{{Adams
{{Adams
| number = ML19067A189
| number = ML16053A400
| issue date = 03/07/2019
| issue date = 02/22/2016
| title = Ltr. 03/07/19 Revised NCV - Palisades Nuclear Plant NRC Integrated IR 05000255/2015003 (NCV 05000255/2015003-01; Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond Their Service Life (DRS-N.Feliz
| title = Ltr. 02/22/16 Palisades Nuclear Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000255/2015003 (Lnr)
| author name = O'Brien K
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Arnone C
| addressee name = Vitale A
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000255
| docket = 05000255
Line 13: Line 13:
| document report number = IR 2015003
| document report number = IR 2015003
| document type = Letter
| document type = Letter
| page count = 8
| page count = 2
}}
}}


Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 22, 2016
[[Issue date::March 7, 2019]]


EA-1 5-264 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc.
==SUBJECT:==
PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003


Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
==Dear Mr. Vitale:==
December 21, 2015


SUBJECT: REVISED NON-CITED VIOLATION
==SUBJECT:==
-PALISADES NUCLEAR PLANT NRC INTEGRATED INSPECTION REPORT 05000255/2015003 (NCV 05000255/2015003
PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003
-01; FAILURE TO JUSTIFY CONTINUED SERVICE OF SAFETY-RELATED ELECTROLYTIC CAPACITORS INSTALLED BEYOND THEIR SERVICE LIFE)


==Dear Mr. Arnone:==
==Dear Mr. Vitale:==
On November 30, 2015, Palisades Nuclear Plant (PNP) provided a written response to U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000255/2015003
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000255/2015003. Specifically, on December 21, 2015, the NRC acknowledged your letter sent to the NRC, dated November 30, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on October 30, 2015. The contested NCV is Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond their Service Life.
, which was issued on October 30, 2015. Specifically, the lette r contested Non
-Cited Violation 05000255/2015003
-01 associated with the failure to justify continued service of safety-related containment floor level indicating transmitter electrolytic capacitors installed beyond their service life. The letter explained PNP agreed a performance deficiency occurred but disagreed the deficiency was associated with a violation of Title 10 of the Code of Federal Regulations
, Part 50, Appendix B, Criterion III, "Design Control," as stated in the inspection report. The letter further stated PNP believed the performance deficiency was associated with 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings."


The NRC carefully reviewed PNP's reply and determined the Non-Cited Violation should be changed to a violation of Technical Specifications Section 5.4.1, "Procedures
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days as we pursue a generic Agency position for the industry. In the interim, we understand you have entered the underlying technical issue into your Corrective Action Program, as discussed in IR 05000255/2015003. We will inform you as soon as we complete our evaluation.
," as shown in the enclosed report.


Technical Specifications Section 5.4.1
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
, requires, in part, the establishment, implementation, and maintenance of written procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Section 9 of the Regulatory Guide requires the development of preventive maintenance schedules and associated procedure s for the inspection or replacement of parts that have a specific lifetime.


The bases for the staff's conclusion are detailed in the enclosed report. This letter, its enclosure, PNP's November 30, 2015, response, and your response (if any)
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,/RA/ Kenneth O'Brien, Director Division of Reactor Safety Docket No. 50
Sincerely,
-255 License No. DPR
/RA/  
-20


===Enclosure:===
David E. Hills, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV DISTRIBUTION:
NRC Staff Assessment of Disputed NCV 05000255/2015003
Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu
-01 cc: Distribution via LISTSERV
 
ADAMS Accession Number ML16053A400 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII
 
RIII
 
RIII
 
RIII
 
NAME LRodriguez DHills
 
DATE 02/18/16 02/22/16
 
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 03:08, 10 January 2025

Ltr. 02/22/16 Palisades Nuclear Plant Follow-Up to Disputed Violations of NRC Inspection Report 05000255/2015003 (Lnr)
ML16053A400
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/22/2016
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Vitale A
Entergy Nuclear Operations
References
EA-15-264 IR 2015003
Download: ML16053A400 (2)


Text

February 22, 2016

SUBJECT:

PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003

Dear Mr. Vitale:

December 21, 2015

SUBJECT:

PALISADES NUCLEAR PLANT FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2015003

Dear Mr. Vitale:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report (IR) 05000255/2015003. Specifically, on December 21, 2015, the NRC acknowledged your letter sent to the NRC, dated November 30, 2015, that contested a Non-Cited Violation (NCV) documented in our IR issued on October 30, 2015. The contested NCV is Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond their Service Life.

The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of licensees points of contention, as described in Section 2.2.8 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days as we pursue a generic Agency position for the industry. In the interim, we understand you have entered the underlying technical issue into your Corrective Action Program, as discussed in IR 05000255/2015003. We will inform you as soon as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Acting Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via LISTSERV DISTRIBUTION:

Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu

ADAMS Accession Number ML16053A400 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII

RIII

RIII

RIII

NAME LRodriguez DHills

DATE 02/18/16 02/22/16

OFFICIAL RECORD COPY