ML16069A193: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:United States Department of the | {{#Wiki_filter:United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office | ||
/L: pCt1, Post Office Box 33726 //-Raleigh, North Carolina 27636-3 726 ~ Fk-September 10, 2015 Ms. Michele Sampson U.S. Nuclear Regulatory Commission Mail Stop T-4B34 U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: Brunswick Steam Electric Plant, Decommissioning Funding Plan, Brunswick County, North Carolina FWS Log No. 2015-1-0612 | /~qt,'/'e,*' | ||
/L: pCt1, Post Office Box 33726 7*t | |||
//- | |||
Raleigh, North Carolina 27636-3 726 | |||
~ | |||
Fk-September 10, 2015 Ms. Michele Sampson U.S. Nuclear Regulatory Commission Mail Stop T-4B34 U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: | |||
Brunswick Steam Electric Plant, Decommissioning Funding Plan, Brunswick County, North Carolina FWS Log No. 2015-1-0612 | |||
==Dear Ms. Sampson:== | ==Dear Ms. Sampson:== | ||
The U.S. Fish and Wildlife Service (Service) has *reviewed your letter regarding the decommissioning funding plan (DFP) submitted by Duke*Energy. | The U.S. Fish and Wildlife Service (Service) has *reviewed your letter regarding the decommissioning funding plan (DFP) submitted by Duke*Energy. Carolinas, LLC, for the Independent Spent Fuel Storage Installation' (1SF SI) located at the 'Brunswick Steam Electric Plant in Brunswick County, North CarolinaJ;Pursuantto section 7 of the Endangered Species Act of 1973 (ESA), the U.S. Nuclear Regulatory Commission (NRC) is requesting consultation regarding potential impacts implementation of the DFP may have upon federally protected species. | ||
Carolinas, LLC, for the Independent Spent Fuel Storage Installation' (1SF SI) located at the 'Brunswick Steam Electric Plant in Brunswick County, North CarolinaJ;Pursuantto section 7 of the Endangered Species Act of 1973 (ESA), the U.S. Nuclear Regulatory Commission (NRC) is requesting consultation regarding potential impacts implementation of the DFP may have upon federally protected species.Approval of the DFP will not authorize changes to licensed operations or maintenance activities, changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of any solid waste.Further, approval of the DFP will not authorize any construction activity, facility modification, or any other land-disturbing activity.. | Approval of the DFP will not authorize changes to licensed operations or maintenance activities, changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of any solid waste. | ||
Any future NRC approval of site disturbing remediation activities requested or conducted by Duke Energy Carolinas, LLC, would require additional environmental reviews. As such the NRC has determined that the proposed implementation of the DFP is not likely to adversely affect federally protected threatened or endangered species.Upon review of the information Submitted, the Service concurs with your'determination that this event is not likely to adversely affect federally protected threatened or endangered species.Please' note that obligationis under'the ESA must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical ~habitat in a 'manner not previously considered; (2) this action is subsequently modified in a manner, which was not | Further, approval of the DFP will not authorize any construction activity, facility modification, or any other land-disturbing activity.. Any future NRC approval of site disturbing remediation activities requested or conducted by Duke Energy Carolinas, LLC, would require additional environmental reviews. As such the NRC has determined that the proposed implementation of the DFP is not likely to adversely affect federally protected threatened or endangered species. | ||
Sincerely, Acting Field Supervisor United States Department of the | Upon review of the information Submitted, the Service concurs with your'determination that this event is not likely to adversely affect federally protected threatened or endangered species. | ||
/L: pCt1, Post Office Box 33726 //-Raleigh, North Carolina 27636-3 726 ~ Fk-September 10, 2015 Ms. Michele Sampson U.S. Nuclear Regulatory Commission Mail Stop T-4B34 U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: Brunswick Steam Electric Plant, Decommissioning Funding Plan, Brunswick County, North Carolina FWS Log No. 2015-1-0612 | Please' note that obligationis under'the ESA must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical ~habitat in a 'manner not previously considered; (2) this action is subsequently modified in a manner, which was not | ||
IJconsidered in this assessment; or (3) a new species is listed or critical habitat is designated that may be affected by the identified action. | |||
If you have any questions, please contact me at 919-856-4520 x21 and reference FWS Log No. 2015-1-0612. | |||
Sincerely, Acting Field Supervisor | |||
United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office | |||
/~qt,'/'e,*' | |||
/L: pCt1, Post Office Box 33726 7*t | |||
//- | |||
Raleigh, North Carolina 27636-3 726 | |||
~ | |||
