| number = ML16200A087
| number = ML16200A087
| issue date = 06/27/2016
| issue date = 06/27/2016
| title = La Crosse Boiling Water Reactor License Termination Plan - Chapter 3 - Identification of Remaining Site Dismantlement Activities, Rev. 0
| title = License Termination Plan - Chapter 3 - Identification of Remaining Site Dismantlement Activities, Rev. 0
| author name =  
| author name =  
| author affiliation = LaCrosseSolutions, LLC
| author affiliation = LaCrosseSolutions, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 3 IDENTIFICATION OF REMAINING SITE DISMANTLEMENT ACTIVITIES  
{{#Wiki_filter:LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 3 IDENTIFICATION OF REMAINING SITE DISMANTLEMENT ACTIVITIES  


La CrossLicense TRevision3.Iden3.1.3.2.3.2.3.2.3 3
La Cross License T Revision 3.
Iden 3.1.
3.2.
3.2.
3.2.
3 3
3 3
3 3
3 3
Line 28: Line 32:
3 3
3 3
3 3
3 3
3 33.2.3.3.3.3.
3 3
3 3
3.2.
3.3.
3.3.
3.3.
3.3.
3.3.4 se Boiling W Termination n 0 ntification of Introduction Completed 1.
Overvi 2.
Disman
.2.2.1. For
.2.2.2. Sea
.2.2.3. Dec
.2.2.4. Prim
.2.2.5. Alt
.2.2.6. Gas
.2.2.7. Fue
.2.2.8. Com
.2.2.9. Hyd
.2.2.10. W
.2.2.11. De
.2.2.12. Ov
.2.2.13. Sta
.2.2.14. Lo
.2.2.15. Hi
.2.2.16. Ci
.2.2.17. Co
.2.2.18. Fu
.2.2.19. Ste
.2.2.20. 60
.2.2.21. Tu
.2.2.22. He
.2.2.23. Li
.2.2.24. El 3.
Additio Future Deco 1.
Reactor 2.
Turbine 3.
Waste T Storage 4.
LACBW Water Reactor Plan f Remaining n.................
and Ongoing ew..............
ntlement of S rced Circulat al Injection S cay Heat Co mary Purific ernate Core seous Waste el Element S mponent Co draulic Valv Well Water Sy emineralized verhead Stor ation and Co ow Pressure igh Pressure irculating W ondensate Sy ull-Flow Con eam Turbine 0-Megawatt G urbine Oil an eating, Venti quid Waste ectrical Dist onal Activiti ommissionin r Building..
e Building a Treatment B e Building..
WR Crib Ho r
TABLE O g Site Disman g Decommis Systems and tion System.
System.........
oling System cation System Spray Syste e Disposal Sy Storage Well oling Water ve Accumula ystem...........
d Water Syst rage Tank....
ontrol Air Sy Service Wat Service Wa Water System ystem and Fe ndensate Dem e..................
Generator....
nd Hydrogen ilation, and A Collection S tribution Sys es................
ng Activities and Turbine O Building, Gas ouse.............
3-i OF CONTE ntlement Ac ssioning Act d Componen m.................
m.................
em................
ystem..........
System......
ator System.
tem..............
ystem..........
ter System..
ater System..
eedwater He mineralizer n Seal Oil Sy Air Conditio Systems.......
stem............
s and Tasks..
Office Build s Storage Ta ENTS ctivities........
tivities and T nts................
eaters...........
System........
ystem...........
oning (HVA ding.............
ank Vault an Tasks...........
AC) Systems.
nd LSA
... 3-1
... 3-1
... 3-3
... 3-3
... 3-3
... 3-3
... 3-4
... 3-4
... 3-4
... 3-4
... 3-4
... 3-4
... 3-5
... 3-5
... 3-5
... 3-5
... 3-5
... 3-6
... 3-6
... 3-6
... 3-6
... 3-6
... 3-6
... 3-7
... 3-7
... 3-7
... 3-7
... 3-8
... 3-8
... 3-8
... 3-8
... 3-9
. 3-11
. 3-12
. 3-13
 
La Cross License T Revision 3.3.
3.3.
3.3.
3.3.3.3.4se Boiling WTermination n 0 ntification o fIntroductio nCompleted 1.Overvi2.Disman.2.2.1.For.2.2.2.Sea.2.2.3.Dec.2.2.4.Prim.2.2.5.Alt.2.2.6.Gas.2.2.7.Fue.2.2.8.Com.2.2.9.Hyd.2.2.10.W.2.2.11.De.2.2.12.Ov.2.2.13.Sta.2.2.14.Lo.2.2.15.Hi.2.2.16.Ci.2.2.17.Co.2.2.18.Fu.2.2.19.Ste.2.2.20.60.2.2.21.Tu.2.2.22.He.2.2.23.Li.2.2.24.El3.AdditioFuture Dec o1.Reactor2.Turbine3.Waste TStorage4.LACBWWater Reacto rPlan f Remainin gn .................
3.3.
and Ongoin gew ..............
3.4.
ntlement of Srced Circula tal Injection Scay Heat Co mary Purifi cernate Core seous Wast eel Element Smponent Co draulic Val vWell Water S yemineralize dverhead Sto ration and C oow Pressure igh Pressure irculating Wondensate S yull-Flow Co neam Turbin e0-Megawatt Gurbine Oil a neating, Vent iquid Waste ectrical Dis tonal Activiti ommissioni nr Building ..
3.4.
e Building aTreatment Be Building ..
3.4.
WR Crib Hor  TABLE Og Site Disma n...................
3.4.
.g Decommis...................
3.4.4 3.4.
.Systems an dtion System
3.5.
.System ........
Table 3-1 Table 3-2 Table 3-3 Table 3-4 se Boiling W Termination n 0 5.
.oling Syste mcation Syste mSpray Syst ee Disposal S yStorage Welloling Water ve Accumul aystem ..........
Mainte 6.
.d Water Sys trage Tank ...
Ventila 7.
.ontrol Air S yService Wa tService W aWater System ystem and F endensate De me .................
Legacy Radiologica 1.
.Generator ....nd Hydroge nilation, and ACollection Stribution Sy ses ...............
Contro 2.
.ng Activitie s...................
Occupa 3.
.and Turbine OBuilding, Ga s...................
Exposu 4.
.ouse ............
Radioa 5.
.3-i OF CONTEntlement A c...................
Project References 1
.ssioning Ac t...................
Status o 2
.d Componen
Radiati 3
...................
Project 4
....................
Genera Water Reactor Plan nance Eat Sh ation Stack..
.m ................
y Waste.......
.m ................
al Impacts of l Mechanism ational Expo ure to the Pu active Waste t Milestones of Major LA ion Exposure ted Waste Qu al Project Mi r
.em ...............
hack and 1B f Decommis ms to Mitigat osure............
.ystem .........
ublic.............
. ..................
Projections LIST ACBWR Sys e Projections uantities......
.System .....
ilestones......
.ator System
3-ii B Diesel Gen sioning Acti te the Recon OF TABLE stems and Co s for Decom nerator Build ivities..........
....................
ntamination ES omponents a mmissioning.
.tem .............
ding.............
....................
of Remediat as of June 20 ted Areas.....
.ystem .........
015..............
.ter System .
. 3-14
.ater System .
. 3-14
...................
. 3-15
.eedwater H emineralizer
. 3-15
...................
. 3-16
....................
. 3-16
.n Seal Oil S yAir Conditi oSystems ......
. 3-16
.stem ...........
. 3-17
....................
. 3-18
.s and Tasks .
. 3-19
....................
... 3-2
.Office Buil ds Storage T a...................
. 3-16
....................
. 3-17
.ENTS ctivities .......
. 3-18
....................
 
.tivities and T...................
La Cross License T Revision ALARA ACM AMSL BSFR CCW CST D-Plan/
.nts ...............
PSDAR FESW FRS G-3 GSTV HPSW HVAC kVA ISFSI LACBW LPSW LSA LSE LTP NRC ODCM OHST REMP RPV RWP WTB se Boiling W Termination n 0 A
....................
As L Asb Abo Bulk Com Con
....................
/
....................
R Dec Fuel Fina Gen Gas High Heat kilo-Inde WR La C Low Low LAC Lice Nuc M
....................
Off-Ove Rad Reac Rad Was Water Reactor Plan LIST OF Low As Rea estos Contai ove Mean Se k Survey For mponent Coo ndensate Stor commissionin l Element St al Radiation noa Fossil Sta Storage Tan h Pressure S ting Ventilat
....................
-Volt-Ampe ependent Spe Crosse Boilin w Pressure Se w Specific Ac CBWR Site E ense Termina lear Regulat
....................
-site Dose Ca rhead Storag iological En ctor Pressure iation Work ste Treatmen r
....................
ACRONYM sonably Ach ining Materi ea Level r Release oling Water rage Tank ng Plan/Post torage Well Survey ation nk Vault ervice Wate tion Air Con re ent Fuel Stor ng Water Re ervice Water ctivity Enclosure ation Plan tory Commis alculation M ge Tank nvironmental e Vessel k Permit nt Building 3-iii MS AND AB hievable ial t Shutdown er nditioning rage Installa eactor r
....................
ssion Manual l Monitoring BBREVIAT Decommiss ation g Program TIONS ioning Activvities Reportt
....................
 
....................
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r
....................
Page Inten 3-iv ntionally Lefft Blank
....................
 
....................
La Cross License T Revision
....................
: 3.
....................
Id 3.1.
....................
In In accord the rema the time remediati Estimate released projected will be Crosse B Decomm to procee The LAC alternativ Decomm DECON sites. Cu located in Decomm regulator State and Decomm of 10 CF involve LACBW the techn approval Decomm Safety an decommi operation The rem described discussed major rem specific e compone se Boiling W Termination n 0 dentificati ntroduction dance with 1 aining major of submitta ion and an a s of the oc to unrestric d volumes of undertaken Boiling Wa issioning Ac ed.
.eaters ..........
CBWR site ve, as desc issioning of alternative i urrently, LaC n Andrews, missioning a ry agencies d local regu missioning ac FR 50.82(a)(6 any un-revi WR. If an act nical specifi before impl missioning ac nd Health P issioning do ns, especially maining dec d in section d in sections maining com equipment r ents that hav Water Reactor Plan ion of Rem n
.System .......
10CFR50.82 r dismantlem al. The info assessment o ccupational r ted areas du f radioactive pursuant to ater Reacto ctivities Repo will be de cribed in N f Nuclear F is contingen CrosseSoluti Texas and at activities are in accordan ulatory agen ctivities at LA
....................
: 6) and (a)(7) iewed safet tivity require ications or l lementing th ctivities are Program, an not pose an y those durin ontamination 3.3. The sp s 3.3.2 throu mponents of remediation e been or are r
....................
maining Si (a)(9)(ii)(B ment and dec formation inc of the potent radiation do uring the co e waste that o the curren or (LACBW ort (D-Plan/
.ystem..........
contaminate NUREG-058 Facilities, S nt upon conti ions (Solutio t the Energy e being co nce with pla ncies are list ACBWR wi
.oning (HVA...................
). At the tim ty questions es prior NRC license, a su he activity in conducted nd Waste M ny greater ra ng major ma n and dism pecific system ugh 3.3.7. T contaminate consideratio e to be remo 3-1 ite Disman
....................
), the Licens contaminatio cludes those tial radiolog ose and the mpletion of will be gene nt 10 CFR 5 WR) Decom
....................
/PSDAR) (1 ed and dism 86 Generic Supplement inued access ons) has acc ySolutions fa oordinated w ant administ ted in sectio ill be conduc me of LTP s s or change C approval u ubmittal wil n question.
....................
under the S Management diological or aintenance an mantlement m considera These section ed plant syst ons. Table 3 oved.
....................
ntlement A se Terminati on activities e areas and ical conditio quantity of f the schedu erated are als 50 license, mmissioning
.ding ............
: 1) and do no mantled in ac Environme 1, Volume 1 s to one or m cess to low-l acility locate with the ap trative proce n 8.7.2 of L cted in accor submittal, th es in the T under 10 CF ll be made Solutions Ra Program r safety risk nd outage ev activities th ations that w ns provide a tems and, as 3-1 contains Activities ion Plan (LT s for the dec equipment ons that may f radioactiv uled tasks ar so included.
.ank Vault a n...................
are consist Plan and ot depend up ccordance w ental Impac 1 (2). Co more low lev level waste d ed in Clive, U pplicable Fe edures. Ap LTP Chapter rdance with he remaining Technical S R 50.59(c)(2 to the NRC adiation Pro Activities c k than those c volutions.
....................
that will be will be taken an overview s appropriate s a list of m TP) must ide commissioni that need fu y be encount e material t e provided.
....................
These acti tent with th d Post-Shut pon LTP app with the DE ct Statemen ompletion o vel waste dis disposal faci Utah.
....................
ederal and pplicable Fed r 8.
.Tasks ..........
the requirem g activities d pecification 2), or a chan C for review otection Prog conducted d conducted d e performed n into accoun and describ e, a descripti major system entify ing at urther tered.
....................
to be The vities he La tdown proval ECON nt on f the sposal ilities State
....................
: deral, ments do not ns for nge to w and
....................
: gram, during during d are nt are be the ion of s and
....................
 
....................
La Cross License T Revision Forced Reacto Reacto Main S Decay Primar Feedw Seal In Altern Gaseo Fuel E Compo Hydra Well W Demin Overh Station Low P High P Circul Conde Heater Steam 60-Me Main C Turbin se Boiling W Termination n 0 Table System or d Circulation or Vessel Int or Vessel Steam in Re y Heat Coolin ry Purificatio water in Reac njection Syst nate Core Spr us Waste Di Element Stor onent Coolin ulic Valve A Water System neralized Wa ead Storage n and Contro Pressure Serv Pressure Serv ating Water ensate and Fe rs Turbine egawatt Gen Condenser &
....................
ne Bldg. Mai Water Reactor Plan e 3-1 Sta as Componen n System ternals actor Bldg.
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.AC) Systems
....................
....................
....................
....................
....................
....................
.nd LSA  ...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.... 3-1... 3-1... 3-3... 3-3... 3-3... 3-3... 3-4... 3-4... 3-4... 3-4... 3-4... 3-4... 3-5... 3-5... 3-5... 3-5... 3-5... 3-6... 3-6... 3-6... 3-6... 3-6... 3-6... 3-7... 3-7... 3-7... 3-7... 3-8... 3-8... 3-8... 3-8... 3-9. 3-11. 3-12. 3-13 La CrossLicense TRevision3.3.3.3.
3.3.3.4.3.4.
3.4.3.4.3.4.43.4.3.5. Table 3-1Table 3-2Table 3-3Table 3-4  se Boiling WTermination n 0 5.Mainte6.Ventila7.LegacyRadiologic a1.Contro2.Occupa3.Exposu4.Radioa5.ProjectReferences 1Status o2Radiati3Project4GeneraWater Reacto rPlan nance Eat S hation Stack ..
y Waste .......
al Impacts o fl Mechanis mational Exp oure to the P uactive Waste t Milestones
...................
of Major L Aion Exposur eted Waste Q ual Project M ir  hack and 1 B...................
....................
.f Decommis ms to Mitiga tosure ...........
.ublic ............
.Projections
...................
....................
.LIST ACBWR Syse Projection suantities .....
.ilestones .....
.3-ii B Diesel Ge n...................
....................
.sioning Act ite the Reco n...................
....................
...................
....................
....................
.OF TABLEstems and C os for Deco m...................
....................
.nerator Buil d...................
....................
.ivities .........
.ntamination
...................
....................
....................
....................
....................
.ES omponents ammissioning
....................
....................
.ding ............
....................
....................
....................
.of Remedia t...................
....................
....................
....................
....................
.as of June 2 0...................
....................
....................
....................
....................
....................
....................
.ted Areas ....
....................
....................
....................
....................
....................
.015 .............
....................
....................
....................
.. 3-14. 3-14. 3-15. 3-15. 3-16. 3-16. 3-16. 3-17. 3-18. 3-19... 3-2. 3-16. 3-17. 3-18 La CrossLicense TRevisionALARAACM AMSL BSFR CCW CST D-Plan/PSDARFESW FRS G-3 GSTV HPSW HVAC kVA ISFSI LACBWLPSW LSA LSE LTP NRC ODCMOHST REMP RPV RWP WTB se Boiling WTermination n 0 A As LAsb AboBulkComCon/ R DecFuelFinaGenGas HighHeatkilo-IndeWR La CLowLowLACLiceNucM Off-OveRad ReacRad WasWater Reacto rPlan LIST OF Low As Rea estos Conta iove Mean S ek Survey Fo rmponent Co ondensate Sto rcommissioni nl Element S tal Radiation noa Fossil St aStorage Ta nh Pressure S ting Ventila t-Volt-Ampeependent Sp eCrosse Boili nw Pressure S ew Specific A cCBWR Site Eense Termin alear Regula t-site Dose C arhead Stora giological E nctor Pressur eiation Wor kste Treatme n r  ACRONYMsonably Ac hining Mater iea Level r Release oling Wate rrage Tank ng Plan/Pos ttorage Well Survey ation nk Vault ervice Wat etion Air Co nre ent Fuel Sto rng Water R eervice Wate rctivity Enclosure ation Plan tory Commi salculation Mge Tank nvironmenta le Vessel k Permit nt Building 3-iii MS AND ABhievable ial t Shutdown er nditioning rage Install aeactor r ssion Manual l Monitorin gBBREVIATDecommiss ation  g Program TIONS ioning Acti vvities Repor tt La CrossLicense TRevision  se Boiling WTermination n 0 Water Reacto rPlan r  Page Inte n3-iv ntionally Le fft Blank La CrossLicense TRevision3.Id3.1.InIn accordthe remathe time remediatiEstimate released projectedwill be Crosse BDecomm to proceeThe LACalternati vDecomm DECON sites. C ulocated i nDecommregulatorState andDecommof 10 CFinvolve LACBWthe technapproval DecommSafety andecommioperationThe remdescribeddiscussedmajor remspecific ecomponese Boiling WTermination n 0 dentificat introductio ndance with 1aining majo rof submitt aion and an as of the o cto unrestric d volumes o fundertaken Boiling Waissioning A ced. CBWR site ve, as des cissioning o falternative iurrently, La Cn Andrews, missioning ary agencies d local reg umissioning a cFR 50.82(a)(
6any un-rev iWR. If an ac tnical specif ibefore imp lmissioning a cnd Health Pissioning do ns, especiall ymaining dec d in section d in section smaining co mequipment rents that hav Water Reacto rPlan ion of Remn 10CFR50.82 r dismantle mal. The in foassessment occupational rted areas d uf radioactiv epursuant t oater React octivities Rep owill be de cribed in Nf Nuclear Fis continge nCrosseSolutiTexas and a tactivities ar ein accorda nulatory age nctivities at L A6) and (a)(7
)iewed safe ttivity requir eications or llementing t hctivities are Program, a n not pose a ny those duri nontaminatio n3.3. The s ps 3.3.2 thro umponents of remediation e been or ar er  maining Si (a)(9)(ii)(B ment and de cformation in cof the poten tradiation d ouring the co e waste that o the curre nor (LACBWort (D-Plan/contaminat eNUREG-058Facilities, Snt upon cont iions (Solutiot the Energ ye being conce with pl ancies are lis tACBWR wi). At the ti mty question ses prior NR Clicense, a s uhe activity i nconducted nd Waste Mny greater ra ng major m an and dismpecific syste mugh 3.3.7.
Tcontaminat econsiderati oe to be rem o3-1 ite Disman), the Licen scontaminati ocludes thos etial radiolog ose and the mpletion o f will be gen ent 10 CFR 5WR) Decom/PSDAR)  (1ed and dis m86 GenericSupplement inued accessons) has accySolutions faoordinated want adminis tted in sectio ill be condu cme of LTP ss or chang eC approval uubmittal wi ln question.
under the SManagement diological o raintenance a nmantlement m consider aThese sectio ned plant sys tons. Table 3oved. ntlement Ase Terminat ion activities e areas andical conditi oquantity o ff the schedu erated are al s50 license, mmissioning
: 1) and do n omantled in a cEnvironme1, Volume 1s to one or mcess to low-lacility locat ewith the a ptrative proc en 8.7.2 of Lcted in acco rsubmittal, t hes in the Tunder 10 CF ll be made Solutions RaProgram r safety ris knd outage e vactivities t hations that wns provide atems and, as 3-1 contain sActivities ion Plan (L Ts for the de cequipment ons that ma yf radioactiv uled tasks arso included.are consis tPlan andot depend u pccordance wental Impac1 (2). Comore low le vlevel waste ded in Clive, Upplicable F eedures. A pLTP Chapte rrdance with he remainin gTechnical S R 50.59(c)(
2to the NR Cadiation Pr oActivities ck than those cvolutions.
that will b ewill be take nan overview s appropriat es a list of mTP) must id ecommission ithat need f uy be encoun te material te provided. These acti tent with t hd Post-Shu tpon LTP ap pwith the D Ect Stateme nompletion o vel waste di sdisposal fac iUtah. ederal andpplicable Fedr 8. the require mg activities dpecification 2), or a cha nC for revie wotection Pro gconducted dconducted de performe dn into accou nand descri be, a descript imajor system entify ing at urther tered. to be  The vities he La tdown proval ECON nt on f the sposal ilities State deral, ments do not ns for nge to w and gram, during during d are nt are be the ion of s and La CrossLicense TRevision ForcedReactoReactoMain SDecayPrimarFeedwSeal InAlternGaseoFuel ECompoHydraWell WDeminOverhStationLow PHigh PCirculCondeHeaterSteam 60-MeMain CTurbin se Boiling WTermination n 0 TableSystem or d Circulatio nor Vessel In tor Vessel Steam in Re y Heat Cooli nry Purificati owater in Rea cnjection Sys tnate Core Sp rus Waste D iElement Sto ronent Cooli nulic Valve AWater Syste mneralized W aead Storage n and Contr oPressure Ser vPressure Ser vating Water ensate and F ers Turbine egawatt Gen Condenser
&ne Bldg. Ma iWater Reacto rPlan e 3-1 Staas Componenn System ternals actor Bldg.
ng System on System ctor Bldg.
ng System on System ctor Bldg.
tem ray System isposal Syst erage Well S yng Water (
tem ray System isposal Syste rage Well Sy ng Water (C Accumulator m
CAccumulato rm ater System Tank (OHS ol Air Syste mvice Water vice Water System eedwater T aerator & Accessori ein Steam r atus of Ma joof June 20 1nt PRRInInIoIn9050em Aystem CCCW) Inr SystemInInInT) Inm In30ORanks and DplRRes 15R3-2 or LACBW15 artially Re mRemoved fro mRemoved fro mn place n place- Dra ion Exchang en place 0% removed0% removedAll except u nContents re mn place- 70
ater System Tank (OHS ol Air System vice Water vice Water System eedwater Ta erator
%n place- Dra in Place - Iso n place- Dra in place- Dra in place 0% removedOperational Remains in p lDrained- Conlace, All Fe eRemoved  Removed 5% RemoveRemoved WR Systems Stamoved m site m site ined ers in place; d d nderground smoved- Drain% Removedined lated from Tined- 50% reined d lace - pum pndensate Sto edwater He aed and Compoatus 90% remov storage tank ned Turbine/Rea cemoved ps de-energi zrage Tank r eaters remov eonents ed removed ctor Bldg.
& Accessorie in Steam r
zed emain in ed La CrossLicense TRevisionTab TurbinTurbinLiquidFuel THVACElectriAsbestAfter thdemonstrreduced twill be decommi3.2.C3.2.1.In excessaddition
atus of Majo of June 201 nt P
R R
In In Io In 90 50 em A
ystem C
CCW)
In r System In In In T)
In m
In 30 O
R anks and D
pl R
R es 15 R
3-2 or LACBW 15 artially Rem Removed from Removed from n place n place-Drai on Exchange n place 0% removed 0% removed All except un Contents rem n place-70%
n place-Drai n Place - Iso n place-Drai n place-Drai n place 0% removed Operational Remains in pl Drained-Con lace, All Fee Removed Removed 5% Remove Removed WR Systems Sta moved m site m site ined ers in place; d
d nderground s moved-Drain
% Removed ined lated from T ined-50% re ined d
lace - pump ndensate Sto edwater Hea ed and Compo atus 90% remov storage tank ned Turbine/Reac emoved ps de-energiz rage Tank re aters remove onents ed removed ctor Bldg.
zed emain in ed  


