ML17088A657: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17088A657 | | number = ML17088A657 | ||
| issue date = 03/28/2017 | | issue date = 03/28/2017 | ||
| title = 2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the | | title = 2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection | ||
| author name = Diaz-Castillo Y | | author name = Diaz-Castillo Y | ||
| author affiliation = NRC/NRO/DCIP | | author affiliation = NRC/NRO/DCIP | ||
| Line 13: | Line 13: | ||
| page count = 7 | | page count = 7 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection Yamir Diaz-Castillo Quality and Vendor Inspection Branch-2 Division of Construction Inspection & | |||
Operational Programs Office of New Reactors Nuclear Supply Chain - Opportunity to Excel | |||
Agenda | |||
* NRC Vendor Inspection Results | |||
* Inspection Trends | |||
* SONGS Lessons Learned | |||
* Questions 2 | |||
NRC Vendor Inspection Results 3 | |||
Corrective Action 28% | |||
Organization 2% | |||
Control of Purchased Equipment, Materials, and Services 18% | |||
Instructions, Procedures, and Drawings 2% | |||
Design Control 30% | |||
Handling, Storage, and Shipping 2% | |||
Nonconforming Materials, parts, or Components 7% | |||
Part 21 7% | |||
Control of Special Processes 4% | |||
FY 2015 NOVs and NONs Design Control 50.00% | |||
Corrective Action 9.09% | |||
Organization 4.55% | |||
Control of Special Processes 9.09% | |||
Audits 4.55% | |||
Control of Purchased | |||
: Material, Equipment, and Services 4.55% | |||
Nonconforming Materials, Parts, or Components 4.55% | |||
Part 21 9.09% | |||
Instructions, Procedures, and Drawings 4.55% | |||
FY 2016 NOVs and NONs | |||
Inspection Trends Increase in the number of Notices of Nonconformances against Criterion III, Design Control" Some inspections resulted in no findings Continue to observe issues with: | |||
- adequate implementation of commercial-grade dedication programs | |||
- adequate qualification of safety-related suppliers and sub-suppliers | |||
- adequate implementation of corrective action programs 4 | |||
SONGS Lessons Learned Evaluate lessons learned in the area of vendor oversight 2 recommendations identified: | |||
Perform pilot design-related inspections at vendor facilities prior to and/or during the fabrication process for safety-related major plant modifications Develop identification guidelines and screening criteria to determine: | |||
When a plant change can be considered a major plant modification When a major plant modification should be subject to a vendor inspection 1st pilot design related aspect inspection at Equipos Nucleares, S.A (ENSA) in Santander, Spain At least 1 other planned 5 | |||
6 SONGS Lessons Learned | |||
* Conclusions | |||
- No specific findings identified related to issues in the design review, design change process, design documentation, or design related software at ENSA | |||
- Continue to perform design-related inspections as part of the pilot program | |||
- Assessment will determine if design related aspect inspections continue on a permanent basis | |||
Questions Contact Information: | |||
Yamir Diaz-Castillo Mail Stop T-7D24 Washington, DC 20555-0001 Phone: 1-301-415-2228 Email: yamir.diaz-castillo@nrc.gov https://www.nrc.gov/reactors/ | |||
new-reactors/oversight/quality-assurance/vendor-insp.html 7}} | |||
Latest revision as of 10:47, 9 January 2025
| ML17088A657 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/28/2017 |
| From: | Yamir Diaz-Castillo Division of Construction Inspection and Operational Programs |
| To: | |
| Sakadales A | |
| References | |
| Download: ML17088A657 (7) | |
Text
Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection Yamir Diaz-Castillo Quality and Vendor Inspection Branch-2 Division of Construction Inspection &
Operational Programs Office of New Reactors Nuclear Supply Chain - Opportunity to Excel
Agenda
- NRC Vendor Inspection Results
- Inspection Trends
- SONGS Lessons Learned
- Questions 2
NRC Vendor Inspection Results 3
Corrective Action 28%
Organization 2%
Control of Purchased Equipment, Materials, and Services 18%
Instructions, Procedures, and Drawings 2%
Design Control 30%
Handling, Storage, and Shipping 2%
Nonconforming Materials, parts, or Components 7%
Part 21 7%
Control of Special Processes 4%
FY 2015 NOVs and NONs Design Control 50.00%
Corrective Action 9.09%
Organization 4.55%
Control of Special Processes 9.09%
Audits 4.55%
Control of Purchased
- Material, Equipment, and Services 4.55%
Nonconforming Materials, Parts, or Components 4.55%
Part 21 9.09%
Instructions, Procedures, and Drawings 4.55%
FY 2016 NOVs and NONs
Inspection Trends Increase in the number of Notices of Nonconformances against Criterion III, Design Control" Some inspections resulted in no findings Continue to observe issues with:
- adequate implementation of commercial-grade dedication programs
- adequate qualification of safety-related suppliers and sub-suppliers
- adequate implementation of corrective action programs 4
SONGS Lessons Learned Evaluate lessons learned in the area of vendor oversight 2 recommendations identified:
Perform pilot design-related inspections at vendor facilities prior to and/or during the fabrication process for safety-related major plant modifications Develop identification guidelines and screening criteria to determine:
When a plant change can be considered a major plant modification When a major plant modification should be subject to a vendor inspection 1st pilot design related aspect inspection at Equipos Nucleares, S.A (ENSA) in Santander, Spain At least 1 other planned 5
6 SONGS Lessons Learned
- Conclusions
- No specific findings identified related to issues in the design review, design change process, design documentation, or design related software at ENSA
- Continue to perform design-related inspections as part of the pilot program
- Assessment will determine if design related aspect inspections continue on a permanent basis
Questions Contact Information:
Yamir Diaz-Castillo Mail Stop T-7D24 Washington, DC 20555-0001 Phone: 1-301-415-2228 Email: yamir.diaz-castillo@nrc.gov https://www.nrc.gov/reactors/
new-reactors/oversight/quality-assurance/vendor-insp.html 7