ML17088A657: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17088A657
| number = ML17088A657
| issue date = 03/28/2017
| issue date = 03/28/2017
| title = 2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection.
| title = 2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection
| author name = Diaz-Castillo Y
| author name = Diaz-Castillo Y
| author affiliation = NRC/NRO/DCIP
| author affiliation = NRC/NRO/DCIP
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Current NRC Vendor Findings and the Results from the 1stSONGS Lessons Learned InspectionYamir Diaz-CastilloQuality and Vendor Inspection Branch-2Division of Construction Inspection & Operational ProgramsOffice of New ReactorsNuclear Supply Chain -Opportunity to Excel Agenda*NRC Vendor Inspection Results*Inspection Trends *SONGS Lessons Learned*Questions2 NRC Vendor Inspection Results3Corrective Action28%Organization2%Control of Purchased Equipment, Materials, and Services18%Instructions, Procedures, and Drawings2%Design Control30%Handling, Storage, and Shipping2%Nonconforming Materials, parts, or Components7%Part 217%Control of Special Processes4%FY 2015 NOVs and NONsDesign Control50.00%CorrectiveAction9.09%Organization4.55%Control of Special Processes9.09%Audits4.55%Control of Purchased Material, Equipment, and Services4.55%Nonconforming Materials, Parts, or Components4.55%Part 219.09%Instructions, Procedures,and Drawings4.55%FY 2016 NOVs and NONs Inspection Trends*Increase in the number of Notices of Nonconformances against Criterion III, "Design Control"*Some inspections resulted in no findings*Continue to observe issues with:-adequate implementation of commercial-grade dedication programs-adequate qualification of safety-related suppliers and sub-suppliers-adequate implementation of corrective action programs4 SONGS Lessons Learned*Evaluate lessons learned in the area of vendor oversight*2 recommendations identified:-Perform pilot design-related inspections at vendor facilities prior to and/or during the fabrication process for safety-related major plant modifications-Develop identification guidelines and screening criteria to determine:*When a plant change can be considered a major plant modification*When a major plant modification should be subject to a vendor inspection*1stpilot design related aspect inspection at Equipos Nucleares, S.A (ENSA) in Santander, Spain *At least 1 other planned5 6SONGS Lessons Learned*Conclusions-No specific findings identified related to issues in the design review, design change process, design documentation, or design related software at ENSA-Continue to perform design-related inspections as part of the pilot program-Assessment will determine if design related aspect inspections continue on a permanent basis QuestionsContact Information:Yamir Diaz-CastilloMail Stop T-7D24Washington, DC 20555-0001Phone: 1-301-415-2228Email: yamir.diaz-castillo@nrc.govhttps://www.nrc.gov/reactors/new-reactors/oversight/quality-assurance/vendor-insp.html7}}
{{#Wiki_filter:Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection Yamir Diaz-Castillo Quality and Vendor Inspection Branch-2 Division of Construction Inspection &
Operational Programs Office of New Reactors Nuclear Supply Chain - Opportunity to Excel
 
Agenda
* NRC Vendor Inspection Results
* Inspection Trends
* SONGS Lessons Learned
* Questions 2
 
NRC Vendor Inspection Results 3
Corrective Action 28%
Organization 2%
Control of Purchased Equipment, Materials, and Services 18%
Instructions, Procedures, and Drawings 2%
Design Control 30%
Handling, Storage, and Shipping 2%
Nonconforming Materials, parts, or Components 7%
Part 21 7%
Control of Special Processes 4%
FY 2015 NOVs and NONs Design Control 50.00%
Corrective Action 9.09%
Organization 4.55%
Control of Special Processes 9.09%
Audits 4.55%
Control of Purchased
: Material, Equipment, and Services 4.55%
Nonconforming Materials, Parts, or Components 4.55%
Part 21 9.09%
Instructions, Procedures, and Drawings 4.55%
FY 2016 NOVs and NONs
 
Inspection Trends Increase in the number of Notices of Nonconformances against Criterion III, Design Control" Some inspections resulted in no findings Continue to observe issues with:
- adequate implementation of commercial-grade dedication programs
- adequate qualification of safety-related suppliers and sub-suppliers
- adequate implementation of corrective action programs 4
 
SONGS Lessons Learned Evaluate lessons learned in the area of vendor oversight 2 recommendations identified:
Perform pilot design-related inspections at vendor facilities prior to and/or during the fabrication process for safety-related major plant modifications Develop identification guidelines and screening criteria to determine:
When a plant change can be considered a major plant modification When a major plant modification should be subject to a vendor inspection 1st pilot design related aspect inspection at Equipos Nucleares, S.A (ENSA) in Santander, Spain At least 1 other planned 5
 
6 SONGS Lessons Learned
* Conclusions
- No specific findings identified related to issues in the design review, design change process, design documentation, or design related software at ENSA
- Continue to perform design-related inspections as part of the pilot program
- Assessment will determine if design related aspect inspections continue on a permanent basis
 
Questions Contact Information:
Yamir Diaz-Castillo Mail Stop T-7D24 Washington, DC 20555-0001 Phone: 1-301-415-2228 Email: yamir.diaz-castillo@nrc.gov https://www.nrc.gov/reactors/
new-reactors/oversight/quality-assurance/vendor-insp.html 7}}

Latest revision as of 10:47, 9 January 2025

2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection
ML17088A657
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/28/2017
From: Yamir Diaz-Castillo
Division of Construction Inspection and Operational Programs
To:
Sakadales A
References
Download: ML17088A657 (7)


Text

Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection Yamir Diaz-Castillo Quality and Vendor Inspection Branch-2 Division of Construction Inspection &

Operational Programs Office of New Reactors Nuclear Supply Chain - Opportunity to Excel

Agenda

  • NRC Vendor Inspection Results
  • Inspection Trends
  • Questions 2

NRC Vendor Inspection Results 3

Corrective Action 28%

Organization 2%

Control of Purchased Equipment, Materials, and Services 18%

Instructions, Procedures, and Drawings 2%

Design Control 30%

Handling, Storage, and Shipping 2%

Nonconforming Materials, parts, or Components 7%

Part 21 7%

Control of Special Processes 4%

FY 2015 NOVs and NONs Design Control 50.00%

Corrective Action 9.09%

Organization 4.55%

Control of Special Processes 9.09%

Audits 4.55%

Control of Purchased

Material, Equipment, and Services 4.55%

Nonconforming Materials, Parts, or Components 4.55%

Part 21 9.09%

Instructions, Procedures, and Drawings 4.55%

FY 2016 NOVs and NONs

Inspection Trends Increase in the number of Notices of Nonconformances against Criterion III, Design Control" Some inspections resulted in no findings Continue to observe issues with:

- adequate implementation of commercial-grade dedication programs

- adequate qualification of safety-related suppliers and sub-suppliers

- adequate implementation of corrective action programs 4

SONGS Lessons Learned Evaluate lessons learned in the area of vendor oversight 2 recommendations identified:

Perform pilot design-related inspections at vendor facilities prior to and/or during the fabrication process for safety-related major plant modifications Develop identification guidelines and screening criteria to determine:

When a plant change can be considered a major plant modification When a major plant modification should be subject to a vendor inspection 1st pilot design related aspect inspection at Equipos Nucleares, S.A (ENSA) in Santander, Spain At least 1 other planned 5

6 SONGS Lessons Learned

  • Conclusions

- No specific findings identified related to issues in the design review, design change process, design documentation, or design related software at ENSA

- Continue to perform design-related inspections as part of the pilot program

- Assessment will determine if design related aspect inspections continue on a permanent basis

Questions Contact Information:

Yamir Diaz-Castillo Mail Stop T-7D24 Washington, DC 20555-0001 Phone: 1-301-415-2228 Email: yamir.diaz-castillo@nrc.gov https://www.nrc.gov/reactors/