disposal  
La Cross License T Revision Tab Turbin Turbin Liquid Fuel T HVAC Electri Asbest After th demonstr reduced t will be decommi 3.2.
C 3.2.1.
In excess addition disposal waste.
Waste sto Class B/C were ship rod blad Attachme removed fuel asse the storag 3.2.2.
3.2.2.1.
The Forc Circulati se Boiling W Termination n 0 ble 3-1 (con System or ne Bldg. Con ne Oil and H d Waste Coll Transfer Brid C Systems ical Systems tos Abateme e balance rated to be to the area a transferred issioning act Completed a Overview s of 2 millio to the Reac of the RPV ored in the F C waste (i.e pped for disp des was fill ents to the R from the R mblies and f ge racks and Dismantl Force ced Circula on pumps, a Water Reactor Plan ntinued)
S a
Componen ndensate and Hydrogen Sea lection Syste dge s
ent of the site below the u around the I back to Da tivities comp and Ongoing w
n pounds of ctor Pressur V included d Fuel Elemen
., resins, filt posal in June led with lo RPV were r eactor Build fuel debris w d installed co lement of Sy d Circulation ation system auxiliary oil r
Status of Ma as of June 20 nt d Feed R
al Oil P
ems In R
In In 75 is remedia unrestricted Independent airyland und pleted to dat g Decommis f metallic wa re Vessel (R disposition o nt Storage W ters, and was e 2007. The ow-density c removed and ding and wa were placed omponents w ystems and n System m and attend pumps, and 3-3 ajor LACBW 015 Removed artially Rem n place - Par Removed n place - Par n place-Disc 5% complet ated and th release crite Spent Fuel der the 10 e are provid ssioning Ac aste have be RPV) and s of irradiated Well (FESW) ste barrel co e RPV conta cellular con d all other a s shipped fo in dry cask were removed Component dant oil sys hydraulic c WR System Sta moved rtially Opera rtially Opera connected te he levels o eria, the 10 Storage Ins CFR Part 5 ded in section ctivities and een removed spent fuel st d hardware a
) was proces ontents) and aining the rea ncrete with appurtenanc or disposal in storage in th d from the F ts stems have oupling oil p ms and Com atus ational ational f residual CFR Part 50 tallation (IS 50 license.
n 3.2.
Tasks d, shipped, an torage racks and all othe ssed and col packaged in actor interna the reactor es were cut n June 2007 he ISFSI in FESW.
been draine pumps have ponents radioactivity 0 license w SFSI) and th Spent fuel nd disposed
: s. Removal er Class B a llected with n three liner als and 29 co r head insta
: t. The RPV
: 7. After all September 2 ed. The Fo been electri y are ill be e site l and of in l and and C other s that ontrol alled.
V was spent
: 2012, orced ically


waste. Waste stoClass B/Cwere shiprod bladAttachmeremoved fuel asse the stora g3.2.2.3.2.2.1.The ForcCirculati se Boiling WTermination n 0 ble 3-1 (co nSystem or ne Bldg. Co nne Oil and Hd Waste Col lTransfer Bri dC Systems ical System stos Abatem ee balance rated to be to the area atransferred issioning ac tCompleted aOverviews of 2 millio to the Rea cof the RP Vored in the FC waste (i.e pped for dis pdes was fil lents to the Rfrom the Rmblies and fge racks an dDismantlForceced Circul aon pumps, aWater Reacto rPlan ntinued) SaComponenndensate an dHydrogen Se alection Syst edge s ent of the site below the uaround the Iback to D ativities com pand Ongoingw n pounds o fctor Pressu rV included dFuel Eleme n., resins, fil tposal in Jun eled with l oRPV were reactor Buil dfuel debris wd installed c olement of S yd Circulatio nation syste mauxiliary oil r  Status of M aas of June 2 0nt d Feed Ral Oil  Pems InRInIn75is remedi aunrestricted Independent airyland un dpleted to dat g Decommisf metallic w are Vessel (
La Cross License T Revision disconne density c nozzles w reactor c disposed 3.2.2.2.
Rdisposition ont Storage Wters, and wa se 2007. Th eow-density cremoved an dding and wa were placed omponents wystems and n System m and atten dpumps, an d3-3 ajor LACBW015 Removed artially Re mn place - Pa rRemoved n place - Pa rn place- Dis c5% complet ated and t hrelease crit eSpent Fuel der the 10e are provid ssioning Acaste have be RPV) and s of irradiate dWell (FESW
The Seal Circulati 90% rem 3.2.2.3.
)ste barrel c oe RPV cont acellular co nd all other as shipped f oin dry cask were remove dComponentdant oil sy shydraulic c WR SystemStamoved rtially Oper artially Oper aconnected te he levels o eria, the 10 Storage Ins CFR Part 5ded in sectio nctivities and een remove dspent fuel s td hardware a) was proce sontents) and aining the re ancrete with appurtenanc or disposal i nstorage in t hd from the Fts stems have oupling oil pms and Com atus ational ational f residual CFR Part 5 0tallation (I S50 license.
The Dec cooler, a This syst 3.2.2.4.
n 3.2. Tasks d, shipped, a ntorage rack sand all oth essed and co lpackaged inactor intern athe reacto res were cu tn June 200 7he ISFSI in FESW. been drain epumps have ponents radioactivit y0 license w SFSI) and th Spent fue lnd disposed
The Prim regenerat resins ha coolers a 3.2.2.5.
: s. Remova ler Class B allected with n three liner als and 29 c or head inst at. The RP V7. After all September 2ed. The F o been electr iy are ill be e site l and of in l and and C other s that ontrol alled. V was spent 2012, orced ically La CrossLicense TRevisiondisconnedensity cnozzles wreactor cdisposed 3.2.2.2.The SealCirculati 90% rem3.2.2.3.The Deccooler, a This syst3.2.2.4.The Primregeneratresins hacoolers a3.2.2.5.
The Alte (HPSW) duplex st system in and 80%
The Alte(HPSW) duplex stsystem inand 80%compone3.2.2.6.This systrecombinexceptiontunnel. 3.2.2.7.The Fuel11 feet b38,000 gpumps, ofuel and
compone 3.2.2.6.
This syst recombin exception tunnel.
3.2.2.7.
The Fuel 11 feet b 38,000 g pumps, o fuel and well and se Boiling W Termination n 0 cted. All 1 cellular conc were cut to cavity was a of. Pumps Seal I l Injection s on pumps an moved.
Decay cay Heat Co nd interconn tem is draine Prima mary Purific tive cooler, ave been rem and 90% of th Altern ernate Core pumps, whi trainers and n the Reacto
% of the pi ents are drain Gaseo tem routed ning, monito n of the und Fuel E l Element Sto by 11 feet b allons of wa one heat exc fuel debris, i a fixative w Water Reactor Plan 16 inch and crete. Four allow remo also cut at and piping i njection Sys ystem provi nd the 29 co y Heat Cooli ooling system necting pipin ed and inope ary Purificati cation syste purification moved and t he piping ha nate Core Sp Spray syste ich took suc two motor-o or Building w iping in the ned and are r ous Waste D main conde oring and h derground ga Element Stor orage Well (
by approxim ater. The FE changer, one installed com was applied to r
20 inch For 16 inch Forc oval of the the biologic n the shielde stem ided cooling ontrol rod dr ing System m was a sin ng used to r erable.
ion System m was a h n cooler, pum the system h ave been rem pray System m consisted ction from th operated val was removed e Turbine B ready for dis isposal Syst enser gasses holdup for as storage tan rage Well (FESW) is a mately 42 fe ESW cooling e ion exchan mponents, an o the walls.
3-4 rced Circula ced Circulat reactor pres cal shield, s ed cubicles r g and sealing ive units. T ngle high pr remove core high pressur mp, two ion has been dr moved and di d of two die he river and lves installed d due to inte Building ha smantlement tem s through va decay. Th nks and the a stainless ste eet deep. W g system is c nger, piping, nd storage ra The system ation system tion inlet no ssure vessel segmented i remain.
g water for This system i ressure clos decay heat re, closed lo n exchanger rained. The isposed as ra esel-driven H discharged d in parallel erference wi as been rem
: t.
arious comp his system h gas storage eel lined con When full, connected to
, valves, and acks have be m has been dr m piping was zzles and fo
. Piping lo into manage the seals on is drained an sed loop con following r oop system rs and filters e Primary Pu adioactive w High Pressur to the reacto
. Approxim th the reacto moved. Re ponents for has been re tank in the T ncrete structu it containe o the well an d instrument een removed rained and is s filled with our 16 inch o ocated withi eable pieces n the two Fo nd approxim ntaining a p reactor shutd consisting
: s. Ion exch urification p waste..
re Service W or vessel thr mately 50% o or vessel rem emaining sy drying, filte emoved with Turbine Bui ure that mea ed approxim nd consists o tation. All d from the sto s inoperable.
h low outlet n the
, and orced mately
: pump, down.
of a hange
: pump, Water rough of the moval ystem
: ering, h the ilding asures mately of two spent orage


well and se Boiling WTermination n 0 cted. All 1cellular con cwere cut to cavity was aof. Pumps Seal Il Injection son pumps a nmoved. Decaycay Heat C ond intercon ntem is drain ePrimamary Purifi ctive cooler, ave been re mand 90% of t hAlternernate Core pumps, wh itrainers and n the React o% of the p ients are drai nGaseotem routed ning, monit on of the un dFuel El Element St oby 11 feet ballons of w aone heat ex cfuel debris, ia fixative wWater Reacto rPlan 16 inch and crete. Four allow rem oalso cut at and piping injection Sy system prov ind the 29 c oy Heat Cool iooling syste mnecting pipi ned and inop eary Purificat ication systepurificatio nmoved and the piping h anate Core S pSpray syste ich took su ctwo motor-oor Building wiping in th ened and are rous Waste Dmain cond eoring and hderground g aElement Sto rorage Well (by approxi mater. The F Echanger, on einstalled co mwas applied t or  20 inch Fo r16 inch For coval of the the biologi cn the shield estem ided coolin gontrol rod dr ing System m was a si nng used to rerable. ion System m was a hn cooler, pu mthe system have been re mpray Systemm consiste dction from t hoperated va lwas remove de Turbine Bready for di sisposal Sys tenser gasse sholdup for as storage ta nrage Well (FESW) is amately 42 f eESW coolin ge ion excha nmponents, a no the walls.
La Cross License T Revision 3.2.2.8.
3-4 rced Circul aced Circula treactor pre scal shield, sed cubicles rg and sealin give units.
The Com various h barrier b cooling w system is 3.2.2.9.
Tngle high p rremove core high pressu rmp, two io nhas been d rmoved and d id of two di ehe river and lves installe dd due to int eBuilding h asmantlemen ttem s through v adecay. Th nks and the a stainless st eeet deep.
The func force to the Force air comp drained.
Wg system is cnger, piping
3.2.2.10.
,nd storage r aThe system ation syste mtion inlet no ssure vessel segmented iremain. g water for This system iressure clos decay heat re, closed l on exchange rrained. Theisposed as r aesel-driven Hdischarged d in parallel erference wi as been re mt. arious com phis system hgas storage eel lined co nWhen full, connected t o, valves, an dacks have b em has been d rm piping wa szzles and f
Water fo suction t system su cooling w down fla equipmen isolated f Administ 3.2.2.11.
: o. Piping l ointo manag ethe seals o nis drained a nsed loop co nfollowing roop system rs and filter se Primary P uadioactive wHigh Pressu rto the react
The Dem of 19,100 are two s Virgin W deminera Station (G 3.2.2.12.
: o. Approxi mth the react omoved. Reponents for has been r etank in the Tncrete struct uit contain eo the well a nd instrumen teen remove drained and i ss filled wit hour 16 inch oocated withi eable pieces n the two F ond approxi mntaining a preactor shut dconsisting
The Ove integral p the FESW OHST ac The OHS Spray sy drained a se Boiling W Termination n 0 Comp mponent Coo heat exchang between rad water to Re s approximat Hydra ction of the H operate the ed Circulatio ressors, wat Well W or this syste through stai upplied wate water for the ash tank and nt and seal w from the Re tration Build Demin mineralized W 0 gallons and sections of a Water Tank p alized water G-3). The sy Overh erhead Stora part of, the R W, cask poo cted as a re ST also supp ystem, and w and inoperab Water Reactor Plan ponent Cooli oling Water gers and pum ioactive sys eactor Build tely 70% com aulic Valve A Hydraulic V five piston-t on and Main ter pumps, an Water System m was supp nless steel er to the pla e two Turbi d sample co water for th eactor/Turbin ding and Crib neralized W Water System d an upper V an integral a provided wat throughout ystem has be head Storage age Tank (O Reactor Bui ol, and upper ceiver for re plied the wa was a backup ble.
: s. Ion exc hurification pwaste.  .
r ing Water Sy (CCW) syst mps in the R stems and s ding Air Con mplete.
re Service Wor vessel th rmately 50%
Accumulator Valve Accum type valve a n Steam syst nd other equ m
oor vessel re memaining s ydrying, filt eemoved withTurbine Bu iure that me aed approxi mnd consists otation. All d from the st os inoperable.
plied from t strainers, an ant and office ne Building ooler. The he Circulatin ne building.
h low outlet n the , and orced mately pump, down. of a hange pump, Water rough of the moval ystem ering, h the ilding asures mately of two spent orage La CrossLicense TRevision3.2.2.8.The Comvarious hbarrier bcooling wsystem is3.2.2.9.
b House.
The funcforce to the Forceair comp drained.
ater System m consists o Virgin Water luminum tan ter to the De the plant. W een drained.
3.2.2.10.Water fosuction tsystem sucooling wdown flaequipmenisolated fAdminist3.2.2.11.
e Tank OHST) is a 4 lding. The r cavity duri ejecting refu ater for the E p source for 3-5 ystem tem provided Reactor Build secondary c nditioner co r System mulator system actuators, wh tems. The h uipment have two sealed s nd discharge e for sanitar g air-conditio well water ng Water pum Well water of a lower C r Tank, whic nk located o mineralized Water was d 45,000-gallo OHST serve ing cask loa ueling water Emergency C the Seal Inj d controlled ding during ooling syste ompressors.
The Demof 19,100are two sVirgin WdemineraStation (
m was to su hich operate hydraulic sy e also been submersible ed into inte ry and drinki oning units system also mps. The W r pump #3 s Condensate S ch has a capa on the Turbin d Water trans demineralize on tank loca ed as a reser ading operati r using the P Core Spray s njection syste d quality coo plant operat ems. The The disma upply the nec ed the five r ystem has be electrically deep well egrated press ing purpose and the heat o supplied w Well Water supplies pot Storage Tank acity of 29,7 ne Building sfer pumps, w ed in batches ated at the t rvoir for wa ions. Durin Primary Pur system and em. The sy oling water t tion, serving system prov antlement of cessary hydr rotoport valv een drained.
G3.2.2.12.
disconnected pumps that sure tanks.
The Oveintegral pthe FESWOHST acThe OHSSpray sydrained ase Boiling WTermination n 0 Compmponent Co oheat exchan gbetween ra dwater to R es approxima tHydraction of the Hoperate the ed Circulati oressors, wa tWell Wor this syste through stai upplied wat ewater for th eash tank an dnt and seal wfrom the R etration Buil dDeminmineralized W0 gallons an dsections of aWater Tank palized water G-3). The s yOverherhead Stor apart of, the RW, cask po octed as a re ST also sup pystem, and wand inopera bWater Reacto rPlan ponent Cool ioling Water gers and pu mioactive sy seactor Buil dtely 70% co maulic Valve AHydraulic Vfive piston-ton and Mai nter pumps, a nWater Syste mm was sup pnless steel er to the pl ae two Turbi d sample c owater for t heactor/Turbi nding and Cri bneralized WWater Syste md an upper Van integral a provided wa tthroughout ystem has b ehead Storag eage Tank (
: s. It was us ting boiler b water for lau System has table water t k with a cap 780 gallons.
OReactor Bui ol, and uppe rceiver for r eplied the w awas a backu pble. r ing Water Sy(CCW) sys tmps in the Rstems and sding Air Co nmplete. Accumulato rValve Accu mtype valve an Steam sys tnd other eq um plied from tstrainers, a nant and offic ene Buildin gooler. The he Circulati nne building.
b House. ater System m consists oVirgin Wate rluminum ta nter to the Dethe plant.
Ween drained.
e Tank OHST) is a 4lding. The r cavity dur iejecting ref uater for the Ep source for 3-5 ystem tem provide dReactor Buil dsecondary c nditioner c or System mulator syste mactuators, w htems. The huipment hav etwo sealed snd discharg ee for sanita rg air-conditiowell water ng Water pu m Well wate rof a lower Cr Tank, whi cnk located omineralized Water was d 45,000-gall oOHST serveing cask lo aueling wate rEmergency Cthe Seal I njd controlle dding during ooling syst eompressors. m was to s uhich operat ehydraulic s ye also been submersible ed into int ery and drink ioning units system als omps. The Wr pump #3 sCondensate Sch has a cap aon the Turbi nd Water tran sdemineraliz eon tank loc aed as a rese rading operat ir using the PCore Spray snjection syst ed quality co oplant opera tems. The The dism aupply the ne ced the five rystem has b eelectrically deep well egrated pres sing purpose and the hea to supplied wWell Water supplies po tStorage Tan kacity of 29, 7ne Building sfer pumps, wed in batche sated at the trvoir for w aions. Duri nPrimary Pu rsystem and em. The s yoling water ttion, servin gsystem pro vantlement o fcessary hyd rrotoport val veen drained. disconnecte dpumps that sure tanks. s. It was u sting boiler bwater for la uSystem has table water tk with a ca p780 gallons.
office roof.
office roof.
which distri bs at Genoa Ftop of, and ater used to ng operation rification s yReactor Bu iystem is cur rto the g as a vided f this raulic ves in The d and took The sed as blow-undry been to the pacity Both The buted Fossil is an flood s, the ystem. ilding rently La CrossLicense TRevision3.2.2.13.There areact as a vsupply toused as n3.2.2.14.Two vertstrainer uwas the system isriver watto allow 3.2.2.15.The purp(G-3) maThe inter(WTB) ihydrants the fire sby the re m3.2.2.16.Circulati nopen sucjoin a cocondenseWater entube sidewhich diLACBWpumps ha3.2.2.17.The Condpressure Tank (CS3.2.2.18.The Fullremoved piping hase Boiling WTermination n 0 Statioe two singl evolume stor ao the statio nneeded. Low Ptical pumps unit. The L normal sups currently uter ingress i ndismantlem eHigh Ppose of the Haintains HP Srnal loop se rinterior hos eand the L Auppression smoval of is oCirculng water is dction bays i nommon 60 i ner, the 60 in cnters the top
which distrib s at Genoa F top of, and ater used to ng operation rification sy Reactor Bui ystem is curr to the g as a vided f this raulic ves in The d and took The sed as blow-undry been to the pacity Both The buted Fossil is an flood s, the ystem.
: e. The 42 i nscharges to tWR Crib Ho uave been de
ilding rently  
-Condedensate Sys tto the sucti oST), this sys tFull-Fl-Flow Con dionic impu ave been remWater Reacto rPlan n and Contr
-stage posit iage unit for tn and the co nPressure Ser vlocated in t how Pressur epply to the Hused as the dn the turbin eent which is Pressure Se rHPSW systeSW system rved the Tu re stations a nCBWR Cribsystem for Golation valv elating Wate rdrawn into tn the LACB nch pipe le ach pipe bra nsection of t hnch conden sthe seal wel use. The C-energized.
ensate Syste tem took co non of the re atem has bee nFlow Conde ndensate De mrities from tmoved. r  ol Air Syste ive displace mthe station.
ntrol air sy svice Water She LACBWe Service W HPSW systdilution wa te building t uapproximat ervice Water em is to su ppressure.
Trbine Buildi nnd sprinkle rb House spr iG-3. Curren tes and instal lr System the intake fl uWR Crib Hading to th enches into t whe condense rser circulati nl from G-3 lCirculating Wm and Feed wndensed ste aactor feed p un drained a nnsate Demi nmineralizer the condens 3-6 m ment lubric aThe air rece stems. This System R Crib Ho uater (LPS Wem throug hter supply f ounnel area.
ely 30% co mSystem ply fire sup The HPSW ng, Reactor Br systems.
inklers. Th etly, the syst eling pipe bl aume from t hHouse. Eac he main con dwo 42 inch p ir tube side ang water ou tlocated appr Water Syste mwater Heate ram from the umps. With nd most of t hneralizer Sys tSystem co nate water g oated type co meiver outlet l isystem is cuse supplied W) system su ph the moto r-or conducti nThe origin amplete. pression w asystem is dBuilding, a nThe extern ae external lo em is isolat eanks to allo whe river by t wh pump disc hdenser in thipe to the t oand is disch atlet lines tie roximately 6 m is curren trs condenser hthe excepti ohe piping ha stem nsisted of r eoing back t ompressors.
ines join to fcurrently sti lthe system upplied the C-driven HP Sng liquid w aal system ha sater. The a ddivided into nd Waste Tr al loop sup pop was cro sed from the Tw only exter nwo pumps l oharges into he Turbine Bop section o farged from t hinto a com m600 feet do wtly inopera bhotwell and don of the C os been remo vesin-filled s eo the reacto The air rec eform a head ell operable athrough a d uCCW cooler SW pump.
aste dischar gs been simp djacent coal two main leatment Bu iplies outsid ess-connecte dTurbine Bu inal fire loop ocated in se p42 inch pip eBuilding.
Af the water bhe bottom s emon 60 inc hwnstream fro mble as the s ydelivered it uondensate St oved. ervice tank sr. All tank seivers er for and is uplex s and This ges of lified plant oops. ilding e fire d with ilding use. parate e that At the boxes. ection h line m the ystem under orage s that s and La CrossLicense TRevision3.2.2.19.The turbirated at 6pressure have bee3.2.2.20.The 60 76,800 kVlubricati nthrough abeen com3.2.2.21.The Turblubricati nreductioncomplete3.2.2.22.
The Reacfor drawiair condi337,500 Bbuilding from the350 feet


exhaust sparticula tincludes
La Cross License T Revision 3.2.2.13.
There are act as a v supply to used as n 3.2.2.14.
Two vert strainer u was the system is river wat to allow 3.2.2.15.
The purp (G-3) ma The inter (WTB) i hydrants the fire s by the rem 3.2.2.16.
Circulatin open suc join a co condense Water en tube side which di LACBW pumps ha 3.2.2.17.
The Cond pressure Tank (CS 3.2.2.18.
The Full removed piping ha se Boiling W Termination n 0 Statio e two single volume stora o the station needed.
Low P tical pumps unit. The L normal sup s currently u ter ingress in dismantleme High P pose of the H aintains HPS rnal loop ser interior hose and the LA uppression s moval of iso Circul ng water is d ction bays in ommon 60 in er, the 60 inc nters the top
: e. The 42 in scharges to t WR Crib Hou ave been de-Conde densate Syst to the suctio ST), this syst Full-F l-Flow Cond ionic impu ave been rem Water Reactor Plan n and Contr
-stage positi age unit for t n and the con Pressure Serv located in th ow Pressure pply to the H used as the d n the turbine ent which is Pressure Ser HPSW syste SW system rved the Tur e stations an CBWR Crib system for G olation valve lating Water drawn into t n the LACB nch pipe lea ch pipe bran section of th nch condens the seal wel use. The C
-energized.
ensate Syste tem took con on of the rea tem has been Flow Conden densate Dem rities from t moved.
r ol Air Syste ive displacem the station.
ntrol air sys vice Water S he LACBW e Service W HPSW syst dilution wat e building tu approximate rvice Water em is to sup pressure. T rbine Buildin nd sprinkler b House spri G-3. Current es and install r System the intake flu WR Crib H ading to the nches into tw he condenser ser circulatin l from G-3 l Circulating W m and Feedw ndensed stea actor feed pu n drained an nsate Demin mineralizer the condens 3-6 m
ment lubrica The air rece stems. This System R Crib Hou ater (LPSW em through ter supply fo unnel area.
ely 30% com System ply fire sup The HPSW ng, Reactor B r systems.
inklers. The tly, the syste ling pipe bla ume from th House. Each e main cond wo 42 inch pi r tube side a ng water out located appr Water System water Heater am from the umps. With nd most of th neralizer Syst System con ate water go ated type com eiver outlet li system is c use supplied W) system sup h the motor-or conductin The origina mplete.
pression wa system is d Building, an The externa e external lo em is isolate anks to allow he river by tw h pump disch denser in th ipe to the to and is discha tlet lines tie roximately 6 m is current rs condenser h the exceptio he piping has tem nsisted of re oing back to mpressors.
ines join to f currently stil the system upplied the C
-driven HPS ng liquid wa al system has ater. The ad divided into nd Waste Tr al loop supp op was cros ed from the T w only extern wo pumps lo harges into he Turbine B op section of arged from th into a comm 600 feet dow tly inoperab hotwell and d on of the Co s been remov esin-filled se o the reacto The air rece form a heade ll operable a through a du CCW cooler SW pump.
aste discharg s been simp djacent coal two main l eatment Bui plies outside ss-connected Turbine Bui nal fire loop ocated in sep 42 inch pipe Building. A f the water b he bottom se mon 60 inch wnstream from ble as the sy delivered it u ondensate Sto ved.
ervice tanks
: r. All tanks eivers er for and is uplex s and This ges of lified plant oops.
ilding e fire d with ilding use.
parate e that At the boxes.
ection h line m the ystem under orage s that s and


