ML17187A037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17187A037
| number = ML17187A037
| issue date = 08/09/2017
| issue date = 08/09/2017
| title = 04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application (CAC No. MF9747)
| title = Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application
| author name = Sayoc E C
| author name = Sayoc E
| author affiliation = NRC/NRR/DLR/RPGB
| author affiliation = NRC/NRR/DLR/RPGB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000458
| docket = 05000458
| license number =  
| license number =  
| contact person = Sayoc E C
| contact person = Sayoc E
| case reference number = CAC MF9747
| case reference number = CAC MF9747
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 3
| page count = 3
| project = CAC:MF9747
| project = CAC:MF9747
| stage = Other
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2017  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2017 LICENSEE:
 
Entergy Operations, Inc.
LICENSEE: Entergy Operations, Inc.
FACILITY:
FACILITY: River Bend Station
River Bend Station  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION (CAC NO. MF9747) On April 25, 2017, the Nuclear Regulatory Commission (NRC) staff met with members of Entergy Operations, Inc. in a telephone conference call to discuss the license renewal application (LRA) process. A list of attendees is provided in the Enclosure.
==SUMMARY==
During this meeting the NRC staff provided an overview of the License Renewal review process, application requirements, staff recommendations and application of lessons learned, typical review schedule, and conducted coordination of a follow on pre-license renewal application coordination meeting. Presentation slides for this meeting are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML17187A046. During this meeting Entergy agreed to conduct, within a month's time, an overview of the contents of their proposed LRA, a discussion of the application of lessons learned from previous applications, as well as logistical details regarding an LRA submission.  
OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION (CAC NO. MF9747)
 
On April 25, 2017, the Nuclear Regulatory Commission (NRC) staff met with members of Entergy Operations, Inc. in a telephone conference call to discuss the license renewal application (LRA) process. A list of attendees is provided in the Enclosure.
During this meeting the NRC staff provided an overview of the License Renewal review process, application requirements, staff recommendations and application of lessons learned, typical review schedule, and conducted coordination of a follow on pre-license renewal application coordination meeting. Presentation slides for this meeting are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML17187A046. During this meeting Entergy agreed to conduct, within a months time, an overview of the contents of their proposed LRA, a discussion of the application of lessons learned from previous applications, as well as logistical details regarding an LRA submission.
Sincerely,  
Sincerely,  
        /RA/ Emmanuel Sayoc, Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458  
/RA/
Emmanuel Sayoc, Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458  


==Enclosure:==
==Enclosure:==
Attendance List cc w/encl: See next page  
Attendance List cc w/encl: See next page  
 
==SUBJECT:==
SUMMARY OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE    U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND    STATION, LICENSE RENEWAL APPLICATION 


DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpgb Resource RidsNrrDlrRerp Resource RidsNrrPMRiverBendProject Resource RidsOgcMailCenter Resource ----------------------------------------------------- ESayoc, NRR ABilloch, NRR BrianParks, RIV BMaier, RIV  GPick, RIV JKozal, RIV CYoung, RIV MYoung, RIV GWerner, RIV DMcIntyre, OPA VDricks, RIV OPA AMoreno, OCA BBurnell, OPA SBailey NRR BWittick, NRR SBloom, NRR TBuchannan, NRR NMartinez, NRR LRegner, NRR STurk, OGC JSowa, RIV SStuchell, NRR DAlley, NRR DRudland NRR TMartinezNavedo, NRR BBeasley, NRR BRogers, NRR EKeegan, NRR Thomas R. Broussard, tbrous1@entergy.com David Lach, dlach@entergy.com Timothy Schenk, tschenk@entergy.com   
ML17187A037 OFFICE PM:RPGB:DLR LA:RPGB:DLR BC:RPGB:DLR NAME ESayoc YEdmonds S Stuchell DATE 8/3/2017 8/3/2017 8/9/2017


