| number = ML16029A063
| number = ML16029A063
| issue date = 01/15/2016
| issue date = 01/15/2016
| title = (External_Sender) UHS Slides for Sequoyah?
| title = NRR E-mail Capture - (External_Sender) UHS Slides for Sequoyah?
| author name = Hess T A
| author name = Hess T
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Hon A
| addressee name = Hon A
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Hess, Thomas A <tahess@tva.gov>
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:
Sent: Friday, January 15, 2016 2:53 PM To: Hon, Andrew
Hess, Thomas A <tahess@tva.gov>
Sent:
Friday, January 15, 2016 2:53 PM To:
Hon, Andrew


==Subject:==
==Subject:==
[External_Sender] RE: UH S Slides for Sequoyah?
[External_Sender] RE: UHS Slides for Sequoyah?
Attachments:
Attachments:
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
Line 26: Line 29:
==Subject:==
==Subject:==
UHS Slides for Sequoyah?
UHS Slides for Sequoyah?
TVA External Message. Please use caution when opening.
TVA External Message. Please use caution when opening.  


Hearing Identifier: NRR_PMDA Email Number: 2627   Mail Envelope Properties   (AB3647DBA77C034D81332BD4C951CD765636E169)
Hearing Identifier:
NRR_PMDA Email Number:
2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)  


==Subject:==
==Subject:==
[External_Sender] RE: UHS Slides for Sequoyah?   Sent Date:   1/15/2016 2:52:34 PM Received Date: 1/15/2016 2:53:02 PM From:   Hess, Thomas A Created By:   tahess@tva.gov Recipients:     "Hon, Andrew" <Andrew.Hon@nrc.gov> Tracking Status: None  
[External_Sender] RE: UHS Slides for Sequoyah?
Sent Date:
1/15/2016 2:52:34 PM Received Date:
1/15/2016 2:53:02 PM From:
Hess, Thomas A Created By:
tahess@tva.gov Recipients:  
"Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:
TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:


Post Office:  TVACHAXCH9.main.tva.gov Files    Size      Date & Time MESSAGE    225      1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx    43334  U1 ITS 3 7 8 draft mark-up.pdf    1104726 
ERCW LAR Pre-submittal Meeting 1/19/16


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
LAR Objective
ERCW LAR Pre-submittal Meeting 1/19/16 LAR Objective
* To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards  
*To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards TS Changes*TS LCO 3.7.8 will be revised to add Condition A*Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F. *Condition A is only applicable:-during planned maintenance
-when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level  23 ft. above top of reactor vessel flange Technical Basis
*During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
*The remaining pump on the effected train is available
*Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
*Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
TS Bases and FSAR Changes
*The TS Bases will be revised to provided additional details regarding the application of condition A.
*FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-1 Amendment XXX3.7  PLANT SYSTEMS3.7.8Essential Raw Cooling Water (ERCW) SystemLCO  3.7.8TwoERCW Systemtrains shall be OPERABLE.APPLICABILITY:MODES1, 2, 3, and4.ACTIONSCONDITIONREQUIRED ACTIONCOMPLETION TIME-------------NOTES--------------1.Only applicable duringplanned maintenance.2.Only applicable whenUnit 2 is defueledor inMODE 6 followingdefueled with Unit 2 refueling water cavitylevel 23 ft. above top ofreactor vessel flange.---------------------------------------A. OneERCW Systemtrain inoperableA.1--------------NOTES-------------1.Enter applicableConditions and Required Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator made inoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops
- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.7 daysInsertednew conditional ACTIONACompletionTimeof 7daysforplanned maintenancewith oppositeunit defueledor subsequentto