Fk-September 10, 2015 Ms. Michele Sampson U.S. Nuclear Regulatory Commission Mail Stop T-4B34 U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: | |||
Brunswick Steam Electric Plant, Decommissioning Funding Plan, Brunswick County, North Carolina FWS Log No. 2015-1-0612 | |||
==Dear Ms. Sampson:== | ==Dear Ms. Sampson:== | ||
The U.S. Fish and Wildlife Service (Service) has *reviewed your letter regarding the decommissioning funding plan (DFP) submitted by Duke*Energy. | The U.S. Fish and Wildlife Service (Service) has *reviewed your letter regarding the decommissioning funding plan (DFP) submitted by Duke*Energy. Carolinas, LLC, for the Independent Spent Fuel Storage Installation' (1SF SI) located at the 'Brunswick Steam Electric Plant in Brunswick County, North CarolinaJ;Pursuantto section 7 of the Endangered Species Act of 1973 (ESA), the U.S. Nuclear Regulatory Commission (NRC) is requesting consultation regarding potential impacts implementation of the DFP may have upon federally protected species. | ||
Carolinas, LLC, for the Independent Spent Fuel Storage Installation' (1SF SI) located at the 'Brunswick Steam Electric Plant in Brunswick County, North CarolinaJ;Pursuantto section 7 of the Endangered Species Act of 1973 (ESA), the U.S. Nuclear Regulatory Commission (NRC) is requesting consultation regarding potential impacts implementation of the DFP may have upon federally protected species.Approval of the DFP will not authorize changes to licensed operations or maintenance activities, changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of any solid waste.Further, approval of the DFP will not authorize any construction activity, facility modification, or any other land-disturbing activity.. | Approval of the DFP will not authorize changes to licensed operations or maintenance activities, changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of any solid waste. | ||
Any future NRC approval of site disturbing remediation activities requested or conducted by Duke Energy Carolinas, LLC, would require additional environmental reviews. As such the NRC has determined that the proposed implementation of the DFP is not likely to adversely affect federally protected threatened or endangered species.Upon review of the information Submitted, the Service concurs with your'determination that this event is not likely to adversely affect federally protected threatened or endangered species.Please' note that obligationis under'the ESA must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical ~habitat in a 'manner not previously considered; (2) this action is subsequently modified in a manner, which was not | Further, approval of the DFP will not authorize any construction activity, facility modification, or any other land-disturbing activity.. Any future NRC approval of site disturbing remediation activities requested or conducted by Duke Energy Carolinas, LLC, would require additional environmental reviews. As such the NRC has determined that the proposed implementation of the DFP is not likely to adversely affect federally protected threatened or endangered species. | ||
Upon review of the information Submitted, the Service concurs with your'determination that this event is not likely to adversely affect federally protected threatened or endangered species. | |||
Please' note that obligationis under'the ESA must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical ~habitat in a 'manner not previously considered; (2) this action is subsequently modified in a manner, which was not | |||
IJconsidered in this assessment; or (3) a new species is listed or critical habitat is designated that may be affected by the identified action. | |||
If you have any questions, please contact me at 919-856-4520 x21 and reference FWS Log No. 2015-1-0612. | |||
Sincerely, Acting Field Supervisor}} | Sincerely, Acting Field Supervisor}} | ||
Latest revision as of 02:28, 10 January 2025
| ML16069A193 | |
| Person / Time | |
|---|---|
| Site: | Brunswick, 07200006 |
| Issue date: | 09/10/2015 |
| From: | Augspurger T US Dept of Interior, Fish & Wildlife Service |
| To: | Michele Sampson NRC/EDO/AO |
| References | |
| FWS Log 2015-I-0612 | |
| Download: ML16069A193 (2) | |
Text
United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office
/~qt,'/'e,*'
/L: pCt1, Post Office Box 33726 7*t
//-
Raleigh, North Carolina 27636-3 726
~
Fk-September 10, 2015 Ms. Michele Sampson U.S. Nuclear Regulatory Commission Mail Stop T-4B34 U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:
Brunswick Steam Electric Plant, Decommissioning Funding Plan, Brunswick County, North Carolina FWS Log No. 2015-1-0612
Dear Ms. Sampson:
The U.S. Fish and Wildlife Service (Service) has *reviewed your letter regarding the decommissioning funding plan (DFP) submitted by Duke*Energy. Carolinas, LLC, for the Independent Spent Fuel Storage Installation' (1SF SI) located at the 'Brunswick Steam Electric Plant in Brunswick County, North CarolinaJ;Pursuantto section 7 of the Endangered Species Act of 1973 (ESA), the U.S. Nuclear Regulatory Commission (NRC) is requesting consultation regarding potential impacts implementation of the DFP may have upon federally protected species.