which hidetectingVentilati
La Cross License T Revision 3.2.2.19.
The turbi rated at 6 pressure have bee 3.2.2.20.
The 60 76,800 kV lubricatin through a been com 3.2.2.21.
The Turb lubricatin reduction complete 3.2.2.22.
The Reac for drawi air condi 337,500 B building from the 350 feet exhaust s particulat includes which hi detecting Ventilati vault are the gas s vault thro Currently use of sta se Boiling W Termination n 0 Steam ine was a hi 60 MW. Th element. T n removed.
60-Me MW gener VA. The g ng system, a a reduction g mpletely rem Turbin bine Oil Sys ng and cooli n gear. This ely removed.
Heatin ctor Buildin ing fresh air itioning unit Btu/hr capac through ope building us high and is system was te radiation an isokineti storically ha g particulate on for the W as of the bu storage tank ough the con y, both syste ack fans that Water Reactor Plan m Turbine igh pressure he turbine co The Steam T egawatt Gen ator was a generator w and excited gear. The m moved, uncon ne Oil and H stem receive ing oil to th s system, wi ng, Ventilati g Ventilatio r into the bu t air inlet inc city steam c enings betw sing stack b constructed equipped w detector. A ic nozzle, lo as drawn air and gaseous WTB was pro uilding and e vault. The nnecting tunn ems are de-e t are energiz r
, condensing onsisted of a Turbine, as w nerator a high-spee as cooled b by a separat main and rese nditionally re Hydrogen Se ed cooled oi he turbine an ith exceptio ion, and Air on System ut uilding and f cluded a filt coil that was een and aro lowers throu of structura with conventi A monitoring ocated down r from the st s activity.
ovided by a 2 exhausted th stack blowe nel and disch energized. B ed by tempo 3-7 g, reaction, t a high pressu well as som d, turbine-d by a hydrog te exciter at erve exciters eleased and d eal Oil System il from the l nd generato n of the dra Conditionin tilized two 3 for circulatin er box assem s used when und the bi-p ugh the exh al concrete w ional and hi g system is i nstream of t tack exhaust 2000 cfm ex he air throug ers then exh harged the a Building ven orary power.
tandem com ure and inter me steam sys driven wou gen system, ttached to th s have been dispositione m
lube oil coo r bearings, ained clean a ng (HVAC) S 30 ton, 12,00 ng the air thr mbly, face a n heating wa parting door haust stack f with an alum igh-efficienc installed wit the high-eff t to the mon xhaust fan th gh a duct ou hausted the a air from the b ntilation is cu mpound, rehe rmediate pre stem piping und-rotor m lubricated b he end of th removed. T ed.
olers to supp exciter bear and dirty oi Systems 00 cfm air c roughout the and bypass d as required.
r sections an for the facili minum nozzle cy filters and th the exhau ficiency filte nitoring syste hat drew air f ut the floor o air from the building thro urrently supp eat 3600 rpm essure and a and compo machine rate by a forced he generator The generato ply the nece rings, and ex l tanks, has conditioning e building.
dampers, and Air entere nd was exha ity. The sta e at the top.
d monitored ust system, w ers. The sy em, is capab from the shi of the buildi gas storage ough the stac plied throug m unit a low-onents ed at
-flow shaft or has essary xciter been units Each d one ed the austed ack is The d by a which
: ystem, ble of elded ing to e tank ck.
gh the


vault arethe gas svault thr oCurrentlyuse of st ase Boiling WTermination n 0 Steamine was a h i60 MW. Thelement.
La Cross License T Revision 3.2.2.23.
Tn removed.
The Liqu storage ta in the tun The Reac consists pump, tw retention Followin liquid wa water dis Spent res quantity transferre disposal.
60-MeMW generVA. The gng system, aa reduction gmpletely re mTurbinbine Oil Sy sng and cool in gear. Thi sely removed
Currently discharge The air o 3.2.2.24.
.Heatinctor Buildi ning fresh ai ritioning uni tBtu/hr capa cthrough op e building u shigh and is system was te radiation an isokinet istorically h ag particulate on for the Was of the bustorage tank ough the co ny, both systeack fans tha tWater Reacto rPlan m Turbine igh pressure he turbine c oThe Steam Tegawatt Ge nator was agenerator w and excited gear. The mmoved, unconne Oil and Hstem receiv eing oil to t hs system, w
The plan site has a buildings the stack 3.2.3.
: i. ng, Ventilat ig Ventilati or into the b ut air inlet in ccity steam cenings betw sing stack bconstructed equipped wdetector.
Other com The con The Con The rack The Co The 3.3.
Aic nozzle, l oas drawn ai rand gaseou sWTB was pr ouilding and evault. The nnecting tun nems are de-et are energiz r  , condensin gonsisted of aTurbine, as wnerator a high-spee as cooled bby a separa tmain and res enditionally r eHydrogen S eed cooled o ihe turbine a nith exceptio ion, and Air on System u tuilding and fcluded a filt coil that wa seen and arolowers thro uof structur awith convent iA monitorin gocated dow nr from the s ts activity.
F The plan remainin se Boiling W Termination n 0 Liquid uid Waste Sy ank vault, an nnel between ctor Buildin of two reten wo sump pu n tanks.
ovided by a 2exhausted t hstack blow enel and disc henergized. Bed by temp o3-7 g, reaction, ta high press uwell as so md, turbine-dby a hydrog te exciter a terve exciter seleased and deal Oil Syste mil from the lnd generato n of the dr aConditioni ntilized two 3for circulati ner box asse ms used whe nund the bi-pugh the ex hal concrete wional and hi g system is instream of ttack exhaus t2000 cfm e xhe air throu gers then ex hharged the aBuilding ve norary power.
ng processin aste from ea scharge outfl sin was trans available f ed to an ap y, the liquid es at LACBW operated pum Electr nt is disconne a 480 volt 50
tandem comure and inte rme steam sy sdriven wougen system, ttached to t hs have been disposition em lube oil co or bearings, ained clean ang (HVAC)
: s. Temporar
S30 ton, 12,0 0ng the air th rmbly, face an heating w aparting doo rhaust stack fwith an alu migh-efficien cinstalled wi tthe high-ef ft to the mo nxhaust fan t hgh a duct o uhausted the aair from the bntilation is c u mpound, reh ermediate pr estem piping und-rotor mlubricated bhe end of t hremoved.
: k.
Ted. olers to sup pexciter bea rand dirty oi Systems 00 cfm air croughout th eand bypass das required.
Addition mpleted dec e abatement ntaining mate e abatemen ntaining Ma e placement ks from the e disconnect old and Dark e draining an Future Deco ns for the de ng site struct Water Reactor Plan d Waste Col ystem collec nd the tunne n the Reacto ng Liquid W ntion tanks, umps, and th ng and samp ach system w low. This w sferred to th for shipmen pproved ship d waste colle WR are thro mp discharge rical Distribu ected from o 00 kVa trans ry power is al Activities ommissionin
r sections a nfor the facil iminum nozzl ecy filters an dth the exha uficiency filt enitoring syst ehat drew air fut the floor oair from the building thr ourrently sup peat 3600 rp messure and aand compomachine rat eby a force dhe generator The generat oply the nec erings, and e xl tanks, has conditioning e building.
, packaging erial.
dampers, an d Air enter end was exh aity. The st ae at the top.
nt, packagin aterial (ACM of all spent FESW.
d monitore dust system, wers. The s yem, is capa bfrom the shi of the build igas storag eough the sta cplied throu gm unit a low-onents ed at -flow shaft or has essary xciter been units Each d one ed the austed ack is  The d by a which ystem, ble of elded ing to e tank ck. gh the La CrossLicense TRevision3.2.2.23.The Liqustorage t ain the tu nThe Reacconsists pump, twretentionFollowinliquid wawater disSpent resquantity transferr edisposal.
tion of LAC k status.
CurrentlydischargeThe air o3.2.2.24.
nd removal o mmissionin contaminatio tures are pr r
The plansite has abuildingsthe stack3.2.3.Other comTheconTheConTherackThe"CoThe3.3.FThe planremaininse Boiling WTermination n 0 Liquiduid Waste S yank vault, a nnnel betwee nctor Buildi nof two rete nwo sump pun tanks. ng processi naste from e ascharge outf lsin was tran savailable fed to an a p y, the liqui des at LACB Woperated pu mElectrnt is disconn ea 480 volt 5 0s. Tempora rk. Additionmpleted de ce abatementntaining mat ee abatemenntaining M ae placement ks from the e disconnec told and Dar ke draining a nFuture Deco ns for the de ng site struc tWater Reacto rPlan d Waste Co lystem colle cnd the tunn en the Reacto ng Liquid Wntion tanks, umps, and t hng and sam pach system wlow. This wsferred to t hfor shipme npproved shi pd waste coll eWR are thr omp discharg erical Distrib uected from o00 kVa tran sry power is al Activitie sommissioni n, packaging erial. nt, packagi naterial (AC Mof all spent FESW. tion of LA Ck" status.
llection Syst cts the liquid el into two st r Building a Waste System each with he necessary pling to dem was then dis was the norm he spent resin nt to an ap pping contai ection system ough the East es to the inlet ution System off-site powe sformer prov tied to exis s
nd removal ommissioni ncontaminati otures are p rr  llection Syst cts the liqui del into two s tr Building aWaste Syste m each with he necessar ypling to de mwas then di swas the norm he spent resi nnt to an a ppping conta iection syste mough the Eas tes to the inle tution Syste moff-site pow esformer pro vtied to exis s ng activities and dispos ang and dis pM). fuel into dr yCBWR from of other mis cng Activitie son, dismant lresented in t3-8 ems d waste fro mtorage tanks and the Turb im, which is sa capacity oy piping to monstrate c oscharged to al liquid eff ln receiving tpproved pro iner, dewat em pumps ar et Turbine b ut of the liqu im er in suppor tviding pow eting overhe a include:
ng activities and disposa ng and disp M).
al of know nposal of k ny storage in toff-site ele ccellaneous s ys and Tasks lement and athe followi nm the Turbin e (4500 gall oine Buildin gseparate fro mof 6000 gal lroute the wompliance wthe commo fluent releas etank and he locessing fa cered, packa ge not opera building sum pid waste mo nrt of Cold a ner to multipl ad cranes a nn and readil ynown and rthe ISFSI f actrical powe rystem pipin ganticipated eng sections.
fuel into dry CBWR from of other misc ng Activities on, dismantl resented in t 3-8 ems d waste from torage tanks and the Turbi m, which is s a capacity o y piping to monstrate co scharged to al liquid effl n receiving t pproved pro iner, dewate m pumps are t Turbine bu t of the liqui m
e Building, tons and 300 0g. m the Liqui lons, a liqu iwaste liquid with the rel eon G-3/LAC e pathway f old until ther ecility. The ged and shipble. The o np using an a initor, whichnd Dark stat ue power ca rnd power to y accessible readily acc eacility and t hr and placi ng. end-state co The meth othe WTB, t h0 gallons) l od Waste Sy id waste tr ato and fro mease criteri aBWR circu lor LACBWRe was a suf firesin was pped for o fnly liquid ef fir operated ph is still oper aus. Current lrts througho u exhaust fa nlead and/o ressible As bhe removal o ng LACBWRndition(s) f oods to rem ehe gas ocated ystem, ansfer m the a, the lating R. ficient then ff-site fluent pump. able. ly the ut the ns for r lead bestos f fuel R in a or the ediate La CrossLicense TRevisioncontaminremediat3.3.1.The Reacellipsoid aand it exfor the u pThe buildincludinglayer of structure
er in support viding powe ting overhea include:
al of known posal of kn y storage in t off-site elec cellaneous sy s and Tasks lement and a the followin m the Turbine (4500 gallo ine Building separate from of 6000 gall route the w ompliance w the commo fluent release tank and hel ocessing fac ered, packag e not operab uilding sump id waste mon rt of Cold an er to multipl ad cranes an n and readily nown and r the ISFSI fa ctrical power ystem piping anticipated e ng sections.
e Building, t ons and 3000
: g.
m the Liqui lons, a liqui waste liquid with the rele on G-3/LAC e pathway fo ld until there cility. The ged and ship ble. The on p using an ai nitor, which nd Dark statu e power car nd power to y accessible readily acce acility and th r and placin
: g.
end-state co The metho the WTB, th 0 gallons) lo d Waste Sy id waste tra to and from ease criteria BWR circul or LACBWR e was a suffi resin was pped for of nly liquid eff ir operated p h is still opera us. Currentl rts throughou exhaust fan lead and/or essible Asb he removal o ng LACBWR ndition(s) fo ods to reme he gas ocated
: ystem, ansfer m the a, the lating R.
ficient then ff-site fluent pump.
able.
ly the ut the ns for r lead bestos f fuel R in a or the ediate  


concrete The shelTurbine Reactor Bremoval closed byleaves ththe northA 50 tonReactor supportedthe 5-tonHatches of the ca bThe remaremoved and the i dSystems overheadsize reduthe wasteWater anOnce thebuilding activity wonce the In preparelevationwill allo wse Boiling WTermination n 0 nated struc tion issues.
La Cross License T Revision contamin remediat 3.3.1.
Reactor Bctor Buildi nal bottom.
The Reac ellipsoida and it ex for the up The build including layer of structure concrete The shel Turbine Reactor B removal closed by leaves th the north A 50 ton Reactor supported the 5-ton Hatches of the cab The rema removed and the id Systems overhead size redu the waste Water an Once the building activity w once the In prepar elevation will allow se Boiling W Termination n 0 nated struct ion issues.
Ixtends 26 fe epper hemisp ding contai ng the RPV a nconcrete to is support eapproximat ell includes t Building.
Reactor B ctor Buildin al bottom. I xtends 26 fee pper hemisp ding contain g the RPV an concrete to is supporte approximate ll includes t Building. I Building tha and dry cas y a weather he Reactor B heast quadran n traveling p Building.
IBuilding th aand dry cas y a weather he Reactor Bheast quadra nn traveling pBuilding.
d by column n hoists are a at several po bles and equ aining comp
d by colum nn hoists are aat several p obles and eq uaining com
. Area prep dentification or compon d crane or loc uce. The sys e loading are nd sludge ar e tank has b demolition.
: p. Area pre pdentificatio nor compond crane or lo cuce. The sy se loading ar end sludge a re tank has bdemolition.
will allow fo tank is prep ration for th
will allow f otank is prep ration for t hn. As neces sw for the pe rWater Reacto rPlan tures, syste mBuilding g is a right It has an ov eet 6 inches bherical dom ned most of tnd biologic aan elevatio ned on a fou nely 3 feet th iwo airlocks In addition, at is intende dk storage, a ntight, insul aBuilding 1 t ont and ente rspolar crane wThe bridge ns around th ealso long e nositions in t huipment. ponents and sparation and n and mitiga tnents will b ecal hoists.
: n. As necess w for the per Water Reactor Plan tures, system Building g is a right It has an ove et 6 inches b herical dom ned most of t nd biologica an elevation ed on a foun ely 3 feet thi wo airlocks In addition, at is intended k storage, an tight, insula Building 1 to nt and enters polar crane w The bridge ns around the also long en ositions in th uipment.
Sstems will b eea in the Tu rre currently been adequa t Keeping a sor the collec tared for de mhe building sary, prior t orformance o fr  ms, and eqcircular cyl ierall interna lbelow grade e, which is 0the equipm eal shielding.
ponents and s paration and n and mitigat nents will be cal hoists. S stems will be ea in the Tur re currently been adequat Keeping as or the collect ared for dem he building sary, prior to rformance of r
n of 727 fe endation con sick. . The pers othere is al sd to accom mn opening wated, roll-up
ms, and eq circular cyli erall internal below grade e, which is 0 the equipme al shielding.
,o 10 feet bel os the pipe tu nwith a 5 to ncompletely e inside of t hnough to rea che main and systems in t hset-up for c tion of any he removed uSome syste me either loa drbine Buildi ninside the Otely charact essociated pi ption of any lmolition. demolition, o dismantle mf hot work a3-9 quipment dinder buildinl height of 1 4level. The 0.60 inch thi ent associat e The interi oet 10 inches sisting of c oonnel airlo cso an 8 feet modate large was created i, bi-parting ow grade le vnnel. n auxiliary hspans the he building.
n of 727 fee ndation cons ick.  
ch down th rintermediat he Reactor Bommodity r ehazardous mutilizing m ems or compo nded into shi png. OHST. Theerized, a fixping and co mliquids. Thi sthe FESWment, the FE Sactivities req udo not inv ong with a h e44 feet and asteel shell tick. ed with the nor of the she lAbove Meaoncrete-stee lck connects by 10 feet pieces of e qin the Reac tdoor. The mvel either at hoist is loc abuilding a n The lifting rough hatch wte floors ma yBuilding wi lemoval will material.
. The perso there is als d to accomm n opening w ated, roll-up, o 10 feet belo s the pipe tun with a 5 ton completely e inside of th nough to reac he main and systems in th set-up for c tion of any h e removed u Some system e either load rbine Buildin inside the O tely characte ssociated pip tion of any l molition.
echanical mnents might pping contai ne tank will bxative will bmponents i ns piping wil will be dis mSW will be duired to re molve any uemispherica lan inside di athickness is nuclear stea mll is lined w ian Sea Lev el piles and athe Reacto rfreight do oquipment.
demolition, o dismantlem f hot work a 3-9 quipment d inder buildin l height of 14 level. The 0.60 inch thi ent associate The interio et 10 inches sisting of co onnel airloc so an 8 feet modate large was created i
Ttor Building majority of pthe northw eated in the und travels o cables of b oways into t hy be opened ll be draine d include ra dmeans with srequire hot wners or will be dewatere dbe applied i nn place whil el be disman tmantled fromdecontamin amove the stai nunique safe tl dome and sameter of 6 01.16 inch, e m supply sy ith a 9-inch
, bi-parting ow grade lev nnel.
-el (AMSL).
n auxiliary h spans the he building.
a pile cappi nr Building tor opening i To facilitate  
ch down thr intermediat he Reactor B ommodity re hazardous m utilizing me ms or compon ded into ship ng.
. The open ipipe penetr aest quadrant upper part on circular toth the 50-to nhe basement to allow pa d, dismantleddiological su rsupport fro mwork activi tbe transpor td and deslu dn preparati oe performin gtled and re mm the main ated to level nless steel Fty or semi-0 feet, xcept ystem, -thick The ng of to the n the RPV ing is ations t or at of the tracks n and area. ssage d, and rveys m the ties to ted to dged. on for g this moved floor s that FESW La CrossLicense TRevisionliner. Asections liner wil lTurbine Bwill be dEnergySoDemolitiAfter comwill be rwith propbasementThe rAsbeDismDismpipinDismRemeThe rThe expoto meet tis identi fmethod wdeeper dopen air
OHST. The erized, a fix ping and com liquids. This the FESW ment, the FES activities requ do not invo ng with a he 44 feet and a steel shell t ick.
: process, tOnce surreach excwalls do segmentethe steel
ed with the n or of the shel Above Mea oncrete-steel ck connects by 10 feet pieces of eq in the React door. The m vel either at hoist is loca building an The lifting rough hatchw te floors may Building wil emoval will material.
echanical m nents might pping contain e tank will b xative will b mponents in s piping wil will be dism SW will be d uired to rem olve any u emispherical an inside dia thickness is nuclear steam ll is lined wi an Sea Leve l piles and a the Reactor freight doo quipment. T tor Building majority of p the northwe ated in the u nd travels o cables of bo ways into th y be opened ll be drained include rad means with s require hot w ners or will be dewatered be applied in n place while l be dismant mantled from decontamina move the stain unique safet l dome and s ameter of 60 1.16 inch, e m supply sy ith a 9-inch-el (AMSL).
a pile cappin r Building t or opening i To facilitate  
. The openi pipe penetra est quadrant upper part o n circular t oth the 50-ton he basement to allow pa d, dismantled diological sur support from work activit be transport d and deslud n preparatio e performing tled and rem m the main ated to level nless steel F ty or semi-0 feet, xcept
: ystem,  
-thick The ng of to the n the RPV ing is ations t or at of the tracks n and area.
ssage d, and rveys m the ties to ted to dged.
on for g this moved floor s that FESW  