defueled.A DD: A.1 Restore ERCW System train to OPERABLE status.
TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.
A ND A.2VerifyUltimateHeatSinkTemperatureis<84degreesF ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-2 Amendment XXXCONDITIONREQUIRED ACTIONCOMPLETION TIMEB. OneERCW Systemtrain inoperable for reasons other than Condition A. B.1--------------NOTES-------------1.Enter applicableConditions andRequired Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator madeinoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.72hoursC. Required Action and associated Completion Time of ConditionA not met.C.1Be in MODE3.
Condition A is only applicable:
ANDC.2Be in MODE5.6 hours36 hoursRenumberedfromConditionAtoConditionBRenumberedfromConditionBtoConditionC ERCW System3.7.8SEQUOYAH -UNIT 13.7.8-3Amendment XXXSURVEILLANCE REQUIREMENTSSURVEILLANCE FREQUENCYSR  3.7.8.1-------------------------------NOTE------------------------------Isolation of ERCW Systemflow to individual components does not render the ERCW Systeminoperable.---------------------------------------------------------------------Verify each ERCW Systemmanual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.2Verify each ERCW Systemautomatic valve in the flow pathservicing safety related equipmentthat is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.3Verify each ERCW Systempump starts automatically on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control Program 1 NRR-PMDAPEm Resource From: Hess, Thomas A <tahess@tva.gov>
- during planned maintenance
Sent: Friday, January 15, 2016 2:53 PM To: Hon, Andrew
- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange
 
Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
 
TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A.
FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
 
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
-------------NOTES--------------
1.
Only applicable during planned maintenance.
2.
Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange.
A. One ERCW System train inoperable
A.1
--------------NOTES-------------
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"
for emergency diesel generator made inoperable by ERCW System.
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
7 days
+RXU
DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled.
ADD:
A.1 Restore ERCW System train to OPERABLE status.
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F
 
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A.
B.1
--------------NOTES-------------
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"
for emergency diesel generator made inoperable by ERCW System.
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
72 hours C. Required Action and associated Completion Time of Condition A not met.
C.1 Be in MODE 3.
AND C.2 Be in MODE 5.
6 hours 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C
 
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1
-------------------------------NOTE------------------------------
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.
Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program
 
1 NRR-PMDAPEm Resource From:
Hess, Thomas A <tahess@tva.gov>
Sent:
Friday, January 15, 2016 2:53 PM To:
Hon, Andrew


==Subject:==
==Subject:==
[External_Sender] RE: UH S Slides for Sequoyah?
[External_Sender] RE: UHS Slides for Sequoyah?
Attachments:
Attachments:
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
Line 62: Line 127:
==Subject:==
==Subject:==
UHS Slides for Sequoyah?
UHS Slides for Sequoyah?
TVA External Message. Please use caution when opening.
TVA External Message. Please use caution when opening.  


Hearing Identifier: NRR_PMDA Email Number: 2627   Mail Envelope Properties   (AB3647DBA77C034D81332BD4C951CD765636E169)
Hearing Identifier:
NRR_PMDA Email Number:
2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)  


==Subject:==
==Subject:==
[External_Sender] RE: UHS Slides for Sequoyah?   Sent Date:   1/15/2016 2:52:34 PM Received Date: 1/15/2016 2:53:02 PM From:   Hess, Thomas A Created By:   tahess@tva.gov Recipients:     "Hon, Andrew" <Andrew.Hon@nrc.gov> Tracking Status: None  
[External_Sender] RE: UHS Slides for Sequoyah?
Sent Date:
1/15/2016 2:52:34 PM Received Date:
1/15/2016 2:53:02 PM From:
Hess, Thomas A Created By:
tahess@tva.gov Recipients:  
"Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:
TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
 
ERCW LAR Pre-submittal Meeting 1/19/16
 
LAR Objective
* To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards
 
TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.
Condition A is only applicable:
- during planned maintenance
- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange
 
Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
 
TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A.
FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.


