| number = ML17081A426
| number = ML17081A426
| issue date = 03/16/2017
| issue date = 03/16/2017
| title = Sequoyah Nuclear Plant - Cyber Security Follow-Up Inspection Report 05000327/2017406 and 05000328/2017406 (Letter Only)
| title = Cyber Security Follow-Up Inspection Report 05000327/2017406 and 05000328/2017406 (Letter Only)
| author name = Shaeffer S M
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2017 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority
{{#Wiki_filter:March 16, 2017


1101 Market Street, LP 3D-C
==SUBJECT:==
 
SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406
Chattanooga, TN 37402-2801
 
SUBJECT: SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406


==Dear Mr. Shea:==
==Dear Mr. Shea:==
Line 31: Line 28:
No NRC-identified or self-revealing findings were identified during this inspection.
No NRC-identified or self-revealing findings were identified during this inspection.


However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV)
consistent with Section 2.3.2.a of the Enforcement Policy.


If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the  
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant.


Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/


Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  


Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79  
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79  


===Enclosure:===
Enclosure:
Inspection Report 05000327/2017406 and 05000328/2017406  
Inspection Report 05000327/2017406 and 05000328/2017406 w/Attachment:
 
===w/Attachment:===
Supplemental Information (OUO)  
Supplemental Information (OUO)  


cc: (See page 3) cc: Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority  
cc: (See page 3) cc:
Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801


1101 Market Street, LP 5A-C
Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000


Chattanooga, TN 37402-2801
Mr. D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000


Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000  
Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000  


Mr. D. G. Dimopoulos
Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801


Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000
Mr. Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200


Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000
___ ____


Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS


1101 Market Street, LP 1A Chattanooga, TN 37402-2801
SIGNATURE PJB4 DWS5 AJB3 SMS


Mr. Brian E. Brigman
NAME P. Braaten D. Strickland A. Blamey S. Shaeffer


Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200
DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017


___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 11:14, 9 January 2025

Cyber Security Follow-Up Inspection Report 05000327/2017406 and 05000328/2017406 (Letter Only)
ML17081A426
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/16/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: James Shea
Tennessee Valley Authority
References
IR 2017406
Download: ML17081A426 (4)


Text

March 16, 2017

SUBJECT:

SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406

Dear Mr. Shea:

On February 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Sequoyah Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Michael Durr and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure:

Inspection Report 05000327/2017406 and 05000328/2017406 w/Attachment:

Supplemental Information (OUO)

cc: (See page 3) cc:

Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801

Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000

Mr. D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000

Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000

Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801

Mr. Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200

___ ____

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS

SIGNATURE PJB4 DWS5 AJB3 SMS

NAME P. Braaten D. Strickland A. Blamey S. Shaeffer

DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO