IR 05000400/2017403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 05/25/2017 | | issue date = 05/25/2017 | ||
| title = U.S. Nuclear Regulatory Commission Security Inspection Report 05000400/2017403 - OUO Removed | | title = U.S. Nuclear Regulatory Commission Security Inspection Report 05000400/2017403 - OUO Removed | ||
| author name = Shaeffer S | | author name = Shaeffer S | ||
| author affiliation = NRC/RGN-II/DRS/EB2 | | author affiliation = NRC/RGN-II/DRS/EB2 | ||
| addressee name = Hamilton T | | addressee name = Hamilton T | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:May 25, 2017 | ||
==SUBJECT:== | |||
SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2017403 | |||
05000400/2017403 | |||
==Dear Ms. Hamilton:== | ==Dear Ms. Hamilton:== | ||
| Line 31: | Line 28: | ||
The NRC inspectors did not identify and findings or violations of more than minor significance. | The NRC inspectors did not identify and findings or violations of more than minor significance. | ||
This letter will be made available for public inspection and copying at | This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for withholding. | ||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390, in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely, | |||
/RA/ | |||
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety | |||
Scott M. Shaeffer, Chief Engineering Branch 2 | Docket No.: | ||
50-400 License No.: NPF-63 | |||
Enclosure: | |||
Inspection Report No. 05000400/2017403 w/ Attachment: Supplementary Information (Official Use Only - Security Related Information) | |||
cc: (See page 3) cc: | |||
Edward T. ONeil, Director, General Manager Nuclear Protective Services Duke Energy - EC5ZD 526 South Church Street Charlotte, NC 28202 | |||
Linwood Faulk, Director Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2017403 | |||
DISTRIBUTION: | |||
E. Wharton, NSIR N. Simonian, NSIR C. Johnson, NSIR D. Garner, NSIR D. Ditto, NMSS S. Rose, RII J. Dodson, RII, SR PE D. Jackson, RII, PE J. Zeiler, RII, SRI A. Patz, RII, RI S. Price, RII, ORA/RC K. Sloan, RII RIDSNRRDIRS Public (OUO removed) | |||
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: | |||
Yes ACCESSION NUMBER:__ _____________ | |||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS | |||
SIGNATURE MJS6 JJP3 SMS SDR2 SMS | |||
NAME SINGLETARY PATEL SHAEFFER ROSE SHAEFFER | |||
DATE 5/22/2017 5/23/2017 5/25/2017 5/25/2017 5/25/2017 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: | |||
S:\\DRS NEW\\ENG BRANCH 2\\TS INSPECTION INFO\\HARRIS\\2017\\HARRIS 2017403 TS IR.DOCX | |||
}} | }} | ||
Latest revision as of 20:25, 8 January 2025
| ML17151A223 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/25/2017 |
| From: | Scott Shaeffer NRC/RGN-II/DRS/EB2 |
| To: | Hamilton T Duke Energy Progress |
| References | |
| IR 2017403 | |
| Download: ML17151A223 (4) | |
Text
May 25, 2017
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2017403
Dear Ms. Hamilton:
On April 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Shearon Harris Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report (IR).
The NRC inspectors did not identify and findings or violations of more than minor significance.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for withholding.
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390, in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket No.:
50-400 License No.: NPF-63
Enclosure:
Inspection Report No. 05000400/2017403 w/ Attachment: Supplementary Information (Official Use Only - Security Related Information)
cc: (See page 3) cc:
Edward T. ONeil, Director, General Manager Nuclear Protective Services Duke Energy - EC5ZD 526 South Church Street Charlotte, NC 28202
Linwood Faulk, Director Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2017403
DISTRIBUTION:
E. Wharton, NSIR N. Simonian, NSIR C. Johnson, NSIR D. Garner, NSIR D. Ditto, NMSS S. Rose, RII J. Dodson, RII, SR PE D. Jackson, RII, PE J. Zeiler, RII, SRI A. Patz, RII, RI S. Price, RII, ORA/RC K. Sloan, RII RIDSNRRDIRS Public (OUO removed)
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS:
Yes ACCESSION NUMBER:__ _____________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS
SIGNATURE MJS6 JJP3 SMS SDR2 SMS
NAME SINGLETARY PATEL SHAEFFER ROSE SHAEFFER
DATE 5/22/2017 5/23/2017 5/25/2017 5/25/2017 5/25/2017
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:
S:\\DRS NEW\\ENG BRANCH 2\\TS INSPECTION INFO\\HARRIS\\2017\\HARRIS 2017403 TS IR.DOCX