ML16257A097: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML16257A097 | | number = ML16257A097 | ||
| issue date = 08/25/2016 | | issue date = 08/25/2016 | ||
| title = | | title = 09 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.5 | ||
| author name = | | author name = | ||
| author affiliation = Entergy Operations, Inc | | author affiliation = Entergy Operations, Inc | ||
| Line 14: | Line 14: | ||
| document type = Final Safety Analysis Report (FSAR) | | document type = Final Safety Analysis Report (FSAR) | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:13.5-1 Revision 308 (11/17) | |||
(DRN 99-630; DRN 00-737, R11; DRN 01-462, R11-A; DRN 02-561, R12; DRN 03-658, R12-C; 03-1228, R13-A; LBDCR 13-015, R308) 13.5 REVIEW AND AUDIT OF OPERATIONS Matters such as design changes to the facility which require a license amendment, changes to operating procedures, or changes to the Technical Specifications, are conducted in accordance with the requirements of 10 CFR 50 and the QAPM. To assist in this function, Entergy has chartered two committees specifically for the review of safety-related items. These committees (i.e., the On-Site Safety Review Committee and the Safety Review Committee) function in accordance with the requirements of the QAPM. | |||
A continuing review of facility operations is performed by the station operating staff and at the executive level. | |||
13.5.1 On-Site Safety Review Committee (OSRC) | |||
The On-Site Safety Review Committee functions to advise on all matters related to nuclear safety in accordance with the requirements of the QAPM. The membership, meeting frequency, responsibilities, records and charter of the OSRC are addressed in the QAPM. | |||
13.5.2 Safety Review Committee (SRC) | |||
The Safety Review Committee functions to provide independent review and audit of designated activities and plant operations in accordance with the requirements of the QAPM. This committee provides independent review and audit of designated activities related to nuclear safety. The composition, responsibilities, and review functions of the SRC are described in the QAPM and implemented procedures. | |||
13.5.3 Qualification of Inspection, Examination, Testing, and Audit Personnel Entergys commitments and exceptions related to the qualification of inspection, examination, testing, and audit personnel are described in the QAPM. | |||
(DRN 99-630; DRN 00-737, R11; DRN 01-462, R11-A; DRN 02-561, R12; DRN 03-658, R12-C; 03-1228, R13-A; LBDCR 13-015, R308)}} | |||
Latest revision as of 20:20, 9 January 2025
| ML16257A097 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16257A097 (1) | |
Text
13.5-1 Revision 308 (11/17)
(DRN 99-630; DRN 00-737, R11; DRN 01-462, R11-A; DRN 02-561, R12; DRN 03-658, R12-C; 03-1228, R13-A; LBDCR 13-015, R308) 13.5 REVIEW AND AUDIT OF OPERATIONS Matters such as design changes to the facility which require a license amendment, changes to operating procedures, or changes to the Technical Specifications, are conducted in accordance with the requirements of 10 CFR 50 and the QAPM. To assist in this function, Entergy has chartered two committees specifically for the review of safety-related items. These committees (i.e., the On-Site Safety Review Committee and the Safety Review Committee) function in accordance with the requirements of the QAPM.
A continuing review of facility operations is performed by the station operating staff and at the executive level.
13.5.1 On-Site Safety Review Committee (OSRC)
The On-Site Safety Review Committee functions to advise on all matters related to nuclear safety in accordance with the requirements of the QAPM. The membership, meeting frequency, responsibilities, records and charter of the OSRC are addressed in the QAPM.
13.5.2 Safety Review Committee (SRC)
The Safety Review Committee functions to provide independent review and audit of designated activities and plant operations in accordance with the requirements of the QAPM. This committee provides independent review and audit of designated activities related to nuclear safety. The composition, responsibilities, and review functions of the SRC are described in the QAPM and implemented procedures.
13.5.3 Qualification of Inspection, Examination, Testing, and Audit Personnel Entergys commitments and exceptions related to the qualification of inspection, examination, testing, and audit personnel are described in the QAPM.
(DRN 99-630; DRN 00-737, R11; DRN 01-462, R11-A; DRN 02-561, R12; DRN 03-658, R12-C; 03-1228, R13-A; LBDCR 13-015, R308)