| number = ML16200A091
| number = ML16200A091
| issue date = 06/27/2016
| issue date = 06/27/2016
| title = La Crosse Boiling Water Reactor License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
| title = License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
| author name =  
| author name =  
| author affiliation = LaCrosseSolutions, LLC
| author affiliation = LaCrosseSolutions, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT  
{{#Wiki_filter:LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT  


La CrossLicense TRevision8.Sup8.1.8.1.8.1.8.2.8.2.8.3.8.4.8.5.8.5.8 8
La Cross License T Revision 8.
88.5.
Sup 8.1.
8.5.8 8
8.1.
88.5.48.6.8.6.
8.1.
8.6.8 8
8.2.
8.2.
8.3.
8.4.
8.5.
8.5.
8 8
8 8
88.6.8 8
8 8.5.
8.5.
8 8
8 8
8 8.5.4 8.6.
8.6.
8.6.
8 8
8 8
8 8
8 8
8 8.6.
8 8
8 8
8 8
8 8
8 8
8 8
8se Boiling WTermination n 0 plement to tIntroductio n1.Purpos2.BackgrSite Locati o1.Site DeRemaining Impacts to tLa Crosse B1.Geogra.5.1.1.Site.5.1.2.Pop.5.1.3.Site2.Climate3.Topogr.5.3.1.Top.5.3.2.Geo.5.3.3.Sei4.HydrolEnvironme n1.Summa2.Radiolo.6.2.1.Occ.6.2.2.Off.6.2.3.Env.6.2.4.Sto.6.2.5.Rad3.Non-ra.6.3.1.Ons.6.3.2.Off.6.3.3.Wa.6.3.4.Wa.6.3.5.Air.6.3.6.Aqu.6.3.7.Ter.6.3.8.Thr.6.3.9.Occ.6.3.10.Co.6.3.11.So.6.3.12.En.6.3.13.Cu.6.3.14.Ae.6.3.15.NoWater Reacto rPlan the Environ mn .................
8 8
e .................
8 8
round ..........
8 8
on and Desc rescription A fDismantle mthe Post-Sh uBoiling Wat eaphy and De me Location a npulation ......
8 8
e Access, L ae .................
8 se Boiling W Termination n 0 plement to t Introduction 1.
raphy, Geol opography ....
Purpos 2.
ology ..........smology .....
Backgr Site Locatio 1.
logy and Hy dntal Effects oary ..............
Site De Remaining Impacts to t La Crosse B 1.
ogical Effec tcupational Rfsite Radiati ovironmental rage and Di sdiological C radiological Esite Land U sfsite Land U ater Use .......
Geogra
ater Quality .
.5.1.1. Site
r Quality .....
.5.1.2. Pop
uatic Ecolo grrestrial Eco lreatened or Ecupational I sost...............
.5.1.3. Site 2.
ocioeconom invironment aultural, Hist oesthetics .....
Climate 3.
Topogr
.5.3.1. Top
.5.3.2. Geo
.5.3.3. Sei 4.
Hydrol Environmen 1.
Summa 2.
Radiolo
.6.2.1. Occ
.6.2.2. Off
.6.2.3. Env
.6.2.4. Sto
.6.2.5. Rad 3.
Non-ra
.6.3.1. Ons
.6.3.2. Off
.6.3.3. Wa
.6.3.4. Wa
.6.3.5. Air
.6.3.6. Aqu
.6.3.7. Ter
.6.3.8. Thr
.6.3.9. Occ
.6.3.10. Co
.6.3.11. So
.6.3.12. En
.6.3.13. Cu
.6.3.14. Ae
.6.3.15. No Water Reactor Plan the Environm n.................
e.................
round..........
on and Descr escription Af Dismantlem the Post-Shu Boiling Wate aphy and Dem e Location an pulation......
e Access, La e.................
raphy, Geolo pography....
ology..........
smology.....
logy and Hyd ntal Effects o ary..............
ogical Effect cupational R fsite Radiatio vironmental rage and Dis diological Cr adiological E site Land Us fsite Land U ater Use.......
ater Quality.
r Quality.....
uatic Ecolog rrestrial Ecol reatened or E cupational Is ost...............
ocioeconomi nvironmenta ultural, Histo esthetics.....
oise.............
oise.............
r TABLE Omental Repo r...................
r TABLE O mental Repor ription.........
....................
fter Unrestri ment and Dec utdown Deco er Reactor E mography...
....................
nd Descripti and and Wat ogy and Seis drogeology.
.ription ........
of Decommi ts of Decom Radiation Exp on Exposure Effects of A sposal of Lo riteria for Li Effects of De se.................
.fter Unrestri ment and De cutdown Dec oer Reactor E mography ..
se (in the Vi gy.................
.nd Descript i...................
logy.............
.and and Wat
Endangered ssues/Safety ic Impacts....
...................
al Justice......
.ogy and Sei s...................
oric, and Arc 8-i OF CONTE rt.................
....................
cted Release commissioni ommissionin nvironment ion...............
....................
er Use.........
.drogeology
smology.......
.of Decommi...................
issioning.....
.ts of Deco mRadiation Ex pon Exposur eEffects of Asposal of L oriteria for L iEffects of D ese ................
mmissioning.
.se (in the V i...................
posure.........
....................
e and Monito Accidents and ow-Level Ra icense Term ecommission icinity)........
....................
Species.......
.gy................
y...................
.logy ............
cheological R ENTS e..................
.Endangered ssues/Safet y...................
ing Activitie ng Activities Description oring............
.ic Impacts ...
d Decommis adioactive W mination........
.al Justice .....
ning.............
.oric, and Ar c...................
Resources...
....................
es.................
.8-i OF CONTErt ................
Report (PSD n...................
....................
ssioning Eve Waste............
....................
DAR)..........
....................
ents.............
....................
... 8-1
.cted Releas ecommission iommissioni nnvironment
... 8-1
...................
... 8-1
.ion ..............
... 8-1
....................
... 8-2
.er Use ........
... 8-3
....................
... 8-5
.smology......
... 8-5
....................
... 8-6
....................
... 8-6
....................
... 8-6
....................
... 8-6
.issioning ....
... 8-6
....................
... 8-7
.mmissioning
... 8-7
.posure ........
... 8-7
.e and Monit oAccidents an dow-Level R aicense Term ecommissio n...................
... 8-8
.icinity) .......
... 8-8
....................
... 8-8
....................
... 8-9
....................
... 8-9
....................
. 8-10
....................
. 8-10
.Species ......
. 8-12
.y ..................
. 8-12
....................
. 8-13
....................
. 8-14
....................
. 8-14
.cheological R...................
. 8-14
....................
. 8-14
.ENTS ...................
. 8-15
....................
. 8-16
....................
. 8-17
....................
. 8-17
....................
. 8-18
.e .................
. 8-19
.ing Activiti eng Activities Descriptio n...................
. 8-20
....................
. 8-20
....................
. 8-20
....................
. 8-21
....................
. 8-21
....................
. 8-22
....................
. 8-22
....................
 
....................
La Cross License T Revision 8
....................
8 8
....................
8.7.
....................
8.7.
....................
8 8
....................
8.7.
.oring ...........
8.8.
.d Decommi sadioactive Wmination .......
8.9.
.ning ............
Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-se Boiling W Termination n 0
....................
.6.3.16. Irr
....................
.6.3.17. Tr
....................
.6.3.18. Cu Overview o 1.
....................
Federal
....................
.7.1.1. Nuc
....................
.7.1.2. U.S 2.
....................
Federal Conclusion References 1
....................
Summa Nuclea
....................
-1 Site Re
....................
-2 Site Ov
....................
-3 LACBW
....................
-4 Topogr
.Resources ..
-5 Ground Water Reactor Plan retrievable R raffic and Tr umulative Im of Regulation l Requireme clear Regula S. Environme l, State and L ary of the En ar Power Fac egional Loca verview.......
....................
WR Building raphical Map dwater Samp r
....................
Resources.....
....................
ransportation mpacts..........
....................
ns Governing ents..............
....................
atory Comm ental Protect Local Requi LIST nvironmenta cilities.........
....................
LIST O ation.............
....................
gs................
....................
p..................
.es ................
pling Wells -
. Report (PS Dn ..................
8-ii n..................
....................
g Decommis ission..........
....................
tion Agency rements......
....................
OF TABLE al Impacts fro OF FIGURE
....................
- LACBWR ssioning Act y...................
....................
ES om Decomm RES R Site...........
....................
tivities and S missioning Site Release
....................
. 8-23
....................
. 8-23
....................
. 8-23 8-24
....................
. 8-24
....................
. 8-24
....................
. 8-25
....................
. 8-25
....................
. 8-25
....................
. 8-26
.ssioning Ev eWaste ...........
. 8-11
....................
. 8-28
....................
. 8-29
....................
. 8-30
....................
. 8-31
....................
. 8-32
....................
 
....................
La Cross License T Revision ACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/
....................
PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACBW LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP se Boiling W Termination n 0 Amer Atom Above As Lo Below Best M Boilin Depar Depar Decom Enviro Enviro Fuel E Final Genoa Genoa Gener Geogr Indep WR La Cr LACB Licen Megaw Megaw Nation Nucle Off-S Occup Polych Post-S Radia Water Reactor Plan LIST OF ican Commu ic Energy C e Mean Sea ow As Reaso w Ground Su Management ng Water Re rtment of En rtment of Tra mmissioning onmental Pr onmental Re Element Stor Radiation Su a No. 1 Stati a No. 3 Foss ric Environm raphic Mana endent Spen rosse Boiling BWR Site En se Terminati watts Electri watts Therm nal Pollutant ear Regulator ite Dose Cal pational Safe hlorinated B Shutdown D ation Work P r
....................
ACRONYM unity Survey ommission Level onably Achie urface t Practices actor nergy ansportation g Plan/Post S rotection Age eport rage Well urvey ion sil Station mental Impac agement Uni nt Fuel Stora g Water Reac nclosure ion Plan ic mal t Discharge ry Commiss lculation Ma ety and Heal Biphenyl ecommissio Permit 8-iii MS AND AB y
....................
evable n
....................
Shutdown A ency ct Statement it age Installatio ctor Elimination ion anual lth Administ ning Activit BBREVIAT ctivities Rep t
....................
on System tration ties Report TIONS port
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.DAR) .........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.ents ............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.... 8-1... 8-1... 8-1... 8-1... 8-2... 8-3... 8-5... 8-5... 8-6... 8-6... 8-6... 8-6... 8-6... 8-7... 8-7... 8-7... 8-8... 8-8... 8-8... 8-9... 8-9. 8-10. 8-10. 8-12. 8-12. 8-13. 8-14. 8-14. 8-14. 8-14. 8-15. 8-16. 8-17. 8-17. 8-18. 8-19. 8-20. 8-20. 8-20. 8-21. 8-21. 8-22. 8-22 La CrossLicense TRevision88 88.7.8.7.888.7.8.8.8.9. Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-  se Boiling WTermination n 0 .6.3.16.Irr.6.3.17.Tr.6.3.18.CuOverview o1.Federal.7.1.1.Nuc.7.1.2.U.S2.FederalConclusion References 1SummaNuclea-1Site Re-2Site Ov-3LACBW-4Topogr-5GroundWater Reacto rPlan retrievable Rraffic and T rumulative I mof Regulatio nl Requirem eclear Regul aS. Environm el, State and L...................


...................
La Cross License T Revision RCRA REMP RPV SAFSTO SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES se Boiling W Termination n 0 Resou Radio React OR SAFe Struct Total Toxic United United Vertic Waste Wisco Wisco Water Reactor Plan urce Conserv ological Envi or Pressure V STORage tures, System Effective Do Substance C d States Arm d States Env cal Concrete e Control Sp onsin Depart onsin Polluta r
ary of the E nar Power Fa cegional Loc averview .......
vation and R ironmental M Vessel ms and Comp ose Equivale Control Act my Corps of vironmental P Cask ecialists tment of Nat ant Discharg 8-iv Recovery Act Monitoring P ponents ent Engineers Protection A tural Resour ge Eliminatio t
WR Buildin graphical Ma pdwater Sam pr  Resources ....
Program Agency rces on System  
.ransportatio nmpacts .........
.ns Governin gents .............
.atory Comm ental Protec tLocal Requi
...................
....................
.LIST nvironment acilities ........
.LIST Oation ............
....................
.gs ...............
.p .................
.pling Wells  ii ...................
.n .................
....................
.g Decommis...................
.ission .........
.tion Agenc yrements .....
....................
....................
.OF TABLEal Impacts fr o...................
.OF FIGURE...................
....................
....................
....................
.- LACBWR...................
....................
....................
.ssioning Ac t...................
....................
.y ..................
....................
....................
....................
.ES om Decomm...................
.RES ...................
....................
....................
....................
.R Site ..........
....................
....................
....................
.tivities and S...................
....................
....................
....................
....................
....................
.missioning 
...................
....................
....................
....................
....................
....................
....................
....................
....................
.Site Release
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.. 8-23. 8-23. 8-238-24. 8-24. 8-24. 8-25. 8-25. 8-25. 8-26. 8-11. 8-28. 8-29. 8-30. 8-31. 8-32 La CrossLicense TRevisionACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/ PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACBWLSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP se Boiling WTermination n 0 AmerAtom AboveAs LoBelowBest MBoilinDeparDeparDecomEnviroEnviroFuel EFinal GenoaGenoaGenerGeogrIndepWR La CrLACBLicenMegawMegawNationNucleOff-S OccupPolychPost-SRadiaWater Reacto rPlan LIST OF ican Commuic Energy C e Mean Sea ow As Reas ow Ground S uManagementng Water Re rtment of E nrtment of Tr ammissionin gonmental P ronmental R eElement Sto rRadiation S ua No. 1 Stat ia No. 3 Fos sric Environ mraphic Man aendent Spe nrosse Boilin gBWR Site E nse Terminat iwatts Electr iwatts Ther mnal Pollutan tear Regulato rite Dose Ca lpational Saf ehlorinated BShutdown D ation Work Pr  ACRONYMunity Surve yommission Level onably Achi eurface t Practices actor nergy ansportatio ng Plan/Post Srotection Ag eeport rage Well urvey ion sil Station mental Impa cagement Un int Fuel Stor ag Water Rea cnclosure ion Plan ic mal t Discharge ry Commisslculation M aety and Hea lBiphenyl ecommissio Permit 8-iii MS AND ABy evable n Shutdown A ency ct Statemen tit age Installati octor Elimination ion anual lth Adminis tning Activi tBBREVIATctivities Re pt on  System tration ties Report TIONS port La CrossLicense TRevisionRCRA REMP RPV SAFSTOSSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES se Boiling WTermination n 0 ResouRadioReactOR SAFe StructTotal ToxicUnitedUnitedVerticWasteWiscoWiscoWater Reacto rPlan urce Conser vological Env ior Pressure VSTORage tures, Syste mEffective D o Substance Cd States Ar md States En vcal Concrete e Control S ponsin Depar tonsin Pollut ar  vation and Rironmental MVessel ms and Com pose Equival eControl Act my Corps of vironmental P Cask ecialists tment of Na tant Dischar g8-iv Recovery Ac tMonitoring Pponents ent Engineers Protection Atural Resou rge Eliminati ot Program Agency rces on System La CrossLicense TRevision8.S8.1.InIn accorRegulatoNuclear describinspecific dReactor (8.1.1.PThis chaReport, Ldescribinspecific Terminatdetailed dbetween activitie sThe supppredictedEnvironm(NUREG(GEIS) oLACBWRPlan/PSDto be peactivitie s8.1.2.BLACBWWater R U.S. Ato1973, theApril 30,electrica lCharacteLimited disposal


consistin(FESW)
La Cross License T Revision
Septembse Boiling WTermination n 0 Supplemenntroductio nrdance wit hory Guide 1.
: 8.
Power Rea cng any new decommissi o(LACBWR)Purpose apter supple mLa Crosse Bng any new decommisstion Plan (
S 8.1.
Ldescription othose acti vs. plement dis cd by the U nmental Stat eG-0191) (4);
In In accor Regulato Nuclear describin specific d Reactor (
on DecommR DecommisDAR) (6).
8.1.1. P This cha Report, L describin specific Terminat detailed d between activities The supp predicted Environm (NUREG (GEIS) o LACBWR Plan/PSD to be pe activities 8.1.2. B LACBW Water R U.S. Ato 1973, the April 30, electrical Characte Limited disposal consistin (FESW)
Terformed fr os. Background WR consists eactor (BW Romic Energ ye reactor an d, 1987, whe nl output.
Septemb se Boiling W Termination n 0 Supplemen ntroduction rdance with ory Guide 1.
Trization Sur vdismantle mof the Rea cng of 333 s pto dry cask er 19, 2012.
Power Reac ng any new decommissio (LACBWR)
Water Reacto rPlan nt to the En h the requi 179, Stand actors (1), thinformatio noning and s isite. ments the 1Boiling Wate rinformatio nsioning an dLTP). This of the remai vities and t hcusses whet hnited States ement relate d NUREG-05missioning o fssioning Pl aThis chapter om time of of a single R) construc t Commissi od its fuel w en it was sh uThe plant wvey for SA Fment activiti ector Pressu rpent fuel as sstorage at t h On Marchr  Environmerements o f ard Format his chapter pn or signifi cite closure a1972 Dairyl ar Reactor (En or signific ad license tsupplement
Purpose apter supplem La Crosse B ng any new decommiss tion Plan (L description o those activ
,ning decom mhe environ mher the acti vNuclear R ed to operat i586, Supple f Nuclear Fan and Pos tdiscusses d esubmittal o Allis-Chal mted in 1967 on (AEC).
: s.
Tere transferr eut down becwas placed iFSTOR was ces were st are Vessel (
plement disc d by the Un mental State G-0191) (4);
Rsemblies, w ahe on-site In dh 12, 2014, D8-1 ental Repof10 CFR 50and Conteprovides a scant environ mactivities pe rand Power ER) (2), wh iant environ mtermination
on Decomm R Decommis DAR) (6). T erformed fro
, including rmissioning ament, and th evities and t hegulatory C oion of La Cment 1, "G eFacilities"
: s.  
, Nt-Shutdown ecommissio nf this LTP mers design eas a demo nThe plant w aed to Dairy lause of eco nin SAFSTOcompleted i narted in 19 9RPV) in Maas transferr edependent S Dairyland suort 0.82 (a)(9)(i ients for Lic supplement mental cha nrformed at tCooperativ eich was revi mental chan activities reference t oand site clo se likely en vheir impacts ommission (Cross Boilin generic Envi rNovember 2Decommiss ining activit iuntil the c oed 50 mega wnstration re aas commiss iland. It wasnomic reas oOR on Augun October 1 994, includi nay 2007. A ed from the pent Fuel S tubmitted a r i)(A) and tense Termi nto the env inge associa tthe La Cros se (Dairylan dsed on June nges associa tpresented io LTP Chap sure activiti evironmental are bounde (NRC) NURg Water Re aronmental I2002 (5); a nioning Acti vies, with a f oompletion o watt electri cactor in con jioned in No vs operated b yons due to i tust 7, 1991.
995. ng the rem oll of the s pFuel Elem etorage Insta levision of t hthe guidan cnation Pla nironmental rted with the se Boiling Wd) Environm 15, 1973 (
3ted with th ein this Li cpter 3, provi es, the inter aimpact of d by the i mREG-0191, Factor, Apri lImpact Stat end the Dair yvities Repo rocus on acti vf site resto rc (MWe) Bojunction wi tvember 1969y Dairylan d ts small siz e An initia loval and o fpent nuclear ent Storage llation (ISF She LACBWce of ns for report  site-Water mental 3), by e site-cense des a action those mpacts Final 1980 ement yland rt (D-vities ration oiling th the 9. In d until e and l Site ff-site fuel, Well SI) by WR D-La CrossLicense TRevisionPlan/PSDcharacterconcludinEnergySoSurvey RCharacteAs statedwas docu1987. LAenvironmsupport oLACBWnoted in 1,155 MWknown aLACBWthe genedecommilocated i that this


Elk Rivelicense t eThe lates"The en dismantlespecificathis Supppotential OffsiAquaTerreThreaSocioEnvir8.2.SLACBWMississipsouth of site loca tcoordinatse Boiling WTermination n 0 DAR to the Nrization wa sng on Auguolutions is dReport for Oerization Su rd in the D-P lumented in ACBWR demental impa of the Augu sWR, dated A pthe ER an dWe WNP-2 as Columbi aWR is a muc heric environ missioning i mn Elk Rive rdecommiss ier facility w aermination i nst D-Plan/P Svironmenta lement activ ially evaluate plement as aenvironme nte land use aatic ecology estrial ecolo gatened and eoeconomic ronmental j uite Locatio nWR is locate dppi River, a bthe city of Ltion, includi ntes for LA CWater Reacto rPlan NRC that a cs performe dust 6, 2015.
===Background===
documented iOctober an drvey Report flan/PSDAR,a suppleme necommissio nct not pre vst 7, 1991, Dpril 21, 198 0d NUREG-0BWR opera Generati nh smaller re amental ass empact of a s mr, Minnesot aioning was cas another An 1974 (9).
WR consists eactor (BWR omic Energy e reactor and
SDAR documl impact o f ities is SM Ad in the GE a basis for mntal impacts activities as to activit igy as to acti vendangered sustice" n and Desc rd in south wbout 1 mile La Crosse, Wng nearby p CBWR are lr  ccounts for td by EnergThe result sin two sepa rd November for June thr u, "Review o fnt to the E nning and dis mviously eval uDecommissi o0."  This rev 0586. The rated by W ang Station, actor compa ressment.
, 1987, when l output. T rization Surv dismantlem of the Reac ng of 333 sp to dry cask er 19, 2012.
Nmall 58.2 m ea, which wa scompleted s aAllis-Chalm ement (issued fall compl eALL as deter mIS. As stat emeeting the r enot determi nies beyond t hvities beyon dspecies ription western Wis csouth of th eWI. The Si trominent fe alongitude 9 8-2 the completi gySolutions s of the sit erate reports, L2014 Fiel du August 20 1f post-opera tnvironmenta lmantlement uated in th eoning Order iew include dreference Bashington P uowned and red to WNP
Water Reactor Plan nt to the E n
-NUREG-0586egawatt the rs dismantle dafely with l iers reactor, ain March 2 0eted or pla nmined by t hed in the G Eequirement sned in the Ghe operatio nd the operat iconsin, in Ve Village o f te Regional atures such 1o, 13', 53.
h the requi 179, Standa ctors (1), th information oning and si site.
3ion of the s pcommencine characteri zLACBWR Rd Work (7)15 Field W oating license l Report fo ractivities h ae NRC's Enor NUREGd the evalu aBWR facili tublic Powe roperated b-2, its impa c6 also pro vrmal (MWt) d between 1 ittle risk to wa superheate 014) conclu dnned LACBhe GEIS. L AEIS, license es in 10 CFR GEIS are:
ments the 1 Boiling Water information sioning and LTP). This of the remai vities and th cusses wheth nited States ement related NUREG-05 missioning of ssioning Pla This chapter om time of of a single R) construct Commissio d its fuel we n it was shu The plant w vey for SAF ment activitie ctor Pressur pent fuel ass storage at th On March r
nal area ional area Vernon Cou nfGenoa, WI Location gr as highway s35" West apent fuel tra nng on Octozation surv eadiological and LACBWork (8). stage envir or LACBWR ave resulted nvironment aG-0191 relat eation of imp aty in NUREr Supply S yby Energy Ncts fall withi nvided infor mBWR demo971 and 19 7workers an dd test BW Rded the foll oBWR decomACBWR deces can rely o50.83(a)(6)
Environme rements of ard Format his chapter p n or signific ite closure a 1972 Dairyla r Reactor (E n or significa d license t supplement, ning decomm he environm her the activ Nuclear Re d to operati 586, Supple f Nuclear F an and Post discusses de submittal o Allis-Chalm ted in 1967 on (AEC). T ere transferre ut down bec was placed i FSTOR was c es were sta re Vessel (R semblies, wa he on-site Ind h 12, 2014, D 8-1 ental Repo f 10 CFR 50 and Conte provides a s cant environm activities per and Power ER) (2), whi ant environm termination
(nty, on the e and appro xaphic (Figu rs, rivers an dand latitude nsfer. Additober 9, 2014eys perform eCharacteri zWR Radioloonmental i mdated Dec ein no signi fal Assessm eed to operat iacts against EG-0586 waystem (plan tNorthwest).
, including r missioning a ment, and the vities and th egulatory Co ion of La C ment 1, Ge Facilities, N t-Shutdown ecommission f this LTP mers designe as a demon The plant wa ed to Dairyl ause of econ in SAFSTO completed in arted in 199 RPV) in Ma as transferre dependent S Dairyland su ort 0.82 (a)(9)(ii ents for Lic supplement mental chan rformed at t Cooperative ich was revi mental chan activities reference to and site clos e likely env heir impacts ommission (
n the envel omation abo uonstration r e74. It was nd the public.
Cross Boiling eneric Envir November 2 Decommissi ning activiti until the co ed 50 megaw nstration rea as commissi land. It was nomic reaso OR on Augu n October 19 94, includin ay 2007. A ed from the pent Fuel St ubmitted a r i)(A) and t ense Termin to the envi nge associat the La Cross e (Dairyland sed on June nges associat presented i o LTP Chap sure activitie vironmental are bounde (NRC) NUR g Water Rea ronmental I 2002 (5); an ioning Activ ies, with a fo ompletion o watt electric actor in conj ioned in Nov s operated by ons due to it ust 7, 1991.
R, which ach owing: mmissionin gcommission ion informat i(ii). Site-sp eeast shore oximately 19 mre 8-1) sho wd lakes. Th e43o, 33', 3tional 4 and ed by zation ogical mpacts ember ficant ent in ion of those as the t now  As ope of ut the eactor noted  The ieved g and ing is ion in ecific of the miles ws the e map 6.22" La CrossLicense TRevisionNorth. TThe Reacthe cargo639 feet Mississipfilled wi tThe licenLACBWthe plant the laformethe lagenerthe Lthe lathe paThe Site The site iMississipCorps of The site HighwayHighwaycurrentlyMississip2.4 milesmussels, 0.75 mile8.2.1.SThis secdecommidefined apiping an10 CFR 2The decobuildingsstructure be removand floostructure se Boiling WTermination n 0 The site is actor Buildin go-carrying-o nAbove Meppi River.
995.
Tth sand mat ensed site co mWR plant co moff of High wand north o fer Genoa N oand area di rrating statio nLACBWR pland area sou tarcel of lan dOverview (
ng the remo ll of the sp Fuel Eleme torage Instal evision of th the guidanc nation Plan ironmental r ted with the se Boiling W d) Environm 15, 1973 (3 ted with the in this Lic pter 3, provi es, the intera impact of d by the im REG-0191, F actor, April Impact State nd the Dairy vities Repor ocus on activ f site restor c (MWe) Bo junction wit vember 1969 y Dairyland ts small size An initial oval and of pent nuclear ent Storage llation (ISFS he LACBW ce of ns for report site-Water mental 3), by e site-cense des a action those mpacts Final 1980 ement yland rt (D-vities ration oiling th the
Fis bordered oppi River a nfEngineers (is border ey 35. A By 35, carries y do not use ppi River N as from LACbrook tro ues south of t hite Descrip tction provi dissioning an das the confi gnd open la n20.1402.
: 9. In d until e and l Site ff-site
ommissioni ns, structures s above a d eved from b aors in the "s:  Water Reacto rPlan at mile 678.
: fuel, Well SI) by WR D-
6g is approxi nly rail roa dean Sea Le vThe covered erial dredge dmprises a to mprising onl yway 35. Ot hf the LACB Wo. 1 Station (rectly south n (Genoa Nant,  th of G-3, wd to the east oFigure 8-2) ion the nort hnd Highway (USACE) Roed on the wBurlington Ncommercia lthis rail lin ational Wil dCBWR, is tut and sturg he LACBWRtion After Udes a summd site closu rguration of tnd areas at ng of the Cl aand compoepth of 3 fe easements lo c"End-State."r  6 on the Mimately 300
: d. The Rea cvel (AMSLland consis td from the Mtal of 163.5 y 1.5 acres.
her promine nWR plant, w(G-1) coal (
aof LACBWNo. 3 Fossil Swhere the IS Fof Highway illustrates th h by the Mis s35. The U
.ock Island Dwest by theNorthern-S al freight al oe. The site dlife & Fis hthe Genoa eon. On t hR plant, the rUnrestricte dmary of the re activities.
the remaini nthe time o ass 1 areas oonents) will et below gra dcated below
"  This ap p8-3 ssissippi Ri vfeet from t hctor Buildin gL), or 19 fe ted of the ri vMississippi Racres whic h The site is nt site featu rwhich includ and later oil
)WR, which cStation [G-3FSI is locate d35, across fre boundary osissippi Riv e.S. Lock &
District, is l oe Mississip panta Fe rai long the east eis bordered h Refuge Po oNational F ihe southwe sre is a publi cd Release final con d The "End-Sng below gr of license t eof the plantinclude the de (designatthe 636 fo oproach will ver above thhe Mississip pg stands on et above t hver edge an dRiver. h is owned baccessed b yres include:
es the site s
) fueled po wcontains an 3]), located d, and from LACBWof the licen ser and a narrDam No. 8, ocated appropi River a nl line, loc aern portion oto the sout hol 9 area.
Fish Hatcher ystern corne rc boat launc hdition of th eState" for L Aound backfilermination m(the on-sit edemolition,ed as 636 f oot elevation apply to t hhe mouth o fpi River an dfilled land ahe normal d low forest aby Dairylan dy a road on witchyard awer plant (re moperational approximat eWR. sed site.
row strip of  managed bximately 0.
6nd bordered ated betwe eof the site.
h by a seg mFurther sou ty, which r ar of the sit ehing ramp we site at t hACBWR declled buildingmeeting the e radiologic a removal a noot AMSL).
leaving on lhe followi nf the Ohio Rd 475 feet w eat an elevati elevation o areas which d, with the athe south s iand the site omoved in 19 350 MWe ely 175 feet land betwe eby the U.S.
A6 miles upst ron the ea sen the site Passenger tment of the Uth, approxi maises endan ge, approxi mwith a parkin ghe conclusi ocommission igs, structurerequireme nally contami nnd disposal o All system sly concrete ng buildingsRiver. est of on of f the were actual ide of of the 89), fossil from en the Army ream. st by  and trains Upper mately gered mately g lot. on of ing is s and nts of nated of all s will walls s and La CrossLicense TRevisionReactWastVentiPipe WastTurbiLow MainThe debrdisposal.
Figure 8-structurewill be dand strucrequire r eG-3 Cribstructure


potential  
La Cross License T Revision Plan/PSD character concludin EnergySo Survey R Characte As stated was docu 1987. LA environm support o LACBW noted in 1,155 MW known a LACBW the gene decommi located i that this Elk Rive license te The lates The en dismantle specifica this Supp potential Offsi Aqua Terre Threa Socio Envir 8.2.
S LACBW Mississip south of site locat coordinat se Boiling W Termination n 0 DAR to the N rization was ng on Augu olutions is d Report for O erization Sur d in the D-Pl umented in ACBWR de mental impa of the Augus WR, dated Ap the ER and We WNP-2 as Columbia WR is a much eric environm issioning im n Elk River decommissi er facility wa ermination in st D-Plan/PS vironmental ement activi ally evaluate plement as a environmen te land use a atic ecology estrial ecolog atened and e oeconomic ronmental ju ite Location WR is located ppi River, ab the city of L tion, includin tes for LAC Water Reactor Plan NRC that ac s performed ust 6, 2015.
documented i October and rvey Report f lan/PSDAR, a supplemen ecommission ct not prev st 7, 1991, D pril 21, 1980 d NUREG-0 BWR oper a Generatin h smaller rea mental asse mpact of a sm r, Minnesota ioning was c as another A n 1974 (9).
SDAR docum l impact of ities is SMA d in the GE a basis for m ntal impacts activities as to activiti gy as to activ endangered s ustice n and Descr d in southw bout 1 mile La Crosse, W ng nearby p CBWR are l r
ccounts for t d by Energ The results in two separ d November for June thru
, Review of nt to the En ning and dism viously evalu Decommissio
: 0. This rev 0586. The rated by Wa ng Station, actor compar essment. N mall 58.2 me a, which was completed sa Allis-Chalme ment (issued f all comple ALL as determ IS. As state meeting the re not determin ies beyond th vities beyond species ription western Wisc south of the WI. The Sit rominent fea longitude 9 8-2 the completi gySolutions s of the site rate reports, L 2014 Field u August 201 f post-operat nvironmental mantlement uated in the oning Order iew included reference B ashington Pu owned and red to WNP-NUREG-0586 egawatt ther s dismantled afely with li ers reactor, a in March 20 eted or plan mined by th ed in the GE equirements ned in the G he operation d the operati consin, in V e Village of te Regional atures such 1o, 13, 53.3 ion of the sp commencin e characteriz LACBWR R d Work (7) 15 Field Wo ating license l Report for activities ha e NRC's En or NUREG d the evalua BWR facilit ublic Power operated b
-2, its impac 6 also prov rmal (MWt) d between 1 ittle risk to w a superheate 014) conclud nned LACB he GEIS. LA EIS, licensee s in 10 CFR GEIS are:
nal area ional area Vernon Coun f Genoa, WI Location gr as highways 35 West a pent fuel tran ng on Octo zation surve adiological and LACBW ork (8).
stage enviro r LACBWR ave resulted nvironmenta G-0191 relate ation of impa ty in NURE r Supply Sy by Energy N cts fall within vided inform BWR demo 971 and 197 workers and d test BWR ded the follo BWR decom ACBWR dec es can rely o 50.83(a)(6)(
nty, on the e and approx aphic (Figur s, rivers and and latitude nsfer. Addit ober 9, 2014 eys performe Characteriz WR Radiolo onmental im dated Dece in no signif al Assessme ed to operati acts against EG-0586 wa ystem (plant Northwest).
n the envelo mation abou onstration re
: 74. It was n d the public.
R, which ach owing:
mmissioning commissioni on informati (ii). Site-spe east shore o ximately 19 m re 8-1) show d lakes. The 43o, 33, 3 tional 4 and ed by zation ogical mpacts ember ficant ent in ion of those as the t now As ope of ut the eactor noted The ieved g and ing is ion in ecific of the miles ws the e map 6.22


the LTP The belofilled wi tDepartmbackfille The strudismantleAdmLACBOutfaG-3 Ccoal waterElectPavedplant After all
La Cross License T Revision North. T The Reac the cargo 639 feet Mississip filled wit The licen LACBW the plant the la forme the la gener the L the la the pa The Site The site i Mississip Corps of The site Highway Highway currently Mississip 2.4 miles
: mussels, 0.75 mile 8.2.1. S This sec decommi defined a piping an 10 CFR 2 The deco buildings structure be remov and floo structure se Boiling W Termination n 0 The site is a ctor Building o-carrying-on Above Me ppi River. T th sand mate nsed site com WR plant com off of Highw and north of er Genoa No and area dir rating station LACBWR pl and area sout arcel of land Overview (F is bordered o ppi River an f Engineers (
is bordere y 35. A B y 35, carries y do not use ppi River Na s from LAC brook trou es south of th ite Descript ction provid issioning and as the config nd open lan 20.1402.
ommissionin s, structures s above a de ved from ba ors in the s:
Water Reactor Plan at mile 678.6 g is approxi nly rail road ean Sea Lev The covered erial dredged mprises a to mprising only way 35. Oth f the LACBW
: o. 1 Station (
rectly south n (Genoa N ant, th of G-3, w d to the east o Figure 8-2) i on the north nd Highway (USACE) Ro ed on the w Burlington N commercial this rail lin ational Wild CBWR, is t ut and sturg he LACBWR tion After U des a summ d site closur guration of t nd areas at ng of the Cla and compo epth of 3 fee asements loc End-State.
r 6 on the Mi mately 300
: d. The Reac vel (AMSL land consist d from the M tal of 163.5 y 1.5 acres.
her prominen WR plant, w (G-1) coal (a of LACBW No. 3 Fossil S where the ISF of Highway illustrates th h by the Miss
: 35. The U.
ock Island D west by the Northern-Sa l freight alo
: e. The site dlife & Fish the Genoa eon. On th R plant, ther Unrestricted mary of the re activities.
the remainin the time o ass 1 areas o onents) will et below grad cated below This app 8-3 ssissippi Riv feet from th ctor Building L), or 19 fe ted of the riv Mississippi R acres which The site is nt site featur which includ and later oil)
WR, which c Station [G-3 FSI is located 35, across fr e boundary o sissippi Rive
.S. Lock &
District, is lo e Mississipp anta Fe rail ong the easte is bordered h Refuge Poo National Fi he southwes re is a public d Release final cond The End-S ng below gro f license te of the plant include the de (designat the 636 foo proach will ver above th he Mississipp g stands on et above th ver edge and River.
h is owned b accessed by res include:
es the site s
) fueled pow contains an 3]), located d, and from LACBW of the licens er and a narr Dam No. 8, ocated appro pi River an l line, loca ern portion o to the south ol 9 area. F ish Hatchery stern corner c boat launch dition of the State for LA ound backfil ermination m (the on-site demolition, ed as 636 fo ot elevation apply to th he mouth of pi River and filled land a he normal d low forest a by Dairyland y a road on witchyard a wer plant (rem operational approximate WR.
sed site.
row strip of managed b ximately 0.6 nd bordered ated betwee of the site.
h by a segm Further sout y, which ra r of the site hing ramp w e site at th ACBWR dec lled building meeting the e radiologica removal an oot AMSL).
leaving onl he followin f the Ohio R d 475 feet we at an elevati elevation o areas which d, with the a the south si and the site o moved in 19 350 MWe ely 175 feet land betwee by the U.S. A 6 miles upstr on the eas en the site Passenger t ment of the U th, approxim aises endang e, approxim with a parking he conclusio commissioni gs, structure requiremen ally contamin nd disposal o All systems ly concrete ng buildings River.
est of on of f the were actual ide of of the 89),
fossil from en the Army ream.
st by and trains Upper mately gered mately g lot.
on of ing is s and nts of nated of all s will walls s and


process aand the sse Boiling WTermination n 0 tor Buildin gte Treatmen tilation Stac kand Ventila tte Gas Tank ine Buildin gSpecific Ac tntenance Eat ris generate d -3 shows t hs and comp odemolished actures asso cemedial act ib House, wil ls at depths gremoval.
La Cross License T Revision React Wast Venti Pipe Wast Turbi Low Main The debr disposal.
FChapter 3.
Figure 8-structure will be d and struc require re G-3 Crib structure potential the LTP The belo filled wit Departm backfille The stru dismantle Adm LACB Outfa G-3 C coal water Elect Paved plant After all process a and the s se Boiling W Termination n 0 tor Building te Treatment ilation Stack and Ventilat te Gas Tank ine Building Specific Act ntenance Eat ris generated
ow grade str uth suitable cent of Natu rd, returned tuctures outs ed and will rinistration BBWR Crib Hall diffuser dCoal Plant a nbarge wash ir systems a ntrical Switc hd roadways area. demolition as described surrounding Water Reacto rPlan g, t Building, k, tion Tunnel sVault, g and Turbi ntivity (LSA
-3 shows th s and compo demolished a ctures assoc emedial acti b House, will s at depths g removal. F Chapter 3.
)Shack.
ow grade stru th suitable c ent of Natur d, returned t uctures outs ed and will r inistration B BWR Crib H all diffuser d Coal Plant an barge washi r systems an trical Switch d roadways area.
d from dem ohe key LAConents, oth eand remove dciated with Gions; theref ol remain int agreater than Further info ructures to r eclean soil, s aral Resourc eto grade, se eide of the remain on si Building, inc lHouse, incl udischarge pi pnd all assoc iing station tnd piping, hyard, and, and the Bu rand remed iin Chapte r open land r s, ne Office Bu i) Storage B ulition and r eCBWR builder than the Ld to a depth oG-3 are ex pore, no reme dact and fun c3 foot belo wrmation on temain in th eand and/or oes (WDNR) eded and app"LACBWRte. These i nluding asso cuding fire pr oping, extend iiated buildi nto the nort hrlington No riation activ i5 of this L Tareas withi n8-4 ilding, uilding, and emoval oper adings at the LACBWR Aof at least 3 pected to be diation is pl actional for Gw grade wil lthe approac he "End Stat eother suitab lregulations propriate ero R Site Encl nclude: ciated sanita rotection pip iing 110 feet ngs, wareho uh of the pla nrthern-Santa ities are co mTP, will be pn its license ations will bsite. All oAdministrati ofeet below ge radiologic aanned and t hG-3 power o pl be assesse dh to the var ie" such as ble media, as. The rest osion control losure" (LS ry sewer an ding systems,into the Mi suses and su pnt and all a sFe rail line mplete, a F iperformed t od boundari ebe segregate don-site LA Con Building grade. Non eally impact ehese structu rperations.
demolition as described surrounding Water Reactor Plan g,
Ad for radiol oious buildin basement fo us allowable ored areas ons will be est E) are not d water syst essissippi Ri vpport structu rssociated s aand spur i ninal Radiati oo demonstra tes, with the d for recycl iCBWR buildand Crib He of the buil ed such tha tres, includi nAny contami nogical impa cngs is provi dundations wunder Wisc n the site wablished. expected tems and pip iver, res, includi nanitary sewe rnto the LAC Bon Survey (te that LAC Bexception oing or dings, House, dings t they ng the nated ct and ded in will be onsin will be to be ing, ng the r and BWR (FRS) BWR of the La CrossLicense TRevisionISFSI fa10 CFR 2dry storadry storaIsolation remediatcontrol mcompromequipmenaccess.
t Building, k,
Ithere is nsurvey arSeveral ssupport tsupportin8.3.RTo date, removal RPV incorFESWVarioRPV,PurifVarioChapter 3remediat achieve t8.4.ImAs previdecommiassociateby the prNURNURChapter 3schedule footprint se Boiling WTermination n 0 acility, co m20.1402. A sage casks an ge within t hand contr oion activitie measures wmised by t hnt. Open l aIsolation an dno risk of re reas that ha vservices suc hthe ISFSI mng the adjac eRemaining Dseveral key of the follo wand associ are monitor g uW stored co mous system p, and prima rfication, Sea lous Turbine 3 of this LT ion activiti ethe "End-St ampacts to t hiously note dissioning o ped with dec oreviously iss uREG-0191, a nREG-0586.
tion Tunnels Vault, g and Turbin tivity (LSA)
3 of the L Td to be co m). The identWater Reacto rPlan mply with s part of the d transferre de ISFSI unt iol measures s. These ac twill be imp lhe potential and areas, a cd control m e-contaminat ve been releah as sanitar ymonitoring aent G-3 foss iDismantlemdismantle mwing compo nated reactor uide tubes, emponents s upiping and cry systems s ul Injection a nand auxilia rP provides des currently bate" conditi ohe Post-Sh ud, the D-P lperations at tommissioni nued environ mnd TP identifi empleted pri otified activit ir  the radiol odecommiss id to the ISF il it is transf ewill be im ptivities will lemented t o for re-co nccess roads aeasures will ion from de ased from th ey sewer serv iand security il station w hent and De cment and dec onents: component setc.), uch as fuel s hcomponents uch as the C nd Main Ste ry systems.
Shack.
detailed des cbeing perfo ron. utdown Dec olan/PSDAR, the site and ng the site h amental imp aes the dis mor to the u nies are not s 8-5 ogical crite rioning proc eSI. It is ex perred to the Dplemented fobe complet eo ensure th entamination and bounda rremain in ecommissio ne license.
d from demo he key LAC onents, othe and removed ciated with G ions; therefo l remain inta greater than Further infor uctures to re clean soil, sa ral Resource to grade, see ide of the remain on si Building, incl House, inclu discharge pip nd all associ ing station t nd piping, hyard, and, and the Bur and remedi in Chapter open land r
ices and ele coperations.
s, ne Office Bui
hich will re mcommissionommissioni ns (e.g. fuel hrouds, cont rassociated ontrol Rod Dam. criptions of rmed and t hommissioni n amended concluded tave already act statemen tmantlement anrestricted r eignificantly ria for un ress, all spen tpected that tDepartment following th ed prior to s te final rad ias result ries will be ffect throug hning. These ctrical servi c  There ar emain in plac ening Activiting activities shrouds, co rol rods, an dwith the F oDrive Mech athe dismant he remainin gng Activiti ein March 2 that the pot ebeen postul ats, specifica land decont aelease of t hdifferent fr orestricted ut nuclear fuethis spent f uof Energy (
) Storage Bu lition and re CBWR build er than the L d to a depth o G-3 are exp ore, no remed act and func 3 foot below rmation on t emain in the and and/or o es (WDNR) eded and app LACBWR te. These in luding assoc uding fire pro ping, extendi iated buildin to the north rlington Nor iation activi 5 of this LT areas within 8-4 ilding, uilding, and emoval opera dings at the LACBWR A of at least 3 pected to be diation is pla ctional for G w grade will the approach e End State other suitabl regulations propriate ero R Site Encl nclude:
De conclusio ntarting the Fiological c oof access bposted wit hhout FRS a cmeasures a rce will rema e three pota be. ies have occur rntrol rods, sd start-up so uorced Circul aanisms, De clement, dec og activities tes Report (
ciated sanitar otection pipi ing 110 feet ngs, warehou h of the plan rthern-Santa ities are com TP, will be p n its license ations will b site. All o Administratio feet below g e radiologica anned and th G-3 power op l be assessed h to the vari e such as b le media, as
P014, descri bential envir oated in, an d lly: amination a che site (exc lom those or iuse specifi eel was loade duel will rem aDOE). n of radiol oFRS process.
. The resto sion control losure (LS ry sewer and ing systems, into the Mis uses and sup nt and all as Fe rail line mplete, a Fi performed to d boundarie be segregated on-site LAC on Building grade. None ally impacte hese structur perations. A d for radiolo ious buildin basement fou s allowable ored areas on s will be est E) are not d water syste ssissippi Riv pport structur ssociated sa and spur in inal Radiatio o demonstrat es, with the d for recycli CBWR build and Crib H e of the buil ed such that res, includin Any contamin ogical impac ngs is provid undations w under Wisc n the site w ablished.
onditions ar eby personn eh signs restr ictivities an dre not requi rin in operat ible wells o nred, includi nsteam separ aurces, and ation syste mcay Heat, Pr iontaminatio nto be execu tPSDAR) bed the pl aonmental i md will be bo uctivities th aluding the Iiginally disc ued in d into ain in ogical  The e not el or icting d until red in ion to n site ng the ators, m, the imary n and ted to anned mpacts unded at are ISFSI ussed La CrossLicense TRevisionin the D-will be didentifie dprovide decommi8.5.L8.5.1.G8.5.1.1.The site Vernon C300 feet by fillingThe site
expected t ems and pipi
: ver, res, includin anitary sewer nto the LACB on Survey (
te that LACB exception o ing or
: dings, House, dings t they ng the nated ct and ded in will be onsin will be to be
: ing, ng the r and BWR (FRS)
BWR of the  


642 feet
La Cross License T Revision ISFSI fa 10 CFR 2 dry stora dry stora Isolation remediat control m comprom equipmen access. I there is n survey ar Several s support t supportin 8.3.
R To date, removal RPV incor FESW Vario
: RPV, Purif Vario Chapter 3 remediat achieve t 8.4.
Im As previ decommi associate by the pr NUR NUR Chapter 3 schedule footprint se Boiling W Termination n 0 acility, com 20.1402. As age casks an ge within th and contro ion activitie measures w mised by th nt. Open la Isolation and no risk of re reas that hav services such the ISFSI m ng the adjace Remaining D several key of the follow and associa re monitor gu W stored com ous system p
, and primar fication, Seal ous Turbine 3 of this LT ion activitie the End-Sta mpacts to th iously noted issioning op ed with deco reviously issu REG-0191, an REG-0586.
3 of the LT d to be com
). The ident Water Reactor Plan mply with s part of the d transferred e ISFSI unti ol measures
: s. These act will be impl he potential and areas, ac d control me
-contaminat ve been relea h as sanitary monitoring a ent G-3 fossi Dismantlem dismantlem wing compon ated reactor uide tubes, e mponents su piping and c ry systems su l Injection an and auxiliar P provides d es currently b ate conditio he Post-Shu d, the D-Pl perations at t ommissionin ued environm nd TP identifie mpleted prio tified activiti r
the radiolo decommissi d to the ISF il it is transfe will be imp tivities will lemented to for re-con ccess roads a easures will ion from de ased from the y sewer servi and security il station wh ent and Dec ment and deco nents:
components etc.),
uch as fuel sh components uch as the C nd Main Ste ry systems.
detailed desc being perfor on.
utdown Deco lan/PSDAR, the site and ng the site ha mental impa es the dism or to the un ies are not s 8-5 ogical criter ioning proce SI. It is exp erred to the D plemented fo be complete o ensure the ntamination and boundar remain in e commission e license.
ices and elec operations.
hich will rem commission ommissionin s (e.g. fuel hrouds, contr associated ontrol Rod D am.
criptions of rmed and th ommissionin amended concluded t ave already act statement mantlement a nrestricted re ignificantly ria for unr ess, all spent pected that t Department following th ed prior to st e final radi as result ries will be ffect through ning. These ctrical servic There are main in place ning Activiti ng activities shrouds, co rol rods, and with the Fo Drive Mecha the dismant he remaining ng Activitie in March 2 that the pote been postula ts, specifical and deconta elease of th different fro restricted u t nuclear fue this spent fu of Energy (D e conclusion tarting the F iological co of access b posted with hout FRS ac measures ar ce will rema e three potab
: e.
ies have occurr ntrol rods, s d start-up sou orced Circula anisms, Dec lement, deco g activities t es Report (P 014, describ ential enviro ated in, and lly:
amination ac he site (excl om those ori use specifie el was loaded uel will rema DOE).
n of radiolo FRS process.
onditions are by personne h signs restri ctivities and re not requir in in operati ble wells on red, includin steam separa urces, and ation system cay Heat, Pri ontamination to be execut PSDAR) bed the pla onmental im d will be bou ctivities tha luding the I iginally discu ed in d into ain in ogical The e not el or icting d until red in ion to n site ng the
: ators, m, the imary n and ted to anned mpacts unded at are ISFSI ussed


Mississipsilts) un dsands and8.5.1.2.The U.Sreliable ctotal pop744 for Snear the small tow(populati5 miles s8.5.1.3.The LACof the Mbounded north, anelectric pThis statGenoa, lowithin thThe areaand freshto the G-site, loc ase Boiling WTermination n 0 -Plan/PSDA defined duri nd in the D
La Cross License T Revision in the D-will be d identified provide decommi 8.5.
-additional issioning.
L 8.5.1. G 8.5.1.1.
La Crosse B oGeography aSite Llocation an dCounty, Wi sfrom the ea sg in river e dis relativel yAMSL bouppi River to derlain by fi nd gravels.
The site Vernon C 300 feet by filling The site 642 feet Mississip silts) und sands and 8.5.1.2.
BPopul. Census B ucensus data fpulation in 2Stoddard, lo cplant, loca twns west oion 397), lo outhwest.
The U.S reliable c total pop 744 for S near the small tow (populati 5 miles s 8.5.1.3.
Site ACBWR propeMississippi Rby the Mi snd a wildlife power statio ntion is locat eocated appr ohe town. Th ea of the Mis sh water fish i-3 station lo ated approxi mWater Reacto rPlan R. Althou gng decommi-Plan/PSDA Revaluation oiling Wateand DemogrLocation and d descriptio nsconsin, in tst bank of th edge and low y flat with t hunded by th ethe west.
The LAC of the M bounded north, an electric p This stat Genoa, lo within th The area and fresh to the G-site, loca se Boiling W Termination n 0  
Tne to mediu mBedrock is e nlation ureau, Amerfor nearby W2013 was 25 cated 7 mile sted 17 miles of the plant cated 3 mi lAccess, Lan derty is locat eRiver. Alth ossissippi Ri vand fish re fn complete ded to the s ooximately 1 mere are no r esissippi Riv eing) and co mcated south mately 4,00 0r  gh additiona lissioning pl R have beeand inforer Reactor Eraphy Descriptio nn were disc uthe Mississi pe Mississip pforest area she reactor fe railroad tr The geolog ym sands wit hncountered arican CommWisconsin v i8 for the V is N of the p lN; and 30
-Plan/PSDA defined durin d in the D-additional issioning.
,across the es northwe d and Water ed in the fa rough the sit ever to the wfuge to the sd in 1969, wouth, adjace nmile to the nesidences wi ter adjacent tmmercial ba rof the LA C0 feet south o8-6 l details reg aanning effo ren identifie drmation re gEnvironmenn ussed in sect ippi River V pi River. T ws with mate rfacilities sta nacks to the y consists p rh some soil sat approxim amunity Surv eillages and cillage of G elant; 51,522
La Crosse Bo Geography a Site L location and County, Wis from the eas g in river ed is relatively AMSL bou ppi River to derlain by fin d gravels. B Popul
,329 for Ve rMississipp ist, and Ne wUse r western po re area is 16 3west, a rail l isouth. The swhich is also nt to the L Anortheast of tthin 2,000 f eto the site i srge and ship CBWR plant
. Census Bu census data f pulation in 2 Stoddard, loc plant, locat wns west o ion 397), lo outhwest.
)of the plant.
Site A CBWR prope Mississippi R by the Mis nd a wildlife power station tion is locate ocated appro he town. The a of the Miss h water fishi
arding majo rts, no sign id. Subseq ugarding the nt Descripti oion 8.2. Th ealley, with twenty-seven rial dredge dnding at ele veast and th rimarily of fs containing ately 130 fe eey (ACS) recities and V eenoa, locate dfor La Cros rnon Count yi River, inc w Albin, I Artion of Ve r3.5 acres, it ine to the esite include s owned an dACBWR facthe site. A neet of any L As used for r ep traffic (e.g
-3 station lo ated approxim Water Reactor Plan R. Althoug ng decommi
.). There is There is a pr decommis ificant impa uent section senvironmeon  e 163.5 acre the Reactor acres of the d from the Mvations ran ghe riprap on fill material shigher perc et below gro ueport (11) p rernon Count yd 1 mile no rse, the large
-Plan/PSDAR evaluation oiling Wate and Demogr Location and d description sconsin, in t st bank of the dge and low y flat with th unded by the the west. T ne to medium Bedrock is en lation ureau, Amer for nearby W 2013 was 25 cated 7 miles ted 17 miles of the plant cated 3 mil Access, Land erty is locate River. Altho ssissippi Riv and fish ref n completed ed to the so oximately 1 m ere are no re sissippi Rive ing) and com cated south mately 4,000 r
: y. There a rluding Ren oA (populat irnon Count yis relativel yeast, USAC Es G-3, a co ad operated b ycilities. Th en elementary ACBWR strecreational
gh additional issioning pl R have bee and infor er Reactor E raphy Description n were discu the Mississip e Mississipp forest areas he reactor f e railroad tr The geology m sands with ncountered a rican Comm Wisconsin vi 8 for the Vi s N of the pl N; and 30, across the es northwe d and Water ed in the far ough the site ver to the w fuge to the s d in 1969, w outh, adjacen mile to the n esidences wit er adjacent t mmercial bar of the LAC 0 feet south o 8-6 l details rega anning effor en identified rmation reg Environmen n
: p. barges of ca public bo portion (Po osioning acti vcts beyond s in this c hental effec te site is loca tBuilding l osite were f oMississippi Rging from 6the shore os (fine sandentages of cund surface rovides the  
ussed in secti ppi River V pi River. Tw s with mater facilities stan acks to the y consists pr h some soils at approxima munity Surve illages and c illage of Ge lant; 51,522
: y. The esti mrth of LAC Bst Wisconsi nre also num o township, ion 513), l oy on the east y isolated a sE property tal-fired 379 My Dairyland e closest to w school is l oructure. purposes (b ocoal are deli vat landing ool 9) of the Uvities those hapter ts of ted in ocated ormed River. 36 to of the s and coarse (10). most mated BWR; n city erous MN ocated bank s it is to the MWe (12). wn is ocated oating vered on the Upper La CrossLicense TRevisionMississipfor huntiGenoa Nmile 679long lockpublic acthrough HighwayNo. 8. 8.5.2.CThe climcontinentriver val lLock andof the infrom 60 winter mthe averasummer sThe averrange fromonth foThe bluffwinds atmonthly experienctornado oF3 (maxicenter in j8.5.3.T8.5.3.1.The site idissectedvaries beriver lev eHighwayPrior to clying wedredged to constrse Boiling WTermination n 0 ppi River N aing, fishing National Fis h.2, is appro xk and dam sccess to an oNovember. y 35 approx iClimate mate at the Ltal climate wley location d Dam No.
,329 for Ver Mississippi st, and New Use r western por e area is 163 west, a rail li south. The s which is also nt to the LA northeast of t thin 2,000 fe to the site is rge and ship CBWR plant) of the plant.
8nformation fto 90o F dumonths of D eage temper aseason (15).
arding majo rts, no signi
rage annual rom 3 to 5 in cor the remai nfs of the Mi st the site w haverage w iced tornado soccurred 27 imum wind jured one p eTopographyTopogis located w d uplands.
: d. Subsequ garding the nt Descriptio ion 8.2. The alley, with t wenty-seven rial dredged nding at elev east and th rimarily of f s containing ately 130 fee ey (ACS) re cities and Ve enoa, located for La Cros rnon County i River, inc w Albin, IA rtion of Ver 3.5 acres, it ine to the e site includes owned and ACBWR fac the site. An eet of any LA s used for re p traffic (e.g.
Fetween 21/2 ael. The LA Cy 35. Figure constructio ntlands. Th esands from truction, the aWater Reacto rPlan ational Wild land recreati h Hatchery
). There is There is a p r decommis ificant impa uent sections environme on e 163.5 acre the Reactor acres of the d from the M vations rang he riprap on fill materials higher perc et below grou eport (11) pr ernon County d 1 mile nor se, the large
.ximately 0.
: y. There ar luding Reno A (populati rnon County is relatively east, USACE s G-3, a coa d operated by cilities. The n elementary ACBWR str ecreational p
6structure ow observation The Stat eimately 1/2 mLa Crosse rwith cold w iof the site.
. barges of c a public bo portion (Poo sioning activ cts beyond s in this ch ental effect e site is locat Building lo site were fo Mississippi R ging from 6 the shore o s (fine sand entages of c und surface rovides the
8 site with afor the past uring the m oecember 201ture is appr rainfall is 3 5ches per mo nnder of the y ssissippi Ri vhere the va ind speeds
: y. The estim rth of LACB st Wisconsin re also num o township, ion 513), lo y on the east y isolated as E property t al-fired 379 M y Dairyland e closest tow school is lo ructure.
: s. On Apri l.4 miles aw aspeeds 158-erson and ca u, Geology angraphy ithin the Mi From La Cro and 41/2 mile CBWR site i8-4 provid en of the LA Ce property g rthe Mississi parea was gr ar  life & Fish Ronal activit
purposes (bo coal are deliv at landing o ol 9) of the U vities those hapter ts of ted in ocated ormed River.
: i. Lock an d6 miles nort hned and op eplatform, ope of Wisco nmile north oregion of Winters and h o The USACarchived we ayear (May onths of Ju n14 to Febru aoximately 25.2 inches.
36 to of the s and coarse (10).
Mnth in the s pear. ver Valley c hlley runs n oare typical ll 30, 1954, aay from the 216 mph) t oused betwe end Seismol ossissippi Ri vsse to Prairi s in width.
most mated BWR; n city erous MN ocated bank s it is to the MWe (12).
is located b ees a Topogr aCBWR facilrade was th eppi River.
wn is ocated oating vered on the Upper  
Daded to a re l8-7 Refuge just sies (13). Fu rd Dam No.h of the sit eerated by th epen from d ansin also mof the LAC BWisconsin a not summers CE maintain sather infor m2014 to M ane through Aary 2015.
C20o F in the Monthly pre cpring and su mhannel the worth-south ay 6 to 10 ma category F 4Genoa vill aornado that oen $500,000 ogy ver Valley, we du Chien, The valley etween two vaphy Map o f lity, the site en increase dDuring grad elatively flat south of the rther south a8, located
: e. The da me USACE (awn to dus kmaintains a BWR site, and at the L Aand extre ms an active wmation for th eay 2015) in dAugust 201 4City data co mwinter mo ncipitation a vmmer seaso nwinds at the Lare from th emph. The 4 (maximumage center.
occurred 6.
6and $5,000, where the v aapproximat ewalls rise svalleys on efthe site. location c od through th ee manipulat iground sur fsite which hare public l aon the Mis m is a 110 fe 14). This fa ck during the highway wacross fro mACBWR sitmes influenc eweather stat e Genoa, W dicated tem p4 and 45 to mpiled for Gnths and rea cverages in th ens and from LACBWR se north and Genoa, WIm wind speeOn June 5, 6 miles awa y000 in dam aalley is deep ely 40 mile ssharply 500 either side o fonsisted of me depositio nion and site face. The r ehas limited aand areas a nsissippi Ri vet wide, 60 0cility also amonths of wayside off m Lock and te is typical ed because oion at the n eI area. A r eperatures ra n-5o F durinGenoa show sches 72o F ie Genoa, W I1 to 3 inch eite. Predo mthe south.
I area has rds 207-260 1980, a cat ey from the v iages. ly cut into hs south, the vto 600 feet f the bluff e amarshes and n of hydraul ipreparation esulting gra daccess nd the ver at 0 feet llows April State Dam  of a of the earby eview nging ng the s that in the I area es per minant  The rarely mph) egory illage highly valley from ast of low-ically prior de for La CrossLicense TRevisionthe LACaccess ro8.5.3.2.LACBWof the Ceof the Wbedrock iGenerallyto 130 feValley.
DreshbacPrecambr(BGS). A509 feet


river sho 8.5.3.3.Many faucapable iconditionin the si tnuclear pany evidTherefor Seismic a2008 all 8.5.4.HHydrologGroundw25 feet BMississipthe Missithe west towards groundwfossil st asome perflooding.Hydraulithe shall ostructure se Boiling WTermination n 0 BWR site i soad along th eGeoloWR is locate dentral Lowl aWisconsin D oin this regio ny, the local get of glacial These unc och Group (rian crystal lAt the subj eAMSL nearreline. Seismults have b ein accordan cns in the sit ete region, b upower plant dence of ca pe, capable f aactivity (m aoccurred ov eHydrology agy and hydwater beneat hBGS and the ppi River.
La Cross License T Revision Mississip for hunti Genoa N mile 679 long lock public ac through Highway No. 8.
Tissippi Rive rand dischar gthe west b uwater elevati oation, it app eriods where
8.5.2. C The clim continent river vall Lock and of the in from 60 winter m the avera summer s The aver range fro month fo The bluff winds at monthly experienc tornado o F3 (maxi center inj 8.5.3. T 8.5.3.1.
. ic conductiv iow sands th aof the shal lWater Reacto rPlan s generally fe eastern bo uogy d on the east and Physiog rme and the n dips less t hgeology is doutwash an onsolidated dUpper Camline rocks eect site, the br the Reacto rmology een mappedce with 10 Ce vicinity th aut investigat isites in the pable faulti naulting does agnitudes ra ner 180 mile snd Hydrogedrogeologic ah the site i swater table Therefore, c hr. Groundw ges into the Mut then may on measure mears that th ethe gradie nity is influe nat were hyd rlow soils w or  flat with gr aundary of th ebank of the raphic Prov iwestern fla nhan 20 feet pdescribed as ad fluvial de pdeposits are mbrian). T hencountere dbedrock sur fr Building ad in the site CFR 100, Aat represent ions of all o region, in a dng. Additi onot need to nging from 3s from the si teology al informa ts first enco u aquifer is i nhanges in th eater in the s hMississippi turn and fl oments colle cere is a slig hnts are reve rnced by the sraulically dr eould not lik e8-8 ade level at e site to the rMississipp iince (16).
The site i dissected varies be river leve Highway Prior to c lying we dredged to constr se Boiling W Termination n 0 ppi River Na ing, fishing National Fish
Tnk of the Wi per mile to t happroximat eposits on th eunderlain bhe Dreshba cd at approx iface is enco uand slopes t oregion. N oAppendix A.
.2, is approx k and dam s ccess to an o November.
hazard to t hf these faul tddition to s tonally, the abe consider e3.5 to 5.4) t hte and did n otion was puntered at d en strong hy de water tabl ehallow depo River. The ow parallel cted during ht downwar rsed and th isoil structur eedged, depo ely influenc eapproximat eriprap alon gi River in th eThe site is l oisconsin Ar che southwe sely 15 feet o e east flood pby flat lying ch Group iimately 65 0untered at a no approxima tone of thes e Per the N he facility.
y 35 approxi Climate mate at the L tal climate w ley location d Dam No. 8 nformation f to 90o F du months of De age tempera season (15).
Nts during th etudies for th earea is one oed in the an ahat has bee not impact th eprimarily o bepths rangi ndraulic com me elevation asits and fill mdeeper gro uto the rive rroutine sa mrd vertical g is is likely de and grain sited, and c oe groundwa tely 639 feet g the river s he Wisconsi nocated on th ech. The sed ist. f hydraulic fplain of the Msandstone ais then un d0 feet belo wn elevation tely 501 fee e faults are NRC, "Ther eNumerous fe course of ve LACBWRof relativel yalysis of thi sn recorded be plant site obtained fro mng from app munication ware depende nmaterial lik eundwater is ar. Based o nmpling in su pgradient. H odue to high size distrib uompacted o nter flow dir eAMSL fromhore. n Driftless s ee southwest imentary str afill overlyin gMississippi Rand shales oderlain by dw ground s uof approxi mt AMSL ne aconsidered e are no ge ofaults are m avalidating s eR, have not fy low seis ms site" (17).
rage annual r om 3 to 5 inc or the remain fs of the Mis t the site wh average wi ced tornados occurred 27 imum wind jured one pe Topography Topog is located w d uplands. F etween 21/2 a el. The LAC y 35. Figure construction tlands. The sands from t ruction, the a Water Reactor Plan ational Wildl and recreati h Hatchery.
etween 197 5or operation sm Referencroximately with the adj nt on the st aely flows to walso likely t on a review opport of th eowever, the rriver stage sution. Beca un site, the in tection. Ho wm the ection flank ata or g 100 River of the dense urface mately ar the to be ologic apped everal found micity. 5 and s. ce 10. 15 to acent age of wards o flow of the e G-3 re are s and use of ternal wever, La CrossLicense TRevisionthe nativanisotropthe horizthese layThe velogradient.
ximately 0.6 structure ow observation The State imately 1/2 m La Crosse r with cold wi of the site.
across ththe grounrange) ev8.6.E8.6.1.SThe evalfollows tincludes considere"Large."
8 site with a for the past uring the mo ecember 201 ture is appr rainfall is 35 ches per mon nder of the y ssissippi Riv here the va ind speeds
: s. On April
.4 miles awa speeds 158-erson and cau
, Geology an graphy ithin the Mi From La Cro and 41/2 mile CBWR site i 8-4 provide n of the LAC e property gr the Mississip area was gra r
life & Fish R onal activiti
. Lock and 6 miles north ned and ope platform, op e of Wiscon mile north o region of W inters and ho The USAC archived wea year (May onths of Jun 14 to Februa oximately 2 5.2 inches. M nth in the sp ear.
ver Valley ch lley runs no are typicall l 30, 1954, a ay from the 216 mph) to used betwee nd Seismolo ssissippi Riv sse to Prairi s in width.
is located be es a Topogra CBWR facil rade was the ppi River. D aded to a rel 8-7 Refuge just s ies (13). Fur d Dam No.
h of the site erated by the pen from da nsin also m of the LACB Wisconsin an ot summers CE maintains ather inform 2014 to Ma ne through A ary 2015. C 20o F in the Monthly prec pring and sum hannel the w orth-south a y 6 to 10 m a category F4 Genoa villa ornado that o en $500,000 ogy ver Valley, w e du Chien, The valley etween two v aphy Map of lity, the site en increased During grade latively flat south of the rther south a 8, located
: e. The dam e USACE (
awn to dusk maintains a BWR site, a nd at the LA and extrem s an active w mation for the ay 2015) ind August 2014 City data com winter mon cipitation av mmer season winds at the L are from the mph. The 4 (maximum age center.
occurred 6.6 and $5,000, where the va approximate walls rise s valleys on e f the site.
location co d through the e manipulati ground surf site which h are public la on the Mis m is a 110 fe 14). This fac k during the highway w across from ACBWR sit mes influence weather stat e Genoa, W dicated temp 4 and 45 to mpiled for G nths and reac verages in the ns and from LACBWR s e north and Genoa, WI m wind spee On June 5, 6 miles away 000 in dama alley is deep ely 40 miles sharply 500 either side of onsisted of m e deposition ion and site face. The re has limited a and areas an sissippi Riv et wide, 600 cility also a months of wayside off m Lock and te is typical ed because o ion at the ne I area. A re peratures ran
-5o F durin Genoa shows ches 72o F i e Genoa, WI 1 to 3 inche ite. Predom the south.
I area has r ds 207-260 1980, a cate y from the vi ages.
ly cut into h s south, the v to 600 feet f the bluff ea marshes and n of hydrauli preparation esulting grad access nd the ver at 0 feet llows April State Dam of a of the earby eview nging ng the s that in the I area es per minant The rarely mph) egory illage highly valley from ast of low-ically prior de for


evaluatioFor thosevaluatio1) TNid2) A3) Pd4) Aesenadavth5) AA concluthe level
La Cross License T Revision the LAC access ro 8.5.3.2.
LACBW of the Ce of the W bedrock i Generally to 130 fe Valley.
Dreshbac Precambr (BGS). A 509 feet river sho 8.5.3.3.
Many fau capable i condition in the sit nuclear p any evid Therefor Seismic a 2008 all 8.5.4. H Hydrolog Groundw 25 feet B Mississip the Missi the west towards groundw fossil sta some per flooding.
Hydrauli the shallo structure se Boiling W Termination n 0 BWR site is oad along the Geolo WR is located entral Lowla Wisconsin Do in this region y, the local g et of glacial These unco ch Group (
rian crystall At the subje AMSL near reline.
Seism ults have be in accordanc ns in the site te region, bu power plant dence of cap e, capable fa activity (ma occurred ove Hydrology a gy and hyd water beneath BGS and the ppi River. T issippi River and discharg the west bu water elevatio ation, it appe riods where ic conductivi ow sands tha of the shall Water Reactor Plan s generally f e eastern bou ogy d on the east and Physiogr me and the n dips less th geology is d outwash an onsolidated d Upper Cam line rocks e ect site, the b r the Reactor mology een mapped ce with 10 C e vicinity tha ut investigati sites in the pable faultin aulting does agnitudes ran er 180 miles nd Hydroge drogeologica h the site is water table Therefore, ch
: r. Groundw ges into the M ut then may on measurem ears that the the gradien ity is influen at were hydr low soils wo r
flat with gra undary of the bank of the raphic Provi western flan han 20 feet p described as a d fluvial dep deposits are mbrian). Th encountered bedrock surf r Building a d in the site CFR 100, A at represent ions of all o region, in ad ng. Additio not need to nging from 3 s from the sit eology al informat s first encou aquifer is in hanges in the ater in the sh Mississippi turn and flo ments collec ere is a sligh nts are rever nced by the s raulically dre ould not like 8-8 ade level at e site to the r Mississippi ince (16). T nk of the Wi per mile to th approximate posits on the underlain b he Dreshbac d at approxi face is encou and slopes to region. No Appendix A.
hazard to th f these fault ddition to st onally, the a be considere 3.5 to 5.4) th te and did no tion was p untered at de n strong hyd e water table hallow depo River. The ow parallel cted during ht downwar rsed and thi soil structure edged, depo ely influence approximate riprap along i River in the The site is lo isconsin Arc he southwes ely 15 feet o e east flood p by flat lying ch Group i imately 650 untered at an o approximat one of these Per the N he facility. N ts during the tudies for the area is one o ed in the ana hat has been ot impact the primarily ob epths rangin draulic comm e elevation a sits and fill m deeper grou to the river routine sam rd vertical g is is likely d e and grain sited, and co e groundwat ely 639 feet g the river sh e Wisconsin ocated on the ch. The sedi st.
f hydraulic f plain of the M sandstone a is then und 0 feet below n elevation tely 501 fee e faults are NRC, There Numerous f e course of v e LACBWR of relatively alysis of this n recorded b e plant site o btained from ng from app munication w are dependen material like undwater is a
: r. Based on mpling in sup gradient. Ho due to high size distribu ompacted on ter flow dire AMSL from hore.
n Driftless se e southwest imentary stra fill overlying Mississippi R and shales o derlain by d w ground su of approxim t AMSL nea considered e are no geo faults are ma validating se R, have not f y low seism s site (17).
etween 1975 or operations m Referenc roximately with the adj nt on the sta ely flows tow also likely to n a review o pport of the owever, ther river stages ution. Becau n site, the int ection. How m the ection flank ata or g 100 River of the dense urface mately ar the to be ologic apped everal found micity.
5 and
: s.
ce 10.
15 to acent age of wards o flow of the e G-3 re are s and use of ternal
: wever,


