{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352 March 29, 2016  Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI  48166 SUBJECT:  FERMI POWER PLANT NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION INSPECTION REPORT 05000341/2016002 Dear Mr. Fessler: On May 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Triennial Heat Sink Performance Inspection at your Fermi Power Plant.  This inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.  The documents have been divided into three groups.  The first group lists information necessary for our initial inspection scoping activities.  This information should be available to the lead inspector no later than April 18, 2016.  By April 25, 2016, the inspector will communicate the initial selected set of approximately 2 - 3 risk significant heat exchangers.  The second group is needed to support our in-office preparation activities.  This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than May 2, 2016.  This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.).  During the in-office preparation activities, the inspector may identify additional information needed to support the inspection.  The last group includes the additional information above as well as plant specific reference material.  This information should be available onsite to the inspector on May 16, 2016.  It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.  If no activities were accomplished in that time period, then the request applies to the
{{#Wiki_filter:UNITED STATES  
P. Fessler -2- last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection. The lead inspector for this inspection is Mr. Michael A. Jones Jr.  We understand that our regulatory contact for this inspection is Mr. Steven Ward of your organization.  If there are questions about the material requested, or the inspection, please call the lead inspector at 630-829-9745.  Please send the information to e-mail address Michael.Jones@nrc.gov.  A hard-copy with the required information is also an acceptable option. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.  In accordance with Title 10 of the Code of Federal Regulations of this letter, its enclosure, and your response (if any) will be available electronically for public inspectcomponent of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,  /RA/   Michael A. Jones, Jr., Reactor Inspector Engineering Branch 2 Division of Reactor Safety  Docket No. 50-341 License No. NPF-43 Enclosure: Information Request for Triennial Heat  Sink Performance Inspection cc:  Distribution via LISTSERV  
NUCLEAR REGULATORY COMMISSION  
REQUEST FOR INFORMATION TRIENNIAL HEAT SINK PERFOMANCE INSPECTION Enclosure Inspection Report: 05000341/2016002 Inspection Dates: May 16 - 20, 2016 Inspection Procedure: IP 71111.07T Inspectors: M. Jones (Lead) 630-829-9745 630-829-9624 Michael.Jones@nrc.gov Gerard.ODwyer@nrc.gov I. Information Requested By April 18, 2016 1. List of the Generic Letter (GL) 89-cting Safety- heat exchangers in order of risk significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat exchanger. 3. List of the Corrective Action Program (CAP) documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous 3 years or since the last CAP document list was sent to the U.S. Nuclear Regulatory Commission (NRC) for the previous Heat Sink Performance Inspection.  The list should include all CAP documents not on the last CAP document list. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers. 5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers. 6. List of engineering-related operator workarounds (with a short description) associated with GL 89-13 heat exchangers.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. 7. List of permanent and temporary modifications (with a short description) associated with GL 89-13 heat exchangers.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. II. Information Requested By May 2, 2016 1. Copies of the GL 89-13 responses.  2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the GL 89-13 Heat Exchanger Program. 3. Copies of procedures developed to implement the recommendations of GL 89-13 (e.g., the GL 89-13 Heat Exchanger Program description).  
REGION III  
REQUEST FOR INFORMATION TRIENNIAL HEAT SINK PERFOMANCE INSPECTION 2 4. Copies of the selected CAP documents. 5. For the specific heat exchangers selected: a. Copies of the UFSAR sections applicable for each heat exchanger. b. Copy of system description and design basis document for the heat exchangers (as applicable). c. Provide a list of calculations (with a short description) which currently apply to each heat exchanger. i. establish the limiting design basis heat load required to be removed by each of these heat exchangers; ii. demonstrate the heat exchangers capacity to remove the limiting heat load; iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria); iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and  v. evaluate excessive tube vibration in each heat exchanger. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers. e. Copy of the construction code, Design Specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the heat exchangers. f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers. g. For the Ultimate Heat Sink (UHS) and the safety-related service water system (or equivalent): i. Copies of the applicable UFSAR sections. ii. Copy of system description and design basis document (as applicable). iii. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety-related service water system. iv. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.  
2443 WARRENVILLE RD. SUITE 210  
REQUEST FOR INFORMATION TRIENNIAL HEAT SINK PERFOMANCE INSPECTION 3 v. Copy of system description and design basis document (as applicable). vi. Copy of the construction code and Design Specification. vii. Copies of normal, abnormal, and emergency operating procedures associated with the UHS and safety-related service water systems including procedures for loss of these systems. viii. Copies of corrective action documents associated with waterhammer or hydraulic transients in the service water system since the last Heat Sink Inspection. ix. If available, provide an electronic copy of piping and instrumentation diagrams for the service water system, including the intake structure. x. Provide a list of calculations (with a short description), which currently apply to UHS and safety-related service water system. xi. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety-related service water system and/or UHS. xii. Provide a list of any design change (with a short description) performed on the UHS or safety-related service water system since the last Heat Sink Performance Inspection. h. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related plant heat exchanger to be performed during the onsite portion of the inspection. III. Information Requested to be Available on First Day of Inspection, May 16, 2016 1. For the specific heat exchangers selected.  i. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria).  j. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers which are performance tested.  k. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments).  Include calibration records for the instruments used during these tests.  l. Information regarding any alarms which monitor on-line performance.  
LISLE, IL  60532-4352  
REQUEST FOR INFORMATION TRIENNIAL HEAT SINK PERFOMANCE INSPECTION 4 m. Copy of the document describing the inspection results of each heat exchanger.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  n. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years.  o. Copy of the design specification and heat exchanger data sheets for each heat exchanger.  p. Copy of the vendor manuals including component drawings for each heat exchanger.  q. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers. r.  Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded.  s. Copy of the calculations or documents which evaluate the potential for water hammer in each heat exchanger or associated piping.  t. Copy of the calculations that evaluate excessive tube vibration in each heat exchanger and the documents that describe the controls that prevent heat exchanger degradation due to excessive flow induced vibration during operation.  u. Copy of the periodic flow testing at or near maximum design flow.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  v. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger.  w. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger.  x. Copies of the documents that verify the structural integrity of the heat exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results).  y. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers.  
March 29, 2016  
REQUEST FOR INFORMATION TRIENNIAL HEAT SINK PERFOMANCE INSPECTION 5 2. For the review of the operation of the safety-related service water system (or equivalent) and the UHS: a. Copies of any design change performed on the UHS.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  b. Copies of any design change performed on the safety-related service water system.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  c. Copies of procedures for a loss of UHS.  d. Copies of procedures for a loss of service water system.  e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt, dead mussel shells, or debris) and biotic fouling (e.g. fish, algae, grass, or kelp).  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  f. [For fixed volume UHS] Copies of chemistry procedures that monitor for pH, calcium hardness, etc.  Also, provide copies of the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  g. Copies of documents associated with the monitoring of pump performance for potential strong-pump vs. weak-pump interaction.  3. For the review associated with the system walkdown of the service water system  a. Copies of the testing, inspection, or monitoring program procedures for buried or inaccessible piping and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  b. Copies of the ultrasonic test results and/or visual inspections that verify the structural integrity of the piping.  c. Copies of the procedures to monitor, assess, and disposition active thru wall pipe leaks, including structural evaluations and/or planned corrective actions.  
   
