ML16207A548: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16207A548
| number = ML16207A548
| issue date = 04/28/2016
| issue date = 04/28/2016
| title = South Texas, Units 1 and 2, Revision 18 to Updated Safety Analysis Report, Chapter 6, Table of Contents
| title = 8 to Updated Safety Analysis Report, Chapter 6, Table of Contents
| author name =  
| author name =  
| author affiliation = South Texas Project Nuclear Operating Co
| author affiliation = South Texas Project Nuclear Operating Co
Line 14: Line 14:
| document type = Updated Final Safety Analysis Report (UFSAR)
| document type = Updated Final Safety Analysis Report (UFSAR)
| page count = 14
| page count = 14
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:STPEGS UFSAR TC 6-1 Revision 18 TABLE OF CONTENTS CHAPTER 6 ENGINEERED SAFETY FEATURES Section Title Page 6.1 ENGINEERED SAFETY FEATURES MATERIALS 6.1-1 6.1.1 Metallic Materials 6.1-1 6.1.2 Organic Materials 6.1-3 6.1.3 Post Accident Chemistry 6.1-5 6.1.4 Post Accident Sump Solution Chemistry Adjustment 6.1-5 6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 Containment Functional Design 6.2-1 6.2.2 Containment Heat Removal Systems 6.2-29 6.2.3 Secondary Containment Functional Design (Does not apply to STPEGS) 6.2-40 6.2.4 Containment Isolation System 6.2-40 6.2.5 Combustible Gas Control in Containment 6.2-47 6.2.6 Containment Leakage Testing 6.2-49 6.3 EMERGENCY CORE COOLING SYSTEM 6.3-l 6.3.l Design Bases 6.3-l 6.3.2
===System Design===
6.3-2 6.3.3 Performance Evaluation 6.3-17 6.3.4 Tests and Inspections 6.3-25 6.3.5 Instrumentation Requirements 6.3-27 6.4 HABITABILITY SYSTEMS 6.4-l 6.4.l Design Bases 6.4-l 6.4.2
===System Design===
6.4-2 6.4.3 System Operational Procedures 6.4-5 6.4.4 Design Evaluation 6.4-5 6.4.5 Testing and Inspection 6.4-7 6.4.6 Instrumentation Requirement 6.4-9 6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5-l 6.5.l Engineered Safety Feature Filter Systems 6.5-l 6.5.2 Containment Spray System - Iodine Removal 6.5-4 6.5.3 Fission Product Control Systems 6.5-8
STPEGS UFSAR TABLE OF CONTENTS (Continued)
CHAPTER 6 Section Title Page TC 6-2 Revision 18 6.6 INSERVICE INSPECTION OF ASME CODE CLASS 2 AND CLASS 3 COMPONENTS 6.6-l 6.6.l Components Subject to Inspection 6.6-l 6.6.2 Accessibility 6.6-l 6.6.3 Examination Techniques and Procedures 6.6-2 6.6.4 Inspection Intervals 6.6-2 6.6.5 Examination Categories and Requirements 6.6-2 6.6.6 Evaluation of Examination Results 6.6-2 6.6.7 System Pressure Tests 6.6-3 6.6.8 Augmented Inservice Inspection 6.6-3 6.7 MAIN STEAM ISOLATION VALVE LEAKAGE CONTROL 6.7-1 SYSTEM
TC 6-3 Revision 18 LIST OF TABLES CHAPTER 6 Table Title Page 6.1-1 Engineered Safety Features Materials 6.1-7 6.1-3 Protective Coatings on Westinghouse-Supplied Equipment Inside Containment 6.1-11 6.1-4 Coating Schedule for Surfaces Inside Containment (Excluding NSSS Scope of Supply) 6.1-12 6.2.1.1-1 Containment Design Accidents 6.2-56 6.2.1.1-2 DBA Calculated Pressures in Containment 6.2-58 6.2.1.1-3 Containment Data Used in P/T Analysis 6.2-59 6.2.1.1-4 Not Used 6.2.1.1-5 Engineered Safety Features System Information 6.2-61 6.2.1.1-7 Modeling of Structural Heat Sinks for Containment Analyses 6.2-62 6.2.1.1-8 Thermophysical Properties of Structural Heat Sink Materials for Containment Analysis 6.2-65 6.2.1.1-9 Containment Heat Sink Surface Heat Transfer Model 6.2-66 6.2.1.1-10 Accident Chronology for DBA LOCA 6.2-67 6.2.1.1-14 Summary of Containment MSLB P/T Analysis Results 6.2-68 6.2.1.1-15 Accident Chronology for DBA MSLB (Peak Temperature Case) 6.2-70 6.2.1.2-1 (Item G)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Pressurizer Spray Line DEG Break 6.2-72 6.2.1.2-1 (Item J)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for MSLB 6.2-82 6.2.1.2-1 (Item K)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Main Feedwater Line Break 6.2-83 6.2.1.2-1 (Item L)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - Radioactive Pipe 6.2-85 Chase Subcompartment Blowdown 6.2.1.2-1 (Item M)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - RHR 1A Valve Room Subcompartment Analyses 6.2-86 6.2.1.2-1 (Item N)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - Regenerative Heat Exchanger Subcompartment Blowdown 6.2-88 6.2.1.2-1 (Item P)
Short-Term Mass and Energy Release Rates for Subcompartment Analysis for RHR 12 Line DEG 6.2-89 6.2.1.2-1 (Item Q)
Short-Term Mass and Energy Release Rates for Subcompartment Analysis for FW 16 DEG Break at SG Nozzle Connection, HFP, FW @ 460 °F 6.2-97
LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page TC 6-4 Revision 18 6.2.1.2-5A Steam Generator Loop Compartment Peak Pressure Summary for RHR Line Break Analysis 6.2-94 6.2.1.2-5B Steam Generator Loop Compartment Peak Pressure Summary for FWLB Analysis 6.2-96 6.2.1.2-6 Steam Generator Loop Compartment Pressure - Junction Properties for RHR/SI Analysis (42-Node Model) 6.2-98 6.2.1.2-6A Steam Generator Loop Compartment Pressure Analysis -
Junction Properties for FWLB Analysis 6.2-102 6.2.1.2-7A Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-104 6.2.1.2-7B Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-105 6.2.1.2-7C Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Steam Generator Subjected to FWLB 6.2-106 6.2.1.2-7D Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Steam Generator Subjected to FWLB 6.2-107 6.2.1.2-8A Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-108 6.2.1.2-8B Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-109 6.2.1.2-9 Pressurizer Subcompartment Analysis Spray Line Break 6.2-110 6.2.1.2-13 Main Steam Line and Feedwater Line Subcompartment Analysis 6.2-111 6.2.1.2-14 Main Steam Line and Feedwater Subcompartment Analysis Junction Description - Steam Line Break Analysis 6.2-112 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Description 6.2-113
STPEGS UFSAR LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page TC 6-5 Revision 18 6.2.1.2-16 Regenerative Heat Exchanger Subcompartment Junction Description 6.2-114 6.2.1.2-17 Radioactive Pipe Chase Subcompartment Nodal Description 6.2-115 6.2.1.2-18 Radioactive Pipe Chase Subcompartment Junction Description 6.2-116 6.2.1.2-19 RHR1A Valve Room Subcompartment Nodal Description 6.2-117 6.2.1.2-20 RHR1A Valve Room Subcompartment Junction Description 6.2-118 6.2.1.3-1 System Parameter Initial Conditions 6.2-119 6.2.1.3-2 LOCA - Total Pumped ECCS Flow Rate for Two Trains of SI Operating 6.2-120 6.2.1.3-3 LOCA - Total Pumped ECCS Flow Rate for Three Trains of SI Operating 6.2-121 6.2.1.3-4 Double-Ended Hot Let Break Blowdown Mass and Energy Releases 6.2-122 6.2.1.3-5A Double-Ended Pump Suction Break Mass and Energy Releases (Minimum SI) 6.2-125 6.2.1.3-5B Double-Ended Pump Suction Break Mass and Energy Releases (Maximum SI) 6.2-132 6.2.1.3-6 Decay Heat Data Based on ANS-51.1-1979 Plus 2 Sigma Uncertainty 6.2-141 6.2.1.3-6A Decay Heat Based on Standard Review Plan ASB 9-2 Correlations 6.2-142 6.2.1.3-7 Not Used 6.2.1.3-8 Not Used 6.2.1.3-9 Double-Ended Pump Suction Break Principal Parameters During Reflood (Minimum SI) 6.2-144 6.2.1.3-10 Double-Ended Pump Suction Break Principal Parameters During Reflood (Maximum SI) 6.2-145 6.2.1.3-11 Not Used 6.2.1.3-12 Not Used 6.2.1.3-13 Double-Ended Pump Suction Break Mass Balance (Minimum SI) 6.2-146 6.2.1.3-14 Double-Ended Pump Suction Break Mass Balance (Maximum SI) 6.2-147 6.2.1.3-15 Double-Ended Hot Let Break Mass Balance 6.2-148 6.2.1.3-16 Double-Ended Pump Suction Break Energy Balance (Minimum SI) 6.2-149 6.2.1.3-17 Double-Ended Pump Suction Break Energy Balance (Maximum SI) 6.2-150 6.2.1.3-18 Double-Ended Hot Leg Break Energy Balance 6.2-151 6.2.1.4-l Mass and Energy Release Rates for Main Steam Line Break -
1.4 ft2 Double-Ended Rupture at 30% Power (MSIV Failure) 6.2-152
STPEGS UFSAR LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page TC 6-6 Revision 18 6.2.1.4-2 Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 0% Power (MSIV Failure) 6.2-156 6.2.1.5-1 Blowdown Mass and Energy Releases 6.2-160 6.2.1.5-1a Broken Loop Injection Spill During Blowdown 6.2-161 6.2.1.5-2 Reflood Mass and Energy Releases 6.2-162 6.2.1.5-3 Active Heat Sink Data for Minimum Post LOCA Containment Pressure 6.2-163 6.2.1.5-4 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure 6.2-164 6.2.2-1 Containment Spray System - Design Parameters 6.2-166 6.2.2-2 Design Data for the Reactor Containment Fan Cooler (RCFC)
