bi+ah:ie .delega+ted;i holwever, t++he r:iespni**ibi lity r.emains w ith: th~e: /::*

il.::::"2:

.:-! i::: :O n~site. and* offsite organization**s shall be est~a bli~shed ifo!r statio~n a:*nd*i: .. : : i::.*i::...: :~::. ::*:***

  • !*c rp oj ra te.m a ni a g e m e n t, *re s p ec tiv ely. T::

h e.o n s ite `a n d

  • o ff s ite :* : :.i*:.":..:iiiii:!i::!*:

!*i!i:i*!!++::i!*

.. ::...: *::":i*;:!;/.:* ;:::: organizatio~ns ;sh all Include :the :positions :for.activities :.affecting lthe :safe
i*:::i."::::i~."

.:.::!:ii."3."i: S:i:i"::!:iince SOLUTiON N +an~d DiPC wilwil be working t+o tihe :requirements of th+is

  • ?:: :;i*i*:~::i;
i:/:: i:*:i i: iii* :i :::i:::Soluti~on *.iOrga*nization.:i :This: QA PD:Identitifies :key. on-site p roject

! :i

::i

, i : :: i::::c~iiorpoate support groups. :The QAPD also definies the DPC.I:;:*::

+.

ii 4:. '4:.Lines of authority,. r.esponsibility,;. and communication: shall b~ie:.::+ :::.. +.:: :::-i:established land :defined for the-"highest management :levels ;throughi++: i ntermediate::levels to and !ncluding a~lloPerating organization:* *:

i!:i:
:ii:**p0sitions. :The~se rielationships shall be documente~d *and *updated,; as QAPD.::

4 i-i

    • /i ?:if: 'i:i*;.i!,,i
  • Yiii:;*!*.*ii:i*i:i*:

Re~ 29i i iI

  • ,..:.:...: / *.. '::,*.,.--. *:: :.:::.:......:
    {}
    !"*ii.

~~ii::i}?.::~::;::ii*i::.}:i: appr~oPriate, in:ii.the'*form~of o~rgantization charts, :functional, descriptionis: 4:

.*{//::.::/".:.:?.i:*....:;}i~;i.'
.:.:fo'r key personnel p~ositions,.or in e*quivalent. forms oif idocumen~tation!..i::..i!;i

..5. 5;..The-ihj iu* we ay uthatWhsics.:and: quality: assurance.:.<...... }::::: !ac~tivi~tie's, may'ifunctionally reportto. an appropria~e onbtsite m*an~ager:**;:!i.:i.

{*.:.

...;:: *.,:however,. they*shall have-sufficientorganizatiornal freedom to e/.nsure;;}:.::*;*; }*.::*.. /.:::

:i ;:i:i:::]* 1!:}Pr:esident:- Th:*eiPraesidentxrnarnag~es th~e p~atlo*n-ofEnergySolutions:*`.:

,.::.3*.:: "-. i": :::i:}]: ::.:* :*.i; :::. *:: :*!;/stew a rd sh i :p!projects ~at: U.:..R eactor :sites,.an d-assu]res: that the:i:;::;-i;: *;; ;.; :

]
:*.::::*/:*.!:/:
: ::.:u:i{*::..::.Y;-*:.L:{

ACBW R *project :*receive~s timhely :and*effective: supportfrm*:;:.::{.&*.::*:;.:**;]: i.::ii:}.::q: ii:-.: ::]:.:.:::.;:::]}.;:))w-*ith th~e GM; and..other k~ey m*anagers ~to review the-.oper~ation of theii:~, }:! management, quality, 'dnd~ related !issues.: The President shali: have*;ii:i::: .corporate~responsibili~ty if6r, the safe' storage of nudiea~r fulad shall..... " *: *}i I,}*I....::. ... take an~y me~asures ;needed to ensur~e acceptable:perfo`rmance o*f tjhe*i*:***;:i** "....... :. :staff in o eai*:* ~ ~ngria*in*t~aining,*and/ providing t`echnical *support toti*:he;:'" -:.i]}::i~;

:::"plant-to ens~ire the, safe storage !.of nuclear. fuel.

A'-

,,:, :::*-**:*v*#::-
2;.::ExecUtW&Vlce.Pressident and General Manaaqer (GM) i;- T:hisexecutivei <-

haor: il.t adis

  • niih frt~ es*tbliishmenet and.
....i wi:.the management *tea~m *toreview pians and: progress and to,

.aidress stakei~oider,* quali ly and project'rnanagement issu es., The GM.,.... . deiegates!to: DPC*: a~nd the.man ageme nt team ~th~e day-to-d ay..*i;:.!].::;i.:~::~:::*.. ...:/,r*espoipii**i~tles'ifor';tie (ISFSI ari*adjdeco*mmssioning b*iy ~a}pproved:i:Y:{*

-:7 7.....

-:*3..

  • ~i

-The::PM is: res )onsible for all.decommissioning::!:

  • i:i?*:::<::y:::*k i* *:. :i::;**i/::/aotiwiies~includimg:firep~rotection and I'ndustrial safety activties

.t.th

,;,:,,iiide,,ommiss
ng site. Tl,::,PM.i*-ha,. have.authority over those on autsite
  • i:..:*.:!.:".,;...:::
.:. ::/. -:.:. ~ ~ ~te~n ~ s a yo,:a e*s o a e fn c e r~u tw lh h v :b en :*:...:c:

i,**:: forsa-.sor gef-.cl .a fuel.. which..--. hav been:::::::::::::..*:* -**:*:*d::*::i**:

  • descr:*"b;id:

i.. i 'o tis~APD and for th~e Qualifiedi Tec5hnical:,.

.i::}i}3-:ii:::
'i:i:}:.:i.:.:~.:!:;:.. :R ev iew. prpbcess,*tt.,ized;j*o rd e omm is sio n~ing g:iThe ePM retainsauhoid"to.jyi: *

-/: ::::::!::u

i:: *:*!*!

for~:: !ftach*: prop6sed~tdst, experiment, ormodification to systenms or:/*}i:;:]: i!i* ::::/::::: :: !~i :*}:= eq uip ment ::that :affec*t *the ~safe :storage : of inu clear fu el: wh ich ha b~*i~Seen::! Qiat! ssra:eMnaer(A M) _T*:**he *QA M 're ports S.to; th e P M :*ianhd;i:i:*:

:: : /:: **:::::k!;:.: :*r n:*att*s,. The P:M: is resp9op si bleI:f etabl Iis hing and: m aintai ning the -,

QAPO""' mo i ,rn the.9 proec' s quali*s t y objectives*, tho ugh.... ove... view.. and,.:,. i~;:}:} : i

  • . ::}: ::i*;;;}:i:{:!:ii i

ns:**

:; ; iihiP~e c~t(i~n ctivitie s,;!apdi-proyidin g'*feeid bak t o: m an.agem ent onithe}. :. i*:
i-:, *!"!:.}:ii

-:...':::ii~:i ef'fp.i!. i,.: ct:::i*:veness.*M.*of the QAPD. i~n~tiohe

  • a*(

ev[aluani es, acceap ts, a nd performs:!:}i*:li!:

.,,..- :..:,.'.t:" "-.': ',.

}:-: i::i.:;..,::,::i::::::::::::::

  • /.............

!!::*:i!!:!::!i:ii}iii i:!*:i*}i!ii:*ilS* '.:. *-,.-.:iy!.:. !.: %y.. ].:..:.:: >..: -: ...:i::{:.*:*!*i:.:*::!*

. i!::!

i}: "::.i:*!i:i*::i*i:::*]ii

!ii:.
  • ii*]!:

Li ....::4.,,,,::i,,i:i i::i:::*.*i*i!:i,!:}:i i]*::

!}
:'*';'.':i::.':::'.
  • .. ::: ::::.. F ":! i.: :.:.: : i: ::* X:.:::i::i

/,;!.:.!,:,;;,Y : ' ::*':i::'::.::*, *} QAP D 5* Rev.:294

.requimrmets..to the *SOLUTION. :organization..Th0 QAM porlodloally:
.""i
.provtides *report..o n project :quahity, activitiei *to.tt.*,..t.

he PM, ... :th i..i*

: m ana~ eh 0 t team.
i:::* ::: ' : ! :i: : :::i::::::. :::::::: :::
5. Hsdiek:n p:"ect

!n;Mn:

er R

5A -Thm 1RPM. i* tmponsibie for all

-.".radiation protection, e n.i.
  • met~i pro*(e4~tion, *Ite olosur*, and. waste

~shipping actlvties at the entire site.- .-:.::..:::!*:: :: :. ::::::activi-ties :with. the RegItq*rs :such as ilcensing submlttsl, regula*toryi:

  • .:*.:*:! -::*:.:::-reports,.!reporteability isesu~i~oQAPD revisiions,. REtvPIOLDCM r:epoi,::*!::

...- :.. -:..:financial. re~pottsDecon~iss~ion~ng.Plan revlsiona*.-$NM Inventory..-:*.::::

iii*
i*!*!I*I
!i:::::*!::

i!i:::i:!:

i* ::..:. i* :: ::. *:i

,,,-:.:.:i::.:i i: :"! i :

  • i iii:: ii* ::
  • *. :* * *.*i*,*,*.-:*nD*":-*,.*;*,,.*

a:. dmi.:"*mnistration and opration of th* LACBWR tSF$I and the Operation : .:.::.:of Th6 00enoa 3 coa! fired plant and the QuaiUl ec.Thnical fRevlewi : responsilbe for o0peration and rn~aIenance.of tIe* LACBWR ISFSI.:.

: :i::.:

within :the limits se~t fo:th in the De~Ommlsi8ni~nt Plan, Thc, hn~cl*li:: .:"::- -..-.::ISF$I Manager and is r s~ponisiblo for ensuring reg~ulatory :requirements ar"e: amdequately niet :and.the $e~curity Pian,. related proceures, training ~and contingency r'equirerments are developed *nd maintained current.: '*".4. OA S*ecia,~t lit/ngi* -, Th e. Q A* SpecIali~t /: Engineer is :responsible 1 S for performing independent overviews of I$FSI related actvivtIes, "..:: admin~isterIng.:the ISFSI'a correotiv ~action prograim, provldln9.

..:...orientation and training on :applicabte q...

uality program requirements tO :: .::.:...: : :.: :D staff, end interfaelntg wth SOLUTION$ off-site QA st~ft..:... :::: .:: ::..: :.:of lSFB! activities and for ensuring that adequatertechnical review Is**: ,: :*::i:pp ied to cha :0 tests andi:i exper::::::::::::I m ents.

:! ::::::::::, :i: :: :::::::::

OU, AIJIY: A SR*::: E PR:OGR

,A:M ::::: :::
: :::: :::i* :::: ::i
I '.:...:..-. " "" " '.'

t

The QA: program describe*d herein Sets forth th~ equiurements for the :QA.: ::

.organi~ation, personnel :responsibilities,-controlS, :end measures. :....:.

.:.:.::"established.to achiev,: maintain,"end document qual~ty. -These.: :-:.

-"::::: :requirements include, but are not limited to, the to~i[win~i: -:r. .::..:::::. -:desig*nbases for. ITS. SS¢$ Into. the I$F$I oeraetions and. ma*intena nce..-

.::: i:.'!::" procedures,:.... :.::.
2.

i:.::"

: :..:2 Performance of-all..installation,. calibratlon, and :testing. on all necessary:.

Q A..:. 6.: 2 9..

'::': ':"'"."i '::":'.": ".': ": /:

.:.:il;:i.*i*i,
ii::!!:!i i!;i!"ii!!!ii*::i:il;*:*:*
i ii* -'
* * *.........
  • *...!..i: ' *..:..*:.i..;:.. ": '" ' ' : *:

iipli*ced:.u*i*bs!i* i*:i-

  • i*i:-il;ii*

i i;:: ii.;;iiiiii iii!i-!

  • iiiii*

!:iiiiii::ii:iiiii::

iii::*.:i!ii:!!ii*.!I:II*

!-I TS; SS*::!: "!i*.-:i*l!sii*ii ;!;:in*;!" i;.i!ii~;i:!*!*i:;::::.:.i:! :: accordance w ith.:;:" approved:!!;! ISFS procedures.:**i*:

Vi
  • :

i::.n:;i :::.:*. i:i:!i*i

i
ii*
,::i
  • !;;!:*i:i
:iI*:;

if!i:

i;;

5o:.i Resolution of :items side~ntified a*s adiverse to,qu ality wit h :!appropiSHate*:::::.:::-?:::ii

6.i P; erformance. of. auldits !and isurveiillances.by :QA personnel ito iverify *.thatii:*..:i:;*l ;
.::.*:....I S FSI*. ad m.inistrative: co ntrolIs,.pro¢ed ures,. a nd. p rocure ment: documenits:*: :;*:*:
.:;*:*:*:iii.i*i:*:i:::graded appoac*h: *to :quality :tha a*:is; cornmmensurate: with-a item' or a
  • .""21.

The folloWing-sections of the~iQA*pO idescribed hi:ere.in or..an in:.dustryi!..*ii.::.il

.i.:.;equivalen~t may *be aapplied *to t:he decommissioning of th~e LAO BWR.*:***:!:i.**.
  • /.- *:'i;::*{**

pl***an~t in *a i:graded appro*ach1 to quality that !is com~mensurate it~h an *:itiem1**** .-.;i;**

  • ii*,**i-:*a. :i:;Forany* Raioactive Material* T~ran~s~portPa*ckage-s subject; to* the** :*i
  • i.i~.]i
i..i::i:!~~.:i~ii:.iiii~i iQ APD a pplies.*:! For ithes*e *activities sa ssoci ated w~ith thfle:! iSF*SI, th:ie :::i I!

.*:::;**:: :For *th ese :activ~'is associated with* decommissioning, ;the: ". **:..:.:..:.:;.:i;*...i *-i";

';ii..
;::

.::-..: ~.impilementaionof 0fithe QAPO ;Is *by itheia ppropriate *soLUTION S.i..*;::i...i;:i*! iii.i -:.ii.i::;ii:.*~i:Sections :I,:*:;i llXV,.. X.V~and *XVII and* Appendix:C of thi:s iQAPD mayl*. ;..!,- apply i!:!!i i: iil;ii

i
!:*:..i!.i*:i;.!::*.i*
i;;!*.

~~*!*:i:;::*.*l I.::*De*om.:mis sioing acn.bti vi ties a-ra

e. otherw:ise :controlled.:by ~proce*.dure s,::;
  • ,.
    .:I ii*:*:.i~

.*pr::: i ocesses,: and; pol*icies di~ee med ad:*aeq u:ate! b:y,th m*.*a n:a~geimen:t:*i ::.!:**

;'..ii:

.:H :.*:: .::-.::***:*S!!:.;,:.!i ..Excep~twhen alternatives or :exceptions: a~re identified,. the implementing ii :i: :;i 'procedures for the QAPD shall* comply with the quality assuranice guidance:.; i:.

documents* listed in
AppendiX B:. Additionally., the following clarififcations:.i.:;:* !:--:

1:":*:.

I
  • :!i;:*f the :guidance:: in anyi of.-the :listed documents is :in:: conflict :with :the :;!.; *:*:.i;i;'
i
" ~*:*;i QAPO, ~the-guidance provided :in "the QAPD is ithe, con~trolling docu menit;..ii..;i

-* ;;li;i: ! i ;i'::* *i* *:i **:

,; :*;!.:;i
    • i !!:;;*;: ::i
  • i: :? * *::;* i*:;* i? :/, :i ::? *ii ::; ;: ;;i!;: *;,*:;**z**;.*ii:;,

R e v. 2 9i:

  • * ; 2 !;: !***

-QAPO !ii ii::iiiiii!* ii*

  • ':ii
ii*.i;*.i!iil;;*
i i*.**.*
Y
:.' ::'- * ' ::,':' :q:.':'.:' "".'.,

i/{*".i !i*

(..ilil :iii!!iiil; i:i:il ii!:i:

':i{! ..,:..::.:,..,..,:::.,:,:, :..y::.- :.:%.,.:,:::: :-.:/...:..:./ ii! i! :! {: !..::.;}.i.

i:: ::i:ii:2:...::i, Standar'ds, g~uides, codesi~ etc., ~iidentified in ~any commitment* document: i
iI}:*(

":/. :{i :.are.not. qudalit~y assUr~ance :prog ram rei'quirem~ents unless !that-document* :

  • <.i:,i3..

,Guid~ance applicable* to sa fetyi related items anld act~ivit!ies !:(}1.0 CF:* R ;5,0)*:*-iiii;i}:i ,*!!:i.::::!-!ii*i!i:::; are :appl iciable:to;: com~p~ar~abl !e:itemsi and: activities ( mporit~ant To b.!Safet~y)'.*,,:!:; i 7 : i..*... .:.,.:..i(;:at ithe compiletion,of fuel tran~sfer to :support; decommissioning;i. T~he}. ..y -. *.:.*..;.:Qualified -TechnicaliReview was added.at the time SOLUTIONS became::4; ii !. !:./ ":.i;:i:the :licensee. *::The ifollowing.subjects shall.be.:independenitly irevitewed} by a;. .".': :""*i.;" ;.":*i1:.. 1..i0.CFR 50.I59 and( 10O CFR 5*0.82 evalUatiOn~s for Changes in th fl~e.acility; : .:v7:::::-.. .. :.:*.,..:-.:::de*scrrib:)ed ~in the.DP and: PSDAR to"- verify that such a:ctionis do Ibnot' :-;:/:::. !:..}:.:.i:..:}:!}...":.. ...:.:inv.,olve a :chang~e to: th~e. Technical :.SpecificatiOns or w:ill :no0t r~equir]ei~::{:i~*:i

17.
".,:/verify that ~such :changes :do. not :invol:ve,a,change to :th~e Techinical- -,...;
;i:
. :*":-. :*-:;::::.. S pe~cific ations :an *:.Will n ot requ*ire: NRC :approval: pu rsuan*:t t:io 10 CFR:,::,:::
:.,....::**5 0 i5 *9 a n d 10.C F R :7 2.4 8 ; a n d ;*::****::.*:.:;:****

`.::.:::*::}:::*.:;:::::{**::*.;*:*:::::E.::*:***:: i{....

  • .::;*::::}:**::i1*:{. :I*nd*ividuals ;that are a;.s~sig:ne.d rtespons*ib:iliti~es *as described ;i~n S*ctioni*!i!,:
/*:::
i i:i.!:~.:.::!:,O.RGAN !ZA*IlON.. *.shall. prepare, admiin~istrative: and q uality :a:ssur~an*ce:;

i"::;*i.:

i;*::: ::; ::i:
i*pr0cedue iis* as n!;e cessar to.

0.impliemenlt the:. requl~irement*s of *th:J;is!:i!: i.::.!i:.i ..:*.:i:::: ;:*:::!!::.*pr~ogriam:: In/s~upporto~f oPe~ration a nd m:.*ain ten anice o0f:.the :LACBW R. ::: :/

i:::
i:,::i:::}::{i.::~l8SF1 an d decommissio ning activitie~s:, as a pplicable. Procedlures sh all."
::.i
.:: :~; *":.include appropriate quantitative and qualitative accep~tance.criteria :.::
  • .;i.:
i :::::::::::::: ne~ces*sary :.to: deter~mine :that :the activity. is :being: prop*erly performed.;:.:.

2..: ",-Audit :or surveillance repo0rt~s.are-distributed ito management f.*or; their.::"

  • ...":.review and assessment of the QA :program, as :to.effectiveness,: scope,-
Y::
.{:}Y:*::ii:Employ*ee-Train ing shl*:l lbe! pr~ovided: to. all: facility.p ersonn~el anhdi:!::q{
.:: : *:,.4.,contractor:s :performi~ng *activi~ties that coUld affect,th~e quality.of***;:.-

!:;::!:::}4*:*.: Inde*pe*nd ent ;:Manage*ment A*ssessme;nts ar*e perii od~ica~lly pe.rforimedi to :}

"': :i :: ' ;.monitor :*over*all performnance: and. confirm that -activities :affecting qUality: -i!,:i!(, ii*/

i QAPD....... /:::; .;i.:

t.;:!
  • :;i,.",:::::i:
.*::}::.:::::.:i":....:.*., :. :: :;i

'81:: ::-:

4.

.i": ::: :: :"..} ;:::

i :}i:Ei;.;;!:::ii!}i

.:" Rev; :.2*i::!::I

I h:**::*:**::-:ik:::!:}:i/:*!*i*:co:i)):mply w:ith the QAPO and ithat `the !QAPD Is effectively implemented.i::;i:i!.il

{!
**:i}.::.:designated:

by: the. President, independentiga of activities assessedt; and pendet;o~atiit~s., ssssd;;i'* :! *;/::i~ {k:::yi::.:i }17*}:*;!:/*i:!:::*:i:il ievel of 0im~anage6me~nt ihav~ing th*e-authority to e6ffect ~orr*ectivle a*ction.i :Iin~i

  • :.:*..*:i;*Yi*,-i:*::.:.::.:y.*:}addlition, tiih ese :*resulits are rePorte d i n a timel *y :fa sh ion to 0the Presi deni*t.::*

-:...F::::..Pe s n e T raining. and: Q ualification.:. i... "}:::*:::;i: i":::"": i::" -i:.:": 1*.} !:iiEach member of the fac¢ility staff (InclJuding audit, sUrveillance and~ii!:!i:i*!

.
.',:inspectio n pe rson n el) shll i~ ha Ve. s uffi cie*n t.i q ualificatio ns: to0 periform.-k
k..*:::...*:

.:ii}..:}it he~ir r*:a ssig ned. duties.i* Reg ulatory :Guide 1l*.8 :-19*77(ANSI ::N1.;I8 1:.;-i.:; :::iii

  • i!iiii:i:iii!::*;!
!;
  • !i 9717:l) I*s uiitilized* :ifor* detjermi n ing anda. aSssessin*g ;ap pro:priate staff;!::{;;:i!ii.!:!
i.;*/::;*..*.*.*p::ersonnel training :andqualification *:re~cords :are. mailntaine~d inii:*~i.*!*i:i :*

i:::* i:~

i i.{'::!:.ai*:. Thie: !p os[:it*~ion ofthie IQA :Man ager iishallJJ* meet :it he :.ifolloin o i

!m inim*um::i:! .{!: i:iii* i::iii >:: ;0 ::! ii.i!i i!i'i:::. il*

}ii/;i! *iii::

i..

:'q":" >": ' i:.: :i,

.:; :-.: " :- -i L:.:;:i ii! Graduate of a four-year accredited engineering or science college or university, or the equivalent in practical experience plus five (5) or more years in positions of leadership, such as lead engineer, project engineer, audit team leader, etc. }.. :" ifi.:":i*:..:i:.:.i *i:: this: exper~ience sha~llbe in 'a quality *assurance organizationi./Y:: :

.... :.-" :.}.. implelmen~tation-may be, substituted for the one-year experien~e:
.:.::i:]Yi-...:i~:.::::.!::iiw:ii.."-wtthin*

a quality assu~ranice orga-nization:....:/ : i!::*iiii:::i..:;i.ii{;:i.-

  • i::!/i:::.!

.-*:-b*.:ii T

  • !ihe ::pos~itilon !of Radiation Protectioni Manaiger :shall meet ~the:;!**i :;i: i

. *..: i- :

.: ::. :.:::}: :!/: :*I:- ::r.ia dio~lo~gical ;Safety,:.thriee6: yearis :of :-whiich;Sh all :*be*in ::a~ppliedi:: :::!{:;i

{i .ii i:::i {ii: i:, i::ii

  • " Technical: experience inT the areaexe ofc radiologicalea safetyd beyond I lIsf~* : e~y::n :::i :i : :ii! i..
  • !i!

' ' 'QAPDII .... " id,.! :....-:.,

.
:*::*,*::i*.:i*i*..i:"i:.

{:*:i.*i. !: i:i;::/!*:.*:::i:i*.*:

  • !.!:!:.i*

Q A P D,. 9 R e.v. 29:} i.::..i:,.*iii} i.!:,:...:.; ;.;:,i,.::I;.::: iii:::i;i!:"!,. e !I2 :*:I.

::%*i:.:.i!{:"*(:/* >*ii

!* il i iii !i*i:*!!!:!i*:Z::¸

..t :.i':':"

}:: '.-.'::i:i:::*'*:':ii!}:.

.::.'.::""":...:**:';:,i*..: **i*-.1:!:::::.*::ii::*!:48*:I*::I
  • !/1:}::.*!:`:.:..:*:i*.`:*:;;*./*!:.i:*....*....:/y:*.::*:::*:(.,.*:.:.*:/

!:t*::::ii.;::::;:::*:i.i*i{:::.:*i::.: ii:.!}:!::!i iii!::i:{i*;~

.**!*!il' :::i*

!: ::** :basis stowarid s th Ie:iacad emic. d egriee :requ1irieme n~t !(four ye:*ars o :f, *: **

.::!:!:,.::.:! i.ii:::; :ii*::{ :technical experiencel being :eq uivae!nt to! a fou r}year aaem.a ilc::::
  • * ':ii*"*::.:.i::{

i.i **: i:A:*ca*demic a:nd-tech*nical~i experiie nce :must i~total: a: minimu oi:::ef::.i..i/ c.::::::::::::l Ti*iihei position ofQ*ualiffied iT =chn*ical.*:Reviewers shall: meetth::ie-:i ::::*- follow ing m inim um qualifications: gim i~i u q*aif ati sii*i i:.!:!;. i:i:-:..:..i :!:i::.:ii::::::.ii:ii:::..~iii::l:.ii:.~iiii **:! i.:-:i :i ::::*i~~:!:!:.-i:ii -.{.:.

.: :: Qu ralifaiedT cn icas~l Ren v~iew rssal l beg u pefrindiiuaswtheout n!.. -
  • }::.:.

. ::::;.}i:::::!::*i;}i:i!!}i:

i::-::::i!*::*:.*:i:::
i

.ii: !!!if iiill i Sii: :.: " ,*Qualified TFechnical: Reviewers shall have at :least :5 years ;of. :;iI i'::::::/.q~u*alification*s evaluated o*n *a case !*by ca*se basis iand: approve:.dii*}

  • !.i:* i..;.

Re~vieweris ifor [deco~mmisioning a:ictivities. iand ith Siii:ite~: ~ i.:.!:::: i} :! i*i:

i i*::::;*Manager, G enoa s*hall: appoi~nt Qui~alified *Tech~nic~al *!Reviewerts::i: i for ISF:
i"::o..

SI*t la ed:ac i ite--rela.ted: activities.*..::

.:.... :; i:i*i~*i;i":" ;::i:i:..:.:i::: - :.:::
." ill:". DESIGN CONTROL.AND:REVIEW!;:.:::.:.!;:::::.::::/:
:;:}ii.
.::::-i
i~**}i~.::.;::::
i.:ili:*:::This* s;ectio e stabl!e i* sh:es *the:re*quir~ements; :to :ass urie thi*at, Importa~nt: To ::! (::::!!:*::
!* ::i::::*~i*::{
!:*:{:; ;::i
  • iiiii; Safety ( ITS
  • st!*ruci:turie s, ::syste*m s,; a*n d :com p onent*s * (SSCs )! :of ! th:e: ELACBW:R * :*i.:*
/: *:*:*::::

i::i:. i::::!*i:i~~* ISFiSi ar*

e: ad * ;:deleted,: chi*a~n*ged: or moodified*:; in* a~ccordlance*:i with :::::::the
ii:::::::::::
.i:.:.
.!i::. : :i ::ii!:(c:.:o~des, s!itandards,!::: an~d r!e~gulationrs.:t thatg overned :th e oiriginla~l. de~sign,::::::::::::::::.!::

i:::::.:.:{:.

~:":::i~-:i::~ii:excep*t.as lamehcide aindi approved. **M~easure~sshallbe establishec~ifo:r th~e

-::::*!:;i*

:,:/*:
!i:.}. :.: : ir:ieview,; evaluation and;
da pproval ~of all :de~sign: chianges ::goven in n.i:S FS i!:t.:::::;./

" :SSCs. Th~e Engineering Manager (EM) :shall }en~sure.that the "design *controli:l /... and: review for.:ITS SS~s :shall be :performeci :by the appropria:te..Design*::.*:.."!I

./ ::::.Auth~ority (ref.; Appen~dix :A) utilizing thleir appr~oved: 1:0 :CFR: 50: Appe~n~dix iB;*:.:ii*-

.- : :::%.::::.......::..Design,: fabrication, o)r modification :of storage and shipping :casks.used for -.

.::i.
  • T:::.:}:

i:.*.!. sh*::ii:

.*:"S. pment iof~i radcioactive !materials :will :;not !be c~ondUcted u:6ndi*:erthiS::secti()n~i-:*i:i.i
i: :. :::.::
i*i
:.:.::::::1i:!.

The:i r:. [e!:DP:C] s~taff: is :r~es ponsiible: fo:r establishiiing :p~roce~dures to{b:* implemb*en t:.i*:;l -I: QAPD: i

10:*:
- -A..:.

10.,.Rev:.:" 29..':

.:.:.:. design.:control and the incorporation of design docume~nts into work
...: : iJ ::orders:,.procedures-and. instrUCtionS. ::

.*;:iz-

i q j ?.:.*.:
I :
:~2.: :The EM is: respOnsible for :the iincor~poration of design lbases, regulatory I:
' requirementS, codes and standard~s into drawings and specifications

... ;:.i .. :...:: :**.i.::: r elated. to ITS SSCs: design :and ch*anges thereto:..The EM ;is*: also.*;*::*

- : :!:::::i;.:!;.:
.i~i::;

respi:::;::

onsi~ble for the r;ieview o~f d:esign drawin~gs, speci~fications,;i!
::i::::calculationad procurement documents: to assure *that: quality

! :1:

..
: :.: i:::standa~rds :are *included or-refere nced.: 7::

i i:::: : i: ;-;:i *::i:::

i1!i

3.TeulfidTehialRviwrisrspnilefrprovidin~g an

i :i::
  • .
    *: *:** :i:*iin depe:nd ent* r*eview of: cha*nges :to *the i:SFSI* iTS. SSi3sl. i They ishall* ; r ;I
": :i::;i~i:::iprovide assurance ::that the :modification: m~eets :the design: bases, regulatory requirements,: and applicable codes and standards. The review shall determine whether: the proposed.modifications: :requi~re:-

prior NRC approval. if prior NRC approval is needed, any.license:;*.. amendment request shall be referred to SOLUTIONS licensing sup0port. i ::"i*:i ~ 1.:::i.:...: iiA W:or~k Order! shall b*,e *initiiated ifor all modification:s to iTS :SS~s :and:: :"* sytmsminane.peaioa.drng.FS.ctvtis.Wr.Odr

ii*ii:iiiiiiii"i::iiiii*i2. :ii!Desigbn :ibases, :regulatory :requ~irements, a!n~d a~pplicabl~e codes :and standards :and requirements for all proposed ISFSI modifications to ITS J, "iJ-S SCsi and sys~tems maintained operation~al duringisFiSi :activities.::
i, These conditions shall be incorp~orated into drawings,: specifications*,

i -: p r o c u r e m e n t d o c u m e n t s, a n d p r o c e d u r e s :. --. : :. : i :~ :i i :: :. :..i :. i :i i ::.. : :: *.'...

i-ii*::!;
i"i:3. ii.:All p.roposed I:SFSI m*odifications :shall be reviewed to determ~ine
"I:
iV.:* PROCUREMENT DOCUM:ENT C:ONTROL: :i::;::i;:i:;: :;;:.:;i: ii:::.:!

Ths ecio:etalihe te eaurs oassure that procurement; ::.i.J.::

: documents (purc(hase requisitions: and' orders) covering: material;:i::,::*..
.equipment, and serv~ices :for ISFSl ITS:SSCs..specify appropriate quality..*

' ~requirements;: Thie purchase order :specifies or r~eferences.:th:e *applicabile.~~.:. ~~requiremen~ts,- d.esign bases, codes, :and stanida~rds to assure qual ityi: ;::.;:. ..::.. B.; Responsibilities.:..::!~::..:.:.*:i:;.;:.::;

.*: it;:
i~~i
:;The DC ::staff *;is respons~ible for; developing p;rocedures ito !cont~rol t~he:
...i.i2i. ! 2:i.T~heDPiC staf~f is iresponsible for:initi~ation iof purchase requisition;::
ii 1
  • wor~kSheets for mater~ial,: equipment, and services: require~d ::for;.::;

.m aintenanice, ;repair:, and: m ~odifications;.

