ML17201Q528: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (6 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 05/23/2017 | | issue date = 05/23/2017 | ||
| title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1 | | title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1 | ||
| author name = Seymour J | | author name = Seymour J | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = | ||
| Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ES-301 Transient and Event Checklist - Group 1 Form ES-301-5 Facility: | |||
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A | |||
P P | |||
L I | |||
C A | |||
N T | |||
E V | |||
E N | |||
T T | |||
Y P | |||
E Scenarios 2 | |||
3 4 | |||
T O | |||
T A | |||
L M | |||
I N | |||
I M | |||
U M(*) | |||
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P R | |||
I U | |||
RO SRO-I SRO-U SRO-U 1 RX 2 | |||
1 1 | |||
1 0 NOR 1 | |||
1 1 | |||
1 1 I/C 3, 4, 5 3 | |||
4 4 2 MAJ 6 | |||
1 2 | |||
2 1 TS 3, 4, 5 3 | |||
0 2 2 RO SRO-I SRO-U SRO-I 1 RX 2 | |||
3 2 | |||
3 1 | |||
1 0 NOR 1 | |||
1 1 | |||
1 1 I/C 3, 4, 5 1, 2, 4 3, 5 8 | |||
4 4 2 MAJ 6 | |||
5, 7 6 | |||
4 2 | |||
2 1 TS 3, 4 1, 3, 4 5 | |||
0 2 2 RO SRO-I SRO-U RO 1 RX 2 | |||
1 1 | |||
1 0 NOR 3 | |||
1, 2 3 | |||
1 1 1 I/C 5, 7 1, 2, 4 | |||
4, 7 7 | |||
4 4 2 MAJ 6 | |||
5, 7 6 | |||
4 2 | |||
2 1 TS 0 | |||
0 2 2 RO SRO-I SRO-U RO 2 RX 3 | |||
1 1 | |||
1 0 NOR 1, 2 2 | |||
1 1 1 I/C 3, 4, 8 | |||
6, 8 5 | |||
4 4 2 MAJ 6 | |||
5, 7 3 | |||
2 2 1 TS 0 | |||
0 2 2 Instructions: | |||
: 1. | |||
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. | |||
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. | |||
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. | |||
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
ES-301 Transient and Event Checklist - Group 2 Form ES-301-5 Facility: | |||
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A | |||
P P | |||
L I | |||
C A | |||
N T | |||
E V | |||
E N | |||
T T | |||
Y P | |||
E Scenarios 1 | |||
2 4 | |||
T O | |||
T A | |||
L M | |||
I N | |||
I M | |||
U M(*) | |||
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P R | |||
I U | |||
RO SRO-I SRO-U SRO-U 2 RX 0 | |||
1 1 0 NOR 4 | |||
1 1 | |||
1 1 I/C 1, 2, 5 3 | |||
4 4 2 MAJ 6 | |||
1 2 | |||
2 1 TS 1, 3 2 | |||
0 2 2 RO SRO-I SRO-U SRO-I 2 RX 2 | |||
2 2 | |||
1 1 0 NOR 1 | |||
1 1 | |||
1 1 I/C 5, 7 3, 4, 5 5 | |||
4 4 2 MAJ 6 | |||
6 2 | |||
2 2 1 TS 3, 4, 5 3 | |||
0 2 2 RO SRO-I SRO-U SRO-I 3 RX 2 | |||
1 1 | |||
1 0 NOR 4 | |||
1 2 | |||
1 1 1 I/C 1, 2, 7, 8 3, 4, 5 3, 5 9 | |||
4 4 2 MAJ 6 | |||
6 6 | |||
3 2 | |||
2 1 TS 3, 4 2 | |||
0 2 2 RO SRO-I SRO-U RO 3 RX 4 | |||
1 1 | |||
1 0 NOR 1, 2 1, 2 4 | |||
1 1 1 I/C 5 | |||
3, 4, 8 | |||
4, 7 6 | |||
4 4 2 MAJ 6 | |||
6 6 | |||
3 2 | |||
2 1 TS 0 | |||