ADAMS Accession No: ML17187A037 OFFICE PM:RPGB:DLR LA:RPGB:DLR BC:RPGB:DLR NAME ESayoc YEdmonds S Stuchell DATE 8/3/2017 8/3/2017 8/9/2017    OFFICIAL RECORD COPY Enclosure MEETING BETWEEN THE NRC STAFF AND ENTERGY OPERATIONS, INC. RIVER BEND STATION LICENSE RENEWAL APPLICATION ROCKVILLE, MARYLAND TELECOM MEETING ATTENDANCE LIST APRIL 25, 2017 PARTICIPANTS AFFILIATIONSSteven Bloom Nuclear Regulatory Commission (NRC)Brian Wittick NRCHeather Jones NRCAllen Hiser NRCThomas Broussard Entergy Operations, Inc. (Entergy) Danny Williamson EntergyRandy Gautreaux EntergyDavid Lach EntergyMark Spinelli EntergyJulie Robinson EntergyAlan Cox EntergyHerbert Rideout Entergy  
Enclosure MEETING BETWEEN THE NRC STAFF AND ENTERGY OPERATIONS, INC.
 
RIVER BEND STATION LICENSE RENEWAL APPLICATION ROCKVILLE, MARYLAND TELECOM MEETING ATTENDANCE LIST APRIL 25, 2017 PARTICIPANTS AFFILIATIONS Steven Bloom Nuclear Regulatory Commission (NRC)
}}
Brian Wittick NRC Heather Jones NRC Allen Hiser NRC Thomas Broussard Entergy Operations, Inc. (Entergy)
Danny Williamson Entergy Randy Gautreaux Entergy David Lach Entergy Mark Spinelli Entergy Julie Robinson Entergy Alan Cox Entergy Herbert Rideout Entergy}}

Latest revision as of 18:24, 8 January 2025

Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application
ML17187A037
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/09/2017
From: Sayoc E
NRC/NRR/DLR/RPGB
To:
Entergy Operations
Sayoc E
References
CAC MF9747
Download: ML17187A037 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2017 LICENSEE:

Entergy Operations, Inc.

FACILITY:

River Bend Station

SUBJECT:

SUMMARY

OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION (CAC NO. MF9747)

On April 25, 2017, the Nuclear Regulatory Commission (NRC) staff met with members of Entergy Operations, Inc. in a telephone conference call to discuss the license renewal application (LRA) process. A list of attendees is provided in the Enclosure.

During this meeting the NRC staff provided an overview of the License Renewal review process, application requirements, staff recommendations and application of lessons learned, typical review schedule, and conducted coordination of a follow on pre-license renewal application coordination meeting. Presentation slides for this meeting are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML17187A046. During this meeting Entergy agreed to conduct, within a months time, an overview of the contents of their proposed LRA, a discussion of the application of lessons learned from previous applications, as well as logistical details regarding an LRA submission.

Sincerely,

/RA/

Emmanuel Sayoc, Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Attendance List cc w/encl: See next page

ML17187A037 OFFICE PM:RPGB:DLR LA:RPGB:DLR BC:RPGB:DLR NAME ESayoc YEdmonds S Stuchell DATE 8/3/2017 8/3/2017 8/9/2017

Enclosure MEETING BETWEEN THE NRC STAFF AND ENTERGY OPERATIONS, INC.

RIVER BEND STATION LICENSE RENEWAL APPLICATION ROCKVILLE, MARYLAND TELECOM MEETING ATTENDANCE LIST APRIL 25, 2017 PARTICIPANTS AFFILIATIONS Steven Bloom Nuclear Regulatory Commission (NRC)

Brian Wittick NRC Heather Jones NRC Allen Hiser NRC Thomas Broussard Entergy Operations, Inc. (Entergy)

Danny Williamson Entergy Randy Gautreaux Entergy David Lach Entergy Mark Spinelli Entergy Julie Robinson Entergy Alan Cox Entergy Herbert Rideout Entergy