REQUEST FOR INFORMATION TRIENNIAL HEAT SINK PERFOMANCE INSPECTION 6 d. History of any thru wall pipe leak on the system.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  e. Copies of the documents associated with the periodic inspection program used to detect protective coating failure, corrosion, and erosion.  f. Copies of the Inservice Test vibration monitoring results and operational history for deep draft vertical pumps, if applicable.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the Previous Heat Sink Performance Inspection.  If the information requested above will not be available, please contact Mr. Michael Jones as soon as possible at 630-829-9745 or email Michael.Jones@nrc.gov.   
Mr. Paul Fessler  
  P. Fessler -2- last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection. The lead inspector for this inspection is Mr. Michael A. Jones Jr.  We understand that our regulatory contact for this inspection is Mr. Steven Ward of your organization.  If there are questions about the material requested, or the inspection, please call the lead inspector at 630-829-9745.  Please send the information to e-mail address Michael.Jones@nrc.gov.  A hard-copy with the required information is also an acceptable option. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.  In accordance with Title 10 of the Code of Federal Regulations this letter, its enclosure, and your response (if any) will be availabPublic Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,  /RA/   Michael A. Jones, Jr., Reactor Inspector Engineering Branch 2 Division of Reactor Safety  Docket No. 50-341 License No. NPF-43 Enclosure: Information Request for Triennial Heat  Sink Performance Inspection cc:  Distribution via LISTSERV DISTRIBUTION: Kimyata MorganButler RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu  ADAMS Accession Number ML16090A103  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII  RIII  RIII  NAME MJones:cl:jw   DATE 03/29/16   OFFICIAL RECORD COPY
Chief Nuclear Officer  
DTE Energy Company  
Fermi 2 - 210 NOC  
6400 North Dixie Highway  
Newport, MI  48166  
SUBJECT:  FERMI POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL HEAT  
SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION  
INSPECTION REPORT 05000341/2016002  
Dear Mr. Fessler:  
On May 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion  
of the Triennial Heat Sink Performance Inspection at your Fermi Power Plant.  This inspection  
will be performed in accordance with NRC baseline Inspection Procedure 71111.07.  
In order to minimize the impact that the inspection has on the site and to ensure a productive  
inspection, we have enclosed a request for documents needed for the inspection.  The  
documents have been divided into three groups.  
   
