ML16029A063: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (8 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML16029A063 | | number = ML16029A063 | ||
| issue date = 01/15/2016 | | issue date = 01/15/2016 | ||
| title = | | title = NRR E-mail Capture - (External_Sender) UHS Slides for Sequoyah? | ||
| author name = Hess T | | author name = Hess T | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = Hon A | | addressee name = Hon A | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:1 NRR-PMDAPEm Resource From: | ||
Sent:Friday, January 15, 2016 2:53 PM To:Hon, Andrew | Hess, Thomas A <tahess@tva.gov> | ||
Sent: | |||
Friday, January 15, 2016 2:53 PM To: | |||
Hon, Andrew | |||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: | [External_Sender] RE: UHS Slides for Sequoyah? | ||
Attachments: | Attachments: | ||
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov] | ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov] | ||
| Line 26: | Line 29: | ||
==Subject:== | ==Subject:== | ||
UHS Slides for Sequoyah? | UHS Slides for Sequoyah? | ||
TVA External Message. Please use caution when opening. | TVA External Message. Please use caution when opening. | ||
Hearing Identifier: | Hearing Identifier: | ||
NRR_PMDA Email Number: | |||
2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169) | |||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: UHS Slides for Sequoyah? | |||
Sent Date: | |||
1/15/2016 2:52:34 PM Received Date: | |||
1/15/2016 2:53:02 PM From: | |||
Hess, Thomas A Created By: | |||
tahess@tva.gov Recipients: | |||
"Hon, Andrew" <Andrew.Hon@nrc.gov> | |||
Tracking Status: None Post Office: | |||
TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
ERCW LAR Pre-submittal Meeting 1/19/16 | |||
LAR Objective | |||
* To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards | |||
*To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards | |||
defueled. | TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F. | ||
Condition A is only applicable: | |||
- during planned maintenance | |||
- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange | |||
Sent:Friday, January 15, 2016 2:53 PM To:Hon, Andrew | |||
Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available. | |||
The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board) | |||
Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed. | |||
TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A. | |||
FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed. | |||
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE. | |||
APPLICABILITY: | |||
MODES 1, 2, 3, and 4. | |||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME | |||
-------------NOTES-------------- | |||
1. | |||
Only applicable during planned maintenance. | |||
2. | |||
Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange. | |||
A. One ERCW System train inoperable | |||
A.1 | |||
--------------NOTES------------- | |||
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating," | |||
for emergency diesel generator made inoperable by ERCW System. | |||
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops | |||
- MODE 4," for residual heat removal loops made inoperable by ERCW System. | |||
Restore ERCW System train to OPERABLE status. | |||
7 days | |||
+RXU | |||
DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled. | |||
ADD: | |||
A.1 Restore ERCW System train to OPERABLE status. | |||
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F | |||
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A. | |||
B.1 | |||
--------------NOTES------------- | |||
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating," | |||
for emergency diesel generator made inoperable by ERCW System. | |||
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops | |||
- MODE 4," for residual heat removal loops made inoperable by ERCW System. | |||
Restore ERCW System train to OPERABLE status. | |||
72 hours C. Required Action and associated Completion Time of Condition A not met. | |||
C.1 Be in MODE 3. | |||
AND C.2 Be in MODE 5. | |||
6 hours 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C | |||
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 | |||
-------------------------------NOTE------------------------------ | |||
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable. | |||
Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position. | |||
In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal. | |||
In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal. | |||
In accordance with the Surveillance Frequency Control Program | |||
1 NRR-PMDAPEm Resource From: | |||
Hess, Thomas A <tahess@tva.gov> | |||
Sent: | |||
Friday, January 15, 2016 2:53 PM To: | |||
Hon, Andrew | |||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: | [External_Sender] RE: UHS Slides for Sequoyah? | ||
Attachments: | Attachments: | ||
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov] | ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov] | ||
| Line 63: | Line 127: | ||
==Subject:== | ==Subject:== | ||
UHS Slides for Sequoyah? | UHS Slides for Sequoyah? | ||
TVA External Message. Please use caution when opening. | TVA External Message. Please use caution when opening. | ||
Hearing Identifier: | Hearing Identifier: | ||
NRR_PMDA Email Number: | |||
2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169) | |||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: UHS Slides for Sequoyah? | |||
Sent Date: | |||
1/15/2016 2:52:34 PM Received Date: | |||
1/15/2016 2:53:02 PM From: | |||
Hess, Thomas A Created By: | |||
tahess@tva.gov Recipients: | |||
"Hon, Andrew" <Andrew.Hon@nrc.gov> | |||
Tracking Status: None Post Office: | |||
TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
ERCW LAR Pre-submittal Meeting 1/19/16 | |||
LAR Objective | |||
* To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards | |||
TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F. | |||
Condition A is only applicable: | |||
- during planned maintenance | |||
- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange | |||
Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available. | |||
The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board) | |||
Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed. | |||
TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A. | |||
FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed. | |||
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE. | |||
APPLICABILITY: | |||
