ML17228A048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document type = Deficiency Correspondence (per 10CFR50.55e and Part 21), Deficiency Report (per 10CFR50.55e and Part 21)
| document type = Deficiency Correspondence (per 10CFR50.55e and Part 21) Deficiency Report (per 10CFR50.55e and Part 21)
| page count = 2
| page count = 2
}}
}}
Line 18: Line 18:


==Subject:==
==Subject:==
Final 10 CFR Part 21.21 Report Mirian Technologies (Canberra), Inc. 800 Research Parkway Meriden, Connecticut 06450
Final 10 CFR Part 21.21 Report Mirian Technologies (Canberra), Inc.
* Name and address of the individual or individuals informing the Commission. Shelia Webb, President -Spectroscopy Division Mirian Technologies (Canberra), Inc. 800 Research Parkway Meriden, CT 06450 swebb@mirion.com 203-639-2563 Toll Free 800-243-4422 Tel. 203-238-2351 www.canberra.com
800 Research Parkway Meriden, Connecticut 06450 Name and address of the individual or individuals informing the Commission.
* Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect. Facility: Fort Calhoun Nuclear Station, Omaha Public Power District Basic Components: Quantity 1, 7068423 Modification Kit for Manual Flow Controller, OPPD PO 00185091, CAN SO 40342 Quantity 2, 602958-001 Relay, Time Delay, OPPD PO 00185167, CAN SO 40197 Quantity 2, 602627-001 Motor, Pumps, OPPD PO 00191479, CAN SO\ 43245
Shelia Webb, President - Spectroscopy Division Mirian Technologies (Canberra), Inc.
* Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect. Mirian Technologies (Canberra), Inc. 800 Research Parkway Meriden, CT 06450
800 Research Parkway Meriden, CT 06450 swebb@mirion.com 203-639-2563 Toll Free 800-243-4422 Tel. 203-238-2351 www.canberra.com Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
* Nature of the defect or failure to comply and the safety hazard which is created or would be created by such defect or failure to comply. These commercial grade items were not properly dedicated. Due to actions taken there is no safety hazard created.
Facility:
* The date on which the information of such defect or failure to comply was obtained. November 06, 2015
Fort Calhoun Nuclear Station, Omaha Public Power District Basic Components: Quantity 1, 7068423 Modification Kit for Manual Flow Controller, OPPD PO 00185091, CAN SO 40342 Quantity 2, 602958-001 Relay, Time Delay, OPPD PO 00185167, CAN SO 40197 Quantity 2, 602627-001 Motor, Pumps, OPPD PO 00191479, CAN SO\\ 43245 Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
* In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part. These components are intended to be used as replacement parts in the Containment Air Radiation Monitoring System, RM-050/051/062, Fort Calhoun Nuclear Station, Omaha Public Power District PAGE 1 of2 CANBERRA MIRION TECHNOLOGIES U.S Nuclear Regulatory Commission Washington, DC 20555-0001 PAGE 2 of2 Mirian Technologies (Canberra), Inc. 800 Research Parkway Meriden, Connecticut 06450 Toll Free 800-243-4422 Tel. 203-238-2351 www.canberra.com
Mirian Technologies (Canberra), Inc.
* The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action. OPPD FTC isolated the parts after notification CANBERRA performed a thorough review of the dedications and provided all available part, testing and QA records to OPPD FTC for their review. OPPD FTC reviewed and approved the dedications. CANBERRA revised its CGDP process for dedications so this type of deficiency will not recur.
800 Research Parkway Meriden, CT 06450 Nature of the defect or failure to comply and the safety hazard which is created or would be created by such defect or failure to comply.
* Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees. No additional advice is provided.
These commercial grade items were not properly dedicated. Due to actions taken there is no safety hazard created.
* In the case of an early site permit, the entities to which an early site permit was transferred. Not applicable Regards, Shelia Webb President, Spectroscopy Division Ref: Interim 10 CFR Part 21.21 Report, January 26, 2016 (ML 16035A254) Cc: Manager -Nuclear Licensing Fort Calhoun Nuclear Station Omaha Public Power District 9610 Power Lane Blair, NE 68008 FCSLicensingMgr@oppd.com CANBERRA}}
The date on which the information of such defect or failure to comply was obtained.
November 06, 2015 In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
These components are intended to be used as replacement parts in the Containment Air Radiation Monitoring System, RM-050/051/062, Fort Calhoun Nuclear Station, Omaha Public Power District PAGE 1 of2 CANBERRA  
 