The first group lists information necessary for our initial inspection scoping activities.   
This information should be available to the lead inspector no later than April 18, 2016.   
By April 25, 2016, the inspector will communicate the initial selected set of approximately  
2 - 3 risk significant heat exchangers.  
   
The second group is needed to support our in-office preparation activities.  This set  
of documents, including the calculations associated with the selected heat exchangers,  
should be available at the Regional Office no later than May 2, 2016.  This information  
should be separated for each selected component, especially if provided electronically  
(e.g., folder with component name that includes calculations, condition reports,  
maintenance history, etc.).  During the in-office preparation activities, the inspector  
may identify additional information needed to support the inspection.  
   
The last group includes the additional information above as well as plant specific  
reference material.  This information should be available onsite to the inspector on  
May 16, 2016.  It is also requested that corrective action documents and/or questions  
developed during the inspection be provided to the inspector as the documents are  
generated.  
All requested documents are to be for the time period from the onsite inspection period  
back to the documents that were provided in response to the previous heat sink performance  
inspection.  If no activities were accomplished in that time period, then the request applies to the  
 
P. Fessler  
-2-  
last applicable document in the previous time period. It is important that these documents be  
as complete as possible, in order to minimize the number of documents requested during the  
preparation week or during the onsite inspection.  
The lead inspector for this inspection is Mr. Michael A. Jones Jr.  We understand that  
our regulatory contact for this inspection is Mr. Steven Ward of your organization.  If there  
are questions about the material requested, or the inspection, please call the lead inspector  
at 630-829-9745.  Please send the information to e-mail address Michael.Jones@nrc.gov.   
A hard-copy with the required information is also an acceptable option.  
This letter does not contain new or amended information collection requirements subject  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
collection requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required  
to respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
Number.   
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public  
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).   
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html  
(the Public Electronic Reading Room).  
Sincerely,  
   
/RA/  
Michael A. Jones, Jr., Reactor Inspector  
Engineering Branch 2  
Division of Reactor Safety   
Docket No. 50-341  
License No. NPF-43  
Enclosure:  
Information Request for Triennial Heat  
   Sink Performance Inspection  
cc:  Distribution via LISTSERV  
 
REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION  
Enclosure  
Inspection Report:  
05000341/2016002  
Inspection Dates:  
May 16 - 20, 2016  
Inspection Procedure:  
IP 71111.07T, Heat Sink Performance
Inspectors:  
M. Jones (Lead)  
G. ODwyer
630-829-9745  
630-829-9624  
Michael.Jones@nrc.gov  
Gerard.ODwyer@nrc.gov  
I.  
Information Requested By April 18, 2016  
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Safety-Related Equipment, heat exchangers in order of risk significance.  
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat  
exchanger.  
3. List of the Corrective Action Program (CAP) documents (with a short description)  
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or  
heat exchanger testing, for the previous 3 years or since the last CAP document list  
was sent to the U.S. Nuclear Regulatory Commission (NRC) for the previous Heat  
Sink Performance Inspection.  The list should include all CAP documents not on the  
last CAP document list.  
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.  
5. Last two System Health Report(s) and maintenance rule system notebooks for all  
the GL 89-13 heat exchangers.  
6. List of engineering-related operator workarounds (with a short description)  
associated with GL 89-13 heat exchangers.  The requested documents are to  
be for the time period from the onsite inspection period back to the documents  
that were provided in response to the previous Heat Sink Performance Inspection.  
7. List of permanent and temporary modifications (with a short description) associated  
with GL 89-13 heat exchangers.  The requested documents are to be for the time  
period from the onsite inspection period back to the documents that were provided in  
response to the previous Heat Sink Performance Inspection.  
II.  
Information Requested By May 2, 2016  
1. Copies of the GL 89-13 responses.   
2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to  
the GL 89-13 Heat Exchanger Program.  
3. Copies of procedures developed to implement the recommendations of GL 89-13  
(e.g., the GL 89-13 Heat Exchanger Program description).
 
REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION  
2  
4. Copies of the selected CAP documents.  
5. For the specific heat exchangers selected:  
a. Copies of the UFSAR sections applicable for each heat exchanger.  
b. Copy of system description and design basis document for the heat exchangers  
(as applicable).  
c. Provide a list of calculations (with a short description) which currently apply to  
each heat exchanger.  
i.  
establish the limiting design basis heat load required to be removed  
by each of these heat exchangers;  
ii.  
demonstrate the heat exchangers capacity to remove the limiting  
heat load;  
iii.  
correlate surveillance testing and/or inspection results from these heat  
exchangers with design basis heat removal capability (e.g., basis for  
surveillance test and/or inspection acceptance criteria);  
iv.  
evaluate the potential for water hammer in each heat exchanger or  
associated piping; and   
v.  
evaluate excessive tube vibration in each heat exchanger.  
d. Copy of any operability determinations or other documentation of degradation  
associated with the heat exchangers or the systems that support the operation  
for the selected heat exchangers.  
e. Copy of the construction code, Design Specification, heat exchanger data  
sheets, and vendor documents including component drawings applicable for  
the heat exchangers.  
f. Copies of normal, abnormal, and emergency operating procedures associated  
with the selected heat exchangers.  
g. For the Ultimate Heat Sink (UHS) and the safety-related service water system  
(or equivalent):  
i.  
Copies of the applicable UFSAR sections.  
ii.  
Copy of system description and design basis document (as applicable).  
iii.  
Copy of any operability determinations or other documentation of  
degradation associated with the UHS and the safety-related service  
water system.  
iv.  
Copy of the document (e.g., UFSAR or Technical Requirements Manual)  
that states the maximum cooling water system inlet temperature limit that  
still allows full licensed power operation of the nuclear reactor.  
 
REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION  
3  
v.  
Copy of system description and design basis document (as applicable).  
vi.  
Copy of the construction code and Design Specification.  
vii.  
Copies of normal, abnormal, and emergency operating procedures  
associated with the UHS and safety-related service water systems  
including procedures for loss of these systems.  
viii.  
Copies of corrective action documents associated with waterhammer or  
hydraulic transients in the service water system since the last Heat Sink  
Inspection.  
ix.  
If available, provide an electronic copy of piping and instrumentation  
diagrams for the service water system, including the intake structure.  
x.  
Provide a list of calculations (with a short description), which currently  
apply to UHS and safety-related service water system.  
xi.  
Provide a list of instruments (with a short description) associated with  
automatic or alarm functions for the safety-related service water system  
and/or UHS.  
xii.  
Provide a list of any design change (with a short description) performed  
on the UHS or safety-related service water system since the last Heat  
Sink Performance Inspection.  
h. A schedule of all inspections, cleanings, maintenance, or testing of any  
safety-related plant heat exchanger to be performed during the onsite portion  
of the inspection.  
III.  
Information Requested to be Available on First Day of Inspection, May 16, 2016  
1. For the specific heat exchangers selected.   
i.  
Copy of the calculation which correlates surveillance testing results from these  
heat exchangers with design basis heat removal capability (e.g., basis for  
surveillance test acceptance criteria).   
j.  
Copies of the two most recent completed tests and evaluation data confirming  
thermal performance for those heat exchangers which are performance tested.   
k. Documentation and procedures that identify the types, accuracy, and location of  
any special instrumentation used for the two most recently completed thermal  
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow  
instruments or temperature instruments).  Include calibration records for the  
instruments used during these tests.   
l.  
Information regarding any alarms which monitor on-line performance.  
 
REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION  
4  
m. Copy of the document describing the inspection results of each heat exchanger.   
The requested documents are to be for the time period from the onsite inspection  
period back to the documents that were provided in response to the previous  
Heat Sink Performance Inspection.   
n. The cleaning and inspection maintenance schedule for each heat exchanger for  
the next 5 years.   
o. Copy of the design specification and heat exchanger data sheets for each heat  
exchanger.   
p. Copy of the vendor manuals including component drawings for each heat  
exchanger.   
q. Copy of the calculation which establishes the limiting (maximum) design basis  
heat load which is required to be removed by each of these heat exchangers.  
r.  Copy of the operating procedure that ensures that the maximum cooling  
water system inlet temperature limit is not exceeded.   
s. Copy of the calculations or documents which evaluate the potential for  
water hammer in each heat exchanger or associated piping.   
t. Copy of the calculations that evaluate excessive tube vibration in each heat  
exchanger and the documents that describe the controls that prevent heat  
exchanger degradation due to excessive flow induced vibration during operation.   
u. Copy of the periodic flow testing at or near maximum design flow.  The  
requested documents are to be for the time period from the onsite inspection  
period back to the documents that were provided in response to the previous  
Heat Sink Performance Inspection.   
v. Copy of the document which identifies the current number of tubes in service  
for each heat exchanger and the supporting calculation which establishes the  
maximum number of tubes which can be plugged in each heat exchanger.   
w. Copy of the document establishing the repair criteria (plugging limit) for degraded  
tubes which are identified in each heat exchanger.   
x. Copies of the documents that verify the structural integrity of the heat exchanger  
(e.g., eddy current summary sheets, ultrasonic testing results, and visual  
inspection results).   
y. Copies of those documents that describe the methods taken to control water  
chemistry in the heat exchangers.  
 
REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION  
5  
2. For the review of the operation of the safety-related service water system  
(or equivalent) and the UHS:  
a. Copies of any design change performed on the UHS.  The requested  
documents are to be for the time period from the onsite inspection period back  
to the documents that were provided in response to the previous Heat Sink  
Performance Inspection.   
b. Copies of any design change performed on the safety-related service water  
system.  The requested documents are to be for the time period from the onsite  
inspection period back to the documents that were provided in response to the  
previous Heat Sink Performance Inspection.   
c. Copies of procedures for a loss of UHS.   
d. Copies of procedures for a loss of service water system.   
e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,  
dead mussel shells, or debris) and biotic fouling (e.g. fish, algae, grass, or kelp).   
The requested documents are to be for the time period from the onsite inspection  
period back to the documents that were provided in response to the previous  
Heat Sink Performance Inspection.   
f. [For fixed volume UHS] Copies of chemistry procedures that monitor for pH,  
calcium hardness, etc.  Also, provide copies of the associated results.  The  
requested documents are to be for the time period from the onsite inspection  
period back to the documents that were provided in response to the previous  
Heat Sink Performance Inspection.   
g. Copies of documents associated with the monitoring of pump performance  
for potential strong-pump vs. weak-pump interaction.   
3. For the review associated with the system walkdown of the service water system   
a. Copies of the testing, inspection, or monitoring program procedures for buried or  
inaccessible piping and the associated results.  The requested documents are to  
be for the time period from the onsite inspection period back to the documents  
that were provided in response to the previous Heat Sink Performance  
Inspection.   
b. Copies of the ultrasonic test results and/or visual inspections that verify the  
structural integrity of the piping.   
c. Copies of the procedures to monitor, assess, and disposition active thru wall  
pipe leaks, including structural evaluations and/or planned corrective actions.  
 
REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION  
6  
d. History of any thru wall pipe leak on the system.  The requested documents are  
to be for the time period from the onsite inspection period back to the documents  
that were provided in response to the previous Heat Sink Performance  
Inspection.   
e. Copies of the documents associated with the periodic inspection program used to  
detect protective coating failure, corrosion, and erosion.   
f. Copies of the Inservice Test vibration monitoring results and operational history  
for deep draft vertical pumps, if applicable.  The requested documents are to be  
for the time period from the onsite inspection period back to the documents that  
were provided in response to the Previous Heat Sink Performance Inspection.   
If the information requested above will not be available, please contact Mr. Michael Jones as  
soon as possible at 630-829-9745 or email Michael.Jones@nrc.gov.  
 