Post Office:   TVACHAXCH9.main.tva.gov Files    Size      Date & Time MESSAGE    225      1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx    43334  U1 ITS 3 7 8 draft mark-up.pdf    1104726 
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
-------------NOTES--------------
1.
Only applicable during planned maintenance.
2.
Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange.
A. One ERCW System train inoperable
A.1
--------------NOTES-------------
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"
for emergency diesel generator made inoperable by ERCW System.
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
Restore ERCW System train to OPERABLE status.
7 days
+RXU
DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled.
ADD:
A.1 Restore ERCW System train to OPERABLE status.
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A.
ERCW LAR Pre-submittal Meeting 1/19/16 LAR Objective
B.1
*To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards TS Changes*TS LCO 3.7.8 will be revised to add Condition A*Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F. *Condition A is only applicable:-during planned maintenance
--------------NOTES-------------
-when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level  23 ft. above top of reactor vessel flange Technical Basis
: 1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"
*During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
for emergency diesel generator made inoperable by ERCW System.
*The remaining pump on the effected train is available
: 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops
*Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
- MODE 4," for residual heat removal loops made inoperable by ERCW System.
*Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
Restore ERCW System train to OPERABLE status.
TS Bases and FSAR Changes
72 hours C. Required Action and associated Completion Time of Condition A not met.
*The TS Bases will be revised to provided additional details regarding the application of condition A.
C.1 Be in MODE 3.
*FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
AND C.2 Be in MODE 5.
ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-1 Amendment XXX3.7  PLANT SYSTEMS3.7.8Essential Raw Cooling Water (ERCW) SystemLCO  3.7.8TwoERCW Systemtrains shall be OPERABLE.APPLICABILITY:MODES1, 2, 3, and4.ACTIONSCONDITIONREQUIRED ACTIONCOMPLETION TIME-------------NOTES--------------1.Only applicable duringplanned maintenance.2.Only applicable whenUnit 2 is defueledor inMODE 6 followingdefueled with Unit 2 refueling water cavitylevel 23 ft. above top ofreactor vessel flange.---------------------------------------A. OneERCW Systemtrain inoperableA.1--------------NOTES-------------1.Enter applicableConditions and Required Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator made inoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops
6 hours 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C
- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.7 daysInsertednew conditional ACTIONACompletionTimeof 7daysforplanned maintenancewith oppositeunit defueledor subsequentto


defueled.A DD: A.1 Restore ERCW System train to OPERABLE status.
ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1
A ND A.2VerifyUltimateHeatSinkTemperatureis<84degreesF ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-2 Amendment XXXCONDITIONREQUIRED ACTIONCOMPLETION TIMEB. OneERCW Systemtrain inoperable for reasons other than Condition A. B.1--------------NOTES-------------1.Enter applicableConditions andRequired Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator madeinoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.72hoursC. Required Action and associated Completion Time of ConditionA not met.C.1Be in MODE3.
-------------------------------NOTE------------------------------
ANDC.2Be in MODE5.6 hours36 hoursRenumberedfromConditionAtoConditionBRenumberedfromConditionBtoConditionC ERCW System3.7.8SEQUOYAH -UNIT 13.7.8-3Amendment XXXSURVEILLANCE REQUIREMENTSSURVEILLANCE FREQUENCYSR  3.7.8.1-------------------------------NOTE------------------------------Isolation of ERCW Systemflow to individual components does not render the ERCW Systeminoperable.---------------------------------------------------------------------Verify each ERCW Systemmanual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.2Verify each ERCW Systemautomatic valve in the flow pathservicing safety related equipmentthat is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.3Verify each ERCW Systempump starts automatically on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control Program}}
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.
Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal.
In accordance with the Surveillance Frequency Control Program}}

Latest revision as of 05:10, 10 January 2025

NRR E-mail Capture - (External_Sender) UHS Slides for Sequoyah?
ML16029A063
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/15/2016
From: Hess T
Tennessee Valley Authority
To: Andrew Hon
Plant Licensing Branch II
References
Download: ML16029A063 (10)


Text

1 NRR-PMDAPEm Resource From:

Hess, Thomas A <tahess@tva.gov>

Sent:

Friday, January 15, 2016 2:53 PM To:

Hon, Andrew

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Attachments:

ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [1]

Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A

Subject:

UHS Slides for Sequoyah?

