Line 3: Line 3:
| issue date = 03/01/2017
| issue date = 03/01/2017
| title = Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006)
| title = Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006)
| author name = Louden P L
| author name = Louden P
| author affiliation = NRC/RGN-III/DRP
| author affiliation = NRC/RGN-III/DRP
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000461
| docket = 05000461
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:March 1, 2017
-4352 March 1, 2017 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


SUBJECT: ANNUAL ASSESSMENT LETTER FOR CLINTON POWER STATION , UNIT 1 (Report 05000461/2016006
==SUBJECT:==
)
ANNUAL ASSESSMENT LETTER FOR CLINTON POWER STATION, UNIT 1 (Report 05000461/2016006)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
The NRC has completed its end
The NRC has completed its end-of-cycle performance assessment of Clinton Power Station, Unit 1, reviewing performance indicators (PIs), inspection results and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
-of-cycle performance assessment of Clinton Power Station, Unit 1, reviewing performance indicators (PIs), inspection results and enforcement actions from January 1, 2016
, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.


The NRC determined the performance at Clinton Power Station, Unit 1, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined the performance at Clinton Power Station, Unit 1, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all PIs were within the expected range (i.e., Green).


The NRC determined the performance at Clinton Power Station, Unit 1, during the first quarter of the assessment period was within the Regulatory Response Column of the NRC's ROP Action Matrix due to a white finding related to your failure to properly design the replacement Division 3 shutdown service water pump and ensure the pump internals would not degrade under expected operating conditions as described in our letter to you dated August 11, 2015
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
, (ADAMS Accession Number ML15223B382).


Per Inspection Procedure 95001, the NRC completed a supplemental inspection for this issue on February 4, 2016, as documented in our letter to you dated March 17, 2016
The NRC determined the performance at Clinton Power Station, Unit 1, during the first quarter of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix due to a white finding related to your failure to properly design the replacement Division 3 shutdown service water pump and ensure the pump internals would not degrade under expected operating conditions as described in our letter to you dated August 11, 2015, (ADAMS Accession Number ML15223B382). Per Inspection Procedure 95001, the NRC completed a supplemental inspection for this issue on February 4, 2016, as documented in our letter to you dated March 17, 2016, (ML16077A312). The White finding was closed as of the end of the first quarter of 2016, in accordance with Inspection Manual Chapter 0305.
, (ML16077A312).


The White finding was closed as of the end of the first quarter of 2016
As defined in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the NRC identified a cross-cutting theme in the area of human performance due to 20 inspection items being identified in the cross-cutting area of human performance over the last 12 months.
, in accordance with Inspection Manual Chapter 0305. As defined in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," t he NRC identified a cross
-cutting theme in the area of human performance due to 2 0 inspection items being identified in the cross-cutting area of human performance over the last 12 months. The NRC will continue to monitor your staff's effort and progress in addressing the theme until the theme criterion is no longer met. The enclosed inspection plan lists the inspections scheduled through December 31, 2018.


The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criterion is no longer met. The enclosed inspection plan lists the inspections scheduled through December 31, 2018.


The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
-related inspections, which will be sent via separate, non
-publicly available correspondence.


In addition to the baseline inspection, the NRC plans to conduct an infrequently performed inspection related to ISFSI Cask Loading using Inspection Procedure (IP) 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants."
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.


In early 2016, the NRC conducted IP 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12
In addition to the baseline inspection, the NRC plans to conduct an infrequently performed inspection related to ISFSI Cask Loading using Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.
-Month Period," at Clinton Power Station to review five traditional enforcement items documented through the third quarter of 2015. From October 1, 2015, to December 31, 2016, the NRC issued an additional eight Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct another IP 92723 to follow-up on these additional violations.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
In early 2016, the NRC conducted IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, at Clinton Power Station to review five traditional enforcement items documented through the third quarter of 2015. From October 1, 2015, to December 31, 2016, the NRC issued an additional eight Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct another IP 92723 to follow-up on these additional violations.
-rm/adams.html (the Public Electronic Reading Room).


Please contact Karla Stoedter at 630-829-9 731 with any questions you may have regarding this letter or the inspection plan.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Please contact Karla Stoedter at 630-829-9731 with any questions you may have regarding this letter or the inspection plan.
Patrick L. Louden, Director Division of Reactor Projects Docket No. 50-461 License No. NPF-62


===Enclosure:===
Sincerely,
Inspection Plan cc: Distribution via LISTSERV
/RA/
 
Patrick L. Louden, Director Division of Reactor Projects
 
Docket No. 50-461 License No. NPF-62
 
Enclosure:
Inspection Plan  
 
cc: Distribution via LISTSERV
}}
}}

Latest revision as of 13:29, 9 January 2025

Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006)
ML17054C676
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/01/2017
From: Louden P
Division Reactor Projects III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2016006
Download: ML17054C676 (5)


Text

March 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CLINTON POWER STATION, UNIT 1 (Report 05000461/2016006)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of Clinton Power Station, Unit 1, reviewing performance indicators (PIs), inspection results and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Clinton Power Station, Unit 1, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC determined the performance at Clinton Power Station, Unit 1, during the first quarter of the assessment period was within the Regulatory Response Column of the NRCs ROP Action Matrix due to a white finding related to your failure to properly design the replacement Division 3 shutdown service water pump and ensure the pump internals would not degrade under expected operating conditions as described in our letter to you dated August 11, 2015, (ADAMS Accession Number ML15223B382). Per Inspection Procedure 95001, the NRC completed a supplemental inspection for this issue on February 4, 2016, as documented in our letter to you dated March 17, 2016, (ML16077A312). The White finding was closed as of the end of the first quarter of 2016, in accordance with Inspection Manual Chapter 0305.

As defined in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the NRC identified a cross-cutting theme in the area of human performance due to 20 inspection items being identified in the cross-cutting area of human performance over the last 12 months.

The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criterion is no longer met. The enclosed inspection plan lists the inspections scheduled through December 31, 2018.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the baseline inspection, the NRC plans to conduct an infrequently performed inspection related to ISFSI Cask Loading using Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.

In early 2016, the NRC conducted IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, at Clinton Power Station to review five traditional enforcement items documented through the third quarter of 2015. From October 1, 2015, to December 31, 2016, the NRC issued an additional eight Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct another IP 92723 to follow-up on these additional violations.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Karla Stoedter at 630-829-9731 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Patrick L. Louden, Director Division of Reactor Projects

Docket No. 50-461 License No. NPF-62

Enclosure:

Inspection Plan

cc: Distribution via LISTSERV