sprung stReactor BThe therpackaginconcrete
La Cross License T Revision liner. A sections liner will Turbine B will be d EnergySo Demoliti After com will be r with prop basement The r Asbe Dism Dism pipin Dism Reme The r The expo to meet t is identif method w deeper d open air process, t Once sur reach exc walls do segmente the steel sprung st Reactor B The ther packagin concrete
: removal, loaded inthe wastedisposal se Boiling WTermination n 0 Associated e qof the FES Wl be lifted b yBuilding.
: removal, loaded in the waste disposal se Boiling W Termination n 0 Associated eq of the FESW l be lifted by Building. O decontamina olutions Tec ion Limits (3 mmodity rem remediated t per contami t will includ removal of a stos Abatem mantle and re mantle and r ng as well as mantle and re ediation of th removal of a osed concret the open-air fied within t will be used depth, then a demolition.
Odecontamin aolutions Tecion Limits (
then a struct rveys have cavator equi wn to grade ed and remo liner segme tructure and Building. T rmal shield ng as mixed will be rem the remain nto appropria e container site in Clive Water Reactor Plan quipment (H W liner will b y the overhe Once the FE ated to the chnical Supp 3).
3mmodity re mremediated tper contam it will inclu dremoval of astos Abate mmantle and r emantle and rng as well as mantle and r eediation of t hremoval of aosed concre tthe open-air fied within twill be used depth, then ademolition
moval is com to levels tha ination contr de:
.then a struc trveys have cavator equ iwn to grad eed and remo liner segm etructure an dBuilding.
any identified ment (to be p move the 6,0 emove the the auxiliary move the co he sump.
Trmal shield ng as mixed will be re mthe remai nnto appropri ae container site in Cliv eWater Reacto rPlan quipment (
any lead shie te will then b demolition the first coup to remove t a wire saw w If large se tural evaluat demonstrate ipped with a e level. Af ved using cu entation and d associated The remainin will be seg waste. Aft moved, comp ning portion ate container will be tran e, Utah.
HW liner will by the overh eOnce the FE ated to the chnical Sup p3). moval is co mto levels th aination cont rde: any identifie dment (to be pmove the 6, 0emove the the auxiliar ymove the c ohe sump. any lead shi ete will then bdemolition the first cou pto remove ta wire saw w If large s etural evalua tdemonstrat eipped with ae level. A fved using c uentation and d associated The remaini nwill be se gwaste. Af tmoved, com pning portion ate containe rwill be tra ne, Utah.
r HVAC, etc.)
r HVAC, etc.
be size reduc ead crane, p SW liner ha extent nece port Docume mplete, the b at will allow rols per Ref d Hazardous erformed by 000-gallon r two Forced y oil pumps.
)be size redu cead crane, pSW liner h aextent nece port Docum emplete, the bat will allo wrols per Re fd Hazardou serformed b y000-gallon rtwo Forced y oil pumps
ondensate pu elding.
.ondensate p uelding. be surveyed criteria spe cple of inche the contami nwill be use dections of ction will be ced that the oa pneumatic fter the aboutting torch eremoval of ventilation ng interio r cgmented usi nter the ther mpletely expo sof the stee lrs and truck nsferred to a3-10 ) and pipin gced using pl ackaged an das been rem ossary to all ent (TSD)
be surveyed criteria spec ple of inche the contamin will be used ections of c tion will be c ed that the o a pneumatic fter the abo utting torche removal of ventilation ng interior c gmented usin ter the therm pletely expos of the steel rs and truck nsferred to a 3-10  
Rasement ele vw demolitio nference 3.
) and piping ced using pl ackaged and as been remo ssary to all ent (TSD) R asement elev w demolition ference 3. T s Waste.
Ts Waste. y a qualified retention ta nCirculatio
y a qualified retention tan Circulation urification io to determin cified in Ref s of concret nated materi d to remove ontaminated completed.
: n. urification i oto determi ncified in Re fs of concre tnated mater id to remove ontaminate dcompleted. open-air de mhammer wive grade i nes from the tthe steel lin system willconcrete wil lng a wire smal shield i ssing the ste el liner will ed to a rail ta rail car ang will also lasma cuttin gd placed in toved, the c olow open-ai rRS-TD-3131 9vation (621 n of above gThe prepara tSubcontrac tnks. n Pumps, i non exchange rne the scope ference 3. I fte, a scabbli nial. If the c ocontaminat ed concrete mmolition cri till be used tnternal steel top down to ner to the gr ol be install el then be remsaw into m as removed, tel liner. Subbe remove dtrans-load f and then shi pbe remove dg. Sized pi ethe waste s toncrete unde r demolitio n96-005, LACfoot) of the ground stru ction of the Rtor). ncluding th ers. of the reme df unaccepta bng method oontaminatio ed areas ab omust be re mteria have bto break the shell is ex pthe ground ound elevati ed over the moved to t hanageable pthe remain dbsequent to  
open-air dem hammer wi ve grade in es from the t the steel lin system will concrete will ng a wire s mal shield is sing the stee l liner will ed to a rail t a rail car an g will also lasma cutting d placed in t oved, the co low open-air RS-TD-31319 vation (621 n of above g The preparat Subcontract nks.
: d. Demoliti oacility in W ipped to the  
n Pumps, in on exchanger ne the scope ference 3. If te, a scabblin ial. If the co contaminate d concrete m molition crit ill be used t nternal steel top down to ner to the gro l be installe l then be rem saw into ma s removed, t el liner. Sub be removed trans-load fa nd then ship be removed
: d. Contami neces of the F taging area irlying the Fn as specifi CBWR OpeReactor Bu ictures in op eReactor Bu ie inlet and odiation nec eble contami nor air ham mn is detecte dove the limi tmoved durin gbeen met, a interior co nposed, it w ielevation.
: g. Sized pie the waste st oncrete unde r demolition 96-005, LAC foot) of the ground struc tion of the R tor).
Won is complremainder ohe thermal s hpieces for s pder of the in tinterior co non debris w iinona, MN wEnergySolunated ESW in the FESW ed in n Air ilding en air ilding outlet essary nation mering d at a ts for g this high ncrete ill be When ete, a of the hield. pecial terior ncrete ill be where utions La CrossLicense TRevisionThe rema"bowl" bFinal Rad3.3.2.The Turswitchgetravelingcrane hasthe main The Turlaboratorventilati nservices.
ncluding the rs.
Turbine OCommodand mecreciprocameet pacloading ais properAfter radsystems,
of the remed f unacceptab ng method o ontaminatio ed areas abo must be rem teria have b to break the shell is exp the ground ound elevati ed over the moved to th anageable p the remaind bsequent to
: d. Demolitio acility in Wi pped to the
: d. Contamin eces of the F taging area i rlying the F n as specifi CBWR Ope Reactor Bui ctures in ope Reactor Bui e inlet and o diation nece ble contamin or air hamm n is detected ove the limit moved during been met, a interior con posed, it wi elevation. W on is compl remainder o he thermal sh pieces for sp der of the int interior con on debris wi inona, MN w EnergySolu nated ESW in the FESW ed in n Air ilding en air ilding outlet essary nation mering d at a ts for g this high ncrete ill be When ete, a of the hield.
pecial terior ncrete ill be where utions  


specifiedcriteria wwith the  
La Cross License T Revision The rema bowl b Final Rad 3.3.2.
The Tur switchge traveling crane has the main The Tur laborator ventilatin services.
Turbine O Commod and mec reciproca meet pac loading a is proper After rad
: systems, specified criteria w with the of inches contamin be used t an accept Utah. A Radiation When al building and struc sequence to allow requirem The majo to be trea disposal facility i shipped se Boiling W Termination n 0 aining struc below 636 fo diation Surv Turbine B rbine Buildi ar, and othe g bridge cran s access to m floor. The T rbine Office ry, shops, co ng and air c In genera Office Build dity removal chanical me ating saws w ckaging and area located rly shipped a dioactive com component d in Referen will be remov Reactor Con s of concrete nated materi to remove c table radioac All structural n Work Perm l structural will be dem ctural concr e within the T open acces ments. Misti ority of the c ated as low l facility. Wa n Winona, to the Ene Water Reactor Plan tural concre oot elevation vey (FRS) in Building an ing housed er pneumatic ne with a 5 major equipm Turbine Bui e Building c ounting room conditioning al, these are ding is 110 fe l has begun eans to dism will be the pr waste dispo on the grou and disposed mmodity rem ts and struc ce 3 is met.
ved, segrega ntainment, if e, a scabblin al. If the co ontaminated ctive waste decontamin mits (RWP) surfaces ha molished. Al ete will be Turbine Bui ss to load o ing methods construction level radioac aste will be l MN where ergySolutions r
ete outside th n, concrete p accordance nd Turbine O the steam c, mechanica ton auxiliar ment items l lding is 105 contained o m, personne g equipment eas were sep eet by 50 fee and will con mantle radio rimary meth osal criteria und floor in t d of at an off-moval is co ctural surfac
. Structural ated, properly f unacceptab ng method o ontamination d areas. All disposal fac nation activit and under th ve been dec l remaining demolished lding will be out areas.
s will be uti debris resul ctive waste a loaded into a the waste c s disposal s 3-11 he liner belo pile cap and with LTP C Office Build turbine and al and hydra ry hoist cap located below feet by 79 f offices, the el change ro
, rest rooms parated from et and 45 fee ntinue in the oactive pipin hods used. S
: a. Waste wi the northwes f-site facility mplete, surv ces to ensur materials th y packaged a ble contamin r air hamme n is detected radioactive ility, primar ties will be he oversight contaminated systems and to the grou e performed Concrete w ilized during lting from th and will be s appropriate c container wi site in Cliv ow the 636 piles) will r Chapter 5.
ding d generator, aulic system pacity spans w the floor t feet and 60 f Control Ro oom, decont s, storeroom m power pla et tall.
e Turbine Bu ng and com System piece ill be packa st corner of veys will be re that the hat do not m and disposed nation is iden ering method d at a deeper waste will rily the Ener performed i of Radiation d to the op d component und level sl from the top will be proc g building d he demolitio shipped to th containers an ill be transf ve, Utah.
foot elevati remain and main cond ms and equip the Turbine through num feet tall.
oom, locker amination fa m, and space ant equipme uilding utiliz mponents.
es and waste aged and sto the Turbine e performed open-air de meet the ope d of as radio ntified withi d will be us r depth, then be loaded an rgySolutions in accordanc n Protection en-air demo ts, interior st ab. The ge p down and cessed to m demolition to n of the stru he licensed r nd trucked to ferred to a r If possible, on (i.e., con be subjected denser, elec pment. A 3 e Building.
merous hatch r room facil facilities, hea e for other ent spaces.
zing cutting Band saws e will be siz ored in the w e Building un of all rema emolition cr en-air demo oactive waste in the first co ed to remov n a wire saw nd transport facility in C ce with appr personnel.
olition limits tructural sur eneral demo from west to meet disposa o minimize ucture is exp radioactive w o a rail trans rail car and some mat ncrete d to a ctrical 0-ton The hes in
: lities, ating, plant The tools s and zed to waste ntil it aining riteria lition
: e. As ouple ve the w will ted to
: Clive, roved s, the rfaces lition o east l site dust.
pected waste s-load d then erials


of inchescontaminbe used tan acceptUtah. ARadiationWhen albuilding and strucsequenceto allow
La Cross License T Revision including accordan of Mater can be re recycle o the prese of a 193-When th excavato building
: removal, Some ex discharge below gr 3.3.3.
The WTB and equip level sol basement bottom w The grad steel spen the shiel piping, c facility, c condition The base gained b drums.
exchange The Gas 14 feet h the WTB elevation compone cubic fee until such some ass The Low It was us se Boiling W Termination n 0 g structural c nce with NU rials and Eq ecycled or re or disposal a ence of any r
-6 Micro R in he Turbine B r with appr slab and fo undergroun xamples of e line. The rade (636 foo Waste Tr B is located pment for d lid radioacti t floor is at which extend de floor of th nt resin rece lded cubicle containers, a consisting of ning units.
ement of the y removal o The other a er, the WTB Storage Tan igh walls an B. The vaul n 617 feet.
ents for dryi et tanks are l h time that t sociated pipin w Specific Ac sed to store Water Reactor Plan concrete wil UREG-1575, uipment Ma eleased for d at a non-radi residual radio nstrument or Building has ropriate tool oundation to nd utilities w undergroun slab and fo ot elevation) reatment Bu d to the north decontaminat ive waste.
elevation 63 d to a depth o he WTB con eiving tank a e were two and pumps.
f a steam cle e WTB cons of floor shie area, to whic sump and p nk Vault (GS nd 2 feet thic lt is 3 feet b The Gas D ing, filtering located in th hey were ba ng. The rem ctivity (LSA processed, r
ll be radiolog Supplement anual (MAR disposal at a ioactive disp oactive cont r similar.
s been dem ls (pneumat meet dispo will also be r nd utilities oundation w uilding, Gas heast of the tion and the The WTB 30 feet and h of 626 feet.
ntains a shie and resin re back-washab The main eaning booth sists of two eld plugs, w ch access is pump, and ad STV) is a 29 ck floors, wa below grade Decay Syste g, recombini he GSTV. Th atch released mainder of th A) Storage Bu packaged an 3-12 gically surve t 1, Multi-Ag RSAME) (4).
non-radiolo posal site wi tamination b molished, the tic hammer, osal site requ removed, sur might be g alls will be s Storage Ta Reactor Bui collection, is 34 feet b has a 3 foot elded compa ceiving and ble radioact floor of th h, a decontam shielded cu was used for gained by dditional was 9 foot by 31 f alls, and ceil e with a sum em routed m ing, monitor he tanks had d via the stac he Gas Decay uilding is lo nd sealed lo eyed and rel gency Radia
. Materials ogical landfi ill be subjec y undergoin e foundation loading bu quirements.
rveyed, pack gas, water, removed to ank Vault a ilding. The processing, by 42 feet a deep sump w artment whi transfer equ tive liquid w e WTB also mination sin ubicles. One the storage a stairway, ste storage s foot undergr ling located mp that exte main conde ring and ho d the capabil ck. The tank y system has cated southw ow level dry leased for un ation Survey released for ll. All bulk cted to a fina ng an aggreg n slab will b ucket, etc.)
During slab kaged and pr miscellane o a minimum and LSA Sto e building co storage, and and 20 feet with 8 inch ich houses a uipment. Lo waste filters o housed a nk, and heati e cubicle, to of high act contains th space.
round concre below groun ends to a de enser gases oldup for de lity to store ks remain in s been remo west of the T y active was nrestricted u y and Assess r unrestricte material sen al assessmen ate survey b be exposed.
will remov b and found roperly disp eous piping, m depth of 3 orage Build ontained faci d disposal o tall. The W thick walls a a 320 ft3 stai ocated outsi s and dewat decontamin ng/ventilatio o which acce tivity solid w e dewaterin ete structure nd just outsi epth of 22 fe through va cay. Two radioactive place along ved.
Turbine Buil ste materials use in sment d use nt for nt for by use An e the dation posed.
, and 3 feet ding ilities f low WTB and a inless ide of tering nation on/air ess is waste g ion e with ide of eet or arious 1,600 gases g with lding.
s, and  


requiremThe majoto be treadisposal facility ishipped se Boiling WTermination n 0 aining struc below 636 f odiation Sur vTurbine Brbine Build iar, and oth eg bridge cra ns access to mfloor. The Trbine Offic ery, shops, c ong and air c In gener aOffice Buil ddity remova lchanical m eating saws wckaging and area located rly shipped adioactive co mcomponentd in Referen will be remo vReactor Co ns of concretenated materi to remove c table radioacAll structural n Work Per ml structural will be de mctural concr e within the Topen acce sments. Mist iority of the cated as low lfacility. W an Winona, to the En eWater Reacto rPlan tural concr eoot elevatio nvey (FRS) in Building aning housed er pneumati cne with a 5 major equip mTurbine Bui e Building counting roo mconditionin gal, these ar eding is 110 fel has begun eans to dis mwill be the p rwaste disp oon the gro uand dispose dmmodity re mts and stru cce 3 is met
La Cross License T Revision sealed lo Building Commod utilizing Band saw be cleane be sized waste loa site facili After com open air demolitio If unacc scabbling the conta contamin radioactiv When all above gr the concr GSTV lo with Cha will be u from the will be s appropria container Clive, Ut 3.3.4.
.ved, segreg antainment, i fe, a scabbli nal. If the c oontaminate dctive waste decontami nmits (RWP) surfaces ha molished. Alete will be Turbine Bui ss to load oing method sconstruction level radioa caste will be lMN where ergySolutionsr  ete outside t hn, concrete paccordance nd Turbine Othe steam c, mechanic aton auxilia rment items llding is 105 contained om, personn eg equipment eas were se peet by 50 fe eand will co nmantle radi orimary met hosal criteri aund floor in td of at an of f-moval is co ctural surfa
The LAC plant. T cooling w diesel-dr circulatin In additio facility, a Radiolog interior a that the s se Boiling W Termination n 0 ow level acti is 27 feet by dity remova cutting tool ws and recip ed and a fixa to meet pack ading area in ity.
: c. Structural ated, properl yf unaccepta bng method o ontaminatio nd areas. All disposal fac nation activi tand under t hve been de cl remaining demolished lding will b eout areas.
mmodity rem demolition c on criteria w eptable con g method or amination is nated areas.
s will be ut idebris resu lctive waste aloaded into athe waste cs disposal s3-11 he liner bel opile cap and with LTP COffice Buil dturbine an dal and hydr ary hoist ca plocated belo wfeet by 79 foffices, the el change r o, rest room sparated fro met and 45 fe entinue in th eoactive pipi nhods used. Sa. Waste w ithe northwe sf-site facilitymplete, sur vces to ensu rmaterials t hy packaged able contami nr air hamm en is detecte dradioactive ility, prima rties will be he oversight contaminate dsystems an dto the gro ue performed Concrete wilized durin glting from t hand will be sappropriate ccontainer w isite in Cli vow the 636piles) will rChapter 5.
ve waste dis l structural rade portions rete floor sl ocated below apter 5. Con utilized durin demolition shipped to th ate container r will be tran tah.
ding d generator, aulic syste mpacity spans w the floor tfeet and 60 fControl R ooom, decont s, storeroo mm power pl aet tall. e Turbine B ung and co mSystem piec eill be pack ast corner of
LACBWR CBWR Crib The structure water to var iven high p ng water pum on to the G-3 and consequ gical surveys and exterior structure can Water Reactor Plan ivity compon y 80 feet and l has begun ls and mech procating saw ative will be kaging and w n the Turbin moval is com criteria per R will be remov ntamination air hammeri s detected a All radioa sposal facilit surfaces hav s of each bu lab will be r w 636 foot e ncrete will be ng building of each of he licensed rs and truck nsferred to a R Crib Hou b House is lo e served as rious LACB pressure serv mps. The LA 3 Crib Hous uently, will r s, either FSS structural su n be released r
. veys will b ere that the hat do not mand dispose dnation is ide nering metho dd at a deepe rwaste will rily the Ene rperformed iof Radiatio nd to the op d componen tund level slfrom the to pwill be pro cg building dhe demolitio shipped to t hcontainers a nill be trans fve, Utah.
nents. No li d 15 feet tall n and will hanical mean ws will be th e applied pri waste dispos ne Building u mplete, the Reference 3 ved, segrega is identified ing method w at a deeper active waste ty.
foot elevati remain and  main con dms and equi pthe Turbin ethrough nu mfeet tall.
ve been dec uilding will b removed. T elevation wi e processed t demolition the structure radioactive ked to a rail a rail car and use ocated on th the intake BWR plant vice water p ACBWR Cri e, the LACB remain intac S or MARSA urface and sy d for unrestric 3-13 iquid wastes
oom, locke ramination fam, and spac eant equipm euilding utili zmponents.
: l.
es and wast eaged and st othe Turbin ee performed open-air d emeet the op ed of as radi ontified with id will be us r depth, the nbe loaded a nrgySolutions in accordan cn Protection en-air dem ots, interior s tab. The g ep down and cessed to mdemolition t on of the str uhe licensed rnd trucked t oferred to a rIf possible,on (i.e., co nbe subjecte ddenser, ele cpment. A 3 e Building.
continue in ns to disman he primary m ior to disma sal criteria. W until it is pro interior con
merous hatc hr room faci lfacilities, he ae for other ent spaces.
. Structural ated, packag d within the will be used depth, then e will be lo ontaminated be demolish The remainin ll remain an to meet disp to minimize e will be tre waste dispo trans-load f d then shippe he bank of t for the Circ systems. T pumps, low ib House is 3 BWR Crib H ct and undist AME free re ystems of th cted use.
zing cutting Band sawse will be si zored in the we Building u nof all rem aemolition c ren-air demo oactive wast ein the first c oed to remo vn a wire sa wnd transpor t facility in Cce with app rpersonnel.
s were store n the WTB, ntle radioact methods used antlement. S Waste will b operly shipp ncrete surfac material tha ged and dispo e first coup d to remove t n a wire sa oaded and t d to the ope hed. The en ng structura nd be subjec posal site req e dust. All eated as low osal facility.
olition limit structural su reneral demofrom west t omeet disposa o minimize ucture is ex pradioactive wo a rail tran srail car and  some mat ncrete d to a ctrical 0-ton  The hes in lities, ating, plant  The tools s and zed to waste ntil it aining riteria lition e. As ouple ve the w will ted to Clive, roved s, the rfaces lition o east l site dust. pected waste s-load d then erials La CrossLicense TRevisionincludingaccordanof Matercan be rerecycle othe preseof a 193-When thexcavatobuilding removal,Some exdischargebelow gr3.3.3.The WTBand equiplevel solbasementbottom wThe gradsteel spe nthe shielpiping, cfacility, cconditionThe basegained b drums.
facility in W ed to the Ene the Mississi culating Wa The LACBW pressure se 35 feet by 45 House also cu turbed by th elease surve he LACBWR d in this bui
exchangeThe Gas 14 feet hthe WTBelevationcomponecubic feeuntil suc hsome assThe LowIt was usse Boiling WTermination n 0 g structural cnce with N Urials and Eq ecycled or r eor disposal aence of any r-6 Micro R i nhe Turbine Br with app rslab and f oundergrounxamples of e line. The rade (636 fo oWaste TrB is locate dpment for dlid radioact it floor is at which exten dde floor of t hnt resin rec elded cubicl econtainers, aconsisting o fning units.
, GSTV an tive piping
ement of th ey removal oThe other aer, the WTB Storage Ta nigh walls a nB. The vau ln 617 feet.
: d. The inter System piece be packaged ped and dispo ces will be r at does not m osed of as r ple of inche the contamin aw will be transported n-air demol ntire LSA bu al concrete f cted to a FR quirements.
ents for dry iet tanks are lh time that tsociated pipi nw Specific A csed to store Water Reacto rPlan concrete wi lUREG-1575, uipment Maeleased for dat a non-rad iresidual radi onstrument o rBuilding ha sropriate too loundation to nd utilities wundergrou nslab and f oot elevation) reatment B ud to the nort hdecontamina tive waste. elevation 6 3d to a depth ohe WTB coneiving tank ae were two and pumps.
construction w-level radio
f a steam cl ee WTB consof floor shi earea, to whi csump and pnk Vault (G Snd 2 feet thi clt is 3 feet bThe Gas Ding, filterin glocated in t hhey were b ang. The re mctivity (LS Aprocessed, r  ll be radiolo gSupplemen tanual (MARdisposal at a ioactive dis poactive con tr similar.
. Waste wi Winona, MN ergySolution ippi River to ater System, WR Crib Ho ervice water 5 feet and 15 urrently serv he decommi eys will be p R Crib Hous ilding. The d LSA Bui and compon riors of tanks es and waste and stored i osed of at an remediated t meet the ope adioactive w es of concre nated materi used to rem to an accep lition criteria uilding, inclu for the WTB RS in accord Misting met n debris resu oactive waste ill be loaded where the w ns disposal s o the west o which prov ouse contain r pumps an 5 feet tall.
s been demls (pneuma t meet disp owill also be rnd utilities oundation
ves the active ssioning pro performed o se to demon LSA ilding nents.
: w. uilding, Gasheast of the tion and the The WTB 30 feet and hof 626 feet.
s will e will in the n off-to the en-air waste.
ntains a shi eand resin reback-washa b The main eaning boot hsists of two eld plugs, wch access is pump, and a dSTV) is a 2 9ck floors, w abelow grad eDecay Syst eg, recombin ihe GSTV. T hatch release dmainder of t hA) Storage B upackaged a n3-12 gically surv et 1, Multi-AgRSAME) (4)
ete, a al. If move ptable a, the uding B and dance thods ulting e and d into waste site in of the vided ns the d the e G-3 ocess.
.non-radiol oposal site w itamination b molished, th etic hammer, osal site req uremoved, su rmight be galls will be s Storage TaReactor Bu icollection, is 34 feet bhas a 3 foot elded comp aceiving and ble radioac tfloor of th h, a deconta mshielded c uwas used for gained by dditional wa s9 foot by 31 falls, and cei le with a su mem routed ming, monito rhe tanks ha dd via the sta che Gas Deca yuilding is lo nd sealed l oeyed and re lgency Radi
on the strate  
: a. Materials ogical landfi ill be subje cy undergoi ne foundatio n loading b uquirements.
rveyed, pac kgas, water, removed t oank Vault ailding. The processing, by 42 feet adeep sump wartment wh itransfer eq utive liquid we WTB als omination si nubicles. On ethe storage a stairway, ste storage sfoot underg rling located mp that ext emain cond ering and ho d the capabi lck. The tan ky system ha scated south wow level dr yleased for u nation Surve yreleased fo rll. All bulk cted to a fin ang an aggreg n slab will bucket, etc.) During sla bkaged and p rmiscellan eo a minimu mand LSA St oe building c ostorage, an dand 20 feet with 8 inch ich houses auipment. L owaste filter so housed a nk, and heati e cubicle, t oof high ac tcontains th space. round concr ebelow grou nends to a d eenser gases oldup for de lity to store ks remain in s been remo west of the Ty active wa snrestricted uy and Asses sr unrestrictematerial se nal assessme nate survey bbe exposed.will remov b and foun droperly dis peous piping
,m depth of 3orage Buildontained fac id disposal otall. The Wthick walls aa 320 ft3 staiocated outs is and dewa tdecontami nng/ventilati oo which acc etivity solid we dewaterin ete structur end just outs iepth of 22 f ethrough v acay. Two radioactive place alon gved. Turbine Bui lste material suse in sment d use nt for nt for by use  An e the dation posed.  , and 3 feet ding ilities f low WTB and a inless ide of tering nation on/air ess is waste g ion e with ide of eet or arious 1,600 gases g with lding. s, and La CrossLicense TRevisionsealed loBuilding Commodutilizing Band sawbe cleanebe sized waste loasite facil iAfter comopen air demolitioIf unacc scabblingthe contacontaminradioacti vWhen allabove grthe concrGSTV lowith Chawill be ufrom the will be sappropriacontainerClive, Ut3.3.4.The LACplant. Tcooling wdiesel-dr circulati nIn additi ofacility, aRadiologinterior athat the sse Boiling WTermination n 0 ow level act iis 27 feet b ydity remov acutting too lws and reci ped and a fix ato meet pac kading area i nity. mmodity re mdemolition con criteria weptable co ng method or amination i snated areas.
ve waste di sl structural rade portion srete floor s located belo wapter 5. Co nutilized duri ndemolition shipped to t hate containe rr will be tra ntah. LACBWRCBWR CribThe structur ewater to va riven high png water pu mon to the G-3and conseq ugical survey sand exterior structure ca nWater Reacto rPlan ivity compo ny 80 feet an dl has begu nls and mec hprocating sa wative will b ekaging and wn the Turbi nmoval is co mcriteria per Rwill be remo vntamination air hammer is detected a All radio asposal facili tsurfaces ha vs of each b ulab will be rw 636 foot encrete will b eng building of each of he licensed rs and truc knsferred to aR Crib Houb House is l oe served as rious LACBpressure ser vmps. The L A3 Crib Hous uently, will rs, either FS Sstructural s un be release dr  nents. No l id 15 feet tal ln and will hanical mea nws will be t he applied pr iwaste dispo sne Building umplete, the Reference 3 ved, segreg ais identifie ding method wat a deeper active wast ety. ve been dec uilding will bremoved.
Televation wi e processed tdemolition the structur eradioactive ked to a rail a rail car anduse ocated on t hthe intake BWR plant vice water pACBWR Crie, the LAC Bremain inta cS or MARSAurface and s yd for unrestri c3-13 iquid waste sl. continue i nns to disma nhe primary mior to dism asal criteria.
Wuntil it is pr ointerior co
: n. Structural ated, packag d within th ewill be use ddepth, the ne will be l oontaminate dbe demolis hThe remaini nll remain a nto meet dis pto minimiz ee will be tr ewaste disp otrans-load fd then shipp ehe bank of tfor the Cir csystems.
Tpumps, low ib House is 3BWR Crib Hct and undis tAME free r eystems of t hcted use.
s were store n the WTB,ntle radioac tmethods use dantlement.
SWaste will boperly ship pncrete surfa cmaterial th aged and disp oe first cou pd to remove tn a wire s aoaded and td to the ope hed. The e nng structur and be subje cposal site re qe dust. All eated as lo wosal facility
.facility in Wed to the En ethe Mississi culating W aThe LACBWpressure s e35 feet by 4 5House also c uturbed by t helease surv ehe LACBWRd in this bu i, GSTV antive piping  
: d. The inte rSystem piec ebe packaged ped and disp oces will be rat does not mosed of as r ple of inch ethe contami naw will be transported n-air demol ntire LSA b ual concrete fcted to a F Rquirements. constructio nw-level radi
: o. Waste w iWinona, MN ergySolutionippi River t oater System, WR Crib Hoervice wate r5 feet and 1 5urrently ser vhe decommi eys will be pR Crib Hou silding. The d LSA Buiand compo nriors of tank ses and wast eand stored iosed of at a nremediated tmeet the op eadioactive wes of concr enated materiused to re mto an acce plition criteri auilding, incl ufor the WT BRS in accor dMisting me tn debris res uoactive wast eill be loade dwhere the wns disposal so the west o which pro vouse contai nr pumps an 5 feet tall.
ves the activ essioning pr operformed ose to demon LSA ilding nents. s will e will in the n off-to the en-air waste. ete, a al. If move ptable a, the uding B and dance thods ulting e and d into waste site in of the vided ns the d the e G-3 ocess. on the strate La CrossLicense TRevision3.3.5.The MaiwindowsThe 1B Dcontains The buildshaped hThese twincludingthese str uradioacti vto a rail tcar and tmaterialsunrestric trecycled