MODES 1, 2, 3, and 4. | |||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME | |||
-------------NOTES-------------- | |||
1. | |||
Only applicable during planned maintenance. | |||
2. | |||
Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange. | |||
A. One ERCW System train inoperable | |||
A.1 | |||
--------------NOTES------------- | |||
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating," | |||
for emergency diesel generator made inoperable by ERCW System. | |||
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops | |||
- MODE 4," for residual heat removal loops made inoperable by ERCW System. | |||
Restore ERCW System train to OPERABLE status. | |||
7 days | |||
+RXU | |||
DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled. | |||
ADD: | |||
A.1 Restore ERCW System train to OPERABLE status. | |||
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F | |||
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A. | |||
ERCW | B.1 | ||
--------------NOTES------------- | |||
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating," | |||
for emergency diesel generator made inoperable by ERCW System. | |||
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops | |||
- MODE 4," for residual heat removal loops made inoperable by ERCW System. | |||
Restore ERCW System train to OPERABLE status. | |||
72 hours C. Required Action and associated Completion Time of Condition A not met. | |||
C.1 Be in MODE 3. | |||
AND C.2 Be in MODE 5. | |||
6 hours 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C | |||
- | |||
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 | |||
-------------------------------NOTE------------------------------ | |||
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable. | |||
Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position. | |||
In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal. | |||
In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal. | |||
In accordance with the Surveillance Frequency Control Program}} | |||
Latest revision as of 05:10, 10 January 2025
| ML16029A063 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/15/2016 |
| From: | Hess T Tennessee Valley Authority |
| To: | Andrew Hon Plant Licensing Branch II |
| References | |
| Download: ML16029A063 (10) | |
Text
1 NRR-PMDAPEm Resource From:
Hess, Thomas A <tahess@tva.gov>
Sent:
Friday, January 15, 2016 2:53 PM To:
Hon, Andrew
Subject:
[External_Sender] RE: UHS Slides for Sequoyah?
Attachments:
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [1]
Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A
Subject:
UHS Slides for Sequoyah?
TVA External Message. Please use caution when opening.
Hearing Identifier:
NRR_PMDA Email Number:
2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)
Subject:
[External_Sender] RE: UHS Slides for Sequoyah?
Sent Date:
1/15/2016 2:52:34 PM Received Date:
1/15/2016 2:53:02 PM From:
Hess, Thomas A Created By:
tahess@tva.gov Recipients:
"Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:
TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
ERCW LAR Pre-submittal Meeting 1/19/16
LAR Objective
- To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards
TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.
Condition A is only applicable:
- during planned maintenance
- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange
Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A.
FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
NOTES--------------
1.
Only applicable during planned maintenance.
2.
Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange.
A. One ERCW System train inoperable
A.1
NOTES-------------
for emergency diesel generator made inoperable by ERCW System.
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
7 days
+RXU
DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled.
ADD:
A.1 Restore ERCW System train to OPERABLE status.
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A.
B.1
NOTES-------------
for emergency diesel generator made inoperable by ERCW System.
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C. Required Action and associated Completion Time of Condition A not met.
C.1 Be in MODE 3.
AND C.2 Be in MODE 5.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1
NOTE------------------------------
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.
Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program
1 NRR-PMDAPEm Resource From:
Hess, Thomas A <tahess@tva.gov>
Sent:
Friday, January 15, 2016 2:53 PM To:
Hon, Andrew
Subject:
[External_Sender] RE: UHS Slides for Sequoyah?
Attachments:
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [2]
Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A
Subject:
UHS Slides for Sequoyah?
TVA External Message. Please use caution when opening.
Hearing Identifier:
NRR_PMDA Email Number:
2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)
Subject:
[External_Sender] RE: UHS Slides for Sequoyah?
Sent Date:
1/15/2016 2:52:34 PM Received Date:
1/15/2016 2:53:02 PM From:
Hess, Thomas A Created By:
tahess@tva.gov Recipients:
"Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:
TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
ERCW LAR Pre-submittal Meeting 1/19/16
LAR Objective
- To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards
TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.
Condition A is only applicable:
- during planned maintenance
- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange
Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A.
FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
NOTES--------------
1.
Only applicable during planned maintenance.
2.
Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange.
A. One ERCW System train inoperable
A.1
NOTES-------------
for emergency diesel generator made inoperable by ERCW System.
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
7 days
+RXU
DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled.
ADD:
A.1 Restore ERCW System train to OPERABLE status.
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A.
B.1
NOTES-------------
for emergency diesel generator made inoperable by ERCW System.
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C. Required Action and associated Completion Time of Condition A not met.
C.1 Be in MODE 3.
AND C.2 Be in MODE 5.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1
NOTE------------------------------
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.
Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program