.:i

':r" ]':' ;"'; *,];":

3.

The Engineering Maniager is: responsible.for preparing engineering QAPD 1:1 Rev.29

! !iiiili ii

  • i: i ?:ii~i*li:;:*::
!pecifications :w~hich detail: the :technicall and quality r!;equi~remenits fiorii:!ii!:

5

III.

Pii:5i ,:*u rch*asing,is rjespo nsible forI prepa ri ngi, rieviewing,* approv~in g,:: is*s~uing,i ! t!~::~ .... :*6. 6 The QA Specialist I Engineer is respon!sible for review of IJTSi;i*:.i::i!.: :ii:; i!+;? i;;;iii:p:ro*:/: ircurement documents ito ensure iinclusion of appro*priate~quiality::* ';::~ii

i--:.
  • .::i..::;! :1:.i:. ::..puto l.. :Tie!rchaserqiiin for new matertiOn al,.

equripet tand s erice*( t h::s andi:*i:.

i
..+*:i!.:*,?ias quantity,..item idescr~iption,* and technical and qula~lity ;reqUlrementds:i!..*ii I-i i.i;*:::il;:i;i!iiii!::i!i:i!.iii:!+i:ii::!

.i. 2.+ Purchase orders shallinclude ispe*cifications th~at contain all the~i:?*+!**:!i+!:i:*::*:+::*+!I +:. + information necessary to* assure material,: equipment, and services are*:**::i: i+:: ii:::,i.:i::!. i:of: a d equa.teb qu* ialit. T~i::ih~is s*h~all !;in clude :material sele:**]ctioni: des ign d ata !ii.!:i, +!i : *.i:: !i:::.:*+:.:..:*delin~eated in;p+urcha~se or*der~s.. :Thm~:issha~ll include a :listing of each :item.:;!::-::,i:.:: o;i*{:*!,iii

f documnen tatio to r
t;be-isub m itted,:wh*en h it [is:to bbe submittedi' wha~t~i:: i,::: ::::*: :: ;

req"- ubirtes.. approval:-""": prio to manufacture, and. toy whom -: I t shall.::::!..:."i-be:?::::-.?i:i*::.: 4:... .4.. To.:the extent necessary, ITS procurement documents shall:r~equire :...

.i:.:: :.*-:;

ii.ili::..::iii:*21,i; 10 CQ:*FR I50, :*Ap pend!ix B,:. and/or* 1

  • 0.: CF*R 72,:+I Su bpart* G.:;::: Suppier~isii:*.:*!
.ii-.

!i.iiiii : ;::i iisha~ll be r.tequire!d !to ::provid{e :acceSs.to o.th~ei~r fac.*i!i~ti~es sialn~d:i* reods iifor:i:l.:*!..+!

.i;: -:i~:.+.:.:ii*.:*i" i::ii:nspect[ion. and audit, as reqluireid,-t~o~determinei complianceb w*ithl!:!!i*:i::.:iii:::l
+ ~
i

!i!i::::i;:; :+:::provisions o:f !thiei pu rch~ase ord:er. *=These: requirem ents shfiall ;exten~d i:to:ii.:ii

+::i~5;:.

ITS;

  • .ispu~rchas~e requisitiOns :sh~all be :reviewed by: the. QA ::Specialist::.: I"-:.:::.
i/i* :.
i~:i~i ":*::in~itiated ia~nd revi~ewed in.

i*:accordanice i:ith:tlhe. s~ame proceduries :u~tilized:*:. !;i+ i::i:i!

  • * * +; ':.:.+? :.. i. i.:. ii:

?.::i i'.'". ". : ?+ '.+.':'." "',

in preparation of the original document. V. INSTRUCTION

S. PROCEDURE

S. AND DRAWINGS i

  • i i i!ii!I*

A. General This section establishes the measures to assure that activities relating to ISFSI activities are performed in accordance with approved instructions, procedures, and drawings. B. Resoonsibilities

1. The DPC staff is responsible for preparing or reviewing all procedures that are required for implementation of the QAPD.
  • 2. The ISFSI Manager is responsible for approval of ISFSI related rirocedures that imDlement NRC-aooroved oroorams and olans. i iiii
3. The Qualified Technical Reviewer is responsible for reviewing all initial and revised procedures that 'affect ITS ISFSI operations and shall determine whether changes to these procedures require prior NRC approval.

C. Reauirements iii!ili!i!: /i !iiii!i:i!iii i

1. Detailed instruction for ISFSI activities shall be contained in procedures and checklists covering the following activities:
a. administrative control,
  • , ": *::*:..,* !,!'r:*-*'
b. general security system operation,
c. Security Plan implementation,
d. quality assurance,

!!i ii!!!i i!!: iii i!iii!ii!ii! !!iiii!!ii ii i:*: i:;;: e;*;. I::sur*veill.ance ::::alnd i::tea~t a ctivities of iequipme~nt,: f.:::::::::::::=================

!::i!

fire::::!::::: :: ii ii::::: p ro t c tio p ro g ra m,:: a nd::

i: E.::
f!::i:::::: : :i:!. E::,i i*~ :::::::::::: ::*~:ii::i i;i:*:i:i ii ii
  • .i ::i**;!::*i:*i::;iii*

i!*ii:;::

ii i2:!;i:.i For;i act*::t~iv
ities othr th!an
  • those w*:

ith;*.in:; ni:*ormal~* craf expertisei -;!~i;yt

::*ii:
~ *!:: : : Ei *
i::i: *i!
: : ::;i i:

i nst:ru ctionsii!:i;::

!si ii :.i~

ii* d : br ~*!l s ~ b i ~s:a:pic **: ; ;:;! i::***i*.:

:ii!::i for maintenance and: repair of ISFSI equipment or systems shall: be:-::

o cointsslaliirine d in proced raes or WorkaOrdeors.Th guidnesallta~~::*:*:i*..*:;:!:ii:.;i:;~:i*l . :. :~i". i..;.". con.

  • .i*,Ptai isru:c:iteions f~or preprtemio n gtl~,
perorane, c tes~tying, a

nd return:~iEi to "::!i!i:**: -"::::i::"i :i: ::::;:ser ic. T hsa*~

  • :*e gu dac em ay refer:::**.::*/:*:*:::*.enc..*:::...;..e m anufactur.*

e r's:**:: Instruct*::::*::::::::**",:*:,*:::*:::*ion

iii.i*::E~i:i:::ii**
!iiiii!ii!!iiii!*!iiiii!i!!ii!ili:ii!::*!ii:iil;i iiiiii*i
  • i::

i ii:,* ii* ii

  • i*!I* i;*

QAPD Rev. 29~i!iiii~iii;!i~**!i:! ii; !ii*:*:il ill:

  • iii:!!*ii*:ili!!i!

-.: ::T¸/:::*:': :.'.:.:: :: *.: ::'*::T ::: iii i +:':::;':::::::: T ::::::,:./*:::" ::::.::::::::.:::.::::::::::::::,::::::;.:::::::::::.*::::*,

  • ...:::::*:.5::::

i!i!i!ii i ili i!iiiiil

4. The department responsible for an activity shall be required to provide the. necessary technical input and review of changes to instructions, procedures, or drawings~
5. Changes to or deviations from established instructions, procedures, or drawings will require the same review and approval as the original document However, temporary changes to procedures that do not change the intent of the original procedure may be made in ink, dated1 and approved by two people of the management staff.
6. Procedures will be reviewed periodically as set forth in administrative
  • .i:)::*:TiT*:!i*!::i::ii!i*Li!!!!i)iiiii:i iii!ii*ii!i:*i*:ii!*!):*iii:i::

i*:::; :

~ :

i! * :.ii *li* :::::

: :: :::::::::pr o c e d u r e s.:::::*:::::::::

A. G enerali* !; ii*~i*~*!i::ii~~iiii~iii:iiii!i~~~~:*i~):;ii*i!i!:iiiii!)**i!*)i)i*)i*i*~)iii*)ii~l

ii:);*i:ji),*i:i

~ )i*l*i)**:*)):i)i)ii~

  • -))))))
  • T hT:**))**:!)is s ci on*:****
  • i !:i!*))*:)

,):):))**i J))i)

i** i) e t b ishes~ :*ij)*
  • ')i * )::i)Y*))) *:

the:~):))~:*i)i i*i:::

!i:*

requirem ents )*:):**)* )i: !) ] fo d cu en control)F) as*

  • i i

ti ) Ti )))*i)))**) fT .i!))i)))]iE~) i : :i:i : i.:])!TIiT )) :):** ~. r~esDonsIDIIIIIes

1. The DPC staff is responsible for preparing a standard procedure for controlling the issuance.of procedures and for preparing, procedures I controlling the distribution of operating, maintenance, repair, and modification procedures for the ISFSI.

C. Requirements iiili for 1; Procedures shall be established for the issuance of procedures, drawings, and specifications. A document control procedure shall be prepared to provide a uniform system of document Identification.

2. All documents shall have an identification number, title, date, and revision number. Documents shall be fi!ed and controlled by. use of

'this Identification. Each type of document shall be filed in a central location identified in a document control procedure.

3. 'DrawIngs, specifications, and procedures', Including revisions, shall be reviewed for adequacy and approvedfor release by authorized personnel. The required reviews and approvals shall be specified' in a document control procedure.
4.

The' administrative staff shall assure that current documents are distributed to and used at the location where the prescribed activity is~ performed. Documents and revisions shall be distributed as specified in a document control procedure. Preliminary and superseded documents shall be clearly identified and closely controlled to preclude their misuse.

5. An index of each type of document shall be established and maintained to provide the current status of documents.

VII. CONTROL OF PURCHASED MATERIAL E ULPMENT AND SERVICES QAPO Rev. 29 i ii ! i :ii! ii! i i!i!i¸i!!ili.:ili!!)ii!ii:il)ii!ili!Sii;!!i)!!i

i!
ii iii iil;iiii!i!!!!

i

iii:ii i i~ i:iiiii:d!i r i iii jelctly ior throlughlc~ontriactors andl subcontriactor,:s conform to t~iihe i:iiiiiilI !ii*iiii;*iiiiiiii!*!:*ii !!ii*i!iiiiii!iiiiii:iiii%!ii*;i evalu*:*:* i*ation, q"ua~lif¢ication,: !*and evaluating*: su PPlier q*Ualit~y pro

  • gr*am*s ii.!i:*iiii::!i The i

!;*!:: f ~iiiiii! QAi~~ii Speciai st:

!*Ii*ii*

E-ngineer is responsible for developing;i: procedures ~li:!

  • ii::iii:

I

  • !i:iiiiili!ii!iiiiiiiiiiii*iii:,

ii;iiiiiiiiiiiiiiiiiiiiii2iiil !!!iii!i! iiiiiiii!iii ii!iii!i!ili!ii!iiii!i!ii!iii!iiiiiiii ii!i!i ii:and:c itec*hnficial capa'bilities.i*.iiiiii Cii:C

  • ii*:;S * *~ ~ ~iQ ** i t*** i::i;::i**!i:!: ~i ~!i:*l
!;i: ii i:~!:l:iii::i:iii:i:

f:iiii.!ii!i!:i !:: il !*i ~ :::ii:

  • !i:i*;*
  • ii::

~i.*~i!i:i ii!. S u nolier Q ualificationi::ii i:ii

1. Q aiiaino upir hl oss fassigps xe ience
  • i:::::! wiii
ii *!init h te snUpplieriind:t~iii:;Q sup ier' rput~ration. and exp* t er iencosi:

in th f:::::::::::ie, andi:::i~~: iiiiiiii!liii!iii i!ii!ii!!ii!iiiii!!! !'i ... ::!.i::*;i:::*i:

*: : i: *;::::',"::*'-:!:'*:i:

2.:::*S up~pliiers iofi c¢ask si us~e~dfor sh ipm~ent: :andcl sto rage: o*f :radioactiveJ *:*:*.iii*iii:::: maeilsal eeauae.oesre* that ithe.:d~esign a:n d :ifabrication f:o~f: iliacain r perfored undrl

i:i~ '~:'*':

the control E: :*! :: of an~ NRC-approvedi'!il~iii:iiiiii:ii andiii~iii:

  • !:!!!!i!

0!:;;:~!i:i.l Source Inspection...............

1. When appropriate, suppliers shall be requested to furnish DPC with sufficient information concerning their manufacturing and inspection plan to permit DPC or their designated agent to plan and implement a source inspection plan.

2.We prpitiseti!oni plans s:*hfal t I:nclueitn~ ii*e~d*ss and hold i*i~i*:i:~i~i::! il*i po!**ii~ i ntsfori nspec.:* f

  • t
  • ion
jjc ti**~ ii:: :!*:!::*i:*:i:i of tem, w tne sin ofpro ess s o tests,::i*i!~i::ii**i*i*

auit:. ofii!i!:iiii: requiredL quality~.*i*i~::*:::.iii:ii:*ii::. i**:i:ii!!l*!i::i*

i*:~*:ii:*i i iii:
ii do um n ato, nd v rii ato that~

vendors:*i:!i*:i~i:! hav:i!ii:i~iiieiilii *iii:ii::!iiiii E.l

1. Items shall be examined by appropriately trained staff upon receipt for shipping damage, correctness of identification, and specified quality documentation, in accordance with approved instructions.
2. Documentary evidence attesting that items conform to purchase order requirements shall be available at the ISFSI prior to installation or use of the item.
. Q Aii:::i~~*! 3.i Documentary eidence!!

shall be sul fiien in ode to Idnif that th .9!i:ii~*i!!:

.:*;:t;*!::.*:!:Y:..;::::;':*:.!*:.}t:i;>:.*;*:::specific r:!eqUirements,- such as codes,. standards,: anid specifications, i::

  • :.*i: !.il ;;*:ii~:zi:!:
. :.i, ~: ii:: :.*::i:

can~i

*;i n~be.* confir'med :fori thle pur~icha sed item, :This r-ieqU ire~ment !s hall: ibe:.i::.ii..! *:i!:
"{

i

"::-: }:i -.

sat:i sfi ap~op ae

d by umhaving ava fiabe copes ofrin the purchase order
and*ii!:.i:i*:

ii~i*:!:!ii:ii-!:.;il*.!:i::i:

  • 'i appropriate...

docum ent referenced.. th rein...

i ; *
..*::.;:::::::::::::::::::i:;;::. *;tit:::.:.-:

i

4!AlIT aeils at, n

o poet il esgegtduo

::;:;i ;. :'i:ii

!: ;:* :I Li;i : :]E T rFece ip an will b*;e place in*: a; receivinginspection hold area* sb EparTe i;:* ii : ~~l

  • i!ii:!ii;~!i i~ :i*

"*:: *: " 'r* :.:*'*

.*:. ;.. *:: :*:** : :* :m ;from:*
  • ]:" :

sto rage*]:;*4**+:2:"*i**;::iZ::

      • +

fa i iies:*:;:**:;.* A fter:

.*:"::" *::** *=;::[*

accep tan ce,: :* : =* * * : ' t he m aterial; w ill::::::::::::::: be identified:*

  • := " :':2:=

x~;:t;:;..:i;i!.t::i::.:;::::*:*o~*:i:}:

-it-a;hs accineptabl iesandplaed insecuifimednts.orag ie.ntfct~ n;;n o~ f::i:i* :* i;: ;::*':=;;

ii::: i;ii~~*:::* ~::ii!;;:i;i!i ii!; 5.i;:i Dui~a~rina!eciva~ing inspectin, ~ If a s non onformanie or di yscrepancy ~ii~;:!ii*i:: iiii:i*i ;:* , ii~i;:::!iii :i ;;;

  • i~i*;:iiii;;
  • :i:

exists, the material shall be placed on hold and w.ill remain d ini a i hold

f6 mi :~e i ti:* ; te ;f~ ityiii*r*gh*: in*tajito~; ;;: us :: iii :i::.:.
i l
iii!i:i:i

!i i! i i ~i:*!;;

~iii

~~i *. ,, :~i;i

i;:i.::;;:i!i:i!i:i
  • ~ii;:::i:;:

sta tu su n til final, d isp o sitioni is d eterm in ed..i A: co rrective:! action. ii:i

i::,i!!::::iii:!:i:i¢;:i¢

-;i:i!:.i~.;.:;:::ii:; !i::iii:: ::.i :?:! i; i:!. ii: :*!:::

i. :i!i:;:*

.::i !::

:i:::i:i::i;:;
ii! ; ;i:::

i* !:;*:::.i *:.:i*:::;:;i - :::*! ii;i!i!:* ::;document:*::

  • .*!i;:::T e shc~*all: be initiatell:b~e~bihn* th*oe~l rq iie e:si:*:! *!, i:
i

... -../ITS mateial,.par., and c mpoeteasb a tsed o n theponentssyste m ...;;::;):i::::::ii::*: !::; :i:?:i}:;:.:*idesignat:iiil iii*:i?:i.i : i on, fromi!::r6 rece.:i~*;u~ ip:!n t aiti theb* fai ity~e: through idbnstallation or u~ste .ti~i: .i! !:ii*;* t;! for3 t;;:; hesi~a:;dentificati.on and controlc f a t~~iderias pabrtshandicomponents~h;"i;.