or dispospresence
La Cross License T Revision 3.3.5.
The Mai windows The 1B D contains The build shaped h These tw including these stru radioactiv to a rail t car and t materials unrestrict recycled or dispos presence a 193-6 M 3.3.6.
The LAC an outsid 15 inches cluster of sides on t The Ven Once ch demolitio fixative w Demoliti system w removed of the v excavato the interi the concr methods and barr resulting and will appropria se Boiling W Termination n 0 Maintena intenance Ea s constructed Diesel Gener the Electric ding is cons aving larges wo structure g the concre uctures will ve waste dis trans-load fa then shipped s, including ted use in ac or released sal at a non of any resid Micro R inst Ventilatio CBWR Vent de diameter s at the bott f 78 piles. T the southeas ntilation Sta aracterizatio on criteria p will be appli ion will be will be emp using mech ventilation s rs will saw ior of stack.
rete debris.
will be utili icade the fa from the de be shipped t ate container Water Reactor Plan ance Eat Sh at Shack is d over a conc rator Buildin al Equipmen structed of c st dimension es will be r ete foundatio be treated as sposal facilit acility in Win d to the En g structural ccordance w for disposal n-radioactive dual radioact trument or si on Stack tilation Stac of 7 feet at tom to 6 inc The foundati st and southw ack will be on is compl per Referenc ed to the ide performed f ployed to pr hanical hand stack will b and break th An opening The concret ized during all zones in emolition of to the licens rs and truck r
hack and 1B a 20 feet b crete slab.
ng is attached nt Room, Di concrete blo s of 31 feet b radiologicall on slabs. C s low-level r ty. Waste wi nona, MN w ergySolution concrete w with MARSA at a non-rad e disposal s tive contami imilar.
k is a 350 fe the top and ches at the to on mat is 40 west corners radiological ete, interior ce 3 and dem entified surfa from the top rovide acces d tools down be removed he concrete g at the botto te foundation all demoliti the vicinity f these struc ed radioactiv ked to a rail 3-14 B Diesel Gen y 40 feet an d to the sout iesel Genera ck and steel by 38 feet an ly character Construction radioactive w ill be loaded where the wa ns disposal will be rad AME. Mate diological la ite will be ination by un feet high, tap 25 feet at th op. The 4 f 0 foot square lly character r concrete su molished. I aces to mitig p down. It ss to the ex n to the lowe d with exca into manage om of the sta n mat will be on to minim y of the ven ctures will b ve waste dis trans-load f nerator Buil nd 15 feet t theast corner ator Room, a l beams and nd 13 feet ta rized and th debris resul waste and w d into approp aste containe site in Cliv diologically rials release andfill. All b subjected to undergoing a pered, reinfo he base. Th feet thick fo e concrete ba rized and th urfaces will If remediatio gate any loos t is anticipat xterior of th er 40 foot el avators and eable section ack will be m e taken down mize dust. P ntilation sta be treated as sposal facilit facility in W lding all steel-sid r of the Turb and an empt d braces. Th all.
hen comple lting from t will be shippe priate contai er will be tra ve, Utah. I surveyed a ed for unrest bulk materia o a final as an aggregate orced concre he wall thick oundation m ase formed w hen comple l be remedi on is not pr se contamina ated that a tr he stack. T levation. Th pneumatic ns and drop made to allo n to 3 feet b Project perso ack. All co s low-level r ty. Waste w Winona, MN ded building bine Building ty Battery R he building tely demoli the demolitio ed to the lice iners and tru ansferred to If possible, and released tricted use ca al sent for re ssessment fo survey by u ete structure kness varies at rests on a without trian etely demoli iated to ope racticable, th ation.
raveling sca The stack wi he bottom 40 breakers.
the sections ow the remov below grade.
onal will mo nstruction d radioactive w will be loaded where the w with g and Room.
is L-
: ished, on of ensed ucked a rail some d for an be ecycle or the use of e with from a pile ngular ished.
en air hen a affold ill be 0 feet The s into val of Wet onitor debris waste d into waste


a 193-6 M3.3.6.The LACan outsid15 inchescluster o fsides on tThe VenOnce ch demolitiofixative wDemolitisystem wremoved of the vexcavatothe inter ithe concrmethods and barr resulting
La Cross License T Revision container Clive, Ut 3.3.7.
Approxim LACBW roads ins removal will be pr 3.4.
R The deco Solutions programs Solutions sufficient accordan Standard Reasonab controls radioactiv written p The curr Effluent Manual the vario are routi the publi also impo waste ma and outa procedu D-Plan/P environm No alte Rad Dec a po Continue Monitori and 10 C se Boiling W Termination n 0 r will be tran tah.
Legacy W mately 75 cu WR Site Encl side the LS of part of a rocessed as Radiological ommissionin s Radiation s are and w s Radiation t informatio nce with 10 ds For Prote bly Achieva the genera ve waste in plant procedu rent Radiati Monitoring (ODCM) (5 ous decontam inely inspec ic, and the e ortant to not anagement c ages, and de ures for wh PSDAR, the mental impac site-specifi er the conclu diation dose commission ositive envir ed applicatio ng Program CFR 50, App Water Reactor Plan nsferred to a Waste ubic yards losure (LSE SE, the unde a wall in the low-level ra l Impacts of ng activities Protection P will continue Protection on to demon 0 CFR 19, N ection Again able (ALAR ation, chara accordance ures.
ion Protecti g and Radi
: 5) will be us mination and cted by the environment te that decom consideratio ecommission hich appro e decommi cts in that:
ic factors pe usions prese to the publi ing is not a ronmental im on of the cur ms at LACB pendix I. Ra r
a rail car and of stockpile E) fence line erlayment s e Turbine Bu adioactive wa f Decommiss described ar Program and to be imple Program an nstrate that Notices, Ins nst Radiatio RA) The S cterization, with the app on Program iological Eff sed to prote d decommiss Nuclear Reg t are protect mmissioning ons as those ning activiti oval is bein ssioning wi ertaining to nted in NUR c will be min an imminent mpact.
rrent and fu BWR ensure adiological E 3-15 d then shippe ed deconstru
: e. The deb and from th uilding. All aste during d sioning Act re and will b d Radioactiv emented as nd written s decommiss structions A on and to m olutions Ra processing, proved Solu m, Waste M ffluent Mon ct the worke sioning activ gulatory Com ted during fa g activities in encountere es conducte ng sought ill be acco the decomm REG-0586 (s nimal.
t health or s uture Radiati s public pro Environment ed to the Ene uction debri bris consistin he roads an l of the stoc decommissio ivities be conducted ve Waste M described i site procedu sioning activ And Reports maintain radi adioactive W
, handling, utions Radiat Management itoring and ers and the vities. Thes mmission (N acility decom nvolve the s ed during pl ed to date.
in this L omplished w missioning see LTP Cha safety conce ion Protectio otection in tal Monitori ergySolution is is stored ng of aspha nd concrete ckpiled deco oning.
d under the Management n the D-Pla ures are inte vities will b s To Work ation exposu Waste Mana
: shipping, tion Protecti Program, a d Offsite D public, as a e well-estab NRC) to ens mmissioning ame radiatio ant operatio There are TP. As d with no sig of the LAC apter 8).
ern and wil on and Radi accordance ing Program ns disposal s inside the alt removed debris from onstruction d provisions o Program. T an/PSDAR.
ended to pro be performe kers, 10 CFR ures As Low agement Pro and disposa ion Program and Radiolo Dose Calcul applicable, d blished prog sure that wor g activities.
on protection ons, mainten e no additi described in gnificant ad CBWR woul ll generally iological Eff with 10 CF m (REMP) re site in south from m the debris of the These The ovide ed in R 20, w As ogram al of m, and ogical lation during grams
: rkers, It is n and nance ional n the dverse ld have fluent FR 20 eports


and will
La Cross License T Revision for LAC activities 3.4.1.
 
Due to t dismantle Consequ remediat radiologi specified described 3.4.2.
appropriase Boiling WTermination n 0 Maintenaintenance E as constructe dDiesel Gene rthe Electric ding is con saving large swo structur eg the concr euctures will ve waste di strans-load f athen shippe ds, includin gted use in a cor released sal at a no nof any resi dMicro R ins tVentilati oCBWR Ventde diameter s at the bot tf 78 piles.
Table 3-2 This dos Exposure informati for remai Decomm Asb Rea Wa Tur Rem Wa Tot 3.4.3.
Tthe southea sntilation St aaracterizati oon criteria pwill be appli ion will be will be em pusing mec hventilation srs will saw ior of stack.
Continue Effluent public pr se Boiling W Termination n 0 CBWR to d s is bounded Control M the large sco ed, FRS of ently, a sys ed prior to p ical conditio d in 10 CFR d in LTP Ch Occupati 2 provides t se estimate e Projection ion gathered ining decom Table 3-missioning A bestos and ot actor Buildin aste Treatmen rbine Buildin maining Stru aste Processin tal for Deco Exposure ed applicatio Technical S rotection in a Water Reactor Plan date conclud by the evalu Mechanisms ope of rema f areas may stematic app performing F on of areas R 20.1402 ha apter 5.
rete debris.
ional Expos the cumulati is documen ns for LACB d for reporti mmissioning a
will be util iicade the f afrom the d ebe shipped tate containe rWater Reacto rPlan ance Eat S hat Shack is d over a con crator Buildi nal Equipme nstructed of cst dimensio nes will be rete foundati obe treated a ssposal facili tacility in Wi nd to the En g structural ccordance wfor disposal n-radioactiv edual radioac ttrument or s ion Stack tilation Stacof 7 feet at tom to 6 in cThe foundati st and south wack will be on is compl per Referen ced to the id eperformed fployed to p rhanical han dstack will band break t h An openin gThe concre tized during all zones in emolition o fto the licens rs and truc kr  hack and 1 Ba 20 feet bcrete slab.
-2 Radi Act Activity ther Hazardo ng nt Building ng uctures ng (includes ommissionin e to the Pub on of Solut Specification accordance w r
ng is attache dnt Room, D iconcrete blo s of 31 feet bradiological lon slabs.
de that the uation in NU s to Mitigat aining struct y be perfor proach will FRS and on s where co as been dem ure ive site dose nted in Ene BWR Decom ing of yearl activities is e iation Expos tivity ous Material s shipping an ng Activities blic tions Radia n and Radio with 10 CFR 3-16 public exp UREG-0586, te the Recon tures and sy rmed in par be employ ngoing decom mpliance w monstrated.
Cs low-level rty. Waste w inona, MN wergySolutionconcrete wwith MARSAat a non-ra de disposal s tive contam iimilar. k is a 350 fethe top and ches at the t oon mat is 4 0west corners radiologica lete, interio rce 3 and de mentified surf afrom the to provide acce sd tools dow nbe removedhe concrete g at the bott ote foundatio nall demolit ithe vicinit yf these stru ced radioacti vked to a rail 3-14 B Diesel Ge ny 40 feet a nd to the sou tiesel Gener ack and stee lby 38 feet a nly characte rConstruction radioactive will be loade dwhere the w ans disposal will be rad AME. Mate diological l aite will be ination by u nfeet high, ta p25 feet at t hop. The 4 f0 foot squar
e estimates ergySolution mmissioning ly site dose estimated to sure Projec l Abatement nd prep) s ation Protec ological Env R 20 and 10 C posure as a
: e. lly characte rr concrete s umolished. Iaces to miti gp down. I tss to the e xn to the low ed with exc ainto manag eom of the st an mat will beon to mini my of the ve nctures will bve waste di strans-load fnerator Bui lnd 15 feet t theast corne rator Room, al beams an dnd 13 feet t arized and t hdebris resu lwaste and wd into appro paste contain esite in Cli vdiologically rials releas eandfill. All bsubjected t oundergoing apered, reinf ohe base. T hfeet thick f oe concrete b arized and t hurfaces wil lIf remediati ogate any loo st is anticipa txterior of t her 40 foot e lavators and eable sectio nack will be me taken dow nmize dust.
, which conc ntamination ystems that rallel with yed to ensu mmissioning with the unr These me for the deco ns TSD RS (6). This i
Pntilation st abe treated a ssposal facili tfacility in Wlding all steel-si dr of the Tur band an emp td braces. T hall. hen complelting from twill be shipp epriate conta ier will be tr ave, Utah.
: e. The total o be approxim ctions for De t
Isurveyed aed for unres tbulk materi ao a final a san aggregate orced concr ehe wall thic koundation m ase formed when complel be remed ion is not p rse contamin aated that a t rhe stack.
ction, Radio vironmental CFR 50, App result of d cludes the im n of Remedi will be dec decommissi ure that area g activities d restricted re easures and ommissionin S-TD-313196 information l radiation e mately 130.3 ecommissio Expo (person 18 81 9
Tlevation. T hpneumatic ns and drop made to all on to 3 feet bProject pers oack. All co s low-level rty. Waste wWinona, MN ded building bine Buildin gty Battery Rhe building tely demol ithe demoliti oed to the lic einers and tr uansferred to If possible, and release dtricted use c aal sent for r essessment f osurvey by uete structur ekness varies at rests on awithout tria netely demol iiated to op eracticable, t hation. raveling sc aThe stack w ihe bottom 4 0breakers.
1 0
the section sow the remo vbelow grade.
18 130 oactive Was Monitoring pendix I.
onal will m onstruction dradioactive wwill be loade dwhere the wwith g and Room. is L-ished, on of ensed ucked a rail some d for an be ecycle or the use of e with from a pile ngular ished. en air hen a affold ill be 0 feet  The s into val of  Wet onitor debris waste d into waste La CrossLicense TRevisioncontainerClive, Ut3.3.7.ApproximLACBWroads insremoval will be p r3.4.RThe decoSolutionsprogramsSolutionssufficien taccordanStandardReasonabcontrols
decommissio mpact is mini iated Areas contaminated ioning activ as are adequ do not impac elease criter mechanism ng of LACB 6-007, Radi is in additi exposure esti 3 person-rem ning osure n-rem) 8.6 1.4  
.6
.6
.8 8.2 0.3 ste, Radiolo Program as oning imal.
d and vities.
uately ct the ria as ms are BWR.
iation on to imate
: m.
ogical ssures


radioacti vwritten pThe currEffluent
La Cross License T Revision 3.4.4.
The Radi processin Activated low leve of waste Con Use Exp Exp Con Con Table 3-3 the deco referred t total volu feet. Ac be shippe WA Debri Deb Deb A
A Dry A
(
Mix se Boiling W Termination n 0 Radioact ioactive Wa ng, handling d and contam el radioactiv generated du ntaminated w ed disposabl pended abra pended resin ntamination ntaminated e 3 provides p mmissioning to as rip &
ume of low ctual waste v ed to the lice STE TYPE is: Concrete bris: Rebar bris: Metal Asphalt Soils Asbestos Active Waste (DAW) xed Waste Water Reactor Plan tive Waste P ste Managem g, shipping, minated syst e waste exp uring decom water; le protective sive and abs ns and filters control mat equipment u projections o g of LACB
& ship verse w-level radio volumes and ensed Energy Table WASTE CLASS A
A A
A A
A e
A A
r Projections ment Progra and dispos tems, structu pected to be mmissioning clothing; sorbent mate s;
erials (e.g., s used in the de of waste cla WR. As S es performin oactive waste d classificati ySolutions ra 3-3 Pro E
S WA WE (l
20,0 88 1,82 54 2,87 30 30 56 3-17 m is used to sal of radio ures, and com e generated include:
rials; strippable co ecommission ssifications Solutions has ng significan e for dispos ions may va adioactive w ojected Was ASTE EIGHT lbs.)
026,177 89,249 27,476 41,575 777,268 00,776 0,880 6,222 Total o control the oactive wast mponents rep during deco oatings, plast ning process and quantiti s elected to nt on-site de sal has been ary. The vas waste disposa ste Quantiti PACK DENS (lb./f 85 85 30 50 74 17 12 110 l Estimated V characteriza te during d present the l ommissionin tic enclosure
: s.
ies that will use an app econtaminati n estimated st majority o al facility in ies KING SITY ft3) 5 5
0 0
4 7
2 0
Volume ation, genera decommissio largest volum ng. Other f es); and be generate proach comm ion activities at 393,696 of this waste Clive, Utah WASTE VOLUME (ft3) 235,603 10,463 60,916 10,832 38,882 17,693 2,574 16,733 393,696
: ation, oning.
me of forms ed by monly s, the cubic e will
: h.
E


Manual the varioare routithe publialso impowaste maand outaproceduD-Plan/PenvironmNo alteRadDeca poContinueMonitoriand 10 Cse Boiling WTermination n 0 r will be tra ntah. Legacy Wmately 75 c uWR Site Enc lside the L Sof part of arocessed as Radiologicalommissioni ns Radiation s are and ws Radiation t informati once with 1 0ds For Prot ebly Achiev athe gener ave waste in plant proced urent Radiat iMonitorin g(ODCM) (5ous deconta minely inspe cic, and the eortant to no tanagement cages, and d eures for w hPSDAR, themental impa csite-specif ier the concl udiation dose commission ositive envi red applicati ong Progra mCFR 50, Ap pWater Reacto rPlan nsferred to aWaste ubic yards losure (LS ESE, the und ea wall in th elow-level r al Impacts o fng activities Protection Pwill continue Protection on to demo n0 CFR 19, Nection Agai nable (ALARation, charaaccordance ures. ion Protecti g and Radi5) will be usmination an dcted by the environmentte that deco mconsiderati oecommissio nhich approe decommicts in that:
La Cross License T Revision WA Clean (Debri Clea D
ic factors p eusions preseto the pu bliing is not aronmental i mon of the cu rms at LACBpendix I. R ar  a rail car andof stockpil eE) fence lin eerlayment s e Turbine B uadioactive w af Decommis sdescribed a rProgram an dto be impl eProgram a nnstrate that Notices, Insnst RadiatioRA)  The Scterization, with the ap pon Programiological Effsed to prote d decommis sNuclear Re gt are protec tmmissionin gons as those ning activit ioval is bei nssioning w iertaining to nted in NU Rc will be mi nan imminen tmpact. rrent and f uBWR ensure adiological E3-15 d then shipp eed deconstr ue. The deband from t huilding. Al laste during dsioning Act re and will bd Radioacti vemented as nd written sdecommissstructions Aon and to molutions Raprocessing,proved Sol um, Waste Mffluent Mon ct the work esioning acti vgulatory Co mted during f ag activities i nencountere es conduct eng sought ill be acc othe decom mREG-0586 (
Recy Recy 3.4.5.
snimal. t health or suture Radiat is public pr oEnvironmen ted to the En euction debri bris consisti nhe roads a nl of the sto cdecommissi oivities be conducte dve Waste Mdescribed i site proced usioning acti vAnd Report smaintain radi adioactive W, handling, utions RadiatManagementitoring anders and the vities. Thes mmission (
Table 3-4 Date Q2/201 Q2/201 Q2/201 Q3/201 Q3/201 Q3/201 Q4/201 Q4/201 Q4/201 Q4/201 se Boiling W Termination n 0 STE TYPE n Backfill -
Nacility deco mnvolve the s ed during pl ed to date.
is to Landfill an Asphalt Disposal cle - Metals ycle - Rebar Project M 4 lists the cu 16 16 16 16 17 17 17 18 18 18 Water Reactor Plan WASTE CLASS l)
in this L omplished wmissioning see LTP Ch asafety conc eion Protecti ootection in tal Monitor iergySolutionis is stored ng of asph and concrete ckpiled dec ooning. d under the Management n the D-Pl aures are int evities will bs To Workation expos uWaste Manashipping, tion Protect
Clean Debris Clean Debris Scrap Metal Scrap Metal Milestones urrent schedu Table Milestone Submit LT License T Mobilizati Stack Dem LTP Appr Componen Building D Transporta Site Reme FRS Com r
: iProgram, ad Offsite Dpublic, as ae well-esta bNRC) to en smmissionin game radiati oant operati oThere areTP. As dwith no si gof the LA Capter 8). ern and wil on and Rad iaccordance ing Progra mns disposal sinside the alt removed debris fro monstruction dprovisions oProgram.
Table 3 E
Tan/PSDAR.
S WA WE (l
ended to pr obe perform ekers, 10 CFRures As Lo wagement Pr oand dispos aion Progra mand Radiol oDose Calcu lapplicable, dblished pro gsure that wo rg activities.
19,7 4,8 1,8 95 ule for the re e 3-4 Ge e
on protectio nons, mainte ne no addit idescribed i ngnificant a dCBWR woulll generally iological Ef fwith 10 C Fm (REMP) resite in south from m the debris of the These The ovide ed in R 20, w As ogram al of m, and ogical lation during grams rkers, It is n and nance ional n the dverse ld have fluent FR 20 eports La CrossLicense TRevisionfor LACactivitie s3.4.1.Due to tdismantleConsequremediatradiologispecifieddescribed3.4.2.Table 3-2This dosExposureinformatifor remaiDecommAsbReaWaTurRemWaTot3.4.3.ContinueEffluent
TP to NRC ransfer Com ion Complet molition Com roval by NR nt Removal Demolition C ation and Di ediation Com mplete 3-18 3-3 Continu ASTE EIGHT lbs.)
747,211 74,175 03,064 54,659 Total emaining dec eneral Proje mplete te mplete C
Complete Complete isposal Com mplete ued PACK DENS (lb./f 75 50 20 30 l Estimated V commissioni ect Mileston mplete KING SITY ft3) 5 0
0 0
Volume ing activities nes WASTE VOLUME (ft3) 263,297 97,484 90,154 31,822 482,757
: s.
E