0586 evathe formeTable 8-1LACBWscreen thse Boiling WTermination n 0 ve sands un dpy of the aq uontal direct iers. ocity of gro u  The gradi ehe site it is l indwater vel oven though t hEnvironmenummary luation of t hthe approac hidentificati oed to be ge n If identifi eon in NURE Gse environ mon, a standar dThe issue or NUREG-019dentified in tApplicable r eotential im pescribed.
La Cross License T Revision the nativ anisotrop the horiz these lay The velo gradient.
An evaluati ostimate or dnvironment dditional m ivoided, a d ehe resource oA conclusio nusion is deri v of signific aaluation. N oer G-1 coal/
across th the groun range) ev 8.6.
o1 was used WR. It is ex che issues t Water Reacto rPlan derlying the uifer would ion than in t hundwater fl oent of the w akely that th eocity across he hydrauli cntal Effects ohe environm eh and metho don of enviro neric, it is aed as generi cG-0586 whi cmental issu d approach iactivity is s1 and D-Pl athese docu megulations, p pacts from d eon is perfo rdetermine w hconsidering itigation me aetermination or attribute. is reached.
E 8.6.1. S The eval follows t includes considere Large.
ved from th eance of the ote that the eoil fueled p oas the ba scerpted fro mo identify r hydraulic fibe more pe rhe vertical dow is directl yater table is e water tabl e the site is c conductivi tof Decommiental effects dology outl inmental iss uassigned a s c, the envir och conclude ses or dec ois followed.
evaluatio For thos evaluatio
summarized,an/PSDAR.
: 1)
ments. ermits, limi tecommissio nrmed. Thi shether the a the availa basures that cis made as e evaluation impacts. S ienvironment aower plant wsis for the m Table 6.1 osite-specifi c8-9 fill would li krmeable an ddirection. T hy related to influenced be has a very also relativ ety could sup pissioning  (or impact sined and de sues as eithe rignificance onmental i ms that the o vommissioni n It is summ a including aNote that mts or other r ening activiti es includes ctivity is li kble informat ican be take nto whether steps sum mite-specific ial impacts o was not cons isite specifi cof NUREG-0c issues.
T N
Dkely provid ed have a hig hhis decrease sboth the h yby the topo glow gradie nely slow (i.
id
eport faster fls) of the de cscribed in N r generic or level of eit hmpact is con sverall impac tng activitie sarized as fol la summary omany decomegulatory re qes relating t oanalysis an kely to mak eion. If an i mn are evalu athe impact imarized abo vissues are n of the operat iidered in thi sc environme0586. The fDecommissie sufficient her hydraul is the vertic aydraulic con graphy and wnt. Therefo re., in the in cflow. commission iNUREG-0586site-specifi cher "Small, "sidered to b et significanc es that req ulows: of the impa cmmissioning quirements ao the enviro nnd professio ne a noticea bmpact is li kated. If an iis likely to sve. The con ot bounded ing G-3 coa ls review.
: 2)
ental impac tfirst step in ioning acti vstructure th aic conductiv al transport wductivity a nwith the flat re, it is likel yches and fe eing of LAC B6. This app rc. If the is s" "Moderat ee bounded be is "Small.
A
"uire site-sp ects as repor tactivities a rare identifie dnmental iss unal judgme ble impact okely, existin gimpact can nseriously da mnclusion ide nby the NU Rl power pla nt assessme nthis proces svities speci fat the vity in within nd the areas y that et/day BWR roach sue is e," or by the " ecific ted in re not d. ue are nt to on the g and not be mage ntifies REG-nt and nt for s is to fic to La CrossLicense TRevisionLACBWidentifie devaluatioOffsi35 yeAquasensitTerreof senThreathreatEnvir35 yeCultuhistor8.6.2.R8.6.2.1.During din accordof the Raexposure2,000 mralso be mprogram RadiationmaterialsIn Augusof the st a1994 witallowed levels at
: 3)
P d
: 4)
A es en ad av th
: 5)
A A conclu the level 0586 eva the forme Table 8-1 LACBW screen th se Boiling W Termination n 0 ve sands und py of the aqu ontal directi ers.
ocity of grou The gradie he site it is li ndwater velo ven though th Environmen ummary luation of th the approach identificatio ed to be gen If identifie on in NUREG se environm on, a standard The issue or NUREG-019 dentified in t Applicable re otential imp escribed.
An evaluatio stimate or d nvironment dditional mi voided, a de he resource o A conclusion usion is deriv of significa aluation. No er G-1 coal/o 1 was used WR. It is exc he issues t Water Reactor Plan derlying the uifer would ion than in th undwater flo ent of the wa kely that the ocity across he hydraulic ntal Effects o he environme h and method on of enviro neric, it is a ed as generic G-0586 whic mental issu d approach i activity is s 1 and D-Pla these docum egulations, p pacts from de on is perfor determine wh considering itigation mea etermination or attribute.
is reached.
ved from the ance of the ote that the e oil fueled po as the bas cerpted from o identify r
hydraulic fi be more per he vertical d ow is directly ater table is e water table the site is c conductivit of Decommi ental effects dology outli nmental issu assigned a s c, the enviro ch concludes es or deco is followed.
summarized, an/PSDAR.
ments.
ermits, limit ecommission rmed. This hether the a the availab asures that c is made as e evaluation impacts. Si environmenta ower plant w sis for the m Table 6.1 o site-specific 8-9 fill would lik rmeable and direction. Th y related to influenced b e has a very also relative ty could supp issioning (or impacts ined and des ues as either ignificance onmental im s that the ov ommissionin It is summa including a Note that m ts or other re ning activitie s includes ctivity is lik ble informati can be taken to whether steps summ ite-specific i al impacts o was not consi site specific of NUREG-0 c issues. D kely provide d have a high his decreases both the hy by the topog low gradien ely slow (i.e port faster fl s) of the dec scribed in N r generic or level of eith mpact is cons verall impact ng activities arized as foll a summary o many decom egulatory req es relating to analysis an kely to make ion. If an im n are evalua the impact i marized abov issues are n of the operati idered in this c environme 0586. The f Decommissi e sufficient her hydrauli s the vertica ydraulic con graphy and w nt. Therefor e., in the inc flow.
commissioni NUREG-0586 site-specific her Small, sidered to be t significance s that requ lows:
of the impac mmissioning quirements a o the environ nd profession e a noticeab mpact is lik ated. If an i is likely to s ve. The con ot bounded ing G-3 coal s review.
ental impact first step in ioning activ structure tha ic conductiv al transport w ductivity an with the flat re, it is likely ches and fee ing of LACB
: 6. This appr
: c. If the iss Moderate e bounded b e is Small.
uire site-spe cts as report activities ar are identified nmental issu nal judgme ble impact o kely, existing impact cann seriously dam nclusion iden by the NUR l power plan t assessmen this process vities specif at the vity in within nd the areas y that et/day BWR roach sue is e, or by the ecific ted in re not
: d.
ue are nt to on the g and not be mage ntifies REG-nt and nt for s is to fic to  


Protectioexposuresignifica nremoval (SSCs). se Boiling WTermination n 0 WR are then  
La Cross License T Revision LACBW identified evaluatio Offsi 35 ye Aqua sensit Terre of sen Threa threat Envir 35 ye Cultu histor 8.6.2. R 8.6.2.1.
: d. The scr eon: te land use aears, since t hatic ecology tive areas.
During d in accord of the Ra exposure 2,000 mr also be m program Radiation materials In Augus of the sta 1994 wit allowed levels at Protectio exposure significan removal (SSCs).
estrial Ecolo nsitive area satened and tened and e nronmental Jears. ural and Hi ric landmar kRadiologicalOccupdecommissi odance with t hadiation Pro es and main trem/yr Tota lmaintained Aand proce dn Work Per ms incorporat est 1987, Dai rabilized and th the com mfor the dec athe facility
se Boiling W Termination n 0 WR are then
.on Program e during th ent contribut oand packa gWater Reacto rPlan reviewed aeening iden tactivities: c hhe FES was iaffected by gy affected bs. endangered ndangered s pJustice: cha nstoric Reso uk designatio nl Effects of Dpational Ra doning, Solut ihe license s ptection Pro gtain occupa tl Effective DAs Low As Rdures will emits (RWP) e effective r aryland plac edefueled fa cmencement oay of most  
: d. The scre on:
: s. This dela yand ALARAe decommis sors to occup ging of rem a r and the acti vtified the f ohanges in de missued. activities b eby activitie sspecies: c hpecies that hnges in de murce impac tns and other Decommissidiation Expo ions will co npecification sgram are to tional work eDose Equiv aReasonably Aensure that involving p oadiological ced LACBWRcility). LA Cof incremen tshort-lived ry, combine dA measures
te land use a ears, since th atic ecology tive areas.
,sioning of Lational dos eaining Reac 8-10 vities that mollowing po mographics eyond the o ps beyond the hanges in l ohave occurre dmographics ts beyond tcultural res oioning sure ntinue to i ms and the re qcontrol radi aer exposure salent (TEDE Achievable (work spec iotential ra diacontrols.
estrial Ecolo nsitive areas atened and tened and en ronmental J ears.
R in a SAF SCBWR remaital decomm iradionuclide sd with the e f, minimized LACBWR t from remaitor Buildin gmay requir eotential area sand zoning tperational ar e operationa local flora a nd in the pas tand socio ethe operati oources. mplement a Rquirements o ation hazar ds to less th aE). Dose to (ALARA).
ural and Hi ric landmark Radiological Occup decommissio dance with th adiation Pro es and maint rem/yr Total maintained A and proced n Work Perm s incorporate st 1987, Dair abilized and th the comm for the deca the facility.
ifications, dation expos uSTOR condi tined in a fu lissioning ac ts, which su bffective imp lthe actual to date. It ining disma ng Structure se site-specif is for additi othat have oc ea; changes l area; chan gnd fauna a nt 35 years.
on Program e during the nt contributo and packag Water Reactor Plan reviewed a eening ident activities: ch he FES was i affected by gy affected b
economic s tonal areas; cRadiation Pr of 10 CFR 2 0ds, avoid ac can the admi nworkers an dThe LACBWdesigns, wo rure or handl ition (a peri olly SAFSTOtivities. T hbsequently rlementation and project eis anticipat entlement act is, Systems, ic evaluatio nonal site-sp ecurred in th ein designat iges in desig nnd designati otatus in the changes in otection Pr o0. The obje ccidental rad inistrative li md the public WR work cork package sing of radio aod of safe st oOR conditio nhis period o freduced rad iof the Rad ied radiation ed that the ivities will band Compo n are ecific e past ion of nation on of past local ogram ctives iation mit of must ontrol s and active orage n until f time iation iation dose most be the onents La CrossLicense TRevisionTable 8Sectio8.6.2    8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4  8.6.3.5 8.6.3.6  8.6.3.7  8.6.3.8 8.6.3.9 8.6.3.18.6.3.128.6.3.13  8.6.3.148.6.3.158.6.3.168.6.3.178.6.3.188.6.3.198.6.3.20 se Boiling WTermination n 0 8-1 SummPoweon RadioloActivitiworkersActivitiRadioloOnsite lOffsite Water UWater QSurfaceGroundAir QuaAquaticActivitiActivitiTerrestrActivitiActivitiThreateOccupa1 Socioec2 Environ3 CulturaActivitiActiviti4 Aesthet5 Noise 6 Irretrie v7 Traffic 8 ISFSI c9 VCC coimpacts0 Rail linoffsite)
: s.
Water Reacto rPlan mary of the r Facilities Enviroogical ies resulting is ies resulting iogical Accid eland use acti vland use acti vUse Quality e water d water ality c Ecology ies within th eies beyond th rial Ecology ies within th eies beyond thened and End aational Issues conomic nmental Justi cal and Histori cies within th eies beyond th tics vable Resour cand Transpo rconstruction:
endangered ndangered sp Justice: chan storic Resou k designation l Effects of D pational Rad oning, Soluti he license sp tection Prog tain occupat l Effective D As Low As R dures will e mits (RWP) e effective ra ryland place defueled fac mencement o ay of most s
lonstruction f os (onsite) ne upgrade an dr  Environmeonmental Iss uin occupation in dose to the ents vities vities e operational ae operational e operational ae operational angered Spe cce c Resource I me operational ae operational ces rtation land use imp aor the ISFSI:
. This delay and ALARA e decommiss ors to occup ging of rema r
ld extension (
and the activ tified the fo hanges in dem issued.
o8-11 ental Impac tue al dose to public area area area area cies mpacts area area acts (onsite) land use onsite and ts from De cNUREG0586(GEIS) Yes Yes Yes Yes No Yes  Yes Yes Yes  Yes No  Yes No No Yes Yes No  Yes No Yes Yes Yes Yes No No No commission iG-) Impac Small Small Small Small Site-speSmall  Small Small Small  Small Site-spe Small Site-speSite-speSmall Small Site-spe Small Site-speSmall Small Small Small Site-speSite-speSite-speing Nuclearct Significan ccific cific cific cific cific cific cific cific cific r ce La CrossLicense TRevisionNUREG-The currestimateddose for bounded 8.6.2.2.Dairylan(REMP) environmthe radiodecommiof 10 CFto adherepublic doconsidereThe onlyliquid wapiping" wcollectio nthrough tdischargeof the cprotectio
activities be by activities species: ch pecies that h nges in dem urce impact ns and other Decommissi diation Expo ions will con pecifications gram are to tional worke Dose Equiva Reasonably A ensure that involving po adiological c ed LACBWR cility). LAC of increment short-lived r y, combined A measures, sioning of L ational dose aining Reac 8-10 vities that m ollowing po mographics eyond the op s beyond the hanges in lo have occurred mographics ts beyond t cultural reso ioning sure ntinue to im s and the req control radia er exposures alent (TEDE Achievable (
work speci otential radia controls.
R in a SAFS CBWR remai tal decommi radionuclides d with the ef
, minimized LACBWR t from remai tor Building may require otential areas and zoning t perational are operational ocal flora an d in the past and socioe the operatio ources.
mplement a R quirements o ation hazard s to less tha E). Dose to (ALARA).
ifications, d ation exposu STOR condit ined in a ful issioning act s, which sub ffective impl the actual to date. It ining disman g Structures e site-specifi s for additio that have oc ea; changes l area; chang nd fauna an t 35 years.
economic st onal areas; c Radiation Pro f 10 CFR 20 ds, avoid acc an the admin workers and The LACBW designs, wor ure or handli tion (a perio lly SAFSTO tivities. Th bsequently r lementation and projecte is anticipate ntlement acti s, Systems, ic evaluation onal site-spe curred in the in designati ges in design nd designatio tatus in the changes in otection Pro
: 0. The objec cidental radi nistrative lim d the public WR work co rk packages ing of radioa od of safe sto OR condition his period of reduced radi of the Radi ed radiation ed that the ivities will b and Compo n are ecific e past ion of nation on of past local ogram ctives iation mit of must ontrol s and active orage n until f time iation iation dose most be the onents  


LACBWbounded The gasemeteorolnoble gasor exposugaseous r8.6.2.3.
La Cross License T Revision Table 8 Sectio 8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.1 8.6.3.12 8.6.3.13 8.6.3.14 8.6.3.15 8.6.3.16 8.6.3.17 8.6.3.18 8.6.3.19 8.6.3.20 se Boiling W Termination n 0 8-1 Summ Powe on Radiolo Activiti workers Activiti Radiolo Onsite l Offsite Water U Water Q Surface Ground Air Qua Aquatic Activiti Activiti Terrestr Activiti Activiti Threate Occupa 1
Decommthis anal yconducteFuel Accdecommithe miniLACBWotherwiseThe decoand contProtectiose Boiling WTermination n 0 -0586 esti mrent occupa td to be 130.
Socioec 2
3the decom mby NUREGOffsitd implemen tat LACBWment in and aoactive gas eissioning ac tFR 50, Appe ne to these lose from de ced as "Smal ly authorized aste from t hwhich is a p an system p uthe East T ues to the inl ecurrent and n in accor WR to date c oby the eval ueous pathw alogical cond is, the gaseo uure pathwa yreleases.
Environ 3
Enviromissioning a cysis has co ned and prov icident Anal yissioning an dmal radioa cWR site is i ne involving aommissioni namination l eon and Safe tWater Reacto rPlan mated that 1, tional expe n3 Rem, whi cmissioning wG-0586 and t hte Radiation ted a regula tWR which paround the e eous (airbo rtivities do n ndix I, or th limits throu gcommission il." effluent rel ehe LACBWRart of the G-3umps are no turbine build iet of the liq ufuture Ra ddance with onclude tha tuation in N Uay (which iitions durin gus pathway cy. Routine aonmental E fccident anal yntinued duri nided in reg uysis" have n od with spen tctive materi nsufficient fa significan tng of radio aevels remai nty and Heal r  874 Rem w inded and d och is well be lwill meet th ehe impact is Exposure a ntory compli aprovided a nnvirons of t hrne) and li qot exceed t he fuel cycle ghout the c oing is boun dease pathwa yR site to the 3 circulatin gt operable.
Cultura Activiti Activiti 4
Ting sump u suid waste m odiation Pro t10 CFR 20t the public eUREG-0586, includes no bg the time o fconsists of aair samples affects of Ac cysis is inte gng shutdow nular updates oted that "
Aesthet 5
wt nuclear fu eal resulting for any pot t adverse ef feactively con tning at LA Cth Program s8-12 ill be need eose expecte low the NU Re regulator yconsidered nd Monitori nant Radiolo gnnual report he site. Th equid efflue nhe concentra tdose limits ourse of th eded by the c ry for the dis Mississipp ig water disc hThe only li qsing an air oonitor, whic htection and 0 and 10 C Fexposure as which con cble gas an df the release.
Noise 6
airborne par tare collected cidents and Dgral to the l in and deco mto the D-P lwith conside rel now store dfrom LACential even tfect on publi ctaminated S CBWR. Wors for LACBed to deco med to comp lREG-0586 ey standards oas "Small."
Irretriev 7
ng gical Enviro ns with ass ee REMP pro gnt releases dation limits oof 40 CFR e decommisriteria in N Ucharge of tr ei River is th rharge syste mquid effluen toperated pu mh is still ope rREMP atFR 50, Appa result of dcludes the i md particulat
Traffic 8
: e. Due to pl aticulate only to determi nDecommissi oicensing de smmissioning
ISFSI c 9
.lan/PSDAR,ration for th d in the ISF SCBWR operat to result ic health an dSCs will i nrker safety iBWR which mmission a slete the de cestimate. A sof 10 CFR 2nmental Mo essments of gram provi dduring plan tof 10 CFR 2 0190. Soluti ossioning.
VCC co impacts 0
CUREG-0586 eated and fi lhrough the "
Rail lin offsite)
sm. Currentl yt discharges mp. The a irable. Cont iLACBWR pendix I. R Edecommissi ompact is min ie) analysis iant shutdow n and presen tne the dose doning Even tsign basis f
Water Reactor Plan mary of the r Facilities Enviro ogical ies resulting i s
: o. Post-fuel
ies resulting i ogical Accide land use activ land use activ Use Quality e water d water ality c Ecology ies within the ies beyond th rial Ecology ies within the ies beyond th ened and Enda ational Issues conomic nmental Justic al and Historic ies within the ies beyond th tics vable Resourc and Transpor construction: l onstruction fo s (onsite) ne upgrade and r
, within sece current st aSI, this anal yation and r in exceedin gd safety."
Environme onmental Issu in occupation in dose to the ents vities vities e operational a e operational e operational a e operational angered Spec ce c Resource Im e operational a e operational ces rtation land use impa or the ISFSI: l d extension (o 8-11 ental Impact ue al dose to public area area area area cies mpacts area area acts (onsite) land use onsite and ts from Dec NUREG 0586 (GEIS)
nvolve the h is addresse drely on A Lsingle unit Bcommissioni ns the occupa t20, it is the ronitoring Pr othe radiol odes assuranc et operation s0, the dose lons will co nConsequentl yand the imp ltered radio aseal well/di fy, the liquid wat LACBWRir operated pinued applicR ensures pEMP reportoning activi timal. is subject t on and cessat its a minor r edue to radio ats or LACBWRaccident an ation "Plant age of LAC Bysis confirmemaining o ng dose lim ihighest dose d in the Rad iLARA princ BWR. ng is tional refore ogram ogical e that s and limits ntinue y, the pact is active ffuser waste R are pump cation public ts for ties is o the ion of elease active R and alysis Post-BWR s that n the its or rates iation iples.
Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No No Yes Yes No Yes No Yes Yes Yes Yes No No No commissioni G-
La CrossLicense TRevisionThe saferelease o During daddition in NUREdecommiLACBWpotential
)
Impac Small Small Small Small Site-spe Small Small Small Small Small Site-spe Small Site-spe Site-spe Small Small Site-spe Small Site-spe Small Small Small Small Site-spe Site-spe Site-spe ing Nuclear ct Significanc cific cific cific cific cific cific cific cific cific r
ce


reductionDecoPrior RadioOperationand serviin the IS FRadioExploLoss NaturHumThe publaccidentsdose conPlan/PSDanalysis i8.6.2.4.The decovolumes bulk debare, and implementhe approand liquiThe majoEnergySoand trucktransferr ese Boiling WTermination n 0 ty of the p uf radioactiv edecommissi oto maintena nEG-0586 as sissioning o fWR are boun dconsequen cn of the tota lontaminatio nradioactive oactive dec anal acciden tice conditio nFSI, operati ooactive was tosions and/
La Cross License T Revision NUREG-The curr estimated dose for bounded 8.6.2.2.
oof contami nral phenom ean caused e vlic dose con ss during dec onsequences fDAR and re sis therefore bStoragommissioni nof low lev eris material swill contin untation of t hopriate segr ed radioactiv ority of the olutions dispked to a r aed to a rail cWater Reacto rPlan ublic is prin e materials doning, Soluti nce, waste msociated wi tf LACBWRded by the ces associat el radionucli dn efforts ma dwaste ship may. s during de cns. With th eonal accide nte transporta tor fires asso cnation contr oena, and vents extern asequences r eommissioni nfrom accide nsulted in do sbounding fo ge and Disp ong of LACBel radioactiv s such as co nue to be dis phe Waste M aegation, cla se wastes. Class A lo wposal site in ail trans-loa dcar. Rail a nr  cipally rela tduring deco mons will per fmanagement
Dairylan (REMP) environm the radio decommi of 10 CF to adhere public do considere The only liquid wa piping w collection through t discharge of the c protectio LACBW bounded The gase meteorol noble gas or exposu gaseous r 8.6.2.3.
,th immedia tR. Conseq uaccident ev aed with tho sde inventory de before de cments, and commissioni e spent nucl ents during de tion accide nciated with e ol, al to LACB Weported in Nng ranged fr onts during Lse ranging frr the decom mosal of Low
Decomm this analy conducte Fuel Acc decommi the mini LACBW otherwise The deco and cont Protectio se Boiling W Termination n 0  
-BWR has, ae waste, in cncrete, met apositioned aanagement Pssification, pw level radi oClive, Uta hd facility i nnd truck sh i8-13 ted to pote nmmissionin gform decon t, and survei lte dismantli nuently, the paluation pre se accidents at LACBWRcommission ing could re sear fuel re mcommissio nnts, xplosive an dWR. NUREG-0586om 0.02 to 0LACBWR deom 0.027 t omissioning o-Level Radi oand will c ocluding cont aal and aspha las low level rogram and processing, poactive wast eh. Waste wn Winona, Mipments are ntial hazards g operations.
-0586 estim rent occupat d to be 130.3 the decomm by NUREG Offsit d implement at LACBW ment in and a oactive gase issioning act FR 50, Appen e to these l ose from dec ed as Small y authorized aste from th which is a pa n system pu the East Tu es to the inle current and n in accor WR to date co by the evalu eous pathwa logical condi s, the gaseou ure pathway releases.
tamination a nllance activi tng would a lpotential d esented in N would be lR from: ing, sult from eq umoved from tning can be cd/or combu s6 for onsite, 0.96 rem.
Enviro missioning ac ysis has con ed and provi cident Analy issioning and mal radioac WR site is in e involving a ommissionin amination le on and Safet Water Reactor Plan mated that 1, tional expen 3 Rem, whic missioning w G-0586 and th te Radiation ted a regulat WR which p around the e eous (airbor tivities do n ndix I, or th limits throug commissioni
Aecommissio no 0.065 rem.
: l.
of LACBWRoactive Was tontinue to r eaminated e qlt. Material sradioactiveassociated ppackaging, s e from LACwill be loade MN where made in ac c associated nd dismantl eties. The ac lso be appl iecommissio nNUREG-0586less at LA Cuipment fail uthe LACBWcategorized astible materi anon-fuel re lAn analysis oning was p r The NURER. te equire the dquipment, t os that canno te waste. Th procedures, Sshipment an dCBWR will bd into appr othe waste ccordance wi twith an air bement of S Scidents disc uicable duri nning accide n6. Howeve rCBWR due ture, human eWR site and sas follows:
effluent rele he LACBWR art of the G-3 umps are not urbine buildi et of the liqu future Rad dance with onclude that uation in NU ay (which i itions during us pathway c
als, lated radiol oof potential provided in t hEG-0586 ac cdisposal of ools, clothin gt be free rel erough the p Solutions e nd control of be shipped topriate cont acontainer w ith Departm eborne SCs in ussed ng the nts at r, the to the error, stored ogical public he D-cident large g and eased roper nsures solid to the ainers ill be ent of La CrossLicense TRevisionTransporWaste Co8.6.2.5.Followinradiologiremainin(excludinradiologilicense wChapter 6criteria.
: y. Routine a onmental Ef ccident analy ntinued durin ided in regu ysis have no d with spent ctive materi nsufficient f a significant ng of radioa evels remain ty and Heal r
8.6.3.N8.6.3.1.The enviwithin seThe LACexisting Lto be conslips are onsite raactivitie sparking ato occur Several sroadwaysincludingremediat636 foot
874 Rem wi nded and do ch is well bel will meet the he impact is Exposure an tory complia provided an nvirons of th rne) and liq ot exceed th e fuel cycle ghout the co ing is bound ease pathway R site to the 3 circulating t operable. T ing sump us uid waste mo diation Prot 10 CFR 20 t the public e UREG-0586, includes nob g the time of consists of a air samples a ffects of Acc ysis is integ ng shutdown ular updates oted that w t nuclear fue al resulting for any pot t adverse effe actively cont ning at LAC th Programs 8-12 ill be neede ose expecte low the NUR e regulatory considered nd Monitorin ant Radiolog nnual report he site. The quid effluen he concentrat dose limits ourse of the ded by the cr y for the dis Mississippi g water disch The only liq sing an air o onitor, which tection and 0 and 10 CF exposure as which conc ble gas and f the release.
airborne part are collected cidents and D gral to the li n and decom to the D-Pl with consider el now stored from LAC ential event fect on public taminated S CBWR. Wor s for LACB ed to decom ed to compl REG-0586 e y standards o as Small.
ng gical Environ s with asse e REMP prog nt releases d ation limits o of 40 CFR e decommis riteria in NU charge of tre i River is thr harge system quid effluent operated pum h is still oper REMP at FR 50, App a result of d cludes the im d particulate
. Due to pla ticulate only to determin Decommissio icensing des mmissioning.
lan/PSDAR, ration for th d in the ISFS CBWR opera t to result i c health and SCs will in rker safety i BWR which mmission a s lete the dec estimate. As of 10 CFR 2 nmental Mo essments of gram provid during plant of 10 CFR 20 190. Solutio ssioning. C UREG-0586 eated and fil hrough the s
: m. Currently t discharges mp. The ai rable. Conti LACBWR pendix I. RE decommissio mpact is mini e) analysis i ant shutdown and present ne the dose d oning Event sign basis fo
. Post-fuel  
, within sec e current sta SI, this analy ation and r in exceeding d safety.
nvolve the h is addressed rely on AL single unit B commissionin s the occupat 20, it is ther onitoring Pro the radiolo des assurance t operations 0, the dose l ons will con Consequently and the imp ltered radioa seal well/dif y, the liquid w at LACBWR ir operated p inued applic R ensures p EMP report oning activit imal.
is subject to n and cessati ts a minor re due to radioa ts or LACBWR accident ana tion Plant age of LACB ysis confirm emaining on g dose limi highest dose d in the Radi LARA princ BWR.
ng is tional refore ogram ogical e that s and limits ntinue y, the pact is active ffuser waste R are pump cation public ts for ties is o the ion of elease active R and alysis Post-BWR s that n the its or rates iation iples.  


waste strNo signactivitie scomply wregulatorIn accordonsite ar e8.6.3.2.Only areand licenand demse Boiling WTermination n 0 rtation (DO Tontrol Speci Radiong the comical surveys ng in backfing the ISFS Iical conditio will be termi 6 provide t hNon-radiolo gOnsiteironmental iection 4.3.1 oCBWR decoLACBWR lnducted wit hbeing cons tail line will
La Cross License T Revision The safe release o During d addition in NURE decommi LACBW potential reduction Deco Prior Radio Operation and servi in the ISF Radio Explo Loss Natur Hum The publ accidents dose con Plan/PSD analysis i 8.6.2.4.
: s. Contain eand equipm ein a manner structures s us and rail l ig piping an ded, as nece selevation wream. nificant env s are anticip awith applic ary requirem edance with te considere dOffsiteas within t hnse terminat imolition equi pWater Reacto rPlan T) regulatio nalist (WCS) ological Crit empletion of will be per filled struct uI) meets the ns are dem onated, with he methodogical Effect se Land Use impact asso cof NUREG-0ommissioni nicensed pro phin the LSE tructed. Th ebe modifie ders will be uent/containesimilar to wuch as the Sines, will r ed tunnels, b essary. All o twill be rem oironmental ated. In ad dable United ents. the guidanc ed as "Small.
The deco volumes bulk deb are, and implemen the appro and liqui The majo EnergySo and truck transferre se Boiling W Termination n 0 ty of the pu f radioactive decommissio to maintenan EG-0586 ass issioning of WR are bound consequenc n of the total ontamination radioactive oactive deca nal accident ice condition FSI, operatio oactive wast osions and/o of contamin ral phenome an caused ev lic dose cons s during deco nsequences f DAR and res is therefore b Storag ommissionin of low leve ris materials will continu ntation of th opriate segre d radioactiv ority of the olutions disp ked to a ra ed to a rail c Water Reactor Plan ublic is prin e materials d oning, Soluti nce, waste m sociated wit f LACBWR ded by the ces associate l radionuclid n efforts mad waste shipm ay.
"te Land Use he existing s ion activiti epment, was tr  ns. If Clas sfacility in Aeria for Licedecontami nformed to d ure baseme nunrestricted onstrated to bthe excepti oology for d es of Decom mciated with 0586 to be gng project i sperty previo ufootprint.
s during dec ns. With the onal acciden te transportat or fires assoc nation contro ena, and vents externa sequences re ommissionin from acciden sulted in dos bounding fo ge and Dispo ng of LACB el radioactiv s such as con ue to be disp he Waste Ma egation, clas e wastes.
Se existing r ad and refur bunloaded a nr laydown, swhen the fac iSwitchyard, emain at lic elow the 63 ther system soved during changes a sdition to NR CStates Envi re presented
Class A low posal site in ail trans-load car. Rail an r
" (in the Vici nite licensed es (such as t te container 8-14 s B/C wast eAndrews, Te xnse Termin anation, dis memonstrate tnts, any re muse  criteri abe below th eon of the ar eemonstratin gmissioningonsite land generically c s located a nusly used f oSome onsite ail line sup pbished with nd loaded o nstorage, sta gility was op eAdministra tense termi n6 foot elev as and comp othe decom mssociated wC requirem eronmental P rin NUREG-nity) boundary wemporary s ts, etc.). O fe is identifi exas. ation mantlement that the dos maining pip ia specified i ne unrestricte ea around th g complian cuses has beonsidered a snd executed or power ge ne roads have ported the o pa rail spur nsite. Onsi ging and w aerational.
cipally relat during decom ons will perf management, th immediat R. Consequ accident eva ed with thos de inventory de before dec ments, and commissioni e spent nucle nts during de tion acciden ciated with e ol, al to LACBW eported in N ng ranged fro nts during L se ranging fr r the decomm osal of Low-BWR has, a e waste, inc ncrete, meta positioned a anagement P ssification, p w level radio Clive, Utah d facility in nd truck shi 8-13 ted to poten mmissioning form decont
tion Buildin gnation. Sub ation will beonents as w emissioning pwith the si tents, decommrotection A g-0586, the pwill be used torage and sf the 163.5 aed, it will band remedse from resi ding and soin 10 CFR 2 0ed use criter ie ISFSI. L Tce with the een determi ns a "Small" iwithin the neration; all been refur bperation of tto support dite activitie saste loading g, Crib Ho usurface bas ee radiologic aell as all str uprocess and te-specific dmissioning agency (USEpotential im pto support dstaging area sacre site, a bbe shipped tdiation acti vdual radioa cils at LAC B0.1402. Aft eia, the 10 C FTP Chapter 5unrestricte dned by the Nimpact. boundary owork is ex pbished. No bthe facility.
, and surveil te dismantlin uently, the p aluation pre se accidents at LACBWR commissioni ng could res ear fuel rem commission
decommissi os such as v eare and co nuse as well aement struc tally assesse ductures abo vdisposed o fdecommissi oactivities wil EPA) and Wpacts to lan ddecommissi os for remed ibout 1.5 acr eto the vities, ctivity BWR er the FR 50 5 and d use NRC, of the pected barge  The oning ehicle ntinue as all tures, d and ve the f as a oning l also WDNR d use oning iation es are La CrossLicense TRevisionlocated AppropricontaminThese mimpacts activitie sLand in twithin a
: nts, xplosive and WR.
NUREG-0586 om 0.02 to 0 LACBWR de om 0.027 to missioning o
-Level Radio and will co cluding conta al and asphal as low level rogram and processing, p oactive waste
: h. Waste w n Winona, M ipments are ntial hazards g operations.
tamination an llance activit ng would al potential de sented in N would be l R from:
: ing, sult from equ moved from t ning can be c d/or combus 6 for onsite, 0.96 rem. A ecommission o 0.065 rem.
of LACBWR oactive Wast ontinue to re aminated eq lt. Materials radioactive associated p packaging, s e from LAC will be loade MN where made in acc associated nd dismantle ties. The ac lso be appli ecommission NUREG-0586 less at LAC uipment failu the LACBW categorized a stible materia non-fuel rel An analysis o ning was pr The NURE R.
te equire the d quipment, to s that cannot e waste. Th procedures, S shipment and CBWR will b d into appro the waste c cordance wit with an airb ement of SS cidents discu icable durin ning acciden
: 6. However CBWR due t ure, human e WR site and s as follows:
: als, lated radiolo of potential p rovided in th EG-0586 acc disposal of ools, clothing t be free rele rough the p Solutions en d control of be shipped t opriate conta container wi th Departme borne SCs in ussed ng the nts at r, the to the
: error, stored ogical public he D-cident large g and eased roper nsures solid to the ainers ill be ent of  


Upper MCrosse-BCounty hwater qulocated wbasin lansome of tThe closnorth of  
La Cross License T Revision Transpor Waste Co 8.6.2.5.
Followin radiologi remainin (excludin radiologi license w Chapter 6 criteria.
8.6.3. N 8.6.3.1.
The envi within se The LAC existing L to be con slips are onsite ra activities parking a to occur Several s roadways including remediat 636 foot waste str No sign activities comply w regulator In accord onsite are 8.6.3.2.
Only are and licen and dem se Boiling W Termination n 0 rtation (DOT ontrol Speci Radio ng the com ical surveys ng in backfi ng the ISFSI ical conditio will be termi 6 provide th Non-radiolog Onsite ironmental i ection 4.3.1 o CBWR deco LACBWR l nducted with being const ail line will
: s. Containe and equipme in a manner structures su s and rail li g piping and ed, as neces elevation w ream.
nificant env s are anticipa with applica ry requireme dance with t e considered Offsit eas within th nse terminati molition equip Water Reactor Plan T) regulation alist (WCS) ological Crite mpletion of will be perf illed structu I) meets the ns are demo nated, with he methodo gical Effects e Land Use impact assoc of NUREG-0 ommissionin icensed prop hin the LSE tructed. The be modified ers will be u ent/containe similar to w uch as the S ines, will re d tunnels, be ssary. All ot will be remo ironmental ated. In add able United ents.
the guidance d as Small.
te Land Use he existing s ion activitie pment, wast r
ns. If Class facility in A eria for Lice decontamin formed to d ure basemen unrestricted onstrated to b the exceptio ology for de s of Decomm ciated with 0586 to be g ng project is perty previou footprint. S e existing ra d and refurb unloaded an r laydown, s when the faci Switchyard, emain at lic elow the 63 ther systems oved during changes as dition to NRC States Envir e presented (in the Vicin ite licensed es (such as t te container 8-14 s B/C waste Andrews, Tex nse Termina nation, dism emonstrate t nts, any rem use criteria be below the on of the are emonstrating missioning onsite land generically c s located an usly used fo Some onsite ail line supp bished with nd loaded on storage, stag ility was ope Administrat ense termin 6 foot eleva s and compo the decomm ssociated w C requireme ronmental Pr in NUREG-nity) boundary w emporary st s, etc.). Of e is identifie xas.
ation mantlement that the dos maining pipi a specified in e unrestricte ea around th g complianc uses has be onsidered as nd executed or power gen e roads have ported the op a rail spur nsite. Onsi ging and wa erational.
tion Building nation. Sub ation will be onents as we missioning p with the sit ents, decomm rotection Ag
-0586, the p will be used torage and s f the 163.5 a ed, it will b and remed se from resid ing and soi n 10 CFR 20 ed use criteri e ISFSI. LT ce with the een determin s a Small i within the neration; all been refurb peration of t to support d ite activities aste loading g, Crib Hou surface base e radiologica ell as all stru process and te-specific d missioning a gency (USE potential imp to support d staging areas acre site, ab be shipped t diation activ dual radioac ils at LACB 0.1402. Afte ia, the 10 CF TP Chapter 5 unrestricted ned by the N impact.
boundary o work is exp bished. No b the facility.
decommissio s such as ve are and con use as well a ement struct ally assessed uctures abov disposed of decommissio activities wil EPA) and W pacts to land decommissio s for remedi bout 1.5 acre to the
: vities, ctivity BWR er the FR 50 5 and d use
: NRC, of the pected barge The oning ehicle ntinue as all
: tures, d and ve the f as a oning l also WDNR d use oning iation es are


with a povalley beDecommthe Refusouthern traffic e ndecommi8.6.3.3.LACBWSlough tpredominMississipthe reactsystems.
La Cross License T Revision located Appropri contamin These m impacts activities Land in t within a Upper M Crosse-B County h water qu located w basin lan some of t The clos north of with a po valley be Decomm the Refu southern traffic en decommi 8.6.3.3.
Water puto be proFor a di towns anriver watin Lansinriver wa40 miles The LACwell at t hPotable wse Boiling WTermination n 0 within the iate isolati onation from measures wil lassociated ws at LACBWthe vicinity five-mile rMississippi RBad Axe Ri vhas establis hality and pr owithin the Bnd use is agr ithe agricult usest munici pthe site, acr oopulation o f elow the eas tmissioning a cge at the s oend of the ntering or le issioning ac tWaterWR is locate dtributary ex tnant water uppi River as tor, river w a River wat eulled from o ncessed onsi tstance of 4 0nd cities alo nter for indus tng, Iowa, a bater for ind udownstrea mCBWR site he site. Th ewater use d uWater Reacto rPlan fence-encl oon and conthe LSE ar el also be m owith the u sWR. of the LAC Bradius, appr oRiver Natio nver Basin W ahed a Land &otection of tBad Axe Ri vicultural an dural land to rpality to the oss from th e258 consist tern bluff.
LACBW Slough t predomin Mississip the react systems.
ctivities are nouthern bou nsite will be aving the si tivities and tr Use d on the sho rtends along usage durin gcondensate ater is not cer does sup pnsite wells wte and disch a0 miles do wng the Missi strial purpos ebout 15 mil eustrial purp om. has its ow ne locations ouring decom mr  osed LSE, ntrol measu rea to the a donitored to ese of offsit eBWR site i soximately o nal Wildlif eatershed as a& Water Re sthe environ mver Watersh ed over 50%
Water pu to be pro For a di towns an river wat in Lansin river wa 40 miles The LAC well at th Potable w se Boiling W Termination n 0 within the iate isolatio nation from measures will associated w s at LACBW the vicinity five-mile r Mississippi R Bad Axe Riv has establish ality and pro within the B nd use is agri the agricultu sest municip the site, acro opulation of elow the east missioning ac ge at the so end of the ntering or le issioning act Water WR is located tributary ext nant water u ppi River as tor, river wa River wate ulled from on cessed onsit stance of 40 nd cities alon ter for indust ng, Iowa, ab ater for indu downstream CBWR site he site. The water use du Water Reactor Plan fence-enclo on and con the LSE are l also be mo with the us WR.
orecreational lLACBWR e north-sout hs of various not being p endary of theminimally ite. Conseq uthe potential res of the M ithe LACBWg the oper acooling wat currently b eply the Lo wwill support arged in acc ownstream of ssippi River es, excludin ges downstre aoses betwe en potable w aof all wells missioning o8-15 where mostres will b edjacent LA Censure their e lands are s predominane third is e & Fish Ra Geograph isource Man ment within ed. Approx of the land i sland use, si msite is the h running Hresidences, rformed in a site. Also
of the LACB radius, appro River Nation ver Basin Wa hed a Land &
,impacted d uuently, the oimpacts to lississippi R iWR site fo ration of LA Cer. With th eeing used a sw Pressure a ndecommiss iordance wit hthe site, vi rare obtaine dg the adjace nam of the s ien the LACater supply, (active and operations i st work is e instituted CBWR proper effectiven eanticipated antly rural anwater and bRefuge. W Dic Managemagement Pl athis GMU. imately 36
otection of t Bad Axe Riv icultural and ural land to r pality to the oss from the 258 consist tern bluff.
%s forested.
ctivities are n outhern boun site will be aving the si tivities and t r Use d on the shor tends along usage during condensate ater is not c er does supp nsite wells w te and discha 0 miles dow ng the Missis trial purpose bout 15 mile ustrial purpo
Tmilar to othe rvillage of GHighway 35.
: m.
has its own e locations o uring decomm r
osed LSE, ntrol measur ea to the ad onitored to e se of offsite BWR site is oximately o nal Wildlife atershed as a
& Water Res the environm ver Watershe d over 50% o recreational l LACBWR e north-south s of various not being pe ndary of the minimally i te. Consequ the potential res of the Mi the LACBW g the opera cooling wat currently be ply the Low will support arged in acco wnstream of ssippi River es, excluding es downstrea oses betwee n potable wa of all wells missioning o 8-15 where most res will be djacent LAC ensure their e lands are s predomina ne third is e & Fish R a Geographi source Man ment within ed. Approx of the land is land use, sim site is the h running H residences, rformed in a site. Also, impacted du uently, the o impacts to l ississippi Ri WR site for ation of LAC er. With the eing used as w Pressure an decommissi ordance with the site, vir are obtained g the adjacen am of the si en the LAC ater supply, (active and operations is t work is e instituted CBWR prope r effectivene anticipated antly rural an water and b Refuge. WD ic Managem agement Pla this GMU.
imately 36%
s forested. T milar to other village of G Highway 35.
farms, and any land are
farms, and any land are
, public acc euring deco moffsite land land use off siver. The Mr 3,000 fee tCBWR wase plant shut ds a cooling nd High Pr eioning task sh the site's s rtually all md from grou nnt G-3 fossi lite. There aCBWR site provided t habandoned
, public acce uring decom offsite land land use offs iver. The M r 3,000 feet CBWR was e plant shut d s a cooling nd High Pre ioning tasks h the sites s rtually all m d from groun nt G-3 fossil ite. There a CBWR site provided th abandoned) s not expect expected to to prevent erty as well ess. Thus, n from the d nd undevelo bottomlands DNR has de ment Unit (GM an (18), add The commu
)s not expec texpected t oto preven terty as wel less. Thus, nfrom the dnd undevelo bottomland sDNR has dement Unit (G Man (18), ad dThe commu% of the La There is an i nr parts of ru rGenoa, appr This small a few retail as adjacent tess to the b mmissioning areas are n osite are con sMississippi R it from nort hs the use o fdown and f umedium foessure servi cs and this w atate dischar gmunicipal wund water.
% of the La There is an in r parts of rur Genoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are no site are cons Mississippi Ri t from north s the use of down and fu medium fo essure servic s and this wa tate discharg municipal w und water. T l plant, is th are no other and Prairie hrough a sin
Tl plant, is t hare no othe rand Prairi ehrough a si n)are illustra tted to be sig o be condut the spre al as offsite ano environ mdecommissi oped. Of th es included i nesignated t hMU) and Vedressing lan dunity of Ge nCrosse-Ba dncreasing s hral Wiscons ioximately 1rural com mbusinesses ito the site o roat launch aby rail and ot affected bsidered "Sm aiver and its h to south.
)are illustrat ted to be sig o be condu t the sprea l as offsite a no environm decommissio ped. Of the s included in esignated th MU) and Ve dressing land unity of Gen Crosse-Bad ncreasing sh ral Wisconsi oximately 1 rural comm businesses i to the site or oat launch a by rail and ot affected b sidered Sma iver and its h to south.
f water fro muel removed or reactor o rce water sys ater will co nge permits.
f water from uel removed or reactor or ce water sys ater will con ge permits.
water suppli eThe nearest uhe coal-fired r known us ee du Chien
water supplie The nearest u he coal-fired r known use e du Chien, ngle groundw ted in Figure nificantly gr ucted.
,ngle ground wted in Figur enificantly g ructed. ad of areas. mental oning e area n the he La ernon d use, noa is d Axe hift of in. 1 mile munity in the r near at the truck by the all.Thief The m the from r fuel tems. ntinue es for use of plant ers of , WI, water e 8-5. reater La CrossLicense TRevisionthan the solids hoincludes
ad of areas.
 
mental oning e area n the he La ernon d use, noa is d Axe hift of in.
tank thatMississipdiscoloradownspolocated i nto water u8.6.3.4.This sectrelated t oponds, reto the weThe envsection 4a "Small"At LACBits WDNLACBWSystem (and WDNreduced erosion decommidemolitioRadiolog(ODCM)Potentialonsite m per year
1 mile munity in the r near at the truck by the all.
Thief The m the from r fuel tems.
ntinue es for use of plant ers of  
, WI, water e 8-5.
reater  


elevation201 A/BbuildingsLACBWAs the wLACBWNo adverdecommiquality a rse Boiling WTermination n 0 potable watolding tank a sanitary h t services t hppi River aation. Roof outs or throu nside the L Suse are con sWatertion evalua to surface weservoirs an dest and the Rvironmental 4.3.3 of NU R" impact.
La Cross License T Revision than the solids ho includes tank that Mississip discolora downspo located in to water u 8.6.3.4.
This sect related to ponds, re to the we The env section 4 a Small At LACB its WDN LACBW System (
and WDN reduced erosion decommi demolitio Radiolog (ODCM)
Potential onsite m per year elevation 201 A/B buildings LACBW As the w LACBW No adver decommi quality ar se Boiling W Termination n 0 potable wat olding tank a sanitary h t services th ppi River a ation. Roof outs or throu nside the LS use are cons Water tion evaluat o surface w eservoirs and est and the R vironmental 4.3.3 of NUR impact.
BWR, all no NR permits.
BWR, all no NR permits.
WR which m(WPDES) asNR Wastewthrough i mand sediissioning, s ton will be mgical impact
WR which m (WPDES) as NR Wastew through im and sedi issioning, st on will be m gical impact
) limits an dl onsite gro uonitoring w efor radiolo gns. The pla n; MW-202As in appro pWR former p rwater from WR, the ther mrse impacts issioning a cre bounded bWater Reacto rPlan ter use duri nand pumpeolding tank he LSE Tur bat outfalls.
) limits and l onsite grou onitoring we for radiolog ns. The plan
drains are egh the nor mSE. Conse qsidered "Sm ar Quality tes potentia lwater and g rd lakes. At Refuge wetla nimpact ev aREG-0586 h an-radiologi c Water mameet the Ge ns well as L Awater Permit mplementatiomentation torm water rmonitored an ds are mini md assessed t hundwater i mells at LAC Bgical analy snt's networ kA/B; MW-20riate locati orocess areas the Missi smal impact t oon surface wctivities. C oby NUREG-r ng plant po ed off by a that service sbine Buildi nRelease a rither discha rmal effluent rquently, in a call." l project ef froundwater.
; MW-202A s in approp WR former pr water from WR, the therm rse impacts issioning ac re bounded b Water Reactor Plan ter use durin and pumpe olding tank he LSE Turb at outfalls.
LACBWR, nds to the s oaluation ass as been det ecal water dis anagement pnoa site's WACBWR's W. In additi on of appro pcontrol drun-off fro md controlled mized throu ghrough the mpacts are mBWR. Repis purposes k of down g r3A/B; and Mons and qu aand potenti assippi is n oo the Missis swater and g ronsequently
drains are e gh the norm SE. Conseq sidered Sma r Quality tes potential water and gr d lakes. At Refuge wetlan impact eva REG-0586 ha n-radiologic Water ma meet the Gen s well as LA water Permit mplementatio mentation torm water r monitored and s are minim d assessed th undwater im ells at LACB gical analys nts network A/B; MW-20 riate locatio rocess areas the Missis mal impact to on surface w ctivities. Co by NUREG-r ng plant po ed off by a that services bine Buildin Release ar ither dischar mal effluent r quently, in ac all.
,-0586 and c o8-16 wer operati olocal state s the Admi nng. Storm reas are pe rrged to the grelease path wccordance wfects on th o Surface wthe nearby bouth. ociated wit hermined to becharges to t hprograms a nWDNR WiscWDNR Tier Ion, impacts priate Best during dec m active im pif necessar ygh adheren cREMP andmonitored b yresentative gwhen grou nradient well sMW-204A/Bantity to i nal release po io longer us esippi River hroundwater a, the potent ionsidered "
l project eff roundwater.
Sons. Sanit apermitted snistration B uwater runo friodically mground area way after pr owith NUREGose portions water genera lbodies of w ath surface ae generally ahe Mississi pnd practice sconsin Poll uII Industrial to the Miss Managemencommissioni npacted area sy. ce to Off-si td the groun dy the routin groundwate rndwater co ns (five pair eB) are situat entercept an dints. ed to cool has been eli mare expecte dial impacts Small." ary wastes asanitary wa suilding and aff is divert emonitored fosurroundin gocessing thr uG-0586, the pof the nat ully refers t oater are the Mand ground wapplicable t oppi River ar es have bee nutant DischStorm Wat esissippi Riv ent Practices ng operatis undergoin te Dose Ca ldwater monne sampling r samples a rnditions are ed wells: M Wed around t hd detect co noperating pminated. d from the i mto surface are collecte dste hauler.
: LACBWR, nds to the so aluation ass as been dete cal water dis anagement p noa sites W ACBWRs W
a sanitary h oed directly t or oil shee ng the facilit yu an oil sep apotential i mural enviro no streams, r iMississippi Rwater quali o LACBWRe controlled un implemen targe Elimi ner General Per will be g r (BMP) fo rions. Dg remediati olculation M nitoring pro gof 10 perm re obtained tat low and W-200A/B; he key LAC Bntamination plant syste mmplementati and ground wd in a This olding to the n and y thru arator mpacts nment ivers, River ty in R with under ted at nation Permit reatly r soil During on or anual gram. anent twice high MW-BWR from ms at on of water La CrossLicense TRevision8.6.3.5.The envi0586 hasLACBWrequiremBMP to msources sfrom the
. In additio n of approp control d
run-off from d controlled mized throug hrough the mpacts are m BWR. Rep is purposes k of down gr 3A/B; and M ons and qua and potentia ssippi is no o the Mississ water and gr onsequently,
-0586 and co 8-16 wer operatio local state s the Admin ng. Storm reas are per rged to the g release pathw ccordance w fects on tho Surface w the nearby b outh.
ociated with ermined to be charges to th programs an WDNR Wisc WDNR Tier I on, impacts priate Best during dec m active imp if necessary gh adherenc REMP and monitored by resentative g when groun radient wells MW-204A/B antity to in al release poi o longer use sippi River h roundwater a
, the potenti onsidered S ons. Sanita permitted s nistration Bu water runof riodically m ground area way after pro with NUREG ose portions water general bodies of wa th surface a e generally a he Mississip nd practices consin Pollu II Industrial to the Miss Managemen commissionin pacted areas
: y.
ce to Off-sit d the ground y the routin groundwater ndwater con s (five paire B) are situate ntercept and ints.
ed to cool has been elim are expected ial impacts Small.
ary wastes a sanitary was uilding and a ff is diverte monitored fo surrounding ocessing thru G-0586, the p of the natu lly refers to ater are the M and groundw applicable to ppi River are s have been utant Disch Storm Wate sissippi Rive nt Practices ng operati s undergoin te Dose Cal dwater mon ne sampling r samples ar nditions are ed wells: MW ed around th d detect con operating p minated.
d from the im to surface are collected ste hauler.
a sanitary ho ed directly t or oil sheen g the facility u an oil sepa potential im ural environ o streams, ri Mississippi R water quali o LACBWR e controlled u n implement arge Elimin er General P er will be gr (BMP) for ions.
D g remediatio lculation M nitoring prog of 10 perm re obtained t at low and W-200A/B; he key LACB ntamination plant system mplementati and groundw d in a This olding to the n and y thru arator mpacts nment
: ivers, River ty in R with under ted at nation Permit reatly r soil During on or anual gram.
anent twice high MW-BWR from ms at on of water  


Fugitive demolitiocontrolleRadiationexcessivesuppressiDemolitispecificaAppropriextendedimpactedNo adveractivitie sconsidere8.6.3.6.The envNUREG-impact.
La Cross License T Revision 8.6.3.5.
The aquaHouse atapproximdisturbeddecommifauna in removal Various these aquincluded Plans forequipmenSolutionsperformese Boiling WTermination n 0 Air Qironmental is been deter mWR complies ments of the Wminimize f usuch as the facility. dust will on of concrd demolitio nn Protectio ne or harmf uion by misti nion equipm eations whic hiate Health ad periods of d by exhaust rse impacts  
The envi 0586 has LACBW requirem BMP to m sources s from the Fugitive demolitio controlle Radiation excessive suppressi Demoliti specifica Appropri extended impacted No adver activities considere 8.6.3.6.
: s. Consequ eed "Small."
The env NUREG-impact.
Aquatvironmental
The aqua House at approxim disturbed decommi fauna in removal Various these aqu included Plans for equipmen Solutions performe se Boiling W Termination n 0 Air Q ironmental i s been determ WR complies ments of the W minimize fu such as the facility.
-0586 has batic habitat at the shore lmately 110 fed during th eissioning a cthe Missis sof the diffu sfresh water uatic enviro 53 species ar the demo lnt by barge.
dust will on of concr d demolition n Protection e or harmfu ion by mistin ion equipme ations which iate Health a d periods of d by exhaust rse impacts
s will conti ned within a pWater Reacto rPlan uality impact eval umined to be gwith all ap pWDNR and ugitive dust dplant's die sbe genera tete buildin gn and disman, Environm eul dust emis sng water wi lent will be h will pre vand Safety a operation t oemissions.
: s. Conseque ed Small.
on air qua lently, the po tic Ecology impact ev abeen deter mat LACBWRline to the feet from th ee initial cotivities is n osippi River ser structure
Aquat vironmental
,fish speci enments. A and 19 fami llition of str u Conseque nnue to mai npplicable li mr  uation asso cgenerally ap plicable Fe dthe Wisco nduring dem osel generato rted from vg structures antlement te cental, and Ssions are n oll be used to operated a nvent excess issessments ao ensure th ality are exp etential imp aaluation as smined to be R includes t hdiffuser str ue shoreline.
-0586 has b atic habitat a t the shorel mately 110 fe d during the issioning ac the Mississ of the diffus fresh water uatic enviro 53 species a r the demol nt by barge.
nstruction oot expected and also n e, which shar es, macro-in 1980 stud ylies (19).
s will contin ed within ap Water Reactor Plan uality impact evalu mined to be g with all app WDNR and ugitive dust d plants dies be generat ete building n and disma n, Environme ul dust emiss ng water wil ent will be h will prev and Safety a operation to emissions.
uctures at Lntly, there is ntain WDNRmits. Protec t8-17 ciated with plicable to Lderal and St ansin Bureau oolition and d rs are no lo nvarious dec oand the ex cchniques, w iSafety and Hot generate dmitigate du nd maintai nive exhaust and controls at personne lected from tacts to air q usociated wi tgenerally a phe area fro mucture that Habitats a sof the facil to disturb eearby River es a line wit vertebrate py indicated tLACBWR dno impact t oR permits a ntion of the nair quality iLACBWR wate air qual iof Air Man aecommissio nger in ser vommissioni ncavation of ith appropri aHealth staff,  
on air qual ently, the po tic Ecology impact eva been determ at LACBWR line to the feet from the e initial co tivities is no sippi River ser structure, fish specie nments. A and 19 famil lition of stru Consequen nue to main pplicable lim r
: d. As nece sst emission sned in acc oemissions s will also b el and the e nthe implem euality are b oth aquatic epplicable t om the intake extends ou tssociated w ility. How eexisting aq utributaries, th the G-3 f opopulations, that the po pdo not incl uo the shoreli nnd decommnearby Ref uin section 4 with a "Smal lity regulati oagement, anning activit ivice and ha vng activitie ssoil. Care ate assessm ewill be co nssary, meas us. ordance wit hfrom defe ce establishe dnvironment aentation of dounded by Necology in o LACBWRstructure in tt into the Mith this are aever, the i muatic habitat sstreams an dossil station, and veget apulation of fude the rem one from thi smissioning o puge wetland s.3.4 of NU Rl" impact.
uation assoc generally ap plicable Fed the Wiscon during demo sel generator ted from v g structures antlement tec ental, and S sions are no ll be used to operated an vent excessi ssessments a o ensure tha lity are expe tential impa aluation ass mined to be R includes th diffuser stru e shoreline.
ons, includi nd will impl eies. Air em ive been re ms, includin gful plannin gents by Sol unducted to e nures such a sh manufact uctive equip md during ex pare not adv edecommissi oNUREG-0586section 4.3 R with a "S mtegral to th eMississippi Ra were previ mplementati os, their flor ad wetlands.
nstruction o ot expected and also ne
is not plan nation exist wfish near th eoval of wa ss type of act iperations w is and habit aREG-ng the ement ission moved g the g and utions nsure s dust urer's ment. pected ersely oning 6 and .5 of mall" e Crib River ously on of a and The ned. within e site ste or ivity. ill be ats is, La CrossLicense TRevisionand will operationExotic sreproducWhile thrusty cra yones in tconductethe site.
, which shar es, macro-in 1980 study lies (19).
A studymacrochiand chan& Fish Rperformesubsequefossil st arequire aconstructaquatic aThe pote0586 andThe poteand cons8.6.3.7.The envibeen deteNo knowdecommiappropriaThe landthe formafrom theprevalentoperationonsite haaddition, that the dto the so udemolitioanticipat ese Boiling WTermination n 0 continue t ons. species ca ntion or sur vhere are so myfish, etc.)
uctures at L ntly, there is ntain WDNR mits. Protect 8-17 ciated with plicable to L deral and Sta nsin Bureau o olition and d rs are no lon various deco and the exc chniques, wi Safety and H ot generated mitigate du nd maintain ive exhaust and controls at personnel ected from t acts to air qu sociated wit generally ap he area from ucture that Habitats as of the facil to disturb e earby River es a line wit vertebrate p y indicated t LACBWR d no impact to R permits an tion of the n air quality i LACBWR w ate air quali of Air Mana ecommissio nger in serv ommissionin cavation of ith appropria Health staff,
ithe vicinity ed at LACB W  of the i mirus), fresh wnnel catfish (Refuge Pool ed in 1980.
: d. As neces st emissions ned in acco emissions s will also be l and the en the impleme uality are bo th aquatic e pplicable to m the intake extends out ssociated wi lity. Howe existing aqu tributaries, th the G-3 fo populations, that the pop do not inclu o the shorelin nd decomm nearby Refu in section 4 with a Small ity regulatio agement, an ning activiti vice and hav ng activities soil. Care ate assessme will be con ssary, measu
ent shutdow nation, has fu rany operati otion, demoli areas beyon dential impac td considered ential impac tidered to be Terresironmental i mermined to bwn terrestr iissioning p rate BMPs a rd around L Aation of ab oe Mississip pt in surroun dns associate dabitats for m with the s hdirect heav yuth, no dire con activities ed impact t oWater Reacto rPlan o be a prior in threaten nvival rate, ame known a qn Vernon C of the LAC WR have nompingement water drum
: s.
((Ictalurus p u9 navigatio n It was d en of LACBWrther reduce dons resultin gtion, materi ad the site bo uts to the aq uto be "Sma lts to the aq u"Small."
ordance with from defec e established nvironment a entation of d ounded by N ecology in o LACBWR structure int t into the M ith this area ever, the im uatic habitats streams and ossil station, and vegeta pulation of f ude the remo ne from this missioning op uge wetlands
strial Ecolo gmpact eval ube generally ial exotic oroject area.
.3.4 of NUR l impact.
re, and will cACBWR wasout 27 acres pi River. Tding areas.
ons, includin d will imple ies. Air emi ve been rem s, including ful planning ents by Solu nducted to en ures such as h manufactu ctive equipm d during exp are not adve decommissio NUREG-0586 section 4.3 R with a Sm tegral to the Mississippi R a were previ mplementatio s, their flora d wetlands.
d with G-1 many plant a nhort-term na t constructio nct impacts t odo not incl uo the shoreli nr  ity when pl anative spe cand disease squatic invasi ounty, thes eBWR site (
is not plann ation exist w fish near the oval of was s type of acti perations wi s and habita REG-ng the ement ission moved g the g and utions nsure s dust urers ment.
ot resulted i nand entrai n(Aplodinotu unctatus),
pected ersely oning 6 and  
wn areas fro metermined t hWR and red ud this impa cg in any i mal and wast eundary. uatic ecolog yll."  uatic ecolog ygy uation of ter rapplicable t oor invasive  To minim continue to bs initially di sby filling ri vherefore, t hGiven the eand G-3 a snd animal s pture of the wn and demo o any off-sit eude the rem one. 8-18 anning onsi tcies and e cs or parasit eve species (e have been n20). The o pn the introd unment of ts grunniens
.5 of mall e Crib River ously on of a and The ned.
)within the U pm the operati ohat the imp auced intake oct. Decom mmpingement e staging or y within the y beyond th erestrial ecol oo LACBWRspecies h ize the intr obe followed.
within e site ste or ivity.
sturbed by t hver edge an dhe site shor eextensive la ns well as L Apecies, incl uwork associ alition proje ce sensitive s poval of wast ete dismantl ecosystems des they ma y(e.g. zebra mnoted in slo uperation an duction of an ythe fishes,
ill be ats is,  
), gizzard s hpper Missis son of LACBact was mo operations, lmissioning o pand entrai ntransfer op esite bound ae site bound aogy in secti oR with a "S mhave been noduction o fthe construc td low fores teline no lo nnd disturbancACBWR, thuding endan gated with d ect area is se ppecies are a ne or equip mement or w adue to aggy transmit t omussel, curl yughs and la kd decommisy aquatic i nsuch as b lhad (Dorososippi River NBWR and G-st likely in slimited to s uperations ar enment impaerations wil lary are bou nary have al son 4.3.6 of Nmall" impact.
noted to of exotic or ition of the ft areas with nger resembce, constru che terrain h gered or inv ecommissio nparated fro mnticipated.
Sment by barg easte manag egressive gr oo native sp ey-leaf pond wkes other th asioning acti vnvasive spec iluegill (Le poma cepedi aNational W i-3 was previ significant.
upporting th ee not expec tacts to fish.
l be perfor mnded by NU Rso been eval uNUREG-058. occur withi ninvasive sp efacility, incl umaterial dr eles the sho rction and ye aas not sup pasive speci ening and th em the Refug eSince the pl ae, there is al ement owth, ecies. weed, an the vities ies to pomis anum) ildlife ously  The e G-3 ted to  No med in REG-uated 6 has n the ecies, uding edged reline ars of ported es. In e fact e area anned so no La CrossLicense TRevisionBest Manspills res The pote"Small."


The poteevaluated8.6.3.8.
La Cross License T Revision and will operation Exotic s reproduc While th rusty cray ones in t conducte the site.
The poteand cons A reviewEndangetwo specwhich LAA mMissiA plafacinNo noteddue to ththe exist iRiver to terrestri apresence
A study macrochi and chan
& Fish R performe subseque fossil sta require a construct aquatic a The pote 0586 and The pote and cons 8.6.3.7.
The envi been dete No know decommi appropria The land the forma from the prevalent operation onsite ha
: addition, that the d to the sou demolitio anticipate se Boiling W Termination n 0 continue to ns.
species can tion or surv here are som yfish, etc.) i the vicinity ed at LACBW of the im irus), freshw nnel catfish (
Refuge Pool ed in 1980.
ent shutdown ation, has fur any operatio tion, demoli areas beyond ential impact d considered ential impact idered to be Terres ironmental im ermined to b wn terrestri issioning pr ate BMPs ar d around LA ation of abo e Mississipp t in surround ns associated abitats for m with the sh direct heavy uth, no direc on activities ed impact to Water Reactor Plan o be a priori n threaten n vival rate, a me known aq n Vernon C of the LAC WR have no mpingement water drum (
(Ictalurus pu 9 navigation It was de n of LACBW rther reduced ons resulting tion, materia d the site bou ts to the aqu to be Smal ts to the aqu Small.
strial Ecolog mpact evalu be generally ial exotic o roject area.
re, and will c ACBWR was out 27 acres pi River. T ding areas.
d with G-1 many plant an hort-term nat construction ct impacts to do not inclu o the shorelin r
ity when pla native spec and diseases quatic invasi ounty, these BWR site (
ot resulted in and entrain (Aplodinotu unctatus), w n areas from etermined th WR and redu d this impac g in any im al and waste undary.
uatic ecology ll.
uatic ecology gy uation of terr applicable to or invasive To minim continue to b s initially dis by filling riv herefore, th Given the e and G-3 as nd animal sp ture of the w n and demo o any off-site ude the remo ne.
8-18 anning onsit cies and ec s or parasite ve species (
e have been n 20). The op n the introdu nment of t s grunniens) within the Up m the operatio hat the impa uced intake o ct. Decomm mpingement e staging or y within the y beyond the restrial ecolo o LACBWR species h ize the intro be followed.
sturbed by th ver edge and he site shore extensive lan s well as LA pecies, inclu work associa lition projec e sensitive sp oval of waste te dismantle cosystems d es they may (e.g. zebra m noted in slou peration and uction of any the fishes,
), gizzard sh pper Mississ on of LACB act was mo operations, l missioning op and entrain transfer ope site bounda e site bounda ogy in sectio R with a Sm have been n oduction of the construct d low forest eline no lon nd disturbanc ACBWR, th uding endang ated with de ct area is sep pecies are an e or equipm ement or wa due to agg y transmit to mussel, curly ughs and lak d decommis y aquatic in such as bl had (Doroso sippi River N BWR and G-st likely ins limited to su perations are nment impa erations will ary are boun ary have als on 4.3.6 of N mall impact.
noted to o f exotic or i tion of the f t areas with nger resemb ce, construc he terrain h gered or inv ecommission parated from nticipated. S ment by barge aste manage gressive gro o native spe y-leaf pondw kes other tha sioning activ nvasive speci luegill (Lep oma cepedia National Wi
-3 was previ significant.
upporting the e not expect acts to fish.
l be perform nded by NUR so been evalu NUREG-058 occur within invasive spe facility, inclu material dre les the shor ction and yea as not supp asive specie ning and the m the Refuge Since the pla e, there is al ement
: owth, ecies.
: weed, an the vities ies to pomis anum) ildlife ously The e G-3 ted to No med in REG-uated 6 has n the
: ecies, uding edged reline ars of ported es. In e fact e area anned so no


been notHiggins eLikewiseWisconsiHabitat Plimestonetownshipfor this pThe PereSpecies lof falconprotectiodelisted
La Cross License T Revision Best Man spills res The pote Small.
The pote evaluated 8.6.3.8.
The pote and cons A review Endange two spec which LA A m Missi A pla facin No noted due to th the existi River to terrestria presence been not Higgins e Likewise Wisconsi Habitat P limestone township for this p The Pere Species l of falcon protectio delisted hatching decommi falcon re se Boiling W Termination n 0 nagement Pr ulting from ential impac ential impac d and consid Threa ential impact idered Sma w of the U ered, Propos cies are desig ACBWR res mussel specie issippi River ant species, g slopes: Th d adverse im he siting and ing G-3 foss the west and al or aquatic of the Higg ted. A mus eye pearlym e, the Northe in Departme Program (22 e cliffs over ps within Ve plant species egrine Falcon list in 1975 n nesting box n (23). Ove in 1999 (24 efforts. S issioning wi covery effor Water Reactor Plan ractices and equipment o cts to terres cts to the t dered to be atened or End ts to Threa all.
U.S. Fish an sed, and Ca gnated as T sides in:
es, Higgins r: Endanger Northern m hreatened.
mpacts to aqu operation of sil station, th d the rail lin habitats wh gins eye pea ssel survey o mussels were ern monksho ent of Agri
: 2) has noted r creeks and ernon County to be impac n (Falco per and starting xes at its fac erall, Peregr 4); however, Since the G ill not interf rt and popula r
d site proced operation.
strial ecolog terrestrial ec Small.
dangered Sp atened or E nd Wildlife ndidate Spe Threatened eye pearly red.
monkshood uatic species f the LACBW he majority o e and Highw hich may be arlymussel i of the Thief found.
ood has not culture, Tra that the Nor d streams an
: y. This hab cted by decom regrinus) we g in 1993, D cilities, inclu ine Falcon r Dairyland G-3 facility fere with G-ation.
8-19 dures require gy are boun cology beyo pecies Endangered Service lis ecies County or Endang ymussel (La (Aconitum n have been n WR facility, of the licens way 35 to the inhabited by n mussel be f Slough riv been noted ade & Cons rthern monk nd the plant bitat is not p mmissioning ere put on the airyland sup uding at the G restoration p has continue will still c
-3 operation e prompt cle nded by NU ond the site species are sting, the F ty Distributi ered within ampsilis hig noveborance noted during
, as well as t sed site, situ e east, is dev y threatened eds in the vi ver area was on or in the sumer Prote kshoods hab is present i present withi g operations e Wisconsin pported reco G-3 stack, to program effo ed to maint continue ope ns or its stac eanup and re UREG-0586 e boundary e bounded b Federally-Lis ion (21) con n Vernon Co gginsii), with ense), with plant operat the previous uated betwee veloped and d or endange icinity of LA s conducted e vicinity of ections End bitat is leach in the White in or near th n Endangered overy efforts o support ch orts resulted tain the G-3 erations and ck, there is emediation o 6 and consid have also by NUREG-sted Threat ncluded that ounty, the co h habitat in habitat in n tions. In gen G-1 facility en the Missis does not su ered species.
ACBWR ha d in 1978 an LACBWR.
dangered Sp hed sandston estown and he LACBWR d and Threat s with install hick hatching in the bird b nesting site d the LACB no impact t of oil dered been
-0586
: tened, only ounty n the north-
: neral, y, and ssippi upport The as not nd no The pecies e and Stark R site tened lation g and being e and BWR to the


hatching
La Cross License T Revision 8.6.3.9.
Occupati considere The envi NUREG-impact.
programs also duri are those ergonom Solutions contracto prevent o with fed States Oc Typical following Safet Safet Provi Work speci such Obtai Invol packa Issuin lesson Hold reinfo 8.6.3.10.
A detaile LTP.
8.6.3.11.
LACBW efficient with som se Boiling W Termination n 0 Occup ional issues/
ed Small.
ironmental i
-0586 has b While decom s addressing ing repair an e related to mic, and biolo s is commi or health and occupational eral and sta ccupational H contractor g:
ty training as ty emphasis iding all wor ker training ific worker q as heavy equ ining and rev lving Health ages and par ng periodic ns learned.
ing safety s orce safety e Cost ed discussion Socio WR was shut to operate.
me projects Water Reactor Plan pational Issu safety has b impact evalu been determ mmissioning g worker saf nd refueling o human he ogical hazard itted to dec d safety prog l injuries an ate regulatio Health and S safety pract s a part of th as the first to rkers with a and require qualification uipment dem viewing Safe h and Safet rticipating in safety mess stand-downs events and le n of the site economic Im down in 19 By 1994, so associated r
ues/Safety een evaluate uation assoc mined to be g involves in fety were im outages. T ealth and sa ds. Radiolog commissioni grams to effe d illnesses.
ons including Safety Admi tices and c he site access opic of discu Health and S ed certificati ns. Certain s molition firm fety Data She ty staff in n pre-job wal ages to com s whenever essons learne decommissi mpacts 987 as the sm ome increme with the r 8-20 ed to be boun ciated with generally ap ncreased indu mplemented The occupati afety, includ gical impact ing LACBW ectively cont Contractor g Wisconsin inistration (O communicati s program fo ussion at me Safety bookl ions review specialty sub ms.
eets for chem reviewing lkdowns, wo mmunicate aw serious saf ed site-wide.
ioning proje mall size of ental decomm removal of nded by NU occupationa pplicable to ustrial activi during the ional issues ding impact ts were discu WR safely trol hazards health and s n Departme OSHA) requ ions will in or all employ eetings.
let.
w prior to as bcontractors micals bough and approv ork condition wareness of fety events ect costs is p f the plant d missioning p the RPV i UREG-0586 al issues in o LACBWR ities and safe operation of and safety ts from phy ussed in sect through the in the work safety progr ent of Labor uirements.
nclude actio yees and sub ssignment to are mobiliz ht onsite.
ving decomm n assessmen f significant occur to c presented in did not make planning and in 2007 an and the imp section 4.3.
R with a Sm fety focus, si f the facility impacts ass ysical, chem tion 8.6.2.
e applicatio environmen rams will co r and the U ons such as b-contractors o tasks requ zed, as neces missioning nts and review safety issue ommunicate Chapter 7 o e it economi d activities b d other me pact is 10 of mall imilar y and essed
: mical, on of nt and omply United s the
: s.
uiring
: ssary, work ws.
s and e and of this ically began etallic


decommifalcon re se Boiling WTermination n 0 nagement P rulting from ential impa cential impa cd and consi dThreaential impac tidered "Sm aw of the Uered, Propo scies are desi gACBWR resmussel speci eissippi Rive rant species, g slopes:  T hd adverse i mhe siting and ing G-3 fos sthe west an dal or aquatic of the Hig gted. A mu seye pearly me, the North ein Departm eProgram (22e cliffs ove rps within V eplant species egrine Falco nlist in 1975 n nesting bo xn (23). Ov ein 1999 (2 4efforts.
La Cross License T Revision radioactiv complete periodic the ISFSI More ac timefram obtained personne activities increased project an Therefor impact is 8.6.3.12.
Sissioning w icovery effo rWater Reacto rPlan ractices an dequipment octs to terre scts to the tdered to be "
The perc Vernon C Crosse) a impact to Decomm transport Highway relative t There is impacted site speci 8.6.3.13.
atened or Endts to "Thre aall." U.S. Fish a nsed, and Ca gnated as "
A review May 201 historical the plant Archeolo which wa Also, as along Hi the USA Upper M Axe. Th first nucl marker a concerns se Boiling W Termination n 0 ve compone ed by 2012.
Tsides in:
spikes in w I project) (2 ctive decom me. Some o from outsid el from the lo s will have a d use of the nd workers w e, the socio s considered Enviro centages of County are q and more po o the greater missioning ac t equipment y 35 traversin o rail and tru no reason d by the deco ific impact i Cultur w of the N 5 and the W l sites in Ve
es, Higgins r:  Endange rNorthern mhreatened.
: t. The close ogical Site ne as certified b indicated in ghway 35 in CE Lock an Mississippi. T he third was lear generati t the waysid associated w Water Reactor Plan ents over th Staff size at orkforce hir 5).
mpacts to aq uoperation o fsil station, t hd the rail linhabitats w hgins eye pe assel survey omussels were ern monksh oent of Agri
mmissioning of the labor de Wisconsi ocal and reg a short-term local craft w with supplie oeconomic i Small.
: 2) has noted r creeks an dernon Count yto be impa cn (Falco perand startin gxes at its fa cerall, Peregr 4); however, Since the Gill not inter frt and popul ar  d site proce doperation.
onmental Ju low-income quite low, a opulated Wi population, ctivities will and debris.
strial ecolo gterrestrial e cSmall."
ng north-sou uck transpor to believe ommissionin s considered ral, Historic, National Park Wisconsin H ernon County est historical ear Stoddard by the Nation n NUREG-0 n Vernon Co nd Dam No.
dangered S patened" or "
The second, s adjacent to ing plant. In de across Hig with having r
End Wildlife ndidate Sp eThreatened" eye pearl yred. monkshood uatic species f the LACB Whe majority oe and High which may be arlymussel i of the Thie ffound. ood has not culture, Tr athat the No rd streams a ny. This ha bcted by deco mregrinus) weg in 1993, D cilities, incl uine Falcon r Dairyland G-3 facility fere with G
he past 7 ye t the plant ha ring to suppo and struct tasks requi in; however, gional areas m positive ec workforce a es and servic impact is ev ustice e and minor approximatel sconsin coun including sp cause slight The truck t uth by the si rtation as a re that low-in ng project.
-ation. 8-19 dures requir egy are bouncology bey opecies Endangered "Service li secies' Coun tyor "Endang ymussel (La(Aconitum nhave been nWR facility
d Small.
,of the licen sway 35 to th einhabited b yn mussel b ef Slough ri vbeen noted ade & Consrthern mon knd the plant bitat is not pmmissionin gere put on th eairyland supuding at the Grestoration phas continu ewill still c-3 operatio ne prompt cl ended by NUond the sit e" species ar esting, the Fty Distribut iered" withi nampsilis hi gnoveboranc enoted during
, and Archeo k Service N Historical So y and no str l site with pr d, WI. locate nal Park Ser 191, the Sta ounty. One i
, as well as tsed site, situ e east, is de vy threatene deds in the v iver area wason or in th esumer Prot ekshood's ha bis present ipresent with ig operationse Wisconsi npported rec oG-3 stack, t oprogram eff oed to maint continue op ens or its sta ceanup and r eUREG-0586e boundary e bounded bFederally-Li sion (21) conn Vernon C ogginsii), withense), with plant opera tthe previous uated betwe eveloped and d or endang eicinity of L As conducte de vicinity of ection's Endbitat is leac hin the Whit ein or near t
: 8. It descri
: h. n Endangere dovery effort so support c horts resulted tain the G-3 erations an dck, there is emediation o6 and consi dhave also by NUREG-sted Threa tncluded that ounty, the c oh habitat i nhabitat in ntions. In ge n G-1 facilit yen the Missi sdoes not s uered species.
, about 7.5 m o LACBWR n 2009, crew ghway 35 fro a public-acc 8-21 ears. A sm as gradually ort specific tural demoli ire specializ
ACBWR had in 1978 a nLACBWR. dangered S phed sandston estown and he LACBWRd and Threa ts with instal lhick hatchin gin the bird b nesting sit ed the LACBno impact tof oil dered been -0586 tened, only ounty n the north-neral, y, and ssippi upport  The as not nd no The pecies e and Stark R site tened lation g and being e and BWR to the La CrossLicense TRevision8.6.3.9.OccupaticonsidereThe enviNUREG-impact.
, some of th surrounding conomic imp and opportun es.
programsalso duriare thoseergonomSolutionscontractoprevent owith fedStates OcTypical followingSafetSafetProviWorkspecisuch ObtaiInvolpackaIssuinlessonHoldreinfo8.6.3.10.A detaileLTP. 8.6.3.11.LACBWefficient with somse Boiling WTermination n 0 Occupional issues/
valuated to ity groups w ly 3%, and nties further pecial group t increases i traffic will u ite. There esult of deco ncome and m Per NUREG ological Res National Reg ociety (29) th ructures in th re-historical ed approxima rvice in 1980 ate of Wisco is about a ha ibes the orig miles south o R and comme ws erected a om the site (
ed "Small."
cess marker o mall ISFSI f y been reduce project need ition is ant zed skills an he workforc g the site. O pact on the nities for loc be bounded within the V lower than r from the L ps, is expecte in truck traff use existing will be no e ommissionin minority po G-0586 and ources gister of H through May he village o l structural r ately 7 miles 0 (30).
ironmental i-0586 has bWhile deco ms addressin ging repair a ne related t omic, and biol os is commior health an doccupationa leral and st accupational Hcontractor g: ty training a sty emphasis iding all worker training ific worker qas heavy eq uining and re vlving Healt hages and pa rng periodic ns learned.
onsin has pla alf mile nort gin of the pr of the plant, emorates th a new, updat (31). This ne on Dairylan facility hold ed as operat ds (e.g. 40 p ticipated in nd equipmen e will be co Overall, the d local comm cal business d by NURE Village of G those in larg LACBWR si ed.
ing safety sorce safety eCost ed discussio nSocioWR was shut to operate.
fic to and fro main street environment ng.
me projects Water Reacto rPlan pational Iss usafety has bimpact eval ubeen deter mmmissionin gg worker sa fnd refueling o human heogical hazar ditted to de cd safety pro gl injuries an ate regulati oHealth and Ssafety prac ts a part of t has the first t orkers with a and requir equalificatio nuipment de mviewing Sa feh and Safe trticipating i nsafety mess stand-downsevents and l en of the site economic I mdown in 1 9By 1994, s oassociated r  ues/Safety een evaluat euation asso cmined to be g involves i nfety were i moutages.
opulations w this evaluat Historic Plac y 2015 ident f Genoa or w remnants is s north of th aced three h th of LACBW resent system
Tealth and s ads. Radiolo gcommission igrams to eff ed illnesses.
, highlights t e plant itsel ted Wisconsi ew location d property.
ons includin gSafety Adm itices and che site acces sopic of disc uHealth and Sed certificat ins. Certain smolition fir mfety Data Sh ety staff in n pre-job wa lages to co ms whenever essons learn edecommiss impacts 987 as the s mome increm ewith the r8-20 ed to be bou nciated with generally a pncreased ind umplemented The occupat iafety, inclu dgical impact ing LACBWectively con tContractor g Wisconsi ninistration (
ding 5 casks tions ceased, personnel sta n the 2016-nt which wi omprised of decommissio munity due t ses to suppor EG-0586 and Genoa as we ge cities (e.
Ocommunicat is program f oussion at me Safety book lions revie wspecialty su bms. eets for che mreviewing lkdowns, w ommunicate a wserious sa fed site-wide
ite (26) (27) om LACBW routes, prim tal justice im will be adve tion, the pote ces (28) thr tified only a within 5 mil the Goose I he LACBWR historical ma WR, overloo m of locks o the Battle of lf as Wiscon in state histo resolved sec s was
.ioning proj emall size o fental decom mremoval of nded by N Uoccupation applicable t oustrial activ iduring the ional issues ding impac tts were disc uWR safelytrol hazards health and sn Departme OSHA) requions will i nor all emplo yeetings. let. w prior to a sbcontractors micals boug hand appro vork conditio nwareness o f fety events
, with affing
. ect costs is pf the plant dmissioning pthe RPV iUREG-0586 al issues in o LACBWRities and sa feoperation o fand safety ts from ph yussed in sec tthrough th ein the work safety prog rent of Labo ruirements.
-2017 ill be f craft oning to the rt the d the ell as
nclude acti oyees and su bssignment t o are mobili zht onsite.
: g. La
ving decom mn assessme nfsignificant occur to c presented in did not mak eplanning an din 2007 anand the imp section 4.3.
. No WR to marily mpact ersely ential rough a few les of Island R site, arkers oking on the f Bad nsins orical curity
R with a "S mfety focus, s if the facilit yimpacts ass ysical, che mtion 8.6.2.
e applicati oenvironme nrams will cor and the Uons such a sb-contractor so tasks req uzed, as nece smissioning nts and revie wsafety issue ommunicat eChapter 7 oe it econom id activities bd other m epact is 10 of mall" imilar y and essed mical, on of nt and omply United s the s. uiring ssary, work ws. s and e and of this ically began etallic La CrossLicense TRevisionradioacti vcompleteperiodic the ISFSIMore actimeframobtained


personneactivitie sincreasedproject a nTherefor impact is8.6.3.12.The percVernon CCrosse) aimpact toDecommtransportHighwayrelative tThere is impactedsite spec i8.6.3.13.A reviewMay 201historica lthe plantArcheolowhich waAlso, as
La Cross License T Revision Dairylan presents or catego Land di primarily Land tha the const station) w erosion c Based on transport impact on 0586 an Archaeol 8.6.3.14.
The envi 0586 has The impa disturban complete removed River. T completi Therefor NUREG-8.6.3.15.
The envi has been LACBW 475 feet north sid south sid hospitals approxim Noise ge equipmen temporar complete experienc se Boiling W Termination n 0 d sent an un the control r orize any par isturbance fo y shipped via at was distur truction and were perform controls and n the historic tation of sys n cultural, h nd based u logical Reso Aesth ironmental i s been determ act of decom nce and dura ed. Once all
, the aesthet The final de on of the dec e, the enviro
-0586 and th Noise ironmental i determined WR is located west of the de and a port de. There ar within 1 m mately 1 mile eneration wi nt. Noise ry and will e, noise level ced during th Water Reactor Plan nused control rod and a re rt of the LAC or the remov a rail.
rbed for proj d demolition med in acco stormwater cal informat stem compon istoric, and a upon this e ources are co hetics impact evalu mined to be g mmissioning ation. These l of the majo tics will imp etermination commission onmental im he impact is impact evalu to be genera d on the sho rail road lin tion of the U re no residen mile. The n e to the north ill primarily associated w occur prim ls in the vici he operation r
l rod to the W eplica fuel as CBWR plant val of large jects beyond of the G-1 ordance wit pollution pr ion presente nents and w archeologica valuation, t onsidered Sm uation assoc generally ap on site aesth impacts are or plant struc prove slightly on usage o ing.
mpact associ considered uation assoc ally applicab ore of the M ne. USACE Upper Missis nces within 1 earest comm h of the plan result from with decomm marily durin inity of the L n of the facili 8-22 Wisconsin H ssembly (32 t as a histori components d the nuclea fossil statio th applicable evention pla ed in NUREG waste, the de al resources.
the potentia mall.
ciated with a plicable to L hetics (e.g. v e temporary ctures and bu y by providi of the decom iated with ae Small.
ciated with n ble to LACB Mississippi R E land and L ssippi River 1,000 feet of munity, the nt.
m demolition missioning a ng daylight LACBWR s ity.
Historical Mu 2); however, ical site.
s will be min ar operationa on and the c e permits an ans.
G-0191 and ecommission
. Consequen al impacts aesthetics in LACBWR w visual skylin and will cea uildings east ing a more o mmissioned esthetics is noise in sect BWR with a River, 300 fe Lock and D National W f the station village of G n activities i and shipment hours. On site will be r useum in Ma there is no nimized as t al areas (e.g onstruction nd included d the current ning will ha ntly, as boun to Cultura n section 4.3 with a Small ne) is limited ase when dec t of the Miss open view o property wi evaluated to tion 4.3.16 o Small imp feet from the Dam No. 8 ar Wildlife & Fi structures a Genoa, Wisc nvolving he t of waste is nce the dec reduced to le adison, WI w objective to the waste w
: g. associated of the G-3 d appropriate approach fo ave no signif nded by NUR al, Historic, 3.15 of NUR l impact.
d in terms of commissioni sissippi Rive of the Missis ill be made o be bounde of NUREG-pact.
e river bank re located o sh Refuge o and no schoo consin is lo eavy constru s intermitten commissionin evels below which o save will be d with fossil e soil or the ficant REG-and REG-f land ing is er are ssippi upon ed by
-0586 k, and on the on the ols or ocated uction nt and ng is those


along Hi the USAUpper MAxe. Thfirst nuc lmarker aconcernsse Boiling WTermination n 0 ve componeed by 2012.
La Cross License T Revision Due to t impacts decommi imposed Therefor NUREG-8.6.3.16.
spikes in w I project) (2 ctive deco mme. Some ofrom outsi del from the l os will have ad use of the nd workers we, the soci os considered Envirocentages of County are qand more p oo the greater missioning a ct equipment y 35 traversi no rail and tr uno reason d by the dec oific impact i Culturw of the N5 and the Wl sites in V et. The clos eogical Site n eas certified bindicated i nghway 35 i nCE Lock a nMississippi.
The envi NUREG-impact.
The third wa slear generatit the waysi d associated wWater Reacto rPlan ents over t hStaff size a torkforce hi r5). mmissioning of the labor de Wiscons iocal and re ga short-ter mlocal craft wwith suppli eoeconomic i"Small."
During th efforts w Low leve disposal
onmental J ulow-incom equite low, aopulated Wi population, ctivities will and debris.
: addition, Texas.
ng north-so uuck transpo rto believe ommissioni ns considere dral, Historic
As stated process a and fuel These re destabiliz Therefor bounded 8.6.3.17.
,National Par kWisconsin Hernon Count yest historica lear Stoddar dby the Natio nn NUREG-0n Vernon C ond Dam No.
The envi NUREG-impact.
The second
The num than dur increased effect on barge tra support t operation Therefor by NURE 8.6.3.18.
,s adjacent t oing plant. I nde across Hi gwith having r  he past 7 y et the plant h aring to supp oand struc ttasks requ iin; however
Cumulati impact of se Boiling W Termination n 0 the distance on noise l issioning, S by the Villa e, the envir
,gional areas m positive e cworkforce aes and servic impact is e vustice e and mino rapproximate lsconsin cou nincluding s pcause sligh t The truck tuth by the s irtation as a r ethat low-i nng project.
-0586 and th Irretri ironmental im
d "Small."
-0586 has b he demolitio will be made el radioactiv site in Clive any Class B d in NUREG are the mater used for con esource com zing.
, and Arche ok Service NHistorical S oy and no st rl site with p rd, WI. locat enal Park Se r191, the St aounty. One i8. It descr i, about 7.5 mo LACBWRn 2009, cre wghway 35 fr oa public-ac c8-21 ears. A s mas graduall yort specific tural demol iire speciali z, some of t hsurroundin gconomic im pand opportu nes. valuated to ity groups wly 3%, and nties furthe rpecial grou pt increases itraffic will uite. There esult of dec oncome and mPer NUREGological Res National Re gociety (29) t hructures in t hre-historica led approxim arvice in 198 0ate of Wisc ois about a h aibes the ori gmiles south oR and comm ews erected a om the site (cess marker omall ISFSI fy been reduceproject nee dition is an tzed skills a nhe workforc g the site.
e, the enviro by NUREG Traffi ironmental i
Opact on the nities for lo cbe bounde dwithin the Vlower than r from the Lps, is expect ein truck traf fuse existing will be no eommissioni nminority p oG-0586 and ources gister of Hthrough Ma yhe village o l structural rately 7 mile s0 (30). onsin has pl aalf mile nor tgin of the p rof the plant,emorates th a new, updat (31). This n eon Dairylan facility hol ded as opera tds (e.g. 40 pticipated i nnd equipme ne will be c oOverall, the dlocal com mcal business d by NUREVillage of Gthose in lar gLACBWR sied. fic to and fr omain street environmen tng. opulations wthis evalua tHistoric Pla cy 2015 iden tf Genoa or wremnants is s north of t haced three hth of LACB Wresent syste m, highlights te plant itse lted Wisconsiew location d property.
-0586 has b mber of shipm ing the ope d traffic and n traffic flow affic. The e the operating ns.
ding 5 cask stions ceased
e, the enviro EG-0586 and Cumu ive impact is f the action w Water Reactor Plan e of the stat levels durin Solutions agr age of Genoa ronmental i he impact is ievable Reso mpact evalu been determ on and struc
,personnel st an the 2016
: e. Some me ve waste has e, Utah. Th B/C waste th G-0586, irretr rials used to nstruction m mmitments onmental im G-0586 and th c and Transp impact evalu been determ ments and th ration of th wear and te w or road we xisting barg g G-3 fossil onmental im d the impact ulative Impac s defined the when added r
-nt which w iomprised o f decommissi omunity due tses to suppo rEG-0586 an dGenoa as w ege cities (e.
tion from se ng decomm rees to com
ite (26) (27)om LACBWroutes, pri mtal justice i mwill be adv etion, the pot eces (28) thrtified only awithin 5 mi lthe Goose Ihe LACBWRhistorical m aWR, overlo om of locks othe Battle o flf as Wisco nin state hist oresolved se cs was , with affing -2017 ill be fcraft oning to the rt the d the ell as g. La . No WR to marily mpact ersely ential rough a few les of Island R site, arkers oking on the f Bad nsin's orical curity La CrossLicense TRevisionDairylanpresents
: a.
mpact assoc considered ources uation associ mined to be tural disman etals from th s been and his facility h hat is genera rievable reso decontamin machinery and are conside mpact associ he impact is portation uation assoc mined to be he volume of he facility.
ar on roadw ear. There w ge traffic on station and mpact associ t is considere cts e impact on to other pas 8-23 ensitive rece issioning an mply with a ciated with Small.
iated with irr generally ap ntlement of he site are an will continu has sufficient ated will be s ources that w nate the facili d for transpo ered to be iated with ir considered ciated with t generally ap f waste ship Non-radiolo ways. It is an will be no ra the Thief S are not asso ated with tr ed as Small the environ st, present, a eptors, there nd demoliti any noise li noise is ev retrievable r pplicable to the station, anticipated to ue to be ship t space for t shipped to th would occur ity (e.g., rag ortation of m minor and rretrievable Small.
transportatio pplicable to pped are grea ogical impac nticipated tha adioactive w Slough branc ociated with ransportation
: l.
nment which and reasonab e will be li ion activitie imitations (e valuated to resources in o LACBWR recycling an o be release pped to the the disposal he WCS fac during the d gs, solvents, materials to a are neither resources is on issues in o LACBWR ater during d cts of transp at there will waste shipme ch and the M LACBWR d n is evaluate h results from bly foreseeab imited temp es. During e.g. quiet h be bounde section 4.3.
R with a Sm nd asset reco d as clean s EnergySolu of this wast cility in And decommissio gases, and to and from the r detectable s evaluated section 4.3.
R with a Sm decommissio portation in be no signif ents execute Mississippi R decommissio ed to be bou m the increm ble future act orary g the hours) ed by 18 of mall overy scrap.
utions te. In
: drews, oning ools),
e site.
e nor to be 17 of mall oning clude ficant ed via River oning unded mental tions.


or catego  Land diprimarilyLand thathe conststation) werosion cBased ontransportimpact on0586 anArchaeol8.6.3.14.The envi0586 hasThe impadisturbancompleteremovedRiver. TcompletiThereforNUREG-8.6.3.15.The envihas been
La Cross License T Revision The cum decommi terrestria cumulativ Past, pr decommi Mississip resources activities over tim major irr disposal disposal In summ 8.7.
O 8.7.1. F Decomm Hand Work Publi Licen Work Liqui Haza Hand Characte of lead p 8.7.1.1.
The majo are admin Part 2 Part 5 Part 5 Part 6 se Boiling W Termination n 0 mulative impa issioning. T al ecology.
ve impact.
roposed an issioning of ppi river for s listed abo s are not proj e, exceed th retrievable re of low lev and will ther ary, the cum Overview of Federal Requ missioning ac dling, packag ker radiation ic radiation p nse terminati ker health an id and gaseo ardous waste dling and rem rization and aint.
Nucle ority of radio nistered by t 20 - Radiatio 50 - Decomm 51 - Environ 61 - Disposa Water Reactor Plan acts were as hese include Irretrievabl nd future f coal-fired p boating. Th ove were al jected to sig he minor im esource attri vel radioactiv refore have n mulative impa Regulation uirements ctivities that ging, and shi n protection, protection, ion and final nd safety, ous effluent r generation/
moval of asb d removal of ear Regulator ological acti the NRC. A on protection missioning a nmental prot al of radioac r
sessed by fi e surface w le resources foreseeable power plant he individual ll determine gnificantly ac mpact of the ibutable to L ve waste. N no cumulativ act to site re ns Governin are subject t ipment of rad l site release
: releases, disposition,
: estos, f Polychlorin ry Commiss ivities fall un Applicable Ti
: n.
activities.
tection.
ctive waste.
8-24 rst determin water and gro s were also e actions ts and recrea l impacts of ed to be mi ccumulate en individual a LACBWR d No future ac ve effect.
esources is pr g Decommi to federal reg dioactive wa e,
nated Biphen ion nder Title 10 itle 10 regula ning the reso oundwater, o evaluated include co ational use f the LACBW inor. The p nvironmenta activities on decommissio ctivities wil rojected to b issioning Ac gulations inc
: aste, nyls (PCBs) 0 of the Cod ations includ ources affect air quality, d from the onstruction, of the land WR decomm past, present al impacts th n the affecte oning was th ll involve r be minor.
ctivities and clude:
), and Handl de of Federa de:
ted by LACB aquatic eco e perspectiv operation as access t missioning o t and future hat would in ed resources he use of lan radioactive w d Site Releas ling and rem al Regulation BWR
: ology, ve of and to the on the e site
: total,
. The nd for waste se moval n and


LACBW475 feet north sidsouth sidhospitalsapproximNoise geequipmentemporarcompleteexperiencse Boiling WTermination n 0 d sent an u nthe control rorize any pa risturbance f oy shipped vi aat was distu rtruction an dwere perfor mcontrols and n the histo rictation of sy sn cultural, h nd based ulogical Res oAesthironmental is been deter mact of deco mnce and dur aed. Once al l, the aesthe tThe final d eon of the de ce, the envir o-0586 and t hNoiseironmental idetermined WR is locate dwest of the de and a por tde. There a r within 1 mmately 1 mil eeneration w int. Noise ry and will e, noise leve lced during t hWater Reacto rPlan nused contro lrod and a rert of the LA Cor the remo va rail. rbed for pro jd demolition med in acc ostormwater cal informat stem compo nistoric, and aupon this e ources are c ohetics impact eval umined to be gmmissioning ation. These l of the maj otics will im petermination commissiononmental i mhe impact is impact eval uto be generad on the sh orail road lintion of the Ure no reside nmile. The n e to the nort hill primarily associated woccur pri mls in the vic ihe operatio nr  l rod to the Weplica fuel a sCBWR plantval of large jects beyon dof the G-1 ordance wi tpollution pr ion present enents and warcheologic avaluation, tonsidered "S muation asso cgenerally ap on site aest h impacts ar eor plant stru cprove slightl yon usage oing. mpact assoc iconsidered "uation asso cally applica bore of the Mne. USACEUpper Missi snces within 1earest com mh of the pla nresult fro mwith decom mmarily duri ninity of the Ln of the facil i8-22 Wisconsin Hssembly (3 2t as a histori component sd the nucle afossil stati oth applicabl eevention pl aed in NURE Gwaste, the d eal resources.
La Cross License T Revision Part 7 throu Part 7 8.7.1.2.
the potenti amall." ciated with aplicable to Lhetics (e.g.
The Env Federal R Part 6 Parts Part 1 Part 1 Parts Part 2 Part 7 Part 1 8.7.2. F Permits a environm fall unde Wisc Wisc Envir Villa Occu This info intended 8.8.
ve temporary ctures and b uy by providiof the deco miated with a e"Small." ciated with nble to LAC BMississippi RE land and Lssippi River 1,000 feet o fmunity, the nt. m demolitio nmissioning ang daylight LACBWR sity. Historical M u2); however, ical site.
C As previo decommi site-spe potential predicted (NUREG environm se Boiling W Termination n 0 71 - Packag ugh 174 also 73 - Physica U.S. E vironmental Regulations 61 - Asbesto 122 to 125 -
s will be mi nar operation aon and the ce permits a nans. G-0191 an decommissio
141 - Safe D 190 - Radiat 260 to 272 -
: n. Conseque nal impacts aesthetics i nLACBWR wvisual skyli nand will ce auildings eas ting a more ommissioned esthetics is noise in sec tBWR with a "River, 300 f eLock and DNational Wf the station village of Gn activities i and shipmen thours. O nsite will be ruseum in M athere is no nimized as tal areas (e.
280 - Under 761 - Toxic 129-132 - C Federal, Stat and approval mental protec r Federal, St onsin Depar onsin Depa ronmental an ge of Genoa upational Saf ormation pro to be all-inc Conclusion ously evalua issioning LA cific in NU environmen d in and wil G-0191, NUR mental chang Water Reactor Plan ing and tran apply).
gonstruction nd include dd the current ning will h antly, as bou nto Cultur an section 4.
al Protection Environment Protection A apply as foll os Handling
3with a "Smal lne) is limite dase when de ct of the Mis sopen view oproperty w ievaluated t otion 4.3.16 o"Small" im pfeet from th eDam No. 8 a rWildlife & Fi structures aGenoa, Wis cnvolving h et of waste i snce the de creduced to l eadison, WI wobjective t othe waste wg. associate dof the G-3 d appropriat eapproach f oave no signi fnded by NU Ral, Historic, 3.15 of NU Rl" impact.
- National P Drinking Wa tion Protecti
d in terms o fcommission isissippi Riv eof the Missi sill be made o be bound eof NUREG-pact. e river ban kre located osh Refuge oand no scho oconsin is l oeavy constr us intermitte ncommissioni nevels below which o save will be d with fossil e soil or the ficant REG- and REG-f land ing is er are ssippi upon ed by -0586 k, and on the on the ols or ocated uction nt and ng is those La CrossLicense TRevisionDue to timpacts decommiimposed ThereforNUREG-8.6.3.16.The enviNUREG-impact.
- Resource C rground Stor Substance C Clean Water A te and Loca ls from or no ction purpos tate and loca rtment of Na artment of nd Occupatio a
During thefforts wLow levedisposal
fety and Hea ovided abov clusive.
: addition,
ated in the D ACBWR are UREG-0586 ntal impacts ll be bounde REG-0586, a ges associate r
nsportation o n of Plants an tal Protectio Agency (EP lows:
and Remova Pollutant Dis ater Standard ion Standard Conservatio rage Tanks Control Act (
Act al Requirem otifications t ses. Decomm al jurisdiction atural Resour Health Se onal Health, alth Adminis ve is a gene D-Plan/PSDA temporary a have been associated w ed by the p and D-Plan/P ed with decom 8-25 f radioactive nd Materials n Agency PA) regulatio al scharge Elim ds ds for Nuclea n and Recov (TSCA) for ments to state and l missioning a n include, bu rces (WDNR ervices, Div Radiation P stration (OSH eral overview AR, the non-and not signi evaluated a with decomm reviously is PSDAR). T mmissioning e waste (reg ons outlined mination Syst ar Power Op very Act (RC Polychlorina local agenci activities an ut are not lim R) vision of Protection Se HA) w of the ap radiological ificant. The and there is missioning L ssued enviro Therefore, th
: g.
gulations in 4 d in Title 40 tem (NPDES perations CRA) ated Biphen es are requir nd related sit mited to the Public Hea ection pplicable reg l environmen e potential is no significa LACBWR h onmental im here are no n 49 CFR Part 0 of the Cod S) nyls (PCBs) red for safety te operations following:
alth, Burea gulations and ntal impacts sues identifi ant impact.
have already mpact assessm new or signif ts 171 de of y and s that au of d not from ied as The been ments ficant


Texas. As statedprocess aand fuel These redestabili zThereforbounded 8.6.3.17.The enviNUREG-impact.
La Cross License T Revision 8.9.
The numthan durincreasedeffect onbarge trasupport toperationTherefor by NURE8.6.3.18.Cumulatiimpact ofse Boiling WTermination n 0 the distanc eon noise lissioning, Sby the Vill ae, the envi r-0586 and t hIrretriironmental i m-0586 has bhe demoliti owill be mad eel radioacti vsite in Cliv e any Class Bd in NUREGare the mate rused for co nesource co mzing. e, the envir oby NUREGTraffiironmental i-0586 has bmber of ship ming the ope d traffic and n traffic flo waffic. The ethe operatin gns. e, the envir oEG-0586 an dCumuive impact i sf the action wWater Reacto rPlan e of the sta tlevels duri nSolutions ag rage of Geno aronmental i he impact is ievable Res ompact eval ubeen deter mon and struc
R
: e. Some m eve waste ha se, Utah. T hB/C waste t hG-0586, irret rrials used to nstruction mmmitments onmental i mG-0586 and t hc and Trans pimpact eval ubeen deter mments and t hration of t hwear and te w or road w existing bar gg G-3 fossil onmental i md the impac tulative Impa cs defined th ewhen added r  tion from s eng decommrees to co ma. mpact asso cconsidered "ources uation assoc imined to be tural disma netals from t hs been and his facility hhat is gener arievable res odecontami nmachinery an dare consid empact assoc ihe impact is portation uation asso cmined to be he volume o fhe facility. ar on road wear. There wge traffic on station and mpact associ t is consider ects e impact on to other pa s8-23 ensitive rec eissioning a nmply with aciated with "Small." iated with ir rgenerally a pntlement of he site are a nwill contin uhas sufficien tated will be sources that wnate the facil id for transp oered to be iated with i rconsidered ciated with tgenerally a pf waste shi pNon-radiol oways. It is a nwill be no r athe Thief Sare not asso ated with tr ed as "Smal lthe environ st, present, aeptors, ther end demolit iany noise l inoise is e vretrievable rpplicable t othe station, anticipated t oue to be shi pt space for t shipped to t hwould occur ity (e.g., ra gortation of mminor and rretrievable "Small."
: 1.
transportati opplicable t opped are gre aogical impa cnticipated th aadioactive wSlough brancociated with ransportatio nl." nment which and reasona be will be l iion activiti eimitations (
U C
evaluated to resources in o LACBWRrecycling a no be release pped to the the disposal he WCS facduring the dgs, solvents, materials to aare neithe rresources i son issues in o LACBWRater during dcts of trans pat there will waste shipm ech and the MLACBWR dn is evaluat eh results fro mbly foreseea bimited temp es. Durin ge.g. quiet hbe boundesection 4.3.
2
R with a "S mnd asset rec od as clean sEnergySoluof this was tcility in An ddecommissi ogases, and t oand from th er detectabl es evaluated section 4.3.
: 2.
R with a "S mdecommissi oportation in be no signi fents execut eMississippi Rdecommissi oed to be bo um the incre mble future ac torary g the hours) ed by 18 of mall" overy scrap. utions te. In drews, oning ools), e site. e nor to be 17 of mall" oning clude ficant ed via River oning unded mental tions.
D R
La CrossLicense TRevisionThe cumdecommiterrestri acumulativPast, prdecommiMississipresourcesactivitie sover timmajor irrdisposal
: 3.
D S
: 4.
U re C
: 5.
U S
N
: 6.
D D
: 7.
E S
: 8.
E S
: 9.
A
: 10.
H 3
: 11.
U ht
: 12.
D
: 13.
U
: 14.
U ht
: 15.
ht se Boiling W Termination n 0 References U.S. Nuclear Content of Li 011.
Dairyland Po Reactor - Sep Dairyland Po upplement R U.S. Nuclear elated to Ope Cooperative -
U.S. Nuclear tatement (G November 20 Dairyland Po Decommissio EnergySoluti urvey Repor EnergySoluti urvey Repor Atomic Powe Haley & Aldr 0, 2012.
U.S. Census B ttps://www.c Dairyland Po U.S. Fish & W U.S. Army C ttp://www.m ttp://www.ci Water Reactor Plan Regulatory icense Termi wer Compan ptember 1972 wer Coopera Report - Jun Regulatory eration of th
- April 1980 Regulatory EIS) on Dec 002.
wer Coopera oning Activit ons GG-EO-rt for Octobe ons LC-RS-rt for June th er Review, A rich, Hydrog Bureau, 200 census.gov/p wer Coopera Wildlife Serv orps of Engi mvp.usace.ar ity-data.com r
Commission ination Plan ny, DPC-ED
: 2.
ative, Enviro ne 15, 1973.
Commission he La Crosse Commission commissioni ative, LACB ties Report (
-313196-RS er and Novem PN-164017-hru August 2 Atomic Jour geological C 8-2012 Ame programs-su ative - http:/
vice - http://
ineers -
rmy.mil/Miss m/city/Genoa 8-26 n Regulatory s for Nuclea D-3, Environ onmental Re n NUREG-0 Boiling Wa n NUREG-0 ing of Nucle BWR Decom (D-Plan/PSD S-RP-001, LA mber 2014 F
-001, LACB 2015 Field W rnal - Septe onceptual Si erican Comm urveys/acs/ne
//www.dairy www.fws.go sions/Naviga a-Wisconsin.
y Guide 1.17 ar Power Rea nmental Repo eport, La Cro 0191, Final E ater Reactor 0586, Generi ear Facilities mmissioning DAR), Revis ACBWR Ra Field Work -
BWR Radiolo Work - Nove ember 24, 20 ite Model, F munity Surve ews/data-rele ynet.com/ene ov/refuge/Up ation/LocksD
.html.
79, Standard actors, Revis ort - Lacross osse Boiling Environment by Dairylan ic Environm
, Supplemen Plan and Po sion - March adiological C
- November ogical Chara ember 2015.
011.
File No. 3870 ey. (5-year d eases.2012.h ergy_resourc pper_Missis Dams/LockD d Format and sion 1 - June se Boiling W g Water Reac tal Statemen nd Power mental Impact nt 1, Volume ost Shutdown h 2014.
Characterizat r 2015.
acterization 05-001 - Au data sets) -
html.
ces/genoa.ph ssippi_River/
Dam8.aspx.
d e
Water
: ctor, nt t
e 1 -
n tion ugust hp.  
/.  


disposal In summ8.7.O8.7.1.FDecommHandWorkPubliLicenWorkLiquiHazaHandCharacteof lead p 8.7.1.1.The majoare adminPart 2Part 5Part 5Part 6se Boiling WTermination n 0 mulative imp aissioning.
La Cross License T Revision
Tal ecology.
: 16.
ve impact.
D P
roposed anissioning o f ppi river for s listed ab os are not pro je, exceed t hretrievable r eof low le vand will the rary, the cu mOverview of Federal Req umissioning a cdling, packa gker radiatio nic radiation pnse terminat iker health a nid and gase oardous waste dling and re mrization an daint. Nucleority of radi onistered by t20 - Radiati o50 - Decom m51 - Enviro n61 - Dispos aWater Reacto rPlan acts were as hese includ eIrretrievab lnd future fcoal-fired pboating. T hove were a ljected to si ghe minor i mesource attr ivel radioacti vrefore have nmulative imp aRegulationuirements ctivities that ging, and sh in protection, protection, ion and fina lnd safety, ous effluent r generation/
W
moval of as bd removal o fear Regulato rological act ithe NRC.
: 17.
Aon protectio nmissioning anmental pro tal of radioa cr  sessed by fi e surface wle resource sforeseeabl epower plan the individua lll determin egnificantly a cmpact of the ibutable to Lve waste.
D D
Nno cumulati vact to site r ens Governinare subject tipment of ra dl site releas ereleases, disposition,estos, f Polychlori nry Commissivities fall u nApplicable T in. activities.
: 18.
tection. ctive waste.
V
8-24 rst determi nwater and gr os were als oe actions ts and recre al impacts o fed to be m iccumulate e nindividual aLACBWR dNo future a cve effect.
: 19.
esources is p rg Decommito federal re gdioactive w ae, nated Biphe nion nder Title 1 0itle 10 regul aning the res ooundwater, o evaluate dinclude c oational use f the LACB Winor. The pnvironment aactivities o ndecommissi octivities wi lrojected to bissioning Acgulations in caste, nyls (PCBs
M C
)0 of the Co dations inclu dources affec tair quality, d from theonstruction, of the land WR decommpast, presen tal impacts t hn the affect eoning was t hll involve rbe minor.
D
ctivities an dclude: ), and Hand lde of Fede rade: ted by LAC Baquatic ec oe perspecti voperation as access tmissioning ot and futur ehat would in ed resources he use of la nradioactive wd Site Relea sling and re mal Regulatio nBWR ology, ve of and to the on the e site total, . The nd for waste se moval n and La CrossLicense TRevisionPart 7throuPart 78.7.1.2.The EnvFederal RPart 6Parts Part 1Part 1Parts Part 2Part 7Part 18.7.2.FPermits aenvironmfall undeWiscWiscEnvirVillaOccuThis infointended 8.8.CAs previodecommi"site-spe potential predicted(NUREGenvironmse Boiling WTermination n 0 71 - Packag ugh 174 also 73 - Physic aU.S. Evironmental Regulations 61 - Asbest o122 to 125
: 20.
-141 - Safe D190 - Radia t260 to 272
W
-280 - Unde r761 - Toxic 129-132 -
: 21.
CFederal, Sta tand approva lmental prote cr Federal, S tonsin Depa ronsin Dep aronmental a nge of Geno aupational Sa formation pr oto be all-in cConclusion ously evalu aissioning L Acific" in N Uenvironme nd in and wi lG-0191, NU Rmental chan gWater Reacto rPlan ing and tra napply). al Protectio nEnvironmen tProtection Aapply as fol los Handling
U C
- National PDrinking W ation Protect i- Resource Crground Sto rSubstance CClean Water Ate and Loc als from or n oction purpo state and loc artment of N aartment of nd Occupati oa fety and He aovided abo vclusive. ated in the DACBWR are UREG-0586ntal impacts ll be bound eREG-0586, ages associat er  nsportation o n of Plants a ntal Protectio Agency (EPlows:  and Remov aPollutant Di sater Standar dion Standar dConservatio rage Tanks Control Act (Act al Require motifications tses. Decom mal jurisdictio natural Resou rHealth Seonal Health, alth Admini sve is a gen eD-Plan/PSD Atemporary a have been associated wed by the p and D-Plan/
ht
Ped with deco m8-25 f radioactiv end Materials n Agency PA) regulati oal scharge Eli mds ds for Nucle an and Reco v(TSCA) for ments to state and lmissioning an include, b urces (WDNRervices, Di v Radiation Pstration (OS Heral overvie wAR, the non-and not sign ievaluated awith decom mreviously is PSDAR). Tmmissionin ge waste (reg
: 22.
. ons outline dmination Sys tar Power O pvery Act (R CPolychlorin alocal agenci activities a nut are not li mR) vision of Protection S eHA) w of the a pradiologica lificant. Th eand there is missioning Lssued envir oTherefore, t hg. gulations in 4d in Title 4 0tem (NPDESperations CRA) ated Biphe nes are requi rnd related si tmited to the Public He aection pplicable re gl environme ne potential is no signific aLACBWR honmental i mhere are no n49 CFR Par t0 of the Co dS) nyls (PCBs) red for safet yte operation sfollowing:
W S
alth, Bure agulations an dntal impacts sues identif iant impact.
: 23.
have already mpact assess mnew or signi fts 171 de of y and s that au of d not from ied as  The been ments ficant La CrossLicense TRevision8.9.R1. UC22. DR3. DS4. UreC5. USN6. DD7. ES8. ES9. A10. H311. Uht12. D13. U14. Uht15. htse Boiling WTermination n 0 References U.S. Nuclear Content of L i011. Dairyland PoReactor - Se pDairyland Poupplement RU.S. Nuclear elated to Op eCooperative
D ht
-U.S. Nuclear tatement (G November 2 0Dairyland Po Decommissi oEnergySoluti urvey Repo rEnergySoluti urvey Repo rAtomic Pow eHaley & Ald r0, 2012.
: 24.
U.S. Census Bttps://www.
W ht
cDairyland Po U.S. Fish &
: 25.
WU.S. Army C ttp://www.
H L
mttp://www.c iWater Reacto rPlan Regulatory icense Term iwer Compa nptember 197 2wer Cooper aReport - Ju nRegulatory eration of t h- April 1980Regulatory EIS) on De c002. wer Cooper aoning Activi tons GG-EO
: 26.
-rt for Octob eons LC-RS-rt for June t her Review, "
V re
Arich, Hydro gBureau, 200 census.gov/
: 27.
pwer Cooper aWildlife Ser vorps of Eng imvp.usace.a rity-data.co mr  Commissio nination Plan ny, DPC-ED2. ative, Envir one 15, 1973. Commissio nhe La Crosse
U
. Commissio ncommission iative, LAC Bties Report
: 28.
(-313196-RSer and Nove mPN-164017
N
-hru August 2Atomic Jou rgeological C 8-2012 Am eprograms-s uative - http:
: 29.
/vice - http://
W
ineers - rmy.mil/Mis sm/city/Geno a8-26 n Regulator ys for Nucle aD-3, Environ onmental R en NUREG-0Boiling W an NUREG-0ing of Nucle BWR Decom(D-Plan/PS DS-RP-001, L Amber 2014 F-001, LACB2015 Field Wrnal" - Sept eonceptual S ierican Com murveys/acs/n e//www.dair ywww.fws.gosions/Navig aa-Wisconsin
: 30.
.y Guide 1.1 7ar Power Re anmental Rep oeport, La Cr o0191, Final Eater Reactor 0586, Gener iear Facilities mmissioning DAR), Revi sACBWR RaField Work
N S
-BWR Radiol oWork - Nov eember 24, 2 0ite Model, Fmunity Surv eews/data-rel eynet.com/en eov/refuge/U pation/Locks D.html. 79, Standar dactors, Revi sort - Lacros sosse Boilin gEnvironmen tby Dairyla nic Environ m, Suppleme nPlan and P osion - Marc hadiological C- Novemberogical Char aember 2015.
: 31.
011. File No. 387 0ey. (5-year deases.2012.
D 2
hergy_resour cpper_Missi sDams/LockDd Format an dsion 1 - Jun ese Boiling Wg Water Rea ctal Stateme nnd Power mental Impac tnt 1, Volum eost Shutdow nh 2014. Characteriza tr 2015. acterization 05-001 - A udata sets) -
: 32.
html. ces/genoa.p hssippi_River
W se Boiling W Termination n 0 Dame & Moo otential, La Wisconsin fo Dairyland Po Decommissio Vernon Coun McInterny, M Cooperatives December 19 Wisconsin De http://dnr.w U.S. Fish and Candidate Sp ttp://www.fw Wisconsin De pecies Habit Dairyland Po ttp://www.d Wisconsin De ttp://dnr.wi.g Hubbuch, Ch La Crosse Tri Village of Ge ecords.com/w U.S. Census B National Park Wisconsin Hi National Park ite Ve-502 -
/Dam8.aspx.
Dairyland Po 009.
d e Water ctor, nt t e 1 - n tion ugust hp.  /.
Wisconsin Hi Water Reactor Plan ore, Geotech Crosse Boil r Gulf Unite wer Coopera oning Plan, r nty, Land & W Michael. C., I s Genoa Site 980.
La CrossLicense TRevision16. DPW17. DD18. V19. MCD20. W- 21. UCht22. WS23. Dht24. Wht25. HL26. Vre27. U28. N29. W30. NS31. D232. Wse Boiling WTermination n 0 Dame & Moootential, La Wisconsin fo Dairyland Po Decommissi oVernon Cou nMcInterny, MCooperative' sDecember 1 9Wisconsin D ehttp://dnr.w U.S. Fish an dCandidate S pttp://www.f wWisconsin D epecies Habi tDairyland Po ttp://www.
epartment of i.gov/lakes/i d Wildlife Se pecies Coun ws.gov/midw epartment of tat Program wer Coopera dairynet.com/
dWisconsin D ettp://dnr.wi.
epartment of gov/eek/critt hris, A nuclea ibune - July enoa, Vernon wisconsin/ge Bureau, Vern k Service, Na istorical Soc k Service, Na
gHubbuch, C hLa Crosse Tr iVillage of G eecords.com/
- http://nrhp.
wU.S. Census BNational Par kWisconsin H iNational Par kite Ve-502  
wer Coopera istorical Soc r
-Dairyland Po 009. Wisconsin H iWater Reacto rPlan ore, Geotec hCrosse Boil r Gulf Unit ewer Cooper aoning Plan, rnty, Land &
hnical Investi ing Water R ed Nuclear F ative, LaCro revised Nove Water Resou Impingemen e, Thesis, sub f Natural Re invasives.
WMichael. C.,
ervice, Feder nty Distributi west/endang f Agriculture
Is Genoa Sit e980. epartment o fi.gov/lakes/
- http://datcp ative, Peregr
id Wildlife S epecies' Cou nws.gov/mid wepartment o ftat Program wer Cooper adairynet.com
/environmen f Natural Re ter/bird/falco ar option: A y 15, 2012.
/epartment o fgov/eek/crit thris, A nucle aibune - Jul yenoa, Verno nwisconsin/g eBureau, Ver nk Service, N aistorical So ck Service, N a- http://nrhp.
n County, W enoa_data.ht non County, ational Regi ciety - http://
wer Cooper aistorical So cr  hnical Invest iing Water Red Nuclear Fative, LaCr orevised Nov eWater Reso uImpingemene, Thesis, su bf Natural R einvasives.
ational Regi focus.nps.go ative, Power ciety, Nuclea 8-27 igation of G Reactor (LAC Fuels Corpor osse Boiling ember 2003.
ervice, Fede rnty Distribut iwest/endang f Agricultur e- http://datc pative, Pereg r/environme nf Natural R eter/bird/falc oar option: A y 15, 2012.
urce Manage nt and Entrai bmitted to U esources, Aqu rally-Listed ion, April 20 ered/lists/wi e, Trade & C p.wi.gov/Fa rine Falcon R ntal/falcon_p esources, Per on.htm.
n County, Wenoa_data.h tnon County
fter 25 years WI Public Rec tm.  
,ational Regi ciety - http:/
, Wisconsin ster of Histo
/ational Regi focus.nps.g oative, Powe rciety, Nucle a8-27 igation of GReactor (LA CFuels Corpo rosse Boiling ember 2003.
/www.wisco stry of Histo ov/natregsea r for Generat ar Fuel Assem Geology, Seis CBWR) near ration - Octo Water Reac ement Plan -
urce Manag ent and Entrai bmitted to Uesources, Aq urally-Listed ion, April 2 0ered/lists/w ie, Trade &
inment of Fi University of quatic Invasiv Threatened, 015 -
Cp.wi.gov/Fa rine Falcon Rntal/falcon_
isc-city.html Consumer Pr arms/Endang Restoration program.php regrine Falco s, Genoa rea cords - http:
pesources, Pe ron.htm. fter 25 year sWI Public Re ctm. , Wisconsin ster of Hist o/www.wisco stry of Hist oov/natregse ar for Genera tar Fuel Asse mGeology, Sei sCBWR) nearration - Oct oWater Rea
- http://www oric Places -
: c. ement Plan  
-inment of Fi University o fquatic Invasi vThreatened, 015 - isc-city.htm lConsumer P rarms/Endan gRestoration program.ph pregrine Falc os, Genoa re acords - http:- http://ww woric Places -
onsinhistory.
onsinhistory.
oric Places, Garchresult.d otions, Geno ambly - http:
oric Places, G archresult.do tions, Genoa mbly - http:/
/smology an dr Genoa, Ve rober 1973.
smology and r Genoa, Ver ober 1973.
ctor (LACB W- February 2shes at Dair yf Wisconsin
ctor (LACBW
-ve Species  
- February 2 shes at Dairy f Wisconsin-ve Species -
-, Endangere dl. rotection, E ngered_Speci eProgram -  
, Endangered
: p. on - actor's wast e//www.ope nw.census.go vhttp://ww.n porg/. Goose Islan do. a Site Upda t//www.wisc d Liquefacti ornon Count yWR) 2009. yland Powe r-La Crosse  
: l.
-- Vernon C od, Proposed ndangered es/index.asp xe gets new h on-public-v/. ps.gov/nr/.
rotection, En gered_Specie Program -
d Archeolo gte - Decemb onsinhistor yon y, r - ounty and x. ome, gical er y.org.
: p.
La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan Figr  ure 8-1 S8-28 Site Regionaal Location
on -
actors waste
//www.open w.census.gov http://ww.np org/.
Goose Island
: o.
a Site Updat
//www.wisc d Liquefactio rnon County WR) 2009.
yland Power
-La Crosse -
- Vernon Co d, Proposed ndangered es/index.aspx e gets new ho n-public-v/.
ps.gov/nr/.
d Archeolog te - Decemb onsinhistory on y,
r ounty and
: x.
: ome, gical er y.org.  
 
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fig r
ure 8-1 S
8-28 Site Regionaal Location  
 
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r
Figure 8-2 8-29 2
Site Ovverview
 
L L
R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-3 8-30 LACBWR Buildings


La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan r Figure 8-28-29 2 Site Ovverview LLR La Crosse Boili nLicense Termin Revision 0 ng Water Reac tation Plan or  Figure 8-3 8-30 LACBWR Buuildings La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan Fir  igure 8-48-31 Topographhical Map  
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fi r
igure 8-4 8-31 Topographhical Map  


LLRLa Crosse Boili nLicense Termin Revision 0 ng Water Reac tation Plan or Figure 8-55 Groundwa t8-32 ter Samplin g WWells - LACB WWR Site}}
L L
R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-55 Groundwat 8-32 ter Sampling Wells - LACBW WR Site}}

Latest revision as of 21:51, 9 January 2025

License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
ML16200A091
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/27/2016
From:
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML16200A091 (37)


Text

LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT

La Cross License T Revision 8.

Sup 8.1.

8.1.

8.1.

8.2.

8.2.

8.3.

8.4.

8.5.

8.5.

8 8

8 8.5.

8.5.

8 8

8 8.5.4 8.6.

8.6.

8.6.

8 8

8 8

8 8.6.

8 8

8 8

8 8

8 8

8 8

8 8

8 8

8 se Boiling W Termination n 0 plement to t Introduction 1.

Purpos 2.

Backgr Site Locatio 1.

Site De Remaining Impacts to t La Crosse B 1.

Geogra

.5.1.1. Site

.5.1.2. Pop

.5.1.3. Site 2.

Climate 3.

Topogr

.5.3.1. Top

.5.3.2. Geo

.5.3.3. Sei 4.

Hydrol Environmen 1.

Summa 2.

Radiolo

.6.2.1. Occ

.6.2.2. Off

.6.2.3. Env

.6.2.4. Sto

.6.2.5. Rad 3.

Non-ra

.6.3.1. Ons

.6.3.2. Off

.6.3.3. Wa

.6.3.4. Wa

.6.3.5. Air

.6.3.6. Aqu

.6.3.7. Ter

.6.3.8. Thr

.6.3.9. Occ

.6.3.10. Co

.6.3.11. So

.6.3.12. En

.6.3.13. Cu

.6.3.14. Ae

.6.3.15. No Water Reactor Plan the Environm n.................

e.................

round..........

on and Descr escription Af Dismantlem the Post-Shu Boiling Wate aphy and Dem e Location an pulation......

e Access, La e.................

raphy, Geolo pography....

ology..........

smology.....

logy and Hyd ntal Effects o ary..............

ogical Effect cupational R fsite Radiatio vironmental rage and Dis diological Cr adiological E site Land Us fsite Land U ater Use.......

ater Quality.

r Quality.....

uatic Ecolog rrestrial Ecol reatened or E cupational Is ost...............

ocioeconomi nvironmenta ultural, Histo esthetics.....

oise.............

r TABLE O mental Repor ription.........

fter Unrestri ment and Dec utdown Deco er Reactor E mography...

nd Descripti and and Wat ogy and Seis drogeology.

of Decommi ts of Decom Radiation Exp on Exposure Effects of A sposal of Lo riteria for Li Effects of De se.................

se (in the Vi gy.................

logy.............

Endangered ssues/Safety ic Impacts....

al Justice......

oric, and Arc 8-i OF CONTE rt.................

cted Release commissioni ommissionin nvironment ion...............

er Use.........

smology.......

issioning.....

mmissioning.

posure.........

e and Monito Accidents and ow-Level Ra icense Term ecommission icinity)........

Species.......

y...................

cheological R ENTS e..................

ing Activitie ng Activities Description oring............

d Decommis adioactive W mination........

ning.............

Resources...

es.................

Report (PSD n...................

ssioning Eve Waste............

DAR)..........

ents.............

... 8-1

... 8-1

... 8-1

... 8-1

... 8-2

... 8-3

... 8-5

... 8-5

... 8-6

... 8-6

... 8-6

... 8-6

... 8-6

... 8-7

... 8-7

... 8-7

... 8-8

... 8-8

... 8-8

... 8-9

... 8-9

. 8-10

. 8-10

. 8-12

. 8-12

. 8-13

. 8-14

. 8-14

. 8-14

. 8-14

. 8-15

. 8-16

. 8-17

. 8-17

. 8-18

. 8-19

. 8-20

. 8-20

. 8-20

. 8-21

. 8-21

. 8-22

. 8-22

La Cross License T Revision 8

8 8

8.7.

8.7.

8 8

8.7.

8.8.

8.9.

Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-se Boiling W Termination n 0

.6.3.16. Irr

.6.3.17. Tr

.6.3.18. Cu Overview o 1.

Federal

.7.1.1. Nuc

.7.1.2. U.S 2.

Federal Conclusion References 1

Summa Nuclea

-1 Site Re

-2 Site Ov

-3 LACBW

-4 Topogr

-5 Ground Water Reactor Plan retrievable R raffic and Tr umulative Im of Regulation l Requireme clear Regula S. Environme l, State and L ary of the En ar Power Fac egional Loca verview.......

WR Building raphical Map dwater Samp r

Resources.....

ransportation mpacts..........

ns Governing ents..............

atory Comm ental Protect Local Requi LIST nvironmenta cilities.........

LIST O ation.............

gs................

p..................

pling Wells -

8-ii n..................

g Decommis ission..........

tion Agency rements......

OF TABLE al Impacts fro OF FIGURE

- LACBWR ssioning Act y...................

ES om Decomm RES R Site...........

tivities and S missioning Site Release

. 8-23

. 8-23

. 8-23 8-24

. 8-24

. 8-24

. 8-25

. 8-25

. 8-25

. 8-26

. 8-11

. 8-28

. 8-29

. 8-30

. 8-31

. 8-32

La Cross License T Revision ACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/

PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACBW LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP se Boiling W Termination n 0 Amer Atom Above As Lo Below Best M Boilin Depar Depar Decom Enviro Enviro Fuel E Final Genoa Genoa Gener Geogr Indep WR La Cr LACB Licen Megaw Megaw Nation Nucle Off-S Occup Polych Post-S Radia Water Reactor Plan LIST OF ican Commu ic Energy C e Mean Sea ow As Reaso w Ground Su Management ng Water Re rtment of En rtment of Tra mmissioning onmental Pr onmental Re Element Stor Radiation Su a No. 1 Stati a No. 3 Foss ric Environm raphic Mana endent Spen rosse Boiling BWR Site En se Terminati watts Electri watts Therm nal Pollutant ear Regulator ite Dose Cal pational Safe hlorinated B Shutdown D ation Work P r

ACRONYM unity Survey ommission Level onably Achie urface t Practices actor nergy ansportation g Plan/Post S rotection Age eport rage Well urvey ion sil Station mental Impac agement Uni nt Fuel Stora g Water Reac nclosure ion Plan ic mal t Discharge ry Commiss lculation Ma ety and Heal Biphenyl ecommissio Permit 8-iii MS AND AB y

evable n

Shutdown A ency ct Statement it age Installatio ctor Elimination ion anual lth Administ ning Activit BBREVIAT ctivities Rep t

on System tration ties Report TIONS port

La Cross License T Revision RCRA REMP RPV SAFSTO SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES se Boiling W Termination n 0 Resou Radio React OR SAFe Struct Total Toxic United United Vertic Waste Wisco Wisco Water Reactor Plan urce Conserv ological Envi or Pressure V STORage tures, System Effective Do Substance C d States Arm d States Env cal Concrete e Control Sp onsin Depart onsin Polluta r

vation and R ironmental M Vessel ms and Comp ose Equivale Control Act my Corps of vironmental P Cask ecialists tment of Nat ant Discharg 8-iv Recovery Act Monitoring P ponents ent Engineers Protection A tural Resour ge Eliminatio t

Program Agency rces on System

La Cross License T Revision

8.

S 8.1.

In In accor Regulato Nuclear describin specific d Reactor (

8.1.1. P This cha Report, L describin specific Terminat detailed d between activities The supp predicted Environm (NUREG (GEIS) o LACBWR Plan/PSD to be pe activities 8.1.2. B LACBW Water R U.S. Ato 1973, the April 30, electrical Characte Limited disposal consistin (FESW)

Septemb se Boiling W Termination n 0 Supplemen ntroduction rdance with ory Guide 1.

Power Reac ng any new decommissio (LACBWR)

Purpose apter supplem La Crosse B ng any new decommiss tion Plan (L description o those activ

s.

plement disc d by the Un mental State G-0191) (4);

on Decomm R Decommis DAR) (6). T erformed fro

s.

Background

WR consists eactor (BWR omic Energy e reactor and

, 1987, when l output. T rization Surv dismantlem of the Reac ng of 333 sp to dry cask er 19, 2012.

Water Reactor Plan nt to the E n

h the requi 179, Standa ctors (1), th information oning and si site.

ments the 1 Boiling Water information sioning and LTP). This of the remai vities and th cusses wheth nited States ement related NUREG-05 missioning of ssioning Pla This chapter om time of of a single R) construct Commissio d its fuel we n it was shu The plant w vey for SAF ment activitie ctor Pressur pent fuel ass storage at th On March r

Environme rements of ard Format his chapter p n or signific ite closure a 1972 Dairyla r Reactor (E n or significa d license t supplement, ning decomm he environm her the activ Nuclear Re d to operati 586, Supple f Nuclear F an and Post discusses de submittal o Allis-Chalm ted in 1967 on (AEC). T ere transferre ut down bec was placed i FSTOR was c es were sta re Vessel (R semblies, wa he on-site Ind h 12, 2014, D 8-1 ental Repo f 10 CFR 50 and Conte provides a s cant environm activities per and Power ER) (2), whi ant environm termination

, including r missioning a ment, and the vities and th egulatory Co ion of La C ment 1, Ge Facilities, N t-Shutdown ecommission f this LTP mers designe as a demon The plant wa ed to Dairyl ause of econ in SAFSTO completed in arted in 199 RPV) in Ma as transferre dependent S Dairyland su ort 0.82 (a)(9)(ii ents for Lic supplement mental chan rformed at t Cooperative ich was revi mental chan activities reference to and site clos e likely env heir impacts ommission (

Cross Boiling eneric Envir November 2 Decommissi ning activiti until the co ed 50 megaw nstration rea as commissi land. It was nomic reaso OR on Augu n October 19 94, includin ay 2007. A ed from the pent Fuel St ubmitted a r i)(A) and t ense Termin to the envi nge associat the La Cross e (Dairyland sed on June nges associat presented i o LTP Chap sure activitie vironmental are bounde (NRC) NUR g Water Rea ronmental I 2002 (5); an ioning Activ ies, with a fo ompletion o watt electric actor in conj ioned in Nov s operated by ons due to it ust 7, 1991.

995.

ng the remo ll of the sp Fuel Eleme torage Instal evision of th the guidanc nation Plan ironmental r ted with the se Boiling W d) Environm 15, 1973 (3 ted with the in this Lic pter 3, provi es, the intera impact of d by the im REG-0191, F actor, April Impact State nd the Dairy vities Repor ocus on activ f site restor c (MWe) Bo junction wit vember 1969 y Dairyland ts small size An initial oval and of pent nuclear ent Storage llation (ISFS he LACBW ce of ns for report site-Water mental 3), by e site-cense des a action those mpacts Final 1980 ement yland rt (D-vities ration oiling th the

9. In d until e and l Site ff-site
fuel, Well SI) by WR D-

La Cross License T Revision Plan/PSD character concludin EnergySo Survey R Characte As stated was docu 1987. LA environm support o LACBW noted in 1,155 MW known a LACBW the gene decommi located i that this Elk Rive license te The lates The en dismantle specifica this Supp potential Offsi Aqua Terre Threa Socio Envir 8.2.

S LACBW Mississip south of site locat coordinat se Boiling W Termination n 0 DAR to the N rization was ng on Augu olutions is d Report for O erization Sur d in the D-Pl umented in ACBWR de mental impa of the Augus WR, dated Ap the ER and We WNP-2 as Columbia WR is a much eric environm issioning im n Elk River decommissi er facility wa ermination in st D-Plan/PS vironmental ement activi ally evaluate plement as a environmen te land use a atic ecology estrial ecolog atened and e oeconomic ronmental ju ite Location WR is located ppi River, ab the city of L tion, includin tes for LAC Water Reactor Plan NRC that ac s performed ust 6, 2015.

documented i October and rvey Report f lan/PSDAR, a supplemen ecommission ct not prev st 7, 1991, D pril 21, 1980 d NUREG-0 BWR oper a Generatin h smaller rea mental asse mpact of a sm r, Minnesota ioning was c as another A n 1974 (9).

SDAR docum l impact of ities is SMA d in the GE a basis for m ntal impacts activities as to activiti gy as to activ endangered s ustice n and Descr d in southw bout 1 mile La Crosse, W ng nearby p CBWR are l r

ccounts for t d by Energ The results in two separ d November for June thru

, Review of nt to the En ning and dism viously evalu Decommissio

0. This rev 0586. The rated by Wa ng Station, actor compar essment. N mall 58.2 me a, which was completed sa Allis-Chalme ment (issued f all comple ALL as determ IS. As state meeting the re not determin ies beyond th vities beyond species ription western Wisc south of the WI. The Sit rominent fea longitude 9 8-2 the completi gySolutions s of the site rate reports, L 2014 Field u August 201 f post-operat nvironmental mantlement uated in the oning Order iew included reference B ashington Pu owned and red to WNP-NUREG-0586 egawatt ther s dismantled afely with li ers reactor, a in March 20 eted or plan mined by th ed in the GE equirements ned in the G he operation d the operati consin, in V e Village of te Regional atures such 1o, 13, 53.3 ion of the sp commencin e characteriz LACBWR R d Work (7) 15 Field Wo ating license l Report for activities ha e NRC's En or NUREG d the evalua BWR facilit ublic Power operated b

-2, its impac 6 also prov rmal (MWt) d between 1 ittle risk to w a superheate 014) conclud nned LACB he GEIS. LA EIS, licensee s in 10 CFR GEIS are:

nal area ional area Vernon Coun f Genoa, WI Location gr as highways 35 West a pent fuel tran ng on Octo zation surve adiological and LACBW ork (8).

stage enviro r LACBWR ave resulted nvironmenta G-0191 relate ation of impa ty in NURE r Supply Sy by Energy N cts fall within vided inform BWR demo 971 and 197 workers and d test BWR ded the follo BWR decom ACBWR dec es can rely o 50.83(a)(6)(

nty, on the e and approx aphic (Figur s, rivers and and latitude nsfer. Addit ober 9, 2014 eys performe Characteriz WR Radiolo onmental im dated Dece in no signif al Assessme ed to operati acts against EG-0586 wa ystem (plant Northwest).

n the envelo mation abou onstration re

74. It was n d the public.

R, which ach owing:

mmissioning commissioni on informati (ii). Site-spe east shore o ximately 19 m re 8-1) show d lakes. The 43o, 33, 3 tional 4 and ed by zation ogical mpacts ember ficant ent in ion of those as the t now As ope of ut the eactor noted The ieved g and ing is ion in ecific of the miles ws the e map 6.22

La Cross License T Revision North. T The Reac the cargo 639 feet Mississip filled wit The licen LACBW the plant the la forme the la gener the L the la the pa The Site The site i Mississip Corps of The site Highway Highway currently Mississip 2.4 miles

mussels, 0.75 mile 8.2.1. S This sec decommi defined a piping an 10 CFR 2 The deco buildings structure be remov and floo structure se Boiling W Termination n 0 The site is a ctor Building o-carrying-on Above Me ppi River. T th sand mate nsed site com WR plant com off of Highw and north of er Genoa No and area dir rating station LACBWR pl and area sout arcel of land Overview (F is bordered o ppi River an f Engineers (

is bordere y 35. A B y 35, carries y do not use ppi River Na s from LAC brook trou es south of th ite Descript ction provid issioning and as the config nd open lan 20.1402.

ommissionin s, structures s above a de ved from ba ors in the s:

Water Reactor Plan at mile 678.6 g is approxi nly rail road ean Sea Lev The covered erial dredged mprises a to mprising only way 35. Oth f the LACBW

o. 1 Station (

rectly south n (Genoa N ant, th of G-3, w d to the east o Figure 8-2) i on the north nd Highway (USACE) Ro ed on the w Burlington N commercial this rail lin ational Wild CBWR, is t ut and sturg he LACBWR tion After U des a summ d site closur guration of t nd areas at ng of the Cla and compo epth of 3 fee asements loc End-State.

r 6 on the Mi mately 300

d. The Reac vel (AMSL land consist d from the M tal of 163.5 y 1.5 acres.

her prominen WR plant, w (G-1) coal (a of LACBW No. 3 Fossil S where the ISF of Highway illustrates th h by the Miss

35. The U.

ock Island D west by the Northern-Sa l freight alo

e. The site dlife & Fish the Genoa eon. On th R plant, ther Unrestricted mary of the re activities.

the remainin the time o ass 1 areas o onents) will et below grad cated below This app 8-3 ssissippi Riv feet from th ctor Building L), or 19 fe ted of the riv Mississippi R acres which The site is nt site featur which includ and later oil)

WR, which c Station [G-3 FSI is located 35, across fr e boundary o sissippi Rive

.S. Lock &

District, is lo e Mississipp anta Fe rail ong the easte is bordered h Refuge Poo National Fi he southwes re is a public d Release final cond The End-S ng below gro f license te of the plant include the de (designat the 636 foo proach will ver above th he Mississipp g stands on et above th ver edge and River.

h is owned b accessed by res include:

es the site s

) fueled pow contains an 3]), located d, and from LACBW of the licens er and a narr Dam No. 8, ocated appro pi River an l line, loca ern portion o to the south ol 9 area. F ish Hatchery stern corner c boat launch dition of the State for LA ound backfil ermination m (the on-site demolition, ed as 636 fo ot elevation apply to th he mouth of pi River and filled land a he normal d low forest a by Dairyland y a road on witchyard a wer plant (rem operational approximate WR.

sed site.

row strip of managed b ximately 0.6 nd bordered ated betwee of the site.

h by a segm Further sout y, which ra r of the site hing ramp w e site at th ACBWR dec lled building meeting the e radiologica removal an oot AMSL).

leaving onl he followin f the Ohio R d 475 feet we at an elevati elevation o areas which d, with the a the south si and the site o moved in 19 350 MWe ely 175 feet land betwee by the U.S. A 6 miles upstr on the eas en the site Passenger t ment of the U th, approxim aises endang e, approxim with a parking he conclusio commissioni gs, structure requiremen ally contamin nd disposal o All systems ly concrete ng buildings River.

est of on of f the were actual ide of of the 89),

fossil from en the Army ream.

st by and trains Upper mately gered mately g lot.

on of ing is s and nts of nated of all s will walls s and

La Cross License T Revision React Wast Venti Pipe Wast Turbi Low Main The debr disposal.

Figure 8-structure will be d and struc require re G-3 Crib structure potential the LTP The belo filled wit Departm backfille The stru dismantle Adm LACB Outfa G-3 C coal water Elect Paved plant After all process a and the s se Boiling W Termination n 0 tor Building te Treatment ilation Stack and Ventilat te Gas Tank ine Building Specific Act ntenance Eat ris generated

-3 shows th s and compo demolished a ctures assoc emedial acti b House, will s at depths g removal. F Chapter 3.

ow grade stru th suitable c ent of Natur d, returned t uctures outs ed and will r inistration B BWR Crib H all diffuser d Coal Plant an barge washi r systems an trical Switch d roadways area.

demolition as described surrounding Water Reactor Plan g,

t Building, k,

tion Tunnels Vault, g and Turbin tivity (LSA)

Shack.

d from demo he key LAC onents, othe and removed ciated with G ions; therefo l remain inta greater than Further infor uctures to re clean soil, sa ral Resource to grade, see ide of the remain on si Building, incl House, inclu discharge pip nd all associ ing station t nd piping, hyard, and, and the Bur and remedi in Chapter open land r

s, ne Office Bui

) Storage Bu lition and re CBWR build er than the L d to a depth o G-3 are exp ore, no remed act and func 3 foot below rmation on t emain in the and and/or o es (WDNR) eded and app LACBWR te. These in luding assoc uding fire pro ping, extendi iated buildin to the north rlington Nor iation activi 5 of this LT areas within 8-4 ilding, uilding, and emoval opera dings at the LACBWR A of at least 3 pected to be diation is pla ctional for G w grade will the approach e End State other suitabl regulations propriate ero R Site Encl nclude:

ciated sanitar otection pipi ing 110 feet ngs, warehou h of the plan rthern-Santa ities are com TP, will be p n its license ations will b site. All o Administratio feet below g e radiologica anned and th G-3 power op l be assessed h to the vari e such as b le media, as

. The resto sion control losure (LS ry sewer and ing systems, into the Mis uses and sup nt and all as Fe rail line mplete, a Fi performed to d boundarie be segregated on-site LAC on Building grade. None ally impacte hese structur perations. A d for radiolo ious buildin basement fou s allowable ored areas on s will be est E) are not d water syste ssissippi Riv pport structur ssociated sa and spur in inal Radiatio o demonstrat es, with the d for recycli CBWR build and Crib H e of the buil ed such that res, includin Any contamin ogical impac ngs is provid undations w under Wisc n the site w ablished.

expected t ems and pipi

ver, res, includin anitary sewer nto the LACB on Survey (

te that LACB exception o ing or

dings, House, dings t they ng the nated ct and ded in will be onsin will be to be
ing, ng the r and BWR (FRS)

BWR of the

La Cross License T Revision ISFSI fa 10 CFR 2 dry stora dry stora Isolation remediat control m comprom equipmen access. I there is n survey ar Several s support t supportin 8.3.

R To date, removal RPV incor FESW Vario

RPV, Purif Vario Chapter 3 remediat achieve t 8.4.

Im As previ decommi associate by the pr NUR NUR Chapter 3 schedule footprint se Boiling W Termination n 0 acility, com 20.1402. As age casks an ge within th and contro ion activitie measures w mised by th nt. Open la Isolation and no risk of re reas that hav services such the ISFSI m ng the adjace Remaining D several key of the follow and associa re monitor gu W stored com ous system p

, and primar fication, Seal ous Turbine 3 of this LT ion activitie the End-Sta mpacts to th iously noted issioning op ed with deco reviously issu REG-0191, an REG-0586.