0 2 2 Instructions: | |||
: 1. | |||
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. | |||
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. | |||
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. | |||
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change | |||
ES-301 Transient and Event Checklist - Group 3 Form ES-301-5 Facility: | |||
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A | |||
P P | |||
L I | |||
C A | |||
N T | |||
E V | |||
E N | |||
T T | |||
Y P | |||
E Scenarios 1 | |||
3 4 | |||
T O | |||
T A | |||
L M | |||
I N | |||
I M | |||
U M(*) | |||
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P R | |||
I U | |||
RO SRO-I SRO-U SRO-I 5 RX 4 | |||
2 2 | |||
1 1 0 NOR 3 | |||
1 2 | |||
1 1 1 I/C 5 | |||
1, 2, 4 | |||
3, 4, 5 7 | |||
4 4 2 MAJ 6 | |||
5, 7 6 | |||
4 2 | |||
2 1 TS 3, 4, 5 3 | |||
0 2 2 RO SRO-I SRO-U SRO-I 6 RX 3 | |||
2 2 | |||
1 1 0 NOR 4 | |||
1 1 | |||
1 1 I/C 1, 2, 7, 8 1, 2, 4 3, 5 9 | |||
4 4 2 MAJ 6 | |||
5, 7 6 | |||
4 2 | |||
2 1 TS 1, 3, 4 3 | |||
0 2 2 RO SRO-I SRO-U SRO-I 7 RX 4 | |||
3 2 | |||
1 1 0 NOR 1, 2 2 | |||
1 1 1 I/C 1, 2, 5 6, 8 4, 7 7 | |||
4 4 2 MAJ 6 | |||
5, 7 6 | |||
4 2 | |||
2 1 TS 1, 3 2 | |||
0 2 2 RO SRO-I SRO-U RX 1 | |||
1 0 NOR 1 | |||
1 1 I/C 4 | |||
4 2 MAJ 2 | |||
2 1 TS 0 | |||
2 2 Instructions: | |||
: 1. | |||
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. | |||
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. | |||
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. | |||
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
ES-301 Transient and Event Checklist - Group 4 Form ES-301-5 Facility: | |||
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A | |||
P P | |||
L I | |||
C A | |||
N T | |||
E V | |||
E N | |||
T T | |||
Y P | |||
E Scenarios 2 | |||
3 T | |||
O T | |||
A L | |||
M I | |||
N I | |||
M U | |||
M(*) | |||
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P S | |||
R O | |||
A T | |||
C B | |||
O P | |||
S R | |||
O A | |||
T C | |||
B O | |||
P R | |||
I U | |||
RO SRO-I SRO-U SRO-U 3 RX 3 | |||
1 1 | |||
1 0 NOR 1, 2 2 | |||
1 1 1 I/C 3, 4, 8 | |||
1, 2, 4 6 | |||
4 4 2 MAJ 6 | |||
5, 7 3 | |||
2 2 1 TS 1, 3, 4 3 | |||
0 2 2 RO SRO-I SRO-U SRO-I 4 RX 2 | |||
3 2 | |||
1 1 0 NOR 1 | |||
1 1 | |||
1 1 I/C 3, 4, 5 6, 8 5 | |||
4 4 2 MAJ 6 | |||
5, 7 3 | |||
2 2 1 TS 3, 4 2 | |||
0 2 2 RO SRO-I SRO-U RO 4 RX 2 | |||
1 1 | |||
1 0 NOR 3 | |||
1 1 | |||
1 1 I/C 5, 7 1, 2, 4 | |||
5 4 | |||
4 2 MAJ 6 | |||
5, 7 3 | |||
2 2 1 TS 0 | |||
0 2 2 RO SRO-I SRO-U RX 1 | |||
1 0 NOR 1 | |||
1 1 I/C 4 | |||
4 2 MAJ 2 | |||
2 1 TS 0 | |||
2 2 Instructions: | |||
: 1. | |||
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. | |||
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. | |||
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. | |||
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}} | |||
Latest revision as of 16:55, 8 January 2025
| ML17201Q528 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/23/2017 |
| From: | Jesse Seymour Operations Branch III |
| To: | Point Beach |
| Shared Package | |
| ML16319A342 | List: |
| References | |
| Download: ML17201Q528 (4) | |
Text
ES-301 Transient and Event Checklist - Group 1 Form ES-301-5 Facility:
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 2
3 4
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U SRO-U 1 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 3, 4, 5 3
4 4 2 MAJ 6
1 2
2 1 TS 3, 4, 5 3
0 2 2 RO SRO-I SRO-U SRO-I 1 RX 2
3 2
3 1
1 0 NOR 1
1 1
1 1 I/C 3, 4, 5 1, 2, 4 3, 5 8
4 4 2 MAJ 6
5, 7 6
4 2
2 1 TS 3, 4 1, 3, 4 5
0 2 2 RO SRO-I SRO-U RO 1 RX 2
1 1
1 0 NOR 3
1, 2 3
1 1 1 I/C 5, 7 1, 2, 4
4, 7 7
4 4 2 MAJ 6
5, 7 6
4 2
2 1 TS 0
0 2 2 RO SRO-I SRO-U RO 2 RX 3
1 1
1 0 NOR 1, 2 2
1 1 1 I/C 3, 4, 8
6, 8 5
4 4 2 MAJ 6
5, 7 3
2 2 1 TS 0
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 2 Form ES-301-5 Facility:
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 4
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U SRO-U 2 RX 0
1 1 0 NOR 4
1 1
1 1 I/C 1, 2, 5 3
4 4 2 MAJ 6
1 2
2 1 TS 1, 3 2
0 2 2 RO SRO-I SRO-U SRO-I 2 RX 2
2 2
1 1 0 NOR 1
1 1
1 1 I/C 5, 7 3, 4, 5 5
4 4 2 MAJ 6
6 2
2 2 1 TS 3, 4, 5 3
0 2 2 RO SRO-I SRO-U SRO-I 3 RX 2
1 1
1 0 NOR 4
1 2
1 1 1 I/C 1, 2, 7, 8 3, 4, 5 3, 5 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 3, 4 2
0 2 2 RO SRO-I SRO-U RO 3 RX 4
1 1
1 0 NOR 1, 2 1, 2 4
1 1 1 I/C 5
3, 4, 8
4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change
ES-301 Transient and Event Checklist - Group 3 Form ES-301-5 Facility:
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
3 4
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U SRO-I 5 RX 4
2 2
1 1 0 NOR 3
1 2
1 1 1 I/C 5
1, 2, 4
3, 4, 5 7
4 4 2 MAJ 6
5, 7 6
4 2
2 1 TS 3, 4, 5 3
0 2 2 RO SRO-I SRO-U SRO-I 6 RX 3
2 2
1 1 0 NOR 4
1 1
1 1 I/C 1, 2, 7, 8 1, 2, 4 3, 5 9
4 4 2 MAJ 6
5, 7 6
4 2
2 1 TS 1, 3, 4 3
0 2 2 RO SRO-I SRO-U SRO-I 7 RX 4
3 2
1 1 0 NOR 1, 2 2
1 1 1 I/C 1, 2, 5 6, 8 4, 7 7
4 4 2 MAJ 6
5, 7 6
4 2
2 1 TS 1, 3 2
0 2 2 RO SRO-I SRO-U RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 4 Form ES-301-5 Facility:
Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 2
3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U SRO-U 3 RX 3
1 1
1 0 NOR 1, 2 2
1 1 1 I/C 3, 4, 8
1, 2, 4 6
4 4 2 MAJ 6
5, 7 3
2 2 1 TS 1, 3, 4 3
0 2 2 RO SRO-I SRO-U SRO-I 4 RX 2
3 2
1 1 0 NOR 1
1 1
1 1 I/C 3, 4, 5 6, 8 5
4 4 2 MAJ 6
5, 7 3
2 2 1 TS 3, 4 2
0 2 2 RO SRO-I SRO-U RO 4 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 5, 7 1, 2, 4
5 4
4 2 MAJ 6
5, 7 3
2 2 1 TS 0
0 2 2 RO SRO-I SRO-U RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.