Line 3: Line 3:
| issue date = 08/28/2017
| issue date = 08/28/2017
| title = Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005)
| title = Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005)
| author name = Kennedy S R
| author name = Kennedy S
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Hanson B
| addressee name = Hanson B
Line 9: Line 9:
| docket = 05000289
| docket = 05000289
| license number = DPR-050
| license number = DPR-050
| contact person = Kennedy S R
| contact person = Kennedy S
| document report number = IR 2017005
| document report number = IR 2017005
| document type = Inspection Plan, Letter
| document type = Inspection Plan, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
{{#Wiki_filter:August 28, 2017


KING OF PRUSSIA, PA 19406
==SUBJECT:==
-2713 August 28, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION , UNIT 1 (REPORT 05000289/2017005
UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2017005)
)


==Dear Mr. H anson:==
==Dear Mr. Hanson:==
The enclosed inspection plan lists the inspections scheduled through June 30, 20 19 , for Three Mile Island, Unit 1
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Three Mile Island, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security
-related inspections, which will be sent via separate, non
-publicly available correspondence.


Please contact me at 610-337-5046 with any questions you have regarding this letter.
Please contact me at 610-337-5046 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/
/RA/  
Silas R. Kennedy, Chief Reactor Projects Branch 6


Division of Reactor Projects
Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects  


Docket Nos.
Docket Nos.


50-2 89 License Nos.
50-289 License Nos. DPR-50


DPR-50 Enclosure: Three Mile Island Inspection Plan
Enclosure:
Three Mile Island Inspection Plan  


cc: Distribution via ListServ
cc: Distribution via ListServ  


ML17240A015 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CSafouri/CF SKennedy/SRK DATE 8/22/17 8/28 17 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2017
ML17240A015  
-06/30/2019 Page 1 of 3 08/09/2017 12:56:546/26EXAM-TMI INITIAL OL EXAM 4 1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017TI-191-FUKUSHIMA LESSONS LEARNED 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 07/24/2017 07/28/201771124-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 08/28/2017 09/01/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 08/28/2017 09/01/201771124-HP INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/25/2017 09/29/2017 1 IP Occupational ALARA Planning and Controls71124.02 09/25/2017 09/29/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/25/2017 09/29/2017 1 IP Occupational Dose Assessment71124.04 09/25/2017 09/29/20177111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 10/06/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/06/201711/10/201771124-HP INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1 IP Occupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1 IP Occupational Dose Assessment71124.0411/13/201711/17/2017 1 IP Occupational Exposure Control Effectiveness71151-OR0111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 03/05/2018 03/09/2018 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/05/2018 03/09/2018 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/05/2018 03/09/2018 1 IP Performance Indicator Verification71151 03/05/2018 03/09/201871124-RAD SAFETY INSP 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/12/2018 02/16/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)
6 1 IP Design Bases Assurance Inspection (Teams)7111121M 03/12/2018 03/16/2018 1 IP Design Bases Assurance Inspection (Teams)7111121M 03/26/2018 03/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2017
SUNSI Review
-06/30/2019 Page 2 of 3 08/09/2017 12:56:5471152B-PI&R BIENNIAL 1 1 IP Problem Identification and Resolution71152B 04/30/2018 05/04/2018 1 IP Problem Identification and Resolution71152B 05/14/2018 05/18/201871124-RAD SAFETY INSP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0106/11/2018 06/15/2018 1 IP Occupational ALARA Planning and Controls71124.0206/11/2018 06/15/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0306/11/2018 06/15/2018 1 IP Occupational Dose Assessment71124.0406/11/2018 06/15/201871124-RAD INSTRUMENTATION 1 1 IP Radiation Monitoring Instrumentation71124.05 09/10/2018 09/14/20186/24EXAM-TMI INITIAL OL EXAM 4 1 FY19 TM I EXAM (JUNE 2019)
U01976 05/27/2019 05/31/2019 1 FY19 TM I EXAM (JUNE 2019)
U01976 06/24/2019 06/28/201971124-RAD SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/12/201811/16/2018 1 IP Occupational ALARA Planning and Controls71124.0211/12/201811/16/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/12/201811/16/2018 1 IP Occupational Dose Assessment71124.0411/12/201811/16/2018 1 IP Occupational Exposure Control Effectiveness71151-OR0111/12/201811/16/2018REQUAL-TMI REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program - Annual Review7111111A 03/18/2019 03/22/2019 1 IP Licensed Operator Requalification Program7111111B 03/18/2019 03/22/20197111121N-EQ PROGRAM 3 1 IP Design Bases Assurance Inspection (Programs)7111121N 01/28/2019 02/01/2019 1 IP Design Bases Assurance Inspection (Programs)7111121N02/11/2019 02/15/201971124-RAD SAFETY 01,02,03,04 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0102/11/2019 02/15/2019 1 IP Occupational ALARA Planning and Controls71124.0202/11/2019 02/15/2019 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0302/11/2019 02/15/2019 1 IP Occupational Dose Assessment71124.0402/11/2019 02/15/2019 EP-EP EXERCISE INSPECTION 5 1 IP Exercise Evaluation7111401 05/06/2019 05/10/2019 1 IP Performance Indicator Verification71151 05/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2017
Non-Sensitive
-06/30/2019 Page 3 of 3 08/09/2017 12:56:5471124.07-RAD SAFETY REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 06/10/2019 06/14/2019 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/10/2019 06/14/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Sensitive
 
Publicly Available
 
Non-Publicly Available
 
OFFICE RI/DRP RI/DRP
 
NAME CSafouri/CF SKennedy/SRK
 
DATE 8/22/17 8/2817
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 3 08/09/2017 12:56:54 6/26EXAM
- TMI INITIAL OL EXAM
 
1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017 TI-191
- FUKUSHIMA LESSONS LEARNED
 
1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 07/24/2017 07/28/2017 71124
- REMP
 
1 IP Radiological Environmental Monitoring Program 71124.07 08/28/2017 09/01/2017
 
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 08/28/2017 09/01/2017 71124
- HP INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/25/2017 09/29/2017
 
IP Occupational ALARA Planning and Controls 71124.02 09/25/2017 09/29/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/25/2017 09/29/2017
 
IP Occupational Dose Assessment 71124.04 09/25/2017 09/29/2017 7111108P
- INSERVICE INSPECTION
 
1 IP Inservice Inspection Activities - PWR 7111108P 09/25/2017 10/06/2017 71124.08
- RADWASTE
 
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/06/2017 11/10/2017 71124
- HP INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/13/2017 11/17/2017
 
IP Occupational ALARA Planning and Controls 71124.02 11/13/2017 11/17/2017
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/13/2017 11/17/2017
 
IP Occupational Dose Assessment 71124.04 11/13/2017 11/17/2017
 
IP Occupational Exposure Control Effectiveness 71151-OR01 11/13/2017 11/17/2017 EP
- EP PROGRAM INSPECTION
 
1 IP Alert and Notification System Testing 7111402 03/05/2018 03/09/2018
 
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/05/2018 03/09/2018
 
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/05/2018 03/09/2018
 
IP Performance Indicator Verification 71151 03/05/2018 03/09/2018 71124
- RAD SAFETY INSP
 
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/12/2018 02/16/2018
 
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/12/2018 02/16/2018 7111121M
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
 
1 IP Design Bases Assurance Inspection (Teams)
7111121M 03/12/2018 03/16/2018
 
IP Design Bases Assurance Inspection (Teams)
7111121M 03/26/2018 03/30/2018 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 3 08/09/2017 12:56:54 71152B
- PI&R BIENNIAL
 
1 IP Problem Identification and Resolution 71152B 04/30/2018 05/04/2018
 
IP Problem Identification and Resolution 71152B 05/14/2018 05/18/2018 71124
- RAD SAFETY INSP
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/11/2018 06/15/2018
 
IP Occupational ALARA Planning and Controls 71124.02 06/11/2018 06/15/2018
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/11/2018 06/15/2018
 
IP Occupational Dose Assessment 71124.04 06/11/2018 06/15/2018 71124
- RAD INSTRUMENTATION
 
1 IP Radiation Monitoring Instrumentation 71124.05 09/10/2018 09/14/2018 6/24EXAM
- TMI INITIAL OL EXAM
 
1 FY19 TM I EXAM (JUNE 2019)
U01976 05/27/2019 05/31/2019
 
FY19 TM I EXAM (JUNE 2019)
U01976 06/24/2019 06/28/2019 71124
- RAD SAFETY INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/12/2018 11/16/2018
 
IP Occupational ALARA Planning and Controls 71124.02 11/12/2018 11/16/2018
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/12/2018 11/16/2018
 
IP Occupational Dose Assessment 71124.04 11/12/2018 11/16/2018
 
IP Occupational Exposure Control Effectiveness 71151-OR01 11/12/2018 11/16/2018 REQUAL
- TMI REQUAL INSP WITH P/F RESULTS
 
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 03/18/2019 03/22/2019
 
IP Licensed Operator Requalification Program 7111111B 03/18/2019 03/22/2019 7111121N
- EQ PROGRAM
 
1 IP Design Bases Assurance Inspection (Programs)
7111121N 01/28/2019 02/01/2019
 
IP Design Bases Assurance Inspection (Programs)
7111121N 02/11/2019 02/15/2019 71124
- RAD SAFETY 01,02,03,04
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/11/2019 02/15/2019
 
IP Occupational ALARA Planning and Controls 71124.02 02/11/2019 02/15/2019
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/11/2019 02/15/2019
 
IP Occupational Dose Assessment 71124.04 02/11/2019 02/15/2019 EP
- EP EXERCISE INSPECTION
 
1 IP Exercise Evaluation 7111401 05/06/2019 05/10/2019
 
IP Performance Indicator Verification 71151 05/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 3 of 3 08/09/2017 12:56:54 71124.07
- RAD SAFETY REMP
 
1 IP Radiological Environmental Monitoring Program 71124.07 06/10/2019 06/14/2019
 
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/10/2019 06/14/2019 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 12:47, 8 January 2025

Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005)
ML17240A015
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/28/2017
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Kennedy S
References
IR 2017005
Download: ML17240A015 (5)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2017005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Three Mile Island, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos.

