{{#Wiki_filter:January | {{#Wiki_filter:January 28, 2016 | ||
==SUBJECT:== | |||
NRC INSPECTION REPORT NO. 05000271/2015010, ENTERGY NUCLEAR OPERATIONS, INC., VERMONT YANKEE NUCLEAR POWER STATION, VERNON, VERMONT | |||
==Dear Mr. Wamser:== | |||
On December 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Vermont Yankee Nuclear Power Station (VY). On-site inspections were performed on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Coley Chappell, Licensing Manager, and other members of the VY staff on January 20, 2016, and are described in the enclosed report. No findings of safety significance were identified. | |||
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. | |||
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). | |||
== | UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
- | ==REGION I== | ||
- | 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter. | ||
Sincerely, | |||
/RA/ | |||
Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety | |||
Enclosure: | |||
Inspection Report 05000271/2015010 | |||
cc w/encl: | |||
Distribution via ListServ | Distribution via ListServ | ||
| Line 52: | Line 49: | ||
Entergy Nuclear Operations, Inc. | Entergy Nuclear Operations, Inc. | ||
Vermont Yankee Nuclear Power Station NRC Inspection Report No. | Vermont Yankee Nuclear Power Station NRC Inspection Report No. 05000271/2015010 | ||
- | |||
An announced quarterly inspection was completed at Vermont Yankee Nuclear Power Station (VY) on December 31, 2015. On-site inspections were conducted on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations, | |||
Inc. (Entergy) were also performed during the inspection period. The inspection included a review of spent fuel pool (SFP) safety, plant modifications, and decommissioning performance. | |||
The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, | The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program." | ||
Based on the results of this inspection, no findings of safety significance were identified. | Based on the results of this inspection, no findings of safety significance were identified. | ||
Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
1.0 | 1.0 Background | ||
On January 12, 2015, VY certified the permanent removal of fuel from the reactor vessel | |||
[Agencywide Document and Access Management System (ADAMS) Accession No. | |||
2.0 | ML15013A426]. This met the requirements of 10 Code of Federal Regulations (CFR)50.82(a)(1)(i) and 50.82(a)(1)(ii). On January 20, 2015, the NRC notified VY that the Operating Reactor Assessment Program would cease on January 24, 2015 and that implementation of the Decommissioning Power Reactor Inspection Program would begin on January 25, 2015 (ADAMS Accession No. ML15020A482). VY is currently in the Post Operation Transition Phase of decommissioning as described in IMC 2561. | ||
2.0 Post Operation Transition Phase Performance and Status Review | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
(Inspection Procedures (IPs) 37801, | (Inspection Procedures (IPs) 37801, 60801, 71801) | ||
-site | |||
The inspector performed on-site inspections the weeks of October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy were also performed during the inspection period. The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. | |||
The | The inspector reviewed the programs for the safe wet storage of spent fuel and verified that maintenance was being performed within the established frequencies and that the equipment was being properly maintained. The inspector performed a walk-down of the spent fuel pool (SFP), service water pumps, and fuel pool cooling heat exchangers to determine the material condition of the SFP and associated systems used to support SFP cooling. | ||
The inspector reviewed the current status and future plans for radioactive water management at the site. The inspector performed a walk-down of various water tanks and water intrusion locations, reviewed current inventories, tank capacities, and groundwater intrusion rates. The inspector reviewed work orders and execution plans for activities taken to mitigate groundwater intrusion. | |||
-down of various water tanks and water intrusion locations, reviewed current inventories, tank capacities, and groundwater intrusion rates. The inspector reviewed work orders and execution plans for activities taken to mitigate groundwater intrusion. | |||
The inspector reviewed the project to place the B.5.b pump at a fixed location with pre | The inspector reviewed the project to place the B.5.b pump at a fixed location with pre-connected piping. The inspector performed a walk-down of the B.5.b pump placement, interviewed personnel, and observed work in-progress. The inspector reviewed engineering change (EC) packages, condition reports, and work orders to determine if the B.5.b pump permanent placement project would fulfill its function. | ||
-connected piping. The inspector performed a walk | |||
-down of the B.5.b pump placement , interviewed personnel, and observed work in | |||
-progress. The inspector reviewed engineering change (EC) packages, condition reports , and work orders to determine if the B.5.b pump permanent placement project would fulfill its function. | |||
Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx The inspector reviewed the project to channel spent fuel assemblies. The inspector interviewed personnel, observed spent fuel assemblies being moved from the spent fuel racks into the fuel prep machine, channels being placed on the fuel assemblies, and the fuel assemblies being returned to the spent fuel racks. The inspector reviewed plans, work orders, and condition reports to verify activities were performed in accordance with plant procedures, technical specifications (TS), and final safety analysis report (FSAR). | |||
====b. Observations and Findings==== | ====b. Observations and Findings==== | ||
The inspector verified that safe wet storage of spent fuel | The inspector verified that safe wet storage of spent fuel was implemented adequately. | ||
The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures. | |||
The inspector determined that radioactive water inventories were increasing due mainly to the intrusion of groundwater at the site. The inspector verified that the water inventory is tracked daily , that the groundwater intrusion rate has slowed considerably, and that the site has excess tank capacity. The inspector determined that VY is considering options regarding disposal of on | The inspector determined that radioactive water inventories were increasing due mainly to the intrusion of groundwater at the site. The inspector verified that the water inventory is tracked daily, that the groundwater intrusion rate has slowed considerably, and that the site has excess tank capacity. The inspector determined that VY is considering options regarding disposal of on-site radioactive water inventory and is also considering options for future action to further mitigate groundwater intrusion. | ||
-site radioactive water inventory and is also considering options for future action to further mitigate groundwater intrusion. | |||
The inspector verified the B.5.b pump placement and pre | The inspector verified the B.5.b pump placement and pre-connected piping was completed and testing of the pump was satisfactory. The inspector also verified that the ECs were performed in accordance with site procedures and safety reviews had been performed adequately. | ||
-connected piping was completed and testing of the pump was satisfactory. The inspector also verified that the ECs were performed in accordance with site procedures and safety reviews had been performed adequately. | |||
The inspector determined the channeling activities were performed safely and met the TS and FSAR requirements. The inspector noted the channeling activities were performed to ensure the fuel assemblies would meet requirements for transportation which would take place at a future date. | The inspector determined the channeling activities were performed safely and met the TS and FSAR requirements. The inspector noted the channeling activities were performed to ensure the fuel assemblies would meet requirements for transportation which would take place at a future date. | ||
| Line 102: | Line 100: | ||
3.0 | 3.0 | ||
===Exit Meeting Summary=== | |||
On January 20, 2016, the inspector presented the inspection results, via teleconference, to Coley Chappell, Licensing Manager, and other members of Entergys staff. The inspectors confirmed that proprietary information was not removed from the site. | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
Licensee M. Ball, Mechnical Design Engineer H. Breite, Sr. Lead Engineer J. Card, Mechanical Systems Engineer C. Chappell, Licensing and CA&A Manager C. Daniels, Plant Manager J. Meyer, Licensing M. Pletcher, Radiation Protection and Chemistry Manager J. Rogers, Design Engineering Manager M. Romeo, Decommissioning Plant Manager K. Whippie, Chemistry Supervisor A. Zander, Shift Manager | |||
ITEMS OPEN, CLOSED, AND DISCUSSED | |||
None | |||
LIST OF | |||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
| Line 112: | Line 117: | ||