Approval of the DFP will not authorize changes to licensed operations or maintenance activities, changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of any solid waste.
Further, approval of the DFP will not authorize any construction activity, facility modification, or any other land-disturbing activity.. Any future NRC approval of site disturbing remediation activities requested or conducted by Duke Energy Carolinas, LLC, would require additional environmental reviews. As such the NRC has determined that the proposed implementation of the DFP is not likely to adversely affect federally protected threatened or endangered species.
Upon review of the information Submitted, the Service concurs with your'determination that this event is not likely to adversely affect federally protected threatened or endangered species.
Please' note that obligationis under'the ESA must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical ~habitat in a 'manner not previously considered; (2) this action is subsequently modified in a manner, which was not
IJconsidered in this assessment; or (3) a new species is listed or critical habitat is designated that may be affected by the identified action.
If you have any questions, please contact me at 919-856-4520 x21 and reference FWS Log No. 2015-1-0612.
Sincerely, Acting Field Supervisor
United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office
/~qt,'/'e,*'
/L: pCt1, Post Office Box 33726 7*t
//-
Raleigh, North Carolina 27636-3 726
~
Fk-September 10, 2015 Ms. Michele Sampson U.S. Nuclear Regulatory Commission Mail Stop T-4B34 U.S. Nuclear Regulatory Commission Washington, DC 20555 Re:
Brunswick Steam Electric Plant, Decommissioning Funding Plan, Brunswick County, North Carolina FWS Log No. 2015-1-0612
Dear Ms. Sampson:
The U.S. Fish and Wildlife Service (Service) has *reviewed your letter regarding the decommissioning funding plan (DFP) submitted by Duke*Energy. Carolinas, LLC, for the Independent Spent Fuel Storage Installation' (1SF SI) located at the 'Brunswick Steam Electric Plant in Brunswick County, North CarolinaJ;Pursuantto section 7 of the Endangered Species Act of 1973 (ESA), the U.S. Nuclear Regulatory Commission (NRC) is requesting consultation regarding potential impacts implementation of the DFP may have upon federally protected species.
Approval of the DFP will not authorize changes to licensed operations or maintenance activities, changes in the types, characteristics, or quantities of radiological or non-radiological effluents released into the environment from the ISFSI, or result in the creation of any solid waste.
Further, approval of the DFP will not authorize any construction activity, facility modification, or any other land-disturbing activity.. Any future NRC approval of site disturbing remediation activities requested or conducted by Duke Energy Carolinas, LLC, would require additional environmental reviews. As such the NRC has determined that the proposed implementation of the DFP is not likely to adversely affect federally protected threatened or endangered species.
Upon review of the information Submitted, the Service concurs with your'determination that this event is not likely to adversely affect federally protected threatened or endangered species.
Please' note that obligationis under'the ESA must be reconsidered if: (1) new information reveals impacts of this identified action may affect any listed species or critical ~habitat in a 'manner not previously considered; (2) this action is subsequently modified in a manner, which was not
IJconsidered in this assessment; or (3) a new species is listed or critical habitat is designated that may be affected by the identified action.
If you have any questions, please contact me at 919-856-4520 x21 and reference FWS Log No. 2015-1-0612.
Sincerely, Acting Field Supervisor