" ".i:.!i.:

from

}

recemm:ip){nt th oug istall~oq:atio n goruse and/ort e v::.tran!;ielop t0:ing pro icdures.} :::;!:;:.;;:.

  • 7*:{**:::,:

documentation.: I::dentific~ation *Shall: be either: o n the: item o r !recor~ds:i. { :::::::i:::!)::

!::} i :traceable ito :the :.:item. iWhe re~plhysical. ide ntification.is *im practicali*:-.:iI :: :
..:.!/i{. :i.:-:physicalisepa rationi~, /procedu*Jral 'cont~r.ol, :or other. approbpriate :means :i"i iii

_:...- :.:/ - IX. CONTROL OF SPECIAL PROCESSES

A.i:

Gene~ral:: .. i.::: This secti~o n es ta blishes, the:: m easurbes.to" assurie* s p ecial :proce~sses,.iii} :i*i::i)i:;. ii{:i* id::i~:.*:i::iientified as I.lSFSi.ITi S,. a*:re c*ontrolled and ~accomplished byZ iqualifie~d*:ii;!.-:;i:: K:-ii~~:*:*..i~ii: .i:}:::. i:ii.}:iiip.;er ison~nel iusing q:..ualiified ~procedue-i.s} in accordance. with:*i":i apicable cei*-as,7:*.! iiii:{: ~i st.eand nards n, sefiatinscriterieaioto and ~oth r spcalsreuirementsrane.:"": ::.;::.: S -1. ThreOPO stafddf is resonsibeWor establising S~capro~cedrs that d~esrib:*ed::;:-i:i --: :.:..::.:.:. ::how p:q~Ja~fersonel a~ndpoedures n aorane w~tqualifiedfosijecalprcessres;::*:{.:.}!/:*}.:::*::*:*i*:E: K:!:.. K.:!!}*:~"**:.i.i] 2:. The QAi Speiaist I En:* g:e.in

eer oisrbe*:f)r.:asponsibne for rev*u~iewing o~i~ifi: :*:: i !i [. :*:
  • -i{:i*}!

repa:!iii-:!ersand mdii.*h 0cedtion w eork nvling specal prcessife~s : :..is perform.;;iiil.::-.:::.:*{:iied

":i:.!i.

-i::.!-:::- byi:! qualc:ifsi~ed proniunde acntildcord nce ithiqualiie:a 6da prceduresi~.-*:~.:-:: .... : :.:...:... using: qualified personnel :and :procedur~es. iQualification of..personnel:.i.: !.

i.iii:i.: i.:/::*!..::*ard*st.n~dproc durs:!:*!::*:*!::

shall.: com ply::::::::::::::::::::::!:!*i with the }{i. req irem ents!:*. of! appl:": i cable.:.:/:: codes!:*::!:::{.!:i:. .":}.::.

i*i-:,,
,, :, i:::}, ::: : "
  • : ';' 7:: :>,:.:>.* *::
  • i!:;*:iiii!-!:ii!:i ii!iiiii{,,iii*i

.{!::if-::::---..::..t::}::.!.::{ii::.:.:*.":*::-:::ii":i¸*: ii::i:!::i:i!i:iiii*i'"'i:'!::*ii;!*

  • . *......... :,V ::i:!*
.i:i*i*::

i*i.::::.*!:i!.:!i.::::.i.:.*.;....

'.*:.:i:i:

.i*i:.:, -..:, ""{. %.. "" :.:'

,.'.{:", ::i:: ".: }".' : / ":
!}:': 'i: "(::'4.:::;/" ":: :::'.*:A:*ai:*l-:t*,
/...::!....> :!,:.:/:.....,# /.: ::: :::: :,
{i:::i2.**:

Wi:eiderSiand welding iprocedu~res: s hall:* be:q ualifi ed,-i as approi:pria*te,:: :in~i:;:::i:!i:*

i :: :i::::iaccordance: w*ith iSection iX o:*f the ASME Boiler :and Pressure :Ves~sel::*;:*:!!~i
i ::: : :.
  • i.: accor*.dance w.:ithi:thhe Amer*ican :Society ifor.Non-destr*uctive :Testin~g:*!:::**:::.*;:

4.: 4 Procedures shall, be established. to describe !the method. used to control." :: " the receipt, storage, baking, drying, and disbursal of welding filler.. caibatdmaintained,":stored, :handled, -and :Issued :in.accor'dance with applicable procedures orinstructions..-..........- ".-,... .:"'/!.....}'i.:.. ": "r ....;i'iii } *:i:ii~ i;i!;::i) i:I*.. .;i*S ;"*:;::i;i..'*'i ll::*.

> 1 * : :

i:::i::!*;ii*: :Si. R e v. 2 9:-

:,......*...***2... -..

i:: :," /:*::,',,::/-'ii: ii

i.
i

-i- -- ':;" " ' ' ':,': "i.":; --,:-- -:' , "+ :,': "", : " S!ii " -:' * '" : :":'"; :' * ':', ::'. :. *'-.'i :ii'.:, ',.':'. i:',.., ::

,.. ::,,,,:::,,i!

!:i:*i*i*!*i*:-: X.INSPECTION: A.* General This section establishes a program for inspection of ISFSi activities to verify conformance with approved procedures, drawings, and specifications.

  • Responsibilities B

ii;.! ::;i:i;;i-i;::;:;:.r.i:.equir~ements ::ar~e :inClu ded:i n engineering;,specifications, alndi reviews *of.:::ii

ii.;.
i*-;-:.any in~sp ection **pr~oce d Ures!: imp lemrne nti ng this Section. arecom p leted*:!::.

.*:!i. ..~ ::;:!

  • .2;.i: :T~he QAi Spec~iali:st I, Engi neer i~is;!:

reponisbleI for esta*bliishing ;inspection :!il.I .:i :.::i.i i!:: :.;;*proceduries and iass urin g adeq uate. ;inspection: req uir~em ents arie!:;:;; :::;!::i :;i:: ~*!.i. .: *****iincluded in procedures. They areu also responsiblrese forcoordienatingi theo sibe,:frl c o!;dnilt n *~th e;::*:::*. :

~ii assignments: ofsgnme t

qualifiedfie isinspection personnel.

*:i:i ".i. i.:*!:*!::Y::i -:;;i~
-: :-*:.i :
  • ..:i..:..;:;::.:;.:..
. :3-*.:

The/.":.:"..:.

i. :i;i:?.?. :i:""-::::,:

ISF I :,;,*:,: Manage shall::i.:,,::;:..i-, be eson ibe for,approv,:, ,ing,,-..ISESI, .inspecti on.* .i:::.~..:,.:..::::::,.

! ;i ;i
i:~i;
;; ::i:}:*i;::*i ;

proci3::;iT e duresF or a!insrcions a nd-* shall ens ure suf~f~ i c:*ient ;Inspect;ions are~i~ !;!J

.;:*ii ;;i!:ii:
!.:..~i-:.:.;!: :*:!performed.

to provide adequate confidence that project activities meet;:~i:*-i::;: !::.ii-;:"::."./.;:::: ::ii*:::;*.i~::.:.; ::::.:

![-S
i*.
.: ;i:::::*?:;;::;**:**;;::i:;;; :':::;::i*::;;i;?:*:i:;:*;;;;.;:: : :::~i.
l : ;:ii*!*:i:i*;**:;
i
p re d e te rm:i:
e :* !i: :in e d re qui':*:

i re m e n ts. .i:::;i:i*i!::::;:'i

!; !' *;l***
~i' i ::; / *i*;*;i:i;;il*:!!i;*:: *i:*

i:*iii:!!!:;;**::!ii;ii:!: ;iii*:: *:*:::;::*;~;'ij:*;i*!*!!!;: *;: i*:i':*:;i***i*!i; .i*:::i;.;ii: to..? tpbe e;*stabl!i.shed.: Plannin:g activities shall. identify :the ~char!acteristicis:

!l*.
.:!i.:i:*l:

i!:.ii;accePltanice cicteraia, a~d the o:ibrganization r.iiesponsi!ble :for:performing~i.:: :. i

i:;:;.*"i:,*

.. :inspectin~g of, an activity. beforie proce~eding, shall be in;:idicated in ithiei:;;:ii..::;:

.i.i;i;.:.:i;:i
-
appro*prijateprocedure, specification, ior :.work :order. Ti;;;he: inspect{ion:.~:;..}.:::::;::

.i::i:::;shall :be documnented, to indicate approvali and rel~ease: p~rior to ....: -:- / : . ;i,.. continu~atio n iof the actvi ty. i. .. i.,... -,,,ii;-i;i:;ii;

i*.:,:,li
-:/::

iiI

  • i;
    • ...ii::iii*;:i::i::.i:-i::"

by:cOm*panyi yipersonn eli o r con:tractor ii.pleriso0nn el, : ian~dii sh alli requir~ei t hat.:i"i.!:*; ::*i*i:*:::::.!

ii:.i:;:*:.:.;..;?.:;!i:;nspection *proced ures ;and :*inOstruc¢tion~s, alo!ng w.ith n*ecess:ar!y dra~lng s,il.!i~i~;.:jj::::.::ii~..

...:: i::i~~ii/:::*;i; i!* ~-*:;*~il:i 5.ii:

Insp.

e ct*ionre uiemet hai eint goverdning modificatieorgns, r epairs an id i; :.....:.* replae m ent; shalli:

-i.;i
;.."

be ,.in acc rdanc with:. the,.... origi:.:. i nal des;;... i gni and.*.

i.
/!*
;;;.

inspctio requirements::, or., as amended.:, by approved chne to the, QAPD....... 18 Rev. 29

  • !i*i!*

i! i*i:!i:*:iil*

i
!;*!iiii;i!i*i
!;i*

i!i;::i*

  • **ii*i¸ Revi:i29 :"
  • i.i-ii::*.:
. ::./i:::!.

section establishes the requirements for an ISFSI test program to demonstrate that ITS SSCs will perform satisfactorily in service. The test program shalt include, but not be limited to.surveitlance testing, special tests, post maintenance testing, and testing following ISFSI modification o significant changes in procedures. B. Resoonsibilities..........

1. The DPC staff is responsible for establishing the requirements to control the test program and for preparation and review of test procedures, surveillance during testing, and review and documentatio of test results. The DPC staff is also responsible for establishing specifications, requirements and acceptance criteria for testing following ISFSJ modifications or installation activities and the review o results for testing following modifications.
2. The ISFSI Manager 'is responsible for the approval of ISFSI test~

procedures or instructions.

3. The Qualified Technical Reviewer is responsible for review of all ITS proposed test procedures, special testing procedures, performance testing procedures following ISFSI modification and performing 10 CFR 72~48 evalu~tion~ to verify that ISFSI tests do not require prior NRC~

approval. C. Requirements

1. A program shall be established to assure all testing required to demonstrate that ITS SSCs will perform satisfactorily in service is, Identified and documented.
2. Testing shall be performed in accordance with approved test procedures that incorporate or reference the requirements and acceptance criteria containedin a'*~~l*i~able design documents and Technical Specifications:
3. Test procedures shall incorporate, but not be limited to, requirements for such items as: hold points, witness points, caution notes,.

emergency reqLirements, and test jumper logs.

4. Test procedures shall Include, as a minimum, provisions for assuring that:
a. Prerequisites have been completed that include, as a minimum:
1) Control of systems status as necessary.
2) Availability of calibrated Instrumentation and special equipmen
b. Test objectives and applicable acceptance limits are stated.
c. Test results are documented.
d. Detailed instructions for performing the test are included.

APD Rev. 2

i*::.:'::.:::::*:*:*i::::*i: .i*:-*,::::*!.:i*: :i! ::!! i .,i:ii*!* ! ii:ii!::ii*:

    • !ii*:;::iii
  • !*i!::*:

i: ii*i:..:,*,:i,:*!:;:i:!!*::::i*ii*ii;:**

    • ,i*:!*:*!
ii*!*ili*i:i!iI ili L!

e-.:i:l Test !res ults ar~e reviewed a nd :approve~d:.:

!i i*i:i
ii:iii!i!:

ii i !*'::!i cond:: .*:0uc~tin:g:the *:test, tihe :.data recorder:, the:: type:-of. observ9ation :made,:: ::

.:...:the :equipment.used,. the test re~sults, :the acceptability of. the :test;::..;;.:

r iesults,.anid approved :dispositio*n for an~y deviaJtions::.

.*:.-;.:":.i":*:::::,

cr:::; iti::ieria :shall :be p:roperliy n:ot~ed :andl appropriate ¢orrie~ctive a~ction tak*:ienii:::.i: XiII. C:!!i*ONT OL:OF.MEASURI:NG AND TEST EQUp:IPMENT..: :;;-i!!i-:::*::~i: ::ii::.:;:i::*:!:: ** iiiilii ii ;:-

!;::.:;::::i!iic:*,on*tr ol,* :calib~rati on,:: andl p:)eri~o~d ic adjuistmient:; of :tools, *gau[g~es,;*: in st rum~ents,*::.* ::

':.:.."!:::':,::~i:!a::*ndl othe r me asurinirg :an~d:test!eq uipment-used, to verify confo rma nce ~toi.::.:-:.:

: : " established :iSFSI tec:hnical requlremients ".....

B. R es o s b i~ es :,!::: :"::" :"::.... "::onsib""il...:":ities'::" :::."":: :::::::i!!i.i:.i::. :::::::::::::

  • ..*.*:....*i*i::i!*:* :*:::.*:

1...The DPC staff is rsponsible for establishing requremet for a

.. ;.... program :for.-the Econttrol, calibrat*ion,: and periodc ~:adjustment. of itoolSi::.
  • i!:*;::::ii
!.: *:en*suriing g:tool s, g auge s:;, instr umen ts,* and Cothe r *m easurin g :anrd : test:.::. i

!*i-,:::.:**::!*.:::***::*::eq:uipmet a:*re calibrated to a:s~sure co*:mp:iai*nce with *t~he imnplementing::*:;

-.::::i*:::
3*
. T;*he~I:SF:SI!: Manag:er rIsi ;resp)onsible for ensuriing iim~plement~ation *of the.i.*:;
.::.-'.. -!req uirements :of this sectioni:of ;the manual "for. ISFSI ::activities andrfor:..:;.

aprovig I:SIprocdurs o insrucion......

    • i*i:i::;*::::
* ::::i *

...*:* * *: : *:* i i*!***~!:/ ; ::::::::::::-

* : :- ! i:i !*::*; *:: Ji :.:; *: :: ::!; :;::: ~: ::*: :i :***::!: :.**i:::
.:.:!i *,:: :*::*::

iili ill:i! i::ii:: :ii.!: i* iii:*.* .*,,..:....I'* UI[*III*li- ".;:'..- : ,*H.. 1 :. *:,*Insp'e~ctio'n, *::t~est, aind iwor p:ro:edure;s shall include pro*:!*ivision t:!:o!**: ::::i :!:

  • ! : a.n d. t~est eqi p m~enrti an d: idev*i:e s :u sed: in : a::cti:vi ti e S affecting*: qu~ality::ar~e of:
    t h~e.*pbrope
range gb~tY pe,: and.!accu: rac(yi.{ to ve rify !c~onhformanceb; to::*:** :"i:":.*

established requirementse andm testan parameters.e~i*;*:;*

  • :::.*;:.;;.*::;i..::::::!:::;i::::*
.*:il*

E::::.:.:*.:equipment shall be.:.:: controlled, calibrated, adjustedecl and maintained.........