Condition Reports | Condition Reports | ||
CR-VTY-2015-01355, 01533, 01550, 01620, 01638, 01680, 01730, 01767 | CR-VTY-2015-01355, 01533, 01550, 01620, 01638, 01680, 01730, 01767 | ||
Calculations | Calculations and ECs | ||
and ECs EC No.: 57228, B.5.b Enhancements | EC No.: 57228, B.5.b Enhancements | ||
Procedures | Procedures | ||
AP-10090, Loss of Large Areas of the Plant Due to Fire or Explosion, Rev. 01 | AP-10090, Loss of Large Areas of the Plant Due to Fire or Explosion, Rev. 01 | ||
| Line 119: | Line 124: | ||
OP 1100, Refuel Platform Operations, Rev. 46 | OP 1100, Refuel Platform Operations, Rev. 46 | ||
OP-1101, Management of Refueling Activities and Fuel Assembly Movement, Rev. 56 | OP-1101, Management of Refueling Activities and Fuel Assembly Movement, Rev. 56 | ||
OP 1102, Fuel Channel Operations, Rev. 26 V-EN-DC-324-DP, Decommissioning Plant Preventive Maintenance Program, Rev. 2 | OP 1102, Fuel Channel Operations, Rev. 26 | ||
Procedures | V-EN-DC-324-DP, Decommissioning Plant Preventive Maintenance Program, Rev. 2 | ||
-Completed Surveillance Procedures | Procedures-Completed Surveillance Procedures | ||
EN-NF-200, Attachment 9.1, Fuel Movement Form, completed move sheets for channeling | EN-NF-200, Attachment 9.1, Fuel Movement Form, completed move sheets for channeling | ||
project | project | ||
ALARA Plan | Miscellaneous | ||
150024 - Prepare CILC Fuel Assemblies for Dry Fuel Storage, Rev. 0 | ALARA Plan 150024 - Prepare CILC Fuel Assemblies for Dry Fuel Storage, Rev. 0 | ||
CILC Fuel | CILC Fuel Channeling POD for 10/14, 10/15, 10/27, 10/28 | ||
Channeling POD for 10/14, 10/15, 10/27, 10/28 | |||
Pullman Execution Plan (PEP), Heater Room Pipe Trench Water Mitigation Crack Injection and | Pullman Execution Plan (PEP), Heater Room Pipe Trench Water Mitigation Crack Injection and | ||
Groundwater Mitigation for Torus and Turbine Building | Groundwater Mitigation for Torus and Turbine Building | ||
RWP 20150700, Refuel Floor Support Work, Rev. 05 | RWP 20150700, Refuel Floor Support Work, Rev. 05 | ||
Water Inventory Spreadsheets, 10/26/15 | Water Inventory Spreadsheets, 10/26/15 | ||
Water Management Overview, 10/29/15 | Water Management Overview, 10/29/15 | ||
Ware Management Update | Ware Management Update - Overall Strategy, October 22, 2015 | ||
- Overall Strategy, October 22, 2015 | |||
Work Orders | Work Orders | ||
WO 00415473, Prepare CILC Fuel Assemblies For Dry Fuel Storage | WO 00415473, Prepare CILC Fuel Assemblies For Dry Fuel Storage | ||
WO 00411517 | WO 00411517-01, Install Permanent Vendor Installed Leak Repair | ||
-01, Install Permanent Vendor Installed Leak Repair | WO 00421602-13, P-70-1A: Replace Pump, Vendor to Perform Condensate Pit Permanent | ||
WO 00421602 | Leak Repair | ||
-13, P-70-1A: Replace Pump, Vendor to Perform Condensate Pit Permanent | WO 00391444-08,12,13 - B.5.b. Enhancements | ||
Leak Repair WO 00391444 | |||
-08,12,13 - B.5.b. Enhancements | |||
WO 00422166, Change B.5.b Discharge Relief Valve Setting | WO 00422166, Change B.5.b Discharge Relief Valve Setting | ||
LIST OF ACRONYMS USED | LIST OF ACRONYMS USED | ||
ADAMS | ADAMS | ||
CFR | Agencywide Document and Access Management System | ||
EC | CFR | ||
Entergy | |||
FSAR | Code of Federal Regulations | ||
IP | EC | ||
NRC | |||
SFP | Engineering Change | ||
TS | Entergy | ||
VY | Entergy Nuclear Operations, Inc. | ||
Station | FSAR | ||
Final Safety Analysis Report | |||
IMC | |||
Inspection Manual Chapter | |||
IP | |||
Inspection Procedure | |||
NRC | |||
U.S. Nuclear Regulatory Commission | |||
SFP | |||
Spent Fuel Pool | |||
TS | |||
Technical Specifications | |||
VY | |||
Vermont Yankee Nuclear Power Station | |||
}} | }} | ||
Latest revision as of 05:21, 10 January 2025
| ML16028A091 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/28/2016 |
| From: | Racquel Powell Division of Nuclear Materials Safety I |
| To: | Wamser C Entergy Nuclear Operations |
| References | |
| IR 2015010 | |
| Download: ML16028A091 (9) | |
Text
January 28, 2016
SUBJECT:
NRC INSPECTION REPORT NO. 05000271/2015010, ENTERGY NUCLEAR OPERATIONS, INC., VERMONT YANKEE NUCLEAR POWER STATION, VERNON, VERMONT
Dear Mr. Wamser:
On December 31, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Vermont Yankee Nuclear Power Station (VY). On-site inspections were performed on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Coley Chappell, Licensing Manager, and other members of the VY staff on January 20, 2016, and are described in the enclosed report. No findings of safety significance were identified.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.