TVA External Message. Please use caution when opening.

Hearing Identifier:

NRR_PMDA Email Number:

2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Sent Date:

1/15/2016 2:52:34 PM Received Date:

1/15/2016 2:53:02 PM From:

Hess, Thomas A Created By:

tahess@tva.gov Recipients:

"Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None Post Office:

TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

ERCW LAR Pre-submittal Meeting 1/19/16

LAR Objective

  • To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards

TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.

Condition A is only applicable:

- during planned maintenance

- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange

Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.

The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)

Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.

TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A.

FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.

ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME


NOTES--------------

1.

Only applicable during planned maintenance.

2.

Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange.

A. One ERCW System train inoperable

A.1


NOTES-------------

1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops

- MODE 4," for residual heat removal loops made inoperable by ERCW System.

Restore ERCW System train to OPERABLE status.

7 days

+RXU

DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled.

ADD:

A.1 Restore ERCW System train to OPERABLE status.

AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F

ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A.

B.1


NOTES-------------

1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops

- MODE 4," for residual heat removal loops made inoperable by ERCW System.

Restore ERCW System train to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C. Required Action and associated Completion Time of Condition A not met.

C.1 Be in MODE 3.

AND C.2 Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C

ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1


NOTE------------------------------

Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.

Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program

1 NRR-PMDAPEm Resource From:

Hess, Thomas A <tahess@tva.gov>

Sent:

Friday, January 15, 2016 2:53 PM To:

Hon, Andrew

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Attachments:

ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [2]

Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A

Subject:

UHS Slides for Sequoyah?

TVA External Message. Please use caution when opening.

Hearing Identifier:

NRR_PMDA Email Number:

2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Sent Date:

1/15/2016 2:52:34 PM Received Date:

1/15/2016 2:53:02 PM From:

Hess, Thomas A Created By:

tahess@tva.gov Recipients:

"Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None Post Office:

TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

ERCW LAR Pre-submittal Meeting 1/19/16

LAR Objective

  • To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards

TS Changes TS LCO 3.7.8 will be revised to add Condition A Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.

Condition A is only applicable:

- during planned maintenance

- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange

Technical Basis During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.

The remaining pump on the effected train is available Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)

Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.

TS Bases and FSAR Changes The TS Bases will be revised to provided additional details regarding the application of condition A.

FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.

ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME


NOTES--------------

1.

Only applicable during planned maintenance.

2.

Only applicable when Unit 2 is defueled or in MODE 6 following defueled with Unit 2 refueling water cavity level 23 ft. above top of reactor vessel flange.

A. One ERCW System train inoperable

A.1


NOTES-------------

1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops

- MODE 4," for residual heat removal loops made inoperable by ERCW System.

Restore ERCW System train to OPERABLE status.

7 days

+RXU

DQGHYHU\\KRXUV Inserted new conditional ACTION A Completion Time of 7 days for planned maintenance with opposite unit defueled or subsequent to defueled.

ADD:

A.1 Restore ERCW System train to OPERABLE status.

AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F

ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train inoperable for reasons other than Condition A.

B.1


NOTES-------------

1. Enter applicable Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops

- MODE 4," for residual heat removal loops made inoperable by ERCW System.

Restore ERCW System train to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C. Required Action and associated Completion Time of Condition A not met.

C.1 Be in MODE 3.

AND C.2 Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Renumbered from Condition A to Condition B Renumbered from Condition B to Condition C

ERCW System 3.7.8 SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1


NOTE------------------------------

Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.

Verify each ERCW System manual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

In accordance with the Surveillance Frequency Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the flow path servicing safety related equipment that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program SR 3.7.8.3 Verify each ERCW System pump starts automatically on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program