-.:-:.-....... :period~ically,-o~r :pr{ior to :use.? Calibratio~ns are performned againSti!:;::"::::

-certified :measur~ement standards that,.are traceable-:to. nationally*::::,.:*... ~recognrized standards. Where, national::standards do: not :exist,================:

  • . i-

.,provision~s will :be established to dc~ument.the. basis for-calibration.:;.**Ei:*..:: .:Contr~ol.m~easures :and, p~rocedures :shall: prevent the use o:f calibrated::.-*..:

=======================

un=

  • auth*orizedi personnel. Special cialibration 1.an~d controi :m~easures :ar*ei::

no.ii0t; required for d~evices when nhormal: commercial. practic~es provi~de:.i.:..--:. .*=.....: *:.;:..*:..:::.iii;*::::*:

i:*a d e q u a te :a c c u ra cy. ::::::::::::::::
  • =i 3,!!*::I:::.:

W he...n.-.:........:........,:,:: an.. .item of.... m e s r n and test:':"!i::i' eqi pmi: e nt!:.i:,'="= .... :is found to,... bei:::. out of':::*:*!,,:* QA. PD:::.:

..:: !i!::!!::i:* ::~:i:
3*.

20 Rev. 29:!:!:*iiie

  • f*

ea~~ing: and; *este~p et:i ifurl~ !.ii:beo :~ : :::i;:ii'

::::ii,: i*: :i::i:i:i::: ** !!i...::i::::i:,
i *,
  • i!ii*: !. :i*!*:i*i:!:*i*i
  • .i:*

!i*:.il ! :!i*iil calibration, an, investigation* will be conducted and documented: to. " deteri~mne :the validity of previous.inspections,. tests, or caliibrations.:: ..which wereper~formed with: the use of that* item:.:..

  • !*I

.:.. :;!i *.l..!i!.::i':* .:'iii!i:,. i i:*~

ii:ii:iI4..*i*R ecords. or loii0gs Siof ithe icalibration nhist or iiof imea suring and dtest:'~~~!ii*::iiIi!:l:i*
:;-::!i*:.-::!i::::ii~*:.:;:-?
?::a**:ffixe*d iserial :n umb er.!.Cali br~atio n:.i decals iiitag s or i*s tickr i eis~ihalli;b e :. :I*
=.:*.:;.i*::i;.:::::::::::::::::

.:.i:i

.!.:~d :islyd enit::f prom iS n i:

entlyn .! i-.,cal rt

h. :::"

on each device and shall reflect. the

=

date======= of===========iii::!-i:ii .:: i:-* T h is* s ecti on es:**:tablishle~s:*t:he* re qu ire~ment s fo lr:S FS p

roce*du re*s to

,on:':r t rol* : i.: . :::*ii~::: the:::::::

ieihan~dlinig, ;:storage, :sh ipping,* iclean*in~g,* pack agin g:,* and :preservation o::0f
  • i:

.:.?!::*IiTS*: m~ateriia~l**a~n*d ieq~uip~ment :*t o :prievent idam*ag e, deterio:ration;, or lioss:ii.:i:i!:*:*i:.-

.ii.*:.:.through.::;.;shipm ent, inst lla io or. use..-.--:.:....

-.-::.:..:-. :-.::.. :.-.::-:-:.-:~.i:.i- :::::i:*.~~:::::

!!::"i: : *.:i~.:!:2:..:.!.:::"2i:.-The.ISFSI ~Ma nag e~r: Is respon*sible::* t forappro*val o:f *allimpl**:

em:enting':i:::::i**:::*::: " : '"";'" -:1.:: Th r:scaequsirements: for handing:, storagpleshippti~ng cl~teanembing,

i and~ :*"*i

-suprlserv *,ation ia l.. of-ma.erials, and:equ ipment ::::: shall be~ :::..i--"?.i.: doc me te.:in::*.:.::::i

.*: :" !:!:i~i :::::.:/
'*:ap p ro v ed p ro ced u res.
...: i. :* ::: * :::i:i:
L.i:*:.:::: : *::i*::
.*
:.:::.c:bovrinand ::it~pr~oetvednviromentrs;, suhatspeinier!it vals a
  • tmospherei::i::
i:.

hand::! lting:tools, .andi~ equip~mentto a e sueafan adequatey mntied::.-::: handling::.:: of;,"*,.*:::*ii*.ii::

':i:! :i*I

,:, ::,":::!i:!!:.:,..: i :!i::':;: /.!:. !*....:. ::;::..;::-i.

  • ,:. :,"" *; ;,*:., ' LII.*,
  • i,:*:.-:*-:i*:*.:
  • i*il-

, :,.

  • H L :L :-.

............... ':.i:***:*

  • -.,i: ::::::? :*: **:i*i:-!:!::i:**::ii

":, i;- i i: *i !iii-!*:*I :, ili,.ii .... **: :.:::i:i:::!* ** : *:!!::*

-.. :*,:i!::*::..:::**

,:.:L :.... .-.,-:I*."::T iiI :::.i :.i* *.* !!i

  • i:*::
..:::::::::i:i*:*i:i:.*9 i,*i:i*
  • ii::*::::::*ii i.:::
i
! !*:il
  • i:i
  • *i:!i
i:
i:::,*,

i::i:::::.:*

  • ' ' **:.*handling personnel. :Other special shipments which requir~e sPecbial:.....
... ;-*@:.::@i.:*:*@equipmenit and handling: willibe *handled by knowledgeable an~d trained !" !. *
-i.!!;..-:::.:::.7,:Storage.o~f material and equipment will be in areas.free from fumes,
.
-::i::
vapors, s.iand
dust.Storage will be in areas protected frobm the weather,. : !/..:.*;
-:.";;::.::;*i!

as approm~; epr~ifjate, andinthorichemical wti*;: storage wislxludd: ecp b::ih a e s:;-!.:.*:i.:::::*:.:::::.:!:;::::.:.

:.:.:"i:which s~atisfy :th~e h;andling and.storage: requirements specifiedO: for the;::.:: ;::i::.. :
.XIV.

..::.:,::.. :....:T......T..-..::... TI ~ t :...

l.

i i!!.*:i!* iiii:.* !!i - + m iiii iii! i!i i!: iii:.":::!"1:.i::: i-:.The DPC istaff:is !.responsib*le for ensuring tha~t the status~of operating.:.'!I -..":'::":.::--.::".eq uip ment o.:r :systems s*to;.be ::removed: from.se rvice fo r: m ain~tenance:,;;: i-.:: .-:test, :Inspection, r~epair, or: modification Is in.accordance with :;the:. ::.;i

.i;

-.-::*-i:

c ompliance witth approved iproc~edures and shall ensUre in~spectioni~::i:*:ii:!::i::

.!:::.*i:

  • ::!:; *..i"*results :are pro*perly rlogged.;,! :They:. s halli establish the :probedIurebs. ifo r : -i.* ;:
  • :: i.-:

. i:iv:..... imple~m~enting :the work inspection or status sheets during imaintenance,;*:: /:*"i

  • ".'i:. ***:!properly loggebd. !:Th~e*D*PC staff *is *also responsibl*e fr ithe con~trol f *:.ii:!- :
! !i!::!i!i: i!i:: !i:*ii:

iili C. Reauirements

1. Equipment or systems not ready for normal service shall be clearly identified by use of tags.
i. :..: ::'.
  • i:':.:"
.:..:...:~i.*2;.:..: Equipment :or syst~em ;inspec~tion :an~d :test statu~s ishall be.indicatedi:::::-.*::.i:.i::::.
  • .::i.:"!:!!::!:i~ii:::3;i:I. ::SS~s :that :!a~re fou~nd. itobe un ac*eptable:i durin:g. !or :a fter tefsting :s hall::: :::!:::!*:!:i

!:~i*ii***i:.:.!:iii:.,:: Th~i.. is section estbliishes measures t~o: :assure t:hat :onditions:advese *:. :::"*.i:

.- :~ii!::
devi atio n s:,, defe~ctive :m ate ri al a nd.,equip ment,; a nd no0n-co0n form an ce:s aref!..:-'- :

..::... :* promptly Ideintified~a~n~d corrected.-, T:his inicldies: the control: of materials:;: :.: parts, or-comp~onents thati do not: conform !to! requirements,.ther~eby..*:i::...:;i:... :::*i. ~~preventing :their inadvertent: use ori :installation. ".::

-;: :::: ::.:..::i::..:::::::.:::.::.::::*i*i::
.B*::. :.ResponslbilitieS*:,: : ::...!...;
Q A PO;i*

':*::ii:::::::

1. Thi:*i:iie DPC.: stafi s ri::iespons:ibl:e :for iesta:blisini:gi
.;!: :::!i:i ii*::~i*i::i.:;:i:!..i:

i:;::!: *!: :::i :::i~i: *i/ *.:ii:2 2 ::i!!ii*:::iii;::*:::: ::2 2 procedures:.: for.:::*..: the

.::*::.:.- ::!"!*!ii :!.ii*!. ::
  • ..:*i:*
      • ii**.:*::*:*:!*:;i*;::*::!iR e v.::2 9 :*:.,:
i.*! ii
.. i.. ;
.::"-identification, !review,: and correction of conditions adverse to quality: :i

.:!i: .:~: *.: i ::]:!!,whi~ch :includes the control, evaluation, and disposition of deficien~t::i*, i-:.

i*)?i?
-::.~i.:.:2;i:.: The D C p*sta~ff is Lrespon~sible :for reva*iewin*g. no nconfor~ming ;items ti*hat!*:i~~~

.:::!:;..~*!*ii* !..:i::?i!*::canrnot:b~e co~rr~ected ;by )vendor a-ctilon anld :recomm~ending :dispositio)n*):.) ':.:-i

?I3. i?!Thie iDPC staff ;is irespo nsible
for
  • rev~iewing condition rsadve~rse: toi;*.:. ::i:*-
  • :.-:i:)::ii.:.quality to. determ~ine the: cause.of the condition; and for: rec*ommending;
  • ..I-). !::i.i;:.

correctivect action

pr toe preclude repetition.i:* i.!~i:.)": :!i~::.::i:i~!-.-..I:IIi:/: :..]

I. ~1. i :::iii i; **!~i**:*:**i*:]:d~eficiencie*s,-

  • devi~atio:ns,~defective m*aterial *and equ*ipm~ent, shiall ~bei:*i:!;

iii!*:;

  • :*:: ;:.:i:*:i!**:ii:

i,*:iir,*ieported ion ia corre[ctiveI *ac*tio0n :d~ocument.: Materials, iparts!,ib*::*i or

i: i;~ii*ii*:*l*:i**
!:.:.i::iil'-':i:!

placedi~ii~~::: i n l::; a holid *st atu[s,. No*nconforming items, shallii remai~n' i n*:: a..i...::!?;!!i~!i*i :;:::i!

  • .-:i:i:

..ii!)*..

.-segregated *area :until *approved disposition: has been determined:i:)- :.i-:*..:*
  • 0L','. '... 0;': i'...i ): :.
  • :...:).'.-:.:---i.:i.,i..'.:

2.: i:The corr~ec~tive action do~cument shall identify :the condition, :the cause- ;.!:l~ all nonco~nforming items and requested to: correCt the deficiencies.:::;: r:

ii ::i
e'spon sible ~fo
r*i coor dinabting ::the !dis pos ition* ofa deficienht: :i t~ems.Wit hi : !i *ii [iili

- o***!!*:*r reject..I:`t~e~ms :shall *be r*epaired or r:eworkedi only: in; ac*co~rdance withi-*i:::!*

approved probcedUres and sha~ll be re-inspected after rePair
by :the: QA: i::III:

.. specialist:I Engineer:. DPC staff :shall ensure ithat documented ~and:.: :i: :: : iappro:ved procedures are availabl~e prior t;!° repair or irework.:::i!:**:i* ii!:!; !:::i i:i : !*!i ~:5... l5ii:.;tem*s.iwhich iare accepted i~for us~e witha :known defiiciency shall b;ie fullyi

*:::i ii:i)::i: :i: :idocumente~td with ~th~especificatio n !:re quirement, j]ustification *:f~or:i*i*::

ii::i !;:i~!:ilL:i~:::i* ir;]i~:ac;eptanice, and effect !of such u:;se;*i Alli such :iitems lshall b*1e :a~p~provediii:

i!:iii::i

!i!i!:::: :::i:!:.;irecommen:0d e~d or*rec*tive. a~ctio~n:s tha a*in*:voliv~e :a d*e~s~ign ncha*nge, *:..shall! :b-e~i "::"'i*:!:========re=====viewedi by :DP pcstaff or: appiciiable :Design n::Author*ity. (r~ef.: Appen*di~x :::... i ii! L ."'"10CFR21I.shall* be :reported In accordance with: approbved.:pr*ocedur~es'..".. XVI. QUALITY ASSURANCE RECORDS Q D. 23 R ev. 29i.::i.:*:*.*. .:...:*.!:*:: :.::..:.: *:..iL:

  • i:

.ii23 ;::):: ,: ":::)...." : -.. " D':"

i:!iiiii
...-L. :..:..:.-...:-..'

ii*.::.*ii!ill:I

  • i: ' ::::*!i!:

A. General: /..-:: <..::;.:.,.:., ::'.-:.:::./::.- -:--.:..-:

      • .*:*iii'i:!!.
  • i:i:::i*i::i::.i;!:i*:*i*::.*¸.

i:/thle oper~ati.on, mi:m.ntenance, :installation, rfepa~ir,: and modification o*f ISFS!::;;**I.

    • ;SScs, :alnd ithe :decommissioning: activities, covered :by the QAP.Di:. Also**::!.*:;!***::

"-infcl ud ed iareh i storical~i reco rds g athe red a nd -c oll!ected; d uring gpl!ant :*and ::i::*::i.: : : :!iii

?ISFS I op*erations; which
are either re t*q Uired to blsupporti th e dry~i icaski sltor~age*i*:: ::.iii
  • !;**exe~mpt from r~ecords ;keeping ir~equirements
    :inaccor~dance *:with :thei ter~ms iofi-*
i:iany iNRC-appro*ved irecords exem ption nth*at"may be g ra nted :.to :!SOLUTi*ONS:::.
  • 1.:
- :T*.::*he DPC staff::is:respor~sib~e for establishing the requirements of :this.

se c tion... .:::.,. i::i'i:

  • i:*

'.i*:.:/;ii:.

  • c:ontrolled and stored in: accordabnce with iwritten !Pr~o~cedures.*; The riecordl:
(
. i:::!i:i
;.
;;. ;: ::!~:system~;!]. inlude~s theii@ *rete ntion of *thioseii d~esign, f!abricatio0n, *in~specttb?

ion, ::*:;

.iii
::
    • ***. ~~;:.:
  • i:::
i:i*; ic::borr*es pondin j :m anufactur:ing,,i:;nstalliation;,:. Insp~ctio:n,.itest, :and iaudeiti::i*i?*!:

-.!ii::i;:::..i i*?::::.. -::*.:;:i:specified ini: approv*ed pro~cedur*ies::. QA riecor~ds shal be:: pro*: tected::** ::.;!.*::!~:!:! .i.!:. :i;~:::::/"::::.::

!
/;*;with :a *mean~s ob.f matching *therecord.d:;to the item; or activity ;to whlich;:f~ ::it
i
  • i:

"..:..:::::i *:*subcon~t'racto~rs/sub-supplier~s,.theorigin~alQA r~ecord of the ~deliverables.i iiii i iiii i -:will:be. transmitted to SOLUTIONS or DPC When applicable:i:.iii-::i:.i*.i-l:..

  • ii:.I:

~i:

  • .ii:?:.:i.i :i2l.i A,.:i:i!:.:.