public pr se Boiling WTermination n 0 CBWR to ds is bounded Control Mthe large sc oed, FRS ofently, a sy sed prior to pical conditi od in 10 CF Rd in LTP Ch Occupati2 provides tse estimate e Projectio nion gathere dining deco mTable 3-missioning Abestos and o tactor Buildi naste Treatme nrbine Buildi nmaining Str uaste Processi ntal for Dec oExposureed applicati oTechnical Srotection in aWater Reacto rPlan date conclu dby the eval uMechanismsope of rem af areas ma ystematic ap pperforming Fon of area sR 20.1402 h aapter 5.
La Cross License T Revision Date Q1/201 Q1/201 Q1/201 Q1/202 Q1/202 Note:
ional Expos the cumulat iis docume nns for LACBd for report immissioning a-2 RadiActActivity ther Hazard ong  nt Building ng uctures ng (include sommissioni ne to the Pu bon of Solu tSpecificatio naccordance w r  de that the uation in N Us to Mitigataining struc ty be perfo rproach will FRS and ons where co as been demure ive site dos ented in En eBWR Decoming of year lactivities is eiation Expo stivity ous Materia ls shipping a nng Activitie sblic tions' Radian and Radiowith 10 CF R3-16 public ex pUREG-0586, te the Reco ntures and s yrmed in pa rbe employngoing deco mmpliance wmonstrated.
3.5.
e estimates ergySolutionmmissionin gly site dose estimated to sure Projecl Abatement nd prep) s ation Prote cological Env R 20 and 10 Cposure as a
R
, which con cntaminatio nystems that rallel with yed to ensummissionin gwith the un r These mefor the dec ons TSD RS(6). This ie. The tota lo be approxi mctions for D e t ction, Radi ovironmental CFR 50, Ap presult of dcludes the i mn of Remed iwill be de cdecommiss iure that are ag activities drestricted r eeasures an d ommissioninS-TD-31319 6information l radiation emately 130.
: 1.
3ecommissio Expo(person188191018130oactive Wa sMonitoring pendix I.
D D
decommissi ompact is min iiated Areas contaminate dioning acti vas are adeq udo not impa celease critermechanismng of LACB6-007, Radiis in additi exposure est i3 person-re mning osure n-rem) 8.6 1.4 .6 .6 .8 8.2 0.3 ste, RadioloProgram a soning imal. d and vities.
: 2.
uately ct the ria as ms are BWR. iation on to imate m. ogical ssures La CrossLicense TRevision3.4.4.The RadiprocessinActivatedlow leveof waste ConUseExpExpConConTable 3-3the decoreferred ttotal vol ufeet. Acbe shippeWADebriDebDebAADry A(Mix  se Boiling WTermination n 0 Radioactioactive Wa ng, handlin gd and conta mel radioactiv generated d untaminated wed disposab lpended abrapended resinntamination ntaminated e3 provides pmmissionin gto as "rip
U S
&ume of lowctual waste ved to the lic eSTE TYPEis: Concrete bris: Reba r bris: Metal Asphalt Soils Asbestos Active Wast e(DAW) xed Waste Water Reacto rPlan tive Waste Pste Manage mg, shipping, minated sys te waste ex puring deco mwater; le protective sive and ab sns and filter scontrol matequipment uprojections og of LACB& ship" vers ew-level radi ovolumes an densed Energ yTableWASTECLASSA A A A A A e A A  r  Projections ment Prograand dispo stems, struct upected to bemmissioning clothing; sorbent mate s; erials (e.g.,
N
sused in the d eof waste claWR. As Ses performi noactive wast ed classificat iySolutions ra 3-3 ProE SWAWE(l20,0881,82542,873030563-17 m is used t osal of radi oures, and co me generatedinclude: rials; strippable c oecommissio nssifications Solutions hasng significa ne for dispo sions may v aadioactive wojected WasASTE EIGHT lbs.)026,177 89,249 27,476 41,575 777,268 00,776 0,880 6,222 Totalo control the oactive was tmponents re pduring dec ooatings, plas tning proces sand quantit is elected to nt on-site d esal has beenary. The va swaste dispos aste Quantit iPACKDENS(lb./f85853050741712110l Estimated V characteriz ate during dpresent the lommissioni ntic enclosur es. ies that willuse an ap pecontaminat in estimated st majority oal facility in ies KING SITY ft3) 5 5 0 0 4 7 2 0 Volume ation, gener adecommissi olargest volu mng. Other fes); and  be generat eproach com mion activitie sat 393,696 of this wast eClive, Uta hWASTE VOLUME(ft3)235,60310,463 60,916 10,832 38,882 17,693 2,574 16,733 393,696ation, oning. me of forms ed by monly s, the cubic e will h. E La CrossLicense TRevisionWAClean(DebriCleaDRecyRecy3.4.5.Table 3-4 Date Q2/201Q2/201Q2/201Q3/201Q3/201Q3/201Q4/201Q4/201Q4/201Q4/201se Boiling WTermination n 0 STE TYPEn Backfill -
: 3.
is to Landfil lan Asphalt Disposalcle - Metalsycle - RebarProject M4 lists the c u16 16 16 16 17 17 17 18 18 18 Water Reacto rPlan WASTECLASSl)Clean DebrisClean DebrisScrap MetalScrap MetalMilestones urrent sched uTable MilestoneSubmit LTLicense TMobilizat iStack DemLTP ApprComponenBuilding DTransport aSite RemeFRS Comr  Table 3E SWAWE(l19,74,81,895ule for the r ee 3-4 Gee TP to NRCransfer Co mion Comple tmolition Co mroval by NR nt Removal Demolition Cation and D iediation Co mmplete 3-18 3-3 Contin uASTE EIGHT lbs.)747,21174,17503,06454,659Totalemaining de ceneral Pro jemplete te mplete C Complete Complete isposal Co mmplete ued PACKDENS(lb./f75502030l Estimated Vcommission iect Milesto nmplete KING SITY ft3) 5000Volume ing activitie snes WASTE VOLUME(ft3)263,29797,48490,15431,822482,757s. E La CrossLicense TRevision Date Q1/201Q1/201Q1/201Q1/202Q1/202Note:  3.5.R1. DD2. USN3. ED4. URD5. R6. EP se Boiling WTermination n 0 19 19 19 20 20 Circumstanc ecannot be co mReferences Dairyland Po Decommissi oU.S. Nuclear tatement on November 2 0EnergySoluti Demolition LU.S. Nuclear Radiation Su rDecember 2 0Radiological EnergySolutirojections f oWater Reacto rPlan  MilestoneSite Rest oSubmit ReSubmit LiLicense TLACBWRs can change dmpleted as outl iwer Cooper aoning Activi tRegulatory Decommiss002. ons Techni cLimits. Regulatory rvey and As 006. Effluent M oons Techni cor LACBWRr  Table 3e oration Com pemaining F Ricense Tran sransfer to D R License T eduring decom mined in this sc hative, LAC Bties Report (Commissio nsioning of N ucal Support DCommissio nsessment of onitoring an dcal Support DR Decommis3-19 3-4 Contin uplete RS Reports sfer to Dairy lairyland Apermination Amissioning. I fhedule, Soluti oBWR Decom(D-Plan/PS Dn NUREG-0uclear Facil iDocument Rn NUREG-1Materials a nd Offsite Do
E D
: Document, Rssioning.
: 4.
ued land Amen dpproved by NApproval by f Solutions deteons will provid emmissioning DAR), Revi s0586, Gener iities, Suppl eRS-TD-3131 91575, Suppl end Equipme nose Calculati RS-TD-3131 dment Requ eNRC NRC ermines that t he an updated s cPlan and P osion - Marc hic Environ mement 1, Vo l96-005, La Cement 1, M unt Manual (
U R
Mon Manual (96-007, Ra dest to NRC he decommissi ochedule to the ost Shutdow nh 2014. mental Impac tlume 1 - Crosse Ope nulti-Agency MARSAME(ODCM). diation Exp ooning NRC. n t n Air E) - osure}}
D
: 5.
R
: 6.
E P
se Boiling W Termination n 0 19 19 19 20 20 Circumstance cannot be com References Dairyland Po Decommissio U.S. Nuclear tatement on November 20 EnergySoluti Demolition L U.S. Nuclear Radiation Sur December 20 Radiological EnergySoluti rojections fo Water Reactor Plan Milestone Site Resto Submit Re Submit Li License T LACBWR s can change d mpleted as outli wer Coopera oning Activit Regulatory Decommiss 002.
ons Technic Limits.
Regulatory rvey and As 006.
Effluent Mo ons Technic or LACBWR r
Table 3 e
oration Comp emaining FR icense Trans ransfer to D R License Te during decomm ined in this sch ative, LACB ties Report (
Commission sioning of Nu cal Support D Commission sessment of onitoring and cal Support D R Decommis 3-19 3-4 Continu plete RS Reports sfer to Dairyl airyland Ap ermination A missioning. If hedule, Solutio BWR Decom (D-Plan/PSD n NUREG-0 uclear Facili Document R n NUREG-1 Materials an d Offsite Do Document, R ssioning.
ued land Amend pproved by N Approval by f Solutions dete ons will provide mmissioning DAR), Revis 0586, Generi ities, Supple RS-TD-31319 1575, Supple nd Equipmen ose Calculati RS-TD-3131 dment Reque NRC NRC ermines that th e an updated sc Plan and Po sion - March ic Environm ement 1, Vol 96-005, La C ement 1, Mu nt Manual (M on Manual (
96-007, Rad est to NRC he decommissio chedule to the ost Shutdown h 2014.
mental Impact lume 1 -
Crosse Open ulti-Agency MARSAME (ODCM).
diation Expo oning NRC.
n t
n Air E) -
osure}}

Latest revision as of 21:52, 9 January 2025

License Termination Plan - Chapter 3 - Identification of Remaining Site Dismantlement Activities, Rev. 0
ML16200A087
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/27/2016
From:
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML16200A087 (24)


Text

LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 3 IDENTIFICATION OF REMAINING SITE DISMANTLEMENT ACTIVITIES

La Cross License T Revision 3.

Iden 3.1.

3.2.

3.2.

3.2.

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3.2.

3.3.

3.3.

3.3.

3.3.

3.3.4 se Boiling W Termination n 0 ntification of Introduction Completed 1.

Overvi 2.

Disman

.2.2.1. For

.2.2.2. Sea

.2.2.3. Dec

.2.2.4. Prim

.2.2.5. Alt

.2.2.6. Gas

.2.2.7. Fue

.2.2.8. Com

.2.2.9. Hyd

.2.2.10. W

.2.2.11. De

.2.2.12. Ov

.2.2.13. Sta

.2.2.14. Lo

.2.2.15. Hi

.2.2.16. Ci

.2.2.17. Co

.2.2.18. Fu

.2.2.19. Ste

.2.2.20. 60

.2.2.21. Tu

.2.2.22. He

.2.2.23. Li

.2.2.24. El 3.

Additio Future Deco 1.

Reactor 2.

Turbine 3.

Waste T Storage 4.

LACBW Water Reactor Plan f Remaining n.................

and Ongoing ew..............

ntlement of S rced Circulat al Injection S cay Heat Co mary Purific ernate Core seous Waste el Element S mponent Co draulic Valv Well Water Sy emineralized verhead Stor ation and Co ow Pressure igh Pressure irculating W ondensate Sy ull-Flow Con eam Turbine 0-Megawatt G urbine Oil an eating, Venti quid Waste ectrical Dist onal Activiti ommissionin r Building..

e Building a Treatment B e Building..

WR Crib Ho r

TABLE O g Site Disman g Decommis Systems and tion System.

System.........

oling System cation System Spray Syste e Disposal Sy Storage Well oling Water ve Accumula ystem...........

d Water Syst rage Tank....

ontrol Air Sy Service Wat Service Wa Water System ystem and Fe ndensate Dem e..................

Generator....

nd Hydrogen ilation, and A Collection S tribution Sys es................

ng Activities and Turbine O Building, Gas ouse.............

3-i OF CONTE ntlement Ac ssioning Act d Componen m.................

m.................

em................

ystem..........

System......

ator System.

tem..............

ystem..........

ter System..

ater System..

eedwater He mineralizer n Seal Oil Sy Air Conditio Systems.......

stem............

s and Tasks..

Office Build s Storage Ta ENTS ctivities........

tivities and T nts................

eaters...........

System........

ystem...........

oning (HVA ding.............

ank Vault an Tasks...........

AC) Systems.

nd LSA

... 3-1

... 3-1

... 3-3

... 3-3

... 3-3

... 3-3

... 3-4

... 3-4

... 3-4

... 3-4

... 3-4

... 3-4

... 3-5

... 3-5

... 3-5

... 3-5

... 3-5

... 3-6

... 3-6

... 3-6

... 3-6

... 3-6

... 3-6

... 3-7

... 3-7

... 3-7

... 3-7

... 3-8

... 3-8

... 3-8

... 3-8

... 3-9

. 3-11

. 3-12

. 3-13

La Cross License T Revision 3.3.

3.3.

3.3.

3.4.

3.4.

3.4.

3.4.

3.4.4 3.4.

3.5.

Table 3-1 Table 3-2 Table 3-3 Table 3-4 se Boiling W Termination n 0 5.

Mainte 6.

Ventila 7.

Legacy Radiologica 1.

Contro 2.

Occupa 3.

Exposu 4.

Radioa 5.

Project References 1

Status o 2

Radiati 3

Project 4

Genera Water Reactor Plan nance Eat Sh ation Stack..

y Waste.......

al Impacts of l Mechanism ational Expo ure to the Pu active Waste t Milestones of Major LA ion Exposure ted Waste Qu al Project Mi r

hack and 1B f Decommis ms to Mitigat osure............

ublic.............

Projections LIST ACBWR Sys e Projections uantities......

ilestones......

3-ii B Diesel Gen sioning Acti te the Recon OF TABLE stems and Co s for Decom nerator Build ivities..........

ntamination ES omponents a mmissioning.

ding.............

of Remediat as of June 20 ted Areas.....

015..............

. 3-14

. 3-14

. 3-15

. 3-15

. 3-16

. 3-16

. 3-16

. 3-17

. 3-18

. 3-19

... 3-2

. 3-16

. 3-17

. 3-18

La Cross License T Revision ALARA ACM AMSL BSFR CCW CST D-Plan/

PSDAR FESW FRS G-3 GSTV HPSW HVAC kVA ISFSI LACBW LPSW LSA LSE LTP NRC ODCM OHST REMP RPV RWP WTB se Boiling W Termination n 0 A

As L Asb Abo Bulk Com Con

/

R Dec Fuel Fina Gen Gas High Heat kilo-Inde WR La C Low Low LAC Lice Nuc M

Off-Ove Rad Reac Rad Was Water Reactor Plan LIST OF Low As Rea estos Contai ove Mean Se k Survey For mponent Coo ndensate Stor commissionin l Element St al Radiation noa Fossil Sta Storage Tan h Pressure S ting Ventilat

-Volt-Ampe ependent Spe Crosse Boilin w Pressure Se w Specific Ac CBWR Site E ense Termina lear Regulat

-site Dose Ca rhead Storag iological En ctor Pressure iation Work ste Treatmen r

ACRONYM sonably Ach ining Materi ea Level r Release oling Water rage Tank ng Plan/Post torage Well Survey ation nk Vault ervice Wate tion Air Con re ent Fuel Stor ng Water Re ervice Water ctivity Enclosure ation Plan tory Commis alculation M ge Tank nvironmental e Vessel k Permit nt Building 3-iii MS AND AB hievable ial t Shutdown er nditioning rage Installa eactor r

ssion Manual l Monitoring BBREVIAT Decommiss ation g Program TIONS ioning Activvities Reportt

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r

Page Inten 3-iv ntionally Lefft Blank

La Cross License T Revision

3.

Id 3.1.

In In accord the rema the time remediati Estimate released projected will be Crosse B Decomm to procee The LAC alternativ Decomm DECON sites. Cu located in Decomm regulator State and Decomm of 10 CF involve LACBW the techn approval Decomm Safety an decommi operation The rem described discussed major rem specific e compone se Boiling W Termination n 0 dentificati ntroduction dance with 1 aining major of submitta ion and an a s of the oc to unrestric d volumes of undertaken Boiling Wa issioning Ac ed.

CBWR site ve, as desc issioning of alternative i urrently, LaC n Andrews, missioning a ry agencies d local regu missioning ac FR 50.82(a)(6 any un-revi WR. If an act nical specifi before impl missioning ac nd Health P issioning do ns, especially maining dec d in section d in sections maining com equipment r ents that hav Water Reactor Plan ion of Rem n

10CFR50.82 r dismantlem al. The info assessment o ccupational r ted areas du f radioactive pursuant to ater Reacto ctivities Repo will be de cribed in N f Nuclear F is contingen CrosseSoluti Texas and at activities are in accordan ulatory agen ctivities at LA

6) and (a)(7) iewed safet tivity require ications or l lementing th ctivities are Program, an not pose an y those durin ontamination 3.3. The sp s 3.3.2 throu mponents of remediation e been or are r

maining Si (a)(9)(ii)(B ment and dec formation inc of the potent radiation do uring the co e waste that o the curren or (LACBW ort (D-Plan/

contaminate NUREG-058 Facilities, S nt upon conti ions (Solutio t the Energy e being co nce with pla ncies are list ACBWR wi

). At the tim ty questions es prior NRC license, a su he activity in conducted nd Waste M ny greater ra ng major ma n and dism pecific system ugh 3.3.7. T contaminate consideratio e to be remo 3-1 ite Disman

), the Licens contaminatio cludes those tial radiolog ose and the mpletion of will be gene nt 10 CFR 5 WR) Decom

/PSDAR) (1 ed and dism 86 Generic Supplement inued access ons) has acc ySolutions fa oordinated w ant administ ted in sectio ill be conduc me of LTP s s or change C approval u ubmittal wil n question.

under the S Management diological or aintenance an mantlement m considera These section ed plant syst ons. Table 3 oved.

ntlement A se Terminati on activities e areas and ical conditio quantity of f the schedu erated are als 50 license, mmissioning

1) and do no mantled in ac Environme 1, Volume 1 s to one or m cess to low-l acility locate with the ap trative proce n 8.7.2 of L cted in accor submittal, th es in the T under 10 CF ll be made Solutions Ra Program r safety risk nd outage ev activities th ations that w ns provide a tems and, as 3-1 contains Activities ion Plan (LT s for the dec equipment ons that may f radioactiv uled tasks ar so included.

are consist Plan and ot depend up ccordance w ental Impac 1 (2). Co more low lev level waste d ed in Clive, U pplicable Fe edures. Ap LTP Chapter rdance with he remaining Technical S R 50.59(c)(2 to the NRC adiation Pro Activities c k than those c volutions.

that will be will be taken an overview s appropriate s a list of m TP) must ide commissioni that need fu y be encount e material t e provided.

These acti tent with th d Post-Shut pon LTP app with the DE ct Statemen ompletion o vel waste dis disposal faci Utah.

ederal and pplicable Fed r 8.

the requirem g activities d pecification 2), or a chan C for review otection Prog conducted d conducted d e performed n into accoun and describ e, a descripti major system entify ing at urther tered.

to be The vities he La tdown proval ECON nt on f the sposal ilities State

deral, ments do not ns for nge to w and
gram, during during d are nt are be the ion of s and

La Cross License T Revision Forced Reacto Reacto Main S Decay Primar Feedw Seal In Altern Gaseo Fuel E Compo Hydra Well W Demin Overh Station Low P High P Circul Conde Heater Steam 60-Me Main C Turbin se Boiling W Termination n 0 Table System or d Circulation or Vessel Int or Vessel Steam in Re y Heat Coolin ry Purificatio water in Reac njection Syst nate Core Spr us Waste Di Element Stor onent Coolin ulic Valve A Water System neralized Wa ead Storage n and Contro Pressure Serv Pressure Serv ating Water ensate and Fe rs Turbine egawatt Gen Condenser &

ne Bldg. Mai Water Reactor Plan e 3-1 Sta as Componen n System ternals actor Bldg.

ng System on System ctor Bldg.

tem ray System isposal Syste rage Well Sy ng Water (C Accumulator m

ater System Tank (OHS ol Air System vice Water vice Water System eedwater Ta erator

& Accessorie in Steam r

atus of Majo of June 201 nt P

R R

In In Io In 90 50 em A

ystem C

CCW)

In r System In In In T)

In m

In 30 O

R anks and D

pl R

R es 15 R

3-2 or LACBW 15 artially Rem Removed from Removed from n place n place-Drai on Exchange n place 0% removed 0% removed All except un Contents rem n place-70%

n place-Drai n Place - Iso n place-Drai n place-Drai n place 0% removed Operational Remains in pl Drained-Con lace, All Fee Removed Removed 5% Remove Removed WR Systems Sta moved m site m site ined ers in place; d

d nderground s moved-Drain

% Removed ined lated from T ined-50% re ined d

lace - pump ndensate Sto edwater Hea ed and Compo atus 90% remov storage tank ned Turbine/Reac emoved ps de-energiz rage Tank re aters remove onents ed removed ctor Bldg.

zed emain in ed

La Cross License T Revision Tab Turbin Turbin Liquid Fuel T HVAC Electri Asbest After th demonstr reduced t will be decommi 3.2.

C 3.2.1.

In excess addition disposal waste.

Waste sto Class B/C were ship rod blad Attachme removed fuel asse the storag 3.2.2.

3.2.2.1.

The Forc Circulati se Boiling W Termination n 0 ble 3-1 (con System or ne Bldg. Con ne Oil and H d Waste Coll Transfer Brid C Systems ical Systems tos Abateme e balance rated to be to the area a transferred issioning act Completed a Overview s of 2 millio to the Reac of the RPV ored in the F C waste (i.e pped for disp des was fill ents to the R from the R mblies and f ge racks and Dismantl Force ced Circula on pumps, a Water Reactor Plan ntinued)

S a

Componen ndensate and Hydrogen Sea lection Syste dge s

ent of the site below the u around the I back to Da tivities comp and Ongoing w

n pounds of ctor Pressur V included d Fuel Elemen

., resins, filt posal in June led with lo RPV were r eactor Build fuel debris w d installed co lement of Sy d Circulation ation system auxiliary oil r

Status of Ma as of June 20 nt d Feed R

al Oil P

ems In R

In In 75 is remedia unrestricted Independent airyland und pleted to dat g Decommis f metallic wa re Vessel (R disposition o nt Storage W ters, and was e 2007. The ow-density c removed and ding and wa were placed omponents w ystems and n System m and attend pumps, and 3-3 ajor LACBW 015 Removed artially Rem n place - Par Removed n place - Par n place-Disc 5% complet ated and th release crite Spent Fuel der the 10 e are provid ssioning Ac aste have be RPV) and s of irradiated Well (FESW) ste barrel co e RPV conta cellular con d all other a s shipped fo in dry cask were removed Component dant oil sys hydraulic c WR System Sta moved rtially Opera rtially Opera connected te he levels o eria, the 10 Storage Ins CFR Part 5 ded in section ctivities and een removed spent fuel st d hardware a

) was proces ontents) and aining the rea ncrete with appurtenanc or disposal in storage in th d from the F ts stems have oupling oil p ms and Com atus ational ational f residual CFR Part 50 tallation (IS 50 license.

n 3.2.

Tasks d, shipped, an torage racks and all othe ssed and col packaged in actor interna the reactor es were cut n June 2007 he ISFSI in FESW.

been draine pumps have ponents radioactivity 0 license w SFSI) and th Spent fuel nd disposed

s. Removal er Class B a llected with n three liner als and 29 co r head insta
t. The RPV
7. After all September 2 ed. The Fo been electri y are ill be e site l and of in l and and C other s that ontrol alled.

V was spent

2012, orced ically

La Cross License T Revision disconne density c nozzles w reactor c disposed 3.2.2.2.

The Seal Circulati 90% rem 3.2.2.3.

The Dec cooler, a This syst 3.2.2.4.

The Prim regenerat resins ha coolers a 3.2.2.5.

The Alte (HPSW) duplex st system in and 80%

compone 3.2.2.6.

This syst recombin exception tunnel.

3.2.2.7.

The Fuel 11 feet b 38,000 g pumps, o fuel and well and se Boiling W Termination n 0 cted. All 1 cellular conc were cut to cavity was a of. Pumps Seal I l Injection s on pumps an moved.

