| number = ML16299A076
| number = ML16299A076
| issue date = 10/25/2016
| issue date = 10/25/2016
| title = Clinton Power Station - NRC Material Control and Accounting Program Inspection Report 05000461/2016409 - Cover Letter Only
| title = NRC Material Control and Accounting Program Inspection Report 05000461/2016409 - Cover Letter Only
| author name = Stoedter K
| author name = Stoedter K
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 Warrenville Rd. LISLE, IL 60532-4352 October 25, 2016  
{{#Wiki_filter:October 25, 2016


Mr. Bryan Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road
==SUBJECT:==
CLINTON POWER STATION NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000461/2016409


Warrenville, IL 60555
==Dear Mr. Hanson:==
On September 19, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Clinton Power Station. The inspection covered key attributes of the Security Cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 5, 2016, with Mr. B. Kapellas, and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


SUBJECT: CLINTON POWER STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000461/2016409
The inspection did not identify any findings or violations of more than minor significance.


==Dear Mr. Hanson:==
In accordance with Title10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On September 19, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Clinton Power Station. The inspection covered key attributes of the Security Cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 5, 2016, with Mr. B. Kapellas, and other members of your staff.
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


The inspection did not identify any findings or violations of more than minor significance.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


In accordance with Title10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/  


However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security
Karla Stoedter, Chief


vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is
Branch 1


Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Division of Reactor Projects


Sincerely,/RA/
Docket No. 50-461 License No. NPF-62
Karla Stoedter, Chief Branch 1 Division of Reactor Projects


Docket No. 50-461 License No. NPF-62 Nonpublic
Nonpublic Enclosure:
Inspection Report 05000461/2016409 cc: W. Marsh, Clinton Station Security


===Enclosure:===
Manager J. Klinger, State Liaison Officer Illinois Emergency Management Agency  
Inspection Report 05000461/2016409 cc: W. Marsh, Clinton Station Security Manager J. Klinger, State Liaison Officer Illinois Emergency Management Agency  


cc w/o encl: Distribution via LISTSERV
cc w/o encl: Distribution via LISTSERV
}}
}}

Latest revision as of 19:35, 9 January 2025

NRC Material Control and Accounting Program Inspection Report 05000461/2016409 - Cover Letter Only
ML16299A076
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/25/2016
From: Karla Stoedter
NRC/RGN-III/DRP/B1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2016409
Download: ML16299A076 (3)


Text

October 25, 2016

SUBJECT:

CLINTON POWER STATION NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000461/2016409

Dear Mr. Hanson:

On September 19, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Clinton Power Station. The inspection covered key attributes of the Security Cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 5, 2016, with Mr. B. Kapellas, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

The inspection did not identify any findings or violations of more than minor significance.

In accordance with Title10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. necessary to provide an acceptable response, please mark your entire response Security-Related Information Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Karla Stoedter, Chief

Branch 1

Division of Reactor Projects

Docket No. 50-461 License No. NPF-62

Nonpublic Enclosure:

Inspection Report 05000461/2016409 cc: W. Marsh, Clinton Station Security

Manager J. Klinger, State Liaison Officer Illinois Emergency Management Agency

cc w/o encl: Distribution via LISTSERV