2::uthie ntic-ation:. - Docum*ents s hall be! *onsid~ered valid~: ireco:rds.o nljy i*ifii~l l~~ . :*: :::i

: :;~i:i::::~i::::: :":::":"::*i!!stamip~ed,:;' i~nitiale d, or *s ig ned :anda dated* by-a uth*ori'zed :.p ers oinel or!:*!ii:.*ii.!i:*:::i::
  • .:.*.:::*:.**i:*:!::i:i*i!**:/:**;:::!!:*:::*:ii:othritW~ise authentlicated, :including th~e :u~se o*:fel bectr~onic approval iarnd~i::i;.i.
-!i'.i:ii?!i!:~:;::~i*:.i:-ii:i;ii.::i:.**:*aUthur*ization.
  • iThis: authen~ticat~ion may t:!ake ithe form o.f a i*statemenht biy!:;i.:*

. *..iii* i/ *ii.::::: i::.:!:ii:ithe rei~sponisible, individu~ali or organlizat!Qion*.Han~dwriitten isignlatures i~arei**:i~:

ii*i::.*:;
i;:.i~~i:.:! : ::*;:::*;*.
  • !::no require.. d; if* thea docu ment :is clearl ! id enti fied as ia :st atement bY *th e:*;::::

!.:;:: ;*: :. :: :;.: ;.repo rtin g* ciniv idu al or i:org anrizat ion. :,T h es e: reco0rds-m ay* b e !orig inoals or0*::i:!: ':: :* :..: *::*'i ::"i,.:.* ::.::: i i ii;.:.::.:3:.:;:.3: Indexing -*. The records indexing system.must incl ude :records:.*i.:: ii:":" i dentif~ication, l;ocation of the record :within ~the isystem, and ~iminimum:.:ii.i -- ii;..:!:.:Hir etention. tim e. I:Th1e re~co rds and/or ind exinrig sy/ste m(s) :shall I ipro~videi:.;::.* QAPD 24 Rev. 29 ,.,*+*.,.,,,,,:,,,:,*,:,...,:, !i:*i:::i!i:::: .ii :,:*:: i*v:i:!29

  • ::i :'i::: ! :i.:!:

ii

!:i!i :i : i

:::i:i: ilili
  • !:::!i!?:;::::-!sufficient; info.rmation to permit ;identtification between the: recor~d"anid the:.

4*.li*i.!

": ;i 4:::~.Distirib~ut[ ion:: a:nd: Cntroli..; The records shlla. be distributed, h~ian dledi! ai!nd::
.cntoledinacoranewitritten np rocedulres. Measuresa*iha!.!. ble.*.zi ;
-
established to preclude the entryi of :unauthorized personnel inito :the:.::i*::::
  • i::iiii.:.;!i:.;
i::*i.::~:stor~ag e requirements !as either lfifetime o r nonpermanient'. R*eco*rds :~ithat:*

.*i::i**?.:,:..:;::**::*.%~imeet.any..of :the efollo~wing 'criteria ~are idesignated Lifetime e"r~ecords ::anid~ii~.:;;i

  • iii::I
.!!!:i:*!:i.iii*!* m ds,

m ust a n d : be m aintained.;!::*-*..:::..:i *i.:*

  • i -:; ::.
...-i.: ::".. ~i:...:i.:~i*-

-i:..

.'::" ; ':i":'-T:il*

i! : *:

a.

..:aiProject lifetime.*records shall.include, as a minimum, design:

  • i.

and interface control drawings, copies of material i.test reports,.-...i ..;i.::/ ii~ ;: :;'::i:inclUding examination :reports*,' and nonconforman~cel re~portsii.;i!:~*:iii

.: :*-:i*:*.:

of:**

.:*f!the itemlm"!ife iof..the facility, ior life: of the license, i.as aiipplicable.:..:*

=============.::!::.s tandaa~rds (.le:g.i: O1C FR 7.i,.::10:: C:FR :72) w)-:ill'-be iin clud ed:.ini thl

  • e: r*et entio n.:

i:.*-.'::*...- .. :6.. - :.-6::Storage Requirements.:-:.The :records shall be stored; rIn: predetermined i:.i:*

    • i======================
.i ::.;.:*::location(s) that a:meet :the lrequir~ements..of appllicable standards, :codes,;i.:::::
  • i::*:ii:: ::~.*i-.

i: :::i!:*:..:: :!i~i

*::i::i*!and regulaor at:Yiige nc*ies..i. Prio~r: *toisto:ra ge o!f r!e c ords,i: a w:ritte*n s:tor~iage*..i:*:

Z '"

"""':l*

""*" "' I".Records

  • shall be stored.to. prevent..damageifr'om moistureor?.:"***
" :temperatur~ei:.:A~ll records m aintained in hard:copy fo:rm shiall b~e firmly:-

..... :: attac~hed: to bi!ndersi or..placed in: :folderts, e:nvelopes, o:r :boxes fo;{ri::!::::.i* ::.:;

.-:*::storage in file :.cabinets or within :containreis on :shelving. :Records miay:**.
  • ::*:i:.i:*i**.:!i.*i::;::*::i:::b:i!le::

stored' i in i:belectr onic :media: pro~vide~d that: the '*process :for mi:anha * *g::ing i..

ii ::*-:::.::.:::-

a.:*::

i:*?Re~cords :shall b:ie stor ied in fiacilities ~that minimize the :risk of damage
.: 1!: : : i.,.¸ QAPD 5.-....
Rev:29.".:::::":"

.b. Natural di sa sters suc h.a s :Win d, fl ood,, or fires;...,.:..:-.:. :..:/.:*f.V:i.:. :. S-:.

-:c.

E::Jnvi~ron*m-ental c:o nditions : sucbh as{ hig

i::a n d :low: temper*atures iand:a*::i :.

S"d::. !Inf:jiestationby* :insects, moldi:. or r:odents.ii:~i: !:.-:7:.: D~isposition-Va~riou s i:reg ulatory agencies ihave: :req~u~irementsi~~*:i{ii: c*:*:::. on~cerning records-that are. withini th-e scope: of thie QAPD. :The::

}
    • :*stringent ir~equire~ments sha~ll be: usedl in !:determining ;the :.finhali:i::~::ii most.

!.i XVI I.

" A::"

LUiT l-.}:, : : -:i::::'<:" ":x.i!,:::::"",,':,:!i \\*:.-. G ene ral

This section :establishes }the requir~ements for a system ::of planned and ii::"::::::::::::

.documented.audits to} verify complianCe with all aspects of the :QA program..================ ,and to. assess the, effectiveness of the program as. it applies to.the ISF:SI,:. The system provides for thee reporting d and review u of audit results by :!*:*:.i~::(:::::!;:.:::*::::!:::i !i:*~i:*::

  • //

chec:!~i:i/* kli~sts.i :des~igna:tin~g ::andc itraiani~ng gaudit pei: rsonnel, !:and*I con ducting:#::::::k i:i*:! **d a u d its..*

  • d i s *" i' *~ i b @ *:**:*!:.,** :i *i:*:*i-i:i*:*:*:i:} i::::::: ::::::::::::::::::: :::::::.!===============================
    ~::d.U :
B.
..*..:::!~2:

ThebiQA :S~pe~ciaJi stl / i:En g in~e* :er peforims :in depe n d en*trevieW an d aui dit i:to:.:l:: :! ., : ": bv:: " verify that *th~e ISFSi :is being maintained :consisstentt w:ith ~company.::*::i:(::i:!i::::*i~

.: i :!::!.

safetyey administrative, andd llicensing provisions.

. :!: :::::"::.. :::i::::}-!:V:.:-;:i,: ::ii !!::

C. R e a u lre m e n ts:: .: b ~ e ~ ~ n s {*:i*!; :;iii:i*i: ..:::i!i:

  • i ::::: *i:i!

{*!iiE~*IEi

/: ;:::*::i i; :i* :* :: :ii::: ::!{ *}.**

.:***i

:i:'": i:::!

.:: i : :: i-:{i :;:*i*i!! *}: i~ii*i": :*:,; 1.*:::*i;;

  • i A udcit i}Shal i:: be p~ierform;e d i~n a*ccorda*nc e ::w ith: written pi;*rocedur esi! or ii~! !: :::

i:.ii:i*i!:

checkl!is~ts! by appropriately ~trained p~er*sonnel: haviing no 6!*dir~ect:.ii:*: i::.:::!'I:: :{

-:=================:.i ri*-espo nsibil ities in.the eartea audi ted.: *Defici encie6s from ip rev*io us sau dit s i -ii:*

}
:}::shall-be r~eViewed a nd re-;audited:, as appropriate:.-The checklists ar:e :::,: ::
. 2:;. AUdlits may b~e conducted by th~e' QA Specialist I :Eng~ineer :or: other.
}::a

.,... :.qualified personnel,. such ~as technical specialists from other: :;::-...;.::;i 3.::::::::::

Au~dit *an i :s u~rveillance iresults :sh alli b:e idocumented :a~n~d reviewed wi*th.,: :. :ii
.!~i i:::i:::*:i:*!isu:pervisi~on r.ie~sponsible..for the ar.!ea audit~ed, who sh0::fall:take necessary!.:::{::
.}:!:i.:::. action :to corr*ect r!epo~rted dleficiencies. i:Follow-up-actionin:rcludciJng r:ie- ::::ili:

,-:;:.s~l;::

i.,:a~udit/re-survey of0 d:eficien*t ara,,

!aS:is ini~tiated :a s }dee~med Jappr*oprli~at~e:...,,:i:i::

:=:.*:~*:::*:::.*!*:

, ~ i: iii 6 ::i:i.i/:::i:!2 6 R e v. 2 9.ii~

.; : :.::}.!i!i::! :ii::i!::.::.:ii}::::R v }2 9 :::i:

QA..:. P.

4. i:i!iii!T~he Q:*A:iSpecialisti i!iEng*ine!er: s*hall *::assess :the following:~**~**

iiiili:ii: ii!:iii::iii*i!!i:! i*!ii:ii iil iiiiiiiii!i:

  • iiii*ii!*iiiiiiii*ii*iii ii
a..!], cviaui:,:*1/

I! U:!..! qua!i !/ ii t 1M!I y dl ~i UlI!:d:IIUC plli:aJ!ULl;iucb, p":i

  • !U UCU U5I dIKED~J[

]i: ii]:i :::] i i~: i*,*:ii.:!::. iii ~ ~ii:* b: effecud t!i v c endUess of implremethati the oiowin; gand. aS reiiauitd:iiii i*ii:::~iii:!*iili: :

i::ii~J
i!i~~ii:i:licii.iii !..: il : i :i* i i th i A cno mac wi th approv01 i i e d~iiICaiii proedureal os.

iand;ia!* ~ b *ii~ !*eiili i:ii !:i: :i* !*iii Aud*:i::i.l it:!i sche:*

iii ii*i**.d ulesi ass~ii*i~i:*ur.

e thatlii:i i**.:i the* folo in areasi1241 are.o:~i: audited at t~he.iii i!ii**ii:**

i:i::ii*

il ::!3:ii**ii**i i*ii i ndiii i cated**:i:ii*

  • ii:*i:*i frequenc
  • [*
  • i :* *d* i*ies or m ore frequently as perform ance dictates.
  • iii;::*i*

lii

  • i ~ii:::**
  • l3**iiii*ii*:i
i:i*i*3i:
i.**:i ii :i::*ii*:i*3i~ii:::::*:ii:i*i**

i::i:. ii i!i 6:::::::::::Training and qualifications of the staff.. Actions taken to correct deficiencies occurring with equipment, structure, systems, or method of operation that affect nuclear safety. .:-::..ill* -:i::.:.

.i.
  • ,: : :;:::7:::::i :i,

,***/-., Perorm nc of,:.:..-.:,:** ac ivities.. ::-*. 3: :.:. -::*.::..) required:b the

  • QA: program to:::::
,.i*:: ::"

meet:*:::.!::~u*arH:ai!l::i:O**CFR::7 .i:i8*b r :~ :3:*!:i:.:,i:::~l: thecrteia f 0 FR 0,Apen ix B 3, 10: CFR: 71:: i:::::*:*~::~:iii*:*!:i:i**i*i,::

i::::i:*:
.i"

docume::::*::*!* n 0:ted

  • .*andarog ht 1.etPo th ate~nt~ioe n olefo!the Pr

~etsMaagder and.. ill 3:::

::.::::::::::::::::::::::9.::::: External audits.or s*:urveys of: suppliers: providing3 Imp~ortant:* To afety::***! I
materials,.

parts, eq::::i;::i::*f* U nyi~i*mom3:*rquipmentlo services 1f imare perormd at th~e~s*::

  • i nd*::*
i cated*:::
  • i**.::::::::::::::::::Ii*:::
!::!: ii(!i:~i:
  • .*!3!*i:iiifrequency::. :i!iii!***::

o~*r*S moefeunl as pn*'::i me~:j**i!erformanc dici~i t:J~ :a~n:tes. n*:~ iies*i:i::i: .i:;!-!*i:: i ::::.!*::::::i*!::*: :: *:!:i:3::::ii:3i:i*0. 3a.Suppliers provdingdi.:by:. co m riali gradei calibrationie a ndte stitng service:sin i::.:: i:ii~i~ii::: who:::::::::: ar::i:i*:* en :accredited. by a m* n at* i onally: re3i co gnize d accredi* i.T tin:gil::~ : *lbody, uiong:i::::i: ii:*:!:ii:::: !:ii::i.. i:::::* *.!)::procedures. consistent w ith: th o se. found In A N SI/ISO IIE C 17025!3

i*i:.::::!;:*:!!:~i~!:*i*::

-:!i.*::*i**!:..!:::*

  • i:::Z::::!**:i*:: ::::::::::::::::::: :::ili.iiF[: ":: i:":F:::..: ::: ! *:*i!* 3: *:! :*: 3 i:i.:( :*i i (::i~i *::::*Q i:*:*:*:**:!.:*

General:::i*i!*ii** Requirements for the Competence:: of-::::J:;*:;*!: Testing::: and3: 'Calibration:::::::::::::::

  • i *i i
  • i i *i¸ ::: :i:: ;z:.*.: :::: i:i:i*,:!.i:
i.
  • :Labo0rato0ries~i, do: not h a ve tob be p erio0dically :su rveyed: !if th cbi*onditions ::::i:i*:i*:
  • i;i of the N RC iSafetyi Evialualtion dated iFebruary 9, 20i 15 :are *met (seei *':I ! ::

Apeni x B. onros hal be etbise in ap ical prcdue to ensure~ii.: the:::::::::

  • .!!i ;ii:;i::*::*2 r qi rem entsii*:::2
  • *.::;i: of
  • i*

i*:i.:: the N RCi Safety:::::::::::::: E valuation?}:i:-.**: are satisfied.) il~::.:i:**::*!::::i;,iii:!::*:*!.:!i.::

  • 1:::?:i;!i~:::.;i:
  • ... :. :.>i.:H, : :...:...::...,.....:.:.:.,....

,+: :,:,L.¸. -<-.>::::,

:/..:> :: :.
  • .* * *! !! **ii*,**.
  • ii*!i*.!**

.i..*iii/*. i *i**. iI* ii *i i*il

  • i i!*i!**I

.i*i* i:i*I ii!i! i!i!! i!¸

  • *=*
  • !* i *IL*:*¸
i
  • :i:il;*!

i;,*:: -.' " ::':: * "* *i: :,'*:: * :.i'*-* ;:.:.,'.. ::,:;*.* .! :ii:..i:i:i +.:i:::

  • ii ill i i:ii:ii i ii*i

. *i* i*;

  • ii*,ii* i*!!*iii'!*iI
  • i i i*,
  • * *i iiI* i ii i i!i* !i i *
r.-
"'::'/,...

ii* i ii" ili*i*i*i* i;i!:* ii i i* *i!* '..'..' i.i..*./.': " i:i: *

,,*: -.-:*:i: :: ::.:%1..

!!i! !i! ill il i i:*- /i*!i !ii

  • iii!i ii/i i i!iii!:i*
  • i *:iii
  • i i**.
  • iii*!*iii*i ill i *! i *i!

ii!i**!*

  • -:i:i:i*!*:i::i*
    ::iiii:

!*: !i:!::::

  • .ilr i:

QAPD 28 Rev.

!..,.i~i*.:-
"
I.iMPOrT.ANT TO1 sAFETY STRUCTruRES. SYSTEMS AND CoMPONENTS:i,:.:. -. :.

. The pertinent qual~ity as~surance requirements of.10 CFR 50, *Appendix :B, 10::I CFR :71!IIi i~i.. Subpart H and 10 CFR: 72 Subpart G will be applied, as a. minimum, to all qualityi-::.* i:i: ...i i.:activities.affecting.the I!mpo rtant TO Safety (ITS) StructuresiSystems and: =* :.* bi.i::ased on.e~ngineering ieval~uations :and :a revision ito t'he INAC-MPC FISA:R*I. :Th~ese!l~:!:::::I

  • not considered**a :redutionintihi~***le comnmitmenjs to :the ::QAPO.::v::*i
  • i~:*::::. !, ',!:!ii:-:::iiii:i::*:
  • The quality cl~assification :of NRC,-licensed Dry Spent"Fuel Storage Components and.