50-289 License Nos. DPR-50

Enclosure:

Three Mile Island Inspection Plan

cc: Distribution via ListServ

ML17240A015

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME CSafouri/CF SKennedy/SRK

DATE 8/22/17 8/2817

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 3 08/09/2017 12:56:54 6/26EXAM

- TMI INITIAL OL EXAM

1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017 TI-191

- FUKUSHIMA LESSONS LEARNED

1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 07/24/2017 07/28/2017 71124

- REMP

1 IP Radiological Environmental Monitoring Program 71124.07 08/28/2017 09/01/2017

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 08/28/2017 09/01/2017 71124

- HP INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/25/2017 09/29/2017

IP Occupational ALARA Planning and Controls 71124.02 09/25/2017 09/29/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/25/2017 09/29/2017

IP Occupational Dose Assessment 71124.04 09/25/2017 09/29/2017 7111108P

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 09/25/2017 10/06/2017 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/06/2017 11/10/2017 71124

- HP INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/13/2017 11/17/2017

IP Occupational ALARA Planning and Controls 71124.02 11/13/2017 11/17/2017

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/13/2017 11/17/2017

IP Occupational Dose Assessment 71124.04 11/13/2017 11/17/2017

IP Occupational Exposure Control Effectiveness 71151-OR01 11/13/2017 11/17/2017 EP

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 03/05/2018 03/09/2018

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/05/2018 03/09/2018

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/05/2018 03/09/2018

IP Performance Indicator Verification 71151 03/05/2018 03/09/2018 71124

- RAD SAFETY INSP

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/12/2018 02/16/2018

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/12/2018 02/16/2018 7111121M

- DESIGN BASES ASSURANCE INSPECTION (TEAM)

1 IP Design Bases Assurance Inspection (Teams)

7111121M 03/12/2018 03/16/2018

IP Design Bases Assurance Inspection (Teams)

7111121M 03/26/2018 03/30/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 3 08/09/2017 12:56:54 71152B

- PI&R BIENNIAL

1 IP Problem Identification and Resolution 71152B 04/30/2018 05/04/2018

IP Problem Identification and Resolution 71152B 05/14/2018 05/18/2018 71124

- RAD SAFETY INSP

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/11/2018 06/15/2018

IP Occupational ALARA Planning and Controls 71124.02 06/11/2018 06/15/2018

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/11/2018 06/15/2018

IP Occupational Dose Assessment 71124.04 06/11/2018 06/15/2018 71124

- RAD INSTRUMENTATION

1 IP Radiation Monitoring Instrumentation 71124.05 09/10/2018 09/14/2018 6/24EXAM

- TMI INITIAL OL EXAM

1 FY19 TM I EXAM (JUNE 2019)

U01976 05/27/2019 05/31/2019

FY19 TM I EXAM (JUNE 2019)

U01976 06/24/2019 06/28/2019 71124

- RAD SAFETY INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/12/2018 11/16/2018

IP Occupational ALARA Planning and Controls 71124.02 11/12/2018 11/16/2018

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/12/2018 11/16/2018

IP Occupational Dose Assessment 71124.04 11/12/2018 11/16/2018

IP Occupational Exposure Control Effectiveness 71151-OR01 11/12/2018 11/16/2018 REQUAL

- TMI REQUAL INSP WITH P/F RESULTS

1 IP Licensed Operator Requalification Program - Annual Review 7111111A 03/18/2019 03/22/2019

IP Licensed Operator Requalification Program 7111111B 03/18/2019 03/22/2019 7111121N

- EQ PROGRAM

1 IP Design Bases Assurance Inspection (Programs)

7111121N 01/28/2019 02/01/2019

IP Design Bases Assurance Inspection (Programs)

7111121N 02/11/2019 02/15/2019 71124

- RAD SAFETY 01,02,03,04

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/11/2019 02/15/2019

IP Occupational ALARA Planning and Controls 71124.02 02/11/2019 02/15/2019

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/11/2019 02/15/2019

IP Occupational Dose Assessment 71124.04 02/11/2019 02/15/2019 EP

- EP EXERCISE INSPECTION

1 IP Exercise Evaluation 7111401 05/06/2019 05/10/2019

IP Performance Indicator Verification 71151 05/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Three Mile Island Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 3 of 3 08/09/2017 12:56:54 71124.07

- RAD SAFETY REMP

1 IP Radiological Environmental Monitoring Program 71124.07 06/10/2019 06/14/2019

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/10/2019 06/14/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.