   
P. Fessler  
-2-  
last applicable document in the previous time period. It is important that these documents be as complete  
as possible, in order to minimize the number of documents requested during the preparation week or  
during the onsite inspection.  
The lead inspector for this inspection is Mr. Michael A. Jones Jr.  We understand that our regulatory  
contact for this inspection is Mr. Steven Ward of your organization.  If there are questions about the  
material requested, or the inspection, please call the lead inspector at 630-829-9745.  Please send the  
information to e-mail address Michael.Jones@nrc.gov.  A hard-copy with the required information is also  
an acceptable option.  
This letter does not contain new or amended information collection requirements subject  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
collection requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document displays  
a currently valid Office of Management and Budget Control Number.   
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its  
enclosure, and your response (if any) will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's  
Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the  
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Sincerely,  
   
/RA/  
Michael A. Jones, Jr., Reactor Inspector  
Engineering Branch 2  
Division of Reactor Safety   
Docket No. 50-341  
License No. NPF-43  
Enclosure:  
Information Request for Triennial Heat  
   Sink Performance Inspection  
cc:  Distribution via LISTSERV  
DISTRIBUTION:  
Kimyata MorganButler  
RidsNrrDorlLpl3-1 Resource  
RidsNrrPMFermi2 Resource  
RidsNrrDirsIrib Resource  
Cynthia Pederson  
Darrell Roberts  
Richard Skokowski  
Allan Barker  
Carole Ariano  
Linda Linn  
DRPIII  
DRSIII  
Jim Clay  
Carmen Olteanu  
   
ADAMS Accession Number ML16090A103  
  Publicly Available  
  Non-Publicly Available  
  Sensitive  
  Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy  
OFFICE  
RIII  
   
RIII  
   
RIII  
   
RIII  
   
NAME  
MJones:cl:jw  
DATE  
03/29/16  
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 02:03, 10 January 2025

Ltr. 03/29/16 Fermi Power Plant - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000341/2016002 (Maj)
ML16090A103
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/29/2016
From: Michael Jones
NRC/RGN-III/DRS/EB2
To: Fessler P
DTE Energy
References
IR 2016002
Download: ML16090A103 (9)


See also: IR 05000341/2016002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

March 29, 2016

Mr. Paul Fessler

Chief Nuclear Officer

DTE Energy Company

Fermi 2 - 210 NOC

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: FERMI POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL HEAT

SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000341/2016002

Dear Mr. Fessler:

On May 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion

of the Triennial Heat Sink Performance Inspection at your Fermi Power Plant. This inspection

will be performed in accordance with NRC baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than April 18, 2016.

By April 25, 2016, the inspector will communicate the initial selected set of approximately

2 - 3 risk significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set

of documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than May 2, 2016. This information

should be separated for each selected component, especially if provided electronically

(e.g., folder with component name that includes calculations, condition reports,

maintenance history, etc.). During the in-office preparation activities, the inspector

may identify additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available onsite to the inspector on

May 16, 2016. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

All requested documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to the

P. Fessler

-2-

last applicable document in the previous time period. It is important that these documents be

as complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

The lead inspector for this inspection is Mr. Michael A. Jones Jr. We understand that

our regulatory contact for this inspection is Mr. Steven Ward of your organization. If there

are questions about the material requested, or the inspection, please call the lead inspector

at 630-829-9745. Please send the information to e-mail address Michael.Jones@nrc.gov.

A hard-copy with the required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Michael A. Jones, Jr., Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure:

Information Request for Triennial Heat

Sink Performance Inspection

cc: Distribution via LISTSERV

REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION

Enclosure

Inspection Report: 05000341/2016002

Inspection Dates:

May 16 - 20, 2016

Inspection Procedure:

IP 71111.07T, Heat Sink Performance

Inspectors:

M. Jones (Lead)

G. ODwyer

630-829-9745

630-829-9624

Michael.Jones@nrc.gov

Gerard.ODwyer@nrc.gov

I.

Information Requested By April 18, 2016

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of the Corrective Action Program (CAP) documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or

heat exchanger testing, for the previous 3 years or since the last CAP document list

was sent to the U.S. Nuclear Regulatory Commission (NRC) for the previous Heat

Sink Performance Inspection. The list should include all CAP documents not on the

last CAP document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous Heat Sink Performance Inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous Heat Sink Performance Inspection.

II.

Information Requested By May 2, 2016

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to

the GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION

2

4. Copies of the selected CAP documents.

5. For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

i.

establish the limiting design basis heat load required to be removed

by each of these heat exchangers;

ii.

demonstrate the heat exchangers capacity to remove the limiting

heat load;

iii.

correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv.

evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v.

evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for

the heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

g. For the Ultimate Heat Sink (UHS) and the safety-related service water system

(or equivalent):

i.

