IR 05000424/2017407: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Haney C
| author name = Haney C
| author affiliation = NRC/RGN-II/ORA
| author affiliation = NRC/RGN-II/ORA
| addressee name = Taber B K
| addressee name = Taber B
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 23, 2017 EA-16-137
{{#Wiki_filter:March 23, 2017


Mr. B. Keith Taber, VP Nuclear Plant Site
==SUBJECT:==
VOGTLE ELECTRIC GENERATING PLANT - NOTICE OF VIOLATION, U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000424/2017407 AND 05000425/2017407 AND INVESTIGATION REPORT NO. 2-2015-043


Southern Nuclear Operating Co., Inc.
==Dear Mr. Taber:==
This refers to the investigation completed on June 15, 2016, by the Nuclear Regulatory Commissions (NRC) Office of Investigations (OI) concerning activities at Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant. The purpose of the investigation, in part, was to review a security incident that was identified on June 4, 2015. The results of the investigation, including the identification of an apparent violation, were described in NRC Inspection Report (IR) 05000424, 425/2016407, dated January 18, 2017.


Vogtle Electric Generating Plant
In the letter transmitting the inspection report, we provided you with the opportunity to address the apparent violation identified in the report by either attending a pre-decisional enforcement conference or by providing a written response before we made our final enforcement decision.


7821 River Road Waynesboro, GA 30830
In a letter dated February 10, 2017, you provided a written response to the apparent violation.


SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTICE OF VIOLATION, U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000424/2017407 AND 05000425/2017407 AND INVESTIGATION REPORT NO. 2-2015-043
As documented in your written response, you accepted the violation, provided the results of your review of this matter, and provided details of your corrective actions to preclude recurrence.


==Dear Mr. Taber:==
Based on the information developed during the investigation and the information provided in your written response, the NRC has determined that a violation of NRC requirements occurred.
This refers to the investigation completed on June 15, 2016, by the Nuclear Regulatory Commission's (NRC) Office of Investigations (OI) concerning activities at Southern Nuclear Operating Company's (SNC) Vogtle Electric Generating Plant. The purpose of the investigation, in part, was to review a security incident that was identified on June 4, 2015. The results of the investigation, including the identification of an apparent violation, were described in NRC Inspection Report (IR) 05000424, 425/2016407, dated January 18, 2017.


In the letter transmitting the inspection report, we provided you with the opportunity to address the apparent violation identified in the report by either attending a pre-decisional enforcement conference or by providing a written response before we made our final enforcement decision.
The violation is cited in the enclosed Notice of Violation (Notice, Enclosure 1), and the circumstances surrounding it are described in detail in the subject NRC Inspection Report.


In a letter dated February 10, 2017, you provided a written response to the apparent violation. As documented in your written response, you accepted the violation, provided the results of your review of this matter, and provided details of your corrective actions to preclude recurrence.
Enclosure 2 to this letter describes the basis for determining the severity level of the violation and the basis for the NRCs conclusion that a civil penalty is not warranted. For administrative purposes, this letter is issued as NRC Inspection Report 05000424, 425/2017407. Accordingly, the AV documented in NRC Inspection Report 05000424, 425/2016407 is designated as VIO 05000424, 425/2016407-001.


Based on the information developed during the investigation and the information provided in your written response, the NRC has determined that a violation of NRC requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice, Enclosure 1), and the circumstances surrounding it are described in detail in the subject NRC Inspection Report. Enclosure 2 to this letter describes the basis for determining the severity level of the violation and the basis for the NRC's conclusion that a civil penalty is not warranted. For administrative purposes, this letter is issued as NRC Inspection Report 05000424, 425/2017407. Accordingly, the AV documented in NRC Inspection Report 05000424, 425/2016407 is designated as VIO 05000424, 425/2016407-001.
The NRC has concluded that information regarding: (1) the reason for the violation; (2) the corrective actions that have been taken and the results achieved; and (3) the date when full compliance was achieved is already adequately addressed on the docket in SNCs written response dated February 10, 2017. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.


The NRC has concluded that information regarding: (1) the reason for the violation; (2) the corrective actions that have been taken and the results achieved; and (3) the date when full compliance was achieved is already adequately addressed on the docket in SNC's written response dated February 10, 2017. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.
This cover letter will be made available for public inspection in the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/readingrm/
adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


This cover letter will be made available for public inspection in the NRC's Agencywide Documents Access and Managemen t System (ADAMS) at http://www.nrc.gov/readingrm/
The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosures will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosures will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this letter, please contact Anthony Gody, Director, Division of Reactor Safety, at 404-997-4600.
Should you have any questions concerning this letter, please contact Anthony Gody, Director, Division of Reactor Safety, at 404-997-4600.


Sincerely,
Sincerely,
/RA: Leonard D. Wert for/
/RA: Leonard D. Wert for/  
Catherine Haney


Regional Administrator Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81  
Catherine Haney Regional Administrator  
 
Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81  


Enclosures:
Enclosures:
1. Notice of Violation 2. Severity Level and Civil Penalty Assessment  
1. Notice of Violation 2. Severity Level and Civil Penalty Assessment  


cc: (See page 3) cc: Stephen P. McGavin Fleet Security Director  
cc: (See page 3) cc:
Stephen P. McGavin Fleet Security Director Southern Nuclear Operating Co., Inc.


Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway, Bin B042 Birmingham, AL 35242 spmcgavi@southernco.com


40 Inverness Center Parkway, Bin B042
Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.


Birmingham, AL 35242 spmcgavi@southernco.com Michael P. Long, Fleet Nuclear Security Operations Manager
40 Inverness Center Parkway Bin B042 Birmingham, AL 35242 mplong@southernco.com  


Southern Nuclear Operating Co., Inc.
Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co. Inc.


40 Inverness Center Parkway Bin B042 Birmingham, AL 35242 mplong@southernco.com  
40 Inverness Center Parkway, BIN B042 Birmingham, AL 35242 LBHOGG@southernco.com  


Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co. Inc.
Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.


40 Inverness Center Parkway, BIN B042
40 Inverness Center Parkway Birmingham, AL 35201-1295 smshipma@southernco.com


Birmingham, AL 35242 LBHOGG@southernco.com
_________________________


Steven M. Shipman Fleet Security Project Manager
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:EICS RII:EICS RII:DRS RII:ORA NRR SIGNATURE JCS3 *
SRS5 *
SAP1 *
MXK7 *
ATG *
LXW1 *
LRC1 VIA EMAIL NAME JSHEHEE SSANDAL SPRICE MKOWAL AGODY LWERT LCASEY DATE 3/8/2017 3/8/2017 3/8/2017 3/8/2017 3/9/2017 3/9/2017 3/17/2017 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE OGC NSIR RII:ORA


Southern Nuclear Operating Co., Inc.
SIGNATURE RGC1 VIA EMAIL AXR2 VIA EMAIL LXW1 FOR CXH


40 Inverness Center Parkway
NAME RCARPENTER ARICHARDSON CHANEY


Birmingham, AL 35201-1295 smshipma@southernco.com
DATE 3/21/2017 3/20/2017 3/23/2017


_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:EICS RII:EICS RII:DRS RII:ORA NRR SIGNATURE JCS3 * SRS5 * SAP1 * MXK7 * ATG * LXW1 * LRC1 VIA EMAIL NAME JSHEHEE SSANDAL SPRICE MKOWAL AGODY LWERT LCASEY DATE 3/8/2017 3/8/2017 3/8/2017 3/8/2017 3/9/2017 3/9/2017 3/17/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE OGC NSIR RII:ORA SIGNATURE RGC1 VIA EMAIL AXR2 VIA EMAIL LXW1 FOR CXH NAME RCARPENTER ARICHARDSONCHANEY DATE 3/21/2017 3/20/2017 3/23/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 11:12, 9 January 2025

Notice of Violation, U.S. Nuclear Regulatory Commission Security Inspection Report 05000424/2017407 and 05000425/2017407 and Investigation Report 2-2015-043
ML17083A179
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/23/2017
From: Catherine Haney
Region 2 Administrator
To: Taber B
Southern Nuclear Operating Co
References
EA-16-137, OI 2-2015-043 IR 2017407
Download: ML17083A179 (4)


Text

March 23, 2017

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - NOTICE OF VIOLATION, U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000424/2017407 AND 05000425/2017407 AND INVESTIGATION REPORT NO. 2-2015-043

Dear Mr. Taber:

This refers to the investigation completed on June 15, 2016, by the Nuclear Regulatory Commissions (NRC) Office of Investigations (OI) concerning activities at Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant. The purpose of the investigation, in part, was to review a security incident that was identified on June 4, 2015. The results of the investigation, including the identification of an apparent violation, were described in NRC Inspection Report (IR) 05000424, 425/2016407, dated January 18, 2017.

In the letter transmitting the inspection report, we provided you with the opportunity to address the apparent violation identified in the report by either attending a pre-decisional enforcement conference or by providing a written response before we made our final enforcement decision.

In a letter dated February 10, 2017, you provided a written response to the apparent violation.

As documented in your written response, you accepted the violation, provided the results of your review of this matter, and provided details of your corrective actions to preclude recurrence.

Based on the information developed during the investigation and the information provided in your written response, the NRC has determined that a violation of NRC requirements occurred.

The violation is cited in the enclosed Notice of Violation (Notice, Enclosure 1), and the circumstances surrounding it are described in detail in the subject NRC Inspection Report.

Enclosure 2 to this letter describes the basis for determining the severity level of the violation and the basis for the NRCs conclusion that a civil penalty is not warranted. For administrative purposes, this letter is issued as NRC Inspection Report 05000424, 425/2017407. Accordingly, the AV documented in NRC Inspection Report 05000424, 425/2016407 is designated as VIO 05000424, 425/2016407-001.

The NRC has concluded that information regarding: (1) the reason for the violation; (2) the corrective actions that have been taken and the results achieved; and (3) the date when full compliance was achieved is already adequately addressed on the docket in SNCs written response dated February 10, 2017. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.

This cover letter will be made available for public inspection in the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/readingrm/

adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosures will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Should you have any questions concerning this letter, please contact Anthony Gody, Director, Division of Reactor Safety, at 404-997-4600.

Sincerely,

/RA: Leonard D. Wert for/

Catherine Haney Regional Administrator

Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81

Enclosures:

1. Notice of Violation 2. Severity Level and Civil Penalty Assessment

cc: (See page 3) cc:

Stephen P. McGavin Fleet Security Director Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway, Bin B042 Birmingham, AL 35242 spmcgavi@southernco.com

Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Bin B042 Birmingham, AL 35242 mplong@southernco.com

Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co. Inc.

40 Inverness Center Parkway, BIN B042 Birmingham, AL 35242 LBHOGG@southernco.com

Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway Birmingham, AL 35201-1295 smshipma@southernco.com

_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:EICS RII:EICS RII:DRS RII:ORA NRR SIGNATURE JCS3 *

SRS5 *

SAP1 *

MXK7 *

ATG *

LXW1 *

LRC1 VIA EMAIL NAME JSHEHEE SSANDAL SPRICE MKOWAL AGODY LWERT LCASEY DATE 3/8/2017 3/8/2017 3/8/2017 3/8/2017 3/9/2017 3/9/2017 3/17/2017 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICE OGC NSIR RII:ORA

SIGNATURE RGC1 VIA EMAIL AXR2 VIA EMAIL LXW1 FOR CXH

NAME RCARPENTER ARICHARDSON CHANEY

DATE 3/21/2017 3/20/2017 3/23/2017

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO