| number = ML16071A444
| number = ML16071A444
| issue date = 03/11/2016
| issue date = 03/11/2016
| title = Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Security Inspection Report 05000528/2016403, 05000529/2016403, and 05000530/2016403
| title = NRC Security Inspection Report 05000528/2016403, 05000529/2016403, and 05000530/2016403
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " SEC URITY-RELATED INFORMATION
{{#Wiki_filter:March 11, 2016


March 11, 2016
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC SECURITY INSPECTION REPORT 05000528/2016403, 05000529/2016403, AND 05000530/2016403


Mr. Randall Executive Vice President Nuclear/CNO
==Dear Mr. Edington:==
On February 4, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and the NRC inspectors discussed the results of this inspection with Ms. M. Lacal, Vice President, Regulatory and Oversight, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
 
The NRC inspectors did not identify any findings or violations of more than minor significance.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
Sincerely,
/RA/


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NRC SECURITY INSPECTION REPORT 05000528/2016403, 05000529/2016403, AND 05000530/2016403
Mark S. Haire


==Dear Mr. Edington:==
Chief, Plant Support Branch 1  
On February 4, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and the NRC inspectors discussed the results of this inspection with Ms. M. Lacal, Vice President, Regulatory and Oversight, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
 
Division of Reactor Safety


The NRC inspectors did not identify any findings or violations of more than minor significance.
Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Nonpublic Enclosure:
NRC Inspection Report 05000528/2016403, 05000529/2016403, 05000530/2016403 w/Attachment: Supplemental Information


However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
cc w/enclosure:
Mr. Michael J. Cosenza Department Leader, Nuclear Security Programs Arizona Public Service Company P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034


response.
cc w/o enclosure: Electronic Distribution


Sincerely,/RA/
ML16071A444 Entire Report:
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74
SUNSI Review: MHaire Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review By: MHaire Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 DRP/D C:DRP/D C:PSB1


Nonpublic
NAME JBuchanan MHaire DReinert JJosey MHaire


===Enclosure:===
SIGNATURE
NRC Inspection Report 05000528/2016403, 05000529/2016403, 05000530/2016403
/RA/ e-mail
/RA/ e-mail
/RA/ e-mail
/RA/
/RA/  


===w/Attachment:===
DATE 3/11/16 3/11/16 3/11/16 3/11/16 3/11/16 Letter to Randall from Mark S. Haire, dated March 11, 2016
Supplemental Information


cc w/enclosure: Mr. Michael J. Cosenza Department Leader, Nuclear Security Programs
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC SECURITY INSPECTION REPORT 05000528/2016403, 05000529/2016403, AND 05000530/2016403


Arizona Public Service Company P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034
Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Resident Inspector (David.You@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jim.Melfi@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)


cc w/o enclosure: Electronic Distribution
Electronic distribution by RIV w/o enclosure:
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Siva.Lingam@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Acting Regional Counsel (Megan.Wright@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Theresa.Clark@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
SAIC (Gayle.Walker@nrc.gov)
RSLO (Bill.Maier@nrc.gov)
RidsOeMailCenter Resource
}}
}}

Latest revision as of 02:26, 10 January 2025

NRC Security Inspection Report 05000528/2016403, 05000529/2016403, and 05000530/2016403
ML16071A444
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/11/2016
From: Mark Haire
Plant Support Branch-1
To: Edington R
Arizona Public Service Co
References
IR2016403
Download: ML16071A444 (4)


Text

March 11, 2016

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NRC SECURITY INSPECTION REPORT 05000528/2016403, 05000529/2016403, AND 05000530/2016403

Dear Mr. Edington:

On February 4, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and the NRC inspectors discussed the results of this inspection with Ms. M. Lacal, Vice President, Regulatory and Oversight, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire

Chief, Plant Support Branch 1

Division of Reactor Safety

Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74

Nonpublic Enclosure:

NRC Inspection Report 05000528/2016403, 05000529/2016403, 05000530/2016403 w/Attachment: Supplemental Information

cc w/enclosure:

Mr. Michael J. Cosenza Department Leader, Nuclear Security Programs Arizona Public Service Company P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034

cc w/o enclosure: Electronic Distribution

ML16071A444 Entire Report:

SUNSI Review: MHaire Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only:

SUNSI Review By: MHaire Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 DRP/D C:DRP/D C:PSB1

NAME JBuchanan MHaire DReinert JJosey MHaire

SIGNATURE

/RA/ e-mail

/RA/ e-mail

/RA/ e-mail

/RA/

/RA/

DATE 3/11/16 3/11/16 3/11/16 3/11/16 3/11/16 Letter to Randall from Mark S. Haire, dated March 11, 2016

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NRC SECURITY INSPECTION REPORT 05000528/2016403, 05000529/2016403, AND 05000530/2016403

Electronic distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)

Senior Resident Inspector (Charles.Peabody@nrc.gov)

Resident Inspector (David.You@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

PV Administrative Assistant (Yvonne.Dubay@nrc.gov)

Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Jim.Melfi@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Electronic distribution by RIV w/o enclosure:

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Acting Regional Counsel (Megan.Wright@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Theresa.Clark@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

SAIC (Gayle.Walker@nrc.gov)

RSLO (Bill.Maier@nrc.gov)

RidsOeMailCenter Resource