Decay cay Heat Co nd interconn tem is draine Prima mary Purific tive cooler, ave been rem and 90% of th Altern ernate Core pumps, whi trainers and n the Reacto

% of the pi ents are drain Gaseo tem routed ning, monito n of the und Fuel E l Element Sto by 11 feet b allons of wa one heat exc fuel debris, i a fixative w Water Reactor Plan 16 inch and crete. Four allow remo also cut at and piping i njection Sys ystem provi nd the 29 co y Heat Cooli ooling system necting pipin ed and inope ary Purificati cation syste purification moved and t he piping ha nate Core Sp Spray syste ich took suc two motor-o or Building w iping in the ned and are r ous Waste D main conde oring and h derground ga Element Stor orage Well (

by approxim ater. The FE changer, one installed com was applied to r

20 inch For 16 inch Forc oval of the the biologic n the shielde stem ided cooling ontrol rod dr ing System m was a sin ng used to r erable.

ion System m was a h n cooler, pum the system h ave been rem pray System m consisted ction from th operated val was removed e Turbine B ready for dis isposal Syst enser gasses holdup for as storage tan rage Well (FESW) is a mately 42 fe ESW cooling e ion exchan mponents, an o the walls.

3-4 rced Circula ced Circulat reactor pres cal shield, s ed cubicles r g and sealing ive units. T ngle high pr remove core high pressur mp, two ion has been dr moved and di d of two die he river and lves installed d due to inte Building ha smantlement tem s through va decay. Th nks and the a stainless ste eet deep. W g system is c nger, piping, nd storage ra The system ation system tion inlet no ssure vessel segmented i remain.

g water for This system i ressure clos decay heat re, closed lo n exchanger rained. The isposed as ra esel-driven H discharged d in parallel erference wi as been rem

t.

arious comp his system h gas storage eel lined con When full, connected to

, valves, and acks have be m has been dr m piping was zzles and fo

. Piping lo into manage the seals on is drained an sed loop con following r oop system rs and filters e Primary Pu adioactive w High Pressur to the reacto

. Approxim th the reacto moved. Re ponents for has been re tank in the T ncrete structu it containe o the well an d instrument een removed rained and is s filled with our 16 inch o ocated withi eable pieces n the two Fo nd approxim ntaining a p reactor shutd consisting

s. Ion exch urification p waste..

re Service W or vessel thr mately 50% o or vessel rem emaining sy drying, filte emoved with Turbine Bui ure that mea ed approxim nd consists o tation. All d from the sto s inoperable.

h low outlet n the

, and orced mately

pump, down.

of a hange

pump, Water rough of the moval ystem
ering, h the ilding asures mately of two spent orage

La Cross License T Revision 3.2.2.8.

The Com various h barrier b cooling w system is 3.2.2.9.

The func force to the Force air comp drained.

3.2.2.10.

Water fo suction t system su cooling w down fla equipmen isolated f Administ 3.2.2.11.

The Dem of 19,100 are two s Virgin W deminera Station (G 3.2.2.12.

The Ove integral p the FESW OHST ac The OHS Spray sy drained a se Boiling W Termination n 0 Comp mponent Coo heat exchang between rad water to Re s approximat Hydra ction of the H operate the ed Circulatio ressors, wat Well W or this syste through stai upplied wate water for the ash tank and nt and seal w from the Re tration Build Demin mineralized W 0 gallons and sections of a Water Tank p alized water G-3). The sy Overh erhead Stora part of, the R W, cask poo cted as a re ST also supp ystem, and w and inoperab Water Reactor Plan ponent Cooli oling Water gers and pum ioactive sys eactor Build tely 70% com aulic Valve A Hydraulic V five piston-t on and Main ter pumps, an Water System m was supp nless steel er to the pla e two Turbi d sample co water for th eactor/Turbin ding and Crib neralized W Water System d an upper V an integral a provided wat throughout ystem has be head Storage age Tank (O Reactor Bui ol, and upper ceiver for re plied the wa was a backup ble.

r ing Water Sy (CCW) syst mps in the R stems and s ding Air Con mplete.

Accumulator Valve Accum type valve a n Steam syst nd other equ m

plied from t strainers, an ant and office ne Building ooler. The he Circulatin ne building.

b House.

ater System m consists o Virgin Water luminum tan ter to the De the plant. W een drained.

e Tank OHST) is a 4 lding. The r cavity duri ejecting refu ater for the E p source for 3-5 ystem tem provided Reactor Build secondary c nditioner co r System mulator system actuators, wh tems. The h uipment have two sealed s nd discharge e for sanitar g air-conditio well water ng Water pum Well water of a lower C r Tank, whic nk located o mineralized Water was d 45,000-gallo OHST serve ing cask loa ueling water Emergency C the Seal Inj d controlled ding during ooling syste ompressors.

m was to su hich operate hydraulic sy e also been submersible ed into inte ry and drinki oning units system also mps. The W r pump #3 s Condensate S ch has a capa on the Turbin d Water trans demineralize on tank loca ed as a reser ading operati r using the P Core Spray s njection syste d quality coo plant operat ems. The The disma upply the nec ed the five r ystem has be electrically deep well egrated press ing purpose and the heat o supplied w Well Water supplies pot Storage Tank acity of 29,7 ne Building sfer pumps, w ed in batches ated at the t rvoir for wa ions. Durin Primary Pur system and em. The sy oling water t tion, serving system prov antlement of cessary hydr rotoport valv een drained.

disconnected pumps that sure tanks.

s. It was us ting boiler b water for lau System has table water t k with a cap 780 gallons.

office roof.

which distrib s at Genoa F top of, and ater used to ng operation rification sy Reactor Bui ystem is curr to the g as a vided f this raulic ves in The d and took The sed as blow-undry been to the pacity Both The buted Fossil is an flood s, the ystem.

ilding rently

La Cross License T Revision 3.2.2.13.

There are act as a v supply to used as n 3.2.2.14.

Two vert strainer u was the system is river wat to allow 3.2.2.15.

The purp (G-3) ma The inter (WTB) i hydrants the fire s by the rem 3.2.2.16.

Circulatin open suc join a co condense Water en tube side which di LACBW pumps ha 3.2.2.17.

The Cond pressure Tank (CS 3.2.2.18.

The Full removed piping ha se Boiling W Termination n 0 Statio e two single volume stora o the station needed.

Low P tical pumps unit. The L normal sup s currently u ter ingress in dismantleme High P pose of the H aintains HPS rnal loop ser interior hose and the LA uppression s moval of iso Circul ng water is d ction bays in ommon 60 in er, the 60 inc nters the top

e. The 42 in scharges to t WR Crib Hou ave been de-Conde densate Syst to the suctio ST), this syst Full-F l-Flow Cond ionic impu ave been rem Water Reactor Plan n and Contr

-stage positi age unit for t n and the con Pressure Serv located in th ow Pressure pply to the H used as the d n the turbine ent which is Pressure Ser HPSW syste SW system rved the Tur e stations an CBWR Crib system for G olation valve lating Water drawn into t n the LACB nch pipe lea ch pipe bran section of th nch condens the seal wel use. The C

-energized.

ensate Syste tem took con on of the rea tem has been Flow Conden densate Dem rities from t moved.

r ol Air Syste ive displacem the station.

ntrol air sys vice Water S he LACBW e Service W HPSW syst dilution wat e building tu approximate rvice Water em is to sup pressure. T rbine Buildin nd sprinkler b House spri G-3. Current es and install r System the intake flu WR Crib H ading to the nches into tw he condenser ser circulatin l from G-3 l Circulating W m and Feedw ndensed stea actor feed pu n drained an nsate Demin mineralizer the condens 3-6 m

ment lubrica The air rece stems. This System R Crib Hou ater (LPSW em through ter supply fo unnel area.

ely 30% com System ply fire sup The HPSW ng, Reactor B r systems.

inklers. The tly, the syste ling pipe bla ume from th House. Each e main cond wo 42 inch pi r tube side a ng water out located appr Water System water Heater am from the umps. With nd most of th neralizer Syst System con ate water go ated type com eiver outlet li system is c use supplied W) system sup h the motor-or conductin The origina mplete.

pression wa system is d Building, an The externa e external lo em is isolate anks to allow he river by tw h pump disch denser in th ipe to the to and is discha tlet lines tie roximately 6 m is current rs condenser h the exceptio he piping has tem nsisted of re oing back to mpressors.

ines join to f currently stil the system upplied the C

-driven HPS ng liquid wa al system has ater. The ad divided into nd Waste Tr al loop supp op was cros ed from the T w only extern wo pumps lo harges into he Turbine B op section of arged from th into a comm 600 feet dow tly inoperab hotwell and d on of the Co s been remov esin-filled se o the reacto The air rece form a heade ll operable a through a du CCW cooler SW pump.

aste discharg s been simp djacent coal two main l eatment Bui plies outside ss-connected Turbine Bui nal fire loop ocated in sep 42 inch pipe Building. A f the water b he bottom se mon 60 inch wnstream from ble as the sy delivered it u ondensate Sto ved.

ervice tanks

r. All tanks eivers er for and is uplex s and This ges of lified plant oops.

ilding e fire d with ilding use.

parate e that At the boxes.

ection h line m the ystem under orage s that s and

La Cross License T Revision 3.2.2.19.

The turbi rated at 6 pressure have bee 3.2.2.20.

The 60 76,800 kV lubricatin through a been com 3.2.2.21.

The Turb lubricatin reduction complete 3.2.2.22.

The Reac for drawi air condi 337,500 B building from the 350 feet exhaust s particulat includes which hi detecting Ventilati vault are the gas s vault thro Currently use of sta se Boiling W Termination n 0 Steam ine was a hi 60 MW. Th element. T n removed.

60-Me MW gener VA. The g ng system, a a reduction g mpletely rem Turbin bine Oil Sys ng and cooli n gear. This ely removed.

Heatin ctor Buildin ing fresh air itioning unit Btu/hr capac through ope building us high and is system was te radiation an isokineti storically ha g particulate on for the W as of the bu storage tank ough the con y, both syste ack fans that Water Reactor Plan m Turbine igh pressure he turbine co The Steam T egawatt Gen ator was a generator w and excited gear. The m moved, uncon ne Oil and H stem receive ing oil to th s system, wi ng, Ventilati g Ventilatio r into the bu t air inlet inc city steam c enings betw sing stack b constructed equipped w detector. A ic nozzle, lo as drawn air and gaseous WTB was pro uilding and e vault. The nnecting tunn ems are de-e t are energiz r

, condensing onsisted of a Turbine, as w nerator a high-spee as cooled b by a separat main and rese nditionally re Hydrogen Se ed cooled oi he turbine an ith exceptio ion, and Air on System ut uilding and f cluded a filt coil that was een and aro lowers throu of structura with conventi A monitoring ocated down r from the st s activity.

ovided by a 2 exhausted th stack blowe nel and disch energized. B ed by tempo 3-7 g, reaction, t a high pressu well as som d, turbine-d by a hydrog te exciter at erve exciters eleased and d eal Oil System il from the l nd generato n of the dra Conditionin tilized two 3 for circulatin er box assem s used when und the bi-p ugh the exh al concrete w ional and hi g system is i nstream of t tack exhaust 2000 cfm ex he air throug ers then exh harged the a Building ven orary power.

tandem com ure and inter me steam sys driven wou gen system, ttached to th s have been dispositione m

lube oil coo r bearings, ained clean a ng (HVAC) S 30 ton, 12,00 ng the air thr mbly, face a n heating wa parting door haust stack f with an alum igh-efficienc installed wit the high-eff t to the mon xhaust fan th gh a duct ou hausted the a air from the b ntilation is cu mpound, rehe rmediate pre stem piping und-rotor m lubricated b he end of th removed. T ed.

olers to supp exciter bear and dirty oi Systems 00 cfm air c roughout the and bypass d as required.

r sections an for the facili minum nozzle cy filters and th the exhau ficiency filte nitoring syste hat drew air f ut the floor o air from the building thro urrently supp eat 3600 rpm essure and a and compo machine rate by a forced he generator The generato ply the nece rings, and ex l tanks, has conditioning e building.

dampers, and Air entere nd was exha ity. The sta e at the top.

d monitored ust system, w ers. The sy em, is capab from the shi of the buildi gas storage ough the stac plied throug m unit a low-onents ed at

-flow shaft or has essary xciter been units Each d one ed the austed ack is The d by a which

ystem, ble of elded ing to e tank ck.

gh the

La Cross License T Revision 3.2.2.23.

The Liqu storage ta in the tun The Reac consists pump, tw retention Followin liquid wa water dis Spent res quantity transferre disposal.

Currently discharge The air o 3.2.2.24.

The plan site has a buildings the stack 3.2.3.

Other com The con The Con The rack The Co The 3.3.

F The plan remainin se Boiling W Termination n 0 Liquid uid Waste Sy ank vault, an nnel between ctor Buildin of two reten wo sump pu n tanks.

ng processin aste from ea scharge outfl sin was trans available f ed to an ap y, the liquid es at LACBW operated pum Electr nt is disconne a 480 volt 50

s. Temporar
k.

Addition mpleted dec e abatement ntaining mate e abatemen ntaining Ma e placement ks from the e disconnect old and Dark e draining an Future Deco ns for the de ng site struct Water Reactor Plan d Waste Col ystem collec nd the tunne n the Reacto ng Liquid W ntion tanks, umps, and th ng and samp ach system w low. This w sferred to th for shipmen pproved ship d waste colle WR are thro mp discharge rical Distribu ected from o 00 kVa trans ry power is al Activities ommissionin

, packaging erial.

nt, packagin aterial (ACM of all spent FESW.

tion of LAC k status.

nd removal o mmissionin contaminatio tures are pr r

llection Syst cts the liquid el into two st r Building a Waste System each with he necessary pling to dem was then dis was the norm he spent resin nt to an ap pping contai ection system ough the East es to the inlet ution System off-site powe sformer prov tied to exis s

ng activities and disposa ng and disp M).

fuel into dry CBWR from of other misc ng Activities on, dismantl resented in t 3-8 ems d waste from torage tanks and the Turbi m, which is s a capacity o y piping to monstrate co scharged to al liquid effl n receiving t pproved pro iner, dewate m pumps are t Turbine bu t of the liqui m

er in support viding powe ting overhea include:

al of known posal of kn y storage in t off-site elec cellaneous sy s and Tasks lement and a the followin m the Turbine (4500 gallo ine Building separate from of 6000 gall route the w ompliance w the commo fluent release tank and hel ocessing fac ered, packag e not operab uilding sump id waste mon rt of Cold an er to multipl ad cranes an n and readily nown and r the ISFSI fa ctrical power ystem piping anticipated e ng sections.

e Building, t ons and 3000

g.

m the Liqui lons, a liqui waste liquid with the rele on G-3/LAC e pathway fo ld until there cility. The ged and ship ble. The on p using an ai nitor, which nd Dark statu e power car nd power to y accessible readily acce acility and th r and placin

g.

end-state co The metho the WTB, th 0 gallons) lo d Waste Sy id waste tra to and from ease criteria BWR circul or LACBWR e was a suffi resin was pped for of nly liquid eff ir operated p h is still opera us. Currentl rts throughou exhaust fan lead and/or essible Asb he removal o ng LACBWR ndition(s) fo ods to reme he gas ocated

ystem, ansfer m the a, the lating R.

ficient then ff-site fluent pump.

able.

ly the ut the ns for r lead bestos f fuel R in a or the ediate

La Cross License T Revision contamin remediat 3.3.1.

The Reac ellipsoida and it ex for the up The build including layer of structure concrete The shel Turbine Reactor B removal closed by leaves th the north A 50 ton Reactor supported the 5-ton Hatches of the cab The rema removed and the id Systems overhead size redu the waste Water an Once the building activity w once the In prepar elevation will allow se Boiling W Termination n 0 nated struct ion issues.

Reactor B ctor Buildin al bottom. I xtends 26 fee pper hemisp ding contain g the RPV an concrete to is supporte approximate ll includes t Building. I Building tha and dry cas y a weather he Reactor B heast quadran n traveling p Building.

d by column n hoists are a at several po bles and equ aining comp

. Area prep dentification or compon d crane or loc uce. The sys e loading are nd sludge ar e tank has b demolition.

will allow fo tank is prep ration for th

n. As necess w for the per Water Reactor Plan tures, system Building g is a right It has an ove et 6 inches b herical dom ned most of t nd biologica an elevation ed on a foun ely 3 feet thi wo airlocks In addition, at is intended k storage, an tight, insula Building 1 to nt and enters polar crane w The bridge ns around the also long en ositions in th uipment.

ponents and s paration and n and mitigat nents will be cal hoists. S stems will be ea in the Tur re currently been adequat Keeping as or the collect ared for dem he building sary, prior to rformance of r

ms, and eq circular cyli erall internal below grade e, which is 0 the equipme al shielding.

n of 727 fee ndation cons ick.

. The perso there is als d to accomm n opening w ated, roll-up, o 10 feet belo s the pipe tun with a 5 ton completely e inside of th nough to reac he main and systems in th set-up for c tion of any h e removed u Some system e either load rbine Buildin inside the O tely characte ssociated pip tion of any l molition.

demolition, o dismantlem f hot work a 3-9 quipment d inder buildin l height of 14 level. The 0.60 inch thi ent associate The interio et 10 inches sisting of co onnel airloc so an 8 feet modate large was created i

, bi-parting ow grade lev nnel.

n auxiliary h spans the he building.

ch down thr intermediat he Reactor B ommodity re hazardous m utilizing me ms or compon ded into ship ng.

OHST. The erized, a fix ping and com liquids. This the FESW ment, the FES activities requ do not invo ng with a he 44 feet and a steel shell t ick.

ed with the n or of the shel Above Mea oncrete-steel ck connects by 10 feet pieces of eq in the React door. The m vel either at hoist is loca building an The lifting rough hatchw te floors may Building wil emoval will material.

echanical m nents might pping contain e tank will b xative will b mponents in s piping wil will be dism SW will be d uired to rem olve any u emispherical an inside dia thickness is nuclear steam ll is lined wi an Sea Leve l piles and a the Reactor freight doo quipment. T tor Building majority of p the northwe ated in the u nd travels o cables of bo ways into th y be opened ll be drained include rad means with s require hot w ners or will be dewatered be applied in n place while l be dismant mantled from decontamina move the stain unique safet l dome and s ameter of 60 1.16 inch, e m supply sy ith a 9-inch-el (AMSL).

a pile cappin r Building t or opening i To facilitate

. The openi pipe penetra est quadrant upper part o n circular t oth the 50-ton he basement to allow pa d, dismantled diological sur support from work activit be transport d and deslud n preparatio e performing tled and rem m the main ated to level nless steel F ty or semi-0 feet, xcept

ystem,

-thick The ng of to the n the RPV ing is ations t or at of the tracks n and area.

ssage d, and rveys m the ties to ted to dged.

on for g this moved floor s that FESW

La Cross License T Revision liner. A sections liner will Turbine B will be d EnergySo Demoliti After com will be r with prop basement The r Asbe Dism Dism pipin Dism Reme The r The expo to meet t is identif method w deeper d open air process, t Once sur reach exc walls do segmente the steel sprung st Reactor B The ther packagin concrete

removal, loaded in the waste disposal se Boiling W Termination n 0 Associated eq of the FESW l be lifted by Building. O decontamina olutions Tec ion Limits (3 mmodity rem remediated t per contami t will includ removal of a stos Abatem mantle and re mantle and r ng as well as mantle and re ediation of th removal of a osed concret the open-air fied within t will be used depth, then a demolition.

then a struct rveys have cavator equi wn to grade ed and remo liner segme tructure and Building. T rmal shield ng as mixed will be rem the remain nto appropria e container site in Clive Water Reactor Plan quipment (H W liner will b y the overhe Once the FE ated to the chnical Supp 3).

moval is com to levels tha ination contr de:

any identified ment (to be p move the 6,0 emove the the auxiliary move the co he sump.

any lead shie te will then b demolition the first coup to remove t a wire saw w If large se tural evaluat demonstrate ipped with a e level. Af ved using cu entation and d associated The remainin will be seg waste. Aft moved, comp ning portion ate container will be tran e, Utah.

r HVAC, etc.)

be size reduc ead crane, p SW liner ha extent nece port Docume mplete, the b at will allow rols per Ref d Hazardous erformed by 000-gallon r two Forced y oil pumps.

ondensate pu elding.

be surveyed criteria spec ple of inche the contamin will be used ections of c tion will be c ed that the o a pneumatic fter the abo utting torche removal of ventilation ng interior c gmented usin ter the therm pletely expos of the steel rs and truck nsferred to a 3-10

) and piping ced using pl ackaged and as been remo ssary to all ent (TSD) R asement elev w demolition ference 3. T s Waste.

y a qualified retention tan Circulation urification io to determin cified in Ref s of concret nated materi d to remove ontaminated completed.

open-air dem hammer wi ve grade in es from the t the steel lin system will concrete will ng a wire s mal shield is sing the stee l liner will ed to a rail t a rail car an g will also lasma cutting d placed in t oved, the co low open-air RS-TD-31319 vation (621 n of above g The preparat Subcontract nks.

n Pumps, in on exchanger ne the scope ference 3. If te, a scabblin ial. If the co contaminate d concrete m molition crit ill be used t nternal steel top down to ner to the gro l be installe l then be rem saw into ma s removed, t el liner. Sub be removed trans-load fa nd then ship be removed

g. Sized pie the waste st oncrete unde r demolition 96-005, LAC foot) of the ground struc tion of the R tor).

ncluding the rs.

of the remed f unacceptab ng method o ontaminatio ed areas abo must be rem teria have b to break the shell is exp the ground ound elevati ed over the moved to th anageable p the remaind bsequent to

d. Demolitio acility in Wi pped to the
d. Contamin eces of the F taging area i rlying the F n as specifi CBWR Ope Reactor Bui ctures in ope Reactor Bui e inlet and o diation nece ble contamin or air hamm n is detected ove the limit moved during been met, a interior con posed, it wi elevation. W on is compl remainder o he thermal sh pieces for sp der of the int interior con on debris wi inona, MN w EnergySolu nated ESW in the FESW ed in n Air ilding en air ilding outlet essary nation mering d at a ts for g this high ncrete ill be When ete, a of the hield.

pecial terior ncrete ill be where utions

La Cross License T Revision The rema bowl b Final Rad 3.3.2.

The Tur switchge traveling crane has the main The Tur laborator ventilatin services.

Turbine O Commod and mec reciproca meet pac loading a is proper After rad

systems, specified criteria w with the of inches contamin be used t an accept Utah. A Radiation When al building and struc sequence to allow requirem The majo to be trea disposal facility i shipped se Boiling W Termination n 0 aining struc below 636 fo diation Surv Turbine B rbine Buildi ar, and othe g bridge cran s access to m floor. The T rbine Office ry, shops, co ng and air c In genera Office Build dity removal chanical me ating saws w ckaging and area located rly shipped a dioactive com component d in Referen will be remov Reactor Con s of concrete nated materi to remove c table radioac All structural n Work Perm l structural will be dem ctural concr e within the T open acces ments. Misti ority of the c ated as low l facility. Wa n Winona, to the Ene Water Reactor Plan tural concre oot elevation vey (FRS) in Building an ing housed er pneumatic ne with a 5 major equipm Turbine Bui e Building c ounting room conditioning al, these are ding is 110 fe l has begun eans to dism will be the pr waste dispo on the grou and disposed mmodity rem ts and struc ce 3 is met.

ved, segrega ntainment, if e, a scabblin al. If the co ontaminated ctive waste decontamin mits (RWP) surfaces ha molished. Al ete will be Turbine Bui ss to load o ing methods construction level radioac aste will be l MN where ergySolutions r

ete outside th n, concrete p accordance nd Turbine O the steam c, mechanica ton auxiliar ment items l lding is 105 contained o m, personne g equipment eas were sep eet by 50 fee and will con mantle radio rimary meth osal criteria und floor in t d of at an off-moval is co ctural surfac

. Structural ated, properly f unacceptab ng method o ontamination d areas. All disposal fac nation activit and under th ve been dec l remaining demolished lding will be out areas.

s will be uti debris resul ctive waste a loaded into a the waste c s disposal s 3-11 he liner belo pile cap and with LTP C Office Build turbine and al and hydra ry hoist cap located below feet by 79 f offices, the el change ro

, rest rooms parated from et and 45 fee ntinue in the oactive pipin hods used. S

a. Waste wi the northwes f-site facility mplete, surv ces to ensur materials th y packaged a ble contamin r air hamme n is detected radioactive ility, primar ties will be he oversight contaminated systems and to the grou e performed Concrete w ilized during lting from th and will be s appropriate c container wi site in Cliv ow the 636 piles) will r Chapter 5.

ding d generator, aulic system pacity spans w the floor t feet and 60 f Control Ro oom, decont s, storeroom m power pla et tall.

e Turbine Bu ng and com System piece ill be packa st corner of veys will be re that the hat do not m and disposed nation is iden ering method d at a deeper waste will rily the Ener performed i of Radiation d to the op d component und level sl from the top will be proc g building d he demolitio shipped to th containers an ill be transf ve, Utah.

foot elevati remain and main cond ms and equip the Turbine through num feet tall.

oom, locker amination fa m, and space ant equipme uilding utiliz mponents.

es and waste aged and sto the Turbine e performed open-air de meet the ope d of as radio ntified withi d will be us r depth, then be loaded an rgySolutions in accordanc n Protection en-air demo ts, interior st ab. The ge p down and cessed to m demolition to n of the stru he licensed r nd trucked to ferred to a r If possible, on (i.e., con be subjected denser, elec pment. A 3 e Building.

merous hatch r room facil facilities, hea e for other ent spaces.

zing cutting Band saws e will be siz ored in the w e Building un of all rema emolition cr en-air demo oactive waste in the first co ed to remov n a wire saw nd transport facility in C ce with appr personnel.

olition limits tructural sur eneral demo from west to meet disposa o minimize ucture is exp radioactive w o a rail trans rail car and some mat ncrete d to a ctrical 0-ton The hes in

lities, ating, plant The tools s and zed to waste ntil it aining riteria lition
e. As ouple ve the w will ted to
Clive, roved s, the rfaces lition o east l site dust.

pected waste s-load d then erials

La Cross License T Revision including accordan of Mater can be re recycle o the prese of a 193-When th excavato building

removal, Some ex discharge below gr 3.3.3.

The WTB and equip level sol basement bottom w The grad steel spen the shiel piping, c facility, c condition The base gained b drums.

exchange The Gas 14 feet h the WTB elevation compone cubic fee until such some ass The Low It was us se Boiling W Termination n 0 g structural c nce with NU rials and Eq ecycled or re or disposal a ence of any r

-6 Micro R in he Turbine B r with appr slab and fo undergroun xamples of e line. The rade (636 foo Waste Tr B is located pment for d lid radioacti t floor is at which extend de floor of th nt resin rece lded cubicle containers, a consisting of ning units.

ement of the y removal o The other a er, the WTB Storage Tan igh walls an B. The vaul n 617 feet.

ents for dryi et tanks are l h time that t sociated pipin w Specific Ac sed to store Water Reactor Plan concrete wil UREG-1575, uipment Ma eleased for d at a non-radi residual radio nstrument or Building has ropriate tool oundation to nd utilities w undergroun slab and fo ot elevation) reatment Bu d to the north decontaminat ive waste.

elevation 63 d to a depth o he WTB con eiving tank a e were two and pumps.

f a steam cle e WTB cons of floor shie area, to whic sump and p nk Vault (GS nd 2 feet thic lt is 3 feet b The Gas D ing, filtering located in th hey were ba ng. The rem ctivity (LSA processed, r

ll be radiolog Supplement anual (MAR disposal at a ioactive disp oactive cont r similar.

s been dem ls (pneumat meet dispo will also be r nd utilities oundation w uilding, Gas heast of the tion and the The WTB 30 feet and h of 626 feet.

ntains a shie and resin re back-washab The main eaning booth sists of two eld plugs, w ch access is pump, and ad STV) is a 29 ck floors, wa below grade Decay Syste g, recombini he GSTV. Th atch released mainder of th A) Storage Bu packaged an 3-12 gically surve t 1, Multi-Ag RSAME) (4).

non-radiolo posal site wi tamination b molished, the tic hammer, osal site requ removed, sur might be g alls will be s Storage Ta Reactor Bui collection, is 34 feet b has a 3 foot elded compa ceiving and ble radioact floor of th h, a decontam shielded cu was used for gained by dditional was 9 foot by 31 f alls, and ceil e with a sum em routed m ing, monitor he tanks had d via the stac he Gas Decay uilding is lo nd sealed lo eyed and rel gency Radia

. Materials ogical landfi ill be subjec y undergoin e foundation loading bu quirements.

rveyed, pack gas, water, removed to ank Vault a ilding. The processing, by 42 feet a deep sump w artment whi transfer equ tive liquid w e WTB also mination sin ubicles. One the storage a stairway, ste storage s foot undergr ling located mp that exte main conde ring and ho d the capabil ck. The tank y system has cated southw ow level dry leased for un ation Survey released for ll. All bulk cted to a fina ng an aggreg n slab will b ucket, etc.)

During slab kaged and pr miscellane o a minimum and LSA Sto e building co storage, and and 20 feet with 8 inch ich houses a uipment. Lo waste filters o housed a nk, and heati e cubicle, to of high act contains th space.

round concre below groun ends to a de enser gases oldup for de lity to store ks remain in s been remo west of the T y active was nrestricted u y and Assess r unrestricte material sen al assessmen ate survey b be exposed.

will remov b and found roperly disp eous piping, m depth of 3 orage Build ontained faci d disposal o tall. The W thick walls a a 320 ft3 stai ocated outsi s and dewat decontamin ng/ventilatio o which acce tivity solid w e dewaterin ete structure nd just outsi epth of 22 fe through va cay. Two radioactive place along ved.

Turbine Buil ste materials use in sment d use nt for nt for by use An e the dation posed.

, and 3 feet ding ilities f low WTB and a inless ide of tering nation on/air ess is waste g ion e with ide of eet or arious 1,600 gases g with lding.

s, and

La Cross License T Revision sealed lo Building Commod utilizing Band saw be cleane be sized waste loa site facili After com open air demolitio If unacc scabbling the conta contamin radioactiv When all above gr the concr GSTV lo with Cha will be u from the will be s appropria container Clive, Ut 3.3.4.

The LAC plant. T cooling w diesel-dr circulatin In additio facility, a Radiolog interior a that the s se Boiling W Termination n 0 ow level acti is 27 feet by dity remova cutting tool ws and recip ed and a fixa to meet pack ading area in ity.

mmodity rem demolition c on criteria w eptable con g method or amination is nated areas.

ve waste dis l structural rade portions rete floor sl ocated below apter 5. Con utilized durin demolition shipped to th ate container r will be tran tah.

LACBWR CBWR Crib The structure water to var iven high p ng water pum on to the G-3 and consequ gical surveys and exterior structure can Water Reactor Plan ivity compon y 80 feet and l has begun ls and mech procating saw ative will be kaging and w n the Turbin moval is com criteria per R will be remov ntamination air hammeri s detected a All radioa sposal facilit surfaces hav s of each bu lab will be r w 636 foot e ncrete will be ng building of each of he licensed rs and truck nsferred to a R Crib Hou b House is lo e served as rious LACB pressure serv mps. The LA 3 Crib Hous uently, will r s, either FSS structural su n be released r

nents. No li d 15 feet tall n and will hanical mean ws will be th e applied pri waste dispos ne Building u mplete, the Reference 3 ved, segrega is identified ing method w at a deeper active waste ty.

ve been dec uilding will b removed. T elevation wi e processed t demolition the structure radioactive ked to a rail a rail car and use ocated on th the intake BWR plant vice water p ACBWR Cri e, the LACB remain intac S or MARSA urface and sy d for unrestric 3-13 iquid wastes

l.

continue in ns to disman he primary m ior to disma sal criteria. W until it is pro interior con

. Structural ated, packag d within the will be used depth, then e will be lo ontaminated be demolish The remainin ll remain an to meet disp to minimize e will be tre waste dispo trans-load f d then shippe he bank of t for the Circ systems. T pumps, low ib House is 3 BWR Crib H ct and undist AME free re ystems of th cted use.

s were store n the WTB, ntle radioact methods used antlement. S Waste will b operly shipp ncrete surfac material tha ged and dispo e first coup d to remove t n a wire sa oaded and t d to the ope hed. The en ng structura nd be subjec posal site req e dust. All eated as low osal facility.

facility in W ed to the Ene the Mississi culating Wa The LACBW pressure se 35 feet by 45 House also cu turbed by th elease surve he LACBWR d in this bui

, GSTV an tive piping

d. The inter System piece be packaged ped and dispo ces will be r at does not m osed of as r ple of inche the contamin aw will be transported n-air demol ntire LSA bu al concrete f cted to a FR quirements.

construction w-level radio

. Waste wi Winona, MN ergySolution ippi River to ater System, WR Crib Ho ervice water 5 feet and 15 urrently serv he decommi eys will be p R Crib Hous ilding. The d LSA Bui and compon riors of tanks es and waste and stored i osed of at an remediated t meet the ope adioactive w es of concre nated materi used to rem to an accep lition criteria uilding, inclu for the WTB RS in accord Misting met n debris resu oactive waste ill be loaded where the w ns disposal s o the west o which prov ouse contain r pumps an 5 feet tall.

ves the active ssioning pro performed o se to demon LSA ilding nents.

s will e will in the n off-to the en-air waste.

ete, a al. If move ptable a, the uding B and dance thods ulting e and d into waste site in of the vided ns the d the e G-3 ocess.

on the strate

La Cross License T Revision 3.3.5.

The Mai windows The 1B D contains The build shaped h These tw including these stru radioactiv to a rail t car and t materials unrestrict recycled or dispos presence a 193-6 M 3.3.6.

The LAC an outsid 15 inches cluster of sides on t The Ven Once ch demolitio fixative w Demoliti system w removed of the v excavato the interi the concr methods and barr resulting and will appropria se Boiling W Termination n 0 Maintena intenance Ea s constructed Diesel Gener the Electric ding is cons aving larges wo structure g the concre uctures will ve waste dis trans-load fa then shipped s, including ted use in ac or released sal at a non of any resid Micro R inst Ventilatio CBWR Vent de diameter s at the bott f 78 piles. T the southeas ntilation Sta aracterizatio on criteria p will be appli ion will be will be emp using mech ventilation s rs will saw ior of stack.

rete debris.

will be utili icade the fa from the de be shipped t ate container Water Reactor Plan ance Eat Sh at Shack is d over a conc rator Buildin al Equipmen structed of c st dimension es will be r ete foundatio be treated as sposal facilit acility in Win d to the En g structural ccordance w for disposal n-radioactive dual radioact trument or si on Stack tilation Stac of 7 feet at tom to 6 inc The foundati st and southw ack will be on is compl per Referenc ed to the ide performed f ployed to pr hanical hand stack will b and break th An opening The concret ized during all zones in emolition of to the licens rs and truck r

hack and 1B a 20 feet b crete slab.

ng is attached nt Room, Di concrete blo s of 31 feet b radiologicall on slabs. C s low-level r ty. Waste wi nona, MN w ergySolution concrete w with MARSA at a non-rad e disposal s tive contami imilar.

k is a 350 fe the top and ches at the to on mat is 40 west corners radiological ete, interior ce 3 and dem entified surfa from the top rovide acces d tools down be removed he concrete g at the botto te foundation all demoliti the vicinity f these struc ed radioactiv ked to a rail 3-14 B Diesel Gen y 40 feet an d to the sout iesel Genera ck and steel by 38 feet an ly character Construction radioactive w ill be loaded where the wa ns disposal will be rad AME. Mate diological la ite will be ination by un feet high, tap 25 feet at th op. The 4 f 0 foot square lly character r concrete su molished. I aces to mitig p down. It ss to the ex n to the lowe d with exca into manage om of the sta n mat will be on to minim y of the ven ctures will b ve waste dis trans-load f nerator Buil nd 15 feet t theast corner ator Room, a l beams and nd 13 feet ta rized and th debris resul waste and w d into approp aste containe site in Cliv diologically rials release andfill. All b subjected to undergoing a pered, reinfo he base. Th feet thick fo e concrete ba rized and th urfaces will If remediatio gate any loos t is anticipat xterior of th er 40 foot el avators and eable section ack will be m e taken down mize dust. P ntilation sta be treated as sposal facilit facility in W lding all steel-sid r of the Turb and an empt d braces. Th all.

hen comple lting from t will be shippe priate contai er will be tra ve, Utah. I surveyed a ed for unrest bulk materia o a final as an aggregate orced concre he wall thick oundation m ase formed w hen comple l be remedi on is not pr se contamina ated that a tr he stack. T levation. Th pneumatic ns and drop made to allo n to 3 feet b Project perso ack. All co s low-level r ty. Waste w Winona, MN ded building bine Building ty Battery R he building tely demoli the demolitio ed to the lice iners and tru ansferred to If possible, and released tricted use ca al sent for re ssessment fo survey by u ete structure kness varies at rests on a without trian etely demoli iated to ope racticable, th ation.

raveling sca The stack wi he bottom 40 breakers.

the sections ow the remov below grade.

onal will mo nstruction d radioactive w will be loaded where the w with g and Room.

is L-

ished, on of ensed ucked a rail some d for an be ecycle or the use of e with from a pile ngular ished.

en air hen a affold ill be 0 feet The s into val of Wet onitor debris waste d into waste

La Cross License T Revision container Clive, Ut 3.3.7.

Approxim LACBW roads ins removal will be pr 3.4.

R The deco Solutions programs Solutions sufficient accordan Standard Reasonab controls radioactiv written p The curr Effluent Manual the vario are routi the publi also impo waste ma and outa procedu D-Plan/P environm No alte Rad Dec a po Continue Monitori and 10 C se Boiling W Termination n 0 r will be tran tah.

Legacy W mately 75 cu WR Site Encl side the LS of part of a rocessed as Radiological ommissionin s Radiation s are and w s Radiation t informatio nce with 10 ds For Prote bly Achieva the genera ve waste in plant procedu rent Radiati Monitoring (ODCM) (5 ous decontam inely inspec ic, and the e ortant to not anagement c ages, and de ures for wh PSDAR, the mental impac site-specifi er the conclu diation dose commission ositive envir ed applicatio ng Program CFR 50, App Water Reactor Plan nsferred to a Waste ubic yards losure (LSE SE, the unde a wall in the low-level ra l Impacts of ng activities Protection P will continue Protection on to demon 0 CFR 19, N ection Again able (ALAR ation, chara accordance ures.

ion Protecti g and Radi

5) will be us mination and cted by the environment te that decom consideratio ecommission hich appro e decommi cts in that:

ic factors pe usions prese to the publi ing is not a ronmental im on of the cur ms at LACB pendix I. Ra r

a rail car and of stockpile E) fence line erlayment s e Turbine Bu adioactive wa f Decommiss described ar Program and to be imple Program an nstrate that Notices, Ins nst Radiatio RA) The S cterization, with the app on Program iological Eff sed to prote d decommiss Nuclear Reg t are protect mmissioning ons as those ning activiti oval is bein ssioning wi ertaining to nted in NUR c will be min an imminent mpact.

rrent and fu BWR ensure adiological E 3-15 d then shippe ed deconstru

e. The deb and from th uilding. All aste during d sioning Act re and will b d Radioactiv emented as nd written s decommiss structions A on and to m olutions Ra processing, proved Solu m, Waste M ffluent Mon ct the worke sioning activ gulatory Com ted during fa g activities in encountere es conducte ng sought ill be acco the decomm REG-0586 (s nimal.

t health or s uture Radiati s public pro Environment ed to the Ene uction debri bris consistin he roads an l of the stoc decommissio ivities be conducted ve Waste M described i site procedu sioning activ And Reports maintain radi adioactive W

, handling, utions Radiat Management itoring and ers and the vities. Thes mmission (N acility decom nvolve the s ed during pl ed to date.

in this L omplished w missioning see LTP Cha safety conce ion Protectio otection in tal Monitori ergySolution is is stored ng of aspha nd concrete ckpiled deco oning.

d under the Management n the D-Pla ures are inte vities will b s To Work ation exposu Waste Mana

shipping, tion Protecti Program, a d Offsite D public, as a e well-estab NRC) to ens mmissioning ame radiatio ant operatio There are TP. As d with no sig of the LAC apter 8).

ern and wil on and Radi accordance ing Program ns disposal s inside the alt removed debris from onstruction d provisions o Program. T an/PSDAR.

ended to pro be performe kers, 10 CFR ures As Low agement Pro and disposa ion Program and Radiolo Dose Calcul applicable, d blished prog sure that wor g activities.

on protection ons, mainten e no additi described in gnificant ad CBWR woul ll generally iological Eff with 10 CF m (REMP) re site in south from m the debris of the These The ovide ed in R 20, w As ogram al of m, and ogical lation during grams

rkers, It is n and nance ional n the dverse ld have fluent FR 20 eports

La Cross License T Revision for LAC activities 3.4.1.

Due to t dismantle Consequ remediat radiologi specified described 3.4.2.

Table 3-2 This dos Exposure informati for remai Decomm Asb Rea Wa Tur Rem Wa Tot 3.4.3.

Continue Effluent public pr se Boiling W Termination n 0 CBWR to d s is bounded Control M the large sco ed, FRS of ently, a sys ed prior to p ical conditio d in 10 CFR d in LTP Ch Occupati 2 provides t se estimate e Projection ion gathered ining decom Table 3-missioning A bestos and ot actor Buildin aste Treatmen rbine Buildin maining Stru aste Processin tal for Deco Exposure ed applicatio Technical S rotection in a Water Reactor Plan date conclud by the evalu Mechanisms ope of rema f areas may stematic app performing F on of areas R 20.1402 ha apter 5.

ional Expos the cumulati is documen ns for LACB d for reporti mmissioning a

-2 Radi Act Activity ther Hazardo ng nt Building ng uctures ng (includes ommissionin e to the Pub on of Solut Specification accordance w r

de that the uation in NU s to Mitigat aining struct y be perfor proach will FRS and on s where co as been dem ure ive site dose nted in Ene BWR Decom ing of yearl activities is e iation Expos tivity ous Material s shipping an ng Activities blic tions Radia n and Radio with 10 CFR 3-16 public exp UREG-0586, te the Recon tures and sy rmed in par be employ ngoing decom mpliance w monstrated.

e estimates ergySolution mmissioning ly site dose estimated to sure Projec l Abatement nd prep) s ation Protec ological Env R 20 and 10 C posure as a

, which conc ntamination ystems that rallel with yed to ensu mmissioning with the unr These me for the deco ns TSD RS (6). This i

e. The total o be approxim ctions for De t

ction, Radio vironmental CFR 50, App result of d cludes the im n of Remedi will be dec decommissi ure that area g activities d restricted re easures and ommissionin S-TD-313196 information l radiation e mately 130.3 ecommissio Expo (person 18 81 9

1 0

18 130 oactive Was Monitoring pendix I.

decommissio mpact is mini iated Areas contaminated ioning activ as are adequ do not impac elease criter mechanism ng of LACB 6-007, Radi is in additi exposure esti 3 person-rem ning osure n-rem) 8.6 1.4

.6

.6

.8 8.2 0.3 ste, Radiolo Program as oning imal.

d and vities.

uately ct the ria as ms are BWR.

iation on to imate

m.

ogical ssures

La Cross License T Revision 3.4.4.

The Radi processin Activated low leve of waste Con Use Exp Exp Con Con Table 3-3 the deco referred t total volu feet. Ac be shippe WA Debri Deb Deb A

A Dry A

(

Mix se Boiling W Termination n 0 Radioact ioactive Wa ng, handling d and contam el radioactiv generated du ntaminated w ed disposabl pended abra pended resin ntamination ntaminated e 3 provides p mmissioning to as rip &

ume of low ctual waste v ed to the lice STE TYPE is: Concrete bris: Rebar bris: Metal Asphalt Soils Asbestos Active Waste (DAW) xed Waste Water Reactor Plan tive Waste P ste Managem g, shipping, minated syst e waste exp uring decom water; le protective sive and abs ns and filters control mat equipment u projections o g of LACB

& ship verse w-level radio volumes and ensed Energy Table WASTE CLASS A

A A

A A

A e

A A

r Projections ment Progra and dispos tems, structu pected to be mmissioning clothing; sorbent mate s;

erials (e.g., s used in the de of waste cla WR. As S es performin oactive waste d classificati ySolutions ra 3-3 Pro E

S WA WE (l

20,0 88 1,82 54 2,87 30 30 56 3-17 m is used to sal of radio ures, and com e generated include:

rials; strippable co ecommission ssifications Solutions has ng significan e for dispos ions may va adioactive w ojected Was ASTE EIGHT lbs.)

026,177 89,249 27,476 41,575 777,268 00,776 0,880 6,222 Total o control the oactive wast mponents rep during deco oatings, plast ning process and quantiti s elected to nt on-site de sal has been ary. The vas waste disposa ste Quantiti PACK DENS (lb./f 85 85 30 50 74 17 12 110 l Estimated V characteriza te during d present the l ommissionin tic enclosure

s.

ies that will use an app econtaminati n estimated st majority o al facility in ies KING SITY ft3) 5 5

0 0

4 7

2 0

Volume ation, genera decommissio largest volum ng. Other f es); and be generate proach comm ion activities at 393,696 of this waste Clive, Utah WASTE VOLUME (ft3) 235,603 10,463 60,916 10,832 38,882 17,693 2,574 16,733 393,696

ation, oning.

me of forms ed by monly s, the cubic e will

h.

E

La Cross License T Revision WA Clean (Debri Clea D

Recy Recy 3.4.5.

Table 3-4 Date Q2/201 Q2/201 Q2/201 Q3/201 Q3/201 Q3/201 Q4/201 Q4/201 Q4/201 Q4/201 se Boiling W Termination n 0 STE TYPE n Backfill -

is to Landfill an Asphalt Disposal cle - Metals ycle - Rebar Project M 4 lists the cu 16 16 16 16 17 17 17 18 18 18 Water Reactor Plan WASTE CLASS l)

Clean Debris Clean Debris Scrap Metal Scrap Metal Milestones urrent schedu Table Milestone Submit LT License T Mobilizati Stack Dem LTP Appr Componen Building D Transporta Site Reme FRS Com r

Table 3 E

S WA WE (l

19,7 4,8 1,8 95 ule for the re e 3-4 Ge e

TP to NRC ransfer Com ion Complet molition Com roval by NR nt Removal Demolition C ation and Di ediation Com mplete 3-18 3-3 Continu ASTE EIGHT lbs.)

747,211 74,175 03,064 54,659 Total emaining dec eneral Proje mplete te mplete C

Complete Complete isposal Com mplete ued PACK DENS (lb./f 75 50 20 30 l Estimated V commissioni ect Mileston mplete KING SITY ft3) 5 0

0 0

Volume ing activities nes WASTE VOLUME (ft3) 263,297 97,484 90,154 31,822 482,757

s.

E

La Cross License T Revision Date Q1/201 Q1/201 Q1/201 Q1/202 Q1/202 Note:

3.5.

R

1.

D D

2.

U S

N

3.

E D

4.

U R

D

5.

R

6.

E P

se Boiling W Termination n 0 19 19 19 20 20 Circumstance cannot be com References Dairyland Po Decommissio U.S. Nuclear tatement on November 20 EnergySoluti Demolition L U.S. Nuclear Radiation Sur December 20 Radiological EnergySoluti rojections fo Water Reactor Plan Milestone Site Resto Submit Re Submit Li License T LACBWR s can change d mpleted as outli wer Coopera oning Activit Regulatory Decommiss 002.

ons Technic Limits.

Regulatory rvey and As 006.

Effluent Mo ons Technic or LACBWR r

Table 3 e

oration Comp emaining FR icense Trans ransfer to D R License Te during decomm ined in this sch ative, LACB ties Report (

Commission sioning of Nu cal Support D Commission sessment of onitoring and cal Support D R Decommis 3-19 3-4 Continu plete RS Reports sfer to Dairyl airyland Ap ermination A missioning. If hedule, Solutio BWR Decom (D-Plan/PSD n NUREG-0 uclear Facili Document R n NUREG-1 Materials an d Offsite Do Document, R ssioning.

ued land Amend pproved by N Approval by f Solutions dete ons will provide mmissioning DAR), Revis 0586, Generi ities, Supple RS-TD-31319 1575, Supple nd Equipmen ose Calculati RS-TD-3131 dment Reque NRC NRC ermines that th e an updated sc Plan and Po sion - March ic Environm ement 1, Vol 96-005, La C ement 1, Mu nt Manual (M on Manual (96-007, Rad est to NRC he decommissio chedule to the ost Shutdown h 2014.

mental Impact lume 1 -

Crosse Open ulti-Agency MARSAME (ODCM).

diation Expo oning NRC.

n t

n Air E) -

osure