MIRION TECHNOLOGIES U.S Nuclear Regulatory Commission Washington, DC 20555-0001 PAGE 2 of2 Mirian Technologies (Canberra), Inc.
800 Research Parkway Meriden, Connecticut 06450 Toll Free 800-243-4422 Tel. 203-238-2351 www.canberra.com The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
OPPD FTC isolated the parts after notification CANBERRA performed a thorough review of the dedications and provided all available part, testing and QA records to OPPD FTC for their review.
OPPD FTC reviewed and approved the dedications.
CANBERRA revised its CGDP process for dedications so this type of deficiency will not recur.
Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
No additional advice is provided.
In the case of an early site permit, the entities to which an early site permit was transferred.
Not applicable
: Regards, Shelia Webb President, Spectroscopy Division Ref:
Interim 10 CFR Part 21.21 Report, January 26, 2016 (ML16035A254)
Cc:
Manager - Nuclear Licensing Fort Calhoun Nuclear Station Omaha Public Power District 9610 Power Lane Blair, NE 68008 FCSLicensingMgr@oppd.com CANBERRA}}

Latest revision as of 13:52, 8 January 2025

Final 10 CFR Part 21.21 Report Re Defect of Manual Flow Controller Used at Fort Calhoun Nuclear Station
ML17228A048
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/14/2017
From: Webb S
Mirion Technologies (Canberra)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17228A048 (2)


Text

MIRION TECHNOLOGIES August 14, 2017 U.S Nuclear Regulatory Commission Washington, DC 20555-0001 MSHD.Resource@nrc.gov

Subject:

Final 10 CFR Part 21.21 Report Mirian Technologies (Canberra), Inc.

800 Research Parkway Meriden, Connecticut 06450 Name and address of the individual or individuals informing the Commission.

Shelia Webb, President - Spectroscopy Division Mirian Technologies (Canberra), Inc.

800 Research Parkway Meriden, CT 06450 swebb@mirion.com 203-639-2563 Toll Free 800-243-4422 Tel. 203-238-2351 www.canberra.com Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

Facility:

Fort Calhoun Nuclear Station, Omaha Public Power District Basic Components: Quantity 1, 7068423 Modification Kit for Manual Flow Controller, OPPD PO 00185091, CAN SO 40342 Quantity 2, 602958-001 Relay, Time Delay, OPPD PO 00185167, CAN SO 40197 Quantity 2, 602627-001 Motor, Pumps, OPPD PO 00191479, CAN SO\\ 43245 Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Mirian Technologies (Canberra), Inc.

800 Research Parkway Meriden, CT 06450 Nature of the defect or failure to comply and the safety hazard which is created or would be created by such defect or failure to comply.

These commercial grade items were not properly dedicated. Due to actions taken there is no safety hazard created.

The date on which the information of such defect or failure to comply was obtained.

November 06, 2015 In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

These components are intended to be used as replacement parts in the Containment Air Radiation Monitoring System, RM-050/051/062, Fort Calhoun Nuclear Station, Omaha Public Power District PAGE 1 of2 CANBERRA

MIRION TECHNOLOGIES U.S Nuclear Regulatory Commission Washington, DC 20555-0001 PAGE 2 of2 Mirian Technologies (Canberra), Inc.

800 Research Parkway Meriden, Connecticut 06450 Toll Free 800-243-4422 Tel. 203-238-2351 www.canberra.com The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

OPPD FTC isolated the parts after notification CANBERRA performed a thorough review of the dedications and provided all available part, testing and QA records to OPPD FTC for their review.

OPPD FTC reviewed and approved the dedications.

CANBERRA revised its CGDP process for dedications so this type of deficiency will not recur.

Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

No additional advice is provided.

In the case of an early site permit, the entities to which an early site permit was transferred.

Not applicable

Regards, Shelia Webb President, Spectroscopy Division Ref:

Interim 10 CFR Part 21.21 Report, January 26, 2016 (ML16035A254)

Cc:

Manager - Nuclear Licensing Fort Calhoun Nuclear Station Omaha Public Power District 9610 Power Lane Blair, NE 68008 FCSLicensingMgr@oppd.com CANBERRA