| author name = Gray M
| author name = Gray M
| author affiliation = NRC/RGN-I/DRS/EB1
| author affiliation = NRC/RGN-I/DRS/EB1
| addressee name = Stoddard D G
| addressee name = Stoddard D
| addressee affiliation = Dominion Energy, Inc
| addressee affiliation = Dominion Energy, Inc
| docket = 05000336, 05000423
| docket = 05000336, 05000423
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 29, 2017 Mr. Daniel Senior Vice President and Chief Nuclear Officer Dominion Energy, Inc.
{{#Wiki_filter:June 29, 2017


Innsbrook Technical Center 5000 Dominion Blvd. Glen Allen, VA 23060-6711
==SUBJECT:==
 
MILLSTONE POWER STATION, UNITS 2 AND 3 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000336/2017404 AND 05000423/2017404
SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000336/2017404 AND 05000423/2017404


==Dear Mr. Stoddard:==
==Dear Mr. Stoddard:==
On June 8, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security  
On June 8, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Millstone Power Station, Units 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. David Blakeney, Assistant Plant Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.


inspection at your Millstone Power Station, U nits 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. David Blakeney, Assistant Plant Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


report.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


The NRC inspectors did not identify any finding or violation of more than minor significance.
The NRC inspectors did not identify any finding or violation of more than minor significance.


This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire  
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire  


Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely,
/RA/
 
Mel Gray, Chief
 
Engineering Branch 1


Sincerely,/RA/
Division of Reactor Safety  
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety  


Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49  
Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49  


Nonpublic  
Nonpublic Enclosure:
 
Inspection Report 05000336/2017404 and 05000423/2017404 w/Attachment:
Supplementary Information (CONTAINS (OUO-SRI))
 
cc w/encl; w/OUO-SRI R. Hanson, Security Department Manager J. Semancik, Director, CT Dept of Energy and Environmental Protection
 
cc w/o encl; w/o OUO-SRI
 
Distribution via ListServ
 
ML17180A190 (Cover letter)


===Enclosure:===
ADAMS ACCESSION NUMBER: ML17180A159 (Cover letter w/enclosure)
Inspection Report 05000336/2017404 and 05000423/2017404


===w/Attachment:===
Cover Letter:
Supplementary Information (CONTAINS (OUO-SRI))
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available


cc w/encl; w/OUO-SRI R. Hanson, Security Department Manager J. Semancik, Director, CT Dept of Energy and Environmental Protection cc w/o encl; w/o OUO-SRI Distribution via ListServ
Cover Letter w/ Enclosure:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS


ML17180A190 (Cover letter) ADAMS ACCESSION NUMBER: ML17180A159 (Cover letter w/enclosure)
NAME EGray/MOrr for JGreives MGray
Cover Letter: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/  


===Enclosure:===
DATE 6/28/17 6/28/17 6/29/17
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS NAME EGray/MOrr for JGreives MGray DATE 6/28/17 6/28/17 6/29/17
}}
}}

Latest revision as of 18:34, 8 January 2025

Material Control and Accounting Program Inspection Report 05000336/2017404 and 05000423/2017404 (Letter Only)
ML17180A190
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/29/2017
From: Mel Gray
Engineering Region 1 Branch 1
To: Stoddard D
Dominion Energy
Gray M
References
IR 2017404
Download: ML17180A190 (3)


Text

June 29, 2017

SUBJECT:

MILLSTONE POWER STATION, UNITS 2 AND 3 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000336/2017404 AND 05000423/2017404

Dear Mr. Stoddard:

On June 8, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Millstone Power Station, Units 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. David Blakeney, Assistant Plant Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mel Gray, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49

Nonpublic Enclosure:

Inspection Report 05000336/2017404 and 05000423/2017404 w/Attachment:

Supplementary Information (CONTAINS (OUO-SRI))

cc w/encl; w/OUO-SRI R. Hanson, Security Department Manager J. Semancik, Director, CT Dept of Energy and Environmental Protection

cc w/o encl; w/o OUO-SRI

Distribution via ListServ

ML17180A190 (Cover letter)

ADAMS ACCESSION NUMBER: ML17180A159 (Cover letter w/enclosure)

Cover Letter:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available

Cover Letter w/ Enclosure:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS

NAME EGray/MOrr for JGreives MGray

DATE 6/28/17 6/28/17 6/29/17