3 of the LT d to be com

). The ident Water Reactor Plan mply with s part of the d transferred e ISFSI unti ol measures

s. These act will be impl he potential and areas, ac d control me

-contaminat ve been relea h as sanitary monitoring a ent G-3 fossi Dismantlem dismantlem wing compon ated reactor uide tubes, e mponents su piping and c ry systems su l Injection an and auxiliar P provides d es currently b ate conditio he Post-Shu d, the D-Pl perations at t ommissionin ued environm nd TP identifie mpleted prio tified activiti r

the radiolo decommissi d to the ISF il it is transfe will be imp tivities will lemented to for re-con ccess roads a easures will ion from de ased from the y sewer servi and security il station wh ent and Dec ment and deco nents:

components etc.),

uch as fuel sh components uch as the C nd Main Ste ry systems.

detailed desc being perfor on.

utdown Deco lan/PSDAR, the site and ng the site ha mental impa es the dism or to the un ies are not s 8-5 ogical criter ioning proce SI. It is exp erred to the D plemented fo be complete o ensure the ntamination and boundar remain in e commission e license.

ices and elec operations.

hich will rem commission ommissionin s (e.g. fuel hrouds, contr associated ontrol Rod D am.

criptions of rmed and th ommissionin amended concluded t ave already act statement mantlement a nrestricted re ignificantly ria for unr ess, all spent pected that t Department following th ed prior to st e final radi as result ries will be ffect through ning. These ctrical servic There are main in place ning Activiti ng activities shrouds, co rol rods, and with the Fo Drive Mecha the dismant he remaining ng Activitie in March 2 that the pote been postula ts, specifical and deconta elease of th different fro restricted u t nuclear fue this spent fu of Energy (D e conclusion tarting the F iological co of access b posted with hout FRS ac measures ar ce will rema e three potab

e.

ies have occurr ntrol rods, s d start-up sou orced Circula anisms, Dec lement, deco g activities t es Report (P 014, describ ential enviro ated in, and lly:

amination ac he site (excl om those ori use specifie el was loaded uel will rema DOE).

n of radiolo FRS process.

onditions are by personne h signs restri ctivities and re not requir in in operati ble wells on red, includin steam separa urces, and ation system cay Heat, Pri ontamination to be execut PSDAR) bed the pla onmental im d will be bou ctivities tha luding the I iginally discu ed in d into ain in ogical The e not el or icting d until red in ion to n site ng the

ators, m, the imary n and ted to anned mpacts unded at are ISFSI ussed

La Cross License T Revision in the D-will be d identified provide decommi 8.5.

L 8.5.1. G 8.5.1.1.

The site Vernon C 300 feet by filling The site 642 feet Mississip silts) und sands and 8.5.1.2.

The U.S reliable c total pop 744 for S near the small tow (populati 5 miles s 8.5.1.3.

The LAC of the M bounded north, an electric p This stat Genoa, lo within th The area and fresh to the G-site, loca se Boiling W Termination n 0

-Plan/PSDA defined durin d in the D-additional issioning.

La Crosse Bo Geography a Site L location and County, Wis from the eas g in river ed is relatively AMSL bou ppi River to derlain by fin d gravels. B Popul

. Census Bu census data f pulation in 2 Stoddard, loc plant, locat wns west o ion 397), lo outhwest.

Site A CBWR prope Mississippi R by the Mis nd a wildlife power station tion is locate ocated appro he town. The a of the Miss h water fishi

-3 station lo ated approxim Water Reactor Plan R. Althoug ng decommi

-Plan/PSDAR evaluation oiling Wate and Demogr Location and d description sconsin, in t st bank of the dge and low y flat with th unded by the the west. T ne to medium Bedrock is en lation ureau, Amer for nearby W 2013 was 25 cated 7 miles ted 17 miles of the plant cated 3 mil Access, Land erty is locate River. Altho ssissippi Riv and fish ref n completed ed to the so oximately 1 m ere are no re sissippi Rive ing) and com cated south mately 4,000 r

gh additional issioning pl R have bee and infor er Reactor E raphy Description n were discu the Mississip e Mississipp forest areas he reactor f e railroad tr The geology m sands with ncountered a rican Comm Wisconsin vi 8 for the Vi s N of the pl N; and 30, across the es northwe d and Water ed in the far ough the site ver to the w fuge to the s d in 1969, w outh, adjacen mile to the n esidences wit er adjacent t mmercial bar of the LAC 0 feet south o 8-6 l details rega anning effor en identified rmation reg Environmen n

ussed in secti ppi River V pi River. Tw s with mater facilities stan acks to the y consists pr h some soils at approxima munity Surve illages and c illage of Ge lant; 51,522

,329 for Ver Mississippi st, and New Use r western por e area is 163 west, a rail li south. The s which is also nt to the LA northeast of t thin 2,000 fe to the site is rge and ship CBWR plant) of the plant.

arding majo rts, no signi

d. Subsequ garding the nt Descriptio ion 8.2. The alley, with t wenty-seven rial dredged nding at elev east and th rimarily of f s containing ately 130 fee ey (ACS) re cities and Ve enoa, located for La Cros rnon County i River, inc w Albin, IA rtion of Ver 3.5 acres, it ine to the e site includes owned and ACBWR fac the site. An eet of any LA s used for re p traffic (e.g.

). There is There is a p r decommis ificant impa uent sections environme on e 163.5 acre the Reactor acres of the d from the M vations rang he riprap on fill materials higher perc et below grou eport (11) pr ernon County d 1 mile nor se, the large

y. There ar luding Reno A (populati rnon County is relatively east, USACE s G-3, a coa d operated by cilities. The n elementary ACBWR str ecreational p

. barges of c a public bo portion (Poo sioning activ cts beyond s in this ch ental effect e site is locat Building lo site were fo Mississippi R ging from 6 the shore o s (fine sand entages of c und surface rovides the

y. The estim rth of LACB st Wisconsin re also num o township, ion 513), lo y on the east y isolated as E property t al-fired 379 M y Dairyland e closest tow school is lo ructure.

purposes (bo coal are deliv at landing o ol 9) of the U vities those hapter ts of ted in ocated ormed River.

36 to of the s and coarse (10).

most mated BWR; n city erous MN ocated bank s it is to the MWe (12).

wn is ocated oating vered on the Upper

La Cross License T Revision Mississip for hunti Genoa N mile 679 long lock public ac through Highway No. 8.

8.5.2. C The clim continent river vall Lock and of the in from 60 winter m the avera summer s The aver range fro month fo The bluff winds at monthly experienc tornado o F3 (maxi center inj 8.5.3. T 8.5.3.1.

The site i dissected varies be river leve Highway Prior to c lying we dredged to constr se Boiling W Termination n 0 ppi River Na ing, fishing National Fish

.2, is approx k and dam s ccess to an o November.

y 35 approxi Climate mate at the L tal climate w ley location d Dam No. 8 nformation f to 90o F du months of De age tempera season (15).

rage annual r om 3 to 5 inc or the remain fs of the Mis t the site wh average wi ced tornados occurred 27 imum wind jured one pe Topography Topog is located w d uplands. F etween 21/2 a el. The LAC y 35. Figure construction tlands. The sands from t ruction, the a Water Reactor Plan ational Wildl and recreati h Hatchery.

ximately 0.6 structure ow observation The State imately 1/2 m La Crosse r with cold wi of the site.

8 site with a for the past uring the mo ecember 201 ture is appr rainfall is 35 ches per mon nder of the y ssissippi Riv here the va ind speeds

s. On April

.4 miles awa speeds 158-erson and cau

, Geology an graphy ithin the Mi From La Cro and 41/2 mile CBWR site i 8-4 provide n of the LAC e property gr the Mississip area was gra r

life & Fish R onal activiti

. Lock and 6 miles north ned and ope platform, op e of Wiscon mile north o region of W inters and ho The USAC archived wea year (May onths of Jun 14 to Februa oximately 2 5.2 inches. M nth in the sp ear.

ver Valley ch lley runs no are typicall l 30, 1954, a ay from the 216 mph) to used betwee nd Seismolo ssissippi Riv sse to Prairi s in width.

is located be es a Topogra CBWR facil rade was the ppi River. D aded to a rel 8-7 Refuge just s ies (13). Fur d Dam No.

h of the site erated by the pen from da nsin also m of the LACB Wisconsin an ot summers CE maintains ather inform 2014 to Ma ne through A ary 2015. C 20o F in the Monthly prec pring and sum hannel the w orth-south a y 6 to 10 m a category F4 Genoa villa ornado that o en $500,000 ogy ver Valley, w e du Chien, The valley etween two v aphy Map of lity, the site en increased During grade latively flat south of the rther south a 8, located

e. The dam e USACE (

awn to dusk maintains a BWR site, a nd at the LA and extrem s an active w mation for the ay 2015) ind August 2014 City data com winter mon cipitation av mmer season winds at the L are from the mph. The 4 (maximum age center.

occurred 6.6 and $5,000, where the va approximate walls rise s valleys on e f the site.

location co d through the e manipulati ground surf site which h are public la on the Mis m is a 110 fe 14). This fac k during the highway w across from ACBWR sit mes influence weather stat e Genoa, W dicated temp 4 and 45 to mpiled for G nths and reac verages in the ns and from LACBWR s e north and Genoa, WI m wind spee On June 5, 6 miles away 000 in dama alley is deep ely 40 miles sharply 500 either side of onsisted of m e deposition ion and site face. The re has limited a and areas an sissippi Riv et wide, 600 cility also a months of wayside off m Lock and te is typical ed because o ion at the ne I area. A re peratures ran

-5o F durin Genoa shows ches 72o F i e Genoa, WI 1 to 3 inche ite. Predom the south.

I area has r ds 207-260 1980, a cate y from the vi ages.

ly cut into h s south, the v to 600 feet f the bluff ea marshes and n of hydrauli preparation esulting grad access nd the ver at 0 feet llows April State Dam of a of the earby eview nging ng the s that in the I area es per minant The rarely mph) egory illage highly valley from ast of low-ically prior de for

La Cross License T Revision the LAC access ro 8.5.3.2.

LACBW of the Ce of the W bedrock i Generally to 130 fe Valley.

Dreshbac Precambr (BGS). A 509 feet river sho 8.5.3.3.

Many fau capable i condition in the sit nuclear p any evid Therefor Seismic a 2008 all 8.5.4. H Hydrolog Groundw 25 feet B Mississip the Missi the west towards groundw fossil sta some per flooding.

Hydrauli the shallo structure se Boiling W Termination n 0 BWR site is oad along the Geolo WR is located entral Lowla Wisconsin Do in this region y, the local g et of glacial These unco ch Group (

rian crystall At the subje AMSL near reline.

Seism ults have be in accordanc ns in the site te region, bu power plant dence of cap e, capable fa activity (ma occurred ove Hydrology a gy and hyd water beneath BGS and the ppi River. T issippi River and discharg the west bu water elevatio ation, it appe riods where ic conductivi ow sands tha of the shall Water Reactor Plan s generally f e eastern bou ogy d on the east and Physiogr me and the n dips less th geology is d outwash an onsolidated d Upper Cam line rocks e ect site, the b r the Reactor mology een mapped ce with 10 C e vicinity tha ut investigati sites in the pable faultin aulting does agnitudes ran er 180 miles nd Hydroge drogeologica h the site is water table Therefore, ch

r. Groundw ges into the M ut then may on measurem ears that the the gradien ity is influen at were hydr low soils wo r

flat with gra undary of the bank of the raphic Provi western flan han 20 feet p described as a d fluvial dep deposits are mbrian). Th encountered bedrock surf r Building a d in the site CFR 100, A at represent ions of all o region, in ad ng. Additio not need to nging from 3 s from the sit eology al informat s first encou aquifer is in hanges in the ater in the sh Mississippi turn and flo ments collec ere is a sligh nts are rever nced by the s raulically dre ould not like 8-8 ade level at e site to the r Mississippi ince (16). T nk of the Wi per mile to th approximate posits on the underlain b he Dreshbac d at approxi face is encou and slopes to region. No Appendix A.

hazard to th f these fault ddition to st onally, the a be considere 3.5 to 5.4) th te and did no tion was p untered at de n strong hyd e water table hallow depo River. The ow parallel cted during ht downwar rsed and thi soil structure edged, depo ely influence approximate riprap along i River in the The site is lo isconsin Arc he southwes ely 15 feet o e east flood p by flat lying ch Group i imately 650 untered at an o approximat one of these Per the N he facility. N ts during the tudies for the area is one o ed in the ana hat has been ot impact the primarily ob epths rangin draulic comm e elevation a sits and fill m deeper grou to the river routine sam rd vertical g is is likely d e and grain sited, and co e groundwat ely 639 feet g the river sh e Wisconsin ocated on the ch. The sedi st.

f hydraulic f plain of the M sandstone a is then und 0 feet below n elevation tely 501 fee e faults are NRC, There Numerous f e course of v e LACBWR of relatively alysis of this n recorded b e plant site o btained from ng from app munication w are dependen material like undwater is a

r. Based on mpling in sup gradient. Ho due to high size distribu ompacted on ter flow dire AMSL from hore.

n Driftless se e southwest imentary stra fill overlying Mississippi R and shales o derlain by d w ground su of approxim t AMSL nea considered e are no geo faults are ma validating se R, have not f y low seism s site (17).

etween 1975 or operations m Referenc roximately with the adj nt on the sta ely flows tow also likely to n a review o pport of the owever, ther river stages ution. Becau n site, the int ection. How m the ection flank ata or g 100 River of the dense urface mately ar the to be ologic apped everal found micity.

5 and

s.

ce 10.

15 to acent age of wards o flow of the e G-3 re are s and use of ternal

wever,

La Cross License T Revision the nativ anisotrop the horiz these lay The velo gradient.

across th the groun range) ev 8.6.

E 8.6.1. S The eval follows t includes considere Large.

evaluatio For thos evaluatio

1)

T N

id

2)

A

3)

P d

4)

A es en ad av th

5)

A A conclu the level 0586 eva the forme Table 8-1 LACBW screen th se Boiling W Termination n 0 ve sands und py of the aqu ontal directi ers.

ocity of grou The gradie he site it is li ndwater velo ven though th Environmen ummary luation of th the approach identificatio ed to be gen If identifie on in NUREG se environm on, a standard The issue or NUREG-019 dentified in t Applicable re otential imp escribed.

An evaluatio stimate or d nvironment dditional mi voided, a de he resource o A conclusion usion is deriv of significa aluation. No er G-1 coal/o 1 was used WR. It is exc he issues t Water Reactor Plan derlying the uifer would ion than in th undwater flo ent of the wa kely that the ocity across he hydraulic ntal Effects o he environme h and method on of enviro neric, it is a ed as generic G-0586 whic mental issu d approach i activity is s 1 and D-Pla these docum egulations, p pacts from de on is perfor determine wh considering itigation mea etermination or attribute.

is reached.

ved from the ance of the ote that the e oil fueled po as the bas cerpted from o identify r

hydraulic fi be more per he vertical d ow is directly ater table is e water table the site is c conductivit of Decommi ental effects dology outli nmental issu assigned a s c, the enviro ch concludes es or deco is followed.

summarized, an/PSDAR.

ments.

ermits, limit ecommission rmed. This hether the a the availab asures that c is made as e evaluation impacts. Si environmenta ower plant w sis for the m Table 6.1 o site-specific 8-9 fill would lik rmeable and direction. Th y related to influenced b e has a very also relative ty could supp issioning (or impacts ined and des ues as either ignificance onmental im s that the ov ommissionin It is summa including a Note that m ts or other re ning activitie s includes ctivity is lik ble informati can be taken to whether steps summ ite-specific i al impacts o was not consi site specific of NUREG-0 c issues. D kely provide d have a high his decreases both the hy by the topog low gradien ely slow (i.e port faster fl s) of the dec scribed in N r generic or level of eith mpact is cons verall impact ng activities arized as foll a summary o many decom egulatory req es relating to analysis an kely to make ion. If an im n are evalua the impact i marized abov issues are n of the operati idered in this c environme 0586. The f Decommissi e sufficient her hydrauli s the vertica ydraulic con graphy and w nt. Therefor e., in the inc flow.

commissioni NUREG-0586 site-specific her Small, sidered to be t significance s that requ lows:

of the impac mmissioning quirements a o the environ nd profession e a noticeab mpact is lik ated. If an i is likely to s ve. The con ot bounded ing G-3 coal s review.

ental impact first step in ioning activ structure tha ic conductiv al transport w ductivity an with the flat re, it is likely ches and fee ing of LACB

6. This appr
c. If the iss Moderate e bounded b e is Small.

uire site-spe cts as report activities ar are identified nmental issu nal judgme ble impact o kely, existing impact cann seriously dam nclusion iden by the NUR l power plan t assessmen this process vities specif at the vity in within nd the areas y that et/day BWR roach sue is e, or by the ecific ted in re not

d.

ue are nt to on the g and not be mage ntifies REG-nt and nt for s is to fic to

La Cross License T Revision LACBW identified evaluatio Offsi 35 ye Aqua sensit Terre of sen Threa threat Envir 35 ye Cultu histor 8.6.2. R 8.6.2.1.

During d in accord of the Ra exposure 2,000 mr also be m program Radiation materials In Augus of the sta 1994 wit allowed levels at Protectio exposure significan removal (SSCs).

se Boiling W Termination n 0 WR are then

d. The scre on:

te land use a ears, since th atic ecology tive areas.

estrial Ecolo nsitive areas atened and tened and en ronmental J ears.

ural and Hi ric landmark Radiological Occup decommissio dance with th adiation Pro es and maint rem/yr Total maintained A and proced n Work Perm s incorporate st 1987, Dair abilized and th the comm for the deca the facility.

on Program e during the nt contributo and packag Water Reactor Plan reviewed a eening ident activities: ch he FES was i affected by gy affected b

s.

endangered ndangered sp Justice: chan storic Resou k designation l Effects of D pational Rad oning, Soluti he license sp tection Prog tain occupat l Effective D As Low As R dures will e mits (RWP) e effective ra ryland place defueled fac mencement o ay of most s

. This delay and ALARA e decommiss ors to occup ging of rema r

and the activ tified the fo hanges in dem issued.

activities be by activities species: ch pecies that h nges in dem urce impact ns and other Decommissi diation Expo ions will con pecifications gram are to tional worke Dose Equiva Reasonably A ensure that involving po adiological c ed LACBWR cility). LAC of increment short-lived r y, combined A measures, sioning of L ational dose aining Reac 8-10 vities that m ollowing po mographics eyond the op s beyond the hanges in lo have occurred mographics ts beyond t cultural reso ioning sure ntinue to im s and the req control radia er exposures alent (TEDE Achievable (

work speci otential radia controls.

R in a SAFS CBWR remai tal decommi radionuclides d with the ef

, minimized LACBWR t from remai tor Building may require otential areas and zoning t perational are operational ocal flora an d in the past and socioe the operatio ources.

mplement a R quirements o ation hazard s to less tha E). Dose to (ALARA).

ifications, d ation exposu STOR condit ined in a ful issioning act s, which sub ffective impl the actual to date. It ining disman g Structures e site-specifi s for additio that have oc ea; changes l area; chang nd fauna an t 35 years.

economic st onal areas; c Radiation Pro f 10 CFR 20 ds, avoid acc an the admin workers and The LACBW designs, wor ure or handli tion (a perio lly SAFSTO tivities. Th bsequently r lementation and projecte is anticipate ntlement acti s, Systems, ic evaluation onal site-spe curred in the in designati ges in design nd designatio tatus in the changes in otection Pro

0. The objec cidental radi nistrative lim d the public WR work co rk packages ing of radioa od of safe sto OR condition his period of reduced radi of the Radi ed radiation ed that the ivities will b and Compo n are ecific e past ion of nation on of past local ogram ctives iation mit of must ontrol s and active orage n until f time iation iation dose most be the onents

La Cross License T Revision Table 8 Sectio 8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.1 8.6.3.12 8.6.3.13 8.6.3.14 8.6.3.15 8.6.3.16 8.6.3.17 8.6.3.18 8.6.3.19 8.6.3.20 se Boiling W Termination n 0 8-1 Summ Powe on Radiolo Activiti workers Activiti Radiolo Onsite l Offsite Water U Water Q Surface Ground Air Qua Aquatic Activiti Activiti Terrestr Activiti Activiti Threate Occupa 1

Socioec 2

Environ 3

Cultura Activiti Activiti 4

Aesthet 5

Noise 6

Irretriev 7

Traffic 8

ISFSI c 9

VCC co impacts 0

Rail lin offsite)

Water Reactor Plan mary of the r Facilities Enviro ogical ies resulting i s

ies resulting i ogical Accide land use activ land use activ Use Quality e water d water ality c Ecology ies within the ies beyond th rial Ecology ies within the ies beyond th ened and Enda ational Issues conomic nmental Justic al and Historic ies within the ies beyond th tics vable Resourc and Transpor construction: l onstruction fo s (onsite) ne upgrade and r

Environme onmental Issu in occupation in dose to the ents vities vities e operational a e operational e operational a e operational angered Spec ce c Resource Im e operational a e operational ces rtation land use impa or the ISFSI: l d extension (o 8-11 ental Impact ue al dose to public area area area area cies mpacts area area acts (onsite) land use onsite and ts from Dec NUREG 0586 (GEIS)

Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No No Yes Yes No Yes No Yes Yes Yes Yes No No No commissioni G-

)

Impac Small Small Small Small Site-spe Small Small Small Small Small Site-spe Small Site-spe Site-spe Small Small Site-spe Small Site-spe Small Small Small Small Site-spe Site-spe Site-spe ing Nuclear ct Significanc cific cific cific cific cific cific cific cific cific r

ce

La Cross License T Revision NUREG-The curr estimated dose for bounded 8.6.2.2.

Dairylan (REMP) environm the radio decommi of 10 CF to adhere public do considere The only liquid wa piping w collection through t discharge of the c protectio LACBW bounded The gase meteorol noble gas or exposu gaseous r 8.6.2.3.

Decomm this analy conducte Fuel Acc decommi the mini LACBW otherwise The deco and cont Protectio se Boiling W Termination n 0

-0586 estim rent occupat d to be 130.3 the decomm by NUREG Offsit d implement at LACBW ment in and a oactive gase issioning act FR 50, Appen e to these l ose from dec ed as Small y authorized aste from th which is a pa n system pu the East Tu es to the inle current and n in accor WR to date co by the evalu eous pathwa logical condi s, the gaseou ure pathway releases.

Enviro missioning ac ysis has con ed and provi cident Analy issioning and mal radioac WR site is in e involving a ommissionin amination le on and Safet Water Reactor Plan mated that 1, tional expen 3 Rem, whic missioning w G-0586 and th te Radiation ted a regulat WR which p around the e eous (airbor tivities do n ndix I, or th limits throug commissioni

l.

effluent rele he LACBWR art of the G-3 umps are not urbine buildi et of the liqu future Rad dance with onclude that uation in NU ay (which i itions during us pathway c

y. Routine a onmental Ef ccident analy ntinued durin ided in regu ysis have no d with spent ctive materi nsufficient f a significant ng of radioa evels remain ty and Heal r

874 Rem wi nded and do ch is well bel will meet the he impact is Exposure an tory complia provided an nvirons of th rne) and liq ot exceed th e fuel cycle ghout the co ing is bound ease pathway R site to the 3 circulating t operable. T ing sump us uid waste mo diation Prot 10 CFR 20 t the public e UREG-0586, includes nob g the time of consists of a air samples a ffects of Acc ysis is integ ng shutdown ular updates oted that w t nuclear fue al resulting for any pot t adverse effe actively cont ning at LAC th Programs 8-12 ill be neede ose expecte low the NUR e regulatory considered nd Monitorin ant Radiolog nnual report he site. The quid effluen he concentrat dose limits ourse of the ded by the cr y for the dis Mississippi g water disch The only liq sing an air o onitor, which tection and 0 and 10 CF exposure as which conc ble gas and f the release.

airborne part are collected cidents and D gral to the li n and decom to the D-Pl with consider el now stored from LAC ential event fect on public taminated S CBWR. Wor s for LACB ed to decom ed to compl REG-0586 e y standards o as Small.

ng gical Environ s with asse e REMP prog nt releases d ation limits o of 40 CFR e decommis riteria in NU charge of tre i River is thr harge system quid effluent operated pum h is still oper REMP at FR 50, App a result of d cludes the im d particulate

. Due to pla ticulate only to determin Decommissio icensing des mmissioning.

lan/PSDAR, ration for th d in the ISFS CBWR opera t to result i c health and SCs will in rker safety i BWR which mmission a s lete the dec estimate. As of 10 CFR 2 nmental Mo essments of gram provid during plant of 10 CFR 20 190. Solutio ssioning. C UREG-0586 eated and fil hrough the s

m. Currently t discharges mp. The ai rable. Conti LACBWR pendix I. RE decommissio mpact is mini e) analysis i ant shutdown and present ne the dose d oning Event sign basis fo

. Post-fuel

, within sec e current sta SI, this analy ation and r in exceeding d safety.

nvolve the h is addressed rely on AL single unit B commissionin s the occupat 20, it is ther onitoring Pro the radiolo des assurance t operations 0, the dose l ons will con Consequently and the imp ltered radioa seal well/dif y, the liquid w at LACBWR ir operated p inued applic R ensures p EMP report oning activit imal.

is subject to n and cessati ts a minor re due to radioa ts or LACBWR accident ana tion Plant age of LACB ysis confirm emaining on g dose limi highest dose d in the Radi LARA princ BWR.

ng is tional refore ogram ogical e that s and limits ntinue y, the pact is active ffuser waste R are pump cation public ts for ties is o the ion of elease active R and alysis Post-BWR s that n the its or rates iation iples.

La Cross License T Revision The safe release o During d addition in NURE decommi LACBW potential reduction Deco Prior Radio Operation and servi in the ISF Radio Explo Loss Natur Hum The publ accidents dose con Plan/PSD analysis i 8.6.2.4.

The deco volumes bulk deb are, and implemen the appro and liqui The majo EnergySo and truck transferre se Boiling W Termination n 0 ty of the pu f radioactive decommissio to maintenan EG-0586 ass issioning of WR are bound consequenc n of the total ontamination radioactive oactive deca nal accident ice condition FSI, operatio oactive wast osions and/o of contamin ral phenome an caused ev lic dose cons s during deco nsequences f DAR and res is therefore b Storag ommissionin of low leve ris materials will continu ntation of th opriate segre d radioactiv ority of the olutions disp ked to a ra ed to a rail c Water Reactor Plan ublic is prin e materials d oning, Soluti nce, waste m sociated wit f LACBWR ded by the ces associate l radionuclid n efforts mad waste shipm ay.

s during dec ns. With the onal acciden te transportat or fires assoc nation contro ena, and vents externa sequences re ommissionin from acciden sulted in dos bounding fo ge and Dispo ng of LACB el radioactiv s such as con ue to be disp he Waste Ma egation, clas e wastes.

Class A low posal site in ail trans-load car. Rail an r

cipally relat during decom ons will perf management, th immediat R. Consequ accident eva ed with thos de inventory de before dec ments, and commissioni e spent nucle nts during de tion acciden ciated with e ol, al to LACBW eported in N ng ranged fro nts during L se ranging fr r the decomm osal of Low-BWR has, a e waste, inc ncrete, meta positioned a anagement P ssification, p w level radio Clive, Utah d facility in nd truck shi 8-13 ted to poten mmissioning form decont

, and surveil te dismantlin uently, the p aluation pre se accidents at LACBWR commissioni ng could res ear fuel rem commission

nts, xplosive and WR.

NUREG-0586 om 0.02 to 0 LACBWR de om 0.027 to missioning o

-Level Radio and will co cluding conta al and asphal as low level rogram and processing, p oactive waste

h. Waste w n Winona, M ipments are ntial hazards g operations.

tamination an llance activit ng would al potential de sented in N would be l R from:

ing, sult from equ moved from t ning can be c d/or combus 6 for onsite, 0.96 rem. A ecommission o 0.065 rem.

of LACBWR oactive Wast ontinue to re aminated eq lt. Materials radioactive associated p packaging, s e from LAC will be loade MN where made in acc associated nd dismantle ties. The ac lso be appli ecommission NUREG-0586 less at LAC uipment failu the LACBW categorized a stible materia non-fuel rel An analysis o ning was pr The NURE R.

te equire the d quipment, to s that cannot e waste. Th procedures, S shipment and CBWR will b d into appro the waste c cordance wit with an airb ement of SS cidents discu icable durin ning acciden

6. However CBWR due t ure, human e WR site and s as follows:
als, lated radiolo of potential p rovided in th EG-0586 acc disposal of ools, clothing t be free rele rough the p Solutions en d control of be shipped t opriate conta container wi th Departme borne SCs in ussed ng the nts at r, the to the
error, stored ogical public he D-cident large g and eased roper nsures solid to the ainers ill be ent of

La Cross License T Revision Transpor Waste Co 8.6.2.5.

Followin radiologi remainin (excludin radiologi license w Chapter 6 criteria.

8.6.3. N 8.6.3.1.

The envi within se The LAC existing L to be con slips are onsite ra activities parking a to occur Several s roadways including remediat 636 foot waste str No sign activities comply w regulator In accord onsite are 8.6.3.2.

Only are and licen and dem se Boiling W Termination n 0 rtation (DOT ontrol Speci Radio ng the com ical surveys ng in backfi ng the ISFSI ical conditio will be termi 6 provide th Non-radiolog Onsite ironmental i ection 4.3.1 o CBWR deco LACBWR l nducted with being const ail line will

s. Containe and equipme in a manner structures su s and rail li g piping and ed, as neces elevation w ream.

nificant env s are anticipa with applica ry requireme dance with t e considered Offsit eas within th nse terminati molition equip Water Reactor Plan T) regulation alist (WCS) ological Crite mpletion of will be perf illed structu I) meets the ns are demo nated, with he methodo gical Effects e Land Use impact assoc of NUREG-0 ommissionin icensed prop hin the LSE tructed. The be modified ers will be u ent/containe similar to w uch as the S ines, will re d tunnels, be ssary. All ot will be remo ironmental ated. In add able United ents.

the guidance d as Small.

te Land Use he existing s ion activitie pment, wast r

ns. If Class facility in A eria for Lice decontamin formed to d ure basemen unrestricted onstrated to b the exceptio ology for de s of Decomm ciated with 0586 to be g ng project is perty previou footprint. S e existing ra d and refurb unloaded an r laydown, s when the faci Switchyard, emain at lic elow the 63 ther systems oved during changes as dition to NRC States Envir e presented (in the Vicin ite licensed es (such as t te container 8-14 s B/C waste Andrews, Tex nse Termina nation, dism emonstrate t nts, any rem use criteria be below the on of the are emonstrating missioning onsite land generically c s located an usly used fo Some onsite ail line supp bished with nd loaded on storage, stag ility was ope Administrat ense termin 6 foot eleva s and compo the decomm ssociated w C requireme ronmental Pr in NUREG-nity) boundary w emporary st s, etc.). Of e is identifie xas.

ation mantlement that the dos maining pipi a specified in e unrestricte ea around th g complianc uses has be onsidered as nd executed or power gen e roads have ported the op a rail spur nsite. Onsi ging and wa erational.

tion Building nation. Sub ation will be onents as we missioning p with the sit ents, decomm rotection Ag

-0586, the p will be used torage and s f the 163.5 a ed, it will b and remed se from resid ing and soi n 10 CFR 20 ed use criteri e ISFSI. LT ce with the een determin s a Small i within the neration; all been refurb peration of t to support d ite activities aste loading g, Crib Hou surface base e radiologica ell as all stru process and te-specific d missioning a gency (USE potential imp to support d staging areas acre site, ab be shipped t diation activ dual radioac ils at LACB 0.1402. Afte ia, the 10 CF TP Chapter 5 unrestricted ned by the N impact.

boundary o work is exp bished. No b the facility.

decommissio s such as ve are and con use as well a ement struct ally assessed uctures abov disposed of decommissio activities wil EPA) and W pacts to land decommissio s for remedi bout 1.5 acre to the

vities, ctivity BWR er the FR 50 5 and d use
NRC, of the pected barge The oning ehicle ntinue as all
tures, d and ve the f as a oning l also WDNR d use oning iation es are

La Cross License T Revision located Appropri contamin These m impacts activities Land in t within a Upper M Crosse-B County h water qu located w basin lan some of t The clos north of with a po valley be Decomm the Refu southern traffic en decommi 8.6.3.3.

LACBW Slough t predomin Mississip the react systems.

Water pu to be pro For a di towns an river wat in Lansin river wa 40 miles The LAC well at th Potable w se Boiling W Termination n 0 within the iate isolatio nation from measures will associated w s at LACBW the vicinity five-mile r Mississippi R Bad Axe Riv has establish ality and pro within the B nd use is agri the agricultu sest municip the site, acro opulation of elow the east missioning ac ge at the so end of the ntering or le issioning act Water WR is located tributary ext nant water u ppi River as tor, river wa River wate ulled from on cessed onsit stance of 40 nd cities alon ter for indust ng, Iowa, ab ater for indu downstream CBWR site he site. The water use du Water Reactor Plan fence-enclo on and con the LSE are l also be mo with the us WR.

of the LACB radius, appro River Nation ver Basin Wa hed a Land &

otection of t Bad Axe Riv icultural and ural land to r pality to the oss from the 258 consist tern bluff.

ctivities are n outhern boun site will be aving the si tivities and t r Use d on the shor tends along usage during condensate ater is not c er does supp nsite wells w te and discha 0 miles dow ng the Missis trial purpose bout 15 mile ustrial purpo

m.

has its own e locations o uring decomm r

osed LSE, ntrol measur ea to the ad onitored to e se of offsite BWR site is oximately o nal Wildlife atershed as a

& Water Res the environm ver Watershe d over 50% o recreational l LACBWR e north-south s of various not being pe ndary of the minimally i te. Consequ the potential res of the Mi the LACBW g the opera cooling wat currently be ply the Low will support arged in acco wnstream of ssippi River es, excluding es downstrea oses betwee n potable wa of all wells missioning o 8-15 where most res will be djacent LAC ensure their e lands are s predomina ne third is e & Fish R a Geographi source Man ment within ed. Approx of the land is land use, sim site is the h running H residences, rformed in a site. Also, impacted du uently, the o impacts to l ississippi Ri WR site for ation of LAC er. With the eing used as w Pressure an decommissi ordance with the site, vir are obtained g the adjacen am of the si en the LAC ater supply, (active and operations is t work is e instituted CBWR prope r effectivene anticipated antly rural an water and b Refuge. WD ic Managem agement Pla this GMU.

imately 36%

s forested. T milar to other village of G Highway 35.

farms, and any land are

, public acce uring decom offsite land land use offs iver. The M r 3,000 feet CBWR was e plant shut d s a cooling nd High Pre ioning tasks h the sites s rtually all m d from groun nt G-3 fossil ite. There a CBWR site provided th abandoned) s not expect expected to to prevent erty as well ess. Thus, n from the d nd undevelo bottomlands DNR has de ment Unit (GM an (18), add The commu

% of the La There is an in r parts of rur Genoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are no site are cons Mississippi Ri t from north s the use of down and fu medium fo essure servic s and this wa tate discharg municipal w und water. T l plant, is th are no other and Prairie hrough a sin

)are illustrat ted to be sig o be condu t the sprea l as offsite a no environm decommissio ped. Of the s included in esignated th MU) and Ve dressing land unity of Gen Crosse-Bad ncreasing sh ral Wisconsi oximately 1 rural comm businesses i to the site or oat launch a by rail and ot affected b sidered Sma iver and its h to south.

f water from uel removed or reactor or ce water sys ater will con ge permits.

water supplie The nearest u he coal-fired r known use e du Chien, ngle groundw ted in Figure nificantly gr ucted.

ad of areas.

mental oning e area n the he La ernon d use, noa is d Axe hift of in.

1 mile munity in the r near at the truck by the all.

Thief The m the from r fuel tems.

ntinue es for use of plant ers of

, WI, water e 8-5.

reater

La Cross License T Revision than the solids ho includes tank that Mississip discolora downspo located in to water u 8.6.3.4.

This sect related to ponds, re to the we The env section 4 a Small At LACB its WDN LACBW System (

and WDN reduced erosion decommi demolitio Radiolog (ODCM)

Potential onsite m per year elevation 201 A/B buildings LACBW As the w LACBW No adver decommi quality ar se Boiling W Termination n 0 potable wat olding tank a sanitary h t services th ppi River a ation. Roof outs or throu nside the LS use are cons Water tion evaluat o surface w eservoirs and est and the R vironmental 4.3.3 of NUR impact.

BWR, all no NR permits.

WR which m (WPDES) as NR Wastew through im and sedi issioning, st on will be m gical impact

) limits and l onsite grou onitoring we for radiolog ns. The plan

MW-202A s in approp WR former pr water from WR, the therm rse impacts issioning ac re bounded b Water Reactor Plan ter use durin and pumpe olding tank he LSE Turb at outfalls.

drains are e gh the norm SE. Conseq sidered Sma r Quality tes potential water and gr d lakes. At Refuge wetlan impact eva REG-0586 ha n-radiologic Water ma meet the Gen s well as LA water Permit mplementatio mentation torm water r monitored and s are minim d assessed th undwater im ells at LACB gical analys nts network A/B; MW-20 riate locatio rocess areas the Missis mal impact to on surface w ctivities. Co by NUREG-r ng plant po ed off by a that services bine Buildin Release ar ither dischar mal effluent r quently, in ac all.

l project eff roundwater.

LACBWR, nds to the so aluation ass as been dete cal water dis anagement p noa sites W ACBWRs W

. In additio n of approp control d

run-off from d controlled mized throug hrough the mpacts are m BWR. Rep is purposes k of down gr 3A/B; and M ons and qua and potentia ssippi is no o the Mississ water and gr onsequently,

-0586 and co 8-16 wer operatio local state s the Admin ng. Storm reas are per rged to the g release pathw ccordance w fects on tho Surface w the nearby b outh.

ociated with ermined to be charges to th programs an WDNR Wisc WDNR Tier I on, impacts priate Best during dec m active imp if necessary gh adherenc REMP and monitored by resentative g when groun radient wells MW-204A/B antity to in al release poi o longer use sippi River h roundwater a

, the potenti onsidered S ons. Sanita permitted s nistration Bu water runof riodically m ground area way after pro with NUREG ose portions water general bodies of wa th surface a e generally a he Mississip nd practices consin Pollu II Industrial to the Miss Managemen commissionin pacted areas

y.

ce to Off-sit d the ground y the routin groundwater ndwater con s (five paire B) are situate ntercept and ints.

ed to cool has been elim are expected ial impacts Small.

ary wastes a sanitary was uilding and a ff is diverte monitored fo surrounding ocessing thru G-0586, the p of the natu lly refers to ater are the M and groundw applicable to ppi River are s have been utant Disch Storm Wate sissippi Rive nt Practices ng operati s undergoin te Dose Cal dwater mon ne sampling r samples ar nditions are ed wells: MW ed around th d detect con operating p minated.

d from the im to surface are collected ste hauler.

a sanitary ho ed directly t or oil sheen g the facility u an oil sepa potential im ural environ o streams, ri Mississippi R water quali o LACBWR e controlled u n implement arge Elimin er General P er will be gr (BMP) for ions.

D g remediatio lculation M nitoring prog of 10 perm re obtained t at low and W-200A/B; he key LACB ntamination plant system mplementati and groundw d in a This olding to the n and y thru arator mpacts nment

ivers, River ty in R with under ted at nation Permit reatly r soil During on or anual gram.

anent twice high MW-BWR from ms at on of water

La Cross License T Revision 8.6.3.5.

The envi 0586 has LACBW requirem BMP to m sources s from the Fugitive demolitio controlle Radiation excessive suppressi Demoliti specifica Appropri extended impacted No adver activities considere 8.6.3.6.

The env NUREG-impact.

The aqua House at approxim disturbed decommi fauna in removal Various these aqu included Plans for equipmen Solutions performe se Boiling W Termination n 0 Air Q ironmental i s been determ WR complies ments of the W minimize fu such as the facility.

dust will on of concr d demolition n Protection e or harmfu ion by mistin ion equipme ations which iate Health a d periods of d by exhaust rse impacts

s. Conseque ed Small.

Aquat vironmental

-0586 has b atic habitat a t the shorel mately 110 fe d during the issioning ac the Mississ of the diffus fresh water uatic enviro 53 species a r the demol nt by barge.

s will contin ed within ap Water Reactor Plan uality impact evalu mined to be g with all app WDNR and ugitive dust d plants dies be generat ete building n and disma n, Environme ul dust emiss ng water wil ent will be h will prev and Safety a operation to emissions.

on air qual ently, the po tic Ecology impact eva been determ at LACBWR line to the feet from the e initial co tivities is no sippi River ser structure, fish specie nments. A and 19 famil lition of stru Consequen nue to main pplicable lim r

uation assoc generally ap plicable Fed the Wiscon during demo sel generator ted from v g structures antlement tec ental, and S sions are no ll be used to operated an vent excessi ssessments a o ensure tha lity are expe tential impa aluation ass mined to be R includes th diffuser stru e shoreline.

nstruction o ot expected and also ne

, which shar es, macro-in 1980 study lies (19).

uctures at L ntly, there is ntain WDNR mits. Protect 8-17 ciated with plicable to L deral and Sta nsin Bureau o olition and d rs are no lon various deco and the exc chniques, wi Safety and H ot generated mitigate du nd maintain ive exhaust and controls at personnel ected from t acts to air qu sociated wit generally ap he area from ucture that Habitats as of the facil to disturb e earby River es a line wit vertebrate p y indicated t LACBWR d no impact to R permits an tion of the n air quality i LACBWR w ate air quali of Air Mana ecommissio nger in serv ommissionin cavation of ith appropria Health staff,

d. As neces st emissions ned in acco emissions s will also be l and the en the impleme uality are bo th aquatic e pplicable to m the intake extends out ssociated wi lity. Howe existing aqu tributaries, th the G-3 fo populations, that the pop do not inclu o the shorelin nd decomm nearby Refu in section 4 with a Small ity regulatio agement, an ning activiti vice and hav ng activities soil. Care ate assessme will be con ssary, measu
s.

ordance with from defec e established nvironment a entation of d ounded by N ecology in o LACBWR structure int t into the M ith this area ever, the im uatic habitats streams and ossil station, and vegeta pulation of f ude the remo ne from this missioning op uge wetlands

.3.4 of NUR l impact.

ons, includin d will imple ies. Air emi ve been rem s, including ful planning ents by Solu nducted to en ures such as h manufactu ctive equipm d during exp are not adve decommissio NUREG-0586 section 4.3 R with a Sm tegral to the Mississippi R a were previ mplementatio s, their flora d wetlands.

is not plann ation exist w fish near the oval of was s type of acti perations wi s and habita REG-ng the ement ission moved g the g and utions nsure s dust urers ment.

pected ersely oning 6 and

.5 of mall e Crib River ously on of a and The ned.

within e site ste or ivity.

ill be ats is,

La Cross License T Revision and will operation Exotic s reproduc While th rusty cray ones in t conducte the site.

A study macrochi and chan

& Fish R performe subseque fossil sta require a construct aquatic a The pote 0586 and The pote and cons 8.6.3.7.

The envi been dete No know decommi appropria The land the forma from the prevalent operation onsite ha

addition, that the d to the sou demolitio anticipate se Boiling W Termination n 0 continue to ns.

species can tion or surv here are som yfish, etc.) i the vicinity ed at LACBW of the im irus), freshw nnel catfish (

Refuge Pool ed in 1980.

ent shutdown ation, has fur any operatio tion, demoli areas beyond ential impact d considered ential impact idered to be Terres ironmental im ermined to b wn terrestri issioning pr ate BMPs ar d around LA ation of abo e Mississipp t in surround ns associated abitats for m with the sh direct heavy uth, no direc on activities ed impact to Water Reactor Plan o be a priori n threaten n vival rate, a me known aq n Vernon C of the LAC WR have no mpingement water drum (

(Ictalurus pu 9 navigation It was de n of LACBW rther reduced ons resulting tion, materia d the site bou ts to the aqu to be Smal ts to the aqu Small.

strial Ecolog mpact evalu be generally ial exotic o roject area.

re, and will c ACBWR was out 27 acres pi River. T ding areas.

d with G-1 many plant an hort-term nat construction ct impacts to do not inclu o the shorelin r

ity when pla native spec and diseases quatic invasi ounty, these BWR site (

ot resulted in and entrain (Aplodinotu unctatus), w n areas from etermined th WR and redu d this impac g in any im al and waste undary.

uatic ecology ll.

uatic ecology gy uation of terr applicable to or invasive To minim continue to b s initially dis by filling riv herefore, th Given the e and G-3 as nd animal sp ture of the w n and demo o any off-site ude the remo ne.

8-18 anning onsit cies and ec s or parasite ve species (

e have been n 20). The op n the introdu nment of t s grunniens) within the Up m the operatio hat the impa uced intake o ct. Decomm mpingement e staging or y within the y beyond the restrial ecolo o LACBWR species h ize the intro be followed.

sturbed by th ver edge and he site shore extensive lan s well as LA pecies, inclu work associa lition projec e sensitive sp oval of waste te dismantle cosystems d es they may (e.g. zebra m noted in slou peration and uction of any the fishes,

), gizzard sh pper Mississ on of LACB act was mo operations, l missioning op and entrain transfer ope site bounda e site bounda ogy in sectio R with a Sm have been n oduction of the construct d low forest eline no lon nd disturbanc ACBWR, th uding endang ated with de ct area is sep pecies are an e or equipm ement or wa due to agg y transmit to mussel, curly ughs and lak d decommis y aquatic in such as bl had (Doroso sippi River N BWR and G-st likely ins limited to su perations are nment impa erations will ary are boun ary have als on 4.3.6 of N mall impact.

noted to o f exotic or i tion of the f t areas with nger resemb ce, construc he terrain h gered or inv ecommission parated from nticipated. S ment by barge aste manage gressive gro o native spe y-leaf pondw kes other tha sioning activ nvasive speci luegill (Lep oma cepedia National Wi

-3 was previ significant.

upporting the e not expect acts to fish.

l be perform nded by NUR so been evalu NUREG-058 occur within invasive spe facility, inclu material dre les the shor ction and yea as not supp asive specie ning and the m the Refuge Since the pla e, there is al ement

owth, ecies.
weed, an the vities ies to pomis anum) ildlife ously The e G-3 ted to No med in REG-uated 6 has n the
ecies, uding edged reline ars of ported es. In e fact e area anned so no

La Cross License T Revision Best Man spills res The pote Small.

The pote evaluated 8.6.3.8.

The pote and cons A review Endange two spec which LA A m Missi A pla facin No noted due to th the existi River to terrestria presence been not Higgins e Likewise Wisconsi Habitat P limestone township for this p The Pere Species l of falcon protectio delisted hatching decommi falcon re se Boiling W Termination n 0 nagement Pr ulting from ential impac ential impac d and consid Threa ential impact idered Sma w of the U ered, Propos cies are desig ACBWR res mussel specie issippi River ant species, g slopes: Th d adverse im he siting and ing G-3 foss the west and al or aquatic of the Higg ted. A mus eye pearlym e, the Northe in Departme Program (22 e cliffs over ps within Ve plant species egrine Falcon list in 1975 n nesting box n (23). Ove in 1999 (24 efforts. S issioning wi covery effor Water Reactor Plan ractices and equipment o cts to terres cts to the t dered to be atened or End ts to Threa all.

U.S. Fish an sed, and Ca gnated as T sides in:

es, Higgins r: Endanger Northern m hreatened.

mpacts to aqu operation of sil station, th d the rail lin habitats wh gins eye pea ssel survey o mussels were ern monksho ent of Agri

2) has noted r creeks and ernon County to be impac n (Falco per and starting xes at its fac erall, Peregr 4); however, Since the G ill not interf rt and popula r

d site proced operation.

strial ecolog terrestrial ec Small.

dangered Sp atened or E nd Wildlife ndidate Spe Threatened eye pearly red.

monkshood uatic species f the LACBW he majority o e and Highw hich may be arlymussel i of the Thief found.

ood has not culture, Tra that the Nor d streams an

y. This hab cted by decom regrinus) we g in 1993, D cilities, inclu ine Falcon r Dairyland G-3 facility fere with G-ation.

8-19 dures require gy are boun cology beyo pecies Endangered Service lis ecies County or Endang ymussel (La (Aconitum n have been n WR facility, of the licens way 35 to the inhabited by n mussel be f Slough riv been noted ade & Cons rthern monk nd the plant bitat is not p mmissioning ere put on the airyland sup uding at the G restoration p has continue will still c

-3 operation e prompt cle nded by NU ond the site species are sting, the F ty Distributi ered within ampsilis hig noveborance noted during

, as well as t sed site, situ e east, is dev y threatened eds in the vi ver area was on or in the sumer Prote kshoods hab is present i present withi g operations e Wisconsin pported reco G-3 stack, to program effo ed to maint continue ope ns or its stac eanup and re UREG-0586 e boundary e bounded b Federally-Lis ion (21) con n Vernon Co gginsii), with ense), with plant operat the previous uated betwee veloped and d or endange icinity of LA s conducted e vicinity of ections End bitat is leach in the White in or near th n Endangered overy efforts o support ch orts resulted tain the G-3 erations and ck, there is emediation o 6 and consid have also by NUREG-sted Threat ncluded that ounty, the co h habitat in habitat in n tions. In gen G-1 facility en the Missis does not su ered species.

ACBWR ha d in 1978 an LACBWR.

dangered Sp hed sandston estown and he LACBWR d and Threat s with install hick hatching in the bird b nesting site d the LACB no impact t of oil dered been

-0586

tened, only ounty n the north-
neral, y, and ssippi upport The as not nd no The pecies e and Stark R site tened lation g and being e and BWR to the

La Cross License T Revision 8.6.3.9.

Occupati considere The envi NUREG-impact.

programs also duri are those ergonom Solutions contracto prevent o with fed States Oc Typical following Safet Safet Provi Work speci such Obtai Invol packa Issuin lesson Hold reinfo 8.6.3.10.

A detaile LTP.

8.6.3.11.

LACBW efficient with som se Boiling W Termination n 0 Occup ional issues/

ed Small.

ironmental i

-0586 has b While decom s addressing ing repair an e related to mic, and biolo s is commi or health and occupational eral and sta ccupational H contractor g:

ty training as ty emphasis iding all wor ker training ific worker q as heavy equ ining and rev lving Health ages and par ng periodic ns learned.

ing safety s orce safety e Cost ed discussion Socio WR was shut to operate.

me projects Water Reactor Plan pational Issu safety has b impact evalu been determ mmissioning g worker saf nd refueling o human he ogical hazard itted to dec d safety prog l injuries an ate regulatio Health and S safety pract s a part of th as the first to rkers with a and require qualification uipment dem viewing Safe h and Safet rticipating in safety mess stand-downs events and le n of the site economic Im down in 19 By 1994, so associated r

ues/Safety een evaluate uation assoc mined to be g involves in fety were im outages. T ealth and sa ds. Radiolog commissioni grams to effe d illnesses.

ons including Safety Admi tices and c he site access opic of discu Health and S ed certificati ns. Certain s molition firm fety Data She ty staff in n pre-job wal ages to com s whenever essons learne decommissi mpacts 987 as the sm ome increme with the r 8-20 ed to be boun ciated with generally ap ncreased indu mplemented The occupati afety, includ gical impact ing LACBW ectively cont Contractor g Wisconsin inistration (O communicati s program fo ussion at me Safety bookl ions review specialty sub ms.

eets for chem reviewing lkdowns, wo mmunicate aw serious saf ed site-wide.

ioning proje mall size of ental decomm removal of nded by NU occupationa pplicable to ustrial activi during the ional issues ding impact ts were discu WR safely trol hazards health and s n Departme OSHA) requ ions will in or all employ eetings.

let.

w prior to as bcontractors micals bough and approv ork condition wareness of fety events ect costs is p f the plant d missioning p the RPV i UREG-0586 al issues in o LACBWR ities and safe operation of and safety ts from phy ussed in sect through the in the work safety progr ent of Labor uirements.

nclude actio yees and sub ssignment to are mobiliz ht onsite.

ving decomm n assessmen f significant occur to c presented in did not make planning and in 2007 an and the imp section 4.3.

R with a Sm fety focus, si f the facility impacts ass ysical, chem tion 8.6.2.

e applicatio environmen rams will co r and the U ons such as b-contractors o tasks requ zed, as neces missioning nts and review safety issue ommunicate Chapter 7 o e it economi d activities b d other me pact is 10 of mall imilar y and essed

mical, on of nt and omply United s the
s.

uiring

ssary, work ws.

s and e and of this ically began etallic

La Cross License T Revision radioactiv complete periodic the ISFSI More ac timefram obtained personne activities increased project an Therefor impact is 8.6.3.12.

The perc Vernon C Crosse) a impact to Decomm transport Highway relative t There is impacted site speci 8.6.3.13.

A review May 201 historical the plant Archeolo which wa Also, as along Hi the USA Upper M Axe. Th first nucl marker a concerns se Boiling W Termination n 0 ve compone ed by 2012.

spikes in w I project) (2 ctive decom me. Some o from outsid el from the lo s will have a d use of the nd workers w e, the socio s considered Enviro centages of County are q and more po o the greater missioning ac t equipment y 35 traversin o rail and tru no reason d by the deco ific impact i Cultur w of the N 5 and the W l sites in Ve

t. The close ogical Site ne as certified b indicated in ghway 35 in CE Lock an Mississippi. T he third was lear generati t the waysid associated w Water Reactor Plan ents over th Staff size at orkforce hir 5).

mmissioning of the labor de Wisconsi ocal and reg a short-term local craft w with supplie oeconomic i Small.

onmental Ju low-income quite low, a opulated Wi population, ctivities will and debris.

ng north-sou uck transpor to believe ommissionin s considered ral, Historic, National Park Wisconsin H ernon County est historical ear Stoddard by the Nation n NUREG-0 n Vernon Co nd Dam No.

The second, s adjacent to ing plant. In de across Hig with having r

he past 7 ye t the plant ha ring to suppo and struct tasks requi in; however, gional areas m positive ec workforce a es and servic impact is ev ustice e and minor approximatel sconsin coun including sp cause slight The truck t uth by the si rtation as a re that low-in ng project.

d Small.

, and Archeo k Service N Historical So y and no str l site with pr d, WI. locate nal Park Ser 191, the Sta ounty. One i

8. It descri

, about 7.5 m o LACBWR n 2009, crew ghway 35 fro a public-acc 8-21 ears. A sm as gradually ort specific tural demoli ire specializ

, some of th surrounding conomic imp and opportun es.

valuated to ity groups w ly 3%, and nties further pecial group t increases i traffic will u ite. There esult of deco ncome and m Per NUREG ological Res National Reg ociety (29) th ructures in th re-historical ed approxima rvice in 1980 ate of Wisco is about a ha ibes the orig miles south o R and comme ws erected a om the site (

cess marker o mall ISFSI f y been reduce project need ition is ant zed skills an he workforc g the site. O pact on the nities for loc be bounded within the V lower than r from the L ps, is expecte in truck traff use existing will be no e ommissionin minority po G-0586 and ources gister of H through May he village o l structural r ately 7 miles 0 (30).

onsin has pla alf mile nort gin of the pr of the plant, emorates th a new, updat (31). This ne on Dairylan facility hold ed as operat ds (e.g. 40 p ticipated in nd equipmen e will be co Overall, the d local comm cal business d by NURE Village of G those in larg LACBWR si ed.

fic to and fro main street environment ng.

opulations w this evaluat Historic Plac y 2015 ident f Genoa or w remnants is s north of th aced three h th of LACBW resent system

, highlights t e plant itsel ted Wisconsi ew location d property.

ding 5 casks tions ceased, personnel sta n the 2016-nt which wi omprised of decommissio munity due t ses to suppor EG-0586 and Genoa as we ge cities (e.

ite (26) (27) om LACBW routes, prim tal justice im will be adve tion, the pote ces (28) thr tified only a within 5 mil the Goose I he LACBWR historical ma WR, overloo m of locks o the Battle of lf as Wiscon in state histo resolved sec s was

, with affing

-2017 ill be f craft oning to the rt the d the ell as

g. La

. No WR to marily mpact ersely ential rough a few les of Island R site, arkers oking on the f Bad nsins orical curity

La Cross License T Revision Dairylan presents or catego Land di primarily Land tha the const station) w erosion c Based on transport impact on 0586 an Archaeol 8.6.3.14.

The envi 0586 has The impa disturban complete removed River. T completi Therefor NUREG-8.6.3.15.

The envi has been LACBW 475 feet north sid south sid hospitals approxim Noise ge equipmen temporar complete experienc se Boiling W Termination n 0 d sent an un the control r orize any par isturbance fo y shipped via at was distur truction and were perform controls and n the historic tation of sys n cultural, h nd based u logical Reso Aesth ironmental i s been determ act of decom nce and dura ed. Once all

, the aesthet The final de on of the dec e, the enviro

-0586 and th Noise ironmental i determined WR is located west of the de and a port de. There ar within 1 m mately 1 mile eneration wi nt. Noise ry and will e, noise level ced during th Water Reactor Plan nused control rod and a re rt of the LAC or the remov a rail.

rbed for proj d demolition med in acco stormwater cal informat stem compon istoric, and a upon this e ources are co hetics impact evalu mined to be g mmissioning ation. These l of the majo tics will imp etermination commission onmental im he impact is impact evalu to be genera d on the sho rail road lin tion of the U re no residen mile. The n e to the north ill primarily associated w occur prim ls in the vici he operation r

l rod to the W eplica fuel as CBWR plant val of large jects beyond of the G-1 ordance wit pollution pr ion presente nents and w archeologica valuation, t onsidered Sm uation assoc generally ap on site aesth impacts are or plant struc prove slightly on usage o ing.

mpact associ considered uation assoc ally applicab ore of the M ne. USACE Upper Missis nces within 1 earest comm h of the plan result from with decomm marily durin inity of the L n of the facili 8-22 Wisconsin H ssembly (32 t as a histori components d the nuclea fossil statio th applicable evention pla ed in NUREG waste, the de al resources.

the potentia mall.

ciated with a plicable to L hetics (e.g. v e temporary ctures and bu y by providi of the decom iated with ae Small.

ciated with n ble to LACB Mississippi R E land and L ssippi River 1,000 feet of munity, the nt.

m demolition missioning a ng daylight LACBWR s ity.

Historical Mu 2); however, ical site.

s will be min ar operationa on and the c e permits an ans.

G-0191 and ecommission

. Consequen al impacts aesthetics in LACBWR w visual skylin and will cea uildings east ing a more o mmissioned esthetics is noise in sect BWR with a River, 300 fe Lock and D National W f the station village of G n activities i and shipment hours. On site will be r useum in Ma there is no nimized as t al areas (e.g onstruction nd included d the current ning will ha ntly, as boun to Cultura n section 4.3 with a Small ne) is limited ase when dec t of the Miss open view o property wi evaluated to tion 4.3.16 o Small imp feet from the Dam No. 8 ar Wildlife & Fi structures a Genoa, Wisc nvolving he t of waste is nce the dec reduced to le adison, WI w objective to the waste w

g. associated of the G-3 d appropriate approach fo ave no signif nded by NUR al, Historic, 3.15 of NUR l impact.

d in terms of commissioni sissippi Rive of the Missis ill be made o be bounde of NUREG-pact.

e river bank re located o sh Refuge o and no schoo consin is lo eavy constru s intermitten commissionin evels below which o save will be d with fossil e soil or the ficant REG-and REG-f land ing is er are ssippi upon ed by

-0586 k, and on the on the ols or ocated uction nt and ng is those

La Cross License T Revision Due to t impacts decommi imposed Therefor NUREG-8.6.3.16.

The envi NUREG-impact.

During th efforts w Low leve disposal

addition, Texas.

As stated process a and fuel These re destabiliz Therefor bounded 8.6.3.17.

The envi NUREG-impact.

The num than dur increased effect on barge tra support t operation Therefor by NURE 8.6.3.18.

Cumulati impact of se Boiling W Termination n 0 the distance on noise l issioning, S by the Villa e, the envir

-0586 and th Irretri ironmental im

-0586 has b he demolitio will be made el radioactiv site in Clive any Class B d in NUREG are the mater used for con esource com zing.

e, the enviro by NUREG Traffi ironmental i

-0586 has b mber of shipm ing the ope d traffic and n traffic flow affic. The e the operating ns.

e, the enviro EG-0586 and Cumu ive impact is f the action w Water Reactor Plan e of the stat levels durin Solutions agr age of Genoa ronmental i he impact is ievable Reso mpact evalu been determ on and struc

e. Some me ve waste has e, Utah. Th B/C waste th G-0586, irretr rials used to nstruction m mmitments onmental im G-0586 and th c and Transp impact evalu been determ ments and th ration of th wear and te w or road we xisting barg g G-3 fossil onmental im d the impact ulative Impac s defined the when added r

tion from se ng decomm rees to com

a.

mpact assoc considered ources uation associ mined to be tural disman etals from th s been and his facility h hat is genera rievable reso decontamin machinery and are conside mpact associ he impact is portation uation assoc mined to be he volume of he facility.

ar on roadw ear. There w ge traffic on station and mpact associ t is considere cts e impact on to other pas 8-23 ensitive rece issioning an mply with a ciated with Small.

iated with irr generally ap ntlement of he site are an will continu has sufficient ated will be s ources that w nate the facili d for transpo ered to be iated with ir considered ciated with t generally ap f waste ship Non-radiolo ways. It is an will be no ra the Thief S are not asso ated with tr ed as Small the environ st, present, a eptors, there nd demoliti any noise li noise is ev retrievable r pplicable to the station, anticipated to ue to be ship t space for t shipped to th would occur ity (e.g., rag ortation of m minor and rretrievable Small.

transportatio pplicable to pped are grea ogical impac nticipated tha adioactive w Slough branc ociated with ransportation

l.

nment which and reasonab e will be li ion activitie imitations (e valuated to resources in o LACBWR recycling an o be release pped to the the disposal he WCS fac during the d gs, solvents, materials to a are neither resources is on issues in o LACBWR ater during d cts of transp at there will waste shipme ch and the M LACBWR d n is evaluate h results from bly foreseeab imited temp es. During e.g. quiet h be bounde section 4.3.

R with a Sm nd asset reco d as clean s EnergySolu of this wast cility in And decommissio gases, and to and from the r detectable s evaluated section 4.3.

R with a Sm decommissio portation in be no signif ents execute Mississippi R decommissio ed to be bou m the increm ble future act orary g the hours) ed by 18 of mall overy scrap.

utions te. In

drews, oning ools),

e site.

e nor to be 17 of mall oning clude ficant ed via River oning unded mental tions.

La Cross License T Revision The cum decommi terrestria cumulativ Past, pr decommi Mississip resources activities over tim major irr disposal disposal In summ 8.7.

O 8.7.1. F Decomm Hand Work Publi Licen Work Liqui Haza Hand Characte of lead p 8.7.1.1.

The majo are admin Part 2 Part 5 Part 5 Part 6 se Boiling W Termination n 0 mulative impa issioning. T al ecology.

ve impact.

roposed an issioning of ppi river for s listed abo s are not proj e, exceed th retrievable re of low lev and will ther ary, the cum Overview of Federal Requ missioning ac dling, packag ker radiation ic radiation p nse terminati ker health an id and gaseo ardous waste dling and rem rization and aint.

Nucle ority of radio nistered by t 20 - Radiatio 50 - Decomm 51 - Environ 61 - Disposa Water Reactor Plan acts were as hese include Irretrievabl nd future f coal-fired p boating. Th ove were al jected to sig he minor im esource attri vel radioactiv refore have n mulative impa Regulation uirements ctivities that ging, and shi n protection, protection, ion and final nd safety, ous effluent r generation/

moval of asb d removal of ear Regulator ological acti the NRC. A on protection missioning a nmental prot al of radioac r

sessed by fi e surface w le resources foreseeable power plant he individual ll determine gnificantly ac mpact of the ibutable to L ve waste. N no cumulativ act to site re ns Governin are subject t ipment of rad l site release

releases, disposition,
estos, f Polychlorin ry Commiss ivities fall un Applicable Ti
n.

activities.

tection.

ctive waste.

8-24 rst determin water and gro s were also e actions ts and recrea l impacts of ed to be mi ccumulate en individual a LACBWR d No future ac ve effect.

esources is pr g Decommi to federal reg dioactive wa e,

nated Biphen ion nder Title 10 itle 10 regula ning the reso oundwater, o evaluated include co ational use f the LACBW inor. The p nvironmenta activities on decommissio ctivities wil rojected to b issioning Ac gulations inc

aste, nyls (PCBs) 0 of the Cod ations includ ources affect air quality, d from the onstruction, of the land WR decomm past, present al impacts th n the affecte oning was th ll involve r be minor.

ctivities and clude:

), and Handl de of Federa de:

ted by LACB aquatic eco e perspectiv operation as access t missioning o t and future hat would in ed resources he use of lan radioactive w d Site Releas ling and rem al Regulation BWR

ology, ve of and to the on the e site
total,

. The nd for waste se moval n and

La Cross License T Revision Part 7 throu Part 7 8.7.1.2.

The Env Federal R Part 6 Parts Part 1 Part 1 Parts Part 2 Part 7 Part 1 8.7.2. F Permits a environm fall unde Wisc Wisc Envir Villa Occu This info intended 8.8.

C As previo decommi site-spe potential predicted (NUREG environm se Boiling W Termination n 0 71 - Packag ugh 174 also 73 - Physica U.S. E vironmental Regulations 61 - Asbesto 122 to 125 -

141 - Safe D 190 - Radiat 260 to 272 -

280 - Under 761 - Toxic 129-132 - C Federal, Stat and approval mental protec r Federal, St onsin Depar onsin Depa ronmental an ge of Genoa upational Saf ormation pro to be all-inc Conclusion ously evalua issioning LA cific in NU environmen d in and wil G-0191, NUR mental chang Water Reactor Plan ing and tran apply).

al Protection Environment Protection A apply as foll os Handling

- National P Drinking Wa tion Protecti

- Resource C rground Stor Substance C Clean Water A te and Loca ls from or no ction purpos tate and loca rtment of Na artment of nd Occupatio a

fety and Hea ovided abov clusive.

ated in the D ACBWR are UREG-0586 ntal impacts ll be bounde REG-0586, a ges associate r

nsportation o n of Plants an tal Protectio Agency (EP lows:

and Remova Pollutant Dis ater Standard ion Standard Conservatio rage Tanks Control Act (

Act al Requirem otifications t ses. Decomm al jurisdiction atural Resour Health Se onal Health, alth Adminis ve is a gene D-Plan/PSDA temporary a have been associated w ed by the p and D-Plan/P ed with decom 8-25 f radioactive nd Materials n Agency PA) regulatio al scharge Elim ds ds for Nuclea n and Recov (TSCA) for ments to state and l missioning a n include, bu rces (WDNR ervices, Div Radiation P stration (OSH eral overview AR, the non-and not signi evaluated a with decomm reviously is PSDAR). T mmissioning e waste (reg ons outlined mination Syst ar Power Op very Act (RC Polychlorina local agenci activities an ut are not lim R) vision of Protection Se HA) w of the ap radiological ificant. The and there is missioning L ssued enviro Therefore, th

g.

gulations in 4 d in Title 40 tem (NPDES perations CRA) ated Biphen es are requir nd related sit mited to the Public Hea ection pplicable reg l environmen e potential is no significa LACBWR h onmental im here are no n 49 CFR Part 0 of the Cod S) nyls (PCBs) red for safety te operations following:

alth, Burea gulations and ntal impacts sues identifi ant impact.

have already mpact assessm new or signif ts 171 de of y and s that au of d not from ied as The been ments ficant

La Cross License T Revision 8.9.

R

1.

U C

2

2.

D R

3.

D S

4.

U re C

5.

U S

N

6.

D D

7.

E S

8.

E S

9.

A

10.

H 3

11.

U ht

12.

D

13.

U

14.

U ht

15.

ht se Boiling W Termination n 0 References U.S. Nuclear Content of Li 011.

Dairyland Po Reactor - Sep Dairyland Po upplement R U.S. Nuclear elated to Ope Cooperative -

U.S. Nuclear tatement (G November 20 Dairyland Po Decommissio EnergySoluti urvey Repor EnergySoluti urvey Repor Atomic Powe Haley & Aldr 0, 2012.

U.S. Census B ttps://www.c Dairyland Po U.S. Fish & W U.S. Army C ttp://www.m ttp://www.ci Water Reactor Plan Regulatory icense Termi wer Compan ptember 1972 wer Coopera Report - Jun Regulatory eration of th

- April 1980 Regulatory EIS) on Dec 002.

wer Coopera oning Activit ons GG-EO-rt for Octobe ons LC-RS-rt for June th er Review, A rich, Hydrog Bureau, 200 census.gov/p wer Coopera Wildlife Serv orps of Engi mvp.usace.ar ity-data.com r

Commission ination Plan ny, DPC-ED

2.

ative, Enviro ne 15, 1973.

Commission he La Crosse Commission commissioni ative, LACB ties Report (

-313196-RS er and Novem PN-164017-hru August 2 Atomic Jour geological C 8-2012 Ame programs-su ative - http:/

vice - http://

ineers -

rmy.mil/Miss m/city/Genoa 8-26 n Regulatory s for Nuclea D-3, Environ onmental Re n NUREG-0 Boiling Wa n NUREG-0 ing of Nucle BWR Decom (D-Plan/PSD S-RP-001, LA mber 2014 F

-001, LACB 2015 Field W rnal - Septe onceptual Si erican Comm urveys/acs/ne

//www.dairy www.fws.go sions/Naviga a-Wisconsin.

y Guide 1.17 ar Power Rea nmental Repo eport, La Cro 0191, Final E ater Reactor 0586, Generi ear Facilities mmissioning DAR), Revis ACBWR Ra Field Work -

BWR Radiolo Work - Nove ember 24, 20 ite Model, F munity Surve ews/data-rele ynet.com/ene ov/refuge/Up ation/LocksD

.html.

79, Standard actors, Revis ort - Lacross osse Boiling Environment by Dairylan ic Environm

, Supplemen Plan and Po sion - March adiological C

- November ogical Chara ember 2015.

011.

File No. 3870 ey. (5-year d eases.2012.h ergy_resourc pper_Missis Dams/LockD d Format and sion 1 - June se Boiling W g Water Reac tal Statemen nd Power mental Impact nt 1, Volume ost Shutdown h 2014.

Characterizat r 2015.

acterization 05-001 - Au data sets) -

html.

ces/genoa.ph ssippi_River/

Dam8.aspx.

d e

Water

ctor, nt t

e 1 -

n tion ugust hp.

/.

La Cross License T Revision

16.

D P

W

17.

D D

18.

V

19.

M C

D

20.

W

21.

U C

ht

22.

W S

23.

D ht

24.

W ht

25.

H L

26.

V re

27.

U

28.

N

29.

W

30.

N S

31.

D 2

32.

W se Boiling W Termination n 0 Dame & Moo otential, La Wisconsin fo Dairyland Po Decommissio Vernon Coun McInterny, M Cooperatives December 19 Wisconsin De http://dnr.w U.S. Fish and Candidate Sp ttp://www.fw Wisconsin De pecies Habit Dairyland Po ttp://www.d Wisconsin De ttp://dnr.wi.g Hubbuch, Ch La Crosse Tri Village of Ge ecords.com/w U.S. Census B National Park Wisconsin Hi National Park ite Ve-502 -

Dairyland Po 009.

Wisconsin Hi Water Reactor Plan ore, Geotech Crosse Boil r Gulf Unite wer Coopera oning Plan, r nty, Land & W Michael. C., I s Genoa Site 980.

epartment of i.gov/lakes/i d Wildlife Se pecies Coun ws.gov/midw epartment of tat Program wer Coopera dairynet.com/

epartment of gov/eek/critt hris, A nuclea ibune - July enoa, Vernon wisconsin/ge Bureau, Vern k Service, Na istorical Soc k Service, Na

- http://nrhp.

wer Coopera istorical Soc r

hnical Investi ing Water R ed Nuclear F ative, LaCro revised Nove Water Resou Impingemen e, Thesis, sub f Natural Re invasives.

ervice, Feder nty Distributi west/endang f Agriculture

- http://datcp ative, Peregr

/environmen f Natural Re ter/bird/falco ar option: A y 15, 2012.

n County, W enoa_data.ht non County, ational Regi ciety - http://

ational Regi focus.nps.go ative, Power ciety, Nuclea 8-27 igation of G Reactor (LAC Fuels Corpor osse Boiling ember 2003.

urce Manage nt and Entrai bmitted to U esources, Aqu rally-Listed ion, April 20 ered/lists/wi e, Trade & C p.wi.gov/Fa rine Falcon R ntal/falcon_p esources, Per on.htm.

fter 25 years WI Public Rec tm.

, Wisconsin ster of Histo

/www.wisco stry of Histo ov/natregsea r for Generat ar Fuel Assem Geology, Seis CBWR) near ration - Octo Water Reac ement Plan -

inment of Fi University of quatic Invasiv Threatened, 015 -

isc-city.html Consumer Pr arms/Endang Restoration program.php regrine Falco s, Genoa rea cords - http:

- http://www oric Places -

onsinhistory.

oric Places, G archresult.do tions, Genoa mbly - http:/

smology and r Genoa, Ver ober 1973.

ctor (LACBW

- February 2 shes at Dairy f Wisconsin-ve Species -

, Endangered

l.

rotection, En gered_Specie Program -

p.

on -

actors waste

//www.open w.census.gov http://ww.np org/.

Goose Island

o.

a Site Updat

//www.wisc d Liquefactio rnon County WR) 2009.

yland Power

-La Crosse -

- Vernon Co d, Proposed ndangered es/index.aspx e gets new ho n-public-v/.

ps.gov/nr/.

d Archeolog te - Decemb onsinhistory on y,

r ounty and

x.
ome, gical er y.org.

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fig r

ure 8-1 S

8-28 Site Regionaal Location

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r

Figure 8-2 8-29 2

Site Ovverview

L L

R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-3 8-30 LACBWR Buildings

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fi r

igure 8-4 8-31 Topographhical Map

L L

R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-55 Groundwat 8-32 ter Sampling Wells - LACBW WR Site