',..Transportation.:Pa~ckages. may.:not be r;evised:.using the iLACBW W*Design ::Control!i:~~:*:!:!!

.:process. *Th~ese :modifica~tions must :be :made :by the Certifica.te Holder. *The*::::i*-:.:!::I::

il:Certificate :Holder is rlespOnsible for idesign and licensing ~icontrols f(orthesei:; I.!::.;:. I*: c.:::,ompo nentsubn der: the ir NRC-appro~ved Quality: A ssuran ce ;iProgram. SOL uTI/oNS!.:I.;

.
  • utilizes these :types ~of.components land *packages* under.:the provisions of a NRCii;::i:i:
.iGeneral-:License fori!Radioactive Material Transportationi Packages (10 :CFR 71ii) ~andi.

I::*:?tems and :services:associated with P:*ackaging and :Transportation of; Radioactive' i: :: "*"i.Materdia s described ::in 10:i :C FR!71:,: andi i ndep*endent:; Sto6rag e: of:Spent N~fuclear: F~uelI.: ..:,as sdescribed*in 1.:;t0 C FR :72,; willials o* fall ;under ;the r*eq'uiremen*ts: of: the:QAPD."*:.ii-.:: :. !!i* :i! "ii:

  • 'i!::ii

!:: :'-i.:*::i.i::.

i:i
  • ".i i.:::!
..iii::i:.::.:..ii::*
?:!*i.:'*
": ":. i:i:i:*:i:ii:::

i.i:.

i :::ii*.i?

packages are defined below :...

ii::L ii:.iiii*;;ii!i!;;*
  • !*:*ii!!ili:i,!?
A.i: ::

Dry Spent::::: Fuel Storage (10. C:FR 72)~i:!:.......

  • ii!:i!i!**i;i~:
i!iiiiiiiiiL:.:
  • ii*i:;:
!!*i:i!*!

!* ?*i:!i*i!** i i:iii*i*i!i*:::;*i ii i* Quality

  • Design
.
  • '::..J
i:..::i::.:.:: S-s c"":ii ~i::

Cateaorv:. !::*:*:i::::**i:::.:iDesign::*!:'.:.i:::i*:

  • %"*Auth0dtv:i:*!:...::;i" T.ransportable Storage:Can~ister and Fuel Basket Assembly:.! i-:"I:"... A'::

.::-NAC Intl'.:..,I :.. ISFSI P ad. .... "....--: * : :.,: :,... :.... :--..: ',.:- : - C... .,. -D PC.....: Laaiftinn:g" Y oke .B NAC Intl. ! ::i:::::*!i: :.i::::U :.::.".*.:i

        • "i-
          :..::

"!::" A ::.:".:I.:*:: A : n L:::i... *: ii¸;i:i.*!:i:::i::

  • .:i::*:ii:!':*.

!:il

?* :*:

i!* iil i!::i* i::::i !i i:: i:i' il ii !* ii i:I QAD29Rv.2 QAPD -:. i:. : i: i*:::*

  • !i::i::,:
    ii*ii:::*i*:

i,

::i!
i::*::,
i:i:!:!i:ii:

i!i*.i:i

  • L*:

i ii*i

, :::!: i**,::

i..:"" :*:i y: :": II::'" " i:...ii.i PP N I A:! : ""APPENDIX A.ii::: i./ ~ii: *!-:i (Page 2 of 2) IMPORTANT TO SAFETY. STRUCTURES. SYSTEMS AND COMPONENTS B. Transport of Spent Fuel and GTCC Waste (10 CFR 71) ,-:. :.:. :.i ; .i::*:"

.} : ::" SC.:. '

.Qa itgoy.-.,*; Design"Authority" Transportable Stora e. Canisters and Fuel Basket Assembiy....I" A... ' NAG Intl:. Damaged Fuel Can:.-.:-.. / !"I;"" A : ".:NAG Intl. Transportable Storage Canister and Basket Assembly For GTCC.I' A" NAGI*,:

intl.

W aste Containers: "__"_____I___""._:-I__"" Storage Transp~ort-Cask. (STC): :"". A'.". "NAG Intl..": C. Radioactive-Material Transport Packages (10 CFR.71) Radioactive M~aterial. Transport.Packages subject to the *provisions of 10. CFR 7:1, S~ubpart C,:. uG eneral.LicernSes,:=' are ;iim portant.:To..Safety and subject:.to i;the* . a~pplicable :requ!irem ents.. of the6 QAPDi:::I..;:! .::..":i ".:: .:.*.::~::.*:

i.
.:::!:::
1. S::::i{::}ee NA*C-MPC **Final ~:*Sa~fety* A*na~yis.:

Report ifor additiionalJclassification:***::.i:}:!::: in fo rm a tio n. [ f r a lc *:*:

::.i.":.:. :......./!:: i:: :i::.

.:.:i.. : ;: : ::::: :. :: ::::::::::::::::::: I: .2. See NAG Storage *Transport Cask (STC) Final Safety Analysis Report and

  • associated NAC specifications for additional* classification information.
3. For the definitionof QualitY Categories A, B:, and C refer to NUREG/CR-6407:.

QAPD 30 QAPD 30Rev. 29

i::,.. :i.lrl:¸,:I:;¸: A*iii;i

  • ~**

i PPEND IX Bi~. !i*i*i

!i,i EPT:

!*::IONS: ":" ii*:::***

  • .i~iii~:*
REG ULATORY C:OMMITMENTS. ALTERNATIVES ANDi EXCI l

11.0..:REGULATORY :COMMITMENTs .1.1 Regulatory Guide 1.8, 1I-R-5/7, Pesne Seletion end Training 1;;.;:,;::!:2..

.;;;::Regulatory iGuide 1.10, Ri;;evisIon 2.(3/05), "Establishing.Quialit~y iii Assuanc Proram forPacagig Usd i theTrasporatin o

........ :i*i::iii:ii*..i*...i:: +.. - l -w *.*...

ii:i*!i;!i:!::*:;:iiiii!i:i:iiiiiii*i*iii*:*::

"";*:i.1l.*TUI .JiOC'liii..Wli.Jiir US.II.:.:.C.J*tl LCLIUIIl i ittislaljiliiu OIIUi LIE 7 i; i::Fueli iSitoria ge::: iSyte m* rC:Om*pon ents A~ccording ito:*il Iportant to ;Safety!i:;i,:i~i (2 /..9.6)...". 2.0 S2.1 N;i ii ucl]ear; Energy:; Insti~tute :(N EEI)! N E !~4i-05 5ii" Guid elines for :the Us e o**f

i~ li li:~;I:i Accred ita tion ::in iLieuJi: of Commrre ci al* Grade !S urvieys for P rocbureme n~t! obfi~lii::*::

S Laboratory Calibration and :Testl Services,"; revision Q. and associated :;:*i i*/ !~ ; :*iii!:** ii:3.0~*:!:*¸ ......,. H..,..,.. None:.'

.*i/-::i.*ii i*.!*'.
//
*:* :i.:,,*.*i*!*

i.i:ii.*iI .-.....-.....- -..-.. H....... H.............. H..,. i: ;*:}ili!i:!.;: i:!::

============================2::*;::::*;;i:

/:*::!:}i
:i:::: :!:i:,:,,:,:

i::'..'i*,, ":i ! ii::.::i :,.!.!'.i:!;:'.: :"" : :.' i:i : /:., _ :. :.::... :.::. iiil! i' ..:,:. : :- :. :- :*..:r', :.'" r "....:

" :"* " ":: ' *. "':'.:::.',", ii i!
0*PD; Q

A PD 31'i*:* ~ !i i:::il i ii~i*ii~i:-. Rev. 29!;i~~~i*!~

  • i ! i*:ii*:,ill *:i::*!i:il;i*iiii :* :*iii*ii*i!ii::i*:*i iii i:::i*i:i!i
  • i*i*i:il::¸
!;
i::':i:* i* :*;*;*/;:i::*;*i':*:*i:;2*i*;!:*;:.

i:!.-*itiii.:iii":i!i;}!*i:*!i(i:.i*i. .(Page 1l of 4). "".-,-:'-,.' '.;-:b.. : ....,:,' ' :."":i:.': :. :.i:":-:.. i,} ::/ .,. 'i:i/i .}i},ADMINISTRATIVE CGONTROLS.:I il,..i~I.~I:.:I::.ii ~,":i :.i}i}~ 'i:These Administr~ative :Control eedvloe osport; opertation of the L{ACBWR /;.ii:;planrti whiilie: :inh. SA:FSTOR Ri(d.i smantlem~ent)} and:-operationi~ of. the. LACBWRi i SF.Sii :i. : T3!;:i: '"hese r ~iequ ire~men ts~we re; pr~evious iyl :in clud ed :i n~ the: Tech nicail Speciifi cation0s :Zand~::. i w:

iii:!iere: :relaei.*bid iL6!to th.xpD!udg.!c!ved~~missinQAPD during-active,: decommissioning.!:::i:iiii:i:!:i~i!i*:~i:i!i!:!:*:.i~l
.::.}:;~..:*-;..;;}:::.

.fi;/::.i.:c:i overing :the :Pl ant dbcomm~is sio niJng a cti vi~tie s ref-reien ce d ibe low and din ji!! 1.1.3 Radiation Protection Program implementation. 1.2 Each procedure required by Section 1.1 above and programs listed in Section 2.1 through 2.5, and any changes theretog shall be independently reviewed by a Qualified Technical Reviewer and approved by the Project Manager or designee prior to implementation. 2::.-20: :PROGRAMS AND :MANUALS ".::

*,.,.,.:..:i!i!

i!i!: ii r:!:..::*:i:;.;eview.: Eice~nse~e-i nitiat ed]: ch anoes. to {theg iPC Cpshal i:b e su bmi[tted to*.iiii the :::. i

  • .!*!.;%{;!..i;;*.!i*which t.ihe chan.;.*ge(s) w*asma*d~ei~i. *This submittal shallicontai~ni :> ; ::
**i!
::!::,;i:}**;:::::
i:::::~~i:*:

con*:::!

  • forman*e iof the solidifi~ed waste :pr~oduc:t to,*existin~g criter~ia* for! ::; ::* * ;: : i; 2.1.:3::.Do:ume~ntaiotJn of :thie fact: that t:he change !has been reviewed a~nd :

i.i::found :acceptable :by a Qualified :Technical Reviewer.. ::: :*i:!

i: I i:-!.*

i:'::!::* .:*!:)}::*::::::

i:}i i:ii:;*!:::::i:i*

} iii i}:!i i i; i: ::i :i'i iii:!:!i*

i:::!:i*ili i*
!:i i: ii*

!*::::::i*

i:ii:/i::!:117

-', :.;..: : ".,'...'w::'::i Q;APD 32 Rev. 29:

:: *'!::}

i..: ;!: ii : ::32::... i... ........ R ei!.:29 :-i

  • ..: } :;.i:;"
APPENDiIXo:: C; (Page 2 of 4)}i

.-,::*.:* :;:..::.3-

..**?::

i::.::i *! :;";:ADM INISTRA ":i :./ :i* i.:... iVE CONTROLSi:;i.*ii~::i:& *~i/;:;

.:/ ":.:{
": 73/ii :: :-::::

In:i~.:i.::!formation submitted should consist of a package of :those -pages:

.i/i.! :.
.:::i:.. }.:::ii::.i:.,.* :::

of::.; /i}.6 the 00* CM :changed iwithi each page numbered.and providedi: : : }:. :"i

}::: "": ;.':{i-:w:itht an approval and date box, together with appropriatei:.!:;. }:::: i
  • i:,i::i:iiiiiii iil i!:!
i;.:::

'.:i ::-...::!:i:Sr~adioactive effluents and for maintaining the doses to miembers of the... :.::.i: {:/ ::;..: progra~m (1I). shalli be cobntained :in: th~e: 0DCM,:(2:)shall: be: implementedI.:i.:ii::!!i

i::: *:.by health :physics pr;*iocedu~res-ia nd: instru ctions,. anid :(3) shall :include !ii:}}:i;-;1* :~

.- T i * *." remedial actions to be ta~ken whenever.the pro0gram limits are exceeded:..};. " ..i.-:/}/,.:i:.:-:The program shall :include.'the following, elements:::. ..,. ?- }..?} 7. ; :.4.:: .... :.:.}.!*i:.:.-:¸,:.{.. Siii! iiiiii " !:.::¸.. :!:,1 "' i:'. ": ::;..'.i*

  • -.:. : ::: i*

2.i3.1~:,: imit:U !ation *s on i~*.the* :o perabii tyi io f-riad i oa ctive li:iq ui d : an d } ga~seo*us!*i ::ii ii / !:::i!.::*;:::: mo6n~ito rinig *in.istrume ntation,,including: surveillianrce *.te:sts and::ii:}! -i:*::i:::*.ii -:- -iset po6in0t:.deter~min*ation 1n{i a ccor~dance :with.:the:.meth Odology In.:ri the::~~ 2.3.2 L:;:im::: i tai*ii{io ns !on theico ncentratio~n s o;*f : rad~ioactive m iia :terial :!r*elesed..~

Y...In.I:

i.{i.liquid :effluent~s t;io:. unrestricted aeaas c;onfor~ming.to 10 Cii~:FR ::20,;i:

! } :::i*i{ii!ii
i..i*.:

i*:

. {i :{Y::i:*ii::!ii*:"i::.

.:ii: ::2.:3.i3 *iMonritor~ing, si.ampling an~d-analysis of radioactive liqu~id andai }: :i:!*:i';i: :iy.

  • .. i:;*

<:{.:aiir::T-}a!borne particulate in accordance withi 10 :CFR :20 and withi: th~e~i:i:i

  • -/

.: }::/":.:: methodolo*gy and iparameters described :in the 00CM:;.:*:i*::/`:::::.*.;*::*:}. i~;:i:..i..

i{ii
  • ii/.:

co:i:::¢m ]mitment: :to,a miember-* of the :public:. from radio~activematerila~ls:* }: i:iiii 2*;{i::':.}:

3.-5 ::;iDeterminaition :of: cumula.tive anid projected dose co ntributions} :.} ;.... :.i:.

.:.:}::::.vi.::.!il":;.from radioactive :effluenits-for :the current calendar quarter *a~nd:!:: * " :*::

.:.::-:*:.:;:.:::.:.::.icurrent :ca~lendar :year ;in* accor~dance" with the methodology :and...i-..,..-

": :"::."-i parameters Inaa the 00CM te atMatlesteve least:."-} every year.:; .:}: :i:i:;":!.:i..":"ii!, !*.!:i}:*i:/:i

,:::":::!!*i:*-:

Q A P..... O 33**`i*! !:**i`*.i:i.:ii;*:i***.!*:!:!;;:9 I..i::::i::! R ev. 29.3

  • ::::i::

i*:*::;i*

i*{*ii :

i:i:ii*!:*!:::::

i*.!i!:!*iii*i-:i:ii::*
ii i:
  • :.. i. " :!::;:

7"::i

...::{*i* *:*::*.*ii!iiiii: APPENbIX c (Page 3 of 4) ~1STRATIVECONIEOL....................... 2.3.6 Limitations on the annual and quarterly doses to a member of the public from tritlum and all radionuclides in particulate form with half-lives greater than eight days in gaseous effluents released to areas beyond the site boundary conforming to 10 CFR 50, Appendix I; 2.3.7 LimItations on the annu'aI dose or dose commitment to any member of the public due to release of radioactivity and to' radiation from uranium fuel cycle sources conforming to 40 CFR - Part 190. Radiological Environmental Monitorina Proa ram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. 'the' program shall provide representative measurements of radioacdvty In the highest potential exposure pathways. The program sha~l (1) be contained in the ODCM; (2) conform to the guidance of 10 CFR 50, Appendix I; and (3) Include the following: 2.4.1 Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters'described in the ODOM.' 2.4.2 Participation in an Interlaboratory Comparison Program to~ensure that independent checks on the precision and accuracy of the measurements of radioactive material in the environmental' sample matrices are performed aspart of the Quality Assurance Program for environmental monitoring. !i!:.:i:i*T*:*:!:iii:i!*::!):i!iii iiii 2...ii:i*::.:.