Sincerely,
/RA/
Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety
Enclosure:
Inspection Report 05000271/2015010
cc w/encl:
Distribution via ListServ
EXECUTIVE SUMMARY
Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station NRC Inspection Report No. 05000271/2015010
An announced quarterly inspection was completed at Vermont Yankee Nuclear Power Station (VY) on December 31, 2015. On-site inspections were conducted on October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy Nuclear Operations,
Inc. (Entergy) were also performed during the inspection period. The inspection included a review of spent fuel pool (SFP) safety, plant modifications, and decommissioning performance.
The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program."
Based on the results of this inspection, no findings of safety significance were identified.
Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx
REPORT DETAILS
1.0 Background
On January 12, 2015, VY certified the permanent removal of fuel from the reactor vessel
[Agencywide Document and Access Management System (ADAMS) Accession No.
ML15013A426]. This met the requirements of 10 Code of Federal Regulations (CFR)50.82(a)(1)(i) and 50.82(a)(1)(ii). On January 20, 2015, the NRC notified VY that the Operating Reactor Assessment Program would cease on January 24, 2015 and that implementation of the Decommissioning Power Reactor Inspection Program would begin on January 25, 2015 (ADAMS Accession No. ML15020A482). VY is currently in the Post Operation Transition Phase of decommissioning as described in IMC 2561.
2.0 Post Operation Transition Phase Performance and Status Review
a. Inspection Scope
(Inspection Procedures (IPs) 37801, 60801, 71801)
The inspector performed on-site inspections the weeks of October 26-29, and December 1-3, 2015. In-office reviews of information supplied by Entergy were also performed during the inspection period. The inspection consisted of observations by the inspector, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs.
The inspector reviewed the programs for the safe wet storage of spent fuel and verified that maintenance was being performed within the established frequencies and that the equipment was being properly maintained. The inspector performed a walk-down of the spent fuel pool (SFP), service water pumps, and fuel pool cooling heat exchangers to determine the material condition of the SFP and associated systems used to support SFP cooling.
The inspector reviewed the current status and future plans for radioactive water management at the site. The inspector performed a walk-down of various water tanks and water intrusion locations, reviewed current inventories, tank capacities, and groundwater intrusion rates. The inspector reviewed work orders and execution plans for activities taken to mitigate groundwater intrusion.
The inspector reviewed the project to place the B.5.b pump at a fixed location with pre-connected piping. The inspector performed a walk-down of the B.5.b pump placement, interviewed personnel, and observed work in-progress. The inspector reviewed engineering change (EC) packages, condition reports, and work orders to determine if the B.5.b pump permanent placement project would fulfill its function.
Inspection Report No. 05000271/2015010 C:\\Users\\ajk\\Documents\\LDPR-28.2015010.docx The inspector reviewed the project to channel spent fuel assemblies. The inspector interviewed personnel, observed spent fuel assemblies being moved from the spent fuel racks into the fuel prep machine, channels being placed on the fuel assemblies, and the fuel assemblies being returned to the spent fuel racks. The inspector reviewed plans, work orders, and condition reports to verify activities were performed in accordance with plant procedures, technical specifications (TS), and final safety analysis report (FSAR).
b. Observations and Findings
The inspector verified that safe wet storage of spent fuel was implemented adequately.
