IR 05000324/2017406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17166A412 | | number = ML17166A412 | ||
| issue date = 06/12/2017 | | issue date = 06/12/2017 | ||
| title = | | title = Cyber Security Implementation Inspection Report 05000325/2017406 and 05000324/2017406 | ||
| author name = Shaeffer S | | author name = Shaeffer S | ||
| author affiliation = NRC/RGN-II/DRS/EB2 | | author affiliation = NRC/RGN-II/DRS/EB2 | ||
| addressee name = Brittain A | | addressee name = Brittain A | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:June 12, 2017 | ||
SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 AND 2 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000325/2017406 AND | ==SUBJECT:== | ||
BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 AND 2 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000325/2017406 AND 05000324/2017406 | |||
05000324/2017406 | |||
==Dear Mr. Brittain:== | ==Dear Mr. Brittain:== | ||
| Line 30: | Line 28: | ||
The NRC inspectors did not identify any finding or violation of more than minor significance. | The NRC inspectors did not identify any finding or violation of more than minor significance. | ||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390. In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA | |||
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety | |||
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 | |||
Enclosure: | |||
Inspection Report 05000325/2017406, and 05000324/2017406 w/Attachment: Supplemental Information (OUO) | |||
cc: (See page 3) cc: | |||
Lee Grzeck Manager, Nuclear Regulatory Affairs Brunswick Steam Electric Plant P.O. Box 10429 (M/C BNP04) | |||
Southport, NC 28461-0429 | |||
Mr. Edward T. ONeil General Manager, Nuclear Protective Services Duke Energy Corporation 526 South Church Street (M/C EC5ZD) | |||
Charlotte, NC 28202 | |||
___ ____ | |||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS | |||
SIGNATURE PJB4 JJP3 FJE SMS | |||
NAME P. Braaten J. Patel S. Rose S. Shaeffer | |||
DATE 6/8 /2017 6/8/2017 6/12/2017 6/8&12/2017 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
}} | }} | ||
Latest revision as of 19:10, 8 January 2025
| ML17166A412 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/12/2017 |
| From: | Scott Shaeffer NRC/RGN-II/DRS/EB2 |
| To: | Brittain A Duke Energy Corp |
| References | |
| IR 2017406 | |
| Download: ML17166A412 (4) | |
Text
June 12, 2017
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 AND 2 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000325/2017406 AND 05000324/2017406
Dear Mr. Brittain:
On May 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Brunswick Steam Electric Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Chris Nolan and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390. In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62
Enclosure:
Inspection Report 05000325/2017406, and 05000324/2017406 w/Attachment: Supplemental Information (OUO)
cc: (See page 3) cc:
Lee Grzeck Manager, Nuclear Regulatory Affairs Brunswick Steam Electric Plant P.O. Box 10429 (M/C BNP04)
Southport, NC 28461-0429
Mr. Edward T. ONeil General Manager, Nuclear Protective Services Duke Energy Corporation 526 South Church Street (M/C EC5ZD)
Charlotte, NC 28202
___ ____
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS
SIGNATURE PJB4 JJP3 FJE SMS
NAME P. Braaten J. Patel S. Rose S. Shaeffer
DATE 6/8 /2017 6/8/2017 6/12/2017 6/8&12/2017
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO