{{#Wiki_filter: | {{#Wiki_filter:November 30, 2016 | ||
==SUBJECT:== | |||
GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION | |||
REPORT 05000416/2016403 | |||
==Dear Mr. Fallacara:== | ==Dear Mr. Fallacara:== | ||
On October 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security | On October 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Grand Gulf Nuclear Station. An NRC inspector discussed the results of this inspection with Mr. T. Coutu, Director, Regulatory Assurance and Performance Improvement, and other members of your staff. The results of the inspection are documented in the enclosed report. | ||
inspection at the Grand Gulf Nuclear Station. An NRC inspector discussed the results of this inspection with Mr. T. Coutu, Director, Regulatory Assurance and Performance Improvement, and other members of your staff. The results of the inspection are documented in the enclosed report. | |||
The NRC inspector documented two findings of very low security significance (Green) in this report. All of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy. | The NRC inspector documented two findings of very low security significance (Green) in this report. All of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy. | ||
| Line 37: | Line 34: | ||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with a basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Grand Gulf Nuclear Station. | If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with a basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Grand Gulf Nuclear Station. | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION | UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, | ==REGION IV== | ||
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Two cross-cutting aspects were assigned to findings in the area of problem identification and resolution. Specifically, (1) the organization failed to thoroughly evaluate the issue to ensure that resolutions address causes and extent of conditions commensurate with their safety/security significance (P.2); and (2) the organization failed to systematically and effectively collect, evaluate, and implement relevant internal and external operating experience in a timely manner (P.5). | |||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding. | |||
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | ||
Sincerely, | Sincerely, | ||
/RA/ Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 | /RA/ | ||
Mark S. Haire | |||
Chief, Plant Support Branch 1 | |||
Division of Reactor Safety | |||
Docket No. 50-416 License No. NPF-29 | |||
Nonpublic Enclosure: | Nonpublic Enclosure: | ||
| Line 50: | Line 58: | ||
cc w/enclosure: | cc w/enclosure: | ||
Mr. James Dorsey | Mr. James Dorsey Manager, Security Entergy Operations, Inc. | ||
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 | |||
cc w/o encl: Electronic Distribution | cc w/o encl: Electronic Distribution | ||
ML16336A525 Entire Report: SUNSI Review By: D. Holman Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only: SUNSI Review By: D. Holman Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE SPSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 | ML16336A525 Entire Report: | ||
SUNSI Review By: D. Holman Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only: | |||
SUNSI Review By: D. Holman Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE SPSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 | |||
SUBJECT: GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000416/2016403 Distribution w/enclosure: | NAME DHolman JLarsen MHaire GWarnick MHaire | ||
SIGNATURE E-mail electronic E-mail | |||
/RA/ | |||
/RA/ | |||
DATE 11/29/16 11/16/2016 11/29/16 11/30/16 11/30/16 Letter to Vin Fallacara from Mark S. Haire, dated November 30, 2016 | |||
SUBJECT: GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION | |||
REPORT 05000416/2016403 | |||
Distribution w/enclosure: | |||
Security Specialist/NSIR (Eric.Wharton@nrc.gov) | Security Specialist/NSIR (Eric.Wharton@nrc.gov) | ||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) | Security Specialist/NSIR (Niry.Simonian@nrc.gov) | ||
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | ||
Security Specialist/ | Security Specialist/NSIR (Douglas.Garner@nrc.gov) | ||
Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov) | |||
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) | Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) | ||
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) | Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) | ||
Regional Administrator (Kriss.Kennedy@nrc.gov) | Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) | Deputy Regional Administrator (Scott.Morris@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | DRS Deputy Director (Jeff.Clark@nrc.gov) | ||
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) | |||
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) Acting Senior Resident Inspector (Wayne.Sifre@nrc.gov) Resident Inspector (Neil.Day@nrc.gov) | Acting Senior Resident Inspector (Wayne.Sifre@nrc.gov) | ||
Site Administrative Assistant (Amy.Elam@nrc.gov) | Resident Inspector (Neil.Day@nrc.gov) | ||
Site Administrative Assistant (Amy.Elam@nrc.gov) | |||
Branch Chief, DRP/C (Greg.Warnick@nrc.gov) | Branch Chief, DRP/C (Greg.Warnick@nrc.gov) | ||
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov) | Senior Project Engineer, DRP/C (Cale.Young@nrc.gov) | ||
Project Engineer, DRP/C (Lindsay.Brandt | Project Engineer, DRP/C (Lindsay.Brandt@nrc.gov) | ||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) | Distribution w/o enclosure: | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (James.Kim@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | ||
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | ||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
SAIC (Gayle.Walker@nrc.gov) | SAIC (Gayle.Walker@nrc.gov) | ||
RSLO (Bill.Maier@nrc.gov) | |||
RSLO (Bill.Maier@nrc.gov) | |||
RidsOeMailCenter Resource | RidsOeMailCenter Resource | ||
}} | }} | ||
Latest revision as of 18:55, 9 January 2025
| ML16336A525 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/30/2016 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Fallacara V Entergy Operations |
| References | |
| IR 2016403 | |
| Download: ML16336A525 (4) | |
Text
November 30, 2016
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION
REPORT 05000416/2016403
Dear Mr. Fallacara:
On October 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Grand Gulf Nuclear Station. An NRC inspector discussed the results of this inspection with Mr. T. Coutu, Director, Regulatory Assurance and Performance Improvement, and other members of your staff. The results of the inspection are documented in the enclosed report.
The NRC inspector documented two findings of very low security significance (Green) in this report. All of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Grand Gulf Nuclear Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with a basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Grand Gulf Nuclear Station.
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Two cross-cutting aspects were assigned to findings in the area of problem identification and resolution. Specifically, (1) the organization failed to thoroughly evaluate the issue to ensure that resolutions address causes and extent of conditions commensurate with their safety/security significance (P.2); and (2) the organization failed to systematically and effectively collect, evaluate, and implement relevant internal and external operating experience in a timely manner (P.5).
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Mark S. Haire
Chief, Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-416 License No. NPF-29
Nonpublic Enclosure:
NRC Inspection Report 05000416/2016403 w/Attachment: Supplemental Information
cc w/enclosure:
Mr. James Dorsey Manager, Security Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
cc w/o encl: Electronic Distribution
ML16336A525 Entire Report:
SUNSI Review By: D. Holman Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review By: D. Holman Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE SPSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1
NAME DHolman JLarsen MHaire GWarnick MHaire
SIGNATURE E-mail electronic E-mail
/RA/
/RA/
DATE 11/29/16 11/16/2016 11/29/16 11/30/16 11/30/16 Letter to Vin Fallacara from Mark S. Haire, dated November 30, 2016
SUBJECT: GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION
REPORT 05000416/2016403
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)
Acting Senior Resident Inspector (Wayne.Sifre@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov)
Site Administrative Assistant (Amy.Elam@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
Project Engineer, DRP/C (Lindsay.Brandt@nrc.gov)
Distribution w/o enclosure:
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (James.Kim@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
SAIC (Gayle.Walker@nrc.gov)
RSLO (Bill.Maier@nrc.gov)
RidsOeMailCenter Resource