The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures.
The inspector determined that radioactive water inventories were increasing due mainly to the intrusion of groundwater at the site. The inspector verified that the water inventory is tracked daily, that the groundwater intrusion rate has slowed considerably, and that the site has excess tank capacity. The inspector determined that VY is considering options regarding disposal of on-site radioactive water inventory and is also considering options for future action to further mitigate groundwater intrusion.
The inspector verified the B.5.b pump placement and pre-connected piping was completed and testing of the pump was satisfactory. The inspector also verified that the ECs were performed in accordance with site procedures and safety reviews had been performed adequately.
The inspector determined the channeling activities were performed safely and met the TS and FSAR requirements. The inspector noted the channeling activities were performed to ensure the fuel assemblies would meet requirements for transportation which would take place at a future date.
c. Conclusions
Based on the results of this inspection, no findings of safety significance were identified.
3.0
Exit Meeting Summary
On January 20, 2016, the inspector presented the inspection results, via teleconference, to Coley Chappell, Licensing Manager, and other members of Entergys staff. The inspectors confirmed that proprietary information was not removed from the site.
PARTIAL LIST OF PERSONS CONTACTED
Licensee M. Ball, Mechnical Design Engineer H. Breite, Sr. Lead Engineer J. Card, Mechanical Systems Engineer C. Chappell, Licensing and CA&A Manager C. Daniels, Plant Manager J. Meyer, Licensing M. Pletcher, Radiation Protection and Chemistry Manager J. Rogers, Design Engineering Manager M. Romeo, Decommissioning Plant Manager K. Whippie, Chemistry Supervisor A. Zander, Shift Manager
ITEMS OPEN, CLOSED, AND DISCUSSED
None
LIST OF
DOCUMENTS REVIEWED
Condition Reports
CR-VTY-2015-01355, 01533, 01550, 01620, 01638, 01680, 01730, 01767
Calculations and ECs
EC No.: 57228, B.5.b Enhancements
Procedures
AP-10090, Loss of Large Areas of the Plant Due to Fire or Explosion, Rev. 01
EGOP-10086, Service Water and Heat Exchanger Program, Rev. 00
OP 1100, Refuel Platform Operations, Rev. 46
OP-1101, Management of Refueling Activities and Fuel Assembly Movement, Rev. 56
OP 1102, Fuel Channel Operations, Rev. 26
V-EN-DC-324-DP, Decommissioning Plant Preventive Maintenance Program, Rev. 2
Procedures-Completed Surveillance Procedures
EN-NF-200, Attachment 9.1, Fuel Movement Form, completed move sheets for channeling
project
Miscellaneous
ALARA Plan 150024 - Prepare CILC Fuel Assemblies for Dry Fuel Storage, Rev. 0
CILC Fuel Channeling POD for 10/14, 10/15, 10/27, 10/28
Pullman Execution Plan (PEP), Heater Room Pipe Trench Water Mitigation Crack Injection and
Groundwater Mitigation for Torus and Turbine Building
RWP 20150700, Refuel Floor Support Work, Rev. 05
Water Inventory Spreadsheets, 10/26/15
Water Management Overview, 10/29/15
Ware Management Update - Overall Strategy, October 22, 2015
Work Orders
WO 00415473, Prepare CILC Fuel Assemblies For Dry Fuel Storage
WO 00411517-01, Install Permanent Vendor Installed Leak Repair
WO 00421602-13, P-70-1A: Replace Pump, Vendor to Perform Condensate Pit Permanent
Leak Repair
WO 00391444-08,12,13 - B.5.b. Enhancements
WO 00422166, Change B.5.b Discharge Relief Valve Setting
LIST OF ACRONYMS USED
Agencywide Document and Access Management System
CFR
Code of Federal Regulations
EC
Engineering Change
Entergy
Entergy Nuclear Operations, Inc.
Final Safety Analysis Report
IMC
Inspection Manual Chapter
IP
Inspection Procedure
NRC
U.S. Nuclear Regulatory Commission
Spent Fuel Pool
TS
Technical Specifications
Vermont Yankee Nuclear Power Station