System 6.2-167 6.2.2-3 Failure Modes and Effect Analysis - Containment Heat Removal Active Failure 6.2-170 6.2.2-4 CSS Pump NPSH Parameters 6.2-174 6.2.2-5 Estimate of CSS Spray Mass Flow Rates for Various Regions 6.2-175 6.2.4-1 Containment Isolation System Failure Modes and Effect Analysis 6.2-176 6.2.6-1 Systems Which Need not be Vented During Type A Testing 6.2-184 6.2.6-3 Containment Isolation Valves to be Leak Tested in Opposite Direction 6.2-186 6.3-1 Emergency Core Cooling System Component Parameters 6.3-32 6.3-2 ECCS Relief Valve Data 6.3-34 6.3-3 Motor-Operated Valves in ECCS 6.3-35 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-37 6.3-5 Single Active Failure Analysis for Emergency Core Cooling System Components Short Term Phase 6.3-39 6.3-6 Emergency Core Cooling System Recirculation Piping - Passive Failure Analysis, Long-Term Phase 6.3-40 6.3-7 Manual Actions Required for Safety Injection Modes of Operation 6.3-41 6.3-8 Emergency Core Cooling System Shared Functions Evaluation 6.3-42 6.3-10 Emergency Core Cooling System - Safeguards Operations Failure Modes and Effects Analysis 6.3-43
STPEGS UFSAR LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page TC 6-7 Revision 18 6.3-11 ECCS Check Valves to be Leak Tested 6.3-48 6.3-12 ECCS Active Powered Components 6.3-49 6.3-13 Air-Operated Valves in the ECCS 6.3-51 6.3-14 Solenoid-Operated Valves in the ECCS 6.3-52 6.4-1 Equipment to Which the Control Room Operators Could Require Access During an Emergency 6.4-11 6.4-2 Control Room Dose Analysis 6.4-12 6.5-1 Comparison of Engineered Safety Feature Filter Systems with Regulatory Guide l.52, Rev. 2, Requirements 6.5-11 6.5-2 Input Parameters for Determining Iodine Removal Coefficients 6.5.14 6.5-3 Input Parameters to Determine Minimum pH for Sump Solution 6.5-15 6.5-4 Input Parameters to Determine Maximum pH for Sump Solution 6.5-16
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-8 Revision 18 6.2.1.1-3 Not used 6.2.1.1-25 Containment Pressure - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-26 Not Used 6.2.1.1-27 Containment Temperature - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-28 Condensing Heat Transfer Coefficient - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-29 Total Vapor Region Energy - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-30 Containment Pressure - LOCA DEHL 6.2.1.1-31 Containment Temperatures - LOCA DEHL 6.2.1.1-32 Heat Transfer Coefficient - LOCA DEHL 6.2.1.1-33 Containment Pressure -LOCA DEPS (Minimum SI) 6.2.1.1-34 Containment Temperatures - LOCA DEPS (Minimum SI) 6.2.1.1-35 Heat Transfer Coefficient - LOCA DEPS (Minimum SI) 6.2.1.1-36 Containment Pressure - LOCA DEPS (Maximum SI) 6.2.1.1-37 Containment Temperatures - LOCA DEPS (Maximum SI) 6.2.1.1-38 Heat Transfer Coefficient - LOCA DEPS (Maximum SI)
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-9 Revision 18
* The drawings below are reference drawings only and are not to be revised.
6.2.1.2-3 Steam Generator Loop Compartment Node Arrangement El. (-)11'33" - (Sheet 1 of 8) 6C18-9-N-05001-2*
El. (-)2'-0" - (Sheet 2 of 8) 6C18-9-N-05002-2*
El. 19'0-" - (Sheet 3 of 8) 6C18-9-N-05003-2*
El. (-)37'3" - (Sheet 4 of 8) 6C18-9-N-05004-2*
El. 52'0" - (Sheet 5 of 8) 6C18-9-N-05005-1*
El. 68'0" - (Sheet 6 of 8) 6C18-9-N-05006-2*
Section AA - (Sheet 7 of 8) 6C18-9-N-05007-3*
Section BB - (Sheet 8 of 8) 6C18-9-N-05008-2*
6.2.1.2-4 Pressurizer Compartment Nodes Between:
El. 69'-9" & 85'-0" - (Sheet 1 of 3) 6C18-9-N-05006-4*
El. 46'-7" & 69'-9" - (Sheet 2 of 3) 6C18-9-N-05005-2*
(Sheet 3 of 3) 6C18-9-N-05008-4*
6.2.1.2-5 Surge Line Subcompartment Nodes Between:
El. 46'-4" & 69'-9" - (Sheet 1 of 5) 6C18-9-N-05005-2*
El. 37'-3" & 43'-4" - (Sheet 2 of 5) 6C18-9-N-05004-3*
El. 19'-0" & 37'-3" - (Sheet 3 of 5) 6C18-9-N-05003-3*
El. 5'-9" & 19'-0" - (Sheet 4 of 5) 6C18-9-N-05002-3*
(Sheet 5 of 5) 6C18-9-N-05008-2*
6.2.1.2-6 Main Steamline and Feedwater Line Subcompartment Nodes Between:
El. 19'-0" & 37'-3" - (Sheet 1 of 3) 6C18-9-N-05003-3*
El. 37'-3" & 52'-0" - (Sheet 2 of 3) 6C18-9-N-05004-3*
El. 52'-0" & 68'-0" - (Sheet 3 of 3) 6C18-9-N-05005-2*
6.2.1.2-7 Regenerative Heat Exchanger Subcompartment Nodes Between El. 37'-3" & 52-0" 6C18-9-N-05004-4*
6.2.1.2-8 Radioactive Pipe Chase Between Elevations 29' & 37'-3" 5C15-9-P-05029-1*
6.2.1.2-9 RHR 1A and 1B Valve Room Subcompartment
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-10 Revision 18 Nodes Between:
El. 37'3" and 52'0" - (Sheet 1 of 2) 6C18-9-N-05004-4*
(Sheet 2 of 2) 6C18-9-N-05003-4*