.ii,2:*5 i:

o.:.**::::**:*/:f

F.e~deral:R~egulations, i:the :following *:repo*rts shall be isub*mitted!:

priI

  • }iori to Orit~iM~aric~h *1.:: of f:eac~hy*e'ar. in: a~ccord ancewitjh ~i:10 C FR !:50ii*::L.4.

2.5.1 Annual Radiolo gical Environmental Monitoring ReM ni o inq e pi*-i!! i L:: i::::i:::!i::!liiE.ii:*:,orti: iiiii! ii!: !:{!::::::*!:::the report :ishall :ibe s::ubm*itted :notin1g :and iexplainin~g :the reasons:**:!:!::

i*:

for*:::::-:**:

:o::the: mis*sinig:i* reuit~s. T he mim ss ing data shall* be sulb mitted: as:!i -::.::://*::!::::

soon as possible In a supplementary report.su le niar~ie o~:::.:i:. ::. ~i:i:*i!:: :::::::::::::::::*:i!:i:i:!*iii::: i*:!:*

i)*:i:**

..; ;.:::i:::

,:{

.:. :::!:::i!.: !::i.,

!:i)i!i iiiiii:ii!

il

.'!i:*i:!:ii:::

- * ":.*i*):i::.*: ):)!!:!*::!::i .::::i*4.i *:*::::*!!ii!

i*;*i*)i

! i: 4 :::;

!i*:i!ii*::ii
! i*' i:, i: :!:i:,

!*:,':*{* .* i:i :"ql ::i*..

  • *i.:
ii:ii:*
  • !i*:i!ii Q

A P D.' R ev": i: ' ; :..:!:::'i:' 29"-: i"::;:-:,'-::::-!'*!::.:

., 'ii:"i:::!:":::i:::::i:i:

"i::::!::::::*:::i:::i::
ii 3"i:-:.'::;:i:*i : !¸. :::::i.i* ::.:.

.::*:!.:*::i:*i..::*i..:::::!i!.!:7.i:*;!:::::

i!

ii i': il !i!!i i! ?:.. i:":i: --i ~::: Z.:i::i :: :A PPE N D IX: C:: ii(Page 4 of 4) Si'ii: ii!

ii ii ::iii ii :

i.i ... ' * *::::i

i.?.
:::! z!iiiiPrtogramii; a.map of iallsampling locat*,ions keyed:*to a table givingi: i~:i:
i *:::;:i:.:*.::*-i.~ii*::

.:i;*,distances :an~d idirections ifrom~tlhe plant*; the: results of: the. ~~ItraoaoyCmaio rga;anda: d iscu ssion o:f :all.i*:::-i**"i:::!: .:..,:.- :... *-:-Paragraph (a)(2).of.: 10 CF;R 50,.36a,. ~Technical Specifications on :.

  • ":.::!:':*:*:::::~:!i;.*:!.::..'~:.*."iEffl uents:.: from Nu cl ear :!Po~wer* Rea ct ors," requires, that a.-re~port be:i:

... :':i~

  • quanitity of each :of the principal :radionuclides released to:-
* :"... ::" unrestricted areas bV:.liquld or gaseous effluents during the.:..::-.i-ii q.:..::i..i.previous :ii'ear., ~:With ~the exception o.f the collection of :hourly~i:::iiii!::"::::
-.. ::i..-meteorologilcal::data,: the *inforimation lisubmitted shall ibe ::in.... "i*::...:.
.
:.*::i:.::::..:.*:.1) dated June. 19.74 :with :data :summarized on at..least a :quarte~rly::i.:
f ?::::::":.!.. i::,::::i accorid a~nce witi.h th O DCM M...of rad:ciatio~n doses :to :m~embers :o~f.th e.. :
i"::::::::::Gpub!ic:. from raidioahctive* liquid! and( airborne particulate :release~di:;! :: 1 U**:U
i*ili.::::?:i.:,beyond :the :effluentr*elease boundlaryi:..This ireport: shall contain~:*:I i~- ii*i.",
.,i::,)* -:. any ch*ianges.made :to theiO DCM durin~g :thei previou~s.~tw~elve
ii~i:ii:i:*

\\i...- :.-: : . m o

  • n~thsi!.::--:.i::i:i.....
).:!" :::i:i.""":' ::: " ':: : : :".:? : ":i(:i.::i:*:*:.i

! 'ii i!i i!

::i*:*j::::i:.iii:::-
..i::::

..:.*::II:.:I"Z.:.

):.:i
!if!!:-:.iii:::
  • i:!3*iii.:
ii*ii*i:!Z:
-iii!:*:::!!:*(:;:ii::!-!::¸i::Zii::!*ii:!:..::::

.: :-:- ;:.i:i';,- ::::: : i:i.i:.: ::: ;:,i.::i

.:i.:! %:!1111:.
  • i::*::i..i::)iii:.,:':::.i

!i::".::' i::ii:: .i.i::i:.i::.

!:.i*i:ili
..... ::.* i ].'Z 'i
    • i:;*:i*

i} i;:i:.ii!!*ii!i

.i:!::,*iiii-:;:::.*

...: :: :.,!:i :i:?i:.ii:).':: : :::. :.i:i:;. i,:i:

i.i

!!i*:*

  • .!.::i:

i:: ::i,. :*-::!ii.!:*?::::

.. f::::: : :.*:::::!i:*
i::").:*::i;-;*

i:::

-:!!i::::4-

.:i:...i,.. :.!Z.:.. ".. :..,.../.,..,..i :::

*.!i.:::*: :-:..-...,.-!.::.:.:::: 'h:; :::*::!i::

..i-:!::*:: ....,..::::!::....: !.i::::i

i!i:)i:

! i i i:i i ii ! !i

f*:: i:::*:::**:.!

.:i*:*:.i:iiil.i!*.::,.i!*.!*i.:::::ii:

, :i::.*
,i:;:,:::::

!i:ii!i%,i:;iiiiiiii!i .QAPD ":::.Ai PD ::: :~:::.R~ev. 29::

FIGURE 1 La Crosse Solutions Organization SOLUTIONS (off-site) I I PresidentI SOLUTIONS (on-site dismantlement) / rjc a grK I / I P I ISFSI ACTIVITIES (subcontracted to DPC) [.............................. QAPD 36 QAPD 36Rev. 29 LACBWR Q.APD, Revision 29, Summary of Changes

QAPD, Revision 29 Summary and Evaluation of Changes LACBWR QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD) Revision 29 Summary of Changes The Dairyland Power Cooperative (DPC) and LaCrosse Solutions (SOLUTIONS) have recently submitted an application to transfer the La Crosse Boiling Water Reactor (LACBWR) Possession-Only License No. DPR-45 to from DPC to LaCrosse Solutions QAPD Revision 29 was developed in conjunction with the SOLUTIONS application for the Transfer of the NRC 10 CFR 50 license from DPC to SOLUTIONS for the completion of decommissioning. Upon NRC approval, SOLUTIONS will be the NRC licensee responsible for all activities under the LACBWR License. QAPD Revision 29 reflects the iicensee change from DPC to SOLUTIONS, and reflects the plan to subcontract the management and activities at the ISFSI to DPC. Upon completion of decommissioning, SOLUTIONS will apply to the NRC to transfer responsibility for the NRC License back to DPC. In order to minimize disruption and maximize efficiency, this revision of the QAPD was jointly developed by DPC and SOLUTIONS to facilitate the various stages of license transition described above. S The proposed revision is a substantial revision to the QAPD and will replace the current QAPD Revision i,28 in its entirety. Major or substantial changes are described along with the justifications for those changes. In addition, various minor changes are discussed in summary form. SMany of the following changes were based on similar changes that the NRC approved in the ZionSolutions Project Quality Assurance Project Plan, ZS-QA-10, Revision 7. The LACBWR site status is substantially the same as that of Z~on at the time the Zion ZS-QA-10, Rev. 7 was approved and implemented (i.e., fuel transfer completed, only decommissioning remaining). Note that by Revision 28 of the QAPD DPC had already completed the maj or QA Program transition to the Regulatory Guide 7.10 (RG 7.10) basis after fuel transfer was completed. Therefore, the ZS-QA-10 Revision 7 and the QAPD Revision 28 were already aligned in that the program basis both were aligned to RG 7.10. Chanwe 1 -Org~anization Changes: The license transfer application and the approach whereby SOLUTIONS will manage and perform decommissioning activities and will subcontract DPC to manage and perform ISFSI activities made extensive changes necessary to the QAPD Policy, Section 0.0 Introduction, Section I Organization, and Figure 1 Organization chart. These changes also made numerous changes necessary throughout the remainder of the QAPD, to align specific references and responsibilities accordingly. The specific changes to the Organization describe and reflect the language contained in the overall license transfer submittal to the NRC. It is understood that the QAPD Revision 29 would only be implemented in conjunction with the NRC approved license transfer from DPC to SOLUTIONS. Given the precondition of NRC approval of the license transfer, the Organization changes herein are specifically identified under 10 CFR 50.54(a)(3)(iii) as not representing a reduction in commitment, and therefore the QAPD Revision 29 changes of this nature continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72. Page 1 of 4

QAPD, Revision 29 Summary and Evaluation of Changes Chang~e 2 - Substantive Chang~es: Substantive Change 2A.: In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSJ and remaining D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Safety Review Committee (SRC) has been removed from QAPD Revision 29 and replaced by the Independent Management Assessment (IMA). Section II.E.4 identifies an Independent Management Assessment (IMA) functiOn. Individual(s) that perform IMAs are assigned by the President. The requirements for an independent review function was based on ANSI Ni18.7-1976 as endorsed by Regulatory Guide 1.33, Revision 2, and were satisfied by the SRC. The composition and function of the SRC as was described in the QAPD revision 28 followed the guidance provided in ANSI Nl8.7-1976, Section 4.3.1. The program described therein was intended for operating nuclear power plants. 10 CFR 50, Appendix B, does not specifically require an independent review function (as described in ANSI Ni18.7) as part of its quality assurance program requirements. Appendix B, 10 CFR 50, Criterion II States in part: "The applicant shall regularly review the status and adequacy of the quality assurance program." The JMA as described in the QAPD revision 29 meets this 10 CFR 50 requirement. Substantive Change 2B:" In recognition of the limited number of ITS and/or radiological items that will require safety reviews at the ISFSI and rema~ning D&D activities, this revision incorporates significant changes to the safety review functions described in the QA program. The Operations Review Committee (ORC) has been removed from QAPD Revision 29 and replaced with the Qualified Technical Review (QTR). The QTR is defined in Section 00.B, and QTR qualifications are established in Section II.F.3.c. The

  • documentation that requires QTR is identified in several places in the QAPD: Section II.D, Section III.B.3, Section V.B.3, Section XI.B.3, and Appendix C Sections 1.0 and 2.1.3 all specify' documents that require a QTR. The Project Manager and the Site Manager, Genoa are responsible for the QTR function.

This change was approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, and Maine Yankee. This change is justified based on reduced scope and complexity of operations at the station, and reduced staff, making the continued operation of the ORC impractical and unnecessary. The responsibilities of the QTR will encompass the functions currently performed by the ORC and will be consistent with the scope of activities at a permanently defueled facility in an advanced stage of decommissioning. Substantive Change 2C. The applicability of the QAPD to the ISFSI and decommissioning scope was clarified in Section II.B. The QAPD Revision 28 Section fl.B stated that the QAPD was applicable to "Passive SAFSTOR decommissioning activities". The QAPD applicability to decommissioning scope is now described in the QAPD Revision 29 in the same way as in the Zion ZS-QA-10, Revision 7. This change is justified based on reduced scope and complexity of operations at the station, and is consistent with the scope of activities at a permanently de fueled facility in an advanced stage of decommissioning. The applicability of the QAPD to ISFSI ITS activities and 10 CFR 71 licensed waste shipments remains unchanged in QAIPD Revision 29. Substantive Change 2D: The QAPD Revision 28 Section XVII Records was replaced in its entirety with the language from the Zion ZS-QA-10 Revision 7. This change represents practical records controls that have been approved by the NRC in the case of numerous other decommissioning plants at the same stage of decommissioning, e.g. Yankee Rowe, Connecticut Yankee, Maine Yankee and Zion. Substantive Change 2E: In the Appendix B "alternatives", the 2005 APS submittal and NRC approval related to the calibration services for M&TE was updated to the recent Nuclear Energy Institute (NEI) Page 2 of 4

QAPD, Revision 29 Summary and Evaluation of Changes NEI 14-05, "Guidelines for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services," Revision 0, and associated NRC Safety Evaluation dated February 9, 2015. This is acceptable since it is approved by NRC Safety Evaluation, and provides more flexibility for acceptance of testing and calibration services. Substantive Change 2F. In Section XVI.C, the following sentence was added as an enhancement: "Conditions that may be reportable per 10CFR72.242, 10CFR71.95, or 10CFR21 shall be reported in accordance with approved procedures." Substantive Change 2G:~ In Appendix C, Section 1.1, the following references were removed, justified as follows: 1.1.1 ISFSI Operations and Maintenance: This was removed as a redundancy. The QAPD Section V already applies to ISFSI Operations and Maintenance, so it was not necessary for this to be listed in Appendix C also. 1.1.5 Physical Security Plan implementation: The requirements for procedure to implement the Physical Security Plan are self-proscribed ther'ein, and it is not necessary to list this in Appendix C. 1.1.6 Emergency Plan implementation: The requirements for procedure to implement the Emergency Plan are self-proscribed therein, and it is not necessary to list this in Appendix C. 1.1.7 Procedure for controlling temporary changes: Based on current status of ISFSI and decommissioning temporary changes are not required. Change 3 - Editorial / Administrative Improvements and Clarifications: Editorial changes to remove historical information no longer relevant after license transfer, make specific references more general in nature, and eliminate unnecessary detail of no QA program relevance were made. The types of changes of this nature are as follows: Editorial Changes Type 3A: In a few instances, historical details that were not necessary were eliminated. These include changes to eliminate "Passive SAFSTOR" in Section 0.0B, and removing historical detail at the introduction to Appendix C. Editorial Changes Type 3B: In a few instances, specific references were changed to be more general in nature. Examples include: Section XV, "Corrective Action Report (CAR)" was made "corrective action document", and "Purchasing" was made "procurement support staff." Vl.C.4, "Administrative Staff' was made "administrative staff." In Section V.C, "procedures" was replaced by "guidance" and "Work Orders" in places to provided flexibility. Editorial Changes Type 3C." In a few instances, unnecessary detail of no QA program relevance was eliminated, such as "Company", "Administrative Control Procedure (ACP)" and "QA Manual" being removed from Section 0.0.B. In summary, these types of changes are considered editorial and do not alter the intent or purpose of the QAPD and continue to satisfy the criteria of Appendix B to 10CFR 50 and the Quality Assurance requirements of 10 CFR 71 and 10 CFR 72. OVERALL EVALUATION: Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI. The ISFSI has transitioned to long-term passive operations. Additionally, although not known for certain, there is a remote possibility that Class B and Class C radioactive waste may be required to be shipped offsite for disposal, so the QAPD still applies to those activities should they be necessary. Page 3 of 4

Al QAPD, Revision 29" Summary and Evaluation of Changes The QAPD Revision 29 applies to all activities associated with structures, systems, and components (SSCs) which are important to safety (10 CFR 72). The QAPD also applies to transportation packages licensed by the NRC under 10 CFR 71. For other ISFSI and D&D activities, administrative programs and procedures ensure compliance with governing regulations and include appropriate controls for activities under the radiological control programs previously contained in the Technical Specifications. The proposed revision to the QAPD is appropriate for the remaining D&D activities and ISFSI operations. All safety related systems have been removed from service and have undergone partial or complete demolition. Radiological risk factors associated with D&D activities have been significantly reduced. All spent fuel has been transferred to the ISFSI and Greater Than Class C (GTCC) waste has~ been removed from the site. Should any Class B and Class C radioactive waste remain to be shipped offsite for disposal, the QAPD would still be applied to those activities. The ISFSI has transitioned to long-term passive operations. The system is inherently safe by design. The main function of the ISFSI organization is to monitor the environment in a way that demonstrates the integrity of the system. While it continues to be important to maintain an appropriate quality standard that preserves the passive functionality of the system, it can be accomplished satisfactorily through conformance to RG 7.10. The proposed revision will continue *o satisfy the criteria of 10 CFR 50, Appendix B and the QA requirements of 10 CFR 71, Subpart H, and 10 CFR 72, Subpart G. - End of Changes - Page 4 of 4}}