| issue date = 02/22/2016
| issue date = 02/22/2016
| title = Ltr. 02/22/16 Palisades Nuclear Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000255/2015003 (Lnr)
| title = Ltr. 02/22/16 Palisades Nuclear Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000255/2015003 (Lnr)
| author name = Hills D E
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Vitale A
| addressee name = Vitale A
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 22, 2016
[[Issue date::February 22, 2016]]


EA-15-264 Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
==SUBJECT:==
PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003


SUBJECT: PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003
==Dear Mr. Vitale:==
December 21, 2015
 
==SUBJECT:==
PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003


==Dear Mr. Vitale:==
==Dear Mr. Vitale:==
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000255/2015003. Specifically, on December 21, 2015, the NRC acknowledged your letter sent to the NRC, dated November 30, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on October 30, 2015. The contested NCV is "Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond their Service Life." The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days as we pursue a generic Agency position for the industry. In the interim, we understand you have entered the underlying technical issue into your Corrective Action Program, as discussed in IR 05000255/2015003. We will inform you as soon as we complete our evaluation. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000255/2015003. Specifically, on December 21, 2015, the NRC acknowledged your letter sent to the NRC, dated November 30, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on October 30, 2015. The contested NCV is Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond their Service Life.
 
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days as we pursue a generic Agency position for the industry. In the interim, we understand you have entered the underlying technical issue into your Corrective Action Program, as discussed in IR 05000255/2015003. We will inform you as soon as we complete our evaluation.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).


Sincerely,/RA/ David E. Hills, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV February 22, 2016 EA-15-264 Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


SUBJECT: PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003
Sincerely,
/RA/  


==Dear Mr. Vitale:==
David E. Hills, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV DISTRIBUTION:
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000255/2015003. Specifically, on December 21, 2015, the NRC acknowledged your letter sent to the NRC, dated November 30, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on October 30, 2015. The contested NCV is "Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond their Service Life." The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensee's points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days as we pursue a generic Agency position for the industry. In the interim, we understand you have entered the underlying technical issue into your Corrective Action Program, as discussed in IR 05000255/2015003. We will inform you as soon as we complete our evaluation. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu
 
ADAMS Accession Number ML16053A400 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII
 
RIII
 
RIII
 
RIII
 
NAME LRodriguez DHills
 
DATE 02/18/16 02/22/16


Sincerely,/RA/ David E. Hills, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV DISTRIBUTION: Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML16053A400 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME LRodriguez DHills DATE 02/18/16 02/22/16 OFFICIAL RECORD COPY
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 03:08, 10 January 2025

Ltr. 02/22/16 Palisades Nuclear Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000255/2015003 (Lnr)
ML16053A400
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/22/2016
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Vitale A
Entergy Nuclear Operations
References
EA-15-264 IR 2015003
Download: ML16053A400 (2)


Text

February 22, 2016

SUBJECT:

PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003

Dear Mr. Vitale:

December 21, 2015

SUBJECT:

PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003

Dear Mr. Vitale:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000255/2015003. Specifically, on December 21, 2015, the NRC acknowledged your letter sent to the NRC, dated November 30, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on October 30, 2015. The contested NCV is Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond their Service Life.

The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days as we pursue a generic Agency position for the industry. In the interim, we understand you have entered the underlying technical issue into your Corrective Action Program, as discussed in IR 05000255/2015003. We will inform you as soon as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV DISTRIBUTION:

Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu

ADAMS Accession Number ML16053A400 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII

RIII

RIII

RIII

NAME LRodriguez DHills

DATE 02/18/16 02/22/16

OFFICIAL RECORD COPY