Copies of the applicable UFSAR sections.

ii.

Copy of system description and design basis document (as applicable).

iii.

Copy of any operability determinations or other documentation of

degradation associated with the UHS and the safety-related service

water system.

iv.

Copy of the document (e.g., UFSAR or Technical Requirements Manual)

that states the maximum cooling water system inlet temperature limit that

still allows full licensed power operation of the nuclear reactor.

REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION

3

v.

Copy of system description and design basis document (as applicable).

vi.

Copy of the construction code and Design Specification.

vii.

Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems

including procedures for loss of these systems.

viii.

Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

ix.

If available, provide an electronic copy of piping and instrumentation

diagrams for the service water system, including the intake structure.

x.

Provide a list of calculations (with a short description), which currently

apply to UHS and safety-related service water system.

xi.

Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

xii.

Provide a list of any design change (with a short description) performed

on the UHS or safety-related service water system since the last Heat

Sink Performance Inspection.

h. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion

of the inspection.

III.

Information Requested to be Available on First Day of Inspection, May 16, 2016

1. For the specific heat exchangers selected.

i.

Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria).

j.

Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested.

k. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

l.

Information regarding any alarms which monitor on-line performance.

REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION

4

m. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

n. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

o. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

p. Copy of the vendor manuals including component drawings for each heat

exchanger.

q. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

r. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

s. Copy of the calculations or documents which evaluate the potential for

water hammer in each heat exchanger or associated piping.

t. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation.

u. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

v. Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

w. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

x. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

y. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION

5

2. For the review of the operation of the safety-related service water system

(or equivalent) and the UHS:

a. Copies of any design change performed on the UHS. The requested

documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink

Performance Inspection.

b. Copies of any design change performed on the safety-related service water

system. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous Heat Sink Performance Inspection.

c. Copies of procedures for a loss of UHS.

d. Copies of procedures for a loss of service water system.

e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g. fish, algae, grass, or kelp).

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

f. [For fixed volume UHS] Copies of chemistry procedures that monitor for pH,

calcium hardness, etc. Also, provide copies of the associated results. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

g. Copies of documents associated with the monitoring of pump performance

for potential strong-pump vs. weak-pump interaction.

3. For the review associated with the system walkdown of the service water system

a. Copies of the testing, inspection, or monitoring program procedures for buried or

inaccessible piping and the associated results. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous Heat Sink Performance

Inspection.

b. Copies of the ultrasonic test results and/or visual inspections that verify the

structural integrity of the piping.

c. Copies of the procedures to monitor, assess, and disposition active thru wall

pipe leaks, including structural evaluations and/or planned corrective actions.

REQUEST FOR INFORMATION - TRIENNIAL HEAT SINK PERFOMANCE INSPECTION

6

d. History of any thru wall pipe leak on the system. The requested documents are

to be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous Heat Sink Performance

Inspection.

e. Copies of the documents associated with the periodic inspection program used to

detect protective coating failure, corrosion, and erosion.

f. Copies of the Inservice Test vibration monitoring results and operational history

for deep draft vertical pumps, if applicable. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the Previous Heat Sink Performance Inspection.

If the information requested above will not be available, please contact Mr. Michael Jones as

soon as possible at 630-829-9745 or email Michael.Jones@nrc.gov.

P. Fessler

-2-

last applicable document in the previous time period. It is important that these documents be as complete

as possible, in order to minimize the number of documents requested during the preparation week or

during the onsite inspection.

The lead inspector for this inspection is Mr. Michael A. Jones Jr. We understand that our regulatory

contact for this inspection is Mr. Steven Ward of your organization. If there are questions about the

material requested, or the inspection, please call the lead inspector at 630-829-9745. Please send the

information to e-mail address Michael.Jones@nrc.gov. A hard-copy with the required information is also

an acceptable option.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document displays

a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael A. Jones, Jr., Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure:

Information Request for Triennial Heat

Sink Performance Inspection

cc: Distribution via LISTSERV

DISTRIBUTION:

Kimyata MorganButler

RidsNrrDorlLpl3-1 Resource

RidsNrrPMFermi2 Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML16090A103

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

MJones:cl:jw

DATE

03/29/16

OFFICIAL RECORD COPY