6.2.1.2-11 Node and Junction Diagram for Steam Loop Compartment (4 Sheets) 6.2.1.2-11A Nodalization Diagram for Steam Generator Loop Compartment for FWLB Analysis (8 sheets) 6.2.1.2-12 Pressurizer Subcompartment Nodal Model 6.2.1.2-13 Surge Line Subcompartment Nodal Model 6.2.1.2-14 Main Steam and Feedwater Line Subcompartment Nodal Model 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Model 6.2.1.2-16 Radioactive Pipe Chase Subcompartment Nodal Model 6.2.1.2-17 RHR Valve Room Subcompartment Nodal Model 6.2.1.2-20A Steam Generator Loop Compartment Pressurization Analysis, 12 RHR Break in Node 15 (11 sheets) 6.2.1.2-20B Steam Generator Loop Compartment Pressurization Analysis, 12 RHR Break in Node 4 (11 sheets) 6.2.1.2-20C Steam Generator Loop Compartment Pressurization Analysis, 12 RHR Break in Node 12 (11 sheets) 6.2.1.2-20D Steam Generator Loop Compartment
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-11 Revision 18 Pressurization Analysis, 16 FWLB (Nodes 1& 17) 6.2.1.2-21A Steam Generator Forces and Moments Analysis -
Steam Generator Forces due to RHR Break in Nodes 15 (6 sheets) 6.2.1.2-21B Steam Generator Loop Compartment Forces and Moments on Steam Generator due to FWLB (11 sheets) 6.2.1.2-22A Reactor Coolant Pump Forces and Moments due to RHR Break in Node 15 (6 sheets) 6.2.1.2-23 Pressurizer P-T Analysis (3 Sheets) 6.2.1.2-25 MSLB Subcompartment P-T Analysis (2 Sheets) 6.2.1.2-26 MFWLB Subcompartment Analysis (2 sheets) 6.2.1.2-27 Calculated Pressures Regenerative Heat Exchanger Subcompartment 6.2.1.2-28 Calculated Pressures Radioactive Pipe Chase Subcompartment 6.2.1.2-29 Calculated Pressures RHR 1A & 1B Valve Room Subcompartment 6.2.1.2-30 Steam Generator Loop Compartment Force and Moment Coordinate System 6.2.1.5-1 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, SI, High TAVG, Containment Backpressure 6.2.1.5-2 Containment Fan Cooler Performance Curves
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-12 Revision 18 6.2.1.5-3 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, Min SI, High TAVG, Containment Heat Transfer Coefficient 6.2.2-1 P&ID Containment Spray System 5N10-9-F-05037#1 5N10-9-F-05037#2 6.2.2-3 Composite Piping, Reactor Containment Building - Plan - El. 83'-0" - Area 12 (Sheet 1 of 4) 5C15-9-P-05025-6 Plan - El. 83'-0" - Area 13 (Sheet 2 of 4) 5C15-9-P-05026-5 Plan - El. 83'-0" - Area 14 (Sheet 3 of 4) 5C15-9-P-05027-5 Plan - El. 83'-0" - Area 15 (Sheet 4 of 4) 5C15-9-P-05028-6 6.2.2-4 P&ID HVAC Reactor Containment 5V14-9-V-00016#1 Building, Fan Coolers Subsystem 5V14-9-V-00016#2 6.2.2-6 Reactor Containment Building CSS Spray Coverage Plan - El. (-)11'-3" 6C18-9-N-05001-2*
6.2.2-7 Reactor Containment Building CSS Spray Coverage Plan - El. (-)2'-0" 6C18-9-N-05002-2*
6.2.2-8 Reactor Containment Building CSS Spray Coverage Plan - El. 19'-0" 6C18-9-N-05003-2*
6.2.2-9 Reactor Containment Building CSS Spray Coverage Plan - El. 37'-3" 6C18-9-N-05004-2*
6.2.2-10 Reactor Containment Building CSS Spray Coverage Plan - El. 52'-0" 6C18-9-N-05005-1*
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-13 Revision 18 6.2.2-11 Reactor Containment Building CSS Spray Coverage Plan - El. 68'-0" 6C18-9-N-05006-2*
6.2.2-12 Reactor Containment Building CSS Spray Coverage Section B-B 6C18-9-N-05007-1*
6.2.2-13 HVAC Reactor Containment Building Plan El. (-)11'-3" Area 13 5V14-9-V-00083 6.2.2-14 HVAC Reactor Containment Building Enlarged Plant and Section RCFC 5V14-9-V-00090 6.2.4-1 Containment Penetrations (100 Sheets) 6.2.4-2 Arrangement of Sump Piping 6.2.6-1 P&ID Containment Leak Rate Test 5C56-0-F-05058 (CLRT) Pressurization System 6.3-1 P&ID Safety Injection System 5N12-9-F-05013#1 5N12-9-F-05013#2 6.3-2 P&ID Safety Injection System 5N12-9-F-05014#1 5N12-9-F-05014#2 6.3-3 P&ID Safety Injection System 5N12-9-F-05015#1 5N12-9-F-05015#2 6.3-4 P&ID Safety Injection System 5N12-9-F-05016#1 5N12-9-F-05016#2 6.3-5 Emergency Core Cooling System, Process Flow Diagram 6.3-6 Low Head SI Pump Performance Curves 6.3-7 High Head SI Pump Performance Curve
STPEGS UFSAR LIST OF FIGURES (Continued)
CHAPTER 6 Figure Reference Number Title Number TC 6-14 Revision 18 6.3-8 RWST Level Setpoints 6.4-1 Control Room Envelope 6.4-2 Control Room Layout 6.5-1 Containment Sump pH vs. Time 6.5-2 Drop Size Distribution for the Sprayed Region}}

Latest revision as of 21:42, 9 January 2025

8 to Updated Safety Analysis Report, Chapter 6, Table of Contents
ML16207A548
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/2016
From:
South Texas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16207A547 List: ... further results
References
NOC-AE-16003371
Download: ML16207A548 (14)


Text

STPEGS UFSAR TC 6-1 Revision 18 TABLE OF CONTENTS CHAPTER 6 ENGINEERED SAFETY FEATURES Section Title Page 6.1 ENGINEERED SAFETY FEATURES MATERIALS 6.1-1 6.1.1 Metallic Materials 6.1-1 6.1.2 Organic Materials 6.1-3 6.1.3 Post Accident Chemistry 6.1-5 6.1.4 Post Accident Sump Solution Chemistry Adjustment 6.1-5 6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 Containment Functional Design 6.2-1 6.2.2 Containment Heat Removal Systems 6.2-29 6.2.3 Secondary Containment Functional Design (Does not apply to STPEGS) 6.2-40 6.2.4 Containment Isolation System 6.2-40 6.2.5 Combustible Gas Control in Containment 6.2-47 6.2.6 Containment Leakage Testing 6.2-49 6.3 EMERGENCY CORE COOLING SYSTEM 6.3-l 6.3.l Design Bases 6.3-l 6.3.2

System Design

6.3-2 6.3.3 Performance Evaluation 6.3-17 6.3.4 Tests and Inspections 6.3-25 6.3.5 Instrumentation Requirements 6.3-27 6.4 HABITABILITY SYSTEMS 6.4-l 6.4.l Design Bases 6.4-l 6.4.2

System Design

6.4-2 6.4.3 System Operational Procedures 6.4-5 6.4.4 Design Evaluation 6.4-5 6.4.5 Testing and Inspection 6.4-7 6.4.6 Instrumentation Requirement 6.4-9 6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5-l 6.5.l Engineered Safety Feature Filter Systems 6.5-l 6.5.2 Containment Spray System - Iodine Removal 6.5-4 6.5.3 Fission Product Control Systems 6.5-8

STPEGS UFSAR TABLE OF CONTENTS (Continued)

CHAPTER 6 Section Title Page TC 6-2 Revision 18 6.6 INSERVICE INSPECTION OF ASME CODE CLASS 2 AND CLASS 3 COMPONENTS 6.6-l 6.6.l Components Subject to Inspection 6.6-l 6.6.2 Accessibility 6.6-l 6.6.3 Examination Techniques and Procedures 6.6-2 6.6.4 Inspection Intervals 6.6-2 6.6.5 Examination Categories and Requirements 6.6-2 6.6.6 Evaluation of Examination Results 6.6-2 6.6.7 System Pressure Tests 6.6-3 6.6.8 Augmented Inservice Inspection 6.6-3 6.7 MAIN STEAM ISOLATION VALVE LEAKAGE CONTROL 6.7-1 SYSTEM

TC 6-3 Revision 18 LIST OF TABLES CHAPTER 6 Table Title Page 6.1-1 Engineered Safety Features Materials 6.1-7 6.1-3 Protective Coatings on Westinghouse-Supplied Equipment Inside Containment 6.1-11 6.1-4 Coating Schedule for Surfaces Inside Containment (Excluding NSSS Scope of Supply) 6.1-12 6.2.1.1-1 Containment Design Accidents 6.2-56 6.2.1.1-2 DBA Calculated Pressures in Containment 6.2-58 6.2.1.1-3 Containment Data Used in P/T Analysis 6.2-59 6.2.1.1-4 Not Used 6.2.1.1-5 Engineered Safety Features System Information 6.2-61 6.2.1.1-7 Modeling of Structural Heat Sinks for Containment Analyses 6.2-62 6.2.1.1-8 Thermophysical Properties of Structural Heat Sink Materials for Containment Analysis 6.2-65 6.2.1.1-9 Containment Heat Sink Surface Heat Transfer Model 6.2-66 6.2.1.1-10 Accident Chronology for DBA LOCA 6.2-67 6.2.1.1-14 Summary of Containment MSLB P/T Analysis Results 6.2-68 6.2.1.1-15 Accident Chronology for DBA MSLB (Peak Temperature Case) 6.2-70 6.2.1.2-1 (Item G)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Pressurizer Spray Line DEG Break 6.2-72 6.2.1.2-1 (Item J)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for MSLB 6.2-82 6.2.1.2-1 (Item K)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Main Feedwater Line Break 6.2-83 6.2.1.2-1 (Item L)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - Radioactive Pipe 6.2-85 Chase Subcompartment Blowdown 6.2.1.2-1 (Item M)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - RHR 1A Valve Room Subcompartment Analyses 6.2-86 6.2.1.2-1 (Item N)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - Regenerative Heat Exchanger Subcompartment Blowdown 6.2-88 6.2.1.2-1 (Item P)

Short-Term Mass and Energy Release Rates for Subcompartment Analysis for RHR 12 Line DEG 6.2-89 6.2.1.2-1 (Item Q)

Short-Term Mass and Energy Release Rates for Subcompartment Analysis for FW 16 DEG Break at SG Nozzle Connection, HFP, FW @ 460 °F 6.2-97

LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-4 Revision 18 6.2.1.2-5A Steam Generator Loop Compartment Peak Pressure Summary for RHR Line Break Analysis 6.2-94 6.2.1.2-5B Steam Generator Loop Compartment Peak Pressure Summary for FWLB Analysis 6.2-96 6.2.1.2-6 Steam Generator Loop Compartment Pressure - Junction Properties for RHR/SI Analysis (42-Node Model) 6.2-98 6.2.1.2-6A Steam Generator Loop Compartment Pressure Analysis -

Junction Properties for FWLB Analysis 6.2-102 6.2.1.2-7A Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-104 6.2.1.2-7B Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-105 6.2.1.2-7C Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Steam Generator Subjected to FWLB 6.2-106 6.2.1.2-7D Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Steam Generator Subjected to FWLB 6.2-107 6.2.1.2-8A Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-108 6.2.1.2-8B Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-109 6.2.1.2-9 Pressurizer Subcompartment Analysis Spray Line Break 6.2-110 6.2.1.2-13 Main Steam Line and Feedwater Line Subcompartment Analysis 6.2-111 6.2.1.2-14 Main Steam Line and Feedwater Subcompartment Analysis Junction Description - Steam Line Break Analysis 6.2-112 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Description 6.2-113

STPEGS UFSAR LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-5 Revision 18 6.2.1.2-16 Regenerative Heat Exchanger Subcompartment Junction Description 6.2-114 6.2.1.2-17 Radioactive Pipe Chase Subcompartment Nodal Description 6.2-115 6.2.1.2-18 Radioactive Pipe Chase Subcompartment Junction Description 6.2-116 6.2.1.2-19 RHR1A Valve Room Subcompartment Nodal Description 6.2-117 6.2.1.2-20 RHR1A Valve Room Subcompartment Junction Description 6.2-118 6.2.1.3-1 System Parameter Initial Conditions 6.2-119 6.2.1.3-2 LOCA - Total Pumped ECCS Flow Rate for Two Trains of SI Operating 6.2-120 6.2.1.3-3 LOCA - Total Pumped ECCS Flow Rate for Three Trains of SI Operating 6.2-121 6.2.1.3-4 Double-Ended Hot Let Break Blowdown Mass and Energy Releases 6.2-122 6.2.1.3-5A Double-Ended Pump Suction Break Mass and Energy Releases (Minimum SI) 6.2-125 6.2.1.3-5B Double-Ended Pump Suction Break Mass and Energy Releases (Maximum SI) 6.2-132 6.2.1.3-6 Decay Heat Data Based on ANS-51.1-1979 Plus 2 Sigma Uncertainty 6.2-141 6.2.1.3-6A Decay Heat Based on Standard Review Plan ASB 9-2 Correlations 6.2-142 6.2.1.3-7 Not Used 6.2.1.3-8 Not Used 6.2.1.3-9 Double-Ended Pump Suction Break Principal Parameters During Reflood (Minimum SI) 6.2-144 6.2.1.3-10 Double-Ended Pump Suction Break Principal Parameters During Reflood (Maximum SI) 6.2-145 6.2.1.3-11 Not Used 6.2.1.3-12 Not Used 6.2.1.3-13 Double-Ended Pump Suction Break Mass Balance (Minimum SI) 6.2-146 6.2.1.3-14 Double-Ended Pump Suction Break Mass Balance (Maximum SI) 6.2-147 6.2.1.3-15 Double-Ended Hot Let Break Mass Balance 6.2-148 6.2.1.3-16 Double-Ended Pump Suction Break Energy Balance (Minimum SI) 6.2-149 6.2.1.3-17 Double-Ended Pump Suction Break Energy Balance (Maximum SI) 6.2-150 6.2.1.3-18 Double-Ended Hot Leg Break Energy Balance 6.2-151 6.2.1.4-l Mass and Energy Release Rates for Main Steam Line Break -

1.4 ft2 Double-Ended Rupture at 30% Power (MSIV Failure) 6.2-152

STPEGS UFSAR LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-6 Revision 18 6.2.1.4-2 Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 0% Power (MSIV Failure) 6.2-156 6.2.1.5-1 Blowdown Mass and Energy Releases 6.2-160 6.2.1.5-1a Broken Loop Injection Spill During Blowdown 6.2-161 6.2.1.5-2 Reflood Mass and Energy Releases 6.2-162 6.2.1.5-3 Active Heat Sink Data for Minimum Post LOCA Containment Pressure 6.2-163 6.2.1.5-4 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure 6.2-164 6.2.2-1 Containment Spray System - Design Parameters 6.2-166 6.2.2-2 Design Data for the Reactor Containment Fan Cooler (RCFC)

System 6.2-167 6.2.2-3 Failure Modes and Effect Analysis - Containment Heat Removal Active Failure 6.2-170 6.2.2-4 CSS Pump NPSH Parameters 6.2-174 6.2.2-5 Estimate of CSS Spray Mass Flow Rates for Various Regions 6.2-175 6.2.4-1 Containment Isolation System Failure Modes and Effect Analysis 6.2-176 6.2.6-1 Systems Which Need not be Vented During Type A Testing 6.2-184 6.2.6-3 Containment Isolation Valves to be Leak Tested in Opposite Direction 6.2-186 6.3-1 Emergency Core Cooling System Component Parameters 6.3-32 6.3-2 ECCS Relief Valve Data 6.3-34 6.3-3 Motor-Operated Valves in ECCS 6.3-35 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-37 6.3-5 Single Active Failure Analysis for Emergency Core Cooling System Components Short Term Phase 6.3-39 6.3-6 Emergency Core Cooling System Recirculation Piping - Passive Failure Analysis, Long-Term Phase 6.3-40 6.3-7 Manual Actions Required for Safety Injection Modes of Operation 6.3-41 6.3-8 Emergency Core Cooling System Shared Functions Evaluation 6.3-42 6.3-10 Emergency Core Cooling System - Safeguards Operations Failure Modes and Effects Analysis 6.3-43

STPEGS UFSAR LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-7 Revision 18 6.3-11 ECCS Check Valves to be Leak Tested 6.3-48 6.3-12 ECCS Active Powered Components 6.3-49 6.3-13 Air-Operated Valves in the ECCS 6.3-51 6.3-14 Solenoid-Operated Valves in the ECCS 6.3-52 6.4-1 Equipment to Which the Control Room Operators Could Require Access During an Emergency 6.4-11 6.4-2 Control Room Dose Analysis 6.4-12 6.5-1 Comparison of Engineered Safety Feature Filter Systems with Regulatory Guide l.52, Rev. 2, Requirements 6.5-11 6.5-2 Input Parameters for Determining Iodine Removal Coefficients 6.5.14 6.5-3 Input Parameters to Determine Minimum pH for Sump Solution 6.5-15 6.5-4 Input Parameters to Determine Maximum pH for Sump Solution 6.5-16

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-8 Revision 18 6.2.1.1-3 Not used 6.2.1.1-25 Containment Pressure - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-26 Not Used 6.2.1.1-27 Containment Temperature - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-28 Condensing Heat Transfer Coefficient - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-29 Total Vapor Region Energy - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-30 Containment Pressure - LOCA DEHL 6.2.1.1-31 Containment Temperatures - LOCA DEHL 6.2.1.1-32 Heat Transfer Coefficient - LOCA DEHL 6.2.1.1-33 Containment Pressure -LOCA DEPS (Minimum SI) 6.2.1.1-34 Containment Temperatures - LOCA DEPS (Minimum SI) 6.2.1.1-35 Heat Transfer Coefficient - LOCA DEPS (Minimum SI) 6.2.1.1-36 Containment Pressure - LOCA DEPS (Maximum SI) 6.2.1.1-37 Containment Temperatures - LOCA DEPS (Maximum SI) 6.2.1.1-38 Heat Transfer Coefficient - LOCA DEPS (Maximum SI)

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-9 Revision 18

  • The drawings below are reference drawings only and are not to be revised.

6.2.1.2-3 Steam Generator Loop Compartment Node Arrangement El. (-)11'33" - (Sheet 1 of 8) 6C18-9-N-05001-2*

El. (-)2'-0" - (Sheet 2 of 8) 6C18-9-N-05002-2*

El. 19'0-" - (Sheet 3 of 8) 6C18-9-N-05003-2*

El. (-)37'3" - (Sheet 4 of 8) 6C18-9-N-05004-2*

El. 52'0" - (Sheet 5 of 8) 6C18-9-N-05005-1*

El. 68'0" - (Sheet 6 of 8) 6C18-9-N-05006-2*

Section AA - (Sheet 7 of 8) 6C18-9-N-05007-3*

Section BB - (Sheet 8 of 8) 6C18-9-N-05008-2*

6.2.1.2-4 Pressurizer Compartment Nodes Between:

El. 69'-9" & 85'-0" - (Sheet 1 of 3) 6C18-9-N-05006-4*

El. 46'-7" & 69'-9" - (Sheet 2 of 3) 6C18-9-N-05005-2*

(Sheet 3 of 3) 6C18-9-N-05008-4*

6.2.1.2-5 Surge Line Subcompartment Nodes Between:

El. 46'-4" & 69'-9" - (Sheet 1 of 5) 6C18-9-N-05005-2*

El. 37'-3" & 43'-4" - (Sheet 2 of 5) 6C18-9-N-05004-3*

El. 19'-0" & 37'-3" - (Sheet 3 of 5) 6C18-9-N-05003-3*

El. 5'-9" & 19'-0" - (Sheet 4 of 5) 6C18-9-N-05002-3*

(Sheet 5 of 5) 6C18-9-N-05008-2*

6.2.1.2-6 Main Steamline and Feedwater Line Subcompartment Nodes Between:

El. 19'-0" & 37'-3" - (Sheet 1 of 3) 6C18-9-N-05003-3*

El. 37'-3" & 52'-0" - (Sheet 2 of 3) 6C18-9-N-05004-3*

El. 52'-0" & 68'-0" - (Sheet 3 of 3) 6C18-9-N-05005-2*

6.2.1.2-7 Regenerative Heat Exchanger Subcompartment Nodes Between El. 37'-3" & 52-0" 6C18-9-N-05004-4*

6.2.1.2-8 Radioactive Pipe Chase Between Elevations 29' & 37'-3" 5C15-9-P-05029-1*

6.2.1.2-9 RHR 1A and 1B Valve Room Subcompartment

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-10 Revision 18 Nodes Between:

El. 37'3" and 52'0" - (Sheet 1 of 2) 6C18-9-N-05004-4*

(Sheet 2 of 2) 6C18-9-N-05003-4*

6.2.1.2-11 Node and Junction Diagram for Steam Loop Compartment (4 Sheets) 6.2.1.2-11A Nodalization Diagram for Steam Generator Loop Compartment for FWLB Analysis (8 sheets) 6.2.1.2-12 Pressurizer Subcompartment Nodal Model 6.2.1.2-13 Surge Line Subcompartment Nodal Model 6.2.1.2-14 Main Steam and Feedwater Line Subcompartment Nodal Model 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Model 6.2.1.2-16 Radioactive Pipe Chase Subcompartment Nodal Model 6.2.1.2-17 RHR Valve Room Subcompartment Nodal Model 6.2.1.2-20A Steam Generator Loop Compartment Pressurization Analysis, 12 RHR Break in Node 15 (11 sheets) 6.2.1.2-20B Steam Generator Loop Compartment Pressurization Analysis, 12 RHR Break in Node 4 (11 sheets) 6.2.1.2-20C Steam Generator Loop Compartment Pressurization Analysis, 12 RHR Break in Node 12 (11 sheets) 6.2.1.2-20D Steam Generator Loop Compartment

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-11 Revision 18 Pressurization Analysis, 16 FWLB (Nodes 1& 17) 6.2.1.2-21A Steam Generator Forces and Moments Analysis -

Steam Generator Forces due to RHR Break in Nodes 15 (6 sheets) 6.2.1.2-21B Steam Generator Loop Compartment Forces and Moments on Steam Generator due to FWLB (11 sheets) 6.2.1.2-22A Reactor Coolant Pump Forces and Moments due to RHR Break in Node 15 (6 sheets) 6.2.1.2-23 Pressurizer P-T Analysis (3 Sheets) 6.2.1.2-25 MSLB Subcompartment P-T Analysis (2 Sheets) 6.2.1.2-26 MFWLB Subcompartment Analysis (2 sheets) 6.2.1.2-27 Calculated Pressures Regenerative Heat Exchanger Subcompartment 6.2.1.2-28 Calculated Pressures Radioactive Pipe Chase Subcompartment 6.2.1.2-29 Calculated Pressures RHR 1A & 1B Valve Room Subcompartment 6.2.1.2-30 Steam Generator Loop Compartment Force and Moment Coordinate System 6.2.1.5-1 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, SI, High TAVG, Containment Backpressure 6.2.1.5-2 Containment Fan Cooler Performance Curves

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-12 Revision 18 6.2.1.5-3 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, Min SI, High TAVG, Containment Heat Transfer Coefficient 6.2.2-1 P&ID Containment Spray System 5N10-9-F-05037#1 5N10-9-F-05037#2 6.2.2-3 Composite Piping, Reactor Containment Building - Plan - El. 83'-0" - Area 12 (Sheet 1 of 4) 5C15-9-P-05025-6 Plan - El. 83'-0" - Area 13 (Sheet 2 of 4) 5C15-9-P-05026-5 Plan - El. 83'-0" - Area 14 (Sheet 3 of 4) 5C15-9-P-05027-5 Plan - El. 83'-0" - Area 15 (Sheet 4 of 4) 5C15-9-P-05028-6 6.2.2-4 P&ID HVAC Reactor Containment 5V14-9-V-00016#1 Building, Fan Coolers Subsystem 5V14-9-V-00016#2 6.2.2-6 Reactor Containment Building CSS Spray Coverage Plan - El. (-)11'-3" 6C18-9-N-05001-2*

6.2.2-7 Reactor Containment Building CSS Spray Coverage Plan - El. (-)2'-0" 6C18-9-N-05002-2*

6.2.2-8 Reactor Containment Building CSS Spray Coverage Plan - El. 19'-0" 6C18-9-N-05003-2*

6.2.2-9 Reactor Containment Building CSS Spray Coverage Plan - El. 37'-3" 6C18-9-N-05004-2*

6.2.2-10 Reactor Containment Building CSS Spray Coverage Plan - El. 52'-0" 6C18-9-N-05005-1*

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-13 Revision 18 6.2.2-11 Reactor Containment Building CSS Spray Coverage Plan - El. 68'-0" 6C18-9-N-05006-2*

6.2.2-12 Reactor Containment Building CSS Spray Coverage Section B-B 6C18-9-N-05007-1*

6.2.2-13 HVAC Reactor Containment Building Plan El. (-)11'-3" Area 13 5V14-9-V-00083 6.2.2-14 HVAC Reactor Containment Building Enlarged Plant and Section RCFC 5V14-9-V-00090 6.2.4-1 Containment Penetrations (100 Sheets) 6.2.4-2 Arrangement of Sump Piping 6.2.6-1 P&ID Containment Leak Rate Test 5C56-0-F-05058 (CLRT) Pressurization System 6.3-1 P&ID Safety Injection System 5N12-9-F-05013#1 5N12-9-F-05013#2 6.3-2 P&ID Safety Injection System 5N12-9-F-05014#1 5N12-9-F-05014#2 6.3-3 P&ID Safety Injection System 5N12-9-F-05015#1 5N12-9-F-05015#2 6.3-4 P&ID Safety Injection System 5N12-9-F-05016#1 5N12-9-F-05016#2 6.3-5 Emergency Core Cooling System, Process Flow Diagram 6.3-6 Low Head SI Pump Performance Curves 6.3-7 High Head SI Pump Performance Curve

STPEGS UFSAR LIST OF FIGURES (Continued)

CHAPTER 6 Figure Reference Number Title Number TC 6-14 Revision 18 6.3-8 RWST Level Setpoints 6.4-1 Control Room Envelope 6.4-2 Control Room Layout 6.5-1 Containment Sump pH vs. Time 6.5-2 Drop Size Distribution for the Sprayed Region