| title = NRC Security Inspection Report 05000317/2016201 and 05000318/2016201
| title = Cover Letter - Calvert Cliff Nuclear Power Plant - NRC Security Baseline Inspection Report 05000317/2016201 and 05000318/2016201
| author name = Huyck D G
| author name = Cardenas D
| author affiliation = NRC/NSIR/DSO/SPEB
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| addressee name = Flaherty M D
| addressee name = Gellrich G
| addressee affiliation = Calvert Cliffs Nuclear Power Plant, Inc
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000317, 05000318
| docket = 05000317, 05000318
| license number = DPR-053, DPR-069
| license number = DPR-053, DPR-069
| contact person = Willis J
| contact person = Andrew Woyansky 287-3650
| document report number = IR 2016201
| document report number = IR 2016201
| document type = Letter
| document type = Inspection Report Correspondence, Letter
| page count = 3
| page count = 3
}}
}}
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:June 14, 2016


/RA/
==SUBJECT:==
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000317/2016201 AND 05000318/2016201
 
==Dear Mr. Gellrich:==
On May 27, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Calvert Cliffs Nuclear Power Plant, Units 1 and 2. On June 6, 2016, the NRC inspectors discussed the results of this inspection with Mr. Mark Flaherty, Plant Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
 
NRC inspectors documented one finding of very low security significance (Green) in this report.
 
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
 
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.
 
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2.
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/  
 
Daniel Cardenas, Chief (Acting)
Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response
 
Docket Nos.: 05000317, 05000318 License Nos.: DPR-53, DPR-69
 
Nonpublic Enclosure: Inspection Report 05000317/2016201 and 05000318/2016201 w/Attachments: Supplemental Information
 
cc w/ enclosure: Tuane Young, Site Security Manager cc w/o enclosure: Bryan Hanson, President and Chief Nuclear Officer
 
ML16159A268 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RI NSIR/DSO/SPEB NAME A. Woyansky J. Clark J. Berry R. McKinley D. Cardenas (Acting)
DATE 6/ 7 /16 6 / 13 /16 6 / 7 /16 6 / 9 /16 6 / 14 /16
}}
}}

Latest revision as of 22:39, 9 January 2025

Cover Letter - Calvert Cliff Nuclear Power Plant - NRC Security Baseline Inspection Report 05000317/2016201 and 05000318/2016201
ML16159A268
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/14/2016
From: Cardenas D
NRC/NSIR/DSO/DDSO/SPEB
To: George Gellrich
Exelon Generation Co
Andrew Woyansky 287-3650
References
IR 2016201
Download: ML16159A268 (3)


Text

June 14, 2016

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000317/2016201 AND 05000318/2016201

Dear Mr. Gellrich:

On May 27, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Calvert Cliffs Nuclear Power Plant, Units 1 and 2. On June 6, 2016, the NRC inspectors discussed the results of this inspection with Mr. Mark Flaherty, Plant Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Daniel Cardenas, Chief (Acting)

Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response

Docket Nos.: 05000317, 05000318 License Nos.: DPR-53, DPR-69

Nonpublic Enclosure: Inspection Report 05000317/2016201 and 05000318/2016201 w/Attachments: Supplemental Information

cc w/ enclosure: Tuane Young, Site Security Manager cc w/o enclosure: Bryan Hanson, President and Chief Nuclear Officer

ML16159A268 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RI NSIR/DSO/SPEB NAME A. Woyansky J. Clark J. Berry R. McKinley D. Cardenas (Acting)

DATE 6/ 7 /16 6 / 13 /16 6 / 7 /16 6 / 9 /16 6 / 14 /16